mahmoud abdul salam abdul aziz - gwcareers.com a… · web viewmahmoud abdul salam abdul aziz....

3

Click here to load reader

Upload: trinhtruc

Post on 15-Mar-2018

213 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Mahmoud Abdul Salam Abdul Aziz - gwcareers.com A… · Web viewMahmoud Abdul Salam Abdul Aziz. Mailing Address: 61/A/ El Maruttia St, El-Haram, Al- Jizah . ... Explored LWD, MWD and

Mahmoud Abdul Salam Abdul AzizMailing Address: 61/A/ El Maruttia St, El-Haram, Al- Jizah Cell phone: +2 01210339481 & +2 01014502623Email: [email protected]

Career Objective A Mid-level position in a field related to Petroleum Engineering, where my educational background and extensive training will be of use.

Education Bachelor of Petroleum Engineering. Faculty of Engineering, Cairo University 2012 Graduation project Grade: Very GoodAdditional Courses:

IWCF (international well control formula), Driller level (Valid) at RandySmith (Intertek). Stuck pipe prevention and Basic Well Control at RandySmith (Intertek) Drilling Technology, Drilling Calculation, Drilling through equipment, Risk Assessment, safety management

system, H2S, Gas tester, Rigging, First Aid, lifting and Working at height at ECDC training center.

Career Related Experience Assistant Driller at Advanced Energy System (ADES) in Egypt. Aug 2016, present. Offshore Rig: (Ad Marine 3), 2000 HP

Supervise and monitor drill floor’s activities related to the sack room and pump room, by being the direct supervisor of the Derrick man and Roughnecks.

Assure operations on the drill floor are executed according to safety regulations and to company policies/work instructions.

The safety of both drill floor crew, as support personnel are included under responsibility. Ensure proper care and maintenance of drilling equipment and the drill floor structure itself. Inspect and test drilling technical equipment and the mechanical cleaning equipment for drilling mud. Responsible for slipping and cutting drill line. String up and string down the block. Assist service personnel and coordinate drill crew during operations. Assist the Driller in directing and supervising the drill crew depending on operations being carried

out. Responsible for the drill crew working in a safe manner and with proper safety equipment. Provide leadership and direction for less experienced Rig Personnel Encourages appropriate professional development and training opportunities for employees.

Assistant Driller at Egyptian Chinese Drilling Company, Jan 2015-Jul 2016 (Onshore Rig: Rig 2), 1500 HP

The safety of both drill floor crew, as support personnel are included under responsibility. Ensure proper care and maintenance of drilling equipment and the drill floor structure itself. Inspect and test drilling technical equipment and the mechanical cleaning equipment for drilling mud. Responsible for slipping and cutting drill line.

Derrick Man at Egyptian Chinese Drilling Company, Oct 2013-Dec 2014. (Onshore Rig: Rig 7), 2000 HP

Safely and efficiently perform all duties assigned by the Driller during drilling, work over and completion operations.

Ensure all operations are proceeding in a safe manner and responsible for correcting or notifying  Responsible person of any unsafe acts and/or conditions which exist. Handle drill pipe or tubing when it is being hoisted out or lowered into the hole. Apprise the Driller of mud condition and pumping equipment conditions.

Page 2: Mahmoud Abdul Salam Abdul Aziz - gwcareers.com A… · Web viewMahmoud Abdul Salam Abdul Aziz. Mailing Address: 61/A/ El Maruttia St, El-Haram, Al- Jizah . ... Explored LWD, MWD and

Maintain periodic check on mud weight, viscosity and add mud or chemicals as directed by the mud engineer.

Assist the Driller in handling day-to-day rig activities, maintenance problems and mud problems. Keep shale shaker and de-sander clean when in use.

Floor Man at Egyptian Chinese Drilling Company, Sep 2012-Sep 2013 (Onshore Rig: Rig 2), 1500 HP

Safely and efficiently perform all duties assigned by the Driller during drilling, work over and completion operations.

Ensure the drill floor is kept clean and that all equipment is in its proper place. Ensure all operations are proceeding in a safe manner, and responsible for correcting or notifying

responsible person of any unsafe acts and/or conditions which exist. Attend and participate in pre-tour, post tour, special operations and weekly safety meetings. During tripping operations work assigned duties: Pull and set slips. Visually inspect the drill string so as to report wash outs, excessive wear, joint or thread damage.

Roustabout at Egyptian Chinese Drilling Company, Jun 2012-Aug 2012 (Onshore Rig: Rig 2), 1500 HP

Performed rig maintenance such as cleaning, painting, and chipping Assisted the Derrick Man in mixing correct mud mix for drilling.

Field Engineer Intern, Gulf of Suez Petroleum Company (GUPCO), September 2011 Discovered Water Flooding Unit and The production Area. Inspected KAMOSE Rig (Offshore). Attended PowerPoint lecture of Logging.

Field Engineer Intern, Belayim Petroleum Company (Petrobel), August 2011 Discovered different types of Rigs and their components including Workover Rig. Identified the Circulation of the mud system.

Field Engineer Intern, Khalda Petroleum Company, August 2010 Examined two Rigs and their components. Explored Directional Drilling, Casing, Cement and Logging Jobs.

Field Engineer Intern, Baker Hughes Company, July 2010 Inspected the Drill Bits, completion & Casing tubes. Discovered Logging units (Sara-1 & Sara- 2). Explored LWD, MWD and the auto track of Directional Drilling.

Extra-Curricular Activities Participant, Society of Petroleum Engineering (SPE), Spring 2010.

Attended Drilling class for (40 Hours)

Skills Computer: Excellent Knowledge of MS Office applications: Word, Excel and PowerPoint. Language: Fluent in Spoken and Written Arabic and English.

Personal information Date of Birth: 2/6/1989. Nationality: Egyptian Military Status: Exempted References Furnished Upon Request