What is CMMI?
CMMI PAs and PMBOK Mappings
What You Can Do
CMMI & OPM3
What is CMMI?
• The Capability Maturity Model Integration (CMMI®) is a world-class performance improvement framework for competitive organizations that want to achieve high-performance operations.
• Building upon an organization`s business performance objectives, CMMI provides a set of practices for improving processes, resulting in a performance improvement system.
PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 2 ©2015 Dora Process ConsulDng Inc. All rights reserved.
What CMMI Is Not?
• CMMI is not a single process. It is a framework that models what to do to improve your processes, not define your processes.
• CMMI is designed to compare an organizaDon`s exisDng processes to proven best pracDces developed by members of industry, government, and academia; reveal possible areas for improvement and provide ways to measure progress.
PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 3 ©2015 Dora Process ConsulDng Inc. All rights reserved.
Three ConstellaDons
PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 4 ©2015 Dora Process ConsulDng Inc. All rights reserved.
Model Components
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 5
Specific Goals Generic Goals
Process Area
Specific PracDces
Generic PracDces
InformaDve Material (example work products, sub pracDces, introductory notes, related process areas, purpose statement)
Required
Expected
CMMI & Benchmarking
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 6
Cost & Benefits
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 7
Process Areas by Category
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 8
Process Areas by Maturity Level
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 9 © 2011 Carnegie Mellon University
CMMI for Development, Version 1.3 | Module 4
8
January 2011
Staged Representation: PAs by Maturity Level
Causal Analysis and Resolution Organizational Performance Management
5 Optimizing
4 Quantitatively Managed 3 Defined
2 Managed
Quantitative Management Process Standardization
Basic Project Management
Organizational Process Performance Quantitative Project Management Decision Analysis and Resolution Integrated Project Management Organizational Process Definition Organizational Process Focus Organizational Training Product Integration Requirements Development Risk Management Technical Solution Validation Verification Configuration Management Measurement and Analysis Project Monitoring and Control Project Planning Process and Product Quality Assurance Requirements Management Supplier Agreement Management
1 Initial
Process Areas Level Focus Continuous Process Improvement
Risk Rework
Quality Productivity
Building a “Way of Working”
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 10
What You Can Achieve
• Improve performance/productivity • Improve product/service quality • Improve on-time delivery speed • Reduce cost • Improve selection of vendors
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 11
Agenda
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 12
What is CMMI ?
CMMI PAs and PMBOK Mappings
What You Can Do
CMMI & OPM3
Process Groups with CMMI-DEV PAs
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 13
PP : project scope, wbs, planning all acDviDes and processes of the project IPM : Integrated related plans, tailoring processes QPM : Plan quanDtaDve project management OPD : Templates, procedures & process assets to be used RSKM: Risk management strategy, risk register PPQA: Plan quality assurance, project audits
OT: Plan skill development
Ini$a$ng , Planning
REQM & RD: Plan requirements management and gathering reqs.
Process Groups with CMMI-DEV PAs
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 14
IPM : Integrated plans, issue management
CM : Change control
PMC :Monitoring & control, data management QPM : QuanDtaDve project management OPD : Templates, procedures & process assets RSKM: Risk idenDficaDon and management PPQA: Quality assurance, project audits
REQM: Manage requirements
Execu$ng, Monitoring & Controlling
MA: Measurement Repository
Engineering PAs for development projects: RD, TS, PI, VER, VAL
Process Groups with CMMI-DEV PAs
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 15
PMC : CorrecDve acDons closure
MA : Measurement repository updates
OPF & OPD :Process asset updates
RSKM: Risk closure
VAL: Final validaDon
REQM: Requirement Management
Closing
SAM: Close Procurements
IPM: Lessons learned, process asset updates
Support PAs all through the project : CM, SAM, DAR, CAR
Project IntegraDon Management
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 16
PMBOK Process Group PMBOK Process
CMMI-‐DEV PA
IniDaDng Develop Project Charter PP
Planning Develop Project Plan
ExecuDng Direct & Manage Project Work IPM
Monitoring & Controlling
Monitor & Control Project Work PMC
Perform Integrated Change Control
IPM CM
Closing Close Project or Phase PMC & GP
3.2
Project Scope Management
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 17
PMBOK Process Group
PMBOK Process CMMI-‐DEV PA
Planning Plan Scope Management PP REQM RD
Collect Requirements Define Scope Create WBS
Monitoring & Controlling
Validate Scope VAL Control Scope REQM
Project Time Management
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 18
PMBOK Process Group PMBOK Process
CMMI-‐DEV PA
Planning
Plan Schedule Management
PP
Define AcDviDes
Sequence AcDviDes
EsDmate AcDvity Resources
EsDmate AcDvity DuraDons
Develop Schedule
Monitoring & Controlling Control Schedule
PMC
Project Cost Management
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 19
PMBOK Process Group PMBOK Process
CMMI-‐DEV PA
Planning
Plan Cost Management
PP EsDmate Costs
Determine Budget
Monitoring & Controlling Control Costs
PMC
Project Quality Management
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 20
PMBOK Process Group PMBOK Process
CMMI-‐DEV PA
Planning Plan Quality Management
PP PPQA GP2.2
ExecuDng Perform Quality Assurance
PPQA VER VAL
Monitoring & Controlling Control Quality
PMC PPQA
Project Human Resource Management
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 21
PMBOK Process Group PMBOK Process
CMMI-‐DEV PA
Planning Plan HR Management
PP OT GP 2.2
ExecuDng
Acquire Project Team OT IPM Develop Project Team
Manage Project Team
Project CommunicaDons Management
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 22
PMBOK Process Group PMBOK Process
CMMI-‐DEV PA
Planning Plan CommunicaDons Management
PP GP2.7
ExecuDng Manage CommunicaDons
IPM GP2.7
Monitoring & Controlling Control CommunicaDons
PMC
Project Risk Management
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 23
PMBOK Process Group PMBOK Process
CMMI-‐DEV PA
Planning
Plan Risk Management
PP RSKM
IdenDfy Risks
Perform QualitaDve Risk Analysis
Perform QuanDtaDve Risk Analysis
Plan Risk Responses
Monitoring & Controlling Control Schedule
PMC
Project Procurement Management
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 24
PMBOK Process Group PMBOK Process
CMMI-‐DEV PA
Planning Plan Procurement Management PP
ExecuDng Conduct Procurements
SAM, DAR TS PI IPM
Monitoring & Controlling Control Procurements
PMC, SAM VER, VAL
Closing Close Procurements SAM
Project Stakeholder Management
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 25
PMBOK Process Group PMBOK Process
CMMI-‐DEV PA
IniDaDng IdenDfy Stakeholders PP
Planning Plan Stakeholder Management PP
ExecuDng Manage Stakeholder Engagement
IPM GP 2.7 for all PAs
Monitoring & Controlling Control Stakeholder Engagement
PMC
Agenda
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 26
What is CMMI ?
CMMI PAs and PMBOK Process Groups
What You Can Do
CMMI & OPM3
Where to Start
• Start with the fundamentals (define what you are doing right now)
• Select a reference (best/good pracDces) • Find out ‘the gap’ • IdenDfy expectaDons • Add new pracDces (only when necessary!) • Have a look at the GPs
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 27
Building Capability on PM Processes
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 28
CL0
CL1
CL2
CL 3
Not much going on here…
Performing the work
Adhere to policy; follow documented plans and processes, apply adequate resources; assign responsibility and authority; train people, configuraDon management, monitor, control, and evaluate process; idenDfy and involve stakeholders; review with management
Process tailoring from standard processes; understanding qualitaDvely; process contributes to the organizaDon’s assets
Building PM Maturity
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 29
L2
L3
L4
PP SAM PMC REQM
IPM RSKM
QPM
Basic Project Mng.
Advanced Project Mng.
OPF, OPD, OT, DAR CM, MA, PPQA
L5 CAR
Agenda
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 30
What is CMMI ?
CMMI PAs & PMBOK Process Groups
What You Can Do
CMMI & OPM3
OPM3 Cycle
• Acquire Knowledge – Understand the organizaDon and OPM3 – Assess change readiness
• Perform Assessment • Manage Improvements
– Create RecommendaDons & Select IniDaDves – Implement IniDaDves & Measure Results – Manage Change
• Repeat the process
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 31
CMMI vs. OPM3
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 32
OPM3 CMMI -‐ DEV
Strategy execuDon framework ~ Process improvement model for different areas of the organizaDon
3 Domains (Project, Program, Porsolio) ~ OrganizaDonal (Process Mng.),
Engineering, Support, Project Mng.
Provides a cycle for usage ~ OpDon to select a category to start improvement
Assessment – Binary scoring ~ Appraisal – Team consensus on implementaDon level
Built-‐in assessment method ~ Separate appraisal method definiDon
Built-‐in organizaDonal change management steps ~ Not addressed as change
management but OPF covers improvement aspect
Different approach to maturity and capability levels
CommonaliDes in PI Approach
OPM3 CMMI -‐ DEV
Standardize • Governance • Documented Process • Communicate the Process • Process adherence
OPD OPF GP 2.Xs and GP 3.Xs
Measure MA
Control PPQA, CM, GP 2.8, GP 2.9
Improve OPF, GP3.2
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 33
Conclusion
• CMMI Project Management PAs are aligned with PMBOK
• CMMI, being a process improvement model for the whole organizaDon can help you improve and obtain more mature project management pracDces
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 34
©2015 Dora Process ConsulDng Inc. All rights reserved. PMI-‐SOC GTIS Branch Event -‐ May 21, 2015 35
www.doraconsul.ng.com [email protected]
twiver.com/doraconsulDng facebook.com/doraconsulDng linkedin.com/company/dora-‐process-‐consulDng-‐inc-‐?trk=biz-‐companies-‐cym