o··· sunsi review complete · ccs has the greatest influence on the saltwater interface out of a...

5
~t:? Florida Keys Aqueduct Authority 1100 Kennedy Drive Key West, Florida 33040 Telephone (305) 296-2454 _# P www.fkaa .com I":! ,#' ~~\~~~.o··· October 29, 2019 Mr. Marc Harris, PE Environmental Administrator Industrial Wastewater Section Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, FL. 32399 RE: Florida Power and Light Company .. Turkey Point Power Plant - Wastewater Permit No. FLOOO 1562 Response to FPL Letter to ORCA, dated September 26, 2019 Dear Mr. Harris: J. Robert Dean Chairman District 3 Richard J. Toppino Vice-Chairman District 2 David C. Ritz Secretary/Treasurer District 5 Antoinette M. Appell District 4 Cara Higgins District 1 Kirk C. Zuelch Executive Director The Florida Keys Aqueduct Authority (FKAA) appreciates the opportunity to provide comments, pursuant to the provisions of 62-620.555, Florida Administrative Code, to the referenced draft permit. For 10 years, Florida Power and Light (FPL) has not, as required by Florida Statutes and governing administrative rules, provided reasonable assurances that it has the ability, under continued operation of this wastewater disposal system, to prevent uncontrolled seepage from its Cooling Canal System (CCS) at the Turkey Point facility from continuing to contaminate the Biscayne Aquifer. For that reason, this application for renewal of the Industrial Wastewater (IWW/NPDES) Permit No. LOOO 1562 at the Turkey Point facility does not comply with the applicable provisions of chapter 403, Florida Statutes and the pertinent administrative rules set out in Title 62 of the Florida Administrative Code. It is in recognition of this that FKAA requests that DEP not renew FPL's IWW/NPDES permit as written. Uncontrolled seepage ofhypersaline water from the CCS at the FPL Turkey Point facility is responsible for the presence and westward migration of the hypersaline plume within the Biscayne Aquifer. FPL is now under Consent Orders with both DEP and Miami-Dade County Department of Environmental Resource Management (DERM) to remediate this hypersaline plume. In agreement in principle of both Consent Orders, it is the position of FKAA that: (1) FPL must be required to cease discharge of hypersaline water and all other potential contamination from its CCS into the Biscayne Aquifer whose SUNSI Review Complete Template = ADM-013 E-RIDS=ADM-03 ADD= Eric Oesterie, David Drucker, Kevin Folk, Lois James COMMENT (14) PUBLICATION DATE: 4/4/2019 CITATION # 84 FR 13322

Upload: others

Post on 07-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: o··· SUNSI Review Complete · CCS has the greatest influence on the saltwater interface out of a total of eight factors considered and therefore the saltwater interface is an integral

~t:?

Florida Keys Aqueduct Authority 1100 Kennedy Drive Key West, Florida 33040 Telephone (305) 296-2454 _# P

www.fkaa .com ~

I":! ~ ,#' ~~\~~~.o···

October 29, 2019

Mr. Marc Harris, PE Environmental Administrator Industrial Wastewater Section Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, FL. 32399

RE: Florida Power and Light Company

..

Turkey Point Power Plant - Wastewater Permit No. FLOOO 1562 Response to FPL Letter to ORCA, dated September 26, 2019

Dear Mr. Harris:

J. Robert Dean Chairman District 3

Richard J. Toppino Vice-Chairman District 2

David C. Ritz Secretary/Treasurer District 5

Antoinette M. Appell District 4

Cara Higgins District 1

Kirk C. Zuelch Executive Director

The Florida Keys Aqueduct Authority (FKAA) appreciates the opportunity to provide comments, pursuant to the provisions of 62-620.555, Florida Administrative Code, to the referenced draft permit.

For 10 years, Florida Power and Light (FPL) has not, as required by Florida Statutes and governing administrative rules, provided reasonable assurances that it has the ability, under continued operation of this wastewater disposal system, to prevent uncontrolled seepage from its Cooling Canal System (CCS) at the Turkey Point facility from continuing to contaminate the Biscayne Aquifer. For that reason, this application for renewal of the Industrial Wastewater (IWW /NPDES) Permit No. LOOO 1562 at the Turkey Point facility does not comply with the applicable provisions of chapter 403, Florida Statutes and the pertinent administrative rules set out in Title 62 of the Florida Administrative Code. It is in recognition of this that FKAA requests that DEP not renew FPL's IWW/NPDES permit as written.

Uncontrolled seepage ofhypersaline water from the CCS at the FPL Turkey Point facility is responsible for the presence and westward migration of the hypersaline plume within the Biscayne Aquifer. FPL is now under Consent Orders with both DEP and Miami-Dade County Department of Environmental Resource Management (DERM) to remediate this hypersaline plume. In agreement in principle of both Consent Orders, it is the position of FKAA that: (1) FPL must be required to cease discharge of hypersaline water and all other potential contamination from its CCS into the Biscayne Aquifer whose

SUNSI Review Complete Template = ADM-013 E-RIDS=ADM-03 ADD= Eric Oesterie, David Drucker, Kevin Folk, Lois James

COMMENT (14)PUBLICATION DATE: 4/4/2019CITATION # 84 FR 13322

Page 2: o··· SUNSI Review Complete · CCS has the greatest influence on the saltwater interface out of a total of eight factors considered and therefore the saltwater interface is an integral

Mr. Marc Harris, PE FPL Turkey Point Power Plant IWW/NPDES Permit No. FL0001562 October 29, 2019 Page 2

presence is facilitating further westward migration of the saltwater interface that currently threatens FKAA's municipal potable water supply to Monroe County.

In its letter to the Ocean Reef Community Association (ORCA) dated September 26, 2019 (ORCA Response Letter), FPL asserts that it "has implemented an extensive groundwater, surface water and ecological monitoring network covering Biscayne Bay, Card sound, manmade canals and wetlands surrounding the [Turkey Point] facility" and that the " . . . results from these monitoring points do not support the contention that that the Turkey Point facility has been releasing pollutants and contaminants from the CCS to Biscayne Bay, Card Sound, or the surrounding wetlands and surface waters". It is of note that FPL specifically excludes the Biscayne Aquifer from this assertion in recognition of its own failing to prevent or control uncontrolled seepage from the CCS from contaminating the Biscayne Aquifer. FPL further claims that Best Management Practices will be used to prevent further degradation of the Biscayne Aquifer, but offers no concrete evidence, data or factual support on specifically what means and methods will actually be used to prevent further contamination under the proposed IWW/NPDES permit.

In the ORCA Response Letter, FPL also claims that the hypersaline plume is "a distinctly separate groundwater phenomenon" from the saltwater interface and in doing so, completely ignores the existential threat to FKAA's municipal water supply wellfield. The 2016 FPL Consent Order from FDEP (Consent Order) specifically states in Paragraph 13 that, "the CCS is the major contributing cause to the continuing westward movement of the saline water interface" and specifically obligates FPL to mitigate impacts arising from the influence of the hypersaline plume on the saltwater interface. In support of this goal, FPL conducted a study to allocate relative contributions of various factors on the historical movement of the saltwater interface, the results of which established that hypersalinity in the CCS has the greatest influence on the saltwater interface out of a total of eight factors considered and therefore the saltwater interface is an integral part of the hypersaline plume originating from the CCS. The current location and movement of the saltwater interface is not natural nor is the hypersaline plume a distinctively separate phenomenon, rather it is a direct and ongoing result of CCS operations. In making the claim that the hypersaline plume and the saltwater interface are separate phenomenon, FPL not only contradicts information developed by its own consultants, but also contradicts its own admissions in the Consent Order.

With regard to distances of various salinity tritium contours from the FKAA municipal water supply wellfield, we have attached two diagrams showing recent salinity and tritium data collected from monitoring stations owned and operated by FKAA, DERM, the USGS, and FPL showing that the hypersaline plume extends approximately 2 miles from the CCS (7-8 miles from FKAA wellfield); the saltwater water interface extends 5-6 miles from the CCS (3-4 miles from FKAA wells); and the elevated tritium plume extends 4-5 miles from the CCS (4-5 miles from FKAA wells). These diagrams show a clear relationship between the hypersaline plume, the saline water interface, and the tritium plume originating at the FPL Turkey Point facility

FKAA is also concerned that current freshening activities are inadequate to successfully reduce the overall salinity in the CCS. FPL has previously stated that the elimination of hypersaline conditions in the CCS is critical to the success of reducing the extent of the hypersaline plume; therefore, failure to achieve this goal has risk implications to FKAA's municipal potable water supply wellfield. In the

Page 3: o··· SUNSI Review Complete · CCS has the greatest influence on the saltwater interface out of a total of eight factors considered and therefore the saltwater interface is an integral

Mr. Marc Harris, PE FPL Turkey Point Power Plant IWW/NPDES Permit No. FL0001562 October 29, 2019 Page 3

ORCA Response Letter, FPL acknowledges that failure to meet the freshening goal appears to be a distinct possibility due to the variability of rainfall. The only assurance of success from FPL is to cite the following DEP Consent Order language: "If FPL fails to reach an annual average salinity of at or below 34 PSU by the end of the fourth year of freshening activities, within 30 days of failing to reach the required threshold, FPL shall submit a plan to the Department detailing additional measures, and a timeframe, that FPL will implement to achieve the threshold." Essentially, FPL will remain in compliance with the Consent Order regardless of the success or failure of its remediation efforts and they offer no assurance, reasonable or otherwise, that current operation of the CCS can continue without risk or harm to the environment.

If you have any questions, please contact Kent Nelson, PE at knelson@fkaa .com or at (305) 295-2140.

Sincerely,

Attachments

cc: Allan Stodghill, FDEP Frank Wall, FDEP May Ma, Director, Program Management, USNRC

J. Robert Dean, FKAA Board of Directors Antoinette M. Appell, FKAA Board of Directors David C. Ritz, FKAA Board of Directors Cara Higgins, FKAA Board of Directors Richard J. Toppino, FKAA Board of Directors

Sylvia Murphy, Monroe County Mayor Danny Kolhage, Monroe County Mayor Pro Tern David Rice, Monroe County Commissioner Heather Carruthers, Monroe County Commissioner Michelle Coldiron, Monroe County Commissioner Roman Gastesi, Monroe County Administrator Robert Shillinger, Monroe County Attorney

Gary List, Chairman, ORCA

Page 4: o··· SUNSI Review Complete · CCS has the greatest influence on the saltwater interface out of a total of eight factors considered and therefore the saltwater interface is an integral

....

.... ~ :

.-: ... ·· .•· .. = ·~

•• • TPGW-6D

• ·\ ~ \..\ .1 I ; / TPJ W-7D ':. (i

• FKS-10

"-:-i G-1264

, ..... + ;I:~~: ,~,}·· ; ::!.::1-ss l .. 'Ci,, + ... • .. ·\' \ \ .,.~ ....... .. .

G-3166 FKS-11 ; ,,•~ ••! / t \ _),, , ,a>f.or··· ; . . . : TPGW-8D ,••

FKAA WELLFIELD : •' ; v; ... 4· \ '"1.4

FKS-8 - . & FKS;12 l T l .. ~ '1ij

l>

i : TPGW-G35-58 TPGW-G28-58

,,.~:,, .~ r-,_, : 1:-~/ • FKS4 / /

'• -:, \_ _,. . :. _ f TPGW-40

N ~

TPGW-12D A TPGW-100

~-: 1:2 ~=-- :I,) Q- It) 0

.--L-eg-e-nd _____ l __ _...f;_> _: _T,,.__._ -_--...;...·' ...... ~ -f J ~ 45 12-2014 - Deep Well Salinity Contours (PSU)

\ G • ......

•••••1

FPL Deep Monitor Wells

FKAA SWIM Monitor Wells

USGS 2016 Saltline (= 1,000 mg/L Cl)

USGS 2011 Saltline (= 1,000 mg/L Cl)

USGS 1995 Saltline (= 1,000 mg/L Cl)

Water Science Associates

-20 CONTROL STRUCTURE

-- -- ·--- -=

0 4

\ GRAPHIC SCALE IN MILES

l PROJECT NAME: _FKAA WELLFIELD EVALUATION . . - - ·- - ------------ - - - ~ PROJECT NUMBER: 4116-01 DATE: NOVEMBER 2018 I

MAP SHOWING FKAA WELLFIELD, MONITOR WELLS, AND SALINITY CONTOURS

Page 5: o··· SUNSI Review Complete · CCS has the greatest influence on the saltwater interface out of a total of eight factors considered and therefore the saltwater interface is an integral

~ • FKS-10

" . i : ' -+

• FKS,.~

~

~8

: .. .. .. :·

\~ •. ·~ ·~ TP~W-7D \

. . . ! :

/A G-1264

TPGW-12D

,/ .. .,.,.,.,,

:.··· t;

Gi 164 ; /•~ TPG"':'!iG21;·58

'· ~ ~1 . .... Ks-14 , .. ,~ TPGW-5D N ; : ~ .1.1•~' / 6

., \. # • ,cv 6 G-3166 FKs:11 ; - r ···~-- SI ,... .._ R t .. . ... ., cf

••

FKAA WELLFIELD ~[ ; ;~~-~:~:::) ,• { '

~ ~• FKS--3

t F~!>:~2 / • ) 4 • u -0

/TP- GW~G35-58 TPGWt _;G28-58

Legend

-45-

G

• ...... ......

FKS-5 G-3342 FKS-7 - • • :1t t _ _ • FKS-4

TPGW-9D ; ~. l - - . -- ~ /'-\ ~ . _ _ T' GW-40

D I i i' \ . -cc \_/

03-2015 - Deep Well Tritium Contours (pCi/L)

FPL Deep Monitor Wells

FKAA SWIM Monitor Wells

USGS 2016 Saltline (= 1,000 mg/L Cl)

USGS 2011 Saltline (= 1,000 mg/L Cl)

USGS 1995 Saltline (= 1,000 mg/L Cl)

-:

- - "l; Q ·, - '

lTPG~ -LS-58

,, TPGW-2[!~

-20 CONTROL STRUCTURE

0

_ \ GRAPHIC SCALE IN MILES

Wafer Science Ass c,ates i£'ROJECT NAME:· FKAA WELLFIELD EVALUATiq_N___ --PROJECT NUMBER: 4116-01 DATE: NOVEMBER 2018

MAP SHOWING FKAA WELLFIELD, MONITOR WELLS, AND TRITIUM CONTOURS

N

A

4

I -----j