gatut indo-german mining symp 13apr11
TRANSCRIPT
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
1/55
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
2/55
Balikpapan
Samarinda
BontangS A N G A T T A
Tanjung Bara
Bengalon
Sangkulirang
Bontang
00
00
Jakarta
Located in East Kalimantan
Expansion Project to 70 MTPY Coal
Swarga Bara
PT KALTIM PRIMA COAL
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
3/55
Overbu rden Hand l ing
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
4/55
Land Clearing
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
5/55
Topso i l Stockp i l ing & Spreading
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
6/55
85 to 280 ton Haul Trucks (500 units)
Up to 32m3 Shovels
1 MBCM Material Movement Daily
Dispatch System with GPS
Overbu rden Management
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
7/55
In Pit Dump Coal Mine
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
8/55
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
9/55
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
10/55
• Lebar loading point mengacu pada
kombinasi TRUK LIEBHERR T282
dengan SHOVEL LIEBHERR R966
• Lebar LIEBHERR T282 = 8.8 m
• Lebar LIEBHERR R966 = 8.25 m
• Lebar untuk single loading = 37.5 m
•Lebar untuk double side loading = 51 m
Loading Point Design
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
11/55
Overburden Hauling
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
12/55
OVERLAND CONVEYOR
Single 13 Km Overland Conveyor from to Port 4,000 tph Capacity
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
13/55
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
14/55
800 KT Coal Stockpile at the Port
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
15/55
Coal Stockpile at Port
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
16/55
Stacker - Reclaimer Capacity – 3500 TPH
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
17/55
4200 TPH Stacker
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
18/55
COAL SHIPMENT
2 km Trestle Conveyor
200,000 dwt Ocean-goingships can be accomodated
Loading Rate 4,730 tph
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
19/55
PT FREEPORT INDONESIA
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
20/5520
Tram
(+3600m)
Surabaya
(+3,700m)
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
21/55
Ertsberg District Orebodies and Mines
N
Skarn System
Grasberg Pit
Grasberg
Underground
Kucing Liar
ig
Gossan
Dom
ESZ
DOZ
OZ
MLZ
Deep MLZ
eep MLZ
Common Infrastructure
COPPER
GOLD
SILVER
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
22/55
PTFI Production Plan - 2010
T b T b k G b 1997
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
23/55
Tambang Terbuka Grasberg - 1997
Grasberg Minelooking North
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
24/55
CABLE-CAR TRAMWAY
The original access connectingErtsberg (3600m) and the Mill(2800m elev)
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
25/55
Loading and hauling by shovel & truck
GRASBERG OPEN PIT
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
26/55
1 2a
3 4 5
6
78
109
11
14
12
13
DRILLINGSAMPLING
EXPLOSIVE
LOADING
BLASTING
LAB.ASSAY2b
FLAGGING
LOADING
HAULING
ORE DUMPING CR6/7
MILL
DISPACTH
CONTROL
RECLAMATION
STACKER LOWERWANAGON
OVERBURDEN
DUMPING OHS-3OVERBURDEN
15 PIT SERVICES
ORE/
OVERBURDEN
MODELING
Grasberg Open Pit Mining Activity
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
27/55
Stacker at Lower Wanagon OBS
Material deliverable up to 135 ktpd
Stacker reposition & relocation using crawler mobile unit
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
28/55
Stacker configuration
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
29/55
Monitoring & Control Technology
Dispatch System
Real-time, effective control of mine fleetallowing quick decision making
Reliable system using GPS satellite and
Terralite XPS transmitter technology
Live Camera
• Real-Time monitoring
• Reliable visual aids
• Accessible world-wide
•
Internet-based6
Geotech Monitor ing
Slope stability radar
Robotic stations & prisms
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
30/55
SLOPE MONITORING SYSTEM - SMS
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
31/55
Extensometer at OBS
Extensometer is used to monitor subsurface lateral deformations.
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
32/55
Global Positioning System (GPS)
Grasberg employs GPS system from Orion Monitoring Company. Single frequency GPS receiver andInteTrak software are used
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
33/55
Robotic Total Station (RTS)
Robotic Total Station (RTS) is automatization of Total
Station to read prisms target put on the area of interest.
By doing periodic or continuous target reading
displacement of the slope can be identified.
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
34/55
ROBOTIC TOTAL STATION - PRISMS
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
35/55
Slope Stability Radar (SSR)
Real-aperture radar (RAR) produced radar images by directing a narrow beam of energy perpendicularly
to the slope. Each spots of area of interest are scanned by rotating the disk in horizontal and verticaldirection.
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
36/55
SLOPE STABILITY RADAR
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
37/55
SLOPE STABILITY RADAR DISPLAY
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
38/55
Block cave mines Open stope w/ paste fill
UNDERGROUND MINES
Grasberg Mine: Transition to Block Caving
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
39/55
Grasberg Mine: Transition to Block Caving
January 2007 Open Pit
2015 Final Pit (3055m)
Block Cave Reserve (2815m)
Kucing Liar Deposit
(2605m)
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
40/55
Grasberg B lock Cave Mine Design
GRS-BC Key Facts:
970 Mt @ 1.09% Cu, 0.87 g/t Au
Cutoff grade ca. 0.70% EqCu
23 b lbs copper; 27 mm ozs gold (contained)
2,356 drawpoints El Teniente-Style Layout 700,000 m2 footprint
30m x 20m drawbells
Mine Access via Light Rail (AB Adits)
Gravity Drainage (AB Adits)
Intake/Exhaust Adits
Mining Rate: 160 ktpd
Rail Haulage to a 4-Crusher Complex
Incline conveyor to surface
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
41/55
DOZ Mine Expansion Infrastructures (completed 2007)
Current Production 80 KTPD after: 2nd Crusher Installation Additional Ventilation
o Intake and Exhaust Aditso Three Mixed Flow Fans
• 3.5m Diameter•
1,600 kW motors
Fan Chamber #1
Big Gossan Mine
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
42/55
Big Gossan MineOpen stope w/ paste fill
Reserves: 53 M tonnes
2.19% Cu & 1.06 g/t Au
Start production in 2008
7,000 tpd in 2012
Miner Training School
Bi G Mi
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
43/55
Big Gossan Mine Long Section View
HEAT Road
Mill Area
500m
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
44/55
GRSBC Terminal
KL Terminal
AB Adits Portals
MLZ Terminal
BGN Terminal
Common Infrastructure Project
Gateway to New Mines 18.6 km long twin-tunnel, 6.8m W x 6.0m H
Conventional hi-speed drill and blast development
Gravity drainage, ventilation and access
Rail system designed forcontainer sized loads
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
45/55
AB Tunnel Lay Out
i i
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
46/55
Convergence Monitoring
Convergence monitoring is a good tool for learning about rock behavior and for monitoring the ground reaction asthe cave progresses in the DOZ mine. Even though the system is simple, the data produced is very useful.
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
47/55
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
48/55
Microseismic & Numerical Modeling
Advance real time monitoring system for PTFI Underground Mines to determine: cave propagation, stress
distribution, and damage prediction. Current UG PTFI mines (DOZ and BG) have implemented thismonitoring
PLAN VIEW
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
49/55
Microseismic Monitoring System
Magnitude and Energy Index are common parameters that used in the analysis
Seismogenic zone
SECTION VIEW
~30 m
+0.9
+1.4
DD02W/South – 12 September
2007
Vibrating Wire Stress meter
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
50/55
Vibrating Wire Stress meterand Smart MPBX
Vibrating wire stress meter determines stress change due to mining activities or other issues (i.e. earth
quake, lithology impact, etc) while Smart MPBX (multi point borehole extensometer) to determinedisplacement at different point distance (i.e. displacement in the pillar)
G d A l t
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
51/55
Ground Accelerometer
Installation of Ground Acceleration Monitoring at Grasberg Area as Part of Regional Seismic Network to
monitor ground motion/stability
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
52/55
MINERALS PROCESSING
Concentrating Plant
SAG Mill
Flotation Process
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
53/55
AMAMAPARE PORT
Concentrate dewateringplant
Concentrate shipment
Coal-fired power plant
Cargo dock
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
54/55
DWP Enclosed Shiploader
-
8/19/2019 Gatut Indo-German Mining Symp 13apr11
55/55
55