PerformanceBased Approach to Integrate Pavement Preservation into PMS Sui Tan, MTC, DingXin Cheng, CPPC

Upload: nb4less

Post on 26-Dec-2014

357 views

Category:

Documents


3 download

DESCRIPTION

To achieve accountablility, performance and transparency, local agencies will have to step up to the plate in the new transportation bill.

TRANSCRIPT

Page 1: Performance-Based Approach to Integrate Pavement Preservation into Pavement Management System

Performance‐Based Approach to Integrate Pavement Preservation 

into PMSSui Tan, MTC, DingXin Cheng, CPPC

Page 2: Performance-Based Approach to Integrate Pavement Preservation into Pavement Management System

Outline of Presentation

• Background and Objective• Study Approach• Target Driven vs Traditional• Study Results• Conclusions and Recommendations

Page 3: Performance-Based Approach to Integrate Pavement Preservation into Pavement Management System

Business As Usual ???

• New Transportation Bill focuses on: Performance Accountability Transparency

Page 4: Performance-Based Approach to Integrate Pavement Preservation into Pavement Management System

Investigation Approach

1. Maintain Current Funding Level2. Maintain Current PCI3. State of Good Repair (PCI = 75)

Vs

Fixed Budget

Page 5: Performance-Based Approach to Integrate Pavement Preservation into Pavement Management System

StreetSaver  

Page 6: Performance-Based Approach to Integrate Pavement Preservation into Pavement Management System

Pavement Preservation and Rehabilitation Decision Tree

Functional Class Surface

Condition Category Treatment Type  Treatment

Cost/Sq Yd, 

except Seal 

Cracks in LF:

Yrs Between Crack Seals

Yrs Between Surface Seals

# of Surface Seals before Overlay

Crack Treatment SEAL CRACKS $       1.00  4Surface Treatment SLURRY SEAL $       3.30  8Restoration Treatment

MILL AND THIN OVERLAY $    20.05  3

II ‐ Good Non‐Load Related

RUBBERIZED CHIP SEAL $       7.55  8

III ‐ Good, Load Related

THIN AC OVERLAY                 $    24.95 

IV ‐ PoorTHICK AC OVERLAY                 $    37.25 

V ‐ Very Poor

RECONSTRUCT     STRUCTURE (AC) $    98.75 

I ‐ Very GoodACResidential / Local

Page 7: Performance-Based Approach to Integrate Pavement Preservation into Pavement Management System

Performance Measures

Remaining Service Life Threshold

•Remaining Service Life•Deferred Maintenance•Pavement Condition Index(PCI)

•Min % in Very Good Condition•Max % in Poor Condition

Page 8: Performance-Based Approach to Integrate Pavement Preservation into Pavement Management System

Deferred Maintenance Vs PCI 

Page 9: Performance-Based Approach to Integrate Pavement Preservation into Pavement Management System

Case Study Scenarios

City of San Leandro

1046 sections178 center miles389 lane miles Current Network PCI = 53

City of Pinole

343 sections52 center miles119 lane milesCurrent Network PCI of 68

Page 10: Performance-Based Approach to Integrate Pavement Preservation into Pavement Management System

Maintain Current Funding

City of Pinole (PCI = 68)

City of San Leandro (PCI = 53)

TraditionalPerformance

BasedTraditional

Performance Based

Total Budget

$15.9 mil $14.0 mil $56.3 mil $49.7 mil

% PM 14.1% 18.3% 3.0% 21.8%

Page 11: Performance-Based Approach to Integrate Pavement Preservation into Pavement Management System

Maintain Current Funding

City of Pinole (PCI = 68)

City of San Leandro (PCI = 53)

TraditionalPerformance

BasedTraditional

Performance Based

RSL 19.0 25.5 11.4 11.6

Deferred Maint. $34.6 mil $16.0 mil $226.4 mil $232.2 mil

Page 12: Performance-Based Approach to Integrate Pavement Preservation into Pavement Management System

Maintain Current Funding

Page 13: Performance-Based Approach to Integrate Pavement Preservation into Pavement Management System

Maintain Current Funding

Page 14: Performance-Based Approach to Integrate Pavement Preservation into Pavement Management System

Maintain Current PCI

City of Pinole (PCI = 68)

City of San Leandro (PCI = 53)

TraditionalPerformance

BasedTraditional

Performance Based

Total Budget

$24.0 mil $20.4 mil $120.1 mil $117.0 mil

% PM 15.0% 26.2% 10.0% 11.5%

Page 15: Performance-Based Approach to Integrate Pavement Preservation into Pavement Management System

Maintain Current PCI

City of Pinole (PCI = 68)

City of San Leandro (PCI = 53)

TraditionalPerformance

BasedTraditional

Performance Based

RSL 23.4 23.3 18.2 17.7

Deferred Maint.

$20.3 mil $22.1 mil $138.6 mil $138.6 mil

Page 16: Performance-Based Approach to Integrate Pavement Preservation into Pavement Management System

Maintain Current PCI

Page 17: Performance-Based Approach to Integrate Pavement Preservation into Pavement Management System

Maintain Current PCI

Page 18: Performance-Based Approach to Integrate Pavement Preservation into Pavement Management System

State of Good Repair (PCI=75)

City of Pinole (PCI = 68)

City of San Leandro (PCI = 53)

TraditionalPerformance

BasedTraditional

Performance Based

Total Budget

$29.8 mil $29.7 mil $191.4 mil $194.0 mil

% PM 15.0% 26.1% 15.0% 14.5%

Page 19: Performance-Based Approach to Integrate Pavement Preservation into Pavement Management System

State of Good Repair (PCI=75)

City of Pinole (PCI = 68)

City of San Leandro (PCI = 53)

TraditionalPerformance

BasedTraditional

Performance Based

RSL 25.7 25.7 24.7 24.7

Deferred Maint.

$12.7 mil $8.4 mil $50.1 mil $33.0 mil

Page 20: Performance-Based Approach to Integrate Pavement Preservation into Pavement Management System

State of Good Repair (PCI=75)

Page 21: Performance-Based Approach to Integrate Pavement Preservation into Pavement Management System

State of Good Repair (PCI=75)

Page 22: Performance-Based Approach to Integrate Pavement Preservation into Pavement Management System

Conclusions

• Traditional fixed budget approach needs trial and error 

• Target‐driven approach– Can quickly achieve the target objective – Provide better solutions than the traditional fixed 

budget approach– Has more flexibility in funding levels– Promote cost effective pavement preservation 

treatments– May not yield the best performance measures in all 4 

categories. 

Page 23: Performance-Based Approach to Integrate Pavement Preservation into Pavement Management System

Recommendations

• Target‐driven approach can be improved to a multiple objectives true network optimization

– Fast and reliable– Pavement preservation centric– Accommodate long term analysis– Ease of setting performance measures

Page 24: Performance-Based Approach to Integrate Pavement Preservation into Pavement Management System

ContactDingXin Cheng, Ph.D., P.E. 

Director and Associate ProfessorCalifornia Pavement Preservation Center

California State University, ChicoChico, CA 95929

Tel: (530) 898‐5114Email: [email protected]

Sui Tan, P.E.StreetSaver Program Manager

Metropolitan Transportation CommissionOakland, CA 94607Tel: (510) 817‐5844