Investment Opportunities in Public infrastructure and Public Service
Infrastructure – ProInversion2015- 2017
Updated on September 30, 2015
Execution of upgrade and rehabilitation works (117Km), initial periodic maintenance (280 Km); andsubsequent maintenance and operation of the 970Km highway, of this important national highwayconnecting 12 departments and runs the Andeanregions from end to end.
Estimated Investment (VAT not included): US$ 340million*
• Does not include routine and periodic operation and maintenance
Type of concession : Co-financed Concession period: 25 years
Estimated date of award: Q I 2016
LONGITUDINAL DE LA SIERRA HIGHWAY, SECTION 4
CALLED
LOGISTICS PLATFORM AND PRE GATE PARKING & SERVICE CENTER
The project comprises the design, financing,construction, operation and maintenance of alogistics platform, in an area of approximately 39 haintegrating four functional areas.
1. Logistic zone platform2. Pre Gate Parking & Service Center3. Inspection Zone4. Administrative Zone
• Estimated investment (Vat not included): USD 157.9 million
• Type of concession: Self –sustained
Estimated award date: Q I 2016
CALLED
PORT TERMINALS
• Self-sustained unsolicited proposals:
1. Salaverry: Upgrading and development ofSalaverry multipurpose terminal.
2. Chimbote: Design, finance, construction,operation and maintenance of the containerterminal.
3. Ilo: Development and operation of Ilomultipurpose terminal.
Estimated award: 2016
UNDER EVALUATION
Ilo
Chimbote
Salaverry
The project comprised the comprehensive rehabilitation of the 128Km of the existing railway.Along the works to develop stands out:
Railway upgrade Purchase of rolling stock Reinforcement of 15 railway bridges Extension of 38 tunnels Upgrades to signaling and telecommunication systems Draining works
Estimated investment (Vat not included): : US$ 194 millionType of concession: Co-financed
Estimated date of award: Q I 2016
HUANCAYO - HUANCAVELICA RAILWAY
Junín
Central RailwayHuancayo – Huancavelica RailwaySouth Railway
Huancavelica
CALLED
Unsolicited proposal for the concession of theconstruction, operation and maintenance ofinfrastructure works on the South PanamericanaHighway, Ica – Detour Quilca section (Department ofArequipa), with an approximate length of 518 Km.
Estimated Investment: Under evaluation Concession period : Self-sustained
Estimated date of award: Q II 2016
PANAMERICANA SUR HIGHWAY : ICA- DV. QUILCA SECTION
UNDER EVALUATION
Ica
Arequipa
PERIPHERAL RING ROAD FOR METROPOLITAN LIMA
UNDER EVALUATION
Unsolicited proposal for the concession of theconstruction, operation and maintenance of a newurban highway of approximately 33 km (from ElmerFaucett to Circunvalación Avenue)in order to createan alternative road that will improve the circulationbetween the districts in the north area and the eastof Metropolitan Lima and the rest of the city.
Estimated Investment: Under evaluation Type of concession: Co-financed
Estimated date of award: Q II2016
Ring Road
LINES 3 AND 4 OF THE METRO OF LIMA AND CALLAO
Comprehensive Project Bid (DFBOT) through twoindependent bids, for Line 3 and 4 of the network ofthe metro of Lima and Callao for the design,financing, construction, equipment, operation andmaintenance, which will serve a 3.5 million of a totalof 10 millions of inhabitants.
Estimated Investment: Under evaluation
Type of concession: Co-financed
Line 3 Line 4
32 Km 30 Km
Q III 2016 2017Estimated date of award
Approximated length
Lima and Callao
Line 1: Under OperationLine 2: Under Construction
Line 4
Line 3
TO BE CALLED
Initial periodic maintenance, operation andmaintenance of 422 Km of the road that links Cuscowith Puno.
Estimated Investment: Under evaluation
Type of concession : Co-financed
Estimated date of award: 2016
LONGITUDINAL DE LA SIERRA HIGHWAY, SECTION 5
TO BE CALLED
12
220 kV MONTALVO-LOS HEROES TRASNMISSION LINES AND ASSOCIATED SUB STATIONS
CALLED
Concession for the design, financing, construction,operation and maintenance of a 129km (approx.)transmission line, located in the departments ofMoquegua and Tacna, with a capacity of 150 MVAin order to secure the power supply to the city ofTacna and its area of influence.
• Estimated Investment (VAT not included): US$41.7 million
• Type of Concession: Self Sustained
• Concession Period: 30 years
• Estimated date of award : Q IV 2015
Tacna Moquegua
QUILLABAMBA THERMAL POWER PLANT
Concession for the design, financing,construction and operation of a 200 Mw thermalpower plant (simple cycle) to be located inQuillabamba (department of Cusco) which shallbegin operations in 2017 and be connected toThe National Electric Power Grid (SEIN)
Estimated investment (VAT not included) : US$ 180 million
Type of concession: Self sustained
Concession period: 20 years
Estimated date of award: Q IV 2015
CALLED
An unsolicited proposal for the design,construcction, operation, financing andmaintenance of San Gaban hhydroelectricpower plant (Department of Puno) 205.8 MWand estimated producction 1.256 GWh/year.
Estimated Investment: Under Evaluation
Type of concession : Self-sustained
Concession period: 30 years
Estimated date of award : Q II2016
SAN GABAN 3 HYDROELECTRIC POWER PLANT
Puno
UNDER EVALUATION
Selection process of one or more bidders topurchase a total of 1,200 Mw of power in 2020and 2021, generated by new hydroelectric powergeneration projects to be incorporated to theNational Electric Power Grid (SEIN).
Estimated Investment (VAT not included):US$ 2,750– US$ 3,000 million
Type of concession : Self-sustained
Concession period: 15 years
Estimated date of award: Under evaluation
ELECTRIC POWER SUPPLY FROM NEW HYDROELECTRIC POWER PLANTS
Nationwide
CALLED
HYDROCARBONS
MASS USE OF NATURAL GAS FOR THE CENTER AND SOUTH OF PERU
Concession for the design, financing,construction, operation and maintenance of theGas Natural Distribution System by pipelinesnetwork in 07 regions of Peru:
1. Junín 5. Apurimac2. Ucayali 6. Cusco3. Huancavelica 7. Puno4. Ayacucho
Estimated Investment (VAT not included):US$ 350 million
Type of concession : Self-sustained
Concession period: 32 years
Estimated date of award: Q IV 2015
1
2
3
6
4 5
7
CALLED
LPG SUPPLY SYSTEM FOR LIMA AND CALLAO
Concession for the design, financing,construction, operation and maintenance ofthe LPG Supply System from the producer(Pisco) to Pucusana district.
• Estimated investment (VAT not included): US$ 250 million.
• Type of concession: Self -sustaining
• Concession period: 23 years
Estimated date of award: Q IV, 2015
CONVOCADOCALLED
LAND AUCTIONCHAVIMOCHIC PROJECT
Initial auction of 17,000 hectares ofagricultural land of the Chavimochicproject, located in the department of LaLibertad with an irrigation water to beprovided by the project’ concessionaire.
Base price (VAT not included) : US$ 5000 /ha
Modality:. Public auction*
Estimated date of award: Q I 2016
TO BE CALLED
*commitment of subscription to the respective water supply contract with the concessionaire
SANITATION
AND HEALTH
MAIN WORKS AND CONDUCTION OF DRINKING WATER SUPPLY FOR LIMA
TO BE ANNOUNCED
Concession for the design, financing, construction, operation andmaintenance of the following infrastructure:
Re-enlargement of two dams Trans-Andean tunnel (about 10 Km) New drinking water plant Huachipa II (5 m3/s) South branch pipeline (about 40 Km), including seven reservoirs
(total storage volume: 49,000 m3) Interconnection lines (90 Km approx) with the current drinking
water supply system.The concession also includes the operation and maintenance of thefollowing facilities: Huachipa Intake (12 m3/s) Huachipa I drinking water plant (5 m3/s) North branch pipeline (27.1 Km), including four compensation
reservoirs (total storage volume: 23,000 m3 )
Estimated investment ( VAT not included): US$ 600 million
Type of concession : Self-sustained
Concession period: 30 years
Estimated date of award: Q IV 2015
CALLED
REGULATION WORKS OF THE CHILLÓN RIVER
Concession for the design, financing, construction,operation and maintenance of the following infrastructureprojects, intended to ensure drinking water supply to thedistricts of North Lima.
Jacaybamba dam (about 28 million m3) located in theprovince of Canta, northeast of Lima.
Pipeline (about 30 Km) for an average flow rate ofabout 1.5 m3/s, from the projected water intake on theChillon River to the current Chillon drinking waterplant.
Estimated investment (VAT not included):US$ 80million
Type of concession: Self-sustained
Concession period: 20 to 30 years
Estimated date of award: 2016
TO BE CALLED
Concession of the design, construction, equipment,operation and maintenance of complementaryservices in three high-complexity hospitals in thePeruvian Social Security System (ESSALUD)
Estimated Investment: US$400 million
Estimated date of award: 2016
THREE NEW HIGH-COMPLEXITY HOSPITALS
TO BE CALLED
Piura
Lima
Ancash
SOLID WASTE MANAGEMENT IN HEALTH FACILITIES UNDER THE MINISTRY OF HEALTH IN METROPOLITAN LIMA
An unsolicited proposal for the construction, operation andmaintenance of the infrastructure and comprehensivemanagement of solid waste generated in healthinstitutions of the Ministry of Health – MINSA (by its initialin Spanish) in Metropolitan Lima.
Estimated Investment: Under Evaluation
Type of concession: Co-financed
Estimated date of award: 2016
UNDER EVALUATION
Lima and Callao
BROADBAND FOR THE INTEGRAL CONNECTIVITY OF TUMBES, PIURA, CAJAMARCA, CUSCO
Deployment of transport networks (fiber optic)and providing access to Internet and intranetbroadband in targeted locations in 04 regions:1. Tumbes 3. Cajamarca2. Piura 4. Cusco
Estimated Investment: Under evaluation Type of concession: Cofinanced
Estimated Award Date: Q IV 2015
1
23
4
CALLED
700 MHZ 4G BAND
Concession of three 698–806 MHz band blocksto provide nationwide 4G broadband internetaccess services. The band is initially expected tobe channeled in 3 blocks of 15 MHz + 15 MHz
Estimated investment: Under evaluation Type of concession: Self sustained
Estimated date of award: Q I 2016
CALLED
CALLED
Concession for the design, construction, operation andmaintenance of the “Grand Aquarium” in an area110,363 m2.The components of the project are:• Aquarium• Coastal defense and areas of marine infrastructure:• Shopping area• General services
GRAND NATIONAL AQUARIUM AND ADDITIONAL WORKS AND SERVICES
Estimated Investment: US$ 38 million
Type of concession : Self-sustained
Estimated date of award: Q IV 2015
Lima
OPERATION AND MAINTENANCE OF THE CONVENTION CENTER OF LIMA
Estimated investment : To be defined
Concession period : 15-20 years
Estimated date of award: Q IV 2015
The project consists in promoting the participation ofthe private sector (Operator) in the operation,exploitation, preservation and integral maintenanceof the Convention Center of Lima, currently underconstruction (it will have a build area of 85,441.39m2 and a capacity of 9,950 people)
CALLED
CORRECTIONAL
SYSTEM
An unsolicited proposal for the provision of electronicpersonal surveillance services to alleviate overcrowding incorrectional facilities in Peru through the use of electronicshackles for tried and sentenced inmates allowed havingaccess to this benefit.
Estimated Investment (VAT not included): US$ 9.2 million
Type of concession : Self-sustained
Estimated date of award: II Q 2016(If other proposals from third parties are not submitted within 90 days of the declaration of interest)
ELECTRONIC SHACKLES
DECLARED OF INTEREST
Lima and Callao
construction of 4 new correctional facilities for the re-location and replacement of the following correctionalfacilities1. Chorrillos Women’s Facility and its Annex (Lima)2. Lurigancho (Lima)3. Miguel Castro Castro (Lima)4. Cusco and Cusco Women’s Facility
•Estimated investment: Under evaluation
Estimated date of award: To be defined
RE-LOCATION OF CORRECTIONAL FACILITIES
TO BE CALLED
123
4
Estimated investment : Under Evaluation
04 MINING EXPLORATION PROJECTS
Investment Projects under the modality of transfercontract for a period of 3 to 4 years for the exploration andfeasibility study of the following prospects:
Apurímac:•Colca: Cu, Mo, Ag, Au, Pb Q III 2016 14,100 ha•Jalaoca: Cu, Mo, Ag, Au, Pb Q IV 2016 6,400ha•Antabamba: Cu, Mo, Au, Zn 2017 19,200 ha
La Libertad •Pampa Grande: Au, Ag 2017 8,700 ha
AreaEstimated
Award
TO BE CALLED