  • Modified Phase I Environmental Site Assessment

    Trunk Highway 15 / 33rd Street South

    (CSAH 74) Interchange

    St. Cloud, Minnesota

    State Project No. SP 7303-48

    State Aid Project No. SAP 073-684-004,

    SAP 073-674-002, SAP 162-151-002

    SEH No. STCLD 123585

    June 2013

  • Short Elliott Hendrickson Inc. | 3535 Vadnais Center Drive | Saint Paul, MN 55110-5196 SEH is an equal opportunity employer | www.sehinc.com | 651.490.2000 | 800.325.2055 | 888.908.8166 fax

    June 10, 2013 RE: TH 15 / 33rd Street South Interchange Modified Phase I Environmental Site Assessment City of St. Cloud, Minnesota State Project No. SP 7303-48 State Aid Project No. SAP 073-684-004, SAP 073-674-002, SAP 162-151-002 SEH No. STCLD 123585

    Mr. Steve Foss, PE City Engineer City of Saint Cloud 400 Second Street South St. Cloud, MN 56301 Dear Mr. Foss: Please find enclosed the Modified Phase I Environmental Site Assessment (ESA) for the Trunk Highway (TH) 15 and 33rd Street South (CSAH 84) Interchange project located at the intersection of TH 15 and 33rd Street South in St. Cloud, Minnesota. We have included a copy of the full report on CD. Please feel free to contact me directly at 651. 490. 2135 if you have any questions or comments. Sincerely, Allen H. Sunderman, PG Project Manager gca c: Bret Johnson - SEH Jeff Miller - Stearns County Claudia Dumont - MnDOT S:\PT\S\Stcld\123585\3-env-stdy-regs\14 Phase I ESA\STCLD 123585_Phase I ESA_20130220

  • TH 15 / 33rd Street South Interchange

    Modified Phase I Environmental Site Assessment St. Cloud, Minnesota

    State Project No. SP 7303-48 State Aid Project No. SAP 073-684-004,

    SAP 073-674-002, SAP 162-151-002 SEH No. STCLD 123585

    June 2013

    __________________________________ Allen H. Sunderman, PG Project Manager __________________________________ Erin E. Borgschatz Environmental Geologist __________________________________ Greg Ahl Environmental Scientist Short Elliott Hendrickson Inc. 3535 Vadnais Center Drive Saint Paul, MN 55110-5196 651.490.2000

  • Distribution List

    No. of Copies Sent to

    1 Steve Foss City of St. Cloud 400 Second Street South St. Cloud, MN 56301 1 Jeff Miller Stearns County 705 Courthouse Square St. Cloud, MN 56303-4701

    1 Claudia Dumont Minnesota Department of Transportation 395 John Ireland Boulevard Saint Paul, MN 55155

    1 digital Carolyn Boben

    MnDOT OES 395 John Ireland Boulevard Saint Paul, MN 55155

  • Modified Phase I Environmental Site Assessment STCLD 123585 City of Saint Cloud, Minnesota

    Executive Summary

    Short Elliott Hendrickson Inc. (SEH) performed a Modified Phase I Environmental Site Assessment of the TH 15 / 33rd Street South Interchange project in St. Cloud, Minnesota. This study identifies potential risk that site contaminants could be encountered during construction activities, or has the potential to migrate through the soil or groundwater from nearby sites to the project corridor. It does not measure the impacts at known or suspected contaminated sites. A contaminated site is defined as a location where a substance that creates a risk to human health or natural ecosystems has been released into the environment. The purpose of this modified Phase I ESA is to identify environmental concerns associated with the Trunk Highway (TH) 15 / 33rd Street South Interchange project (State Project No. SP 7303-48, State Aid Project No. SAP 073-684-004, SAP 073-674-002, SAP 162-151-002). Summary information and conclusions from this report may be used to develop contingency planning for environmental issues associated with construction planning and execution.

    SEH followed MnDOT Office of Environmental Stewardship (OES) guidelines for completion of the Phase I ESA using a modified version of the American Society of Testing and Materials (ASTM) methodology E 1527-05. The purpose of the ASTM standard Phase I ESA is to identify, to the extent feasible pursuant to the processes described in E 1527-05 and in a manner consistent with good commercial or customary practice, Recognized Environmental Conditions (RECs) and Historic RECs (HRECs) in connection with the project corridor. Specifically, sites are identified as high, medium, and low risk sites.

    Four (4) sites were identified for the project corridor; one high, and three medium risk sites. These are summarized below by site identification number (Site ID). A list of abbreviations is included, following this summary.

    Site ID Site Name Rank Rationale for Ranking 1 Kellys Excavating Inc M Removed diesel UST and an AST observed on-site.

    2 Finski Properties M Active diesel and gasoline ASTs observed on-site. Mechanic shop observed on-site.

    3 Ralphs Car & Tractor Service H Vehicle maintenance and recycling facility. RCRAGN SQG of used oil and residues/sludges. 4 Olmscheid Body Shop M Former body shop that transported hazardous waste.

  • Modified Phase I Environmental Site Assessment STCLD 123585 City of Saint Cloud, Minnesota

    List of Abbreviations

    AMSL Above Mean Sea Level AST Above -ground Storage Tank ASTM American Society for Testing and Materials bgs Below Ground Surface CERCLIS Comprehensive Environmental Response, Compensation and Liability

    Information System CSAH County State Aid Highway CWI County Well Index DPLP De-listed Permanent List of Priorities EPA (USEPA) Environmental Protection Agency (USEPA) ERNS Emergency Response Notification System ERS Environmental Record Search ESA Environmental Site Assessment FED BF Federal Brownfield FED IC/EC Federal Institutional Controls and Engineering Controls GIS Geographical Information System LUST Leaking Underground Storage Tank MDA Minnesota Department of Agriculture MDH Minnesota Department of Health MERLA Minnesota Environmental Response & Liability Act MGS Minnesota Geological Survey MN Minnesota MnDOT Minnesota Department of Transportation MPCA Minnesota Pollution Control Agency NFRAP No Further Remedial Action Planned NPL National Priority List PLP Permanent List of Priorities RCRA Resource Conservation and Recovery Act RCRA COR ACT Resource Conservation and Recovery Act Corrective Action Report RCRAGN Resource Conservation and Recovery Act Generators RCRIS Resource Conservation and Recovery Information System SEH Short Elliott Hendrickson Inc. SQG Small Quantity Generator SRS Site Remediation Section SW Solid Waste SWL Permitted Solid Waste Management Facilities TH Trunk Highway USGS United States Geological Survey UST Underground Storage Tank VIC Voluntary Investigation and Cleanup

  • SEH is a registered trademark of Short Elliott Hendrickson Inc. Modified Phase I Environmental Site Assessment STCLD 123585 Trunk Highway 15 / 33rd Street South (CSAH 74) Interchange Page i

    Table of Contents

    Transmittal Letter Certification Page Distribution Page Executive Summary List of Abbreviations Table of Contents

    Page

    1.0 Introduction ................................................................................................................11.1 Purpose ............................................................................................................... 11.2 Reason for Performing the Phase I ESA ............................................................ 11.3 Scope of Services ............................................................................................... 11.4 Significant Assumptions ...................................................................................... 31.5 Definitions ........................................................................................................... 3

    1.5.1 American Society of Testing & Materials E1527-05 ................................ 31.5.2 Minnesota Department of Transportation ................................................ 3

    1.6 Limitations and Exceptions ................................................................................. 41.7 Special Terms and Conditions ............................................................................ 41.8 User Reliance ..................................................................................................... 4

    2.0 Site Description .........................................................................................................52.1 Location and Legal Description ........................................................................... 52.2 Current Use of the Project Corridor .................................................................... 5

    2.2.1 Reconnaissance ...................................................................................... 52.3 Physical Setting .................................................................................................. 5

    2.3.1 Topography ............................................................................................. 52.3.2 Geology ................................................................................................... 52.3.3 Hydrogeology .......................................................................................... 5

    3.0 Historical Land Use Review ......................................................................................63.1 Sources ............................................................................................................... 6

    3.1.1.1 Aerial photographs .................................................................. 63.1.1.2 Topographic Maps .................................................................. 63.1.1.3 Sanborn Fire Insurance Maps ............................................... 63.1.1.4 City Directories .....................................................................