NGNP-CTF MTECH-TDRM-017 December 2008 Revision 0 NGNP and Hydrogen Production Conceptual Design Study NGNP Technology Development Road Mapping Report Section 17: Integrated Schedule and Cost Estimate APPROVALS Function Printed Name and Signature Date Author Name: Louisa Venter Company: M-Tech Industrial December 2, 2008 Author Name: Werner Koekemoer Company: M-Tech Industrial December 2, 2008 Reviewer Name: Scott Penfield Company: Technology Insights December 2, 2008 Reviewer Name: Dan Allen Company: Technology Insights December 2, 2008 Reviewer Name: Michael Correia Company: Pebble Bed Modular Reactor December 2, 2008 Approval Name: Jan van Ravenswaay Company: M-Tech Industrial December 2, 2008 Westinghouse Electric Company LLC Nuclear Power Plants Post Office Box 355 Pittsburgh, PA 15230-0355 2008 Westinghouse Electric Company LLC All Rights Reserved

Upload: others

Post on 17-Aug-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NGNP-CTF MTECH-TDRM-017 December 2008 Revision 0

NGNP and Hydrogen Production

Conceptual Design Study

NGNP Technology Development Road

Mapping Report

Section 17: Integrated Schedule and Cost

Estimate

APPROVALS

Function Printed Name and Signature Date Author

Name: Louisa Venter Company: M-Tech Industrial

December 2, 2008

Author

Name: Werner Koekemoer Company: M-Tech Industrial

December 2, 2008

Reviewer

Name: Scott Penfield Company: Technology Insights

December 2, 2008

Reviewer

Name: Dan Allen Company: Technology Insights

December 2, 2008

Reviewer

Name: Michael Correia Company: Pebble Bed Modular Reactor

December 2, 2008

Approval

Name: Jan van Ravenswaay Company: M-Tech Industrial

December 2, 2008

Westinghouse Electric Company LLC Nuclear Power Plants Post Office Box 355

Pittsburgh, PA 15230-0355

�2008 Westinghouse Electric Company LLC All Rights Reserved

Page 2: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NGNP-CTF MTECH-TDRM-017 NGNP Technology Development Road Mapping Section 17 : Integrated Schedule and Cost Estimate

NGNP-CTF MTECH-TDRM-017_Rev0.doc 12/5/2008

Page 2 of 89

LIST OF CONTRIBUTORS

Name and Company Date

Johan Markgraaff (M-Tech Industrial (Pty) Ltd.) December 2008

Phil Rittenhouse (Technology Insights) December 2008

George Hayner (Technology Insights) December 2008

Scott Penfield (Technology Insights) December 2008

Dan Allen (Technology Insights) December 2008

Jan van Ravenswaay (M-Tech Industrial (Pty) Ltd.) December 2008

BACKGROUND INTELLECTUAL PROPERTY CONTENT

Section Title Description

N/A

REVISION HISTORY

RECORD OF CHANGES

Revision No. Revision Made by Description Date

A Louisa Venter Werner Koekemoer

Initial Review November 18, 2008

B Louisa Venter Werner Koekemoer

Formal Review November 20, 2008

C Louisa Venter Werner Koekemoer

Document for approval December 3, 2008

0 Louisa Venter Werner Koekemoer

Document for release to WEC December 4, 2008

DOCUMENT TRACEABILITY

Created to Support the Following

Document(s) Document Number Revision

N/A

Page 3: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NGNP-CTF MTECH-TDRM-017 NGNP Technology Development Road Mapping Section 17 : Integrated Schedule and Cost Estimate

NGNP-CTF MTECH-TDRM-017_Rev0.doc 10/27/2008

3 of 89

TABLE OF CONTENTS

Section Title Page

17.1 INTEGRATED TEST SCHEDULE........................................................................... 10

17.1.1 INTRODUCTION.................................................................................................... 10 17.1.2 INTEGRATED TEST SCHEDULE WITH ORIGINAL TDRM SCHEDULE ................. 10 17.1.3 MODIFIED TDRM SCHEDULE ............................................................................ 16 17.1.4 MODIFIED CTF SCHEDULE................................................................................. 23 17.1.5 CONCLUSION ....................................................................................................... 26

17.2 COST ESTIMATE ....................................................................................................... 27

17.2.1 INTRODUCTION.................................................................................................... 27 17.2.2 ASSUMPTIONS AND BASES OF COST ESTIMATIONS ............................................. 27 17.1.2.1 APPLICABILITY TO SCHEDULE............................................................................ 27 17.1.2.2 TRL ADVANCEMENTS......................................................................................... 28 17.1.2.3 CONTINGENCIES AND UNCERTAINTIES .............................................................. 28 17.1.2.4 GENERAL ............................................................................................................. 29 17.2.3 SUMMARY COST: ORIGINAL TDRMS ................................................................ 30 17.2.4 ORIGINAL TDRM COST ESTIMATE (FACILITIES DESCRIPTION AND TOTAL

COST INCLUDED).................................................................................................. 32 17.1.6 CONCLUSION – COST ESTIMATES....................................................................... 42 17.2.5 APPENDIX A: DETAILED COST ESTIMATION SHEETS ....................................... 43 17.2.6 APPENDIX B: REFERENCES ................................................................................ 88

Page 4: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NGNP-CTF MTECH-TDRM-017 NGNP Technology Development Road Mapping Section 17 : Integrated Schedule and Cost Estimate

NGNP-CTF MTECH-TDRM-017_Rev0.doc 10/27/2008

4 of 89

LIST OF TABLES

Table 17-1: The number of loops required in the CTF.................................................................. 26 Table 17-2: Cost ratios for metallic IHX A to IHX B .................................................................... 28 Table 17-3: Summary Cost: Original TDRM................................................................................ 31 Table 17-4: Original TDRM Cost Estimates (Facilities description and total cost included) ......... 33

LIST OF FIGURES

Figure 17-1: Integrated Schedule with original TDRMs ................................................................ 11 Figure 17-2: Modified TDRM Schedule ......................................................................................... 17 Figure 17-3: Modified CTF Schedule - 950°C case......................................................................... 24 Figure 17-4: Modified CTF Schedule - 750°C case......................................................................... 25

Page 5: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NGNP-CTF MTECH-TDRM-017 NGNP Technology Development Road Mapping Section 17 : Integrated Schedule and Cost Estimate

NGNP-CTF MTECH-TDRM-017_Rev0.doc 10/27/2008

5 of 89

ACRONYMS

Acronym Definition

AI Inner Annulus (active cooling piping) AMS Activity Measurement System ANL Argonne National Laboratory AO Outer Annulus (active cooling piping) AOO Anticipated Operational Occurrence AS Automation System ASME American Society of Mechanical Engineers AVR Arbeitsgemeinschaft Versuchs-Reaktor BNL Brookhaven National Laboratory BOP Balance of Plant BUMS Burn-up Measurement System CB Core Barrel CCS Core Conditioning System CEA Commissariat à l'Énergie Atomique CFD Computational Fluid Dynamics CHE Compact Heat Exchanger CIP Core Inlet Pipe CO2 Carbon Dioxide COC Core Outlet Connection COP Core Outlet Pipe COTS Commercial Off The Shelf CRADA Co-operative Research and Development Agreement CRD Control Rod Drive CSC Core Structure Ceramics CSIR Council for Scientific Industrial Research CTF Component Test Facility CTF Component Test Facility CUD Core Unloading Devices DAU Data Acquisition Unit DBA Design Base Accident DBE Design Base Event DDN Design Data Need DFC Depressurized Forced Cooling DLOFC De-pressurized Loss of Forced Cooling DOE Department of Energy DPP Demonstration Power Plant DRL Design Readiness Level DWS Demineralized Water System ELE Elecrolyser System EM Evaluation Model EMB Electomagnetic Bearing EOFY End of Fiscal Year EPCC Equipment Protection Cooling Circuit

Page 6: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NGNP-CTF MTECH-TDRM-017 NGNP Technology Development Road Mapping Section 17 : Integrated Schedule and Cost Estimate

NGNP-CTF MTECH-TDRM-017_Rev0.doc 10/27/2008

6 of 89

Acronym Definition

EPCT Equipment Protection Cooling Tower F&OR Functional and Operational Requirements FHS Fuel Handling System FHSS Fuel Handling and Storage System FIMA Fissions per Initial Metal Atoms FMECA Failure Modes, Effects and Criticality Analysis FS Fuel Spheres FTA Fault Tree Analysis FUS Feed and Utility System H2 Hydrogen H2SO4 Sulfuric Acid HC Helium Circulator He Helium HETP Height Equivalent of the theoretical Plate HGD Hot Gas Duct HI Hydro-Iodic HLW High Level Waste HPB Helium Pressure Boundary HPC High Pressure Compressor HPS Helium Purification System HPS Hydrogen Production System HPT High Pressure Turbine HPU Hydrogen Production Unit HRS Heat Removal System HTF Helium Test Facility HTGR High Temperature Gas-Cooled Reactor HTR High Temperature Reactor HTS Heat Transport System HTSE High Temperature Steam Electrolysis HTTR High Temperature Test Reactor HVAC Heating Ventilation and Air Conditioning HX Heat Exchanger HyS Hybrid Sulfur I&C Instrumentation and Control I2 Iodine ID Inner Diameter IHX Intermediate Heat Exchanger ILS Integrated Laboratory Scale I-NERI International Nuclear Energy Research Initiative INL Idaho National Laboratory INL Idaho National Laboratory IPT Intermediate Pressure Turbine ISR Inner Side Reflector K-T Kepner-Tregoe

Page 7: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NGNP-CTF MTECH-TDRM-017 NGNP Technology Development Road Mapping Section 17 : Integrated Schedule and Cost Estimate

NGNP-CTF MTECH-TDRM-017_Rev0.doc 10/27/2008

7 of 89

Acronym Definition

KTA German nuclear technical committee LANL Los Alamos National Laboratory LEU Low Enriched Uranium LOFC Loss of Forced Cooling LPT Low Pressure Turbine MES Membrane-electrode assembly MTR Material Test Reactor NAA Neutron Activation Analysis NCS Nuclear Control System NGNP Next Generation Nuclear Plant NHI Nuclear Hydrogen Initiative NHS Nuclear Heat Supply NHSS Nuclear Heat Supply System NNR National Nuclear Regulator NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter ORNL Oak Ridge National Laboratory PBMR Pebble Bed Modular Reactor PCC Power Conversion System PCDR Pre-Conceptual Design Report PCHE Printed Circuit Heat Exchanger PCHX Process Coupling Heat Exchanger PCS Power Conversion System PFHE Plate Fin Heat Exchanger PHTS Primary Heat Transport System PIE Post-irradiation Examination PLOFC Pressurized Loss of Forced Cooling POC Power Conversion System PPM Parts per million PPU Product Purification Unit PPWC Primary Pressurized Water Cooler QA Quality Assurance RAMI Reliability, Availability, Maintainability and Inspectability RC Reactor Cavity RCCS Reactor Cavity Cooling System RCS Reactivity Control System RCSS Reactivity Control and Shutdown System RDM Rod Drive Mechanism RIM Reliability and Integrity Management RIT Reactor Inlet Temperature RM Road Map ROT Reactor Outlet Temperature RPS Reactor Protection System

Page 8: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NGNP-CTF MTECH-TDRM-017 NGNP Technology Development Road Mapping Section 17 : Integrated Schedule and Cost Estimate

NGNP-CTF MTECH-TDRM-017_Rev0.doc 10/27/2008

8 of 89

Acronym Definition

RPT Report RPV Reactor Pressure Vessel RS Reactor System RSS Reserve Shutdown System RUS Reactor Unit System SAD Acid Decomposition System SAR Safety Analysis Report SAS Small Absorber Spheres SG Steam Generator SHTS Secondary Heat Transport System S-I Sulfur Iodine SiC Silicon Carbide SNL Sandia National Laboratory SO2 Sulfur Dioxide SOE Sulfuric Oxide Electrolyzers SOEC Sulfuric Oxide Electrolyzers Cells SR Side Reflector SSC System Structure Component SSCs Systems, Structures and Components SSE Safe Shutdown Earthquake SUD Software Under Development TBC To Be Confirmed TBD To Be Determined TDL Technology Development Loop (As incorporated in Concept 1) TDRM Technology Development Road Map TER Test Execution Report THTR Thorium High Temperature Reactor TRISO Triple Coated Isotropic TRL Technology Readiness Level TRM Technology Road Map UCO Uranium Oxycarbide UO2 Uranium Dioxide USA. United States of America V&V Verification and Validation V&Ved Verified and Validated VLE Vapor-Liquid Equilibrium WBS Work Breakdown Structure WEC Westinghouse Electric Company

Page 9: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NGNP-CTF MTECH-TDRM-017 NGNP Technology Development Road Mapping Section 17 : Integrated Schedule and Cost Estimate

NGNP-CTF MTECH-TDRM-017_Rev0.doc 10/27/2008

9 of 89

SUMMARY AND CONCLUSIONS

In this section, the integrated Technology Development Road Maps (TDRMs) schedule is

provided for the WEC NGNP Critical SSCs, together with cost estimates for certain critical Systems, Structures and Components (SSC’s).

The cost and schedule of the NGNP evolves continuously as the project progresses due to

high uncertainties associated with technology advancements, evolving test plans and schedules, timely availability of resources, etc. Therefore this document presents detailed schedules which include the following:

• Integrated Test Schedule with original TDRM Schedule – Inclusive of the overall NGNP schedule, the original TDRM schedules for critical SSC’s as well as the CTF high level schedule.

• Modified TDRM Schedule - The main purpose of the modified TDRM schedule is to move back non-critical tasks in order to relieve pressure on the front end of the schedule. This was done without jeopardizing CTF and NGNP start up dates. Also shown in this schedule is the total estimated cost per specification with possible testing facilities identified.

• Modified CTF Schedule – Schedules of CTF specific tasks were outlined for the 950°C Reactor Outlet Temperature (ROT) case (inclusive of Small Scale Development Tests (SSDT), Technology Development Loops (TDL), Component Qualification Loops (CQL) and Circulator Test Loop (CTL)) as well as for the 750°C ROT case. Results and conclusions for the above mentioned scenarios are given in Section 17.1.5.

Cost estimates are provided for certain critical SSCs (notably IHX A (metallic as well as ceramic), IHX B and HTS Piping). Estimates have only been provided only up to a TRL rating of 5. Estimates for higher TRL advancements can only be provided when additional design information (preliminary or final) pertaining to the NGNP and its components becomes available. For some of the SSCs, more design information is required in order to develop reliable cost estimates (notably PHTS Circulator, SHTS Mixing Chamber and Steam Generator). Trade studies (or various trade studies) need to be done to verify and determine the specific combinations of sub-components that will be used in the aforementioned SSCs. There is enough time in the modified schedule to perform the trade studies before the advancement of the TRLs and before possible testing in the CTF will be performed. Costing input relating to the HPS, as noted in the Hydrogen Plant Alternatives Study (HPAS), has also been incorporated into this document.

The bases for all estimates given are noted in Appendix A of this document.

Page 10: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NGNP-CTF MTECH-TDRM-017 NGNP Technology Development Road Mapping Section 17 : Integrated Schedule and Cost Estimate

NGNP-CTF MTECH-TDRM-017_Rev0.doc 10/27/2008

10 of 89

17.1 INTEGRATED TEST SCHEDULE

17.1.1 Introduction

In this section, the integrated schedule for the Technology Development Road Maps (TDRMs) addressing the WEC NGNP Critical SSCs is provided. This schedule, Figure 17-1, is bounded by the CTF schedule [17-2] showing a CTF operational date of 2014 and the WEC Next Generation Nuclear Plant (NGNP) Demonstration Plant schedule [17-1] showing a NGNP start up date of 2021.

The schedule was prepared in Microsoft Project to get an overall impression of the

anticipated schedules for the Test Specifications provided in the Technology Development Road Maps.

All of the Test Specifications and their original dates, as stated in Sections 3 to 16, are

indicated in the TDRM Schedule Section of the Integrated Test Schedule. This schedule was then modified to accommodate the Small Scale Development Tests (SSDT), an assumed CTF Initial Operational Date of March 2014 (when the first TDL can be assumed to be finished) and the NGNP Initial Operational Date of FY 2021. The resulting modified schedule is given in Figure 17-2.

The CTF schedule with the above mentioned modified Test Specification Schedule

incorporated can be seen in Figure 17-3. The following Critical SSCs are included in the TDRM schedule:

• PHTS Circulator (including the SHTS Circulator and Valve) • IHX A – Metallic and Ceramic • IHX B • HTS Piping • SHTS Flow Mixing Chamber • Hydrogen Production System • Power Conversion system Steam Generator • Fuel Elements • Core Structure Ceramics • Reserve Shutdown System • Reactivity Control System • Core Conditioning System • Reactor Cavity Cooling System

17.1.2 Integrated Test Schedule with Original TDRM Schedule The integrated Test Schedule given in Figure 17-1 includes the NGNP Schedule, the original TDRM Schedules, as in Section 3 – Section 16 in the previous report sections, and the CTF High Level Schedule.

Page 11: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

IDN

otes

Tas

k N

ame

1A

: N

GN

P S

ched

ule

2T

ech

no

log

y D

evel

op

men

t3

Pre

-Pro

duct

ion

Fue

l Irr

adia

tion

Pro

gram

4P

rodu

ctio

n F

uel I

rrad

iatio

n

5In

itial

Gra

phite

Irra

diat

ion

6E

xten

ded

Gra

phite

Irra

diat

ion

7M

etal

lic IH

X D

evel

opm

ent

8H

ydro

gen

Pro

duct

ion

Fac

ility

9P

ower

Con

vers

ion

Fac

ility

10N

ucl

ear

Hea

t S

up

ply

Fac

ility

, Po

wer

Co

nve

rsio

n F

acili

ty &

Bal

ance

of

Pla

nt

11C

once

ptua

l Des

ign

12C

ompl

etio

n of

NH

SF

, PC

F &

BO

P C

once

ptua

l Des

ign

13P

relim

inar

y D

esig

n

14C

ompl

etio

n of

NH

SF

, PC

F &

BO

P P

relim

inar

y D

esig

n

15F

inal

Des

ign

16A

ppro

ve S

tart

of C

onst

ruct

ion

17C

ompl

etio

n of

NH

SF

, PC

F &

BO

P F

inal

Des

ign

and

afte

r re

ceip

t of N

RD

Ear

ly S

ite P

erm

it D

ecis

ion

18A

cqui

sitio

n S

trat

egie

s/ L

ong

lead

Pro

cure

men

t

19S

itew

ork/

BO

P

20L

icen

sin

g21

ES

P/L

WA

App

licat

ion

Sub

mitt

ed

22C

onst

ruct

ion

(Nuc

lear

)

23C

OL

App

licat

ion

Sub

mitt

ed

24S

tart

up &

Tes

ting

25C

omm

erci

al O

pera

tion

& In

spec

tion

26E

SP

Pre

para

tion

27N

RC

ES

P R

evie

w

28C

OL

Per

mit

Issu

ed

29C

OL

App

licat

ion

30N

RC

CO

L R

evie

w

31H

ydro

gen

Pro

du

ctio

n F

acili

ty32

Con

cept

ual D

esig

n

33C

ompl

etio

n of

HP

F C

once

ptua

l Des

ign

34D

esig

n S

uppo

rt D

urin

g T

ech

Dev

elop

men

t

35P

relim

inar

y D

esig

n

36C

ompl

etio

n of

HP

F "

Fro

nt E

nd"

desi

gn p

acka

ge

37F

inal

Des

ign

38S

ucce

ssfu

l res

olut

ion

of D

OE

com

men

ts o

n H

PF

"F

ront

End

", d

esig

n pa

ckag

e.

39C

ompo

nent

Dev

elop

men

t

40D

ecom

pose

r P

ilot T

estin

g

41A

cqui

sitio

n S

trat

egie

s/Lo

ng L

ead

Pro

cure

men

t

42E

lect

roly

zer

Pilo

t Tes

ting

43C

onst

ruct

ion

44S

tart

up &

Tes

ting

45C

omm

erci

al O

pera

tion

& In

spec

tion

46 47B

: T

DR

M R

oad

Map

s (O

rig

inal

Sch

edu

le)

48C

ircu

lato

r49

TR

L 6

- T

RL

7

50O

rigin

al S

ched

ule

in T

DR

M

51W

EC

-TS

-CIR

C-0

01E

MB

s, c

atch

er b

earin

gs T

est S

peci

ficat

ion

52W

EC

-TS

-CIR

C-0

02H

eliu

m R

otat

ing

seal

s T

est S

peci

ficat

ion

53W

EC

-TS

-CIR

C-0

03P

artia

l or

Ful

l sca

le c

ircul

ator

Mod

el T

est S

peci

ficat

ion

54T

RL

7 -

TR

L 8

55O

rigin

al S

ched

ule

in T

DR

M

56W

EC

-TS

-CIR

C-0

04P

roto

type

circ

ulat

or T

est S

peci

ficat

ion

57IH

X A

(M

etal

lic)

58T

RL

2 -

TR

L 3

59O

rigin

al S

ched

ule

in T

DR

M

CT

F In

itial

Ope

ratin

gN

GN

P In

itial

Ope

ratin

g

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

Tas

k

Spl

it

Pro

gres

s

Mile

ston

e

Sum

mar

y

Pro

ject

Sum

mar

y

Ext

erna

l Tas

ks

Ext

erna

l Mile

ston

e

Dea

dlin

e

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng

TD

RM

-017

_6.m

pp

Fig

ure

17-

1: I

nte

gra

ted

Sch

edu

leF

ri 08

/12/

05

Pro

ject

: Pro

ject

1D

ate:

Fri

08/1

2/05

Page 12: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

IDN

otes

Tas

k N

ame

60W

EC

-TS

-IH

XA

-001

Allo

y 61

7 M

ater

ial S

peci

ficat

ion

and

proc

urem

ent

61W

EC

-TS

-IH

XA

-002

Allo

y 61

7 Jo

inin

g T

echn

olog

y an

d R

esul

tant

Pro

pert

ies

62W

EC

-TS

-IH

XA

-003

The

rmal

/phy

sica

l and

mec

hani

cal p

rope

rtie

s of

Allo

y 61

7

63W

EC

-TS

-IH

XA

-004

Effe

cts

of th

erm

al A

ging

and

env

ironm

ent o

n A

lloy

617

64W

EC

-TS

-IH

XA

-005

Effe

cts

of G

rain

siz

e an

d se

lect

ion

thic

knes

s on

Allo

y 61

7 pr

oper

ties

65W

EC

-TS

-IH

XA

-006

Cor

rosi

on A

llow

ance

s fo

r A

lloy

617

66T

RL

3 -

TR

L 4

67O

rigin

al S

ched

ule

in T

DR

M

68W

EC

-TS

-IH

XA

-007

AS

ME

sec

tion

III C

ode

Cas

e fo

r A

lloy

617

69W

EC

-TS

-IH

XA

-008

The

rmal

/Flu

id M

odel

ing

Met

hods

for

Met

allic

IHX

A

70W

EC

-TS

-IH

XA

-009

Met

hods

for

stre

ss/s

trai

n m

odel

ing

of m

etal

lic IH

X A

71W

EC

-TS

-IH

XA

-010

Crit

eria

for

stru

ctur

al in

tegr

ity o

f IH

X A

72W

EC

-TS

-IH

XA

-011

Per

form

ance

Mod

elin

g M

etho

ds fo

r IH

X A

73T

RL

4 -

TR

L 5

74O

rigin

al S

ched

ule

in T

DR

M

75W

EC

-TS

-IH

XA

-12

Spe

cific

atio

n of

test

ing

of u

nit c

ell o

f com

pact

Hea

t Exc

hang

ers

76T

RL

5 -

TR

L 6

77O

rigin

al S

ched

ule

in T

DR

M

78W

EC

-TS

-IH

XA

-013

Spe

cific

atio

n of

test

ing

of c

ompa

ct h

eat e

xcha

nger

mod

ule

(1.2

MW

)

79W

EC

-TS

-IH

XA

-014

AS

ME

Sec

tion

III C

ode

Cas

e fo

r C

ompa

ct H

eat E

xcha

nger

Des

igns

80T

RL

6 -

TR

L 7

81O

rigin

al S

ched

ule

in T

DR

M

82W

EC

-TS

-IH

XA

-015

She

ll S

ide

Flo

w D

istr

ibut

ion

and

Byp

ass

Leak

age

Tes

ting

83W

EC

-TS

-IH

XA

-016

Mul

ti-m

odul

e H

eat T

rans

fer

Tes

ting

84T

RL

7 -

TR

L 8

85O

rigin

al S

ched

ule

in T

DR

M

86W

EC

-TS

-IH

XA

-017

Spe

cific

atio

n of

test

ing

of a

full

scal

e co

mpa

ct H

eat E

xcha

nger

s

87IH

X A

(C

eram

ic)

88T

RL

2 -

TR

L 3

89O

rigin

al S

ched

ule

in T

DR

M

90W

EC

-TS

-IH

XA

-018

Tra

de s

tudy

on

Can

dida

te C

eram

ic M

ater

ial f

or IH

X A

91W

EC

-TS

-IH

XA

-019

Tra

de s

tudy

on

Can

dida

te C

eram

ic D

esig

ns fo

r IH

X A

92T

RL

3 -

TR

L 4

93O

rigin

al S

ched

ule

in T

DR

M

94W

EC

-TS

-IH

XA

-020

Cer

amic

IHX

Det

aile

d D

esig

n D

ata

Nee

ds (

DD

Ns)

95W

EC

-TS

-IH

XA

-021

Cer

amic

Mat

eria

ls S

peci

ficat

ions

and

Pro

cure

men

t

96W

EC

-TS

-IH

XA

-022

The

rmal

Phy

sica

l Pro

pert

ies

of C

eram

ics

97W

EC

-TS

-IH

XA

-023

Mec

hani

cal P

rope

rtie

s of

Cer

amic

s

98W

EC

-TS

-IH

XA

-024

Com

patib

ility

of C

eram

ic M

ater

ials

to N

GN

P H

e en

viro

nmen

t

99W

EC

-TS

-IH

XA

-025

Man

ufac

turin

g T

echn

olog

ies

for

Cer

amic

Hea

t Exc

hang

ers

100

TR

L 4

- T

RL

5

101

Orig

inal

Sch

edul

e in

TD

RM

102

WE

C-T

S-I

HX

A-0

26C

eram

ic M

ater

ials

Cod

es a

nd S

tand

ards

103

WE

C-T

S-I

HX

A-0

27M

etho

ds fo

r T

herm

al/F

luid

and

Str

ess/

Str

ain

Mod

elin

g

104

WE

C-T

S-I

HX

A-0

28S

truc

tura

l Int

egrit

y C

riter

ia fo

r C

eram

ic H

eat E

xcha

nger

s

105

WE

C-T

S-I

HX

A-0

29P

erfo

rman

ce M

odel

ing

of C

eram

ic H

eat E

xcha

nger

s

106

WE

C-T

S-I

HX

A-0

30T

estin

g of

uni

t cel

l of C

ompa

ct H

eat E

xcha

nger

107

TR

L 5

- T

RL

6

108

Orig

inal

Sch

edul

e in

TD

RM

109

WE

C-T

S-I

HX

A-0

31S

peci

ficat

ions

of t

estin

g of

uni

t cel

ls o

f com

pact

Hea

t Exc

hang

er M

odul

e (1

.2M

W)

110

WE

C-T

S-I

HX

A-0

32A

SM

E C

ode

Cas

e fo

r C

eram

ic C

ompa

ct H

eat E

xcha

nger

Des

ign

111

TR

L 6

- T

RL

7

112

Orig

inal

Sch

edul

e in

TD

RM

113

WE

C-T

S-I

HX

A-0

33S

hell-

side

Flo

w D

istr

ibut

ion

and

Byp

ass

Leak

age

Tes

ting

114

WE

C-T

S-I

HX

A-0

34M

ulti-

mod

e H

eat T

rans

fer

Tes

ting

115

TR

L 7

- T

RL

8

116

Orig

inal

Sch

edul

e in

TD

RM

117

WE

C-T

S-I

HX

A-0

35S

peci

ficat

ions

of t

estin

g of

a fu

ll sc

ale

com

pact

Hea

t Exc

hang

er

118

IHX

B11

9T

RL

3 -

TR

L 4

: A

lloy

800

H M

ater

ial S

pec

ific

atio

n a

nd

Pro

cure

men

t

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

Tas

k

Spl

it

Pro

gres

s

Mile

ston

e

Sum

mar

y

Pro

ject

Sum

mar

y

Ext

erna

l Tas

ks

Ext

erna

l Mile

ston

e

Dea

dlin

e

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng

TD

RM

-017

_6.m

pp

Fig

ure

17-

1: I

nte

gra

ted

Sch

edu

leF

ri 08

/12/

05

Pro

ject

: Pro

ject

1D

ate:

Fri

08/1

2/05

Page 13: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

IDN

otes

Tas

k N

ame

120

Orig

inal

Sch

edul

e in

TD

RM

121

WE

C-T

S-I

HX

B-0

01A

lloy

800H

Mat

eria

l Spe

cific

atio

n an

d P

rocu

rem

ent

122

WE

C-T

S-I

HX

B-0

02D

atab

ase

for

Bra

zed

and

Diff

usio

n B

onde

d A

lloy

800H

123

WE

C-T

S-I

HX

B-0

03A

lloy

800H

Hig

h T

empe

ratu

re M

ater

ial P

rope

rtie

s

124

WE

C-T

S-I

HX

B-0

04E

ffect

s of

The

rmal

Agi

ng a

nd E

nviro

nmen

t on

Allo

y 80

0H P

rope

rtie

s

125

WE

C-T

S-I

HX

B-0

05E

ffect

s of

Env

ironm

enta

l Exp

osur

e on

Allo

y 80

0H B

raze

and

Diff

usio

n B

onde

d Jo

ints

126

WE

C-T

S-I

HX

B-0

06E

ffect

s of

Gra

in S

ize

and

Sec

tion

Thi

ckne

ss o

n A

lloy

800H

Pro

pert

ies

127

WE

C-T

S-I

HX

B-0

07C

orro

sion

Allo

wan

ces

for

Allo

y 80

0H

128

WE

C-T

S-I

HX

B-0

08T

herm

al/F

luid

Mod

elin

g M

etho

ds fo

r IH

X B

129

WE

C-T

S-I

HX

B-0

09M

etho

ds fo

r S

tres

s/S

trai

n M

odlin

g of

IHX

B

130

WE

C-T

S-I

HX

B-0

10C

riter

ia fo

r S

truc

tura

l Int

ergr

ity o

f IH

X B

131

WE

C-T

S-I

HX

B-0

11P

erfo

rman

ce M

odel

ing

Met

hods

for

IHX

B

132

TR

L 4

- T

RL

5:

Dat

abas

e fo

r B

raze

d a

nd

Dif

fusi

on

Bo

nd

ed A

lloy

800H

133

Orig

inal

Sch

edul

e in

TD

RM

134

WE

C-T

S-I

HX

B-0

12T

estin

g of

Uni

t Cel

l of C

ompa

ct H

eat E

xcha

nger

135

TR

L 5

- T

RL

6

136

Orig

inal

Sch

edul

e in

TD

RM

137

WE

C-T

S-I

HX

B-0

13T

estin

g of

inte

grat

ed c

ompa

ct H

eat E

xcha

nger

138

WE

C-T

S-I

HX

B-0

14A

SM

E II

I Cod

e C

ase

for

Mea

tllic

Com

pact

Hea

t Exc

hang

er D

esig

n

139

TR

L 6

- T

RL

7

140

Orig

inal

Sch

edul

e in

TD

RM

141

WE

C-T

S-I

HX

B-0

15S

hell-

side

Flo

w D

istr

ibut

ion

and

Byp

ass

Leak

age

Tes

ting

142

WE

C-T

S-I

HX

B-0

16M

ulti-

mod

e H

eat T

rans

fer

Tes

ting

143

TR

L 7

- T

RL

8

144

Orig

inal

Sch

edul

e in

TD

RM

145

WE

C-T

S-I

HX

B-0

17T

estin

g of

full

size

Com

pact

Hea

t Exc

hang

er

146

Pip

ing

147

TR

L 4

- T

RL

5

148

Orig

inal

Sch

edul

e in

TD

RM

149

WE

C-T

S-P

IP-0

01P

HT

S h

igh-

tem

pera

ture

[760

°C a

nd 9

50°C

] pip

ing

cool

ing,

line

r an

d in

sula

tion

optio

ns tr

ade

stud

y

150

WE

C-T

S-P

IP-0

02P

HT

S lo

w-t

empe

ratu

re [3

50°C

] pip

ing

liner

and

insu

latio

n op

tions

trad

e st

udy

151

WE

C-T

S-P

IP-0

03S

HT

S h

igh-

tem

pera

ture

[840

°C a

nd 9

00°C

] pip

ing

liner

and

insu

latio

n st

udy

152

WE

C-T

S-P

IP-0

04S

HT

S m

ediu

m-t

empe

ratu

re [6

59°C

and

700

°C] p

ipin

g lin

er a

nd in

sula

tion

trad

e st

udy

153

WE

C-T

S-P

IP-0

05S

HT

S lo

w-t

empe

ratu

re [<

300°

C] p

ipin

g lin

er a

nd in

sula

tion

trad

e st

udy

154

TR

L 5

- T

RL

6

155

Orig

inal

Sch

edul

e in

TD

RM

156

WE

C-T

S-P

IP-0

06E

ffect

s of

He

infil

trat

ion

on th

erm

al c

ondu

ctiv

ity o

f ins

ulat

ion

mat

eria

l

157

WE

C-T

S-P

IP-0

07T

he e

ffect

of f

luid

impu

ritie

s on

insu

latio

n pr

oper

ties

158

WE

C-T

S-P

IP-0

08R

e-ev

alua

tion

of n

eede

d m

atur

atio

n ta

sks

base

d on

Tra

de s

tudi

es

159

TR

L 6

- T

RL

7

160

Orig

inal

Sch

edul

e in

TD

RM

161

WE

C-T

S-P

IP-0

09P

erfo

rman

ce a

nd e

nviro

nmen

tal t

estin

g of

pro

toty

pica

l hig

h-te

mpe

ratu

re a

nd lo

w-t

empe

ratu

re p

ipin

g/in

sula

162

TR

L 7

- T

RL

8

163

Orig

inal

Sch

edul

e in

TD

RM

164

WE

C-T

S-P

IP-0

10T

estin

g of

full

size

PH

TS

pip

ing

in N

GN

P

165

Mix

ing

Ch

amb

er16

6T

RL

6 -

TR

L 7

167

Orig

inal

Sch

edul

e in

TD

RM

168

WE

C-T

S-M

C-0

01E

nhan

ced

Mix

ing

Dev

ices

Tes

t Spe

cific

atio

n

169

WE

C-T

S-M

C-0

02V

ibra

tion

Dam

ping

Dev

ices

Tes

t Spe

cific

atio

n

170

WE

C-T

S-M

C-0

03P

artia

l or

Ful

l Sca

le F

low

Mix

ing

Cha

mbe

r M

odel

Tes

t Spe

cific

atio

n

171

TR

L 7

- T

RL

8

172

Orig

inal

Sch

edul

e in

TD

RM

173

WE

C-T

S-M

C-0

04P

roto

type

Flo

w M

ixin

g C

ham

ber

Tes

t Spe

cific

atio

n

174

Ste

am G

ener

ato

r17

5T

RL

6 -

TR

L 7

176

Orig

inal

Sch

edul

e in

TD

RM

177

WE

C-T

S-S

G-0

01P

erfo

rm a

dow

n se

lect

ion

trad

e st

udy

to d

eter

min

e th

e pr

efer

red

conc

eptu

al a

rran

gem

ent o

f the

SG

178

WE

C-T

S-S

G-0

02D

efin

e re

quire

men

ts a

nd d

esig

n de

tails

for

the

SG

in th

e P

CS

sys

tem

con

text

179

WE

C-T

S-S

G-0

03P

erfo

rm c

onfig

urat

ion

deve

lopm

ent t

ests

to s

ubst

antia

te th

e de

sign

TB

D

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

Tas

k

Spl

it

Pro

gres

s

Mile

ston

e

Sum

mar

y

Pro

ject

Sum

mar

y

Ext

erna

l Tas

ks

Ext

erna

l Mile

ston

e

Dea

dlin

e

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng

TD

RM

-017

_6.m

pp

Fig

ure

17-

1: I

nte

gra

ted

Sch

edu

leF

ri 08

/12/

05

Pro

ject

: Pro

ject

1D

ate:

Fri

08/1

2/05

Page 14: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

IDN

otes

Tas

k N

ame

180

WE

C-T

S-S

G-0

04D

esig

n an

d su

pply

a s

cale

pro

toty

pe fo

r th

e te

stin

g in

the

CT

F

181

WE

C-T

S-S

G-0

05P

erfo

rman

ce te

stin

g in

CT

F

182

TR

L 7

- T

RL

8

183

Orig

inal

Sch

edul

e in

TD

RM

184

WE

C-T

S-S

G-0

06C

ompl

ete

final

des

ign

of th

e pr

otot

ype

SG

for

the

NG

NP

185

WE

C-T

S-S

G-0

07F

abric

ate

and

deliv

er to

NG

NP

to th

e S

ite

186

WE

C-T

S-S

G-0

08In

stal

l and

ope

rate

187

Hyd

rog

en P

rod

uct

ion

Sys

tem

188

Su

lfu

ric

Aci

d D

eco

mp

osi

tio

n

189

Up

to c

ompl

etio

n of

S-I

ILS

190

Com

plet

e an

alys

is, s

uppo

rtin

g da

ta, m

ater

ials

test

ing

and

cata

lyst

cho

ice

& te

sts

191

Pilo

t tes

t of D

ecom

pose

r

192

Eng

inee

ring

test

of D

ecom

pose

r

193

Pro

toty

pe te

st o

f Dec

ompo

ser

194

Su

lfu

r D

ioxi

de

Ele

ctro

lysi

s T

ech

no

log

y A

rea

195

Up

to c

ompl

etio

n of

cel

l dem

onst

ratio

n at

tem

pera

ture

and

pre

ssur

e

196

HyS

ILS

and

opt

imiz

ed c

ell d

emon

stra

tion

197

Sca

le-u

p ce

lls to

400

cm

2 ,

and

Ele

ctro

lyze

r P

ilot T

est –

mod

ule

198

Sca

le-u

p ce

lls to

100

0 cm

2 an

d E

ngin

eerin

g te

st o

f Ele

ctro

lyze

r

199

Sca

le-u

p ce

lls to

1 m

2 an

d P

roto

type

test

of E

lect

roly

zer

200

Bu

nse

n R

eact

ion

an

d H

I Dec

om

po

sist

ion

Tec

hn

olo

gy

Are

a

201

Up

to c

ompl

etio

n of

S-I

ILS

–B

unse

n: T

RL

202

HI S

ectio

n E

xper

imen

tal T

est

– H

I

203

Bun

sen

and

HI S

yste

ms

Pilo

t Tes

t

204

Bun

sen

and

HI S

yste

ms

Eng

inee

ring

Tes

t

205

Pro

toty

pe H

PS

Tes

t: S

ulfu

ric A

cid,

Bun

sen

& H

I Sec

tions

206

Hig

h T

emp

erat

ure

Ste

am E

lect

roly

sis

Tec

hn

olo

gy

Are

a

207

Up

to c

ompl

etio

n of

ILS

208

Ful

l-sca

le s

tack

dem

onst

ratio

n

209

Pilo

t Tes

t

210

Pro

toty

pe H

PS

Tes

t

211

Sul

furic

Aci

d D

ecom

posi

tion

212

Sul

fur

Dio

xide

Ele

ctor

lysi

s

213

Bun

sen

Rea

ctio

n an

d H

I dec

ompo

sitio

n

214

Hig

h T

empe

ratu

re S

team

Ele

ctro

lysi

s

215

Fu

el E

lem

ents

216

TR

L 6

- T

RL

7

217

WE

C-T

S-F

UE

L-0

01P

rod

uct

ion

Fu

el Ir

rad

iati

on

Tes

ts f

or

No

rmal

Op

erat

ion

al C

on

dit

ion

s

218

Irra

diat

ion

plan

ning

& P

repa

ratio

n

219

Irra

diat

ion

of P

re-P

rodu

ctio

n F

uel

220

PIE

and

Ana

lysi

s

221

WE

C-T

S-F

UE

L-0

02P

rod

uct

ion

Fu

el H

eat-

up

Tes

ts a

t 16

00°C

an

d 1

800°

C.

222

Phy

sica

l Hea

ting

Tes

t

223

PIE

and

ana

lysi

s of

Hea

ted

Sph

eres

224

WE

C-T

S-F

UE

L-0

03F

uel

Mat

rix

Gra

ph

ite

Irra

dia

tio

n t

ests

an

d P

IE

225

Irra

diat

ion

Pla

nnin

g &

Pre

para

tion

226

Irra

diat

ion

and

PIE

227

WE

C-T

S-F

UE

L-0

04M

ach

ined

Gra

ph

ite

Irra

dia

tio

n t

ests

an

d P

IE

228

Irra

diat

ion

Pla

nnin

g &

Pre

para

tion

229

Irra

diat

ion

and

PIE

230

TR

L 7

- T

RL

8

231

WE

C-T

S-F

UE

L-0

02P

rod

uct

ion

Fu

el Ir

rad

iati

on

Tes

ts f

or

NG

NP

No

rmal

Op

erat

ion

al C

on

dit

ion

s

232

Irra

diat

ion

plan

ning

& P

repa

ratio

n

233

Irra

diat

ion

of P

re-P

rodu

ctio

n F

uel

234

PIE

and

Ana

lysi

s

235

WE

C-T

S-F

UE

L-0

03P

rod

uct

ion

Fu

el H

eat-

up

Tes

ts a

t 17

00°C

an

d 1

900°

C.

236

Phy

sica

l Hea

ting

Tes

t

237

PIE

and

ana

lysi

s of

Hea

ted

Sph

eres

238

WE

C-T

S-F

UE

L-0

04F

uel

Mat

rix

Gra

ph

ite

Irra

dia

tio

n t

ests

an

d P

IE

239

Irra

diat

ion

Pla

nnin

g &

Pre

para

tion

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

Tas

k

Spl

it

Pro

gres

s

Mile

ston

e

Sum

mar

y

Pro

ject

Sum

mar

y

Ext

erna

l Tas

ks

Ext

erna

l Mile

ston

e

Dea

dlin

e

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng

TD

RM

-017

_6.m

pp

Fig

ure

17-

1: I

nte

gra

ted

Sch

edu

leF

ri 08

/12/

05

Pro

ject

: Pro

ject

1D

ate:

Fri

08/1

2/05

Page 15: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

IDN

otes

Tas

k N

ame

240

Irra

diat

ion

and

PIE

241

Co

re S

tru

ctu

re C

eram

ics

242

TR

L 6

- T

RL

7

243

WE

C-T

S-C

SC

-001

PB

MR

Rel

evan

t

244

WE

C-T

S-C

SC

-002

Ext

ende

d P

rope

rtie

s of

Irra

diat

ed G

raph

ite a

t Low

Tem

pera

ture

s

245

WE

C-T

S-C

SC

-003

Ext

ende

d P

rope

rtie

s of

Irra

diat

ed G

raph

ite a

t Hig

h T

empe

ratu

res

246

WE

C-T

S-C

SC

-004

Cha

ract

eriz

e R

ace

Tra

ck S

trap

and

Tie

Rod

Mat

eria

l

247

WE

C-T

S-C

SC

-005

Insu

latio

n M

ater

ial (

Uni

rrad

iate

d D

ata

Nee

ded)

248

Res

erve

Sh

utd

ow

n S

yste

m24

9A

ntic

ipat

ed S

ched

ule

250

TR

L 6

- T

RL

7

251

TR

L 7

- T

RL

8

252

Rea

ctiv

ity

Co

ntr

ol S

yste

m25

3A

ntic

ipat

ed S

ched

ule

254

TR

L 6

- T

RL

7

255

TR

L 7

- T

RL

8

256

Co

re C

on

dit

ion

ing

Sys

tem

257

TR

L 6

- T

RL

7

258

WE

C-T

S-C

CS

-001

Val

ves

deve

lopm

ent T

est S

peci

ficat

ion

259

WE

C-T

S-C

CS

-002

Blo

wer

dev

elop

men

t Tes

t Spe

cific

atio

n

260

TR

L 7

- T

R8

261

WE

C-T

S-C

CS

-003

CC

S D

evel

opm

ent T

est S

peci

ficat

ion

262

Rea

cto

r C

avit

y C

oo

ling

Sys

tem

263

TR

L 6

- T

RL

7

264

No

test

s de

fined

yet

. Adv

ance

men

t to

the

next

TR

L on

ly a

chie

ved

thro

ugh

softw

are

anal

ysis

.

265

TR

L 7

- T

RL

8

266

Orig

inal

Sch

edul

e in

TD

RM

267

WE

C-T

S-R

CC

S-0

01V

erify

the

func

tioni

ng o

f the

RC

CS

with

res

pect

to m

aint

aini

ng R

eact

or C

avity

con

cret

e be

low

cod

e lim

its

268

WE

C-T

S-R

CC

S-0

02C

onfir

m o

pera

tion

of R

CC

S ta

nk a

utom

atic

wat

er r

eple

nish

men

t fun

ctio

n

269

WE

C-T

S-R

CC

S-0

03V

alid

ate

anal

ysis

of D

WS

sup

ply

and

heat

sin

k pe

rfor

man

ces

270

WE

C-T

S-R

CC

S-0

04V

alid

ate

theo

retic

al a

naly

sis

of p

ump

trip

effe

ct o

n R

CC

S p

ress

ure

271

272

C:

HT

GR

Co

mp

on

ent

Tes

t F

acili

ty27

3In

dust

ry C

TF

Rec

omm

enda

tion

Stu

dies

274

Pre

-Con

cept

ual D

esig

n

275

CT

F P

CD

R

276

Stu

dy #

1, T

DR

M a

nd T

est P

lans

for

Hig

h T

empe

ratu

re S

SC

s

277

50%

ICD

Rev

iew

278

Pre

pare

CT

F P

CD

R

279

Pre

pare

CT

F P

re-C

once

ptua

l Tes

t Loo

p D

esig

n

280

PC

D 9

0% R

evie

w

281

Pre

-Con

cept

ual T

DR

M &

Tes

t Loo

p D

esig

n

282

PC

D 9

0% R

evie

w

283

DO

E o

r P

PP

Issu

es E

PC

SO

W &

RF

P

284

Sta

rt E

PC

Con

tact

285

CT

F P

relim

inar

y D

esig

n

286

Pre

limin

ary

90%

Des

ign

Rev

iew

287

CT

F F

inal

Des

ign

288

Fin

al D

esig

n 90

% R

evie

w

289

Issu

e C

onst

ruct

ion

Doc

umen

ts

290

Tes

t & T

urno

ver

291

CT

F c

onst

ruct

ion

com

plet

ion

292

CT

F B

egin

Com

pone

nt In

stal

latio

n &

Tes

ting

293

Pro

ject

Tra

nsfe

r

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

Tas

k

Spl

it

Pro

gres

s

Mile

ston

e

Sum

mar

y

Pro

ject

Sum

mar

y

Ext

erna

l Tas

ks

Ext

erna

l Mile

ston

e

Dea

dlin

e

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng

TD

RM

-017

_6.m

pp

Fig

ure

17-

1: I

nte

gra

ted

Sch

edu

leF

ri 08

/12/

05

Pro

ject

: Pro

ject

1D

ate:

Fri

08/1

2/05

Page 16: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NGNP-CTF MTECH-TDRM-017 NGNP Technology Development Road Mapping Section 17 : Integrated Schedule and Cost Estimate

NGNP-CTF MTECH-TDRM-017_Rev0.doc 10/27/2008

16 of 89

17.1.3 Modified TDRM Schedule

The original integrated TDRM Schedule (Figure 17-1) made the assumption that all work would start in October 2008 (FY2009). In the modified schedule, Figure 17-2, this was changed to relieve the initial pressure on the schedule by moving some of the less critical SSCs to a later starting date, but still within the constraints of the CTF- and NGNP start-up dates noted in the assumptions that follow:

• Small Scale Development Test will start in (October 2011-TBC as part of Phase II). • CTF Initial Operating Date is March 2014 • NGNP Initial Operation Date is October 2021 • The designs of modules and unit cells are finished and they are fabricated just prior to the

start of a test.

SSC specific comments contributing to the starting/end date modification can be seen in Figure 17-2.

Page 17: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

IDN

otes

Tas

k N

ame

Cha

nge

to O

rigin

alP

ossi

ble

test

ing

faci

lity

loca

tions

1T

est

Sp

ecN

um

ber

Mo

dif

ied

TD

RM

Sch

edu

leC

om

men

ts

2C

ircu

lato

r

3TR

L 6

- T

RL

7

4O

rigin

al S

ched

ule

in T

DR

M

5T

rade

Stu

dies

Sup

plie

r / D

esig

n A

utho

rity

6W

EC

-TS

-CIR

C-0

01E

MB

s, c

atch

er b

earin

gs T

est S

peci

ficat

ion

Sta

rt d

ate

mov

ed: S

mal

l Sca

leD

evel

opm

ent T

est

EM

Bs

Sup

plie

r T

est F

acili

ty

7W

EC

-TS

-CIR

C-0

02H

eliu

m R

otat

ing

seal

s T

est S

peci

ficat

ion

Sta

rt d

ate

mov

ed: S

mal

l Sca

leD

evel

opm

ent T

est

Rot

atin

g S

eal S

uppl

ier

Tes

t Fac

ility

8W

EC

-TS

-CIR

C-0

03P

artia

l or

Ful

l sca

le c

ircul

ator

Mod

el T

est S

peci

ficat

ion

Sta

rt d

ate

mov

ed to

coi

ncid

e w

ithC

TF

Sta

rtin

g da

te:

CT

LC

TF

/Sup

plie

r S

ite

9TR

L 7

- T

RL

8

10O

rigin

al S

ched

ule

in T

DR

M

11W

EC

-TS

-CIR

C-0

04P

roto

type

circ

ulat

or T

est S

peci

ficat

ion

Sta

rt d

ate

mov

ed to

coi

ncid

e w

ithN

GN

P In

itial

Ope

ratin

g da

teN

GN

P S

ite

12IH

X A

(M

etal

lic)

13TR

L 2

- T

RL

3

14O

rigin

al S

ched

ule

in T

DR

M

15W

EC

-TS

-IH

XA

-001

Allo

y 61

7 M

ater

ial S

peci

ficat

ion

and

proc

urem

ent

INL,

OR

NL

16W

EC

-TS

-IH

XA

-002

Allo

y 61

7 Jo

inin

g T

echn

olog

y an

d R

esul

tant

Pro

pert

ies

Sta

rtin

g da

tes

mov

ed to

mor

ere

alis

tic a

nd a

chie

vabl

e da

tes

INL,

OR

NL,

AN

L, C

ompa

ct h

eat

exch

ange

r de

sign

ers/

man

ufac

ture

rs

17W

EC

-TS

-IH

XA

-003

The

rmal

/phy

sica

l and

mec

hani

cal p

rope

rtie

s of

Allo

y 61

7S

tart

ing

date

s m

oved

to m

ore

real

istic

and

ach

ieva

ble

date

sIN

L, O

RN

L, A

NL,

LA

NL,

SN

L, B

NL,

CS

IR

18W

EC

-TS

-IH

XA

-004

Effe

cts

of th

erm

al A

ging

and

env

ironm

ent o

n A

lloy

617

Sta

rtin

g da

tes

mov

ed to

mor

ere

alis

tic a

nd a

chie

vabl

e da

tes

INL,

OR

NL

19W

EC

-TS

-IH

XA

-005

Effe

cts

of G

rain

siz

e an

d se

lect

ion

thic

knes

s on

Allo

y 61

7 pr

oper

ties

Sta

rtin

g da

tes

mov

ed to

mor

ere

alis

tic a

nd a

chie

vabl

e da

tes

INL,

OR

NL,

AN

L, L

AN

L, S

NL,

BN

L,C

SIR

20W

EC

-TS

-IH

XA

-006

Cor

rosi

on A

llow

ance

s fo

r A

lloy

617

Sta

rtin

g da

tes

mov

ed to

mor

ere

alis

tic a

nd a

chie

vabl

e da

tes

INL,

OR

NL,

FZ

J, S

acla

y

21TR

L 3

- T

RL

4

22O

rigin

al S

ched

ule

in T

DR

M

23W

EC

-TS

-IH

XA

-007

AS

ME

sec

tion

III C

ode

Cas

e fo

r A

lloy

617

Sta

rtin

g da

tes

mov

ed to

mor

ere

alis

tic a

nd a

chie

vabl

e da

tes

INL,

OR

NL,

CH

Ede

sign

ers/

man

ufac

ture

rs

24W

EC

-TS

-IH

XA

-008

The

rmal

/Flu

id M

odel

ing

Met

hods

for

Met

allic

IHX

AS

tart

ing

date

s m

oved

to m

ore

real

istic

and

ach

ieva

ble

date

sC

HE

sup

plie

r/de

sign

aut

horit

y, IN

L,O

RN

L, A

NL,

LA

NL

25W

EC

-TS

-IH

XA

-009

Met

hods

for

stre

ss/s

trai

n m

odel

ing

of m

etal

lic IH

X A

Sta

rtin

g da

tes

mov

ed to

mor

ere

alis

tic a

nd a

chie

vabl

e da

tes

CH

E s

uppl

ier/

desi

gn a

utho

rity,

INL,

OR

NL,

AN

L, L

AN

L

26W

EC

-TS

-IH

XA

-010

Crit

eria

for

stru

ctur

al in

tegr

ity o

f IH

X A

Sta

rtin

g da

tes

mov

ed to

mor

ere

alis

tic a

nd a

chie

vabl

e da

tes

CH

E s

uppl

ier/

desi

gn a

utho

rity,

INL,

OR

NL,

AN

L, L

AN

L

27W

EC

-TS

-IH

XA

-011

Per

form

ance

Mod

elin

g M

etho

ds fo

r IH

X A

Sta

rtin

g da

tes

mov

ed to

mor

ere

alis

tic a

nd a

chie

vabl

e da

tes

CH

E s

uppl

ier/

desi

gn a

utho

rity,

INL,

OR

NL,

AN

L, L

AN

L

28TR

L 4

- T

RL

5

29O

rigin

al S

ched

ule

in T

DR

M

30W

EC

-TS

-IH

XA

-12

Spe

cific

atio

n of

test

ing

of u

nit c

ell o

f com

pact

Hea

t Exc

hang

ers

Sta

rtin

g da

tes

mov

ed to

mor

ere

alis

tic a

nd a

chie

vabl

e da

tes

CH

E d

esig

ner/

man

ufac

ture

r (H

eatr

ic,

Bra

yton

Ene

rgy)

31TR

L 5

- T

RL

6

32O

rigin

al S

ched

ule

in T

DR

MA

ssum

ing

1.2M

W M

odul

e is

desi

gned

and

Fab

ricat

ed

33W

EC

-TS

-IH

XA

-013

Spe

cific

atio

n of

test

ing

of c

ompa

ct h

eat e

xcha

nger

mod

ule

(1.2

MW

)S

tart

ing

date

mov

ed to

coi

ncid

ew

ith C

TF

Sta

rtin

g da

te: T

DL

CT

F

34W

EC

-TS

-IH

XA

-014

AS

ME

Sec

tion

III C

ode

Cas

e fo

r C

ompa

ct H

eat E

xcha

nger

Des

igns

Sta

rtin

g da

tes

mov

ed to

mor

ere

alis

tic a

nd a

chie

vabl

e da

tes

CH

E s

uppl

ier/

desi

gn a

utho

rity,

INL,

OR

NL,

AN

L, L

AN

L

35TR

L 6

- T

RL

7

36O

rigin

al S

ched

ule

in T

DR

M

37W

EC

-TS

-IH

XA

-015

She

ll S

ide

Flo

w D

istr

ibut

ion

and

Byp

ass

Leak

age

Tes

ting

Sta

rtin

g da

te m

oved

to c

oinc

ide

with

CT

F S

tart

ing

date

: TD

LC

TF

$ 0.

00

Su

pp

lier

/ Des

ign

Au

tho

rity

$ 45

0,00

0.00

Ro

tati

ng

Sea

l Su

pp

lier

Test

Fac

ility

$ 0.

00

NG

NP

Sit

e$

0.00

INL

, OR

NL

$

105,

600.

00

INL

, OR

NL

, AN

L, C

om

pac

t h

eat

exch

ang

er d

esig

ner

s/m

anu

fact

ure

rs$

3,73

5,40

3.10

INL

, OR

NL

, AN

L, L

AN

L, S

NL

, BN

L, C

SIR

$ 81

1,25

7.70

INL

, OR

NL

$ 4,

491,

176.

80

INL

, OR

NL

, AN

L, L

AN

L, S

NL

, BN

L, C

SIR

$ 83

3,70

7.60

INL

, OR

NL

, FZ

J, S

acla

y$

1,90

4,40

8.00

INL

, OR

NL

, CH

E d

esig

ner

s/m

anu

fact

ure

rs$

760,

650.

00

CH

E s

up

plie

r/d

esig

n a

uth

ori

ty, I

NL

, OR

NL

, AN

L, L

AN

L$

140,

250.

00

CH

E s

up

plie

r/d

esig

n a

uth

ori

ty, I

NL

, OR

NL

, AN

L, L

AN

L$

140,

250.

00

CH

E s

up

plie

r/d

esig

n a

uth

ori

ty, I

NL

, OR

NL

, AN

L, L

AN

L$

140,

250.

00

CH

E s

up

plie

r/d

esig

n a

uth

ori

ty, I

NL

, OR

NL

, AN

L, L

AN

L$

140,

250.

00

CH

E d

esig

ner

/man

ufa

ctu

rer

(Hea

tric

, Bra

yto

n E

ner

gy)

$ 20

0,00

0.00

CTF

$ 0.

00

CH

E s

up

plie

r/d

esig

n a

uth

ori

ty, I

NL

, OR

NL

, AN

L, L

AN

L$

0.00 CTF

$ 0.

00

NG

NP

Initi

al O

pera

ting

CT

F In

itial

Ope

ratin

g

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

Tas

k

Spl

it

Pro

gres

s

Mile

ston

e

Sum

mar

y

Pro

ject

Sum

mar

y

Ext

erna

l Tas

ks

Ext

erna

l Mile

ston

e

Dea

dlin

e

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng

TD

RM

-017

_7.m

pp

Fig

ure

17-

2: M

od

ifie

d T

DR

M S

ched

ule

Fri

08/1

2/05

Pro

ject

: TD

RM

Sch

edul

e_te

rugg

etre

k D

ate:

Fri

08/1

2/05

Page 18: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

IDN

otes

Tas

k N

ame

Cha

nge

to O

rigin

alP

ossi

ble

test

ing

faci

lity

loca

tions

38W

EC

-TS

-IH

XA

-016

Mul

ti-m

odul

e H

eat T

rans

fer

Tes

ting

Sta

rtin

g da

te m

oved

to c

oinc

ide

with

CT

F S

tart

ing

date

: TD

LC

TF

39TR

L 7

- T

RL

8

40O

rigin

al S

ched

ule

in T

DR

M

41W

EC

-TS

-IH

XA

-017

Spe

cific

atio

n of

test

ing

of a

full

scal

e co

mpa

ct H

eat E

xcha

nger

sS

tart

dat

e m

oved

to c

oinc

ide

with

NG

NP

Initi

al O

pera

ting

date

NG

NP

42IH

X A

(C

eram

ic)

43TR

L 2

- T

RL

3

44O

rigin

al S

ched

ule

in T

DR

M

45W

EC

-TS

-IH

XA

-018

Tra

de s

tudy

on

Can

dida

te C

eram

ic M

ater

ial f

or IH

X A

Orig

inal

Dat

eS

uppl

ier

/ Des

ign

Aut

horit

y

46W

EC

-TS

-IH

XA

-019

Tra

de s

tudy

on

Can

dida

te C

eram

ic D

esig

ns fo

r IH

X A

Orig

inal

Dat

eS

uppl

ier

/ Des

ign

Aut

horit

y

47TR

L 3

- T

RL

4

48O

rigin

al S

ched

ule

in T

DR

M

49W

EC

-TS

-IH

XA

-020

Cer

amic

Det

aile

d D

esig

n D

ata

Nee

ds (

DD

Ns)

Sta

rtin

g da

tes

mov

ed to

mor

ere

alis

tic a

nd a

chie

vabl

e da

tes

Des

ign

Aut

horit

y

50W

EC

-TS

-IH

XA

-021

Cer

amic

Mat

eria

ls S

peci

ficat

ions

and

Pro

cure

men

tS

tart

ing

date

s m

oved

to m

ore

real

istic

and

ach

ieva

ble

date

sIN

L, O

RN

L

51W

EC

-TS

-IH

XA

-022

The

rmal

Phy

sica

l Pro

pert

ies

of C

eram

ics

Sta

rtin

g da

tes

mov

ed to

mor

ere

alis

tic a

nd a

chie

vabl

e da

tes

INL,

OR

NL,

AN

L, L

AN

L, S

NL,

BN

L,C

SIR

52W

EC

-TS

-IH

XA

-023

Mec

hani

cal P

rope

rtie

s of

Cer

amic

sS

tart

ing

date

s m

oved

to m

ore

real

istic

and

ach

ieva

ble

date

sIN

L, O

RN

L, A

NL,

LA

NL,

SN

L, B

NL,

CS

IR

53W

EC

-TS

-IH

XA

-024

Com

patib

ility

of C

eram

ic M

ater

ials

to N

GN

P H

e en

viro

nmen

tS

tart

ing

date

s m

oved

to m

ore

real

istic

and

ach

ieva

ble

date

sIN

L, O

RN

L

54W

EC

-TS

-IH

XA

-025

Man

ufac

turin

g T

echn

olog

ies

for

Cer

amic

Hea

t Exc

hang

ers

Sta

rtin

g da

tes

mov

ed to

mor

ere

alis

tic a

nd a

chie

vabl

e da

tes

CH

E d

esig

ner/

man

ufac

ture

r

55TR

L 4

- T

RL

5

56O

rigin

al S

ched

ule

in T

DR

MA

ssum

ing

unit

cell

is d

esig

ned

and

Fab

ricat

ed

57W

EC

-TS

-IH

XA

-026

Cer

amic

Mat

eria

ls C

odes

and

Sta

ndar

dsS

tart

ing

date

s m

oved

to m

ore

real

istic

and

ach

ieva

ble

date

sC

HE

sup

plie

r/de

sign

aut

horit

y, IN

L,O

RN

L, A

NL,

LA

NL

58W

EC

-TS

-IH

XA

-027

Met

hods

for

The

rmal

/Flu

id a

nd S

tres

s/S

trai

n M

odel

ing

Sta

rtin

g da

tes

mov

ed to

mor

ere

alis

tic a

nd a

chie

vabl

e da

tes

CH

E s

uppl

ier/

desi

gn a

utho

rity,

INL,

OR

NL,

AN

L, L

AN

L

59W

EC

-TS

-IH

XA

-028

Str

uctu

ral I

nteg

rity

Crit

eria

for

Cer

amic

Hea

t Exc

hang

ers

Sta

rtin

g da

tes

mov

ed to

mor

ere

alis

tic a

nd a

chie

vabl

e da

tes

CH

E s

uppl

ier/

desi

gn a

utho

rity,

INL,

OR

NL,

AN

L, L

AN

L

60W

EC

-TS

-IH

XA

-029

Per

form

ance

Mod

elin

g of

Cer

amic

Hea

t Exc

hang

ers

Sta

rtin

g da

tes

mov

ed to

mor

ere

alis

tic a

nd a

chie

vabl

e da

tes

CH

E s

uppl

ier/

desi

gn a

utho

rity,

INL,

OR

NL,

AN

L, L

AN

L

61W

EC

-TS

-IH

XA

-030

Tes

ting

of u

nit c

ell o

f Com

pact

Hea

t Exc

hang

erS

tart

dat

e m

oved

bac

k: S

mal

lS

cale

Dev

elop

men

t Tes

tC

HE

des

igne

r/m

anuf

actu

rer

(Hea

tric

,B

rayt

on E

nerg

y)

62TR

L 5

- T

RL

6

63O

rigin

al S

ched

ule

in T

DR

MA

ssum

ing

1.2M

W M

odul

e is

desi

gned

and

Fab

ricat

ed

64W

EC

-TS

-IH

XA

-031

Spe

cific

atio

n of

test

ing

of c

ompa

ct h

eat e

xcha

nger

mod

ule

(1.2

Mw

)S

tart

ing

date

mov

ed to

coi

ncid

ew

ith C

TF

Sta

rtin

g da

te: T

DL

CT

F

65W

EC

-TS

-IH

XA

-032

AS

ME

Cod

e C

ase

for

Cer

amic

Com

pact

Hea

t Exc

hang

er D

esig

nS

tart

ing

date

s m

oved

to m

ore

real

istic

and

ach

ieva

ble

date

sC

HE

sup

plie

r/de

sign

aut

horit

y, IN

L,O

RN

L, A

NL,

LA

NL

66TR

L 6

- T

RL

7

67O

rigin

al S

ched

ule

in T

DR

M

68W

EC

-TS

-IH

XA

-033

She

ll-si

de F

low

Dis

trib

utio

n an

d B

ypas

s Le

akag

e T

estin

gS

tart

ing

date

mov

ed to

coi

ncid

ew

ith C

TF

Sta

rtin

g da

te: T

DL

CT

F

69W

EC

-TS

-IH

XA

-034

Mul

ti-m

ode

Hea

t Tra

nsfe

r T

estin

gS

tart

ing

date

mov

ed to

coi

ncid

ew

ith C

TF

Sta

rtin

g da

te: T

DL

CT

F

70TR

L 7

- T

RL

8

71O

rigin

al S

ched

ule

in T

DR

M

72W

EC

-TS

-IH

XA

-035

Spe

cific

atio

ns o

f tes

ting

of a

full

scal

e co

mpa

ct H

eat E

xcha

nger

Sta

rt d

ate

mov

ed to

coi

ncid

e w

ithN

GN

P In

itial

Ope

ratin

g da

teN

GN

P

73IH

X B

74TR

L 3

- T

RL

4

CTF

$ 0.

00

NG

NP

$ 0.

00

Su

pp

lier

/ Des

ign

Au

tho

rity

$ 21

1,20

0.00

Su

pp

lier

/ Des

ign

Au

tho

rity

$ 21

1,20

0.00

Des

ign

Au

tho

rity

$ 17

6,00

0.00

INL

, OR

NL

$ 10

5,60

0.00

INL

, OR

NL

, AN

L, L

AN

L, S

NL

, BN

L, C

SIR

$ 33

8,62

4.00

INL

, OR

NL

, AN

L, L

AN

L, S

NL

, BN

L, C

SIR

$ 6,

350,

142.

00

INL

, OR

NL

$ 1,

199,

000.

00

CH

E d

esig

ner

/man

ufa

ctu

rer

$ 5,

275,

512.

00

CH

E s

up

plie

r/d

esig

n a

uth

ori

ty, I

NL

, OR

NL

, AN

L, L

AN

L$

1,52

1,30

0.00

CH

E s

up

plie

r/d

esig

n a

uth

ori

ty, I

NL

, OR

NL

, AN

L, L

AN

L$

415,

800.

00

CH

E s

up

plie

r/d

esig

n a

uth

ori

ty, I

NL

, OR

NL

, AN

L, L

AN

L$

280,

500.

00

CH

E s

up

plie

r/d

esig

n a

uth

ori

ty, I

NL

, OR

NL

, AN

L, L

AN

L$

280,

500.

00

CH

E d

esig

ner

/man

ufa

ctu

rer

(Hea

tric

, Bra

yto

n E

ner

gy)

$ 40

0,00

0.00

CTF

$ 0.

00

CH

E s

up

plie

r/d

esig

n a

uth

ori

ty, I

NL

, OR

NL

, AN

L, L

AN

L$

0.00

CTF

$ 0.

00

CTF

$ 0.

00

NG

NP

$ 0.

00

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

Tas

k

Spl

it

Pro

gres

s

Mile

ston

e

Sum

mar

y

Pro

ject

Sum

mar

y

Ext

erna

l Tas

ks

Ext

erna

l Mile

ston

e

Dea

dlin

e

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng

TD

RM

-017

_7.m

pp

Fig

ure

17-

2: M

od

ifie

d T

DR

M S

ched

ule

Fri

08/1

2/05

Pro

ject

: TD

RM

Sch

edul

e_te

rugg

etre

k D

ate:

Fri

08/1

2/05

Page 19: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

IDN

otes

Tas

k N

ame

Cha

nge

to O

rigin

alP

ossi

ble

test

ing

faci

lity

loca

tions

75O

rigin

al S

ched

ule

in T

DR

M

76W

EC

-TS

-IH

XB

-001

Allo

y 80

0H M

ater

ial S

peci

ficat

ion

and

Pro

cure

men

tS

tart

ing

date

s m

oved

to m

ore

real

istic

and

ach

ieva

ble

date

sIN

L, O

RN

L

77W

EC

-TS

-IH

XB

-002

Dat

abas

e fo

r B

raze

d an

d D

iffus

ion

Bon

ded

Allo

y 80

0HS

tart

ing

date

s m

oved

to m

ore

real

istic

and

ach

ieva

ble

date

sIN

L, O

RN

L, A

NL,

CH

Ede

sign

ers/

man

ufac

ture

rs

78W

EC

-TS

-IH

XB

-003

Allo

y 80

0H H

igh

Tem

pera

ture

Mat

eria

l Pro

pert

ies

Sta

rtin

g da

tes

mov

ed to

mor

ere

alis

tic a

nd a

chie

vabl

e da

tes

INL,

OR

NL,

CS

IR

79W

EC

-TS

-IH

XB

-004

Effe

cts

of T

herm

al A

ging

and

Env

ironm

ent o

n A

lloy

800H

Pro

pert

ies

Sta

rtin

g da

tes

mov

ed to

mor

ere

alis

tic a

nd a

chie

vabl

e da

tes

INL,

OR

NL

80W

EC

-TS

-IH

XB

-005

Effe

cts

of E

nviro

nmen

tal E

xpos

ure

on A

lloy

800H

Bra

ze a

ndD

iffus

ion

Bon

ded

Join

tsS

tart

ing

date

s m

oved

to m

ore

real

istic

and

ach

ieva

ble

date

sIN

L, O

RN

L

81W

EC

-TS

-IH

XB

-006

Effe

cts

of G

rain

Siz

e an

d S

ectio

n T

hick

ness

on

Allo

y 80

0HP

rope

rtie

sS

tart

ing

date

s m

oved

to m

ore

real

istic

and

ach

ieva

ble

date

sIN

L, O

RN

L, A

NL,

LA

NL,

SN

L, B

NL,

CS

IR

82W

EC

-TS

-IH

XB

-007

Cor

rosi

on A

llow

ance

s fo

r A

lloy

800H

Sta

rtin

g da

tes

mov

ed to

mor

ere

alis

tic a

nd a

chie

vabl

e da

tes

INL,

OR

NL,

FZ

J, S

acla

y

83W

EC

-TS

-IH

XB

-008

The

rmal

/Flu

id M

odel

ing

Met

hods

for

IHX

BC

HE

des

igne

r/su

pplie

r, IN

L, O

RN

L,A

NL

84W

EC

-TS

-IH

XB

-009

Met

hods

for

Str

ess/

Str

ain

Mod

ling

of IH

X B

Sta

rtin

g da

tes

mov

ed to

mor

ere

alis

tic a

nd a

chie

vabl

e da

tes

CH

E d

esig

ner/

supp

lier,

INL,

OR

NL,

AN

L

85W

EC

-TS

-IH

XB

-010

Crit

eria

for

Str

uctu

ral I

nter

grity

of I

HX

BS

tart

ing

date

s m

oved

to m

ore

real

istic

and

ach

ieva

ble

date

sC

HE

des

igne

r/su

pplie

r, IN

L, O

RN

L,A

NL

86W

EC

-TS

-IH

XB

-011

Per

form

ance

Mod

elin

g M

etho

ds fo

r IH

X B

Sta

rtin

g da

tes

mov

ed to

mor

ere

alis

tic a

nd a

chie

vabl

e da

tes

CH

E d

esig

ner/

supp

lier,

INL,

OR

NL,

AN

L

87TR

L 4

- T

RL

5

88O

rigin

al S

ched

ule

in T

DR

MA

ssum

ing

unit

cell

is d

esig

ned

and

Fab

ricat

ed

89W

EC

-TS

-IH

XB

-012

Tes

ting

of U

nit C

ell o

f Com

pact

Hea

t Exc

hang

erS

tart

dat

e m

oved

bac

k: S

mal

lS

cale

Dev

elop

men

t Tes

tC

HE

des

igne

r/m

anuf

actu

rer

(Hea

tric

,B

rayt

on E

nerg

y)

90TR

L 5

- T

RL

6

91O

rigin

al S

ched

ule

in T

DR

M

92W

EC

-TS

-IH

XB

-013

Tes

ting

of in

tegr

ated

com

pact

Hea

t Exc

hang

erS

tart

ing

date

mov

ed to

coi

ncid

ew

ith C

TF

Sta

rtin

g da

te: T

DL

CT

F

93W

EC

-TS

-IH

XB

-014

AS

ME

III C

ode

Cas

e fo

r M

eatll

ic C

ompa

ct H

eat E

xcha

nger

Des

ign

Sta

rtin

g da

tes

mov

ed to

mor

ere

alis

tic a

nd a

chie

vabl

e da

tes

CH

E s

uppl

ier/

desi

gn a

utho

rity,

INL,

OR

NL,

AN

L, L

AN

L

94TR

L 6

- T

RL

7

95O

rigin

al S

ched

ule

in T

DR

M

96W

EC

-TS

-IH

XB

-015

She

ll-si

de F

low

Dis

trib

utio

n an

d B

ypas

s Le

akag

e T

estin

gS

tart

ing

date

mov

ed to

coi

ncid

ew

ith C

TF

Sta

rtin

g da

te: T

DL

CT

F

97W

EC

-TS

-IH

XB

-016

Mul

ti-m

odul

e H

eat T

rans

fer

Tes

ting

Sta

rtin

g da

te m

oved

to c

oinc

ide

with

CT

F S

tart

ing

date

: TD

LC

TF

98TR

L 7

- T

RL

8

99O

rigin

al S

ched

ule

in T

DR

M

100

WE

C-T

S-I

HX

B-0

17T

estin

g of

full

size

Com

pact

Hea

t Exc

hang

erS

tart

dat

e m

oved

to c

oinc

ide

with

NG

NP

Initi

al O

pera

ting

date

NG

NP

101

Pip

ing

102

TRL

4 -

TR

L5

103

Orig

inal

Sch

edul

e in

TD

RM

104

WE

C-T

S-P

IP-0

01P

HT

S h

igh-

tem

pera

ture

[760

°C a

nd 9

50°C

] pip

ing

cool

ing,

line

r&in

sula

tion

optio

ns tr

ade

stud

yO

rigin

al D

ate

Pip

ing

Sys

tem

Des

igne

r

105

WE

C-T

S-P

IP-0

02P

HT

S lo

w-t

empe

ratu

re [3

50°C

] pip

ing

liner

and

insu

latio

n op

tions

trad

e st

udy

Orig

inal

Dat

eP

ipin

g S

yste

m D

esig

ner

106

WE

C-T

S-P

IP-0

03S

HT

S h

igh-

tem

pera

ture

[840

°C a

nd 9

00°C

] pip

ing

liner

and

insu

altio

n st

udy

Orig

inal

Dat

eP

ipin

g S

yste

m D

esig

ner

107

WE

C-T

S-P

IP-0

04S

HT

S m

ediu

m-t

empe

ratu

re [6

59°C

and

700

°C] p

ipin

g lin

er a

ndin

sula

tion

trad

e st

udy

Orig

inal

Dat

eP

ipin

g S

yste

m D

esig

ner

108

WE

C-T

S-P

IP-0

05S

HT

S lo

w-t

empe

ratu

re [<

300°

C] p

ipin

g lin

er a

nd in

sula

tion

trad

est

udy

Orig

inal

Dat

eP

ipin

g S

yste

m D

esig

ner

109

TRL

5 -

TR

L 6

110

Orig

inal

Sch

edul

e in

TD

RM

111

WE

C-T

S-P

IP-0

06E

ffect

s of

He

infil

trat

ion

on th

erm

al c

ondu

ctiv

ity o

f ins

ulat

ion

mat

eria

lS

tart

dat

e m

oved

forw

ard:

Sm

all

Sca

le D

evel

opm

ent T

est

Insu

latio

n M

anuf

actu

rers

, IN

L, O

RN

L,A

NL

INL

, OR

NL

$ 70

,400

.00

INL

, OR

NL

, AN

L, C

HE

des

ign

ers/

man

ufa

ctu

rers

$ 3,

730,

875.

50

INL

, OR

NL

, CS

IR$

80,9

72.3

2 INL

, OR

NL

$ 10

4,50

9.02

INL

, OR

NL

$ 36

7,61

6.37

INL

, OR

NL

, AN

L, L

AN

L, S

NL

, BN

L, C

SIR

$ 83

2,45

6.90

INL

, OR

NL

, FZ

J, S

acla

y$

1,90

1,07

5.00

CH

E d

esig

ner

/su

pp

lier,

INL

, OR

NL

, AN

L$

140,

250.

00

CH

E d

esig

ner

/su

pp

lier,

INL

, OR

NL

, AN

L$

140,

250.

00

CH

E d

esig

ner

/su

pp

lier,

INL

, OR

NL

, AN

L$

140,

250.

00

CH

E d

esig

ner

/su

pp

lier,

INL

, OR

NL

, AN

L$

140,

250.

00

CH

E d

esig

ner

/man

ufa

ctu

rer

(Hea

tric

, Bra

yto

n E

ner

gy)

$ 20

0,00

0.00

CTF

$ 0.

00

CH

E s

up

plie

r/d

esig

n a

uth

ori

ty, I

NL

, OR

NL

, AN

L, L

AN

L$

0.00

CTF

$ 0.

00

CTF

$ 0.

00

NG

NP

$ 0.

00

Pip

ing

Sys

tem

Des

ign

er$

211,

200.

00 Pip

ing

Sys

tem

Des

ign

er$

140,

800.

00 Pip

ing

Sys

tem

Des

ign

er$

211,

200.

00 Pip

ing

Sys

tem

Des

ign

er$

140,

800.

00 Pip

ing

Sys

tem

Des

ign

er$

105,

600.

00

Insu

lati

on

Man

ufa

ctu

rers

, IN

L, O

RN

L, A

NL

$ 40

0,00

0.00

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

Tas

k

Spl

it

Pro

gres

s

Mile

ston

e

Sum

mar

y

Pro

ject

Sum

mar

y

Ext

erna

l Tas

ks

Ext

erna

l Mile

ston

e

Dea

dlin

e

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng

TD

RM

-017

_7.m

pp

Fig

ure

17-

2: M

od

ifie

d T

DR

M S

ched

ule

Fri

08/1

2/05

Pro

ject

: TD

RM

Sch

edul

e_te

rugg

etre

k D

ate:

Fri

08/1

2/05

Page 20: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

IDN

otes

Tas

k N

ame

Cha

nge

to O

rigin

alP

ossi

ble

test

ing

faci

lity

loca

tions

112

WE

C-T

S-P

IP-0

07T

he e

ffect

of f

luid

impu

ritie

s on

insu

latio

n pr

oper

ties

Sta

rt d

ate

mov

ed fo

rwar

d: S

mal

lS

cale

Dev

elop

men

t Tes

tIn

sula

tion

Man

ufac

ture

rs, I

NL,

OR

NL,

AN

L

113

WE

C-T

S-P

IP-0

08R

e-ev

alua

tion

of n

eede

d m

atur

atio

n ta

sks

base

d on

Tra

de s

tudi

esS

tart

ing

date

s m

oved

to m

ore

real

istic

and

ach

ieva

ble

date

sP

ipin

g S

yste

m D

esig

ner

114

TRL

6 -

TR

L 7

115

Orig

inal

Sch

edul

e in

TD

RM

116

WE

C-T

S-P

IP-0

09P

erfo

rman

ce&

envi

ronm

enta

l tes

ting:

prot

otyp

ical

hig

h-&

low

-tem

ppi

ping

/insu

latio

n sy

stem

Sta

rtin

g da

te m

oved

to c

oinc

ide

with

CT

F: T

DL/

CT

LC

TF

117

TRL

7 -

TR

L 8

118

Orig

inal

Sch

edul

e in

TD

RM

119

WE

C-T

S-P

IP-0

10T

estin

g of

full

sie

PH

TS

pip

ing

in N

GN

PS

tart

dat

e m

oved

to c

oinc

ide

with

NG

NP

Initi

al O

pera

ting

date

NG

NP

120

Mix

ing

Ch

amb

er

121

TRL

6 -

TR

L 7

122

Orig

inal

Sch

edul

e in

TD

RM

123

WE

C-T

S-M

C-0

01E

nhan

ced

Mix

ing

Dev

ices

Tes

t Spe

cific

atio

nO

rigin

al D

ate

Sup

plie

r / D

esig

n A

utho

rity

124

WE

C-T

S-M

C-0

02V

ibra

tion

Dam

ping

Dev

ices

Tes

t Spe

cific

atio

nO

rigin

al D

ate

supp

lier

site

125

WE

C-T

S-M

C-0

03P

artia

l or

Ful

l Sca

le F

low

Mix

ing

Cha

mbe

r M

odel

Tes

t Spe

cific

atio

nS

tart

ing

date

mov

ed to

coi

ncid

ew

ith C

TF

Sta

rtin

g da

te: C

TL

supp

lier

site

126

TRL

7 -

TR

L 8

127

Orig

inal

Sch

edul

e in

TD

RM

128

WE

C-T

S-M

C-0

04P

roto

type

Flo

w M

ixin

g C

ham

ber

Tes

t Spe

cific

atio

nS

tart

dat

e m

oved

to c

oinc

ide

with

NG

NP

Initi

al O

pera

ting

date

CT

F /

Sup

plie

r si

te

129

Ste

am G

ener

ato

r

130

TRL

6 -

TR

L 7

131

Orig

inal

Sch

edul

e in

TD

RM

132

Tra

de S

tudi

esn/

a

133

WE

C-T

S-S

G-0

01D

own

sele

ctio

n tr

ade

stud

y:de

term

ine

the

pref

erre

d co

ncep

tual

arra

ngem

ent o

f the

SG

Orig

inal

Dat

en/

a

134

WE

C-T

S-S

G-0

02D

efin

e re

quire

men

ts a

nd d

esig

n de

tails

for

the

SG

in th

e P

CS

syst

em c

onte

xtT

o be

per

form

ed a

fter

Tra

de S

tudy

n/a

135

WE

C-T

S-S

G-0

03P

erfo

rm c

onfig

urat

ion

deve

lopm

ent t

ests

to s

ubst

antia

te th

e de

sign

To

be p

erfo

rmed

afte

r T

rade

Stu

dyn/

a

136

WE

C-T

S-S

G-0

04D

esig

n an

d su

pply

a s

cale

pro

toty

pe fo

r th

e te

stin

g in

the

CT

FM

oved

to b

e fin

ishe

d be

fore

test

ing

in C

TF

CT

F

137

WE

C-T

S-S

G-0

05P

erfo

rman

ce te

stin

g in

CT

FS

tart

ing

date

mov

ed to

coi

ncid

ew

ith C

TF

Sta

rtin

g da

te: C

TL

138

TRL

7 -

TR

L 8

139

Orig

inal

Sch

edul

e in

TD

RM

140

WE

C-T

S-S

G-0

06C

ompl

ete

final

des

ign

of th

e pr

otot

ype

SG

for

the

NG

NP

Sta

rtin

g da

tes

mov

ed to

mor

ere

alis

tic a

nd a

chie

vabl

e da

tes

n/a

141

WE

C-T

S-S

G-0

07F

abric

ate

and

deliv

er to

NG

NP

Site

Mov

ed to

be

finis

hed

befo

re te

stin

gin

CT

Fn/

a

142

WE

C-T

S-S

G-0

08In

stal

l and

ope

rate

Sta

rt d

ate

mov

ed to

coi

ncid

e w

ithN

GN

P In

itial

Ope

ratin

g da

teN

GN

P

143

Hyd

rog

en P

rod

uct

ion

Sys

tem

144

Su

lfu

ric

Aci

d D

eco

mp

osi

tio

nO

rig

inal

Dat

en

/a

145

Up

to c

ompl

etio

n of

S-I

ILS

146

Com

plet

e an

alys

is, s

uppo

rtin

g da

ta, m

ater

ials

test

ing

and

cata

lyst

choi

ce &

test

s

147

Pilo

t tes

t of D

ecom

pose

r

148

Eng

inee

ring

test

of D

ecom

pose

r

Insu

lati

on

Man

ufa

ctu

rers

, IN

L, O

RN

L, A

NL

$ 45

0,00

0.00

Pip

ing

Sys

tem

Des

ign

er$

105,

600.

00

CTF

$ 0.

00

NG

NP

$ 0.

00

Su

pp

lier

/ Des

ign

Au

tho

rity

$ 25

0,00

0.00 su

pp

lier

site

$ 0.

00

sup

plie

r si

te$

0.00

CTF

/ S

up

plie

r si

te$

0.00

n/a

$ 0.

00

n/a

$ 0.

00

n/a

$ 0.

00

n/a

$ 0.

00

CTF

$ 0.

00

$ 0.

00

n/a

$ 0.

00

n/a

$ 0.

00

NG

NP

$ 0.

00

$ 0.

00

$ 1,

500,

000.

00

$ 10

,300

,000

.00

$ 22

,000

,000

.00

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

Tas

k

Spl

it

Pro

gres

s

Mile

ston

e

Sum

mar

y

Pro

ject

Sum

mar

y

Ext

erna

l Tas

ks

Ext

erna

l Mile

ston

e

Dea

dlin

e

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng

TD

RM

-017

_7.m

pp

Fig

ure

17-

2: M

od

ifie

d T

DR

M S

ched

ule

Fri

08/1

2/05

Pro

ject

: TD

RM

Sch

edul

e_te

rugg

etre

k D

ate:

Fri

08/1

2/05

Page 21: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

IDN

otes

Tas

k N

ame

Cha

nge

to O

rigin

alP

ossi

ble

test

ing

faci

lity

loca

tions

149

Pro

toty

pe te

st o

f Dec

ompo

ser

150

Su

lfu

r D

ioxi

de

Ele

ctro

lysi

s Te

chn

olo

gy

Are

a

151

Up

to c

ompl

etio

n of

cel

l dem

onst

ratio

n at

tem

pera

ture

and

pre

ssur

e

152

HyS

ILS

and

opt

imiz

ed c

ell d

emon

stra

tion

153

Sca

le-u

p ce

lls to

400

cm

2 ,

and

Ele

ctro

lyze

r P

ilot T

est –

mod

ule

154

Sca

le-u

p ce

lls to

100

0 cm

2 an

d E

ngin

eerin

g te

st o

f Ele

ctro

lyze

r

155

Sca

le-u

p ce

lls to

1 m

2 an

d P

roto

type

test

of E

lect

roly

zer

156

Bu

nse

n R

eact

ion

an

d H

I Dec

om

po

sist

ion

Tec

hn

olo

gy

Are

a

157

Up

to c

ompl

etio

n of

S-I

ILS

–B

unse

n: T

RL

158

HI S

ectio

n E

xper

imen

tal T

est

– H

I

159

Bun

sen

and

HI S

yste

ms

Pilo

t Tes

t

160

Bun

sen

and

HI S

yste

ms

Eng

inee

ring

Tes

t

161

Pro

toty

pe H

PS

Tes

t: S

ulfu

ric A

cid,

Bun

sen

& H

I Sec

tions

162

Hig

h T

emp

erat

ure

Ste

am E

lect

roly

sis

Tech

no

log

y A

rea

163

Up

to c

ompl

etio

n of

ILS

164

Ful

l-sca

le s

tack

dem

onst

ratio

n

165

Pilo

t Tes

t

166

Pro

toty

pe H

PS

Tes

t

167

Fu

el E

lem

ents

168

TRL

6 -

TR

L 7

169

WE

C-T

S-F

UE

L-0

01P

rod

uct

ion

Fu

el Ir

rad

iati

on

Tes

ts f

or

No

rmal

Op

erat

ion

alC

on

dit

ion

sIN

M F

acili

ty

170

Irra

diat

ion

plan

ning

& P

repa

ratio

nO

rigin

al D

ate

171

Irra

diat

ion

of P

re-P

rodu

ctio

n F

uel

Orig

inal

Dat

e

172

PIE

and

Ana

lysi

sO

rigin

al D

ate

173

WE

C-T

S-F

UE

L-0

02P

rod

uct

ion

Fu

el H

eat-

up

Tes

ts a

t 16

00°C

an

d 1

800°

C.

INM

Fac

ility

174

Phy

sica

l Hea

ting

Tes

tO

rigin

al D

ate

175

PIE

and

ana

lysi

s of

Hea

ted

Sph

eres

Orig

inal

Dat

e

176

WE

C-T

S-F

UE

L-0

03F

uel

Mat

rix

Gra

ph

ite

Irra

dia

tio

n t

ests

an

d P

IEIV

V-2

M R

uss

ian

Rea

cto

r

177

Irra

diat

ion

Pla

nnin

g &

Pre

para

tion

Orig

inal

Dat

e

178

Irra

diat

ion

and

PIE

Orig

inal

Dat

e

179

WE

C-T

S-F

UE

L-0

04M

ach

ined

Gra

ph

ite

Irra

dia

tio

n t

ests

an

d P

IEIV

V-2

M R

uss

ian

Rea

cto

r

180

Irra

diat

ion

Pla

nnin

g &

Pre

para

tion

Orig

inal

Dat

e

181

Irra

diat

ion

and

PIE

Orig

inal

Dat

e

182

TRL

7 -

TR

L 8

183

WE

C-T

S-F

UE

L-0

05P

rod

uct

ion

Fu

el Ir

rad

iati

on

Tes

ts f

or

NG

NP

No

rmal

Op

erat

ion

al C

on

dit

ion

sS

uit

able

Tes

t R

eact

or

- A

TR

184

Irra

diat

ion

plan

ning

& P

repa

ratio

nO

rigin

al D

ate

185

Irra

diat

ion

of P

re-P

rodu

ctio

n F

uel

Orig

inal

Dat

e

$ 27

,000

,000

.00

$ 3,

000,

000.

00

$ 4.

80

$ 36

.50

$ 59

,000

,000

.00

$ 22

,000

,000

.00

$ 0.

00 $ 3,

000,

000.

00

$ 43

,000

,000

.00

$ 58

,000

,000

.00

$ 0.

00

$ 0.

00

$ 35

,000

,000

.00

$ 30

,000

,000

.00

$ 50

,000

,000

.00

$ 0.

00

$ 0.

00

$ 0.

00

$ 0.

00

$ 0.

00

$ 0.

00

$ 0.

00

$ 0.

00

$ 0.

00

$ 0.

00

$ 0.

00

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

Tas

k

Spl

it

Pro

gres

s

Mile

ston

e

Sum

mar

y

Pro

ject

Sum

mar

y

Ext

erna

l Tas

ks

Ext

erna

l Mile

ston

e

Dea

dlin

e

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng

TD

RM

-017

_7.m

pp

Fig

ure

17-

2: M

od

ifie

d T

DR

M S

ched

ule

Fri

08/1

2/05

Pro

ject

: TD

RM

Sch

edul

e_te

rugg

etre

k D

ate:

Fri

08/1

2/05

Page 22: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

IDN

otes

Tas

k N

ame

Cha

nge

to O

rigin

alP

ossi

ble

test

ing

faci

lity

loca

tions

186

PIE

and

Ana

lysi

sO

rigin

al D

ate

187

WE

C-T

S-F

UE

L-0

06P

rod

uct

ion

Fu

el H

eat-

up

Tes

ts a

t 17

00°C

an

d 1

900°

C.

Su

itab

le T

est

Rea

cto

r -

ATR

188

Phy

sica

l Hea

ting

Tes

tO

rigin

al D

ate

189

PIE

and

ana

lysi

s of

Hea

ted

Sph

eres

Orig

inal

Dat

e

190

WE

C-T

S-F

UE

L-0

07F

uel

Mat

rix

Gra

ph

ite

Irra

dia

tio

n t

ests

an

d P

IES

uit

able

Tes

t R

eact

or

- A

TR

191

Irra

diat

ion

Pla

nnin

g &

Pre

para

tion

Orig

inal

Dat

e

192

Irra

diat

ion

and

PIE

Orig

inal

Dat

e

193

Co

re S

tru

ctu

re C

eram

ics

194

TRL

6 -

TR

L 7

195

WE

C-T

S-C

SC

-001

PB

MR

Rel

evan

tO

rigin

al D

ate

196

WE

C-T

S-C

SC

-002

Ext

ende

d P

rope

rtie

s of

Irra

diat

ed G

raph

ite a

t Low

Tem

pera

ture

sO

rigin

al D

ate

Nat

iona

l Lab

orat

ory

/ Uni

vers

ity

197

WE

C-T

S-C

SC

-003

Ext

ende

d P

rope

rtie

s of

Irra

diat

ed G

raph

ite a

t Hig

h T

empe

ratu

res

Orig

inal

Dat

eN

atio

nal L

abor

ator

y / U

nive

rsity

198

WE

C-T

S-C

SC

-004

Cha

ract

eriz

e R

ace

Tra

ck S

trap

and

Tie

Rod

Mat

eria

lO

rigin

al D

ate

Nat

iona

l Lab

orat

ory

/ Uni

vers

ity

199

WE

C-T

S-C

SC

-005

Insu

latio

n M

ater

ial (

Uni

rrad

iate

d D

ata

Nee

ded)

Orig

inal

Dat

eN

atio

nal L

abor

ator

y / U

nive

rsity

200

Res

erve

Sh

utd

ow

n S

yste

m

201

Orig

inal

Sch

edul

e in

TD

RM

202

TR

L 6

- T

RL

7O

rigin

al D

ate

n/a

203

TR

L 7

- T

RL

8O

rigin

al D

ate

n/a

204

Rea

ctiv

ity

Co

ntr

ol S

yste

m

205

Orig

inal

Sch

edul

e in

TD

RM

206

TR

L 6

- T

RL

7O

rigin

al D

ate

n/a

207

TR

L 7

- T

RL

8O

rigin

al D

ate

n/a

208

Co

re C

on

dit

ion

ing

Sys

tem

209

TRL

6 -

TR

L 7

210

WE

C-T

S-C

CS

-001

Val

ves

deve

lopm

ent T

est S

peci

ficat

ion

Orig

inal

Dat

en/

a

211

WE

C-T

S-C

CS

-002

Blo

wer

dev

elop

men

t Tes

t Spe

cific

atio

nO

rigin

al D

ate

n/a

212

TRL

7 -

TR

8

213

WE

C-T

S-C

CS

-003

CC

S D

evel

opm

ent T

est S

peci

ficat

ion

Orig

inal

Dat

en/

a

214

Rea

cto

r C

avit

y C

oo

ling

Sys

tem

215

TRL

6 -

TR

L 7

216

No

test

s de

fined

.Adv

ance

men

t to

next

TR

L w

ill b

e ac

hiev

ed th

roug

hso

ftwar

e an

alys

is.

Orig

inal

Dat

en/

a

217

TRL

7 -

TR

L 8

218

Orig

inal

Sch

edul

e in

TD

RM

219

WE

C-T

S-R

CC

S-0

01V

erify

func

tioni

ng o

f RC

CS

with

res

pect

-mai

ntai

ning

Rea

ctor

Cav

ityco

ncre

te b

elow

cod

e lim

itsO

rigin

al D

ate

n/a

220

WE

C-T

S-R

CC

S-0

02C

onfir

m o

pera

tion

of R

CC

S ta

nk a

utom

atic

wat

er r

eple

nish

men

tfu

nctio

nO

rigin

al D

ate

n/a

221

WE

C-T

S-R

CC

S-0

03V

alid

ate

anal

ysis

of D

WS

sup

ply

and

heat

sin

k pe

rfor

man

ces

Orig

inal

Dat

en/

a

222

WE

C-T

S-R

CC

S-0

04V

alid

ate

theo

retic

al a

naly

sis

of p

ump

trip

effe

ct o

n R

CC

S p

ress

ure

Orig

inal

Dat

en/

a

$ 0.

00

$ 0.

00

$ 0.

00 $ 0.

00

$ 0.

00

$ 0.

00

Nat

ion

al L

abo

rato

ry /

Un

iver

sity

$ 0.

00

Nat

ion

al L

abo

rato

ry /

Un

iver

sity

$ 0.

00

Nat

ion

al L

abo

rato

ry /

Un

iver

sity

$ 0.

00

Nat

ion

al L

abo

rato

ry /

Un

iver

sity

$ 0.

00

n/a

$ 0.

00

n/a

$ 0.

00

n/a

$ 0.

00

n/a

$ 0.

00

n/a

$ 0.

00

n/a

$ 0.

00

n/a

$ 0.

00

n/a

$ 0.

00

$ 0.

00

n/a

$ 0.

00

n/a

$ 0.

00

n/a

$ 0.

00

n/a

$ 0.

00

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

Tas

k

Spl

it

Pro

gres

s

Mile

ston

e

Sum

mar

y

Pro

ject

Sum

mar

y

Ext

erna

l Tas

ks

Ext

erna

l Mile

ston

e

Dea

dlin

e

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng

TD

RM

-017

_7.m

pp

Fig

ure

17-

2: M

od

ifie

d T

DR

M S

ched

ule

Fri

08/1

2/05

Pro

ject

: TD

RM

Sch

edul

e_te

rugg

etre

k D

ate:

Fri

08/1

2/05

Page 23: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NGNP-CTF MTECH-TDRM-017 NGNP Technology Development Road Mapping Section 17 : Integrated Schedule and Cost Estimate

NGNP-CTF MTECH-TDRM-017_Rev0.doc 10/27/2008

23 of 89

17.1.4 Modified CTF Schedule

Figure 17-3 shows the test specifications relevant to the CTF only and especially for the 950ºC Reactor Outlet (ROT) Temperature related SSCs. These include Small Scale Development Tests (SSDTs), Technology development Loops (TDLs), Component Qualification Loops and the envisaged Circulator Test Loop (CTL).

The SSDTs are envisaged to incorporate separate and multiple effects tests which are

more sophisticated than normal university of laboratory testing. The TDLs are envisaged to be loops with mass flows in the order of 3.6 kg/s at temperature of 950ºC and pressures up to 9 MPa. The CQLs are earmarked for larger component testing and consists of a combination of TDLs linked together to provide higher mass flows and more heating capacity.

For the case in which the NGNP ROT is lowered to 750°C, the test specifications that

will still be relevant can be seen in Figure 17-4. This CTF test schedule is an input to the Test Loop(s) Preconceptual Design and will be

updated as the Test Loop(s) Preconceptual Design develops.

Page 24: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

IDN

otes

Task

Nam

e1

Test

Spe

c N

umbe

rM

odifi

ed C

TF O

nly

950°

C2

Circ

ulat

or3

TRL

6 - T

RL

7

4W

EC

-TS

-CIR

C-0

01E

MB

s, c

atch

er b

earin

gs T

est S

peci

ficat

ion

5W

EC

-TS

-CIR

C-0

02H

eliu

m R

otat

ing

seal

s Te

st S

peci

ficat

ion

6W

EC

-TS

-CIR

C-0

03P

artia

l or F

ull s

cale

circ

ulat

or M

odel

Tes

t Spe

cific

atio

n

7IH

X A

(Met

allic

)8

TRL

4 - T

RL

5

9W

EC

-TS

-IHX

A-1

2S

peci

ficat

ion

of te

stin

g of

uni

t cel

l of c

ompa

ct H

eat E

xcha

nger

s

10TR

L 5

- TR

L 6

11W

EC

-TS

-IHX

A-0

13S

peci

ficat

ion

of te

stin

g of

com

pact

hea

t exc

hang

er m

odul

e (1

.2M

W)

12TR

L 6

- TR

L 7

13W

EC

-TS

-IHX

A-0

15S

hell

Sid

e Fl

ow D

istri

butio

n an

d B

ypas

s Le

akag

e Te

stin

g

14W

EC

-TS

-IHX

A-0

16M

ulti-

mod

ule

Hea

t Tra

nsfe

r Tes

ting

15IH

X A

(Cer

amic

)16

TRL

4 - T

RL

5

17W

EC

-TS

-IHX

A-0

30Te

stin

g of

uni

t cel

l of C

ompa

ct H

eat E

xcha

nger

18TR

L 5

- TR

L 6

19W

EC

-TS

-IHX

A-0

31S

peci

ficat

ion

of te

stin

g of

com

pact

hea

t exc

hang

er m

odul

e (1

.2M

w)

20TR

L 6

- TR

L 7

21W

EC

-TS

-IHX

A-0

33S

hell-

side

Flo

w D

istri

butio

n an

d B

ypas

s Le

akag

e Te

stin

g

22W

EC

-TS

-IHX

A-0

34M

ulti-

mod

ule

Hea

t Tra

nsfe

r Tes

ting

23IH

X B

24TR

L 4

- TR

L 5

25W

EC

-TS

-IHX

B-0

12Te

stin

g of

Uni

t Cel

l of C

ompa

ct H

eat E

xcha

nger

26TR

L 5

- TR

L 6

27W

EC

-TS

-IHX

B-0

13Te

stin

g of

inte

grat

ed c

ompa

ct H

eat E

xcha

nger

28TR

L 6

- TR

L 7

29W

EC

-TS

-IHX

B-0

15S

hell-

side

Flo

w D

istri

butio

n an

d B

ypas

s Le

akag

e Te

stin

g

30W

EC

-TS

-IHX

B-0

16M

ulti-

mod

e H

eat T

rans

fer T

estin

g

31Pi

ping

32TR

L 5

- TR

L 6

33W

EC

-TS

-PIP

-006

Effe

cts

of H

e in

filtra

tion

on th

erm

al c

ondu

ctiv

ity o

f ins

ulat

ion

mat

eria

l

34W

EC

-TS

-PIP

-007

The

effe

ct o

f flu

id im

purit

ies

( C) o

n in

sula

tion

prop

ertie

s

35W

EC

-TS

-PIP

-008

Re-

eval

uatio

n of

nee

ded

mat

urat

ion

task

s ba

sed

on T

rade

stu

dies

36TR

L 6

- TR

L 7

37W

EC

-TS

-PIP

-009

Per

form

ance

&en

viro

nmen

tal t

estin

g:pr

otot

ypic

al h

igh-

& lo

w-te

mp

pipi

ng/in

sula

tion

syst

em

38M

ixin

g C

ham

ber

39TR

L 6

- TR

L 7

40W

EC

-TS

-MC

-003

Par

tial o

r Ful

l Sca

le F

low

Mix

ing

Cha

mbe

r Mod

el T

est S

peci

ficat

ion

41St

eam

Gen

erat

or42

TRL

6 - T

RL

7

43W

EC

-TS

-SG

-005

Per

form

ance

test

ing

in C

TF

CTF

Initi

al O

pera

ting

Dat

e

Sm

all S

cale

Dev

elop

men

t Tes

ts

Tech

nolo

gy D

evel

opm

ent L

oop

Circ

ulat

or T

est L

oop

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

Task

Spl

it

Pro

gres

s

Mile

ston

e

Sum

mar

y

Pro

ject

Sum

mar

y

Ext

erna

l Tas

ks

Ext

erna

l Mile

ston

e

Dea

dlin

e

NG

NP

-CTF

MTE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng

CTF

Sch

edul

e 95

0.m

pp

Figu

re 1

7-3:

Mod

ified

CTF

Sch

edul

e - 9

50°C

Thu

08/1

2/04

Pro

ject

: CTF

Sch

edul

e 95

0D

ate:

Thu

08/

12/0

4

Page 25: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

IDN

otes

Task

Nam

e1

Test

Spe

c N

umbe

rM

odifi

ed C

TF O

nly

750°

C

2C

ircul

ator

3TR

L 6

- TR

L 7

4W

EC

-TS

-CIR

C-0

01E

MB

s, c

atch

er b

earin

gs T

est S

peci

ficat

ion

5W

EC

-TS

-CIR

C-0

02H

eliu

m R

otat

ing

seal

s Te

st S

peci

ficat

ion

6W

EC

-TS

-CIR

C-0

03P

artia

l or F

ull s

cale

circ

ulat

or M

odel

Tes

t Spe

cific

atio

n

7IH

X B

8TR

L 4

- TR

L 5

9W

EC

-TS

-IHX

B-0

12Te

stin

g of

Uni

t Cel

l of C

ompa

ct H

eat E

xcha

nger

10TR

L 5

- TR

L 6

11W

EC

-TS

-IHX

B-0

13Te

stin

g of

inte

grat

ed c

ompa

ct H

eat E

xcha

nger

12TR

L 6

- TR

L 7

13W

EC

-TS

-IHX

B-0

15S

hell-

side

Flo

w D

istri

butio

n an

d B

ypas

s Le

akag

e Te

stin

g

14W

EC

-TS

-IHX

B-0

16M

ulti-

mod

ule

Hea

t Tra

nsfe

r Tes

ting

15Pi

ping

16TR

L 5

- TR

L 6

17W

EC

-TS

-PIP

-006

Effe

cts

of H

e in

filtra

tion

on th

erm

al c

ondu

ctiv

ity o

f ins

ulat

ion

mat

eria

l

18W

EC

-TS

-PIP

-007

The

effe

ct o

f flu

id im

purit

ies

( C) o

n in

sula

tion

prop

ertie

s

19W

EC

-TS

-PIP

-008

Re-

eval

uatio

n of

nee

ded

mat

urat

ion

task

s ba

sed

on T

rade

stu

dies

20TR

L 6

- TR

L 7

21W

EC

-TS

-PIP

-009

Per

form

ance

&en

viro

nmen

tal t

estin

g:pr

otot

ypic

al h

igh-

& lo

w-te

mp

pipi

ng/in

sula

tion

syst

em

22M

ixin

g C

ham

ber

23TR

L 6

- TR

L 7

24W

EC

-TS

-MC

-003

Par

tial o

r Ful

l Sca

le F

low

Mix

ing

Cha

mbe

r Mod

el T

est S

peci

ficat

ion

25St

eam

Gen

erat

or

26TR

L 6

- TR

L 7

27W

EC

-TS

-SG

-005

Per

form

ance

test

ing

in C

TF

CTF

Initi

al O

pera

ting

Dat

e

Sm

all S

cale

Dev

elop

men

t Tes

ts

Tech

nolo

gy D

evel

opm

ent L

oop

Circ

ulat

or T

est L

oop

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

Task

Spl

it

Pro

gres

s

Mile

ston

e

Sum

mar

y

Pro

ject

Sum

mar

y

Ext

erna

l Tas

ks

Ext

erna

l Mile

ston

e

Dea

dlin

e

NG

NP

-CTF

MTE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng

CTF

Sch

edul

e 75

0.m

pp

Figu

re 1

7-4:

CTF

Sch

edul

e 75

0°C

Thu

08/1

2/04

Pro

ject

: CTF

Sch

edul

e 75

0.m

ppD

ate:

Thu

08/

12/0

4

Page 26: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NGNP-CTF MTECH-TDRM-017 NGNP Technology Development Road Mapping Section 17 : Integrated Schedule and Cost Estimate

NGNP-CTF MTECH-TDRM-017_Rev0.doc 10/27/2008

26 of 89

17.1.5 Conclusion

Pending further schedule enhancements and optimization, the number of loops required in the CTF is forecasted in Table 17.1. (This will be confirmed as part of the Test Loop(s) Preconceptual Design)

Table 17-1: The number of loops required in the CTF

Number of: 950ºC ROT Related SSCs

750ºC ROT Related SSCs

Technology Development Loops 5-6 2-3 Circulator Test Loops 1 1 CQL-1 1 1

For the 950ºC ROT it is forecasted that five to six TDLs are required, This can be

optimized (and will be as part of the Test Loop(s) Preconceptual Design). For instance if the IHX A (Ceramic) tests are conducted after the IHX A (Metallic) testing is completed), two TDLs will fall away. As the methods and software used in the design matures some of the scheduled testing could also be reduced as risks will be mitigated though code verification and validation.

For the 750ºC ROT it is forecasted that two TDLs are required for testing of IHX B. It is

forecasted that a CTL will be required to test the circulator as well as some of the piping sections and the mixing chamber.

The Component Qualification Loops (CQL-1) are envisaged for testing of larger

components that might be required as the NGNP design progresses and are configured using TDLs.

The number of Small Scale Development Tests will be determined as part of the Test

Loop(s) Preconceptual Design.

At the completion of the CTF Preconceptual Design, where the optimum construction and commissioning schedule for the CTF will be determined, the TDRM Schedules will be updated accordingly.

Page 27: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NGNP-CTF MTECH-TDRM-017 NGNP Technology Development Road Mapping Section 17 : Integrated Schedule and Cost Estimate

NGNP-CTF MTECH-TDRM-017_Rev0.doc 10/27/2008

27 of 89

17.2 COST ESTIMATE

17.2.1 Introduction

Cost estimates are provided for certain critical Systems, Structures and Components (SSCs) in this document. These SSCs entail inter alia the metallic IHX A, ceramic IHX A and IHX B, as well as the HTS Piping systems. For the purpose of this document, estimates have been provided only up to a TRL rating of 5, due to the high uncertainty that exists in estimating the costs for higher TRL advancements. Estimates for higher TRL advancements can only be provided when additional design information (preliminary or final) of the NGNP and components are available. For some of the SSCs, more design information is required in order to develop reliable cost estimates. These include the PHTS Circulator, SHTS Mixing Chamber and Steam Generator. Trade studies need to be done to progress the designs and to verify and determine the specific combinations of sub-components that will be used. There is enough time as per the modified schedule to perform the trade study before the advancement of the TRL and before possible testing in the CTF will be performed.

The Hydrogen production system cost estimate has been developed as part of the

Hydrogen Production Alternatives Study [17-3] and is presented in this document (see Tables 17-3 and 17-4). Estimates for the HPS shown in Table 17-3 (summary cost of original TDRMs) only incorporate total estimates for (i) sulfuric acid decomposition and (ii) sulfur dioxide electrolysis technologies, the respective technologies needed for the Hybrid Sulfur (HyS) hydrogen production system. Although a reference design has not been down selected for the HPS, the HyS process has been selected as the basis for the estimates shown.

Where cost information was not available, the WEC NGNP PCDR costs were used as the

basis, i.e., Fuel Elements, Core Structures Ceramics, etc [17-4]. The bulk of estimated costs provided are based on input received/readily available from

contributors/institutions conducting similar work in industry. Table 17-4 of this document captures the estimates made for the identified SSCs as well as possible test locations/facilities that were identified and are involved with similar testing programs. The compositions of the estimates made for each test specification are captured in individual specification estimates in Appendix A. The bases used in these sheets will be elaborated upon here after.

17.2.2 Assumptions and Bases of Cost Estimates The following assumptions and bases are applicable to the estimates shown in Appendix

A.

17.1.2.1 Applicability to Schedule The cost estimates stated in Table 17.4 are based on November 2008 dollar values. No

escalation for future years has been incorporated.

Page 28: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NGNP-CTF MTECH-TDRM-017 NGNP Technology Development Road Mapping Section 17 : Integrated Schedule and Cost Estimate

NGNP-CTF MTECH-TDRM-017_Rev0.doc 10/27/2008

28 of 89

17.1.2.2 TRL Advancements For the purpose of this document, estimates have only been provided up to a TRL rating

of 5 due to the high uncertainty that exists in estimating the costs for higher TRL advancements. Estimates for higher TRL advancements can only be provided when additional design information (preliminary or final) is available and the initial technology development has progressed to a more mature point.

17.1.2.3 Contingencies and Uncertainties

Contingencies for the proposed estimates given involve a 10 percent adjustment on resource, testing, materials and other applicable costs stated. This is separate from the adjustment factors applicable to the ceramic IHX A as well as IHX B. The adjustment factors applicable to IHX B are based on IHX A and are shown in Table 17.2. These factors have been used as the basis for the IHX B estimates due to time constraints. The adjustment factors for the ceramic IHX A have been based on a factor of 2 due to various uncertainties that still exist in the estimate process. These factors involve intricacies that exist relating to sample preparation, sample machining as well as the ceramic material that still needs to be identified through relevant trade studies.

Table 17-2: Cost Ratios for Metallic IHX A to IHX B

# IHX A Test

Specification IHX B Test

Specification Comments IHX A to IHX B Cost Ratio

1 617 Material Specification and Procure

800H Material Specification and

Procure

Adopt existing 800H specification, procure 1 to 2 heats vs. 3 for 617

>2

2 617 Joining Technology and Result Properties

Database for Braze & Diffusion Bond

800H

Equivalent work for both 1

3 Thermal/Physical/ Mech. Prop of 617

800H High Temp Material Properties

Adopt existing 800H database

>10

4

Effects of Thermal Ageing and Environment on 617 Properties

Effects of Thermal Ageing and

Environment on 800H

Adopt existing 800H database

>10

5 Covered in rows 2 and 4 above.

Effects of Environment

Exposure on 800H Braze & Diff

Bonds

Equivalent work for 617 and 800H

1

6 Effects of GS and Section Thickness on 617 Properties

Effects of GS and Section Thickness

on 800H Properties

Equivalent work for 617 and 800H

1

7 Corrosion Allowance for 617

Corrosion Allowance for

800H

Equivalent work for 617 and 800H but time and cost may be reduced by

working in parallel

1

8 ASME Sect III CC for 617

Existing ASME Section III Code

No or minimal cost for IHX B

>100

Page 29: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NGNP-CTF MTECH-TDRM-017 NGNP Technology Development Road Mapping Section 17 : Integrated Schedule and Cost Estimate

NGNP-CTF MTECH-TDRM-017_Rev0.doc 10/27/2008

29 of 89

# IHX A Test

Specification IHX B Test

Specification Comments IHX A to IHX B Cost Ratio

Case

9 Thermal/Fluid Modeling Methods

Thermal/Fluid Modeling Methods

Probably a shared task but with higher

temperatures to be considered for IHX A

1

10 Methods for Stress/Strain Modeling

Methods for Stress/Strain

Modeling

Probably a shared task but with higher

temperatures to be considered for IHX A

1.25

11 Structural Integrity Criteria

Structural Integrity Criteria

Probably a shared task but with higher

temperatures to be considered for IHX A

1.25

12 Performance Modeling Methods

Performance Modeling Methods

Probably a shared task but with higher

temperatures to be considered for IHX A

1

13 Unit Cell Tests Unit Cell Tests Separate and equivalent

in cost 1

At a ROT of 950°C, it is important to note that development of both IHX A (metallic or

ceramic) and IHX B will be required. At a ROT of 750°C, only the development of an IHX B will be applicable.

The confidence level of the cost estimates at present is +120%/-:60%, which corresponds

to an accuracy level of Class 4 as noted in [17-5].

17.1.2.4 General

Other bases for the estimates relating to resources used, testing estimates as well as materials are stated in Appendix A. Aspects lacking an estimate basis will only be updated when additional plant design information is available (preliminary or final). Until this information is readily available, only an allowance for certain identified tasks without a basis can be given.

Page 30: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NGNP-CTF MTECH-TDRM-017 NGNP Technology Development Road Mapping Section 17 : Integrated Schedule and Cost Estimate

NGNP-CTF MTECH-TDRM-017_Rev0.doc 10/27/2008

30 of 89

17.2.3 Summary Cost: Original TDRMs Table 17.3 shows the sum of cost estimates distributed along a timeline starting in

FY2009 and ending in FY2021. The starts and durations of the tasks corresponds to those noted in the original TDRMs. Comments and assumptions applicable to the values shown are given below Table 17.3.

Page 31: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t R

oad

Map

ping

Rep

ort

Sec

tion

17: I

nteg

rate

d S

ched

ule

and

Cos

t E

stim

ate

Tab

le 1

7-3:

Sum

mar

y C

ost:

Ori

gina

l TD

RM

Su

mm

ary

cost

s: O

rig

inal

TD

RM

sS

SC

[1],

[2]

FY

2009

FY

2010

FY

2011

FY

2012

FY

2013

FY

2014

FY

201

5F

Y 2

016

FY

201

7F

Y 2

018

FY

201

9F

Y 2

020

FY

202

1T

ota

l

Circ

ulat

or [3

]$4

50,0

00$0

$0$0

$0$0

$0$0

$0$0

$0$0

$0$4

50,0

00IH

X A

(M

etal

lic)

$4,2

05,0

30$4

,464

,905

$3,3

00,9

71$1

,007

,072

$225

,225

$100

,000

$100

,000

$0$0

$0$0

$0$0

$13,

403,

203

IHX

A (

Cer

amic

)$5

,482

,274

$4,4

88,6

66$3

,896

,338

$0$0

$0$0

$0$7

05,9

25$7

05,9

25$7

05,9

25$3

80,3

25$4

00,0

00$1

6,76

5,37

8IH

X B

$3,1

07,6

90$2

,851

,809

$1,6

89,4

06$0

$0$1

00,0

00$1

00,0

00$0

$0$0

$0$0

$0$7

,848

,905

Pip

ing

$1,4

81,8

67$2

83,3

33$0

$0$0

$0$0

$0$0

$0$0

$0$0

$1,7

65,2

00M

ixin

g C

ham

ber

[3]

$0$0

$1,1

24,0

00$1

,124

,000

$0$0

$0$0

$0$0

$0$0

$0$2

,248

,000

Ste

am G

ener

ator

$0$4

,092

,000

$7,2

74,0

00$7

,741

,000

$2,8

14,0

00$0

$0$0

$0$0

$0$0

$0$2

1,92

1,00

0H

PS

[4]

$3,5

00,0

00$5

,300

,000

$12,

670,

000

$15,

610,

000

$15,

610,

000

$23,

110,

000

$30,

670,

000

$30,

670,

000

$24,

500,

000

$24,

500,

000

$7,8

00,0

00$0

$0$1

93,9

40,0

00F

uel

$4,5

00,0

00$6

,500

,000

$6,5

00,0

00$6

,500

,000

$5,5

00,0

00$3

,500

,000

$3,5

00,0

00$3

,500

,000

$4,5

00,0

00$0

$0$0

$0$4

4,50

0,00

0C

SC

$500

,000

$600

,000

$800

,000

$800

,000

$700

,000

$900

,000

$700

,000

$0$0

$0$0

$0$0

$5,0

00,0

00R

SS

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

RC

Sn/

an/

an/

an/

an/

an/

an/

an/

an/

an/

an/

an/

an/

an

/aC

CS

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

RC

CS

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

TO

TA

L (

$)$2

3,22

6,86

1$2

8,58

0,71

4$3

7,25

4,71

4$3

2,78

2,07

2$2

4,84

9,22

5$2

7,71

0,00

0$3

5,07

0,00

0$3

4,17

0,00

0$2

9,70

5,92

5$2

5,20

5,92

5$8

,505

,925

$380

,325

$400

,000

$113

,901

,686

[1]

E

stim

ates

not

ed fo

r so

me

SS

C's

are

thos

e gi

ven

in N

GN

P-1

6-R

PT

-001

(no

tabl

y M

ixin

g C

ham

ber,

Ste

am G

ener

ator

, Fue

l, C

SC

) du

e to

lim

ited

desi

gn

.

in

form

atio

n[2

]

Cos

ting

of R

SS

, RC

S, C

CS

and

RC

CS

mak

e pa

rt o

f PB

MR

DP

P a

nd a

re n

ot in

clud

ed[3

]

For

the

Circ

ulat

or, M

ixin

g C

ham

ber

as w

ell a

s th

e S

team

Gen

erat

or, c

once

pt d

esig

n ne

eds

to b

e pr

ogre

ssed

furt

her

befo

re s

ensi

ble

estim

atio

ns c

an b

e

.

mad

e[4

]

Sum

tota

l of H

PS

ref

lect

s to

tals

of s

ulfu

ric a

cid

deco

mpo

sitio

n te

chno

logy

dev

elop

men

t as

wel

l as

sulfu

r di

oxid

e el

ectr

olys

is te

chno

logy

dev

elop

men

t [N

GN

P-

.

CT

F M

TE

CH

-TD

RM

-008

]. F

or th

e pu

rpos

es o

f thi

s es

timat

ion,

est

imat

ions

ref

lect

cos

ts n

eede

d to

eta

blis

h H

ybrid

Sul

phur

hyd

roge

n pr

oduc

tion

syst

em (

even

.

th

ough

the

refe

renc

e de

sign

stil

l has

to b

e se

lect

ed).

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 32: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NGNP-CTF MTECH-TDRM-017 NGNP Technology Development Road Mapping Section 17 : Integrated Schedule and Cost Estimate

NGNP-CTF MTECH-TDRM-017_Rev0.doc 10/27/2008

32 of 89

17.2.4 Original TDRM Cost Estimate (Facilities Description and Total Cost Included)

Table 17.4 shows the original TDRM cost estimate for each test specification with

associated details regarding possible facilities that have the capabilities of conducting the relevant testing. Costing assumptions have also been listed at the end of the table. Detailed bases for each of the individual test specifications estimates are given in Specification cost estimate sheets shown in Appendix A.

Due to the large number of possible facilities that can conduct similar work to that stated

in the test specifications (notably materials qualification actions), only the facility capability is noted in Table 17.4 and not the facility availability. Facilities have been identified in the following areas:

1. Laboratories – These facilities are most common and widely available. Work associated with these facilities involves aspects relating to material qualification actions.

2. Small Scale Testing – Specialized testing on scaled units is required here and can in general be conducted by the relevant supplier or in a small scale development test loop (CTF capability)

3. CTF Testing – Testing of partial or full scaled units at relevant temperatures and pressures.

Page 33: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F-M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

SS

CT

est

Sp

ecif

icat

ion

Tes

t S

pec

ific

atio

n N

um

ber

Fac

ility

/Su

pp

ort

ing

Org

aniz

atio

ns

Du

rati

on

Fis

cal

Yea

r/s

To

tal (

$)

$450

,000

TR

L 6

- T

RL

7T

rade

stu

dies

to s

elec

t ref

eren

ce d

esig

nn/

aS

uppl

ier

/ Des

ign

Aut

horit

y12

Mon

ths

FY

201

0 -

FY

20

13$4

50,0

00

EM

Bs,

Cat

cher

bea

rings

Tes

t Spe

cific

atio

nW

EC

-TS

-CIR

C-0

01E

MB

s S

uppl

ier

Tes

t Fac

ility

12 M

onth

sF

Y 2

010

- F

Y

2013

[-]

Hel

ium

Rot

atin

g se

als

Tes

t Spe

cific

atio

nW

EC

-TS

-CIR

C-0

02R

otat

ing

Sea

l Sup

plie

r T

est F

acili

ty12

Mon

ths

FY

201

0 -

FY

20

13[-

]

Par

tial o

r F

ull s

cale

circ

ulat

or M

odel

Tes

t Spe

cific

atio

nW

EC

-TS

-CIR

C-0

03C

TF

/Sup

plie

r S

ite18

Mon

ths

FY

201

0 -

FY

20

13[-

]

TR

L 7

- T

RL

8P

roto

type

circ

ulat

or T

est S

peci

ficat

ion

WE

C-T

S-C

IRC

-004

NG

NP

Site

3 -

12 M

onth

sF

Y 2

016

- F

Y

2018

[-]

$13,

403,

203

TR

L 2

- T

RL

3A

lloy

617

Mat

eria

l Spe

cific

atio

n an

d pr

ocur

emen

tW

EC

-TS

-IH

XA

-001

INL,

OR

NL

12 M

onth

sF

Y 2

009

- F

Y

2012

$105

,600

Allo

y 61

7 Jo

inin

g T

echn

olog

y an

d R

esul

tant

Pro

pert

ies

WE

C-T

S-I

HX

A-0

02IN

L, O

RN

L, A

NL,

Com

pact

hea

t exc

hang

er

desi

gner

s/m

anuf

actu

rers

30 M

onth

sF

Y 2

009

- F

Y

2012

$3,7

35,4

03

The

rmal

/phy

sica

l and

mec

hani

cal p

rope

rtie

s of

Allo

y 61

7W

EC

-TS

-IH

XA

-003

INL,

OR

NL,

AN

L, L

AN

L, S

NL,

BN

L, C

SIR

36 M

onth

sF

Y 2

009

- F

Y

2012

$811

,258

Effe

cts

of th

erm

al A

ging

and

env

ironm

ent o

n A

lloy

617

WE

C-T

S-I

HX

A-0

04IN

L, O

RN

L42

Mon

ths

FY

200

9 -

FY

20

12$4

,491

,177

Effe

cts

of G

rain

siz

e an

d se

lect

ion

thic

knes

s on

Allo

y 61

7 pr

oper

ties

WE

C-T

S-I

HX

A-0

05IN

L, O

RN

L, A

NL,

LA

NL,

SN

L, B

NL,

CS

IR24

Mon

ths

FY

200

9 -

FY

20

12$8

33,7

08

Cor

rosi

on A

llow

ance

s fo

r A

lloy

617

WE

C-T

S-I

HX

A-0

06IN

L, O

RN

L, F

ZJ,

Sac

lay

36 M

onth

sF

Y 2

009

- F

Y

2012

$1,9

04,4

08

Tab

le 1

7-4:

Ori

gina

l TD

RM

Cos

t E

stim

ates

(F

acili

ty D

escr

ipti

on a

nd T

otal

Cos

t In

clud

ed)

Cir

cula

tor

[1]

IHX

A (

Met

allic

) [2

]

NG

NP

-CTF

MTE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 34: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F-M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

SS

CT

est

Sp

ecif

icat

ion

Tes

t S

pec

ific

atio

n N

um

ber

Fac

ility

/Su

pp

ort

ing

Org

aniz

atio

ns

Du

rati

on

Fis

cal

Yea

r/s

To

tal (

$)

Tab

le 1

7-4:

Ori

gina

l TD

RM

Cos

t E

stim

ates

(F

acili

ty D

escr

ipti

on a

nd T

otal

Cos

t In

clud

ed)

TR

L 3

- T

RL

4A

SM

E s

elec

tion

III C

ode

Cas

e fo

r A

lloy

617

WE

C-T

S-I

HX

A-0

07IN

L, O

RN

L, C

HE

des

igne

rs/m

anuf

actu

rers

48 M

onth

sF

Y 2

010

- F

Y

2015

$760

,650

The

rmal

/Flu

id M

odel

ing

Met

hods

for

Met

allic

IHX

AW

EC

-TS

-IH

XA

-008

CH

E s

uppl

ier/

desi

gn a

utho

rity,

INL,

OR

NL,

AN

L, L

AN

L36

Mon

ths

FY

201

0 -

FY

20

15$1

40,2

50

Met

hods

for

stre

ss/s

trai

n m

odel

ing

of m

etal

lic IH

X A

WE

C-T

S-I

HX

A-0

09C

HE

sup

plie

r/de

sign

aut

horit

y, IN

L, O

RN

L, A

NL,

LA

NL

36 M

onth

sF

Y 2

010

- F

Y

2015

$140

,250

Crit

eria

for

stru

ctur

al in

tegr

ity o

f IH

X A

WE

C-T

S-I

HX

A-0

10C

HE

sup

plie

r/de

sign

aut

horit

y, IN

L, O

RN

L, A

NL,

LA

NL

36 M

onth

sF

Y 2

010

- F

Y

2015

$140

,250

Per

form

ance

Mod

elin

g M

etho

ds fo

r IH

X A

WE

C-T

S-I

HX

A-0

11C

HE

sup

plie

r/de

sign

aut

horit

y, IN

L, O

RN

L, A

NL,

LA

NL

48 M

onth

sF

Y 2

010

- F

Y

2015

$140

,250

TR

L 4

- T

RL

5S

peci

ficat

ion

of te

stin

g of

uni

t cel

l of c

ompa

ct H

eat

Exc

hang

ers

[3]

WE

C-T

S-I

HX

A-0

12C

HE

des

igne

r/m

anuf

actu

rer

(Hea

tric

, Bra

yton

Ene

rgy)

24 M

onth

sF

Y 2

014

- F

Y

2016

$200

,000

TR

L 5

- T

RL

6T

estin

g of

inte

grat

ed c

ompa

ct h

eat e

xcha

nger

mod

ule

(~1.

2MW

) W

EC

-TS

-IH

XA

-013

CT

F24

Mon

ths

FY

201

7 -

FY

20

19[-

]

AS

ME

III C

ode

Cas

e fo

r C

ompa

ct H

eat E

xcha

nger

D

esig

ns

WE

C-T

S-I

HX

A-0

14C

HE

sup

plie

r/de

sign

aut

horit

y, IN

L, O

RN

L, A

NL,

LA

NL

48 M

onth

sF

Y 2

017

- F

Y

2019

[-]

TR

L 6

- T

RL

7 S

hell-

side

flow

dis

trib

utio

n an

d by

pass

leak

age

test

ing

WE

C-T

S-I

HX

A-0

15C

TF

FY

201

8 -

FY

20

20[-

]

Mul

ti-m

odul

e he

at tr

ansf

er te

stin

g W

EC

-TS

-IH

XA

-016

CT

FF

Y 2

018

- F

Y

2020

[-]

TR

L 7

- T

RL

8T

estin

g of

full

size

com

pact

hea

t exc

hang

er (

Ful

l sca

le

NG

NP

IHX

A)

WE

C-T

S-I

HX

A-0

17N

GN

P48

Mon

ths

FY

201

9 -

FY

20

20[-

]

$16,

765,

378

TR

L 2

- T

RL

3T

rade

stu

dy o

n C

andi

date

Cer

amic

Mat

eria

l for

IHX

AW

EC

-TS

-IH

XA

-018

Sup

plie

r / D

esig

n A

utho

rity

12 M

onth

sF

Y 2

009

- F

Y

2010

$211

,200

IHX

A (

Cer

amic

) [4

]

NG

NP

-CTF

MTE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 35: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F-M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

SS

CT

est

Sp

ecif

icat

ion

Tes

t S

pec

ific

atio

n N

um

ber

Fac

ility

/Su

pp

ort

ing

Org

aniz

atio

ns

Du

rati

on

Fis

cal

Yea

r/s

To

tal (

$)

Tab

le 1

7-4:

Ori

gina

l TD

RM

Cos

t E

stim

ates

(F

acili

ty D

escr

ipti

on a

nd T

otal

Cos

t In

clud

ed)

Tra

de s

tudy

on

Can

dida

te C

eram

ic D

esig

ns fo

r IH

X A

WE

C-T

S-I

HX

A-0

19S

uppl

ier

/ Des

ign

Aut

horit

y12

Mon

ths

FY

200

9 -

FY

20

10$2

11,2

00

TR

L 3

- T

RL

4C

aram

ic H

X D

etai

led

Des

ign

Dat

a N

eeds

(D

DN

s)W

EC

-TS

-IH

XA

-020

Des

ign

Aut

horit

y18

Mon

ths

FY

201

1 -

FY

20

16$1

76,0

00

Cer

amic

Mat

eria

ls S

peci

ficat

ions

and

Pro

cure

men

tW

EC

-TS

-IH

XA

-021

INL,

OR

NL

30 M

onth

sF

Y 2

009

- F

Y

2011

$105

,600

The

rmal

Phy

sica

l Pro

pert

ies

of C

eram

ics

WE

C-T

S-I

HX

A-0

22IN

L, O

RN

L, A

NL,

LA

NL,

SN

L, B

NL,

CS

IR18

Mon

ths

FY

200

9 -

FY

20

11$3

38,6

24

Mec

hani

cal P

rope

rtie

s of

Cer

amic

sW

EC

-TS

-IH

XA

-023

INL,

OR

NL,

AN

L, L

AN

L, S

NL,

BN

L, C

SIR

36 M

onth

sF

Y 2

009

- F

Y

2011

$6,3

50,1

42

Com

patib

ility

of C

eram

ic M

ater

ials

to N

GN

P H

e E

nviro

nmen

tW

EC

-TS

-IH

XA

-024

INL,

OR

NL

18 M

onth

sF

Y 2

009

- F

Y

2011

$1,1

99,0

00

Man

ufac

turin

g T

echn

olog

ies

for

Cer

amic

Hea

t E

xcha

nger

sW

EC

-TS

-IH

XA

-025

CH

E d

esig

ner/

man

ufac

ture

r36

Mon

ths

FY

200

9 -

FY

20

11$5

,275

,512

TR

L 4

- T

RL

5C

eram

ic M

ater

ials

Cod

es a

nd S

tand

ards

WE

C-T

S-I

HX

A-0

26C

HE

sup

plie

r/de

sign

aut

horit

y, IN

L, O

RN

L, A

NL,

LA

NL

48 M

onth

sF

Y 2

017

- F

Y

2020

$1,5

21,3

00

Met

hods

for

The

rmal

/Flu

id a

nd S

tres

s/S

trai

n M

odel

ing

WE

C-T

S-I

HX

A-0

27C

HE

sup

plie

r/de

sign

aut

horit

y, IN

L, O

RN

L, A

NL,

LA

NL

48 M

onth

sF

Y 2

017

- F

Y

2020

$415

,800

Str

uctu

ral I

nteg

rity

Crit

eria

for

Cer

amic

Hea

t E

xcha

nger

sW

EC

-TS

-IH

XA

-028

CH

E s

uppl

ier/

desi

gn a

utho

rity,

INL,

OR

NL,

AN

L, L

AN

L48

Mon

ths

FY

201

7 -

FY

20

20$2

80,5

00

Per

form

ance

Mod

elin

g of

Cer

amic

Hea

t Exc

hang

ers

WE

C-T

S-I

HX

A-0

29C

HE

sup

plie

r/de

sign

aut

horit

y, IN

L, O

RN

L, A

NL,

LA

NL

48 M

onth

sF

Y 2

017

- F

Y

2020

$280

,500

Tes

ting

of u

nit c

ell o

f com

pact

hea

t exc

hang

er [

3]W

EC

-TS

-IH

XA

-030

CH

E d

esig

ner/

man

ufac

ture

r (H

eatr

ic, B

rayt

on E

nerg

y)12

Mon

ths

FY

201

7 -

FY

20

20$4

00,0

00

TR

L 5

- T

RL

6S

peci

ficat

ions

of t

estin

g of

com

pact

hea

t exc

hang

er

mod

ule

(~1

.2M

W)

WE

C-T

S-I

HX

A-0

31C

TF

12 M

onth

sF

Y 2

020

- F

Y

2022

[-]

NG

NP

-CTF

MTE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 36: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F-M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

SS

CT

est

Sp

ecif

icat

ion

Tes

t S

pec

ific

atio

n N

um

ber

Fac

ility

/Su

pp

ort

ing

Org

aniz

atio

ns

Du

rati

on

Fis

cal

Yea

r/s

To

tal (

$)

Tab

le 1

7-4:

Ori

gina

l TD

RM

Cos

t E

stim

ates

(F

acili

ty D

escr

ipti

on a

nd T

otal

Cos

t In

clud

ed)

AS

ME

III C

ode

Cas

e fo

r C

eram

ic C

ompa

ct H

eat

Exc

hang

er D

esig

nsW

EC

-TS

-IH

XA

-032

CH

E s

uppl

ier/

desi

gn a

utho

rity,

INL,

OR

NL,

AN

L, L

AN

L48

Mon

ths

FY

202

0 -

FY

20

22[-

]

TR

L 6

- T

RL

7S

hell-

side

flow

dis

trib

utio

n an

d by

pass

leak

age

test

s.W

EC

-TS

-IH

XA

-033

CT

FF

Y 2

022

- F

Y

2024

[-]

Mul

ti-m

odul

e he

at tr

ansf

er te

stin

gW

EC

-TS

-IH

XA

-034

CT

FF

Y 2

022

- F

Y

2024

[-]

TR

L 7

- T

RL

8T

estin

g of

full

size

com

pact

hea

t exc

hang

er (

Ful

l sca

le

NG

NP

IHX

A)

WE

C-T

S-I

HX

A-0

35N

GN

PF

Y 2

024

- F

Y

2027

[-]

$7,8

48,9

05

TR

L 3

- T

RL

4A

lloy

800H

Mat

eria

l Spe

cific

atio

n an

d P

rocu

rem

ent

WE

C-T

S-I

HX

B-0

01IN

L, O

RN

L12

Mon

ths

FY

200

9 -

FY

20

15$7

0,40

0

Dat

abas

e fo

r B

raze

d an

d D

iffus

ion

Bon

ded

Allo

y 80

0HW

EC

-TS

-IH

XB

-002

INL,

OR

NL,

AN

L, C

HE

des

igne

rs/m

anuf

actu

rers

30 M

onth

sF

Y 2

009

- F

Y

2015

$3,7

30,8

76

Allo

y 80

0H H

igh

Tem

pera

ture

Mat

eria

l Pro

pert

ies

WE

C-T

S-I

HX

B-0

03IN

L, O

RN

L, C

SIR

3 M

onth

sF

Y 2

009

- F

Y

2015

$80,

972

Effe

cts

of T

herm

al A

ging

and

Env

ironm

ent o

n A

lloy

800H

Pro

pert

ies

WE

C-T

S-I

HX

B-0

04IN

L, O

RN

L6

Mot

nhs

FY

200

9 -

FY

20

15$1

04,5

09

Effe

cts

of E

nviro

nmen

tal E

xpos

ure

on A

lloy

800H

B

raze

and

Diff

usio

n B

onde

d Jo

ints

WE

C-T

S-I

HX

B-0

05IN

L, O

RN

L36

Mon

ths

FY

200

9 -

FY

20

15$3

67,6

16

Effe

cts

of G

rain

Siz

e an

d S

ectio

n T

hick

ness

on

Allo

y 80

0H P

rope

rtie

sW

EC

-TS

-IH

XB

-006

INL,

OR

NL,

AN

L, L

AN

L, S

NL,

BN

L, C

SIR

24 M

onth

sF

Y 2

009

- F

Y

2015

$832

,457

Cor

rosi

on A

llow

ance

s fo

r A

lloy

800H

WE

C-T

S-I

HX

B-0

07IN

L, O

RN

L, F

ZJ,

Sac

lay

36 M

onth

sF

Y 2

009

- F

Y

2015

$1,9

01,0

75

The

rmal

/Flu

id M

odel

ing

Met

hods

for

IHX

BW

EC

-TS

-IH

XB

-008

CH

E d

esig

ner/

supp

lier,

INL,

OR

NL,

AN

L36

Mon

ths

FY

200

9 -

FY

20

15$1

40,2

50

IHX

B [

5]

NG

NP

-CTF

MTE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 37: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F-M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

SS

CT

est

Sp

ecif

icat

ion

Tes

t S

pec

ific

atio

n N

um

ber

Fac

ility

/Su

pp

ort

ing

Org

aniz

atio

ns

Du

rati

on

Fis

cal

Yea

r/s

To

tal (

$)

Tab

le 1

7-4:

Ori

gina

l TD

RM

Cos

t E

stim

ates

(F

acili

ty D

escr

ipti

on a

nd T

otal

Cos

t In

clud

ed)

Met

hods

for

Str

ess/

Str

ain

Mod

ling

of IH

X B

WE

C-T

S-I

HX

B-0

09C

HE

des

igne

r/su

pplie

r, IN

L, O

RN

L, A

NL

36 M

onth

sF

Y 2

009

- F

Y

2015

$140

,250

Crit

eria

for

Str

uctu

ral I

nter

grity

of I

HX

BW

EC

-TS

-IH

XB

-010

CH

E d

esig

ner/

supp

lier,

INL,

OR

NL,

AN

L36

Mon

ths

FY

200

9 -

FY

20

15$1

40,2

50

Per

form

ance

Mod

elin

g M

etho

ds fo

r IH

X B

WE

C-T

S-I

HX

B-0

11C

HE

des

igne

r/su

pplie

r, IN

L, O

RN

L, A

NL

48 M

onth

sF

Y 2

009

- F

Y

2015

$140

,250

TR

L 4

- T

RL

5S

peci

ficat

ion

of te

stin

g of

Uni

t Cel

l of C

ompa

ct H

eat

Exc

hang

er [

3]W

EC

-TS

-IH

XB

-012

CH

E d

esig

ner/

man

ufac

ture

r (H

eatr

ic, B

rayt

on E

nerg

y)24

Mon

ths

FY

201

4 -

FY

2016

$200

,000

TR

L 5

- T

RL

6S

peci

ficat

ion

of te

stin

g of

com

pact

hea

t exc

hang

er

mod

ule

(~1

.2M

W)

WE

C-T

S-I

HX

B-0

13C

TF

24 M

onth

sF

Y 2

017

- F

Y

2019

[-]

AS

ME

Sec

tion

III C

ode

Cas

e fo

r C

ompa

ct H

eat

Exc

hang

er D

esig

nsW

EC

-TS

-IH

XB

-014

CH

E s

uppl

ier/

desi

gn a

utho

rity,

INL,

OR

NL,

AN

L, L

AN

L48

Mon

ths

FY

201

7 -

FY

20

19[-

]

TR

L 6

- T

RL

7S

hell-

side

Flo

w D

istr

ibut

ion

and

Byp

ass

Leak

age

Tes

ting

WE

C-T

S-I

HX

B-0

15C

TF

FY

201

8 -

FY

20

20[-

]

Mul

ti-m

odul

e H

eat T

rans

fer

Tes

ting

WE

C-T

S-I

HX

B-0

16C

TF

FY

201

8 -

FY

20

20[-

]

TR

L 7

- T

RL

8S

peci

ficat

ion

of te

stin

g of

a fu

ll sc

ale

com

pact

hea

t ex

chan

ger

WE

C-T

S-I

HX

B-0

17N

GN

P24

Mon

ths

FY

202

0 -

FY

20

22[-

]

$1,7

65,2

00

TR

L 4

- T

RL

5 P

HT

S h

igh-

tem

pera

ture

[760

°C a

nd 9

50°C

] pip

ing

cool

ing,

line

r an

d in

sula

tion

optio

ns tr

ade

stud

yW

EC

-TS

-PIP

-001

Pip

ing

Sys

tem

Des

igne

r6

Mon

ths

FY

200

9 -

FY

20

12$2

11,2

00

PH

TS

low

-tem

pera

ture

[350

°C] p

ipin

g lin

er a

nd

insu

latio

n op

tions

trad

e st

udy

WE

C-T

S-P

IP-0

02P

ipin

g S

yste

m D

esig

ner

6 M

onth

sF

Y 2

009

- F

Y

2012

$140

,800

SH

TS

hig

h-te

mpe

ratu

re[8

40°C

and

900

°C] p

ipin

g lin

er

and

insu

altio

n st

udy

WE

C-T

S-P

IP-0

03P

ipin

g S

yste

m D

esig

ner

6 M

onth

sF

Y 2

009

- F

Y

2012

$211

,200

SH

TS

med

ium

-tem

pera

ture

[659

°C a

nd 7

00°C

] pip

ing

liner

and

insu

latio

n tr

ade

stud

y W

EC

-TS

-PIP

-004

Pip

ing

Sys

tem

Des

igne

r6

Mon

ths

FY

200

9 -

FY

20

12$1

40,8

00

HT

S P

ipin

g

NG

NP

-CTF

MTE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 38: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F-M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

SS

CT

est

Sp

ecif

icat

ion

Tes

t S

pec

ific

atio

n N

um

ber

Fac

ility

/Su

pp

ort

ing

Org

aniz

atio

ns

Du

rati

on

Fis

cal

Yea

r/s

To

tal (

$)

Tab

le 1

7-4:

Ori

gina

l TD

RM

Cos

t E

stim

ates

(F

acili

ty D

escr

ipti

on a

nd T

otal

Cos

t In

clud

ed)

SH

TS

low

-tem

pera

ture

[<30

0°C

] pip

ing

liner

and

in

sula

tion

trad

e st

udy

WE

C-T

S-P

IP-0

05P

ipin

g S

yste

m D

esig

ner

6 M

onth

sF

Y 2

009

- F

Y

2012

$105

,600

TR

L 5

- T

RL

6E

ffect

s of

He

infil

trat

ion

on th

erm

al c

ondu

ctiv

ity o

f in

sula

tion

mat

eria

l [6]

WE

C-T

S-P

IP-0

06In

sula

tion

Man

ufac

ture

rs, I

NL,

OR

NL,

AN

L18

Mon

ths

FY

200

9 -

FY

20

12$4

00,0

00

The

effe

ct o

f flu

id im

purit

ies

on in

sula

tion

prop

ertie

s [7

]W

EC

-TS

-PIP

-007

Insu

latio

n M

anuf

actu

rers

, IN

L, O

RN

L, A

NL

18 M

onth

sF

Y 2

009

- F

Y

2012

$450

,000

Re-

eval

uatio

n of

nee

ded

mat

urat

ion

task

s ba

sed

on

Tra

de s

tudi

esW

EC

-TS

-PIP

-008

Pip

ing

Sys

tem

Des

igne

r3

Mon

ths

FY

200

9 -

FY

20

12$1

05,6

00

TR

L 6

- T

RL

7P

erfo

rman

ce a

nd e

nviro

nmen

tal t

estin

g of

pro

toty

pica

l he

gh-t

empe

ratu

re a

nd lo

w-t

empe

ratu

re

pipi

ng/in

sula

tion

syst

emW

EC

-TS

-PIP

-009

CT

F24

Mon

ths

FY

201

1 -

FY

20

13[-

]

TR

L 7

- T

RL

8T

estin

g of

full

sie

PH

TS

pip

ing

in N

GN

PW

EC

-TS

-PIP

-010

NG

NP

24 M

onth

sF

Y 2

019

- F

Y

2020

[-]

$2,4

98,0

00

TR

L 6

- T

RL

7T

rade

stu

dies

to s

elec

t ref

eren

ce d

esig

nn/

aS

uppl

ier

/ Des

ign

Aut

horit

y12

Mon

ths

FY

201

0 -

FY

20

13$2

50,0

00

Spe

cific

atio

n 1:

Enh

ance

d M

ixin

g D

evic

es T

est

Spe

cific

atio

nW

EC

-TS

-MC

-001

supp

lier

site

6 M

onth

sF

Y 2

009

- F

Y

2012

[-]

Spe

cific

atio

n 2:

Vib

ratio

n D

ampi

ng D

evic

es T

est

Spe

cific

atio

nW

EC

-TS

-MC

-002

supp

lier

site

6 M

onth

sF

Y 2

009

- F

Y

2012

[-]

Par

tial o

r F

ull S

cale

Flo

w M

ixin

g C

ham

ber

Mod

el T

est

Spe

cific

atio

nW

EC

-TS

-MC

-003

CT

F /

Sup

plie

r si

te12

Mon

ths

FY

200

9 -

FY

20

12[-

]

TR

L 7

- T

RL

8P

roto

type

Flo

w M

ixin

g C

ham

ber

Tes

t Spe

cific

atio

nW

EC

-TS

-MC

-004

NG

NP

Site

12 M

onth

sF

Y 2

016

- F

Y20

18[-

]

$22,

500,

000

Ste

am G

ener

ato

r [9

]

Mix

ing

Ch

amb

er [

8]

NG

NP

-CTF

MTE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 39: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F-M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

SS

CT

est

Sp

ecif

icat

ion

Tes

t S

pec

ific

atio

n N

um

ber

Fac

ility

/Su

pp

ort

ing

Org

aniz

atio

ns

Du

rati

on

Fis

cal

Yea

r/s

To

tal (

$)

Tab

le 1

7-4:

Ori

gina

l TD

RM

Cos

t E

stim

ates

(F

acili

ty D

escr

ipti

on a

nd T

otal

Cos

t In

clud

ed)

TR

L 6

- T

RL

7P

erfo

rm a

dow

n se

lect

ion

trad

e st

udy

to d

eter

min

e th

e pr

efer

red

conc

eptu

al a

rran

gem

ent o

f the

SG

WE

C-T

S-S

G-0

01n/

a48

Mon

ths

FY

200

9 -

FY

2012

[-]

Def

ine

requ

irem

ents

and

des

ign

deta

ils fo

r th

e S

G in

th

e P

CS

sys

tem

con

text

WE

C-T

S-S

G-0

02n/

a48

Mon

ths

FY

200

9 -

FY

2012

[-]

Per

form

con

figur

atio

n de

velo

pmen

t tes

ts to

su

bsta

ntia

te th

e de

sign

WE

C-T

S-S

G-0

03n/

a48

Mon

ths

FY

200

9 -

FY

2012

[-]

Des

ign

and

supp

ly a

sca

le p

roto

type

for

the

test

ing

in

the

CT

FW

EC

-TS

-SG

-004

n/a

48 M

onth

sF

Y 2

009

- F

Y20

12[-

]

Per

form

ance

test

ing

in C

TF

WE

C-T

S-S

G-0

05C

TF

48 M

onth

sF

Y 2

009

- F

Y20

12[-

]

TR

L 7

- T

RL

8C

ompl

ete

final

des

ign

of th

e pr

otot

ype

SG

for

the

NG

NP

WE

C-T

S-S

G-0

06n/

a40

- 5

0 m

onth

sF

Y 2

011

- F

Y20

14[-

]

Fab

ricat

e an

d de

liver

to N

GN

P to

the

Site

WE

C-T

S-S

G-0

07n/

a40

- 5

0 m

onth

sF

Y 2

011

- F

Y20

14[-

]

Inst

all a

nd o

pera

teW

EC

-TS

-SG

-008

NG

NP

40 -

50

mon

ths

FY

201

1 -

FY

2014

[-]

$45,

000,

000

TR

L 6

- T

RL

7P

rodu

ctio

n F

uel I

rrad

iatio

n T

ests

for

Nor

mal

O

pera

tiona

l Con

ditio

nsW

EC

-TS

-FU

EL-

001

INM

Fac

ility

FY

201

2 -

2015

[-]

Pro

duct

ion

Fue

l Hea

t-up

Tes

tsW

EC

-TS

-FU

EL-

002

INM

Fac

ility

FY

201

2 -

2015

[-]

Fue

l Mat

rix G

raph

ite Ir

radi

atio

n te

sts

and

PIE

WE

C-T

S-F

UE

L-00

3IV

V-2

M R

ussi

an R

eact

orF

Y 2

012

- 20

15[-

]

Mac

hine

d G

raph

ite Ir

radi

atio

n te

sts

and

PIE

WE

C-T

S-F

UE

L-00

4IV

V-2

M R

ussi

an R

eact

orF

Y 2

012

- 20

15[-

]

Fu

el [

10]

NG

NP

-CTF

MTE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 40: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F-M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

SS

CT

est

Sp

ecif

icat

ion

Tes

t S

pec

ific

atio

n N

um

ber

Fac

ility

/Su

pp

ort

ing

Org

aniz

atio

ns

Du

rati

on

Fis

cal

Yea

r/s

To

tal (

$)

Tab

le 1

7-4:

Ori

gina

l TD

RM

Cos

t E

stim

ates

(F

acili

ty D

escr

ipti

on a

nd T

otal

Cos

t In

clud

ed)

TR

L 7

- T

RL

8A

dditi

onal

Pro

duct

ion

Fue

l Irr

adia

tion

Tes

ts fo

r N

orm

al

Ope

ratio

nal C

ondi

tions

WE

C-T

S-F

UE

L-00

5S

uita

ble

Tes

t Rea

ctor

- A

TR

FY

201

2 -

2015

[-]

Pro

duct

ion

Fue

l Hea

t-up

Tes

tsW

EC

-TS

-FU

EL-

006

Sui

tabl

e T

est R

eact

or -

AT

RF

Y 2

012

- 20

15[-

]

Fue

l Mat

rix G

raph

ite Ir

radi

atio

n te

sts

and

PIE

WE

C-T

S-F

UE

L-00

7S

uita

ble

Tes

t Rea

ctor

- A

TR

FY

201

2 -

2015

[-]

CS

C [

11]

$5,0

00,0

00

TR

L 6

- T

RL

7P

BM

R R

elev

ant

WE

C-T

S-C

SC

-001

FY

200

9 -

FY

20

13[-

]

Ext

ende

d P

rope

rtie

s of

Irra

diat

ed G

raph

ite a

t Low

T

empe

ratu

res

WE

C-T

S-C

SC

-002

Nat

iona

l Lab

orat

ory

/ Uni

vers

ityF

Y 2

009

- F

Y

2013

[-]

Ext

ende

d P

rope

rtie

s of

Irra

diat

ed G

raph

ite a

t Hig

h T

empe

ratu

res

WE

C-T

S-C

SC

-003

Nat

iona

l Lab

orat

ory

/ Uni

vers

ityF

Y 2

009

- F

Y

2013

[-]

Cha

ract

eriz

e R

ace

Tra

ck S

trap

and

Tie

Rod

Mat

eria

lW

EC

-TS

-CS

C-0

04N

atio

nal L

abor

ator

y / U

nive

rsity

FY

200

9 -

FY

20

13[-

]

Insu

latio

n M

ater

ial (

Uni

rrad

iate

d D

ata

Nee

ded)

WE

C-T

S-C

SC

-005

Nat

iona

l Lab

orat

ory

/ Uni

vers

ityF

Y 2

009

- F

Y

2013

[-]

HP

S [

12]

$193

,900

,000

Sul

furi

c A

cid

D

eco

mp

osi

tio

nn/

an/

an/

an/

a$6

5,70

0,00

0

Sul

fur

Dio

xid

e E

lect

orl

ysis

n/a

n/a

n/a

n/a

$128

,200

,000

Bun

sen

Rea

ctio

n an

d H

I d

eco

mp

osi

tio

nn/

an/

an/

an/

a$2

52,1

00,0

00

NG

NP

-CTF

MTE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 41: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F-M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

SS

CT

est

Sp

ecif

icat

ion

Tes

t S

pec

ific

atio

n N

um

ber

Fac

ility

/Su

pp

ort

ing

Org

aniz

atio

ns

Du

rati

on

Fis

cal

Yea

r/s

To

tal (

$)

Tab

le 1

7-4:

Ori

gina

l TD

RM

Cos

t E

stim

ates

(F

acili

ty D

escr

ipti

on a

nd T

otal

Cos

t In

clud

ed)

Hig

h T

emp

erat

ure

Ste

am E

lect

roly

sis

n/a

n/a

n/a

n/a

$128

,800

,000

[1]

Add

ition

al d

esig

n in

form

atio

n is

req

uire

d to

con

duct

sen

sibl

e co

st e

stim

ates

. Tra

de s

tudi

es s

till h

ave

to b

e co

mpl

eted

for

the

Circ

ulat

or to

ver

ify a

nd d

eter

min

e th

e sp

ecifi

c co

mbi

natio

ns o

f sub

-com

pone

nts

that

will

be

used

.[2

]F

or IH

X A

, est

imat

es h

ave

been

con

duct

ed fo

r th

ree

heat

s. E

stim

ates

exc

lude

TR

L 5

to T

RL

8 ad

vanc

emen

ts d

ue to

unc

erta

intie

s th

at a

re s

till p

rese

nt fo

r la

ter

TR

L ad

vanc

emen

ts[3

]T

otal

bas

ed o

n di

scus

sion

s w

ith S

cott

Pen

field

. Fur

ther

det

ail f

or c

ost b

reak

dow

n st

ill r

equi

red

[4]

Equ

ival

ent w

ork

rela

ting

to m

etal

lic IH

X A

hav

e be

en a

djus

ted

by a

fact

or o

f 2 d

ue to

var

ious

unc

erta

intie

s ex

istin

g w

ith r

egar

ds to

cer

amic

s (s

ampl

e pr

epar

atio

n, m

ater

ials

cos

t, et

c.).

Est

imat

es e

xclu

de T

RL

5 to

TR

L 8

adva

ncem

ents

due

to u

ncer

tain

ties

that

are

stil

l pre

sent

for

late

r T

RL

adva

ncem

ents

[5]

Equ

ival

ent w

ork

rela

ting

to m

etal

lic IH

X A

hav

e be

en a

djus

ted

by fa

ctor

s sh

own

in T

able

18.

1 in

Sec

tion

1: In

tegr

ated

Sch

edul

e an

d C

ost E

stim

ate

(with

Fac

ility

Info

rmat

ion)

. Est

imat

es e

xclu

de T

RL

5 to

TR

L 8

adva

ncem

ents

due

to u

ncer

tain

ties

that

are

stil

l pre

sent

for

late

r T

RL

adva

ncem

ents

[6]

Tot

al b

ased

on

disc

ussi

ons

with

Phi

l Ritt

enho

use.

Fur

ther

det

ail f

or c

ost b

reak

dow

n st

ill r

equi

red

[7]

Tot

al b

ased

on

disc

ussi

ons

with

Phi

l Ritt

enho

use.

Fur

ther

det

ail f

or c

ost b

reak

dow

n st

ill r

equi

red

[8]

NG

NP

PC

DR

Rep

ort -

Sec

tion

16 e

stim

ate

give

n -

Con

cept

des

ign

of p

lant

nee

ds to

be

prog

ress

ed b

efor

e se

nsib

le c

ost e

stim

ates

can

be

give

n.

[9]

NG

NP

PC

DR

Rep

ort -

Sec

tion

16 e

stim

ate

give

n -

Con

cept

des

ign

of p

lant

nee

ds to

be

prog

ress

ed b

efor

e se

nsib

le c

ost e

stim

ates

can

be

give

n.

[10]

NG

NP

PC

DR

Rep

ort -

Sec

tion

16 e

stim

ate

give

n[1

1]N

GN

P P

CD

R R

epor

t - S

ectio

n 16

est

imat

e gi

ven

[12]

Est

imat

es fo

r va

rious

pro

cess

HP

S te

chno

logi

es n

oted

in N

GN

P-C

TF

MT

EC

H-T

DR

M-0

08. S

um to

tal r

efle

cts

tota

ls o

f sul

furic

aci

d de

com

posi

tion

tech

nolo

gy d

evel

opm

ent a

s w

ell a

s su

lfur

diox

ide

elec

trol

ysis

tech

nolo

gy d

evel

opm

ent.

For

the

purp

oses

of t

his

estim

atio

n, e

stim

atio

ns r

efle

ct c

osts

nee

ded

to e

tabl

ish

Hyb

rid S

ulph

ur h

ydro

gen

prod

uctio

n sy

stem

(ev

en th

ough

the

refe

renc

e de

sign

stil

l has

to b

e se

lect

ed).

INL

-

Idah

o N

atio

nal L

abo

rato

ryO

RN

L

-

Oak

Rid

ge

Nat

iona

l Lab

ora

tory

AN

L

- A

rgo

nne

Nat

iona

l Lab

ora

tory

LA

NL

-

Lo

s A

lam

os

Nat

iona

l Lab

ora

tory

SN

L

-S

and

ia N

atio

nal L

abo

rato

ryB

NL

-

Bro

okh

aven

Nat

iona

l Lab

ora

tory

CS

IR

-

C

oun

cil f

or

Sci

enti

fic

Ind

ustr

ial R

esea

rch

NG

NP

-CTF

MTE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 42: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NGNP-CTF MTECH-TDRM-017 NGNP Technology Development Road Mapping Section 17 : Integrated Schedule and Cost Estimate

NGNP-CTF MTECH-TDRM-017_Rev0.doc 10/27/2008

42 of 89

17.1.6 Conclusion – Cost Estimates

Cost estimates have been provided for certain critical SSCs (notably IHX A (metallic as well as ceramic), IHX B and HTS Piping). Estimates have only been provided up to a TRL rating of 5. Estimates for higher TRL advancements can only be provided when additional design information (preliminary or final) of the NGNP and components are available.

For some of the SSCs, more design information is required in order to develop reliable

cost estimates (notably PHTS Circulator, SHTS Mixing Chamber and Steam Generator). Trade studies (or various trade studies) need to be done to verify and determine the specific combinations of sub-components that will be used in the aforementioned SSC’s. There is enough time in the modified schedule to perform the trade studies before the advancement of the TRLs and before possible testing in the CTF will be performed. Costing input relating to the HPS as noted in the Hydrogen Plant Alternatives Study (HPAS) has also been incorporated into this document.

The bases for the estimates given (with the exception of the HPS) have also been noted in

Appendix A of this document.

Page 43: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NGNP-CTF MTECH-TDRM-017 NGNP Technology Development Road Mapping Section 17 : Integrated Schedule and Cost Estimate

NGNP-CTF MTECH-TDRM-017_Rev0.doc 10/27/2008

43 of 89

17.2.5 Appendix A: Detailed Cost Estimation Sheets

Page 44: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NGNP-CTF MTECH-TDRM-017 NGNP Technology Development Road Mapping Report Section 17: Integrated Schedule and Cost Estimate

Basis motivations for cost estimations

1) General- Guidelines for minimum required number of samples shown in 'sample' sheet

2) Bases for estimations- Discussions with institutions/available information from institutions conducting similar work (notably ORNL and CSIR) serves partly as basis for these estimations- Information stipulated in technology maturation plans with an element of engineering judgment also serve as part basis for cost estimations.- Basis of cost estimation of test equipment costs noted is based on available information for similar work conducted at ORNL- 10 percent contingency has been built into estimates of individual test specifications- Material costs have been based on the following:

a) Alloy 617 - $40/kg, as well as typical sample size needed for relevant testingb) Alloy 800H - $35/kg, as well as typical sample size needed for relevant testingc) Ceramic - $40/kg (please note that this is subject to change since the down selection still has to be done)

- Other additional bases for testing requirements that are needed are stated in estimate sheets

NGNP-CTF MTECH-TDRM-017-Rev0 12/03/2008

Page 45: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP-

CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17:

Int

egra

ted

Sche

dule

and

Cos

t Est

imat

e

Cri

t S

SC

Sp

ecifi

catio

n n

um

ber

Sp

ecifi

catio

nD

escr

iptio

nC

om

men

ts

IHX

AW

EC

-TS

-IH

XA

-001

Allo

y 61

7 M

ater

ial

Spe

cific

atio

ns a

nd

Pro

cure

men

t

Fin

aliz

e m

ater

ial

spec

ifica

tions

, dev

elop

pr

ocur

emen

t req

uire

men

ts,

proc

ure

3 he

ats

of A

lloy

617

N/A

Tas

ks r

equ

ired

Act

ion

to

be

per

form

ed b

yT

ariff

($)

Tim

e n

eed

edT

ota

l ($)

Ass

um

ptio

ns/

Bas

es

Ho

ur

Act

ion

Ho

urs

Day

sW

eeks

Mo

nth

s

Com

pile

Allo

y 61

7 pr

ocur

emen

t spe

cific

atio

nE

ngin

eer

200

N/A

85

43

9600

01)

Bas

ed o

n tim

e ne

eded

to c

ompi

le p

rocu

rem

ent s

peci

ficat

ion,

insp

ectio

n du

ring

proc

urem

ent p

rodu

ctio

n (p

rodu

ctio

n/

rolli

ng/s

ampl

ing)

as

wel

l as

com

pilin

g re

port

.

To

tal (

$)96

000

10%

co

nti

ng

ency

($)

9600

Gra

nd

to

tal (

$)10

5600

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 46: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP-

CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

Cri

t S

SC

Spe

cifi

cati

on n

umbe

rS

peci

fica

tion

Des

crip

tion

Com

men

tsW

= W

eldi

ng

Allo

y 61

7 jo

inin

gD

emon

stra

te th

at A

lloy6

17 c

an b

e w

elde

d,

BR

= B

razi

ng

IHX

AW

EC

-TS

-IH

XA

-002

tech

nolo

gy a

ndbr

azed

, diff

usio

n bo

nded

and

that

join

tD

B =

Diff

usio

n B

ondi

ng

resu

ltant

pro

pert

ies

prop

ertie

s ar

e ap

prop

riate

for

this

use

N/A

Res

our

ces Res

ourc

e re

quir

emen

tA

ctio

n to

be

perf

orm

ed b

yT

arif

f ($

)D

urat

ion

Tot

al (

$)A

ssum

ptio

ns/B

ases

Hou

rA

ctio

nH

ours

Day

sW

eeks

Mon

ths

Yea

rsW

eld

desi

gn/C

ompi

ling

W-B

R-D

B

s pec

ific

atio

nE

ngin

eer

200

85

43

9600

0A

ssum

ing

1 m

onth

nee

ded

per

join

ing

met

hod

to c

ompi

le s

peci

ficat

ion

(W/B

R/D

B)

Wel

ding

of

join

ts (

W/B

R/D

B)

Cod

ed w

elde

r10

08

546

1840

0054

9 sa

mpl

es to

be

join

ed. D

ue to

larg

e un

cert

aint

y of

of

time

need

ed to

est

ablis

h di

ffus

ion

bond

ed

spec

imen

s, a

ssum

e th

at 1

2 sa

mpl

es/w

eek

are

to b

e jo

ined

(irr

espe

ctiv

e of

join

ing

met

hod)

.

Con

duct

ing

test

ing:

Joi

nt p

rope

rtie

sLa

bora

tory

Tec

hnic

ian

80n/

a8

561

1952

00T

estin

g w

ill r

equi

re r

esou

rces

in th

e fo

rm o

f 1

engi

neer

($2

00/h

our)

as

wel

l as

1 la

bora

tory

tech

nici

an

Ove

rsee

& M

anag

eE

ngin

eer

200

n/a

85

6148

8000

(80

$/ho

ur).

Ass

umin

g th

at 9

sam

ples

are

test

ed /w

eek

(due

to la

rge

time

unce

rtai

nty

for

fatig

ue te

stin

g).

Tot

al 1

($)

9632

00

Tes

ting

Tas

k re

quir

emen

tT

esti

ngT

otal

($)

Ass

umpt

ions

/Bas

es

Sam

ples

[1]

Pre

p (M

achi

ning

) [2

]T

est

cost

/sam

ple

Tes

ting

Cos

ts

Eq

. set

up

Pos

t te

st s

ampl

e pr

epP

ost

test

ana

lysi

sR

epor

ting

Met

allo

grap

hy (

post

wel

ding

/bon

ding

, pre

-te

stin

g) [

3]

Cut

ting,

pol

ishi

ng54

964

035

1360

3513

60T

akin

g in

to a

ccou

nt th

at la

bora

tory

tech

nici

an w

ill n

eed

8 ho

urs

for

sam

ple

prep

arat

ion

at $

80/h

our.

Est

imat

e m

ade

by s

peci

alis

ts.

Obs

erva

tion

of m

etal

lurg

y54

940

021

9600

2196

00In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $20

0/ho

ur a

nd 2

) S

cien

tist/E

ngin

eerin

g in

put a

t $20

0/ho

ur .

Est

imat

e m

ade

by s

peci

alis

ts.

Che

mis

try

prof

ile in

join

ts54

940

021

9600

2196

00In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $20

0/ho

ur a

nd 2

) S

cien

tist/E

ngin

eerin

g in

put a

t $20

0/ho

ur .

Est

imat

e m

ade

by s

peci

alis

ts.

The

rmal

Phy

sica

l Mec

hani

cal p

rope

rtie

s

of W

/BR

/DB

join

ts

Ela

stic

pro

pert

ies

[4]

1872

0035

063

00n/

an/

an/

a50

014

000

$350

-00

per

spec

imen

at 9

50°C

(+

- 30

°C).

Bas

ed o

n of

ficia

l quo

tatio

n to

con

duct

wor

k

Ten

sile

Pro

pert

ies

[5]

4518

000

350

1575

0n/

an/

an/

a50

034

250

$350

-00

per

spec

imen

at 9

50°C

(+

- 30

°C).

Bas

ed o

n of

ficia

l quo

tatio

n to

con

duct

wor

k

Fat

igue

Str

engt

h (L

CF

)13

554

000

720

9720

066

000

n/a

n/a

1000

2182

00F

atig

ue s

tren

gth

LCF

to 1

000°

C -

$72

0-00

up

to 8

0 00

0 cy

cles

+

$20-

00/h

our

ther

e af

ter

per

spec

imen

at 9

50°C

(+

- 30

°C).

Bas

ed o

n of

ficia

l quo

tatio

n to

con

duct

wor

k

Fat

igue

str

engt

h (H

CF

)13

554

000

800

1080

0066

000

n/a

n/a

1000

2290

00F

atig

ue s

tren

gth

HC

F to

100

0°C

- $

800-

00 u

p to

100

0 00

0 cy

cles

per

spec

imen

at 9

50°C

(+

- 30

°C).

Bas

ed o

n of

ficia

l quo

tatio

n to

con

duct

wor

k

Cre

ep s

tren

gth

144

5760

035

0050

4000

n/a

n/a

n/a

500

5621

00C

reep

str

engt

h to

100

0°C

for

10,

000

h -

$350

0-00

per

spe

cim

en. B

ased

on

offic

ial q

uota

tion

to c

ondu

ct w

ork

Fra

ctur

e to

ughn

ess:

CT

OD

2710

800

1000

2700

0n/

an/

an/

a50

038

300

Fra

ctur

e to

ughn

ess:

CT

OD

- $

1000

-00

at 6

50°C

per

spe

cim

en. B

ased

on

offic

ial q

uota

tion

to c

ondu

ct w

ork

Fra

ctur

e to

ughn

ess:

Kc

2710

800

560

1512

0n/

an/

an/

a50

026

420

Fra

ctur

e to

ughn

ess:

Kc

- $5

60-0

0 at

650

°C p

er s

peci

men

. Bas

ed o

n of

ficia

l quo

tatio

n to

con

duct

wor

k

The

rmal

con

duct

ivity

1872

0010

018

00n/

an/

an/

a50

095

00T

herm

al c

ondu

ctiv

ity to

100

0°C

: - $

95-0

0 pe

r sp

ecim

en. B

ased

on

offic

ial q

uota

tion

to c

ondu

ct w

ork

Met

allo

grap

hy/O

ptic

al/S

EM

(po

st-

wel

din g

,pos

t-te

stin

g) [

6]C

uttin

g, p

olis

hing

, etc

hing

sam

ple

459

640

2937

6029

3760

Tak

ing

into

acc

ount

that

labo

rato

ry te

chni

cian

will

nee

d 8

hour

s fo

r

sam

ple

prep

arat

ion

at $

80/h

our.

Est

imat

e m

ade

by s

peci

alis

ts.

Obs

erva

tion

of s

ampl

e/m

etal

lurg

y45

940

018

3600

1836

00In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $20

0/ho

ur a

nd 2

) S

cien

tist/E

ngin

eerin

g in

put a

t $20

0/ho

ur. E

stim

ate

mad

e by

spe

cial

ists

.

Tot

al 2

($)

2196

0012

5253

013

2000

00

5000

2399

690

Mat

eria

lsM

ater

ials

req

uire

men

tT

otal

($)

Ass

umpt

ions

/Bas

es

Sam

ples

Mat

.cos

t/sa

mpl

eM

ater

ial c

ost

All

oy 6

17 s

ampl

es [

7]n/

an/

a32

,931

32,9

31C

ostin

g ba

sed

on m

ater

ial p

rice

of $

40/k

g an

d ty

pica

l sam

ple

size

for

rel

evan

t tes

ting.

Thi

s do

es n

ot

allo

w f

or th

e co

st/d

evel

opm

ent f

or th

e w

eld/

braz

e al

loy.

Tot

al 3

($)

3293

1

To

tal (

$)33

9582

1

10%

co

ntin

gen

cy (

$)33

9582

.1

Gra

nd t

ota

l ($)

3735

403.

1

[1] S

ee p

refe

rred

num

ber

of s

ampl

es to

be

used

in 's

ampl

e sh

eet'

[2] B

asis

for

pre

para

tion

cost

s -

$400

/sam

ple

[3] A

ssum

ing

that

all

the

join

ed s

ampl

es to

be

chec

ked

for

join

t int

egrit

y af

ter

join

ing

[4] D

eter

min

atio

n by

way

of

mec

hani

cal t

estin

g no

t adv

ised

. Det

erm

inat

ion

shou

ld b

e ba

sed

on n

atur

al v

ibra

tiona

l met

hods

[5] T

ensi

le p

rope

rtie

s (y

ield

str

engt

h, te

nsile

str

engt

h, e

long

atio

n, a

nd R

A)

[6] O

ptic

al/S

EM

wor

k to

be

cond

ucte

d fo

r te

sile

, fat

igue

(H

CF

& L

CF

) an

d cr

eep

[7] R

efer

to 'm

ater

ial c

ost'

shee

t for

mat

eria

l cos

ting

aspe

cts

NG

NP

-CTF

MTE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 47: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

Inte

grat

ed S

ched

ule

and

Cos

t Est

imat

e (a

nd F

acili

ty I

nfor

mat

ion)

Cri

t SS

CS

pec

ifica

tion

num

ber

Sp

ecifi

catio

nD

escr

iptio

nC

om

men

ts

The

rmal

, Phy

sica

lD

emon

stra

te th

at p

rocu

red

Allo

y617

IHX

AW

EC

-TS

-IH

XA

-003

and

Mec

hani

cal

will

hav

e th

erm

al, p

hysi

cal a

nd m

echa

nica

l

prop

ertie

s of

Allo

y 61

7pr

oper

ties

appr

opria

te fo

r us

e in

CH

EN

/A

Res

ou

rces R

eso

urce

req

uire

men

tA

ctio

n to

be

per

form

ed b

yT

ariff

($)

Dur

atio

nT

ota

l ($)

Ass

ump

tions

/Bas

es

Ho

urA

ctio

nH

our

sD

ays

Wee

ksM

ont

hsY

ears

Co

nduc

ting

test

ing

Labo

rato

ry T

echn

icia

n80

n/a

85

2167

200

Tes

ting

will

req

uire

res

ourc

es in

the

form

of 1

eng

inee

r ($

200/

hour

)

Ove

rsee

& M

anag

eE

ngin

eer

200

n/a

85

2116

8000

as w

ell a

s 1

labo

rato

ry te

chni

cian

(80

$/ho

ur).

Ass

umin

g th

at 9

sam

ples

are

tes

ted

/ wee

k

(due

to la

rge

time

unce

rtai

nty

for

fatig

ue te

stin

g)

To

tal 1

($)

2352

00

Tes

tin

gT

ask

req

uire

men

tT

estin

gT

ota

l ($)

Ass

ump

tions

/Bas

es

Sam

ple

s [1

]P

rep

(Mac

hini

ng) [

2]T

est c

ost

/sam

ple

Tes

ting

Co

sts

E

q. s

etup

P

ost

test

sam

ple

pre

pP

ost

test

ana

lysi

s [3

]R

epo

rtin

g

The

rmal

Phy

sica

l Mec

hani

cal p

rop

ertie

s

Ela

stic

pro

pert

ies

[4]

624

0035

021

00n/

an/

an/

a50

050

00$3

50-0

0 pe

r sp

ecim

en a

t 950

°C (

+-

30°C

). B

ased

on

offic

ial q

uote

to c

ondu

ct w

ork.

Ten

sile

Pro

pert

ies

[5]

1560

0035

052

50n/

an/

an/

a50

011

750

$350

-00

per

spec

imen

at 9

50°C

(+

- 30

°C).

Bas

ed o

n of

ficia

l quo

te to

con

duct

wor

k.

Fat

igue

Str

engt

h (L

CF

)45

1800

072

032

400

6600

0n/

a90

0010

0012

6400

Fat

igue

str

engt

h LC

F to

100

0°C

- $

720-

00 u

p to

80

000

cycl

es +

$20-

00/h

our

ther

e af

ter

per

spec

imen

at 9

50°C

(+

- 30

°C).

Bas

ed o

n of

ficia

l quo

te to

con

duct

wor

k.

Fat

igue

str

engt

h (H

CF

)45

1800

080

036

000

6600

0n/

a90

0010

0013

0000

Fat

igue

str

engt

h H

CF

to 1

000°

C -

$80

0-00

up

to 1

000

000

cycl

es p

er

spec

imen

at 9

50°C

(+

- 30

°C).

Bas

ed o

n of

ficia

l quo

te to

con

duct

wor

k.

Cre

ep s

tren

gth

4819

200

3500

1680

00n/

an/

an/

a50

018

7700

Cre

ep s

tren

gth

to 1

000°

C fo

r 10

,000

h -

$35

00-0

0 pe

r sp

ecim

en. B

ased

on

offic

ial q

uote

to c

ondu

ct w

ork.

Fra

ctur

e to

ughn

ess:

CT

OD

936

0010

0090

00n/

an/

a18

0050

014

900

Fra

ctur

e to

ughn

ess:

CT

OD

- $

1000

-00

at 6

50°C

per

spe

cim

en. B

ased

on

offic

ial q

uote

to c

ondu

ct w

ork.

Fra

ctur

e to

ughn

ess:

Kc

936

0056

050

40n/

an/

a18

0050

010

940

Fra

ctur

e to

ughn

ess:

Kc

- $5

60-0

0 at

650

°C p

er s

peci

men

. Bas

ed o

n of

ficia

l quo

te to

con

duct

wor

k.

The

rmal

con

duct

ivity

624

0010

060

0n/

an/

a12

0050

047

00T

herm

al c

ondu

ctiv

ity to

100

0°C

: - $

95-0

0 pe

r sp

ecim

en. B

ased

on

offic

ial q

uote

to c

ondu

ct w

ork.

SE

M R

elat

ed w

ork

n/a

To

tal 2

($)

7320

025

8390

1320

000

2280

050

0049

1390

Mat

eria

lsM

ater

ials

req

uire

men

tT

ota

l ($)

Ass

ump

tions

/Bas

es

Sam

ple

sM

at.c

ost

/sam

ple

Mat

eria

l co

st

Allo

y 61

7 sa

mp

les

[6]

n/a

n/a

10,9

1710

,917

Cos

ting

base

d on

mat

eria

l pric

e of

$40

/kg

and

typi

cal s

ampl

e si

ze n

eede

d fo

r re

leva

nt te

stin

g.

To

tal 3

($)

1091

7

To

tal (

$)73

7507

10%

co

nti

ng

ency

($)

7375

0.7

Gra

nd

to

tal (

$)81

1257

.7

[1] S

ee p

refe

rred

num

ber

of s

ampl

es to

be

used

in 's

ampl

e sh

eet'

[2] B

asis

for

prep

arat

ion

cost

s -

$400

/sam

ple

[3] P

ost t

est a

naly

ses

incl

udes

pos

sibl

e op

tical

and

sca

nnin

g el

ectr

on m

icro

scop

y w

ork

and

is b

ased

eng

inee

r/sc

ient

ist t

ariff

of $

200/

hour

[4] D

eter

min

atio

n by

way

of m

echa

nica

l tes

ting

not a

dvis

ed. D

eter

min

atio

n sh

ould

be

base

d on

nat

ural

vib

ratio

nal m

etho

ds

[5] T

ensi

le p

rope

rtie

s (y

ield

str

engt

h, te

nsile

str

engt

h, e

long

atio

n, a

nd R

A)

[6] R

efer

to 'm

ater

ial c

ost'

shee

t for

mat

eria

l cos

ting

aspe

cts

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 48: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d S

ched

ule

and

Cos

t Est

imat

e

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

Effe

cts

of th

erm

alD

emon

stra

te th

at A

lloy

617

and

join

ts c

an b

e

IHX

AW

EC

-TS

-IHX

A-0

04ag

ing

and

envi

ronm

ent

utili

zed

in N

GN

P e

nviro

nmen

t (te

mpe

ratu

re &

on A

lloy

617p

rope

rtie

sm

ediu

m)

for

long

per

iods

with

out d

egra

datio

nN

/A

Res

our

ces Res

ou

rce

req

uir

emen

tA

ctio

n t

o b

e p

erfo

rmed

by

Tar

iff

($)

Du

rati

on

To

tal (

$)A

ssu

mp

tio

ns/

Bas

es

Ho

ur

Act

ion

Ho

urs

Day

sW

eeks

Mo

nth

sY

ears

Wel

din

g o

f jo

ints

(W

/BR

/DB

)C

oded

wel

der

100

n/a

85

4618

4000

549

sam

ples

to b

e jo

ined

. Due

to la

rge

unce

rtai

nty

in ti

me

need

ed to

est

ablis

h di

ffusi

on b

onde

d s

peci

men

s,

assu

me

that

12

sam

ples

/wee

k ar

e to

be

join

ed (

irres

pect

ive

of jo

inin

g m

etho

d).

Ove

rsee

& M

anag

e: T

her

mal

exp

osu

re o

f sa

mp

les

- 10

,000

hLa

bora

tory

Tec

hnic

ian

100

n/a

100

1000

0B

asis

that

ther

mal

exp

osur

e sa

mpl

es a

re to

be

mon

itore

d by

lab

tech

nici

an e

very

100

h (1

00 in

terv

als)

.

Co

nd

uct

ing

tes

tin

g:

Allo

y/Jo

int

pro

per

ties

Labo

rato

ry T

echn

icia

n80

n/a

85

8226

2400

Tes

ting

will

req

uire

res

ourc

es in

the

form

of 1

eng

inee

r ($

200/

hour

) as

wel

l as

1 la

bora

tory

tech

nici

an (

80$/

hour

).

Ove

rsee

& M

anag

eE

ngin

eer

200

n/a

85

8265

6000

Ass

umin

g th

at 9

sam

ples

are

test

ed /

wee

k (d

ue to

larg

e tim

e un

cert

aint

y fo

r fa

tigue

test

ing)

To

tal 1

($)

1112

400

Tes

ting

Tas

k re

qu

irem

ent

Tes

tin

gT

ota

l ($)

Ass

um

pti

on

s/B

ases

Sam

ple

s [1

]P

rep

(M

ach

inin

g)

[2]

Tes

t co

st/s

amp

leT

esti

ng

Co

sts

E

q. s

etu

p

Po

st t

est

sam

ple

pre

pP

ost

tes

t an

alys

isR

epo

rtin

gM

etal

log

rap

hy

(po

st w

eld

ing

/bo

nd

ing

, pre

-te

stin

g)

[3]

Cut

ting,

pol

ishi

ng s

ampl

e54

9n/

a64

035

1360

n/a

n/a

n/a

3513

60T

akin

g in

to a

ccou

nt th

at la

bora

tory

tech

nici

an w

ill n

eed

8 ho

urs

for

sam

ple

prep

arat

ion

at $

80/h

our.

Est

imat

e m

ade

by s

peci

alis

t.

Obs

erva

tion

of m

etal

lurg

y54

9n/

a40

021

9600

n/a

n/a

500

2196

00In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $20

0/ho

ur a

nd 2

) S

cien

tist/E

ngin

eerin

g in

put a

t $20

0/ho

ur. E

stim

ate

mad

e by

spe

cial

ist.

Che

mis

try

prof

ile in

join

ts54

9n/

a40

021

9600

n/a

n/a

500

2196

00In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $20

0/ho

ur a

nd 2

) S

cien

tist/E

ngin

eerin

g in

put a

t $20

0/ho

ur. E

stim

ate

mad

e by

spe

cial

ist.

Th

erm

al P

hys

ical

Mec

han

ical

pro

per

ties

of

Allo

y 61

7 an

d W

/BR

/DB

join

ts

Ela

stic

pro

pert

ies

[4]

2496

0035

084

00n/

an/

an/

a50

018

500

$350

-00

per

spec

imen

at 9

50°C

(+

- 30

°C).

Bas

ed o

n of

ficia

l quo

tatio

n to

con

duct

wor

k.

Ten

sile

Pro

pert

ies

[5]

6024

000

350

2100

0n/

an/

an/

a50

045

500

$350

-00

per

spec

imen

at 9

50°C

(+

- 30

°C).

Bas

ed o

n of

ficia

l quo

tatio

n to

con

duct

wor

k.

Fat

igue

Str

engt

h (L

CF

)18

072

000

720

1296

0066

000

n/a

n/a

1000

2686

00F

atig

ue s

tren

gth

LCF

to 1

000°

C -

$72

0-00

up

to 8

0 00

0 cy

cles

+

$20-

00/h

our

ther

e af

ter

per

spec

imen

at 9

50°C

(+

- 30

°C).

Bas

ed o

n of

ficia

l quo

tatio

n to

con

duct

wor

k.

Fat

igue

str

engt

h (H

CF

)18

072

000

800

1440

0066

000

n/a

n/a

1000

2830

00F

atig

ue s

tren

gth

HC

F to

100

0°C

- $

800-

00 u

p to

100

0 00

0 cy

cles

per

spec

imen

at 9

50°C

(+

- 30

°C).

Bas

ed o

n of

ficia

l quo

tatio

n to

con

duct

wor

k.

Cre

ep s

tren

gth

192

7680

035

0067

2000

n/a

n/a

n/a

500

7493

00C

reep

str

engt

h to

100

0°C

for

10,0

00 h

- $

3500

-00

per

spec

imen

. Bas

ed o

n of

ficia

l quo

tatio

n to

con

duct

wor

k.

Fra

ctur

e to

ughn

ess:

CT

OD

3614

400

1000

3600

0n/

an/

an/

a50

050

900

Fra

ctur

e to

ughn

ess:

CT

OD

- $

1000

-00

at 6

50°C

per

spe

cim

en. B

ased

on

offic

ial q

uota

tion

to c

ondu

ct w

ork.

Fra

ctur

e to

ughn

ess:

Kc

3614

400

560

2016

0n/

an/

an/

a50

035

060

Fra

ctur

e to

ughn

ess:

Kc

- $5

60-0

0 at

650

°C p

er s

peci

men

. Bas

ed o

n of

ficia

l quo

tatio

n to

con

duct

wor

k.

The

rmal

con

duct

ivity

2496

0010

024

00n/

an/

an/

a50

012

500

The

rmal

con

duct

ivity

to 1

000°

C: -

$95

-00

per

spec

imen

. Bas

ed o

n of

ficia

l quo

tatio

n to

con

duct

wor

k.

Met

allo

gra

ph

y/S

EM

(p

ost

-wel

din

g, p

ost

-te

stin

g)

[6]

Cut

ting,

pol

ishi

ng, e

tchi

ng s

ampl

e61

2n/

a64

039

1680

n/a

n/a

n/a

3916

80T

akin

g in

to a

ccou

nt th

at la

bora

tory

tech

nici

an w

ill n

eed

8 ho

urs

for

sam

ple

prep

arat

ion

at $

80/h

our.

Est

imat

e m

ade

by s

peci

alis

t.

Obs

erva

tion

of s

ampl

e/m

etal

lurg

y61

2n/

a40

024

4800

n/a

n/a

500

2448

00In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $20

0/ho

ur a

nd 2

) S

cien

tist/E

ngin

eerin

g in

put a

t $20

0/ho

ur. E

stim

ate

mad

e by

spe

cial

ist.

To

tal 2

($)

2928

0024

6060

013

2000

00

6500

2890

400

Mat

eria

lsM

ater

ials

req

uir

emen

tT

ota

l ($)

Ass

um

pti

on

s/B

ases

Sam

ple

sM

at.c

ost

/sam

ple

Mat

eria

l co

st

Allo

y 61

7 sa

mp

les

[7]

n/a

n/a

43,6

6843

,668

Cos

ting

base

d on

mat

eria

l pric

e of

$40

/kg

and

typi

cal s

ampl

e si

ze fo

r re

leva

nt te

stin

g. T

his

does

not

allo

w fo

r

the

cost

/dev

elop

men

t for

the

wel

d/br

aze

allo

y.

To

tal 3

($)

4366

8

Oth

erA

dd

itio

nal

req

uir

emen

tsT

ota

l ($)

Ass

um

pti

on

s/B

ases

Un

it p

rice

($)

Qu

anti

ty

Cap

ital

co

st -

fu

rnac

es f

or

ther

mal

ag

ing

3000

390

00C

ostin

g ba

sed

on v

erba

l quo

tatio

n fo

r fu

rnac

e w

ith r

equi

red

capa

bilit

y si

zed

at 1

80m

m x

180

mm

x 2

50m

mC

on

tin

gen

cies

(p

ow

er c

on

sum

pti

on

, el

emen

t re

pla

cem

ent)

900

190

0F

urna

ce c

ontin

genc

ies

base

d on

10%

of t

otal

cap

ital c

ost f

or fu

rnac

es

Hel

ium

gas

fo

r re

gu

lati

ng

en

viro

nm

ent

120

156

18,7

2015

6 x

50kg

He

cylin

ders

to b

e ut

ilize

d. N

umbe

r ba

sed

on u

tiliz

atio

n of

one

cyl

inde

r a

wee

k fo

r ea

ch

furn

ace

for

1 ye

ar (

52 w

eeks

). H

e ga

s co

st in

clus

ive

of im

purit

y ga

ses.

Sam

plin

g g

as a

nal

yses

150

527,

800

Sam

plin

g of

furn

ace

test

ing

envi

ronm

ent d

one

once

a w

eek

by e

xter

nal

inst

itutio

n. C

olle

ctiv

e sa

mpl

ing

from

3 fu

rnac

es a

dd u

p to

$15

0/w

eek.

Bas

ed o

n pe

rson

al c

omm

unic

atio

n w

ith

rele

vant

par

ties

in M

tech

.

To

tal 4

($)

3642

0

To

tal (

$)40

8288

8

10%

co

ntin

gen

cy ($

)40

8288

.8

Gra

nd to

tal (

$)44

9117

6.8

[1] S

ee p

refe

rred

num

ber

of s

ampl

es to

be

used

in 's

ampl

e sh

eet'

[2] B

asis

for

prep

arat

ion

cost

s -

$400

/sam

ple

[3] A

ssum

ing

that

all

sam

ples

to b

e ch

ecke

d fo

r jo

int c

onsi

sten

cy a

fter

join

ing

[4] D

eter

min

atio

n by

way

of m

echa

nica

l tes

ting

not a

dvis

ed. D

eter

min

atio

n sh

ould

be

base

d on

nat

ural

vib

ratio

nal m

etho

ds

[5] T

ensi

le p

rope

rtie

s (y

ield

str

engt

h, te

nsile

str

engt

h, e

long

atio

n, a

nd R

A)

[6] O

ptic

al/S

EM

wor

k to

be

cond

ucte

d fo

r te

nsile

, fat

igue

(H

CF

, LC

F),

cre

ep

[7] R

efer

to 'm

ater

ial c

ost'

shee

t for

mat

eria

l cos

ting

aspe

cts

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 49: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d S

ched

ule

and

Cos

t Est

imat

e

Cri

t S

SC

Sp

ecif

icat

ion

num

ber

Sp

ecif

icat

ion

Des

crip

tio

nC

om

men

ts

Effe

cts

of g

rain

siz

eD

emon

stra

te th

at s

light

cha

nges

in g

rain

siz

e as

IHX

AW

EC

-TS

-IH

XA

-005

and

sect

ion

thic

knes

sw

ell a

s th

e se

ctio

n th

ickn

ess

of A

lloy

617

has

little

on A

lloy

617

effe

ct in

ove

rall

prop

ertie

s of

mat

eria

lN

/A

Res

ou

rces R

eso

urce

req

uire

men

tA

ctio

n to

be

per

form

ed b

yT

arif

f ($

)D

urat

ion

To

tal (

$)A

ssum

pti

ons

/Bas

esH

our

Act

ion

Ho

urs

Day

sW

eeks

Mo

nths

Yea

rs

Co

nduc

ting

tes

ting

: A

lloy

617

pro

per

ties

Labo

rato

ry T

echn

icia

n80

n/a

85

1651

200

Tes

ting

will

req

uire

res

ourc

es in

the

form

of 1

eng

inee

r ($

200/

hour

) as

wel

l as

1 la

bora

tory

tech

nici

an

Ove

rsee

& M

anag

eE

ngin

eer

200

n/a

85

1612

8000

(80

$/ho

ur).

Ass

umin

g th

at 9

sam

ples

/wee

k ar

e te

sted

(du

e to

larg

e tim

e un

cert

aint

y fo

r fa

tigue

test

ing)

.

To

tal 1

($)

1792

00

Test

ing

Tas

k re

qui

rem

ent

Tes

ting

To

tal (

$)A

ssum

pti

ons

/Bas

esS

amp

les

[1]

Pre

p (

Mac

hini

ng)

[2]

Tes

t co

st/s

amp

leT

esti

ng C

ost

s

Eq

. set

up

Po

st t

est

sam

ple

pre

pP

ost

tes

t an

alys

isR

epo

rtin

g

The

rmal

Phy

sica

l Mec

hani

cal p

rop

erti

es

of

Allo

y 61

7F

atig

ue S

tren

gth

(LC

F)

4518

000

720

3240

066

000

n/a

n/a

1000

1174

00F

atig

ue s

tren

gth

LCF

to 1

000°

C -

$72

0-00

up

to 8

0 00

0 cy

cles

+

$20-

00/h

our

ther

e af

ter

per

spec

imen

at 9

50°C

(+-

30°

C).

Bas

ed o

n of

ficia

l quo

tatio

n to

con

duct

wor

k.

Fat

igue

str

engt

h (H

CF

)45

1800

080

036

000

6600

0n/

an/

a10

0012

1000

Fat

igue

str

engt

h H

CF

to 1

000°

C -

$80

0-00

up

to 1

000

000

cycl

es p

er

spec

imen

at 9

50°C

(+-

30°

C).

Bas

ed o

n of

ficia

l quo

tatio

n to

con

duct

wor

k.

Cre

ep s

tren

gth

4819

200

3500

1680

00n/

an/

an/

a50

018

7700

Cre

ep s

tren

gth

to 1

000°

C fo

r 10

,000

h -

$35

00-0

0 pe

r sp

ecim

en. B

ased

on

offic

ial q

uota

tion

to c

ondu

ct w

ork.

Met

allo

gra

phy

/SE

M (

po

st-t

esti

ng)

[3]

Cut

ting,

pol

ishi

ng, e

tchi

ng s

ampl

e13

864

088

320

n/a

n/a

n/a

8832

0T

akin

g in

to a

ccou

nt th

at la

bora

tory

tech

nici

an w

ill n

eed

8 ho

urs

for

sam

ple

prep

arat

ion

at $

80/h

our.

Est

imat

e m

ade

by s

peci

alis

t.

Obs

erva

tion

of s

ampl

e/m

etal

lurg

y13

840

055

200

n/a

n/a

500

5520

0In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $20

0/ho

ur a

nd 2

) S

cien

tist/E

ngin

eerin

g in

put a

t $20

0/ho

ur. E

stim

ate

mad

e by

spe

cial

ist.

To

tal 2

($)

5520

037

9920

1320

000

030

0056

9620

Mat

eria

lsM

ater

ials

req

uire

men

tT

ota

l ($)

Ass

ump

tio

ns/B

ases

Sam

ple

sM

at.c

ost

/sam

ple

Mat

eria

l co

st

Allo

y 61

7 sa

mp

les

[4]

n/a

n/a

9,09

69,

096

Cos

ting

base

d on

mat

eria

l pric

e of

$40

/kg

and

typi

cal s

ampl

e si

ze r

elev

ant f

or te

stin

g.N

umbe

r of

sam

ples

onl

y

rele

vant

to fa

tigue

test

ing

and

cree

p te

stin

g

To

tal 3

($)

9096

Tota

l ($)

7579

16

10%

co

nti

ng

ency

($)

7579

1.6

Gra

nd

to

tal (

$)83

3707

.6

[1] S

ee p

refe

rred

num

ber

of s

ampl

es to

be

used

in 's

ampl

e sh

eet'

[2] B

asis

for

prep

arat

ion

cost

s -

$400

/sam

ple

[3] O

ptic

al/S

EM

wor

k to

be

cond

ucte

d fo

r fa

tigue

and

cre

ep s

ampl

es

[4] R

efer

to 'm

ater

ial c

ost'

shee

t for

mat

eria

l cos

ting

aspe

cts

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 50: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP-

CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

Cor

rosi

onD

emon

stra

te s

atis

fact

ory

corr

osio

n al

low

ance

s

IHX

AW

EC

-TS

-IH

XA

-006

allo

wan

ces

for

for

Allo

y 61

7 an

d w

elde

d/bo

nded

sec

tions

Allo

y 61

7N

/A

Res

ou

rces R

eso

urc

e re

qu

irem

ent

Act

ion

to

be

per

form

ed b

yT

arif

f ($

)D

ura

tio

nT

ota

l ($)

Ass

um

pti

on

s/B

ases

Ho

ur

Act

ion

Ho

urs

Day

sW

eeks

Mo

nth

sY

ears

Wel

din

g o

f jo

ints

(W

/BR

/DB

)C

oded

wel

der

100

n/a

85

1248

000

135

sam

ples

to b

e jo

ined

. Due

to la

rge

unce

rtai

nty

of ti

me

need

ed to

est

ablis

h di

ffusi

on b

onde

d sp

ecim

ens,

ass

ume

that

12

are

to b

e jo

ined

(ir

resp

ectiv

e of

join

ing

met

hod)

.

Ove

rsee

& M

anag

e: T

her

mal

exp

osu

re o

f sa

mp

les

- 10

,000

hLa

bora

tory

Tec

hnic

ian

100

n/a

100

1000

0B

asis

that

ther

mal

exp

osur

e sa

mpl

es a

re to

be

mon

itore

d by

lab

tech

nici

an e

very

100

h (1

00 in

terv

als)

.

Ove

rsee

& M

anag

eE

ngin

eer

200

n/a

85

2016

0000

To

tal 1

($)

2180

00

Tes

tin

gT

ask

req

uir

emen

tT

esti

ng

To

tal (

$)A

ssu

mp

tio

ns/

Bas

es

Sam

ple

sP

rep

(M

ach

inin

g)

[1]

Tes

t co

st/s

amp

leT

esti

ng

Co

sts

E

q. s

etu

p

Po

st t

est

sam

ple

pre

pP

ost

tes

t an

alys

isR

epo

rtin

g

Met

allo

gra

ph

y (p

ost

wel

din

g/b

on

din

g)

[2]

Cut

ting,

pol

ishi

ng s

ampl

e13

5n/

a64

086

400

n/a

n/a

n/a

8640

0T

akin

g in

to a

ccou

nt th

at la

bora

tory

tech

nici

an w

ill n

eed

8 ho

urs

for

sam

ple

prep

arat

ion

at $

80/h

our.

Est

imat

e m

ade

by s

peci

alis

t.

Obs

erva

tion

of m

etal

lurg

y13

5n/

a40

054

000

n/a

n/a

500

5400

0In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $20

0/ho

ur a

nd 2

) S

cien

tist/E

ngin

eeri

ng in

put a

t $20

0/ho

ur. E

stim

ate

mad

e by

spe

cial

ist.

Che

mis

try

prof

ile in

join

ts13

5n/

a40

054

000

n/a

n/a

500

5400

0In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $20

0/ho

ur a

nd 2

) S

cien

tist/E

ngin

eeri

ng in

put a

t $20

0/ho

ur. E

stim

ate

mad

e by

spe

cial

ist.

Th

erm

al P

hys

ical

Mec

han

ical

pro

per

ties

of

Allo

y 61

7 an

d W

/BR

/DB

join

ts

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

Met

allo

gra

ph

y/S

EM

(p

ost

-tes

tin

g)

Cut

ting,

pol

ishi

ng, e

tchi

ng s

ampl

e18

0n/

a64

011

5200

n/a

n/a

n/a

1152

00T

akin

g in

to a

ccou

nt th

at la

bora

tory

tech

nici

an w

ill n

eed

8 ho

urs

for

sam

ple

prep

arat

ion

at $

80/h

our.

Est

imat

e m

ade

by s

peci

alis

t.

Obs

erva

tion

of s

ampl

e/m

etal

lurg

y18

0n/

a40

072

000

n/a

n/a

500

7200

0In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $20

0/ho

ur a

nd 2

) S

cien

tist/E

ngin

eeri

ng in

put a

t $20

0/ho

ur. E

stim

ate

mad

e by

spe

cial

ist.

Dep

th o

f int

erna

l oxi

datio

n18

0n/

a40

072

000

500

7250

0In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $20

0/ho

ur a

nd 2

) S

cien

tist/E

ngin

eeri

ng in

put a

t $20

0/ho

ur. E

stim

ate

mad

e by

spe

cial

ist.

Dep

th o

f dep

letio

n of

allo

y el

emen

ts (

Cr)

18

0n/

a40

072

000

500

7250

0In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $20

0/ho

ur a

nd 2

) S

cien

tist/E

ngin

eeri

ng in

put a

t $20

0/ho

ur. E

stim

ate

mad

e by

spe

cial

ist.

Dep

th a

ffect

ed b

ycar

buri

zatio

n/ d

ecar

buri

zatio

n18

0n/

a40

072

000

500

7250

0In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $20

0/ho

ur a

nd 2

) S

cien

tist/E

ngin

eeri

ng in

put a

t $20

0/ho

ur. E

stim

ate

mad

e by

spe

cial

ist.

To

tal 2

($)

059

7600

00

030

0059

9100

Mat

eria

lsM

ater

ials

req

uir

emen

tT

ota

l ($)

Ass

um

pti

on

s/B

ases

Sam

ple

sM

at.c

ost

/sam

ple

Mat

eria

l co

st

Allo

y 61

7 sa

mp

les

[3]

n/a

n/a

12,1

2012

,120

Cos

ting

base

d on

mat

eria

l pri

ce o

f $40

/kg

and

typi

cal s

ampl

e si

ze r

elev

ant f

or te

stin

g. T

his

does

not

allo

w fo

r

the

cost

/dev

elop

men

t for

the

wel

d/br

aze

allo

y.

To

tal 3

($)

1212

0

Oth

erA

dd

itio

nal

req

uir

emen

tsT

ota

l ($)

Ass

um

pti

on

s/B

ases

Un

it p

rice

($)

Qu

anti

ty

Cap

ital

co

st -

fu

rnac

es f

or

ther

mal

ag

ing

3000

390

00C

ostin

g ba

sed

on v

erba

l quo

tatio

n fo

r fu

rnac

e w

ith r

equi

red

capa

bilit

y si

zed

at 1

80m

m x

180

mm

x 2

50m

mC

on

tin

gen

cies

(p

ow

er c

on

sum

pti

on

, el

emen

t re

pla

cem

ent)

900

190

0F

urna

ce c

ontin

genc

ies

base

d on

10%

of t

otal

cap

ital c

ost f

or fu

rnac

es

Hel

ium

gas

fo

r re

gu

lati

ng

en

viro

nm

ent

120

156

18,7

2015

6 x

50kg

He

cylin

ders

to b

e ut

ilize

d. N

umbe

r ba

sed

on u

tiliz

atio

n of

one

cyl

inde

r a

wee

k fo

r ea

ch

furn

ace

for

1 ye

ar (

52 w

eeks

). H

e ga

s co

st in

clus

ive

of im

puri

ty g

ases

.

Sam

plin

g g

as a

nal

yses

150

527,

800

Sam

plin

g of

furn

ace

test

ing

envi

ronm

ent d

one

once

a w

eek

by e

xter

nal

inst

itutio

n. C

olle

ctiv

e sa

mpl

ing

from

3 fu

rnac

es a

dd u

p to

$15

0/w

eek.

Bas

ed o

n pe

rson

al c

omm

unic

atio

n w

ith

rele

vant

par

ties

in M

tech

.

To

tal 4

($)

3642

0

To

tal (

$) (

Pri

mar

y si

de

He

effe

cts)

8656

40

Sec

on

dar

y si

de

He

effe

cts

($)

8656

40

To

tal (

Pri

mar

y an

d S

eco

nd

ary

effe

cts)

($)

1731

280

10%

co

nti

ng

ency

($)

1731

28

Gra

nd

to

tal (

$)19

0440

8

[1] B

asis

for

prep

arat

ion

cost

s -

$400

/sam

ple

[2] A

ssum

ing

that

all

join

ed s

ampl

es to

be

chec

ked

for

join

t con

sist

ency

afte

r jo

inin

g

[3] R

efer

to 'm

ater

ial c

ost'

shee

t for

mat

eria

l cos

ting

aspe

cts

NG

NP

-CTF

MTE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 51: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d S

ched

ule

and

Cos

t Est

imat

e

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

IHX

AW

EC

-TS

-IH

XA

-007

AS

ME

III C

ode

case

for

Allo

y 61

7D

evel

op a

nd e

stab

lish

AS

ME

Cod

e ca

se II

I for

N

/A

Tas

ks r

equ

ired

Act

ion

to

be

per

form

ed b

yT

arif

f ($

)T

ime

nee

ded

To

tal (

$)A

ssu

mp

tio

ns/

Bas

es

Ho

ur

Act

ion

Ho

urs

Day

sW

eeks

Mo

nth

s

Pre

para

tory

wor

kE

ngin

eers

150

n/a

110

1650

01)

Est

mat

ion

incl

usiv

e of

inte

ract

ions

with

AS

ME

dur

ing

appr

oval

pro

cess

and

pro

visi

on

of a

dditi

onal

dat

a re

ques

ted

by A

SM

E.

Dra

fttin

g co

de c

ase

for

Allo

y 61

7E

ngin

eers

150

n/a

4500

6750

00B

ased

on

disc

ussi

ons

with

Geo

rge

Hay

ner.

Tot

al 1

($)

6915

00

To

tal (

$)69

1500

10%

co

nti

ng

ency

($)

6915

0

Gra

nd

to

tal (

$)76

0650

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 52: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d S

ched

ule

and

Cos

t Est

imat

e

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

IHX

AW

EC

-TS

-IH

XA

-008

The

rmal

/Flu

id

mod

ellin

g m

etho

ds f

or IH

X A

Dev

elop

ther

mal

mod

els

for

IHX

AN

/A

Tas

ks r

equ

ired

Act

ion

to

be

per

form

ed b

yT

arif

f ($

)T

ime

nee

ded

To

tal (

$)A

ssu

mp

tio

ns/

Bas

es

Ho

ur

Yea

rH

ou

rsD

ays

Wee

ksM

on

ths

Yea

rM

odel

gen

erat

ion

givi

ng r

esul

ts f

or

mec

hani

cal,

phys

ical

and

ther

mal

pe

rfor

man

ce p

redi

ctio

n

Gro

up o

f th

erm

al f

luid

/mod

elin

g sp

ecia

lists

42,5

003

1275

001)

Est

mat

ion

mad

e by

M-T

ech

base

d on

tech

nolo

gy m

atur

atio

n pl

an in

put-

Dur

atio

n

and

cost

is g

reat

ly d

epen

dant

on

the

data

sup

plie

d by

sup

plie

rs (

tran

sfer

coe

ffic

ient

s).

Dur

atio

n of

3 y

ears

for

wor

k

To

tal (

$)12

7500

10%

co

nti

ng

ency

($)

1275

0

Gra

nd

to

tal (

$)14

0250

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 53: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

IHX

AW

EC

-TS

-IH

XA

-009

Met

hods

for

stre

ss-

stra

in m

odel

ling

of

IHX

A

Dev

elop

str

uctu

ral m

odel

ling

met

hods

for

pred

ictiv

e o p

erat

ion

for

IHX

AN

/A

Tas

ks r

equ

ired

Act

ion

to

be

per

form

ed b

yT

arif

f ($

)T

ime

nee

ded

To

tal (

$)A

ssu

mp

tio

ns/

Bas

es

Ho

ur

Yea

rH

ou

rsD

ays

Wee

ksM

on

ths

Yea

rS

truc

tura

l mod

el g

ener

atio

n gi

ving

res

ults

for

pred

ictiv

e op

erat

ion

for

IHX

BG

roup

of m

odel

ing

spec

ialis

ts42

,500

312

7500

1) E

stm

atio

n m

ade

by M

-Tec

h ba

sed

on te

chno

logy

mat

urat

ion

plan

inpu

t.

Dur

atio

n of

3 y

ears

for

wor

k

To

tal (

$)12

7500

10%

co

nti

ng

ency

($)

1275

0

Gra

nd

to

tal (

$)14

0250

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 54: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

IHX

AW

EC

-TS

-IH

XA

-010

Crit

eria

for

stru

ctur

al in

tegr

ityE

stab

lish

crite

ria fo

r st

ruct

ural

in

tegr

ity o

f CH

E's

N/A

Tas

ks r

equ

ired

Act

ion

to

be

per

form

ed b

yT

arif

f ($

)T

ime

nee

ded

To

tal (

$)A

ssu

mp

tio

ns/

Bas

es

Ho

ur

Yea

rH

ou

rsD

ays

Wee

ksM

on

ths

Yea

r

Str

uctu

ral i

nteg

rity

mod

els

of C

HE

'sG

roup

of m

odel

ing

spec

ialis

ts42

,500

312

7500

1) E

stm

atio

n m

ade

by M

-Tec

h ba

sed

on te

chno

logy

mat

urat

ion

plan

inpu

t.

Dur

atio

n an

d co

st is

gre

atly

dep

enda

nt o

n th

e da

ta s

uppl

ied

by s

uppl

iers

(tr

ansf

er c

oeff

icie

nts)

. Dur

atio

n of

3 y

ears

for

wor

k

To

tal (

$)12

7500

10%

co

nti

ng

ency

($)

1275

0

Gra

nd

to

tal (

$)14

0250

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 55: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

IHX

AW

EC

-TS

-IH

XA

-011

Per

form

ance

m

odel

ling

met

hods

fo

r IH

X A

Dev

elop

per

form

ance

mod

els

for

pred

ictiv

e op

erat

ion

for

IHX

A

N/A

Tas

ks r

equ

ired

Act

ion

to

be

per

form

ed b

yT

arif

f ($

)T

ime

nee

ded

To

tal (

$)A

ssu

mp

tio

ns/

Bas

es

Ho

ur

Yea

rH

ou

rsD

ays

Wee

ksM

on

ths

Yea

r

Per

form

ance

mod

els

for

IHX

Gro

up o

f mod

elin

g sp

ecia

lists

42,5

003

1275

001)

Est

mat

ion

mad

e by

M-T

ech

base

d on

tech

nolo

gy m

atur

atio

n pl

an in

put.

Dur

atio

n of

3 y

ears

for

wor

k

To

tal (

$)12

7500

10%

co

nti

ng

ency

($)

1275

0

Gra

nd

to

tal (

$)14

0250

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 56: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17:

Int

egra

ted

Sch

edul

e an

d C

ost E

stim

ate

Mat

eria

l co

st d

etai

ls b

ased

on

pre

ferr

ed n

um

ber

of

sam

ple

s to

be

test

ed -

Allo

y 61

7 (@

$40

/kg

)

Sam

ple

am

ou

nt

Per

sam

ple

co

st -

617

549

IHX

A.2

183

IHX

A.3

732

IHX

A.4

138

IHX

A.5

180

IHX

A.6

Mat

.co

stC

ost

($)

sam

ple

s($

)sa

mp

les

($)

($)

($)

($)

Ela

stic

Pro

pert

ies

118

186

624

240

00

0T

ensi

le P

rope

rtie

s1

4545

1515

6060

00

00

Fat

i gue

str

engt

h (L

CF

)10

013

513

500

4545

0018

018

000

4545

0060

6000

Fat

i gue

str

engt

h (H

CF

)10

013

513

500

4545

0018

018

000

4545

0060

6000

Cre

e p s

tren

gth

214

428

848

9619

238

448

9660

120

Fra

ctur

e to

u ghn

ess:

CT

OD

100

2727

009

900

3636

000

00

0F

ract

ure

tou g

hnes

s: K

c10

027

2700

990

036

3600

00

00

The

rmal

con

duct

ivit y

1018

180

660

2424

00

00

0T

ota

l ($)

414

3293

110

917

4366

890

9612

120

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 57: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

IHX

AW

EC

-TS

-IH

XA

-018

Tra

de s

tudi

es o

n ca

ndid

ate

cera

mic

m

ater

ials

Eva

luat

e ce

ram

ic m

ater

ials

fo

r us

e in

cer

amic

CH

E's

N/A

Tas

ks r

equ

ired

Act

ion

to

be

per

form

ed b

yT

arif

f ($

)T

ime

nee

ded

To

tal (

$)A

ssu

mp

tio

ns/

Bas

es

Ho

ur

Act

ion

Ho

urs

Day

sW

eeks

Mo

nth

sE

valu

ate

and

iden

tify

cand

idat

e ce

ram

ic

mat

eria

ls fr

om tr

ade

stud

ies

Eng

inee

r20

0N

/A8

54

619

2000

Bas

ed o

n ne

ed o

f one

eng

inee

r fo

r du

ratio

n of

6 m

onth

s to

com

plet

e tr

ade

stud

ies.

Rep

ortin

g in

clud

ed.

To

tal (

$)19

2000

10%

co

nti

ng

ency

($)

1920

0

Gra

nd

to

tal (

$)21

1200

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 58: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

IHX

AW

EC

-TS

-IH

XA

-019

Tra

de s

tudi

es o

n ca

ndid

ate

cera

mic

C

HE

des

i gns

Eva

luat

e ce

ram

ic C

HE

de

sign

s fo

r us

e in

cer

amic

IH

X A

N/A

Tas

ks r

equ

ired

Act

ion

to

be

per

form

ed b

yT

arif

f ($

)T

ime

nee

ded

To

tal (

$)A

ssu

mp

tio

ns/

Bas

es

Ho

ur

Act

ion

Ho

urs

Day

sW

eeks

Mo

nth

sE

valu

ate

and

iden

tify

cand

idat

e ce

ram

ic C

HE

de

sign

s fr

om tr

ade

stud

ies

Eng

inee

r20

0N

/A8

54

619

2000

Bas

ed o

n ne

ed o

f one

eng

inee

r fo

r du

ratio

n of

6 m

onth

s to

com

plet

e tr

ade

stud

ies.

Rep

ortin

g in

clud

ed.

To

tal (

$)19

2000

10%

co

nti

ng

ency

($)

1920

0

Gra

nd

to

tal (

$)21

1200

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 59: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

IHX

AW

EC

-TS

-IH

XA

-020

Cer

amic

Hea

t E

xcha

nger

D

etai

led

DD

N's

Dev

elop

det

aile

d D

DN

's fo

r th

e ce

ram

ic IH

X A

N/A

Tas

ks r

equ

ired

Act

ion

to

be

per

form

ed b

yT

arif

f ($

)T

ime

nee

ded

To

tal (

$)A

ssu

mp

tio

ns/

Bas

es

Ho

ur

Act

ion

Ho

urs

Day

sW

eeks

Mo

nth

s

Dev

elop

ing

deta

iled

DD

N's

for

cera

mic

IHX

AE

ngin

eer

200

N/A

85

45

1600

00B

ased

on

need

of o

ne e

ngin

eer

for

dura

tion

of 6

mon

ths

to

com

pile

DD

N's

. Rep

ortin

g in

clud

ed.

To

tal (

$)16

0000

10%

co

nti

ng

ency

($)

1600

0

Gra

nd

to

tal (

$)17

6000

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 60: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

IHX

AW

EC

-TS

-IH

XA

-021

Cer

amic

Mat

eria

l S

peci

ficat

ions

and

P

rocu

rem

ent

Fin

aliz

e m

ater

ial

spec

ifica

tions

, dev

elop

pr

ocur

emen

t req

uire

men

tsN

/A

Tas

ks r

equ

ired

Act

ion

to

be

per

form

ed b

yT

arif

f ($

)T

ime

nee

ded

To

tal (

$)A

ssu

mp

tio

ns/

Bas

es

Ho

ur

Act

ion

Ho

urs

Day

sW

eeks

Mo

nth

s

Cer

amic

pro

cure

men

t spe

cific

atio

nE

ngin

eer

200

N/A

85

43

9600

01)

Bas

ed o

n tim

e ne

eded

to c

ompi

le p

rocu

rem

ent s

peci

ficat

ion,

insp

ectio

n du

ring

proc

urem

ent p

rodu

ctio

n as

wel

l as

com

pilin

g re

port

.

To

tal (

$)96

000

10%

co

nti

ng

ency

($)

9600

Gra

nd

to

tal (

$)10

5600

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 61: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP-

CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

The

rmal

, Phy

sica

lD

emon

stra

te th

at p

rocu

red

Cer

amic

IHX

AW

EC

-TS

-IH

XA

-022

prop

ertie

s of

Cer

amic

will

hav

e th

erm

al, p

hysi

cal

Co

st w

ill b

e h

igh

er c

om

par

ed t

o s

imila

r m

etal

lic IH

X A

sp

ecif

icat

ion

du

e to

intr

icac

y o

f sa

mp

le p

rep

arat

ion

,

prop

ertie

s ap

prop

riate

for

use

in C

HE

N/A

mac

hin

ing

an

d a

nal

yses

as

wel

l as

un

kno

wn

det

ail r

egar

din

g t

he

cera

mic

mat

eria

l to

be

use

d.

Res

ou

rces R

eso

urc

e re

qu

irem

ent

Act

ion

to

be

per

form

ed b

yTa

riff

($)

Du

rati

on

Tota

l ($)

Ass

um

pti

on

s/B

ases

Ho

ur

Act

ion

Ho

urs

Day

sW

eeks

Mo

nth

sY

ears

Co

nd

uct

ing

tes

tin

gLa

bora

tory

Tec

hnic

ian

80n/

a8

52

6400

Tes

ting

will

req

uire

res

ourc

es in

the

form

of

1 en

gine

er (

$200

/hou

r)

Ove

rsee

& M

anag

eE

ngin

eer

200

n/a

85

216

000

as w

ell a

s 1

labo

rato

ry te

chni

cian

(80

$/ho

ur).

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

.

Tota

l 1 (

$)22

400

Tes

tin

gTa

sk r

equ

irem

ent

Test

ing

Tota

l ($)

Ass

um

pti

on

s/B

ases

Sam

ple

s [1

]P

rep

(M

ach

inin

g)

[2]

Test

co

st/s

amp

leTe

stin

g C

ost

s

Eq

. set

up

P

ost

tes

t sa

mp

le p

rep

Po

st t

est

anal

ysis

Rep

ort

ing

Ther

mal

Ph

ysic

al p

rop

erti

es

The

rmal

con

duct

ivity

624

0010

060

0n/

an/

a12

0050

047

00T

herm

al c

ondu

ctiv

ity to

100

0°C

: - $

95-0

0 pe

r sp

ecim

en.

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

Coe

ffic

ient

of

ther

mal

exp

ansi

on6

2400

350

2100

n/a

n/a

n/a

500

5000

Coe

ffic

ient

of

ther

mal

exp

ansi

on te

st c

ost b

ased

on

Ten

sile

/Ela

stic

pro

pert

ies'

pric

e.

The

rmal

sho

ck r

esis

tanc

e6

2400

350

2100

n/a

n/a

1200

500

6200

The

rmal

sho

ck r

esis

tanc

e te

st c

ost b

ased

on

Ten

sile

/Ela

stic

pro

pert

ies'

pric

e.

SE

M R

elat

ed w

ork

n/a

Tota

l 2 (

$)72

0048

000

024

0015

0015

900

Mat

eria

lsM

ater

ials

req

uir

emen

tTo

tal (

$)A

ssu

mp

tio

ns/

Bas

es

Sam

ple

sM

at.c

ost

/sam

ple

Mat

eria

l co

st

Cer

amic

sam

ple

s [3

]n/

an/

a18

018

0C

ostin

g ba

sed

on m

ater

ial p

rice

of $

40/k

g. O

ther

fac

tors

bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

Tota

l 3 (

$)18

0

To

tal (

$)38

480

To

tal (

4 h

eats

at

leas

t) (

$)15

3920

10%

co

nti

ng

ency

($)

1539

2

Gra

nd

to

tal (

$)16

9312

C

ost

will

be

hig

her

co

mp

ared

to

sim

ilar

met

allic

IHX

A

Met

allic

IHX

A t

o C

eram

ic IH

X A

rat

io a

dju

stm

ent

0.5

s

pec

ific

atio

n d

ue

to in

tric

acy

of

sam

ple

pre

par

atio

n,

m

ach

inin

g a

nd

an

alys

es a

s w

ell a

s u

nkn

ow

n d

etai

l reg

ard

ing

Eq

uiv

alen

t co

sts

for

cera

mic

IHX

A s

pec

ific

atio

n33

8624

t

he

cera

mic

mat

eria

l to

be

use

d.

[1]S

ee p

refe

rred

num

ber

of s

ampl

es to

use

in 's

ampl

e' s

heet

[2] B

asis

for

pre

para

tion

cost

s -

$400

/sam

ple

[3] R

efer

to 'm

ater

ial c

ost'

shee

t for

mat

eria

l cos

ting

aspe

cts

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 62: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP-

CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

Mec

hani

cal

Dem

onst

rate

that

pro

cure

d C

eram

ic

IHX

AW

EC

-TS

-IH

XA

-023

prop

ertie

s of

Cer

amic

will

hav

e th

e m

echa

nica

lC

ost

will

be

hig

her

co

mp

ared

to

sim

ilar

met

allic

IHX

A s

pec

ific

atio

n d

ue

to in

tric

acy

of

sam

ple

pre

par

atio

n,

prop

ertie

s ap

prop

riate

for

use

in C

HE

N/A

mac

hin

ing

an

d a

nal

yses

as

wel

l as

un

kno

wn

det

ail r

egar

din

g t

he

cera

mic

mat

eria

l to

be

use

d.

Res

ou

rces R

eso

urc

e re

qu

irem

ent

Act

ion

to

be

per

form

ed b

yTa

riff

($)

Du

rati

on

Tota

l ($)

Ass

um

pti

on

s/B

ases

Ho

ur

Act

ion

Ho

urs

Day

sW

eeks

Mo

nth

sY

ears

Co

nd

uct

ing

tes

tin

gLa

bora

tory

Tec

hnic

ian

80n/

a8

520

6400

0T

estin

g w

ill r

equi

re r

esou

rces

in th

e fo

rm o

f 1

engi

neer

($2

00/h

our)

Ove

rsee

& M

anag

eE

ngin

eer

200

n/a

85

2016

0000

as w

ell a

s 1

labo

rato

ry te

chni

cian

(80

$/ho

ur).

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

.

Tota

l 1 (

$)22

4000

Tes

tin

gTa

sk r

equ

irem

ent

Test

ing

Tota

l ($)

Ass

um

pti

on

s/B

ases

Sam

ple

s [1

]P

rep

(M

ach

inin

g)

[2]

Test

co

st/s

amp

leTe

stin

g C

ost

s

Eq

. set

up

P

ost

tes

t sa

mp

le p

rep

Po

st t

est

anal

ysis

[3]

Rep

ort

ing

Ther

mal

Ph

ysic

al M

ech

anic

al p

rop

erti

es

Ela

stic

pro

pert

ies

[4]

624

0035

021

00n/

an/

an/

a50

050

00$3

50-0

0 pe

r sp

ecim

en a

t 950

°C (

+-

30°C

). B

ased

on

met

allic

IHX

A (

see

adju

stm

ent f

acto

r).

Ten

sile

Pro

pert

ies

[5]

1560

0035

052

50n/

an/

an/

a50

011

750

$350

-00

per

spec

imen

at 9

50°C

(+

- 30

°C).

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

.

Fat

igue

Str

engt

h (L

CF

)45

1800

072

032

400

6600

0n/

a90

0010

0012

6400

Fat

igue

str

engt

h LC

F to

100

0°C

- $

720-

00 u

p to

80

000

cycl

es +

$20-

00/h

our

ther

e af

ter

per

spec

imen

at 9

50°C

(+

- 30

°C).

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

.

Fat

igue

str

engt

h (H

CF

)45

1800

080

036

000

6600

0n/

a90

0010

0013

0000

Fat

igue

str

engt

h H

CF

to 1

000°

C -

$80

0-00

up

to 1

000

000

cycl

es p

er

spec

imen

at 9

50°C

(+

- 30

°C).

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

.

Cre

ep s

tren

gth

4819

200

3500

1680

00n/

an/

an/

a50

018

7700

Cre

ep s

tren

gth

to 1

000°

C f

or 1

0,00

0 h

- $3

500-

00 p

er s

peci

men

. Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

Fra

ctur

e to

ughn

ess:

CT

OD

936

0010

0090

00n/

an/

a18

0050

014

900

Fra

ctur

e to

ughn

ess:

CT

OD

- $

1000

-00

at 6

50°C

per

spe

cim

en. B

ased

on

met

allic

IHX

A (

see

adju

stm

ent f

acto

Fra

ctur

e to

ughn

ess:

Kc

936

0056

050

40n/

an/

a18

0050

010

940

Fra

ctur

e to

ughn

ess:

Kc

- $5

60-0

0 at

650

°C p

er s

peci

men

. Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

.

Tota

l 2 (

$)70

800

2577

9013

2000

021

600

4500

4866

90

Mat

eria

lsM

ater

ials

req

uir

emen

tTo

tal (

$)A

ssu

mp

tio

ns/

Bas

es

Sam

ple

sM

at.c

ost

/sam

ple

Mat

eria

l co

st

Cer

amic

sam

ple

s [6

]n/

an/

a10

,917

10,9

17C

ostin

g ba

sed

on m

ater

ial p

rice

of $

40/k

g. O

ther

fac

tors

bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

.

Tota

l 3 (

$)10

917

To

tal (

$)72

1607

To

tal (

4 h

eats

at

leas

t) (

$)28

8642

810

% c

on

tin

gen

cy (

$)28

8643

Gra

nd

to

tal (

$)31

7507

1

Co

st w

ill b

e h

igh

er c

om

par

ed t

o s

imila

r m

etal

lic IH

X A

Met

allic

IHX

A t

o C

eram

ic IH

X A

rat

io a

dju

stm

ent

0.5

s

pec

ific

atio

n d

ue

to in

tric

acy

of

sam

ple

pre

par

atio

n,

m

ach

inin

g a

nd

an

alys

es a

s w

ell a

s u

nkn

ow

n d

etai

l reg

ard

ing

Eq

uiv

alen

t co

sts

for

cera

mic

IHX

A s

pec

ific

atio

n63

5014

2

th

e ce

ram

ic m

ater

ial t

o b

e u

sed

.

[1]S

ee p

refe

rred

num

ber

of s

ampl

es to

use

in 's

ampl

e' s

heet

[2] B

asis

for

pre

para

tion

cost

s -

$400

/sam

ple

[3] P

ost t

est a

naly

ses

incl

udes

pos

sibl

e op

tical

and

sca

nnin

g el

ectr

on m

icro

scop

y w

ork

and

is b

ased

on

engi

neer

/sci

entis

t tar

iff

[4] D

eter

min

atio

n by

way

of

mec

hani

cal t

estin

g no

t adv

ised

. D

eter

min

atio

n sh

ould

be

base

d on

nat

ural

vib

ratio

nal m

etho

ds

[5] T

ensi

le p

rope

rtie

s (y

ield

str

engt

h, te

nsile

str

engt

h, e

long

atio

n, a

nd R

A)

[6] R

efer

to 'm

ater

ial c

ost'

shee

t for

mat

eria

l cos

ting

aspe

cts

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 63: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

Cri

t SS

CS

pec

ifica

tion

nu

mb

erS

pec

ifica

tion

Des

crip

tion

Co

mm

ents

Com

patib

ility

ofD

emon

stra

te th

at C

eram

ic c

an b

e

IHX

AW

EC

-TS

-IHX

A-0

24ce

ram

ic m

ater

ials

tout

ilized

in N

GN

P e

nviro

nmen

t (te

mpe

ratu

re &

Co

st w

ill b

e h

igh

er c

om

par

ed t

o s

imila

r m

etal

lic IH

X A

sp

ecif

icat

ion

du

e to

intr

icac

y o

f sam

ple

pre

par

atio

n,

NG

NP

He

envi

ronm

ent

med

ium

) fo

r lo

ng p

erio

ds w

ithou

t deg

rada

tion

N/A

mac

hin

ing

an

d a

nal

yses

as

wel

l as

un

kno

wn

det

ail r

egar

din

g th

e ce

ram

ic m

ater

ial t

o b

e u

sed

.

Res

ou

rces R

eso

urc

e re

qu

irem

ent

Act

ion

to b

e p

erfo

rmed

by

Tar

iff ($

)D

ura

tion

To

tal (

$)A

ssu

mp

tion

s/B

ases

Ho

ur

Act

ion

Ho

urs

Day

sW

eeks

Mo

nth

sY

ears

Tes

ting

: T

her

mal

exp

osu

re o

f sam

ple

s -

10,0

00h

Labo

rato

ry T

echn

icia

n10

0n/

a10

010

000

Bas

is th

at th

erm

al e

xpos

ure

sam

ples

are

to b

e m

onito

red

by la

b te

chni

cian

eve

ry 1

00h

(100

inte

rval

s).

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

.

Ove

rsee

& M

anag

eE

ngin

eer

200

n/a

85

540

000

Bas

is o

f est

imat

e: R

esou

rce

requ

irem

ent i

n th

e fo

rm o

f one

eng

inee

r at

$20

0/ho

ur a

t 9 s

ampl

es/w

eek

To

tal 1

($)

5000

0 B

ased

on

met

allic

IHX

A (

see

adju

stm

ent f

acto

r).

Tes

tin

gT

ask

req

uir

emen

tT

estin

gT

ota

l ($)

Ass

um

ptio

ns/

Bas

es

Sam

ple

sP

rep

(Mac

hin

ing

) [1]

Tes

t co

st/s

amp

leT

estin

g C

ost

s

Eq

. set

up

P

ost

test

sam

ple

pre

pP

ost

test

an

alys

isR

epo

rtin

g

Met

allo

gra

ph

y/S

EM

Cut

ting,

pol

ishi

ng, e

tchi

ng s

ampl

e45

n/a

640

2880

0n/

an/

an/

a28

800

Tak

ing

into

acc

ount

that

labo

rato

ry te

chni

cian

will

need

8 h

ours

for

sam

ple

prep

arat

ion

at $

80/h

our.

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

.

Obs

erva

tion

of s

ampl

e/m

etal

lurg

y45

n/a

400

1800

0n/

an/

a50

018

000

Incl

usiv

e of

1)

Ana

lyse

s co

st (

incl

usiv

e of

ope

rato

r an

d m

achi

ne

cost

s) a

t $20

0/ho

ur a

nd 2

) S

cien

tist/E

ngin

eerin

g in

put a

t $20

0/ho

ur.

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

.

To

tal 2

($)

046

800

00

050

046

800

Mat

eria

lsM

ater

ials

req

uir

emen

tT

ota

l ($)

Ass

um

ptio

ns/

Bas

es

Sam

ple

sM

at.c

ost

/sam

ple

Mat

eria

l co

st

Cer

amic

sam

ple

s [2

]n/

an/

a3,

030

3,03

0C

ostin

g ba

sed

on m

ater

ial p

rice

of $

40/k

g. O

ther

fact

ors

bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

.

To

tal 3

($)

3030

Oth

erA

dd

itio

nal

req

uir

emen

tsT

ota

l ($)

Ass

um

ptio

ns/

Bas

es (

Bas

ed o

n m

etal

lic IH

X A

(see

ad

just

men

t fac

tor)

.)

Un

it p

rice

($)

Qu

antit

y

Cap

ital c

ost

- fu

rnac

es fo

r th

erm

al a

gin

g30

003

9000

Cos

ting

base

d on

ver

bal q

uota

tion

for

furn

ace

with

req

uire

d ca

pabi

lity

size

d at

180

mm

x 1

80m

m x

250

mm

Co

ntin

gen

cies

(po

wer

co

nsu

mp

tion

, el

emen

t re p

lace

men

t)90

01

900

Fur

nace

con

tinge

ncie

s ba

sed

on 1

0% o

f tot

al c

apita

l cos

t for

furn

aces

Hel

ium

gas

for

reg

ula

ting

en

viro

nm

ent

120

156

18,7

2015

6 x

50kg

He

cylin

ders

to b

e ut

ilized

. Num

ber

base

d on

util

izat

ion

of o

ne c

ylin

der

a w

eek

for

each

furn

ace

for

1 ye

ar (

52 w

eeks

). H

e ga

s co

st in

clus

ive

of im

purit

y ga

ses.

Sam

plin

g g

as a

nal

yses

150

527,

800

Sam

plin

g of

furn

ace

test

ing

envi

ronm

ent d

one

once

a w

eek

by e

xter

nal

inst

itutio

n. C

olle

ctiv

e sa

mpl

ing

from

3 fu

rnac

es a

dd u

p to

$15

0/w

eek.

Bas

ed o

n pe

rson

al c

omm

unic

atio

n w

ith

rele

vant

par

ties

in M

tech

.

To

tal 4

($)

3642

0

To

tal (

$)13

6250

To

tal (

4 h

eats

at

leas

t) (

$)54

5000

10%

co

nti

ng

ency

($)

5450

0

Gra

nd

to

tal (

$)59

9500

C

ost

will

be

hig

her

co

mp

ared

to

sim

ilar

met

allic

IHX

A

s

pec

ifica

tion

du

e to

intr

icac

y o

f sam

ple

pre

par

atio

n,

Met

allic

IHX

A t

o C

eram

ic IH

X A

rat

io a

dju

stm

ent

0.5

m

ach

inin

g a

nd

an

alys

es a

s w

ell a

s u

nkn

ow

n d

etai

l reg

ard

ing

t

he

cera

mic

mat

eria

l to

be

use

d.

Eq

uiv

alen

t co

sts

for

cera

mic

IHX

A s

pec

ific

atio

n11

9900

0

[1] B

asis

for

prep

arat

ion

cost

s -

$400

/sam

ple

[2] R

efer

to 'm

ater

ial c

ost'

shee

t for

mat

eria

l cos

ting

aspe

cts

NG

NP

-CTF

MTE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 64: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17:

Int

egra

ted

Sche

dule

and

Cos

t Est

imat

e

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

C

-C =

cer

amic

to c

eram

ic b

ond

Man

ufac

turin

g E

nsur

e th

at m

etho

ds a

nd te

chni

ques

C

-M =

cer

amic

to m

etal

licC

ost

will

be

hig

her

co

mp

ared

to

sim

ilar

met

allic

IHX

A s

pec

ific

atio

n d

ue

to in

tric

acy

of

sam

ple

pre

par

atio

n,

IHX

AW

EC

-TS

-IH

XA

-025

tech

nolo

gy f

orar

e av

aila

ble

and

effe

ctiv

e in

est

ablis

hing

C-C

com

p =

C-C

com

posi

te jo

ints

mac

hin

ing

an

d a

nal

yses

as

wel

l as

un

kno

wn

det

ail r

egar

din

g t

he

cera

mic

mat

eria

l to

be

use

d.

cera

mic

CH

E's

the

CH

EN

/A

Res

ou

rces R

eso

urc

e re

qu

irem

ent

Act

ion

to

be

per

form

ed b

yTa

riff

($)

Du

rati

on

Tota

l ($)

Ass

um

pti

on

s/B

ases

(B

ased

on

met

allic

IHX

A (

see

adju

stm

ent

fact

or)

).

Ho

ur

Act

ion

Ho

urs

Day

sW

eeks

Mo

nth

sY

ears

Join

t d

esig

n/C

om

pili

ng

C-C

/C-M

/C-C

co

mp

bo

nd

sp

ecif

icat

ion

Eng

inee

r20

08

54

396

000

Ass

umin

g 1

mon

th n

eede

d pe

r jo

inin

g m

etho

d to

com

pile

spe

cific

atio

n (c

-c/m

-c/c

-c c

omp)

Bo

nd

ing

of

join

ts (

C-C

/C-M

/C-C

co

mp

) fo

r sa

mp

les

Cod

ed w

elde

r10

08

545

1800

0013

5 sa

mpl

es to

be

join

ed. A

ssum

e 3

sam

ples

/wee

k du

e to

the

larg

e un

cert

aint

y in

tim

e ne

eded

to e

stab

lish

cer

Ove

rsee

& M

anag

eE

ngin

eer

200

n/a

85

1512

0000

Ove

rsig

ht a

nd m

anag

emen

t will

req

uire

res

ourc

es in

the

form

of

1 en

gine

er (

$200

/hou

r)

Tota

l 1 (

$)39

6000

Tes

tin

gTa

sk r

equ

irem

ent

Test

ing

Tota

l ($)

Ass

um

pti

on

s/B

ases

Sam

ple

sP

rep

(M

ach

inin

g)

[1]

Test

co

st/s

amp

leTe

stin

g C

ost

s

Eq

. set

up

P

ost

tes

t sa

mp

le p

rep

Po

st t

est

anal

ysis

Rep

ort

ing

Met

allo

gra

ph

y/S

amp

le p

rep

arat

ion

&

anal

yses

[2]

]

Sam

ple

prep

arat

ion

135

640

8640

086

400

Tak

ing

into

acc

ount

that

labo

rato

ry te

chni

cian

will

nee

d 8

hour

s fo

r

sam

ple

prep

arat

ion

at $

80/h

our.

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

Obs

erva

tion

of m

etal

lurg

y/op

tical

/SE

M13

540

054

000

5400

0In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $20

0/ho

ur a

nd 2

) S

cien

tist/E

ngin

eerin

g in

put a

t $20

0/ho

ur .

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t

Che

mis

try

prof

ile in

join

ts13

540

054

000

5400

0In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $20

0/ho

ur a

nd 2

) S

cien

tist/E

ngin

eerin

g in

put a

t $20

0/ho

ur .

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t

Tota

l 2 (

$)14

4019

4400

1944

00

Mat

eria

ls

Mat

eria

ls r

equ

irem

ent

Tota

l ($)

Ass

um

pti

on

s/B

ases

Sam

ple

sM

at.c

ost

/sam

ple

Mat

eria

l co

st

Cer

amic

sam

ple

s [3

]n/

an/

a9,

090

9,09

0C

ostin

g ba

sed

on m

ater

ial p

rice

of $

40/k

g. T

his

does

not

allo

w f

or

the

cost

/dev

elop

men

t for

the

wel

d/br

aze

allo

y. O

ther

fac

tors

bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

Tota

l 3 (

$)90

90

To

tal (

$)59

9490

To

tal (

4 h

eats

at

leas

t) (

$)23

9796

010

% c

on

tin

gen

cy (

$)23

9796

Gra

nd

to

tal (

$)26

3775

6

Co

st w

ill b

e h

igh

er c

om

par

ed t

o s

imila

r m

etal

lic IH

X A

s

pec

ific

atio

n d

ue

to in

tric

acy

of

sam

ple

pre

par

atio

n,

Met

allic

IHX

A t

o C

eram

ic IH

X A

rat

io a

dju

stm

ent

0.5

m

ach

inin

g a

nd

an

alys

es a

s w

ell a

s u

nkn

ow

n d

etai

l reg

ard

ing

t

he

cera

mic

mat

eria

l to

be

use

d.

Eq

uiv

alen

t co

sts

for

cera

mic

IHX

A s

pec

ific

atio

n52

7551

2

[1] B

asis

for

pre

para

tion

cost

s -

$400

/sam

ple

[2] A

ssum

ing

that

all

the

join

ed s

ampl

es to

be

chec

ked

for

join

t int

egrit

y af

ter

join

ing

[3] R

efer

to 'm

ater

ial c

ost'

shee

t for

mat

eria

l cos

ting

aspe

cts

NG

NP

-CTF

MTE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 65: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d S

ched

ule

and

Cos

t Est

imat

e

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

IHX

AW

EC

-TS

-IH

XA

-026

Cer

amic

mat

eria

ls

code

s an

d st

anda

rds

Dev

elop

and

est

ablis

h A

SM

E

code

cas

e an

d A

ST

M

stan

dard

sN

/A

Tas

ks r

equ

ired

Act

ion

to

be

per

form

ed b

yT

arif

f ($

)T

ime

nee

ded

To

tal (

$)A

ssu

mp

tio

ns/

Bas

es (

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fa

cto

r)).

Ho

ur

Act

ion

Ho

urs

Day

sW

eeks

Mo

nth

s

Pre

para

tory

wor

kE

ngin

eers

150

n/a

110

1650

01)

Est

mat

ion

incl

usiv

e of

inte

ract

ions

with

AS

ME

and

AS

TM

dur

ing

appr

oval

pro

cess

and

prov

isio

n of

add

ition

al d

ata

requ

este

d D

raftt

ing

code

cas

e an

d st

anda

rds

for

cera

mic

Eng

inee

rs15

0n/

a45

0067

5000

by A

SM

E/A

ST

M. B

asis

ent

ails

dis

cuss

ions

with

Geo

rge

Hay

ner.

Tot

al 1

($)

6915

00

To

tal (

$)69

1500

10%

co

nti

ng

ency

($)

6915

0

Gra

nd

to

tal (

$)76

0650

Met

allic

IHX

A t

o C

eram

ic IH

X A

rat

io a

dju

stm

ent

0.5

Eq

uiv

alen

t co

sts

for

cera

mic

IHX

A s

pec

ific

atio

n15

2130

0

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 66: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

IHX

AW

EC

-TS

-IH

XA

-027

The

rmal

/Flu

id a

nd

stre

ss-s

trai

n m

odel

ling

met

hods

fo

r ce

ram

ic IH

X A

Dev

elop

ther

mal

-flu

id a

nd

stre

ss-s

trai

n m

odel

s fo

r ce

ram

ic IH

X A

N/A

Tas

ks r

equ

ired

Act

ion

to

be

per

form

ed b

yT

arif

f ($

)T

ime

nee

ded

To

tal (

$)A

ssu

mp

tio

ns/

Bas

es (

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fa

cto

r))

Ho

ur

Yea

rH

ou

rsD

ays

Wee

ksM

on

ths

Yea

rM

odel

gen

erat

ion

com

bini

ng th

erm

al-f

luid

as

wel

l as

stre

ss-s

trai

n m

odel

s to

gui

de

cera

mic

IHX

des

i gn

Gro

up o

f mod

elin

g sp

ecia

lists

63,0

003

1890

001)

Est

mat

ion

mad

e by

M-T

ech

- D

urat

ion

and

cost

is g

reat

ly

depe

ndan

t on

the

data

sup

plie

d by

sup

plie

rs (

tran

sfer

coe

ffici

ents

).

Dur

atio

n of

3 y

ears

for

wor

k

To

tal (

$)18

9000

10%

co

nti

ng

ency

($)

1890

0

Gra

nd

to

tal (

$)20

7900

Met

allic

IHX

A t

o C

eram

ic IH

X A

rat

io a

dju

stm

ent

0.5

Eq

uiv

alen

t co

sts

for

cera

mic

IHX

A s

pec

ific

atio

n41

5800

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 67: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP-

CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17:

Int

egra

ted

Sche

dule

and

Cos

t Est

imat

e

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

IHX

AW

EC

-TS

-IH

XA

-028

Crit

eria

for

st

ruct

ural

inte

grity

fo

r ce

ram

ic IH

X A

Est

ablis

h cr

iteria

for

str

uctu

ral

inte

grity

for

cer

amic

IHX

AN

/A

Tas

ks r

equ

ired

Act

ion

to

be

per

form

ed b

yT

arif

f ($

)T

ime

nee

ded

To

tal (

$)A

ssu

mp

tio

ns/

Bas

es (

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fa

cto

r))

Ho

ur

Yea

rH

ou

rsD

ays

Wee

ksM

on

ths

Yea

r

Str

uctu

ral i

nteg

rity

mod

els

of c

eram

ic IH

X A

Gro

up o

f m

odel

ing

spec

ialis

ts42

,500

312

7500

1) E

stm

atio

n m

ade

by M

-Tec

h -

Dur

atio

n an

d co

st is

gre

atly

depe

ndan

t on

the

data

sup

plie

d by

sup

plie

rs (

tran

sfer

coe

ffic

ient

s).

Dur

atio

n of

3 y

ears

for

wor

k

To

tal (

$)12

7500

10%

co

nti

ng

ency

($)

1275

0

Gra

nd

to

tal (

$)14

0250

Met

allic

IHX

A t

o C

eram

ic IH

X A

rat

io a

dju

stm

ent

0.5

Eq

uiv

alen

t co

sts

for

cera

mic

IHX

A s

pec

ific

atio

n28

0500

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 68: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP-

CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17:

Int

egra

ted

Sche

dule

and

Cos

t Est

imat

e

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

IHX

AW

EC

-TS

-IH

XA

-029

Per

form

ance

m

odel

ling

met

hods

fo

r ce

ram

ic IH

X A

Dev

elop

per

form

ance

mod

els

for

pred

ictiv

e op

erat

ion

for

cera

mic

IHX

AN

/A

Tas

ks r

equ

ired

Act

ion

to

be

per

form

ed b

yT

arif

f ($

)T

ime

nee

ded

To

tal (

$)A

ssu

mp

tio

ns/

Bas

es (

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fa

cto

r))

Ho

ur

Yea

rH

ou

rsD

ays

Wee

ksM

on

ths

Yea

r

Per

form

ance

mod

els

for

cera

mic

IHX

Gro

up o

f m

odel

ing

spec

ialis

ts42

,500

312

7500

1) E

stm

atio

n m

ade

by M

-Tec

h

Dur

atio

n of

3 y

ears

for

wor

k

To

tal (

$)12

7500

10%

co

nti

ng

ency

($)

1275

0

Gra

nd

to

tal (

$)14

0250

Met

allic

IHX

A t

o C

eram

ic IH

X A

rat

io a

dju

stm

ent

0.5

Eq

uiv

alen

t co

sts

for

cera

mic

IHX

A s

pec

ific

atio

n28

0500

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 69: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

Mat

eria

l co

st d

etai

ls b

ased

on

pre

ferr

ed n

um

ber

of

sam

ple

s to

be

test

ed -

Cer

amic

[1]

(@

$40

/kg

)

Sam

ple

am

ou

nt

[2]

Per

sam

ple

co

st -

617

18IH

XA

.22

177

IHX

A.2

345

IHX

A.2

413

5IH

XA

.25

Sh

eet

nam

eM

at.c

ost

Co

st($

)sa

mp

les

($)

sam

ple

s($

)($

)($

)E

last

ic P

rope

rtie

s 1

00

66

00

00

Ten

sile

Pro

pert

ies

10

015

150

00

0F

atig

ue s

tren

gth

(LC

F)

100

00

4545

0015

1500

4545

00F

ati g

ue s

tren

gth

(HC

F)

100

00

4545

0015

1500

4545

00C

reep

str

engt

h2

00

4896

1530

4590

Fra

ctur

e to

u ghn

ess:

CT

OD

100

00

990

00

00

0F

ract

ure

toug

hnes

s: K

c10

00

09

900

00

00

The

rmal

con

duct

ivit y

1018

180

00

00

00

To

tal (

$)41

418

010

917

3030

9090

[1] D

own

sele

ctio

n of

the

cera

mic

mat

eria

l stil

l has

to b

e do

ne a

nd th

is v

alue

is s

ubje

ct to

cha

nge

[2] S

ampl

e am

ount

nee

ded

base

d on

Met

allic

IHX

A S

ampl

es r

equi

red

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 70: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d S

ched

ule

and

Cos

t Est

imat

e

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

IHX

BW

EC

-TS

-IH

XB

-001

Allo

y 80

0H

Mat

eria

l S

peci

ficat

ions

and

P

rocu

rem

ent

Fin

aliz

e m

ater

ial

spec

ifica

tions

, dev

elop

pr

ocur

emen

t req

uire

men

ts,

proc

ure

1/2

heat

s of

Allo

y 80

0H

N/A

Tas

ks r

equ

ired

Act

ion

to

be

per

form

ed b

yT

arif

f ($

)T

ime

nee

ded

To

tal (

$)A

ssu

mp

tio

ns/

Bas

es (

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fa

cto

r)).

Ho

ur

Act

ion

Ho

urs

Day

sW

eeks

Mo

nth

s

Allo

y 80

0H p

rocu

rem

ent s

peci

ficat

ion

Eng

inee

r20

0N

/A8

58

6400

01)

Bas

ed o

n tim

e ne

eded

to c

ompi

le p

rocu

rem

ent s

peci

ficat

ion,

insp

ectio

n du

ring

proc

urem

ent p

rodu

ctio

n (p

rodu

ctio

n/ro

lling

/sam

plin

g)

as w

ell a

s co

mpi

ling

repo

rt.

To

tal (

$)64

000

10%

co

nti

ng

ency

($)

6400

Gra

nd

to

tal (

$)70

400

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 71: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP-

CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

W =

Wel

ding

Allo

y 80

0H jo

inin

gD

emon

stra

te th

at A

lloy8

00H

can

be

BR

= B

razi

ng

IHX

BW

EC

-TS

-IH

XB

-002

tech

nolo

gy a

ndbr

azed

, diff

usio

n bo

nded

and

that

join

tD

B =

Diff

usio

n B

ondi

ngS

ame

equ

ival

ent

of

wo

rk n

eed

ed a

s fo

r m

etal

lic IH

X A

sp

ecif

icat

ion

resu

ltant

pro

pert

ies

prop

ertie

s ar

e ap

prop

riate

for

this

use

N/A

Res

ou

rces R

eso

urc

e re

qu

irem

ent

Act

ion

to

be

per

form

ed b

yT

arif

f ($

)D

ura

tio

nT

ota

l ($)

Ass

um

pti

on

s/B

ases

(B

ased

on

met

allic

IHX

A (

see

adju

stm

ent

fact

or)

).

Ho

ur

Act

ion

Ho

urs

Day

sW

eeks

Mo

nth

sY

ears

Wel

d d

esi g

n/C

om

pili

ng

W-B

R-D

B

s pec

ific

atio

nE

ngin

eer

200

85

43

9600

0A

ssum

ing

1 m

onth

nee

ded

per

join

ing

met

hod

to c

ompi

le s

peci

ficat

ion

(W/B

R/D

B)

Wel

din

g o

f jo

ints

(W

/BR

/DB

)C

oded

wel

der

100

85

4618

4000

549

sam

ples

to b

e jo

ined

. Due

to la

rge

unce

rtai

nty

of th

e tim

e ne

eded

to e

stab

lish

diff

usio

n bo

nded

spe

cim

ens,

ass

ume

that

12

sam

ples

/wee

k ar

e to

be

join

ed (

irres

pect

ive

of jo

inin

g m

etho

d).

Co

nd

uct

ing

tes

tin

g:

Join

t p

rop

erti

esLa

bora

tory

Tec

hnic

ian

80n/

a8

561

1952

00T

estin

g w

ill r

equi

re r

esou

rces

in th

e fo

rm o

f 1 e

ngin

eer

($20

0/ho

ur)

Ove

rsee

& M

anag

eE

ngin

eer

200

n/a

85

6148

8000

as w

ell a

s 1

labo

rato

ry te

chni

cian

(80

$/ho

ur).

Ass

umin

g th

at 9

sam

ples

/wee

k ar

e te

sted

To

tal 1

($)

9632

00(d

ue to

larg

e tim

e un

cert

aint

y fo

r fa

tigue

test

ing)

Tes

ting

Tas

k re

qu

irem

ent

Tes

tin

gT

ota

l ($)

Ass

um

pti

on

s/B

ases

(B

ased

on

met

allic

IHX

A (

see

adju

stm

ent

fact

or)

).

Sam

ple

s [1

]P

rep

(M

ach

inin

g)

[2]

Tes

t co

st/s

amp

leT

esti

ng

Co

sts

E

q. s

etu

p

Po

st t

est

sam

ple

pre

pP

ost

tes

t an

alys

isR

epo

rtin

gM

etal

log

rap

hy

(po

st w

eld

ing

/bo

nd

ing

, pre

-te

stin

g)

[3]

Cut

ting,

pol

ishi

ng54

964

035

1360

3513

60T

akin

g in

to a

ccou

nt th

at la

bora

tory

tech

nici

an w

ill n

eed

8 ho

urs

for

sam

ple

prep

arat

ion

at $

80/h

our.

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

Obs

erva

tion

of m

etal

lurg

y54

940

021

9600

2196

00In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $20

0/ho

ur a

nd 2

) S

cien

tist/E

ngin

eerin

g in

put a

t $20

0/ho

ur.

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

Che

mis

try

prof

ile in

join

ts54

940

021

9600

2196

00In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $20

0/ho

ur a

nd 2

) S

cien

tist/E

ngin

eerin

g in

put a

t $20

0/ho

ur.

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

Th

erm

al P

hys

ical

Mec

han

ical

pro

per

ties

of

W/B

R/D

B jo

ints

Ela

stic

pro

pert

ies

[4]

1872

0035

063

00n/

an/

an/

a50

014

000

$350

-00

per

spec

imen

at 9

50°C

(+-

30°

C).

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

Ten

sile

Pro

pert

ies

[5]

4518

000

350

1575

0n/

an/

an/

a50

034

250

$350

-00

per

spec

imen

at 9

50°C

(+-

30°

C).

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

Fat

igue

Str

engt

h (L

CF

)13

554

000

720

9720

066

000

n/a

n/a

1000

2182

00F

atig

ue s

tren

gth

LCF

to 1

000°

C -

$72

0-00

up

to 8

0 00

0 cy

cles

+

$20-

00/h

our

ther

e af

ter

per

spec

imen

at 9

50°C

(+-

30°

C).

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

Fat

igue

str

engt

h (H

CF

)13

554

000

800

1080

0066

000

n/a

n/a

1000

2290

00F

atig

ue s

tren

gth

HC

F to

100

0°C

- $

800-

00 u

p to

100

0 00

0 cy

cles

per

spec

imen

at 9

50°C

(+-

30°

C).

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

Cre

ep s

tren

gth

144

5760

035

0050

4000

n/a

n/a

n/a

500

5621

00C

reep

str

engt

h to

100

0°C

for

10,0

00 h

- $

3500

-00

per

spec

imen

. Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

Fra

ctur

e to

ughn

ess:

CT

OD

2710

800

1000

2700

0n/

an/

an/

a50

038

300

Fra

ctur

e to

ughn

ess:

CT

OD

- $

1000

-00

at 6

50°C

per

spe

cim

en. B

ased

on

met

allic

IHX

A (

see

adju

stm

ent f

acto

r)

Fra

ctur

e to

ughn

ess:

Kc

2710

800

560

1512

0n/

an/

an/

a50

026

420

Fra

ctur

e to

ughn

ess:

Kc

- $5

60-0

0 at

650

°C p

er s

peci

men

. Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

The

rmal

con

duct

ivity

1872

0010

018

00n/

an/

an/

a50

095

00T

herm

al c

ondu

ctiv

ity to

100

0°C

: - $

95-0

0 pe

r sp

ecim

en. B

ased

on

met

allic

IHX

A (

see

adju

stm

ent f

acto

r)

Met

allo

gra

ph

y/O

pti

cal/S

EM

(p

ost

-w

eld

ing

,po

st-t

esti

ng

) [

6]C

uttin

g, p

olis

hing

, etc

hing

sam

ple

459

640

2937

6029

3760

Tak

ing

into

acc

ount

that

labo

rato

ry te

chni

cian

will

nee

d 8

hour

s fo

r

sam

ple

prep

arat

ion

at $

80/h

our.

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

Obs

erva

tion

of s

ampl

e/m

etal

lurg

y45

940

018

3600

1836

00In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $20

0/ho

ur a

nd 2

) S

cien

tist/E

ngin

eerin

g in

put a

t $20

0/ho

ur .

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

To

tal 2

($)

2196

0012

5253

013

2000

00

5000

2399

690

Mat

eria

lsM

ater

ials

req

uir

emen

tT

ota

l ($)

Ass

um

pti

on

s/B

ases

(B

ased

on

met

allic

IHX

A (

see

adju

stm

ent

fact

or)

).

Sam

ple

sM

at.c

ost

/sam

ple

Mat

eria

l co

st

Allo

y 80

0H s

amp

les

[7]

n/a

n/a

28,8

1528

,815

Cos

ting

base

d on

mat

eria

l pric

e of

$35

/kg.

Thi

s do

es n

ot a

llow

for

the

cost

/dev

elop

men

t for

the

wel

d/br

aze

allo

y. O

ther

asp

ects

bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

To

tal 3

($)

2881

5

To

tal (

$)33

9170

5

10%

co

ntin

gen

cy ($

)33

9170

Gra

nd

tota

l ($)

3730

875

Sam

e es

tim

ates

fo

r IH

X B

rel

atin

g t

o IH

X A

IHX

A to

IHX

B r

atio

ad

just

men

t1

Sam

e eq

uiv

alen

t o

f w

ork

nee

ded

as

for

met

allic

IHX

A s

pec

ific

atio

n

Eq

uiv

alen

t co

sts

for

IHX

B s

pec

ifica

tion

3730

875

[1] S

ee p

refe

rred

num

ber

of s

ampl

es to

be

used

in 's

ampl

e' s

heet

[2] B

asis

for

prep

arat

ion

cost

s -

$400

/sam

ple

[3] A

ssum

ing

that

all

the

join

ed s

ampl

es to

be

chec

ked

for

join

t int

egrit

y af

ter

join

ing

[4] D

eter

min

atio

n by

way

of m

echa

nica

l tes

ting

not a

dvis

ed. D

eter

min

atio

n sh

ould

be

base

d on

nat

ural

vib

ratio

nal m

etho

ds

[5] T

ensi

le p

rope

rtie

s (y

ield

str

engt

h, te

nsile

str

engt

h, e

long

atio

n, a

nd R

A)

[6] O

ptic

al/S

EM

wor

k to

be

cond

ucte

d fo

r te

sile

, fat

igue

(H

CF

& L

CF

) an

d cr

eep

[7] R

efer

to 'm

ater

ial c

ost'

shee

t for

mat

eria

l cos

ting

aspe

cts

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 72: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t R

oad

Map

ping

Rep

ort

Sec

tion

17: I

nteg

rate

d S

ched

ule

and

Cos

t E

stim

ate

Cri

t S

SC

Sp

ecif

icat

ion

num

ber

Sp

ecif

icat

ion

Des

crip

tion

Co

mm

ents

The

rmal

, Phy

sica

lD

emon

stra

te th

at p

rocu

red

Allo

y800

H

IHX

BW

EC

-TS

-IH

XB

-003

and

Mec

hani

cal

will

hav

e th

erm

al, p

hysi

cal a

nd m

echa

nica

lC

ost

will

be

low

er c

om

par

ed t

o s

imila

r m

etal

lic IH

X A

sp

ecif

icat

ion

due

to

the

exi

stin

g

prop

ertie

s of

Allo

y 80

0Hpr

oper

ties

appr

opria

te fo

r us

e in

CH

EN

/AA

lloy

800H

dat

abas

e th

at c

an b

e ad

op

ted

Res

ou

rces R

eso

urce

req

uire

men

tA

ctio

n to

be

per

form

ed b

yT

arif

f ($

)D

urat

ion

To

tal (

$)A

ssum

ptio

ns/B

ases

(B

ased

on

met

allic

IHX

A (

see

adju

stm

ent

fact

or)

).H

our

Act

ion

Ho

urs

Day

sW

eeks

Mo

nths

Yea

rs

Co

nduc

ting

tes

ting

Labo

rato

ry T

echn

icia

n80

n/a

85

2167

200

Tes

ting

will

req

uire

res

ourc

es in

the

form

of 1

eng

inee

r ($

200/

hour

)

Ove

rsee

& M

anag

eE

ngin

eer

200

n/a

85

2116

8000

as w

ell a

s 1

labo

rato

ry te

chni

cian

(80

$/ho

ur).

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

To

tal 1

($)

2352

00

Tes

tin

gT

ask

req

uire

men

tT

estin

gT

ota

l ($)

Ass

ump

tions

/Bas

es (

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fa

cto

r)).

Sam

ple

s [1

]P

rep

(M

achi

ning

) [2

]T

est

cost

/sam

ple

Tes

ting

Co

sts

E

q. s

etup

P

ost

tes

t sa

mp

le p

rep

Po

st t

est

anal

ysis

[3]

Rep

ort

ing

The

rmal

Phy

sica

l Mec

hani

cal p

rop

ertie

s

Ela

stic

pro

pert

ies

[4]

624

0035

021

00n/

an/

an/

a50

050

00$3

50-0

0 pe

r sp

ecim

en a

t 950

°C (

+-

30°C

). B

ased

on

met

allic

IHX

A (

see

adju

stm

ent f

acto

r)

Ten

sile

Pro

pert

ies

[5]

1560

0035

052

50n/

an/

an/

a50

011

750

$350

-00

per

spec

imen

at 9

50°C

(+

- 30

°C).

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

Fat

igue

Str

engt

h (L

CF

)45

1800

072

032

400

6600

0n/

a90

0010

0012

6400

Fat

igue

str

engt

h LC

F to

100

0°C

- $

720-

00 u

p to

80

000

cycl

es +

$20-

00/h

our

ther

e af

ter

per

spec

imen

at 9

50°C

(+

- 30

°C).

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

Fat

igue

str

engt

h (H

CF

)45

1800

080

036

000

6600

0n/

a90

0010

0013

0000

Fat

igue

str

engt

h H

CF

to 1

000°

C -

$80

0-00

up

to 1

000

000

cycl

es p

er

spec

imen

at 9

50°C

(+

- 30

°C).

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

Cre

ep s

tren

gth

4819

200

3500

1680

00n/

an/

an/

a50

018

7700

Cre

ep s

tren

gth

to 1

000°

C fo

r 10

,000

h -

$35

00-0

0 pe

r sp

ecim

en. B

ased

on

met

allic

IHX

A (

see

adju

stm

ent f

acto

r)

Fra

ctur

e to

ughn

ess:

CT

OD

936

0010

0090

00n/

an/

a18

0050

014

900

Fra

ctur

e to

ughn

ess:

CT

OD

- $

1000

-00

at 6

50°C

per

spe

cim

en. B

ased

on

met

allic

IHX

A (

see

adju

stm

ent f

acto

r)

Fra

ctur

e to

ughn

ess:

Kc

936

0056

050

40n/

an/

a18

0050

010

940

Fra

ctur

e to

ughn

ess:

Kc

- $5

60-0

0 at

650

°C p

er s

peci

men

. Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

The

rmal

con

duct

ivity

624

0010

060

0n/

an/

a12

0050

047

00T

herm

al c

ondu

ctiv

ity to

100

0°C

: - $

95-0

0 pe

r sp

ecim

en. B

ased

on

met

allic

IHX

A (

see

adju

stm

ent f

acto

r)

SE

M R

elat

ed w

ork

n/a

To

tal 2

($)

7320

025

8390

1320

000

2280

050

0049

1390

Mat

eria

lsM

ater

ials

req

uire

men

tT

ota

l ($)

Ass

ump

tions

/Bas

es (

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fa

cto

r)).

Sam

ple

sM

at.c

ost

/sam

ple

Mat

eria

l co

st

Allo

y 80

0H s

amp

les

[6]

n/a

n/a

9,55

29,

552

Cos

ting

base

d on

mat

eria

l pric

e of

$35

/kg.

Oth

er fa

ctot

s ba

sed

on m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

To

tal 3

($)

9552

To

tal (

$)73

6142

10%

co

nti

ng

ency

($)

7361

4

Gra

nd

to

tal (

$)80

9757

IHX

A t

o IH

X B

rat

io a

dju

stm

ent

10C

ost

will

be

low

er c

om

par

ed t

o s

imila

r m

etal

lic IH

X A

sp

ecif

icat

ion

due

to

the

exi

stin

g

Allo

y 80

0H d

atab

ase

that

can

be

ado

pte

dE

qu

ival

ent

cost

s fo

r IH

X B

sp

ecif

icat

ion

8097

6

[1] S

ee p

refe

rred

num

ber

of s

ampl

es to

be

used

in 's

ampl

e' s

heet

[2] B

asis

for

prep

arat

ion

cost

s -

$400

/sam

ple

[3] P

ost t

est a

naly

ses

incl

udes

pos

sibl

e op

tical

and

sca

nnin

g el

ectr

on m

icro

scop

y w

ork

and

is b

ased

eng

inee

r/sc

ient

ist t

ariff

of $

200/

hour

[4] D

eter

min

atio

n by

way

of m

echa

nica

l tes

ting

not a

dvis

ed. D

eter

min

atio

n sh

ould

be

base

d on

nat

ural

vib

ratio

nal m

etho

ds

[5] T

ensi

le p

rope

rtie

s (y

ield

str

engt

h, te

nsile

str

engt

h, e

long

atio

n, a

nd R

A)

[6] R

efer

to 'm

ater

ial c

ost'

shee

t for

mat

eria

l cos

ting

aspe

cts

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 73: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP-

CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

Effe

cts

of th

erm

alD

emon

stra

te th

at A

lloy

800H

can

be

Co

st w

ill b

e lo

wer

co

mp

ared

to

sim

ilar

met

alli

c IH

X A

sp

ecif

icat

ion

du

e to

th

e ex

isti

ng

IHX

BW

EC

-TS

-IHX

B-0

04ag

ing

and

envi

ronm

ent

utili

zed

in N

GN

P e

nviro

nmen

t (te

mpe

ratu

re &

All

oy

800H

dat

abas

e th

at c

an b

e ad

op

ted

on A

lloy

800H

prop

ertie

sm

ediu

m)

for

long

per

iods

with

out d

egra

datio

nN

/A

Res

ou

rces R

eso

urc

e re

qu

irem

ent

Act

ion

to

be

per

form

ed b

yT

arif

f ($

)D

ura

tio

nT

ota

l ($)

Ass

um

pti

on

s/B

ases

( B

ased

on

met

alli

c IH

X A

(se

e ad

just

men

t fa

cto

r)).

Ho

ur

Act

ion

Ho

urs

Day

sW

eeks

Mo

nth

sY

ears

Wel

din

g o

f jo

ints

(W

/BR

/DB

)C

oded

wel

der

n/a

n/a

n/a

n/a

n/a

0

Ove

rsee

& M

anag

e: T

her

mal

exp

osu

re o

f sa

mp

les

- 10

,000

hLa

bora

tory

Tec

hnic

ian

100

n/a

100

1000

0T

herm

al e

xpos

ure

mon

itore

d by

lab

tech

nici

an e

very

100

h (1

00 in

terv

als)

. B

ased

on

met

allic

IHX

A (

see

adju

stm

ent f

acto

r)

Co

nd

uct

ing

tes

tin

g:

All

oy

pro

per

ties

Labo

rato

ry T

echn

icia

n80

n/a

85

2167

200

Tes

ting

will

req

uire

res

ourc

es in

the

form

of 1

eng

inee

r ($

200/

hour

)

Ove

rsee

& M

anag

eE

ngin

eer

200

n/a

85

2116

8000

as w

ell a

s 1

labo

rato

ry te

chni

cian

(80

$/ho

ur).

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

To

tal 1

($)

2452

00

Tes

tin

gT

ask

req

uir

emen

tT

esti

ng

To

tal (

$)A

ssu

mp

tio

ns/

Bas

es (

Bas

ed o

n m

etal

lic

IHX

A (

see

adju

stm

ent

fact

or)

).

Sam

ple

s [1

]P

rep

(M

ach

inin

g)

[2]

Tes

t co

st/s

amp

leT

esti

ng

Co

sts

E

q. s

etu

p

Po

st t

est

sam

ple

pre

pP

ost

tes

t an

alys

isR

epo

rtin

gM

etal

log

rap

hy

(po

st w

eld

ing

/bo

nd

ing

, pre

-te

stin

g)

[3]

Cut

ting,

pol

ishi

ng s

ampl

en/

an/

a64

00

n/a

n/a

n/a

0T

akin

g in

to a

ccou

nt th

at la

bora

tory

tech

nici

an w

ill n

eed

8 ho

urs

for

sam

ple

prep

arat

ion

at $

80/h

our.

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

Obs

erva

tion

of m

etal

lurg

yn/

an/

a40

00

n/a

n/a

500

0In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $20

0/ho

ur a

nd 2

) S

cien

tist/E

ngin

eerin

g in

put a

t $20

0/ho

ur.

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

Che

mis

try

prof

ile in

join

tsn/

an/

a40

00

n/a

n/a

500

0In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $20

0/ho

ur a

nd 2

) S

cien

tist/E

ngin

eerin

g in

put a

t $20

0/ho

ur.

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

Th

erm

al P

hys

ical

Mec

han

ical

pro

per

ties

of

All

oy

800H

an

d W

/BR

/DB

join

ts

Ela

stic

pro

pert

ies

[4]

624

0035

021

00n/

an/

an/

a50

050

00$3

50-0

0 pe

r sp

ecim

en a

t 950

°C (

+- 3

0°C

). B

ased

on

met

allic

IHX

A (

see

adju

stm

ent f

acto

r)

Ten

sile

Pro

pert

ies

[5]

1560

0035

052

50n/

an/

an/

a50

011

750

$350

-00

per

spec

imen

at 9

50°C

(+-

30°

C).

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

Fat

igue

Str

engt

h (L

CF

)45

1800

072

032

400

6600

0n/

an/

a10

0011

7400

Fat

igue

str

engt

h LC

F to

100

0°C

- $

720-

00 u

p to

80

000

cycl

es +

$20-

00/h

our

ther

e af

ter

per

spec

imen

at 9

50°C

(+-

30°

C).

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

Fat

igue

str

engt

h (H

CF

)45

1800

080

036

000

6600

0n/

an/

a10

0012

1000

Fat

igue

str

engt

h H

CF

to 1

000°

C -

$80

0-00

up

to 1

000

000

cycl

es p

er

spec

imen

at 9

50°C

(+-

30°

C).

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

Cre

ep s

tren

gth

4819

200

3500

1680

00n/

an/

an/

a50

018

7700

Cre

ep s

tren

gth

to 1

000°

C fo

r 10

,000

h -

$35

00-0

0 pe

r sp

ecim

en.

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

Fra

ctur

e to

ughn

ess:

CT

OD

936

0010

0090

00n/

an/

an/

a50

013

100

Fra

ctur

e to

ughn

ess:

CT

OD

- $

1000

-00

at 6

50°C

per

spe

cim

en.

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

Fra

ctur

e to

ughn

ess:

Kc

936

0056

050

40n/

an/

an/

a50

091

40F

ract

ure

toug

hnes

s: K

c -

$560

-00

at 6

50°C

per

spe

cim

en.

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

The

rmal

con

duct

ivity

624

0010

060

0n/

an/

an/

a50

035

00T

herm

al c

ondu

ctiv

ity to

100

0°C

: - $

95-0

0 pe

r sp

ecim

en.

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

Met

allo

gra

ph

y/S

EM

(p

ost

-wel

din

g, p

ost

-te

stin

g)

[6]

Cut

ting,

pol

ishi

ng, e

tchi

ng s

ampl

e18

3n/

a64

011

7120

n/a

n/a

n/a

1171

20T

akin

g in

to a

ccou

nt th

at la

bora

tory

tech

nici

an w

ill n

eed

8 ho

urs

for

sam

ple

prep

arat

ion

at $

80/h

our.

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

Obs

erva

tion

of s

ampl

e/m

etal

lurg

y18

3n/

a40

073

200

n/a

n/a

500

7320

0In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $20

0/ho

ur a

nd 2

) S

cien

tist/E

ngin

eerin

g in

put a

t $20

0/ho

ur.

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

To

tal 2

($)

7320

044

8710

1320

000

065

0065

8910

Mat

eria

lsM

ater

ials

req

uir

emen

tT

ota

l ($)

Ass

um

pti

on

s/B

ases

Sam

ple

sM

at.c

ost

/sam

ple

Mat

eria

l co

st

All

oy

800H

sam

ple

s [7

]n/

an/

a9,

552

9,55

2C

ostin

g ba

sed

on m

ater

ial p

rice

of $

35/k

g. T

his

does

not

allo

w fo

r

the

cost

/dev

elop

men

t for

the

wel

d/br

aze

allo

y. O

ther

asp

ects

bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

To

tal 3

($)

9552

.375

Oth

erA

dd

itio

nal

req

uir

emen

tsT

ota

l ($)

Ass

um

pti

on

s/B

ases

Un

it p

rice

($)

Qu

anti

ty

Cap

ital

co

st -

fu

rnac

es f

or

ther

mal

ag

ing

3000

390

00F

urna

ce w

ith r

equi

red

capa

bilit

y si

zed

at 1

80m

m x

180

mm

x 2

50m

m.

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

Co

nti

ng

enci

es (

po

wer

co

nsu

mp

tio

n,

elem

ent

rep

lace

men

t)90

01

900

Fur

nace

con

tinge

ncie

s m

ake

up 1

0% o

f tot

al c

apita

l cos

t for

furn

aces

. B

ased

on

met

allic

IHX

A (

see

adju

stm

ent f

acto

r)

Hel

ium

gas

fo

r re

gu

lati

ng

en

viro

nm

ent

120

156

18,7

2015

6 50

kg x

He

cylin

ders

to b

e ut

ilize

d. O

ne c

ylin

der

a w

eek

for

each

furn

ace

(52

wee

ks in

tota

l). H

e ga

s co

st in

clus

ive

of im

purit

y ga

ses.

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

Sam

pli

ng

gas

an

alys

es15

052

7,80

0S

ampl

ing

of fu

rnac

e te

stin

g en

viro

nmen

t don

e on

ce a

wee

k by

ext

erna

l

inst

itutio

n. C

olle

ctiv

e sa

mpl

ing

from

3 fu

rnac

es a

dd u

p to

$15

0/w

eek.

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

To

tal 4

($)

3642

0

To

tal (

$)95

0082

.38

10%

co

nti

ng

ency

($)

9500

8.23

8

Gra

nd

to

tal (

$)10

4509

1C

ost

wil

l be

low

er c

om

par

ed t

o s

imil

ar m

etal

lic

IHX

A s

pec

ific

atio

n d

ue

to t

he

exis

tin

g

IHX

A t

o IH

X B

rat

io a

dju

stm

ent

10A

llo

y 80

0H d

atab

ase

that

can

be

ado

pte

d

Eq

uiv

alen

t co

sts

for

IHX

B s

pec

ific

atio

n10

4509

[1] S

ee p

refe

rred

num

ber

of s

ampl

es to

be

used

in 's

ampl

e' s

heet

[2] B

asis

for

prep

arat

ion

cost

s -

$400

/sam

ple

[3] A

ssum

ing

that

all

sam

ples

to b

e ch

ecke

d fo

r jo

int c

onsi

sten

cy a

fter

join

ing

[4] D

eter

min

atio

n by

way

of m

echa

nica

l tes

ting

not a

dvis

ed. D

eter

min

atio

n sh

ould

be

base

d on

nat

ural

vib

ratio

nal m

etho

ds

[5] T

ensi

le p

rope

rtie

s (y

ield

str

engt

h, te

nsile

str

engt

h, e

long

atio

n, a

nd R

A)

[6] O

ptic

al/S

EM

wor

k to

be

cond

ucte

d fo

r te

nsile

, fat

igue

(H

CF

, LC

F),

cre

ep

[7] R

efer

to 'm

ater

ial c

ost'

shee

t for

mat

eria

l cos

ting

aspe

cts

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 74: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP-

CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17:

Inte

grat

ed S

ched

ule

and

Cos

t Est

imat

e

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

Effe

cts

ofD

emon

stra

te t

hat

Allo

y 80

0H jo

ints

can

be

IHX

BW

EC

-TS

-IH

XB

-005

envi

ronm

ent

onut

ilize

d in

NG

NP

env

ironm

ent

(tem

pera

ture

&E

xist

ing

Allo

y 80

0H d

atab

ase

can

be

uti

lized

Allo

y 80

0H jo

ints

med

ium

) fo

r lo

ng p

erio

ds w

ithou

t de

grad

atio

nN

/A

Res

ourc

es Res

ou

rce

req

uir

emen

tA

ctio

n t

o b

e p

erfo

rmed

by

Tar

iff

($)

Du

rati

on

To

tal (

$)A

ssu

mp

tio

ns/

Bas

es (

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fa

cto

r)).

Ho

ur

Act

ion

Ho

urs

Day

sW

eeks

Mo

nth

sY

ears

Wel

din

g o

f jo

ints

(W

/BR

/DB

)C

oded

wel

der

100

n/a

85

4618

4000

549

sam

ples

to

be jo

ined

. A

ssum

e 12

sam

ples

/wee

k. B

ased

on

met

allic

IH

X A

(se

e ad

just

men

t fa

ctor

).

Ove

rsee

& M

anag

e: T

her

mal

exp

osu

re o

f sa

mp

les

- 10

,000

hLa

bora

tory

Tec

hnic

ian

100

n/a

100

1000

0T

herm

al e

xpos

ure

mon

itore

d by

lab

tech

nici

an e

very

100

h (1

00 in

terv

als)

. B

ased

on

met

allic

IH

X A

(se

e ad

just

men

t fa

cC

on

du

ctin

g t

esti

ng

: A

lloy/

Join

t p

rop

erti

esLa

bora

tory

Tec

hnic

ian

80n/

a8

561

1952

00T

estin

g w

ill r

equi

re r

esou

rces

in t

he fo

rm o

f 1 e

ngin

eer

($20

0/ho

ur)

Ove

rsee

& M

anag

eE

ngin

eer

200

n/a

85

6148

8000

as w

ell a

s 1

labo

rato

ry t

echn

icia

n (8

0$/h

our)

. B

ased

on

met

allic

IH

X A

(se

e ad

just

men

t fa

ctor

).

To

tal 1

($)

8772

00

Tes

ting

Tas

k re

qu

irem

ent

Tes

tin

gT

ota

l ($)

Ass

um

pti

on

s/B

ases

(B

ased

on

met

allic

IHX

A (

see

adju

stm

ent

fact

or)

.)

Sam

ple

s [1

]P

rep

(M

ach

inin

g)

[2]

Tes

t co

st/s

amp

leT

esti

ng

Co

sts

E

q. s

etu

p

Po

st t

est

sam

ple

pre

pP

ost

tes

t an

alys

isR

epo

rtin

gM

etal

log

rap

hy

(po

st w

eld

ing

/bo

nd

ing

, pre

-te

stin

g)

[3]

Cut

ting,

pol

ishi

ng s

ampl

e54

9n/

a64

035

1360

n/a

n/a

n/a

3513

60T

akin

g in

to a

ccou

nt t

hat

labo

rato

ry t

echn

icia

n w

ill n

eed

8 ho

urs

for

sam

ple

prep

arat

ion

at $

80/h

our.

Bas

ed o

n m

etal

lic I

HX

A (

see

adju

stm

ent

fact

or).

Obs

erva

tion

of m

etal

lurg

y54

9n/

a40

021

9600

n/a

n/a

500

2196

00In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $2

00/h

our

and

2) S

cien

tist/

Eng

inee

ring

inpu

t at

$20

0/ho

ur.

Bas

ed o

n m

etal

lic I

HX

A (

see

adju

stm

ent

fact

or).

Che

mis

try

prof

ile in

join

ts54

9n/

a40

021

9600

n/a

n/a

500

2196

00In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $2

00/h

our

and

2) S

cien

tist/

Eng

inee

ring

inpu

t at

$20

0/ho

ur.

Bas

ed o

n m

etal

lic I

HX

A (

see

adju

stm

ent

fact

or).

T

her

mal

Ph

ysic

al M

ech

anic

al p

rop

erti

es

of

Allo

y 80

0H a

nd

W/B

R/D

B jo

ints

Ela

stic

pro

pert

ies

[4]

1872

0035

063

00n/

an/

an/

a50

014

000

$350

-00

per

spec

imen

at

950°

C (

+-

30°C

). B

ased

on

met

allic

IH

X A

(se

e ad

just

men

t fa

ctor

).

Ten

sile

Pro

pert

ies

[5]

4518

000

350

1575

0n/

an/

an/

a50

034

250

$350

-00

per

spec

imen

at

950°

C (

+-

30°C

). B

ased

on

met

allic

IH

X A

(se

e ad

just

men

t fa

ctor

).

Fat

igue

Str

engt

h (L

CF

)13

554

000

720

9720

066

000

n/a

n/a

1000

2182

00F

atig

ue s

tren

gth

LCF

to

1000

°C -

$72

0-00

up

to 8

0 00

0 cy

cles

+

$20-

00/h

our

ther

e af

ter

per

spec

imen

at

950°

C (

+-

30°C

). B

ased

on

met

allic

IH

X A

(se

e ad

just

men

t fa

ctor

).

Fat

igue

str

engt

h (H

CF

)13

554

000

800

1080

0066

000

n/a

n/a

1000

2290

00F

atig

ue s

tren

gth

HC

F t

o 10

00°C

- $

800-

00 u

p to

100

0 00

0 cy

cles

per

spec

imen

at

950°

C (

+-

30°C

). B

ased

on

met

allic

IH

X A

(se

e ad

just

men

t fa

ctor

).

Cre

ep s

tren

gth

144

5760

035

0050

4000

n/a

n/a

n/a

500

5621

00C

reep

str

engt

h to

100

0°C

for

10,0

00 h

- $

3500

-00

per

spec

imen

. B

ased

on

met

allic

IH

X A

(se

e ad

just

men

t fa

ctor

).

Fra

ctur

e to

ughn

ess:

CT

OD

2710

800

1000

2700

0n/

an/

an/

a50

038

300

Fra

ctur

e to

ughn

ess:

CT

OD

- $

1000

-00

at 6

50°C

per

spe

cim

en.

Bas

ed o

n m

etal

lic I

HX

A (

see

adju

stm

ent

fact

or).

Fra

ctur

e to

ughn

ess:

Kc

2710

800

560

1512

0n/

an/

an/

a50

026

420

Fra

ctur

e to

ughn

ess:

Kc

- $5

60-0

0 at

650

°C p

er s

peci

men

. B

ased

on

met

allic

IH

X A

(se

e ad

just

men

t fa

ctor

).

The

rmal

con

duct

ivity

1872

0010

018

00n/

an/

an/

a50

095

00T

herm

al c

ondu

ctiv

ity t

o 10

00°C

: -

$95-

00 p

er s

peci

men

. B

ased

on

met

allic

IH

X A

(se

e ad

just

men

t fa

ctor

).

Met

allo

gra

ph

y/S

EM

(p

ost

-wel

din

g, p

ost

-te

stin

g)

[6]

Cut

ting,

pol

ishi

ng,

etch

ing

sam

ple

459

n/a

640

2937

60n/

an/

an/

a29

3760

Tak

ing

into

acc

ount

tha

t la

bora

tory

tec

hnic

ian

will

nee

d 8

hour

s fo

r

sam

ple

prep

arat

ion

at $

80/h

our.

Bas

ed o

n m

etal

lic I

HX

A (

see

adju

stm

ent

fact

or).

Obs

erva

tion

of s

ampl

e/m

etal

lurg

y45

9n/

a40

018

3600

n/a

n/a

500

1836

00In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $2

00/h

our

and

2) S

cien

tist/

Eng

inee

ring

inpu

t at

$20

0/ho

ur.

Bas

ed o

n m

etal

lic I

HX

A (

see

adju

stm

ent

fact

or).

To

tal 2

($)

2196

0020

4309

013

2000

00

6500

2399

690

Mat

eria

lsM

ater

ials

req

uir

emen

tT

ota

l ($)

Ass

um

pti

on

s/B

ases

(B

ased

on

met

allic

IHX

A (

see

adju

stm

ent

fact

or)

.)

Sam

ple

sM

at.c

ost

/sam

ple

Mat

eria

l co

st

Allo

y 80

0H s

amp

les

[7]

n/a

n/a

28,6

5728

,657

Cos

ting

base

d on

mat

eria

l pric

e of

$35

/kg.

Thi

s do

es n

ot a

llow

for

the

cost

/dev

elop

men

t fo

r th

e w

eld/

braz

e al

loy.

Oth

er a

spec

ts b

ased

on

met

allic

IH

X A

(se

e ad

just

men

t fa

ctor

).

To

tal 3

($)

2865

7.12

5

Oth

erA

dd

itio

nal

req

uir

emen

tsT

ota

l ($)

Ass

um

pti

on

s/B

ases

(B

ased

on

met

allic

IHX

A (

see

adju

stm

ent

fact

or)

.)

Un

it p

rice

($)

Qu

anti

ty

Cap

ital

co

st -

fu

rnac

es f

or

ther

mal

ag

ing

3000

390

00F

urna

ce w

ith r

equi

red

capa

bilit

y si

zed

at 1

80m

m x

180

mm

x 2

50m

m.

Bas

ed o

n m

etal

lic I

HX

A (

see

adju

stm

ent

fact

or).

Co

nti

ng

enci

es (

po

wer

co

nsu

mp

tio

n,

elem

ent

rep

lace

men

t)90

01

900

Fur

nace

con

tinge

ncie

s m

ake

up 1

0% o

f tot

al c

apita

l cos

t fo

r fu

rnac

es.

Bas

ed o

n m

etal

lic I

HX

A (

see

adju

stm

ent

fact

or)

Hel

ium

gas

fo

r re

gu

lati

ng

en

viro

nm

ent

120

156

18,7

2015

6 x

50kg

He

cylin

ders

to

be u

tiliz

ed.

One

cyl

inde

r a

wee

k fo

r ea

ch

furn

ace.

He

gas

cost

incl

usiv

e of

impu

rity

gase

s. B

ased

on

met

allic

IH

X A

(se

e ad

just

men

t fa

ctor

).

Sam

plin

g g

as a

nal

yses

150

527,

800

Sam

plin

g of

furn

ace

test

ing

envi

ronm

ent

done

onc

e a

wee

k by

ext

erna

l

inst

itutio

n. C

olle

ctiv

e sa

mpl

ing

from

3 fu

rnac

es a

dd u

p to

$15

0/w

eek.

Bas

ed o

n m

etal

lic I

HX

A (

see

adju

stm

ent

fact

or).

To

tal 4

($)

3642

0

Tot

al (

$)33

4196

7.1

10%

con

ting

ency

($)

3341

96.7

1

Gra

nd

tot

al (

$)36

7616

4

IHX

A t

o IH

X B

rat

io a

dju

stm

ent

10E

xist

ing

Allo

y 80

0H d

atab

ase

can

be

uti

lized

Eq

uiv

alen

t co

sts

for

IHX

B s

pec

ifica

tion

3676

16

[1]

See

pre

ferr

ed n

umbe

r of

sam

ples

to

be u

sed

in 's

ampl

e' s

heet

[2]

Bas

is fo

r pr

epar

atio

n co

sts

- $4

00/s

ampl

e

[3]

Ass

umin

g th

at a

ll sa

mpl

es t

o be

che

cked

for

join

t co

nsis

tenc

y af

ter

join

ing

[4]

Det

erm

inat

ion

by w

ay o

f mec

hani

cal t

estin

g no

t ad

vise

d. D

eter

min

atio

n sh

ould

be

base

d on

nat

ural

vib

ratio

nal m

etho

ds

[5]

Ten

sile

pro

pert

ies

(yie

ld s

tren

gth,

ten

sile

str

engt

h, e

long

atio

n, a

nd R

A)

[6]

Opt

ical

/SE

M w

ork

to b

e co

nduc

ted

for

tens

ile,

fatig

ue (

HC

F,

LCF

), c

reep

[7]

Ref

er t

o 'm

ater

ial c

ost'

shee

t fo

r m

ater

ial c

ostin

g as

pect

s

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 75: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

Cri

t SS

CS

pec

ifica

tion

nu

mb

erS

pec

ifica

tion

Des

crip

tion

Co

mm

ents

Effe

cts

of g

rain

siz

eD

emon

stra

te th

at s

light

cha

nges

in g

rain

siz

e as

IHX

BW

EC

-TS

-IHX

B-0

06an

d se

ctio

n th

ickn

ess

wel

l as

the

sect

ion

thic

knes

s of

Allo

y 80

0H h

as li

ttle

Wo

rk s

tate

d is

eq

uiv

alen

t to

sim

ilar

wo

rk s

tate

d in

met

allic

IHX

A

on A

lloy

800H

effe

ct in

ove

rall

prop

ertie

s of

mat

eria

lN

/A

Res

ou

rces R

eso

urc

e re

qu

irem

ent

Act

ion

to b

e p

erfo

rmed

by

Tar

iff ($

)D

ura

tion

To

tal (

$)A

ssu

mp

tion

s/B

ases

( B

ased

on

met

allic

IHX

A (s

ee a

dju

stm

ent f

acto

r)).

Ho

ur

Act

ion

Ho

urs

Day

sW

eeks

Mo

nth

sY

ears

Co

nd

uct

ing

test

ing

: A

lloy

800H

pro

per

ties

Labo

rato

ry T

echn

icia

n80

n/a

85

1651

200

Tes

ting

will

requ

ire r

esou

rces

in th

e fo

rm o

f 1 e

ngin

eer

($20

0/ho

ur)

Ove

rsee

& M

anag

eE

ngin

eer

200

n/a

85

1612

8000

as w

ell a

s 1

labo

rato

ry te

chni

cian

(80

$/ho

ur).

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

.

To

tal 1

($)

1792

00

Tes

tin

gT

ask

req

uir

emen

tT

estin

gT

ota

l ($)

Ass

um

ptio

ns/

Bas

es (

Bas

ed o

n m

etal

lic IH

X A

(see

ad

just

men

t fac

tor)

).

Sam

ple

s [1

]P

rep

(Mac

hin

ing

) [2]

Tes

t co

st/s

amp

leT

estin

g C

ost

s

Eq

. set

up

P

ost

test

sam

ple

pre

pP

ost

test

an

alys

isR

epo

rtin

g

Th

erm

al P

hys

ical

Mec

han

ical

pro

per

ties

of A

lloy

800H

Fat

igue

Str

engt

h (L

CF

)45

1800

072

032

400

6600

0n/

an/

a10

0011

7400

Fat

igue

str

engt

h LC

F to

100

0°C

- $

720-

00 u

p to

80

000

cycl

es +

$20-

00/h

our

ther

e af

ter

per

spec

imen

at 9

50°C

(+

- 30

°C).

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

.

Fat

igue

str

engt

h (H

CF

)45

1800

080

036

000

6600

0n/

an/

a10

0012

1000

Fat

igue

str

engt

h H

CF

to 1

000°

C -

$80

0-00

up

to 1

000

000

cycl

es p

er

spec

imen

at 9

50°C

(+

- 30

°C).

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

.

Cre

ep s

tren

gth

4819

200

3500

1680

00n/

an/

an/

a50

018

7700

Cre

e p s

tren

gth

to 1

000°

C fo

r 10

,000

h -

$35

00-0

0 pe

r sp

ecim

en. B

ased

on

met

allic

IHX

A (

see

adju

stm

ent f

acto

r

Met

allo

gra

ph

y/S

EM

(po

st-t

estin

g) [

3]

Cut

ting,

pol

ishi

ng, e

tchi

ng s

ampl

e13

864

088

320

n/a

n/a

n/a

8832

0T

akin

g in

to a

ccou

nt th

at la

bora

tory

tech

nici

an w

ill ne

ed 8

hou

rs fo

r

sam

ple

prep

arat

ion

at $

80/h

our.

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

.

Obs

erva

tion

of s

ampl

e/m

etal

lurg

y13

840

055

200

n/a

n/a

500

5520

0In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $20

0/ho

ur a

nd 2

) S

cien

tist/E

ngin

eerin

g in

put a

t $20

0/ho

ur. B

ased

on

met

allic

IHX

A (

see

adju

stm

ent f

act

To

tal 2

($)

5520

037

9920

1320

000

030

0056

9620

Mat

eria

lsM

ater

ials

req

uir

emen

tT

ota

l ($)

Ass

um

ptio

ns/

Bas

es (

Bas

ed o

n m

etal

lic IH

X A

(see

ad

just

men

t fac

tor)

).

Sam

ple

sM

at.c

ost

/sam

ple

Mat

eria

l co

st

Allo

y 80

0H s

amp

les

[4]

n/a

n/a

7,95

97,

959

Cos

ting

base

d on

mat

eria

l pric

e of

$35

/kg.

Num

ber

of s

ampl

es o

nly

rele

vant

to fa

tigue

test

ing

and

cree

p te

stin

g. B

ased

on

met

allic

IHX

A (

see

adju

stm

ent f

acto

r).

To

tal 3

($)

7959

To

tal (

$)75

6779

10%

co

nti

ng

ency

($)

7567

7.9

Gra

nd

to

tal (

$)83

2456

.9S

ame

estim

ates

for

IHX

B r

elat

ing

to IH

X A

IHX

A t

o IH

X B

rat

io a

dju

stm

ent

1W

ork

sta

ted

is e

qu

ival

ent t

o s

imila

r w

ork

sta

ted

in m

etal

lic IH

X A

Eq

uiv

alen

t co

sts

for

IHX

B s

pec

ific

atio

n83

2456

.9

[1] S

ee p

refe

rred

num

ber

of s

ampl

es to

be

used

in 's

ampl

e' s

heet

[2] B

asis

for

prep

arat

ion

cost

s -

$400

/sam

ple

[3] O

ptic

al/S

EM

wor

k to

be

cond

ucte

d fo

r fa

tigue

and

cre

ep s

ampl

es

[4] R

efer

to 'm

ater

ial c

ost'

shee

t for

mat

eria

l cos

ting

aspe

cts

NG

NP

-CTF

MTE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 76: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17:

Inte

grat

ed S

ched

ule

and

Cos

t Est

imat

e

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

Cor

rosi

onD

emon

stra

te s

atis

fact

ory

corr

osio

n al

low

ance

s

IHX

BW

EC

-TS

-IH

XB

-007

allo

wan

ces

for

for

Allo

y 80

0H a

nd w

elde

d/bo

nded

sec

tions

Wo

rk s

tate

d is

eq

uiv

alen

t to

th

at s

tate

d in

met

allic

IHX

A

Allo

y 80

0HN

/A

Res

ourc

es Res

ou

rce

req

uir

emen

tA

ctio

n t

o b

e p

erfo

rmed

by

Tar

iff

($)

Du

rati

on

To

tal (

$)A

ssu

mp

tio

ns/

Bas

es (

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fa

cto

r)).

Ho

ur

Act

ion

Ho

urs

Day

sW

eeks

Mo

nth

sY

ears

Wel

din

g o

f jo

ints

(W

/BR

/DB

)C

oded

wel

der

100

n/a

85

1248

000

135

sam

ples

to b

e jo

ined

. Ass

ume

12 s

ampl

es/w

eek.

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

.

Ove

rsee

& M

anag

e: T

her

mal

exp

osu

re o

f sa

mp

les

- 10

,000

hLa

bora

tory

Tec

hnic

ian

100

n/a

100

1000

0T

herm

al e

xpos

ure

mon

itore

d by

lab

tech

nici

an e

very

100

h (1

00 in

terv

als)

. Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

.

Ove

rsee

& M

anag

eE

ngin

eer

200

n/a

85

2016

0000

To

tal 1

($)

2180

00

Tes

ting

Tas

k re

qu

irem

ent

Tes

tin

gT

ota

l ($)

Ass

um

pti

on

s/B

ases

(B

ased

on

met

allic

IHX

A (

see

adju

stm

ent

fact

or)

).

Sam

ple

sP

rep

(M

ach

inin

g)

[1]

Tes

t co

st/s

amp

leT

esti

ng

Co

sts

E

q. s

etu

p

Po

st t

est

sam

ple

pre

pP

ost

tes

t an

alys

isR

epo

rtin

g

Met

allo

gra

ph

y (p

ost

wel

din

g/b

on

din

g)

[2]

Cut

ting,

pol

ishi

ng s

ampl

e13

5n/

a64

086

400

n/a

n/a

n/a

8640

0T

akin

g in

to a

ccou

nt th

at la

bora

tory

tech

nici

an w

ill n

eed

8 ho

urs

for

sam

ple

prep

arat

ion

at $

80/h

our.

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

.

Obs

erva

tion

of m

etal

lurg

y13

5n/

a40

054

000

n/a

n/a

500

5400

0In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $20

0/ho

ur a

nd 2

) S

cien

tist/E

ngin

eeri

ng in

put a

t $20

0/ho

ur. B

ased

on

met

allic

IHX

A (

see

adju

stm

ent f

acto

r).

Che

mis

try

prof

ile in

join

ts13

5n/

a40

054

000

n/a

n/a

500

5400

0In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $20

0/ho

ur a

nd 2

) S

cien

tist/E

ngin

eeri

ng in

put a

t $20

0/ho

ur. B

ased

on

met

allic

IHX

A (

see

adju

stm

ent f

acto

r).

Th

erm

al P

hys

ical

Mec

han

ical

pro

per

ties

of

Allo

y 80

0H a

nd

W/B

R/D

B jo

ints

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

Met

allo

gra

ph

y/S

EM

(p

ost

-tes

tin

g)

Cut

ting,

pol

ishi

ng, e

tchi

ng s

ampl

e18

0n/

a64

011

5200

n/a

n/a

n/a

1152

00T

akin

g in

to a

ccou

nt th

at la

bora

tory

tech

nici

an w

ill n

eed

8 ho

urs

for

sam

ple

prep

arat

ion

at $

80/h

our.

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

.

Obs

erva

tion

of s

ampl

e/m

etal

lurg

y18

0n/

a40

072

000

n/a

n/a

500

7200

0In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $20

0/ho

ur a

nd 2

) S

cien

tist/E

ngin

eeri

ng in

put a

t $20

0/ho

ur. B

ased

on

met

allic

IHX

A (

see

adju

stm

ent f

acto

r).

Dep

th o

f int

erna

l oxi

datio

n18

0n/

a40

072

000

500

7250

0In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $20

0/ho

ur a

nd 2

) S

cien

tist/E

ngin

eeri

ng in

put a

t $20

0/ho

ur. B

ased

on

met

allic

IHX

A (

see

adju

stm

ent f

acto

r).

Dep

th o

f dep

letio

n of

allo

y el

emen

ts (

Cr)

18

0n/

a40

072

000

500

7250

0In

clus

ive

of 1

) A

naly

ses

cost

(in

clus

ive

of o

pera

tor

and

mac

hine

cost

s) a

t $20

0/ho

ur a

nd 2

) S

cien

tist/E

ngin

eeri

ng in

put a

t $20

0/ho

ur. B

ased

on

met

allic

IHX

A (

see

adju

stm

ent f

acto

r).

Dep

th a

ffect

ed b

ycar

buri

zatio

n/

deca

rbur

izat

ion

180

n/a

400

7200

050

072

500

Incl

usiv

e of

1)

Ana

lyse

s co

st (

incl

usiv

e of

ope

rato

r an

d m

achi

ne

cost

s) a

t $20

0/ho

ur a

nd 2

) S

cien

tist/E

ngin

eeri

ng in

put a

t $20

0/ho

ur. B

ased

on

met

allic

IHX

A (

see

adju

stm

ent f

acto

r).

To

tal 2

($)

059

7600

00

030

0059

9100

Mat

eria

lsM

ater

ials

req

uir

emen

tT

ota

l ($)

Ass

um

pti

on

s/B

ases

(B

ased

on

met

allic

IHX

A (

see

adju

stm

ent

fact

or)

).

Sam

ple

sM

at.c

ost

/sam

ple

Mat

eria

l co

st

Allo

y 80

0H s

amp

les

[3]

n/a

n/a

10,6

0510

,605

Cos

ting

base

d on

mat

eria

l pri

ce o

f $35

/kg.

Thi

s do

es n

ot a

llow

for

the

cost

/dev

elop

men

t for

the

wel

d/br

aze

allo

y. B

ased

on

met

allic

IHX

A (

see

adju

stm

ent f

acto

r).

To

tal 3

($)

1060

5

Oth

erA

dd

itio

nal

req

uir

emen

tsT

ota

l ($)

Ass

um

pti

on

s/B

ases

(B

ased

on

met

allic

IHX

A (

see

adju

stm

ent

fact

or)

).

Un

it p

rice

($)

Qu

anti

ty

Cap

ital

co

st -

fu

rnac

es f

or

ther

mal

ag

ing

3000

390

00F

urna

ce w

ith r

equi

red

capa

bilit

y si

zed

at 1

80m

m x

180

mm

x 2

50m

m. B

ased

on

met

allic

IHX

A (

see

adju

stm

ent f

acto

r).

Co

nti

ng

enci

es (

po

wer

co

nsu

mp

tio

n,

elem

ent

rep

lace

men

t)90

01

900

Fur

nace

con

tinge

ncie

s m

ake

up 1

0% o

f tot

al c

apita

l cos

t for

furn

aces

. Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

.

Hel

ium

gas

fo

r re

gu

lati

ng

en

viro

nm

ent

120

156

18,7

2015

6 x

50kg

He

cylin

ders

to b

e ut

ilize

d. O

ne c

ylin

der

a w

eek

for

each

furn

ace.

He

gas

cost

incl

usiv

e of

impu

rity

gas

es. B

ased

on

met

allic

IHX

A (

see

adju

stm

ent f

acto

r).

Sam

plin

g g

as a

nal

yses

150

527,

800

Sam

plin

g of

furn

ace

test

ing

envi

ronm

ent d

one

once

a w

eek

by e

xter

nal

inst

itutio

n. C

olle

ctiv

e sa

mpl

ing

from

3 fu

rnac

es a

dd u

p to

$15

0/w

eek.

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fac

tor)

.

To

tal 4

($)

3642

0

Tot

al (

$) (

Pri

mar

y si

de H

e ef

fect

s)86

4125

Sec

onda

ry s

ide

He

effe

cts

($)

8641

25

Tot

al (

Pri

mar

y an

d se

cond

ary

effe

cts)

($)

1728

250

10%

con

ting

ency

($)

1728

25

Gra

nd t

otal

($)

1901

075

IHX

A t

o IH

X B

rat

io a

djus

tmen

t1

Wo

rk s

tate

d is

eq

uiv

alen

t to

th

at s

tate

d in

met

allic

IHX

A

Equ

ival

ent

cost

s fo

r IH

X B

spe

cifi

cati

on19

0107

5

[1] B

asis

for

prep

arat

ion

cost

s -

$400

/sam

ple

[2] A

ssum

ing

that

all

join

ed s

ampl

es to

be

chec

ked

for

join

t con

sist

ency

afte

r jo

inin

g

[3] R

efer

to 'm

ater

ial c

ost'

shee

t for

mat

eria

l cos

ting

aspe

cts

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 77: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP-

CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17:

Int

egra

ted

Sche

dule

and

Cos

t Est

imat

e

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

IHX

BW

EC

-TS

-IH

XB

-008

The

rmal

/Flu

id

mod

ellin

g m

etho

ds

for

IHX

B

Dev

elop

ther

mal

mod

els

for

IHX

BN

/A

Tas

ks r

equ

ired

Act

ion

to

be

per

form

ed b

yT

arif

f ($

)T

ime

nee

ded

To

tal (

$)A

ssu

mp

tio

ns/

Bas

es (

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fa

cto

r))

Ho

ur

Yea

rH

ou

rsD

ays

Wee

ksM

on

ths

Yea

rM

odel

gen

erat

ion

givi

ng r

esul

ts f

or

mec

hani

cal,

phys

ical

and

ther

mal

pe

rfor

man

ce p

redi

ctio

n

Gro

up o

f th

erm

al f

luid

/mod

elin

g sp

ecia

lists

42,5

003

1275

001)

Est

mat

ion

mad

e by

M-T

ech

- D

urat

ion

and

cost

is g

reat

ly

depe

ndan

t on

the

data

sup

plie

d by

sup

plie

rs (

tran

sfer

coe

ffic

ient

s).

Dur

atio

n of

3 y

ears

for

wor

k. B

ased

on

met

allic

IHX

A (

see

adju

stm

ent f

acto

r)

To

tal (

$)12

7500

10%

co

nti

ng

ency

($)

1275

0

Gra

nd

to

tal (

$)14

0250

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 78: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

IHX

BW

EC

-TS

-IH

XB

-009

Met

hods

for

stre

ss-

stra

in m

odel

ling

of

IHX

B

Dev

elop

str

uctu

ral m

odel

ling

met

hods

for

pred

ictiv

e op

erat

ion

for

IHX

BN

/A

Tas

ks r

equ

ired

Act

ion

to

be

per

form

ed b

yT

arif

f ($

)T

ime

nee

ded

To

tal (

$)A

ssu

mp

tio

ns/

Bas

es (

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fa

cto

r)).

Ho

ur

Yea

rH

ou

rsD

ays

Wee

ksM

on

ths

Yea

rS

truc

tura

l mod

el g

ener

atio

n gi

ving

res

ults

fo

r pr

edic

tive

oper

atio

n fo

r IH

X B

Gro

up o

f mod

elin

g sp

ecia

lists

42,5

003

1275

001)

Est

mat

ion

mad

e by

M-T

ech

Dur

atio

n of

3 y

ears

for

wor

k. B

ased

on

met

allic

IHX

A (

see

adju

stm

ent f

acto

r)

To

tal (

$)12

7500

10%

co

nti

ng

ency

($)

1275

0

Gra

nd

to

tal (

$)14

0250

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 79: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP-

CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17:

Int

egra

ted

Sche

dule

and

Cos

t Est

imat

e

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

IHX

BW

EC

-TS

-IH

XB

-010

Crit

eria

for

st

ruct

ural

inte

grity

Est

ablis

h cr

iteria

for

str

uctu

ral

inte

grity

of

CH

E's

N/A

Tas

ks r

equ

ired

Act

ion

to

be

per

form

ed b

yT

arif

f ($

)T

ime

nee

ded

To

tal (

$)A

ssu

mp

tio

ns/

Bas

es (

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fa

cto

r)).

Ho

ur

Yea

rH

ou

rsD

ays

Wee

ksM

on

ths

Yea

r

Str

uctu

ral i

nteg

rity

mod

els

of C

HE

'sG

roup

of

mod

elin

g sp

ecia

lists

42,5

003

1275

001)

Est

mat

ion

mad

e by

M-T

ech

- D

urat

ion

and

cost

is g

reat

ly

depe

ndan

t on

the

data

sup

plie

d by

sup

plie

rs (

tran

sfer

coe

ffic

ient

s).

Dur

atio

n of

3 y

ears

for

wor

k. B

ased

on

met

allic

IHX

A (

see

adju

stm

ent f

acto

r)

To

tal (

$)12

7500

10%

co

nti

ng

ency

($)

1275

0

Gra

nd

to

tal (

$)14

0250

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 80: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP-

CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17:

Int

egra

ted

Sche

dule

and

Cos

t Est

imat

e

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

IHX

BW

EC

-TS

-IH

XB

-011

Per

form

ance

m

odel

ling

met

hods

fo

r IH

X B

Dev

elop

per

form

ance

mod

els

for

pred

ictiv

e op

erat

ion

for

IHX

BN

/A

Tas

ks r

equ

ired

Act

ion

to

be

per

form

ed b

yT

arif

f ($

)T

ime

nee

ded

To

tal (

$)A

ssu

mp

tio

ns/

Bas

es (

Bas

ed o

n m

etal

lic IH

X A

(se

e ad

just

men

t fa

cto

r)).

Ho

ur

Yea

rH

ou

rsD

ays

Wee

ksM

on

ths

Yea

r

Per

form

ance

mod

els

for

IHX

Gro

up o

f m

odel

ing

spec

ialis

ts42

,500

312

7500

1) E

stm

atio

n m

ade

by M

-Tec

h

Dur

atio

n of

3 y

ears

for

wor

k. B

ased

on

met

allic

IHX

A (

see

adju

stm

ent f

acto

r)

To

tal (

$)12

7500

10%

co

nti

ng

ency

($)

1275

0

Gra

nd

to

tal (

$)14

0250

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 81: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

Mat

eria

l co

st d

etai

ls b

ased

on

pre

ferr

ed n

um

ber

of

sam

ple

s to

be

test

ed -

Allo

y 80

0H (

@ $

35/k

g)

Sam

ple

am

ou

nt

Per

sam

ple

co

st -

800

H54

9IH

XB

.218

3IH

XB

.318

3IH

XB

.454

9IH

XB

.513

8IH

XB

.618

0IH

XB

.7M

at.c

ost

Co

st($

)sa

mp

les

($)

sam

ple

s($

)($

)($

)($

)($

)E

last

ic P

rope

rtie

s 0.

875

1815

.75

65.

256

5.25

1815

.75

00

00

Ten

sile

Pro

pert

ies

0.87

545

39.3

7515

13.1

2515

13.1

2545

39.3

750

00

0F

ati g

ue s

tren

gth

(LC

F)

87.5

135

1181

2.5

4539

37.5

4539

37.5

135

1181

2.5

4539

37.5

6052

50F

atig

ue s

tren

gth

(HC

F)

87.5

135

1181

2.5

4539

37.5

4539

37.5

135

1181

2.5

4539

37.5

6052

50C

ree p

str

engt

h1.

7514

425

248

8448

8414

425

248

8460

105

Fra

ctur

e to

ughn

ess:

CT

OD

87.5

2723

62.5

978

7.5

978

7.5

2723

62.5

00

00

Fra

ctur

e to

u ghn

ess:

Kc

87.5

2723

62.5

978

7.5

978

7.5

2723

62.5

00

00

The

rmal

con

duct

ivity

8.75

1815

7.5

652

.56

52.5

1815

7.5

00

00

To

tal (

$)36

228

815

9552

9552

2865

779

5910

605

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 82: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

HT

S P

ipin

gW

EC

-TS

-PIP

-001

PH

TS

Hig

h te

mpe

ratu

re tr

ade

stud

y

Ass

ess

desi

gn o

ptio

ns fo

r hi

gh te

mpe

ratu

re P

HT

S

pipi

ngN

/A

Tas

ks r

equ

ired

Act

ion

to

be

per

form

ed b

yT

arif

f ($

)T

ime

nee

ded

To

tal (

$)A

ssu

mp

tio

ns

Ho

ur

Act

ion

Ho

urs

Day

sW

eeks

Mo

nth

sE

valu

ate

and

iden

tify

cand

idat

e de

sign

o p

tions

from

trad

e st

udie

sE

ngin

eer

200

N/A

85

46

1920

00B

ased

on

need

for

one

engi

neer

for

dura

tion

of 6

mon

ths.

Incl

udes

rep

ortin

g.

To

tal (

$)19

2000

10%

co

nti

ng

ency

($)

1920

0

Gra

nd

to

tal (

$)21

1200

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 83: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

HT

S P

ipin

gW

EC

-TS

-PIP

-002

PH

TS

Low

te

mpe

ratu

re tr

ade

stud

y

Ass

ess

desi

gn o

ptio

ns fo

r lo

w

tem

pera

ture

PH

TS

pip

ing

N/A

Tas

ks r

equ

ired

Act

ion

to

be

per

form

ed b

yT

arif

f ($

)T

ime

nee

ded

To

tal (

$)A

ssu

mp

tio

ns

Ho

ur

Act

ion

Ho

urs

Day

sW

eeks

Mo

nth

sE

valu

ate

and

iden

tify

cand

idat

e de

sign

o p

tions

from

trad

e st

udie

sE

ngin

eer

200

N/A

85

44

1280

00B

ased

on

need

for

one

engi

neer

for

dura

tion

of 6

mon

ths.

Incl

udes

rep

ortin

g.

To

tal (

$)12

8000

10%

co

nti

ng

ency

($)

1280

0

Gra

nd

to

tal (

$)14

0800

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 84: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

HT

S P

ipin

gW

EC

-TS

-PIP

-003

SH

TS

Hig

h te

mpe

ratu

re tr

ade

stud

y

Ass

ess

desi

gn o

ptio

ns fo

r hi

gh te

mpe

ratu

re S

HT

S

pipi

ngN

/A

Tas

ks r

equ

ired

Act

ion

to

be

per

form

ed b

yT

arif

f ($

)T

ime

nee

ded

To

tal (

$)A

ssu

mp

tio

ns

Ho

ur

Act

ion

Ho

urs

Day

sW

eeks

Mo

nth

sE

valu

ate

and

iden

tify

cand

idat

e de

sign

o p

tions

from

trad

e st

udie

sE

ngin

eer

200

N/A

85

46

1920

00B

ased

on

need

for

one

engi

neer

for

dura

tion

of 6

mon

ths.

Incl

udes

rep

ortin

g.

To

tal (

$)19

2000

10%

co

nti

ng

ency

($)

1920

0

Gra

nd

to

tal (

$)21

1200

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 85: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

HT

S P

ipin

gW

EC

-TS

-PIP

-004

SH

TS

Med

ium

te

mpe

ratu

re tr

ade

stud

y

Ass

ess

desi

gn o

ptio

ns fo

r m

ediu

m te

mpe

ratu

re P

HT

S

pipi

ngN

/A

Tas

ks r

equ

ired

Act

ion

to

be

per

form

ed b

yT

arif

f ($

)T

ime

nee

ded

To

tal (

$)A

ssu

mp

tio

ns

Ho

ur

Act

ion

Ho

urs

Day

sW

eeks

Mo

nth

sE

valu

ate

and

iden

tify

cand

idat

e de

sign

o p

tions

from

trad

e st

udie

sE

ngin

eer

200

N/A

85

44

1280

00B

ased

on

need

for

one

engi

neer

for

dura

tion

of 6

mon

ths.

Incl

udes

rep

ortin

g.

To

tal (

$)12

8000

10%

co

nti

ng

ency

($)

1280

0

Gra

nd

to

tal (

$)14

0800

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 86: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

NG

NP

Tec

hnol

ogy

Dev

elop

men

t Roa

d M

appi

ng R

epor

t Sec

tion

17: I

nteg

rate

d Sc

hedu

le a

nd C

ost E

stim

ate

Cri

t S

SC

Sp

ecif

icat

ion

nu

mb

erS

pec

ific

atio

nD

escr

ipti

on

Co

mm

ents

HT

S P

ipin

gW

EC

-TS

-PIP

-005

SH

TS

Low

te

mpe

ratu

re tr

ade

stud

y

Ass

ess

desi

gn o

ptio

ns fo

r lo

w

tem

pera

ture

SH

TS

pip

ing

N/A

Tas

ks r

equ

ired

Act

ion

to

be

per

form

ed b

yT

arif

f ($

)T

ime

nee

ded

To

tal (

$)A

ssu

mp

tio

ns

Ho

ur

Act

ion

Ho

urs

Day

sW

eeks

Mo

nth

sE

valu

ate

and

iden

tify

cand

idat

e de

sign

o p

tions

from

trad

e st

udie

sE

ngin

eer

200

N/A

85

43

9600

0B

ased

on

need

for

one

engi

neer

for

dura

tion

of 6

mon

ths.

Incl

udes

rep

ortin

g.

To

tal (

$)96

000

10%

co

nti

ng

ency

($)

9600

Gra

nd

to

tal (

$)10

5600

NG

NP

-CT

F M

TE

CH

-TD

RM

-017

-Rev

0 1

2/03

/200

8

Page 87: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NGNP-CTF MTECH-TDRM-017 NGNP Technology Development Road Mapping Report Section 17: Integrated Schedule and Cost Estimate

Additional notes on preferred number of testing samples - Alloy 617 / Alloy 800H

1) General- Samples representative of the three heats to be tested for all thermal, physical and mechanical tests

2) Elastic properties- At least 2 samples for each heat should be tested assuming the vibrational methods permit testing of a single specimen at multiple temperatures

3) Tensile properties- As a minimum, testing should be conducted on 15 samples (5 temperatures for each heat)- Noted testing does not include any duplicates

4) Fatigue tests- As a minimum, LCF testing should be conducted on 45 samples [3 heats x 5 temperatures x 3 strain ranges]- As a minimum, HCF testing should be conducted on 45 samples [3 heats x 5 temperatures x 3 cycle rates]

5) Creep strength- As a minimum, testing should be conducted on 48 samples [3 heats x 4 temperatures x 4 stress levels]

6) Fracture Toughness- As a minimum, testing for fracture toughness [CTOD] should be conducted on 9 samples [3 heats x 3 temperatures]- As a minimum, testing for fracture toughness [Kc] should be conducted on 9 samples [3 heats x 3 temperatures]

7) Thermal conductivity- As a minimum, testing should be conducted on 6 samples, 2 for each heat, as the complete temperature range can be covered with a single specimen

8) Coefficient of thermal expansion- As a minimum, testing should be conducted on 6 samples, 2 for each heat, as the complete temperature range can be covered with a single specimen

9) Stress rupture- As a minimum, stress rupture testing should be conducted on 48 samples [3 heats x 4 temperatures x 4 stress levels]

NGNP-CTF MTECH-TDRM-017-Rev0 12/03/2008

Page 88: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NGNP-CTF MTECH-TDRM-017 NGNP Technology Development Road Mapping Section 17 : Integrated Schedule and Cost Estimate

NGNP-CTF MTECH-TDRM-017_Rev0.doc 10/27/2008

88 of 89

17.2.6 Appendix B: References

Page 89: NGNP and Hydrogen Production Conceptual Design Study NGNP … Documents... · 2015. 7. 29. · NRG Nuclear Research and consultancy Group NRV Non-Return Valve O2 Oxygen OD Outer Diameter

NGNP-CTF MTECH-TDRM-017 NGNP Technology Development Road Mapping Section 17 : Integrated Schedule and Cost Estimate

NGNP-CTF MTECH-TDRM-017_Rev0.doc 10/27/2008

89 of 89

[17-1] “NGNP and Hydrogen Production Pre-conceptual Design Report - SECTION 18: NGNP PROJECT SCHEDULE “,NGNP-18-RPT-001, Rev 0, May 2007

[17-2] CTF Schedule per e-mail from BEA

[17-3] HPS.000.S01 (WBS Element Code Level) - Hydrogen Plant Alternatives Study

[17-4] NGNP-16-RPT-001 – NGNP and Hydrogen Production Pre-conceptual Design Report – Technology Development

[17-5] AACE International Recommended Practice No. 17R-97 TCM Framework; 7.3-Cost Estimating and Budgeting (as supplied by BEA)