  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    1/55

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    2/55

    Balikpapan

    Samarinda

    BontangS A N G A T T A

    Tanjung Bara

    Bengalon

    Sangkulirang

    Bontang

    00

    00

    Jakarta

    Located in East Kalimantan

    Expansion Project to 70 MTPY Coal

    Swarga Bara

    PT KALTIM PRIMA COAL 

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    3/55

    Overbu rden Hand l ing 

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    4/55

    Land Clearing 

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    5/55

    Topso i l Stockp i l ing & Spreading 

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    6/55

    85 to 280 ton Haul Trucks (500 units)

    Up to 32m3 Shovels

    1 MBCM Material Movement Daily

    Dispatch System with GPS

    Overbu rden Management 

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    7/55

    In Pit Dump Coal Mine 

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    8/55

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    9/55

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    10/55

    • Lebar loading point mengacu pada

    kombinasi TRUK LIEBHERR T282

    dengan SHOVEL LIEBHERR R966

    • Lebar LIEBHERR T282 = 8.8 m

    • Lebar LIEBHERR R966 = 8.25 m

    • Lebar untuk single loading = 37.5 m

    •Lebar untuk double side loading = 51 m

    Loading Point Design 

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    11/55

    Overburden Hauling 

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    12/55

    OVERLAND CONVEYOR 

    Single 13 Km Overland Conveyor from to Port 4,000 tph Capacity

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    13/55

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    14/55

    800 KT Coal Stockpile at the Port 

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    15/55

    Coal Stockpile at Port 

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    16/55

    Stacker - Reclaimer Capacity – 3500 TPH 

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    17/55

    4200 TPH Stacker

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    18/55

    COAL SHIPMENT 

    2 km Trestle Conveyor

    200,000 dwt Ocean-goingships can be accomodated

    Loading Rate 4,730 tph

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    19/55

    PT FREEPORT INDONESIA

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    20/5520

    Tram

    (+3600m)

    Surabaya

    (+3,700m)

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    21/55

    Ertsberg District Orebodies and Mines

    N

    Skarn System

    Grasberg Pit

    Grasberg

    Underground

    Kucing Liar

      ig

    Gossan

    Dom

    ESZ

    DOZ

    OZ

    MLZ

    Deep MLZ

    eep MLZ

    Common Infrastructure

    COPPER

    GOLD

    SILVER

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    22/55

    PTFI Production Plan - 2010

    T b T b k G b 1997

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    23/55

    Tambang Terbuka Grasberg - 1997 

    Grasberg Minelooking North

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    24/55

    CABLE-CAR TRAMWAY 

    The original access connectingErtsberg (3600m) and the Mill(2800m elev)

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    25/55

    Loading and hauling by shovel & truck

    GRASBERG OPEN PIT 

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    26/55

    1 2a

    3 4 5

    6

    78

    109

    11

    14

    12

    13

    DRILLINGSAMPLING

    EXPLOSIVE

    LOADING

    BLASTING

    LAB.ASSAY2b

    FLAGGING

    LOADING

    HAULING

    ORE DUMPING CR6/7

    MILL

    DISPACTH

    CONTROL

    RECLAMATION

    STACKER LOWERWANAGON

    OVERBURDEN

    DUMPING OHS-3OVERBURDEN

    15   PIT SERVICES

    ORE/

    OVERBURDEN

    MODELING

    Grasberg Open Pit Mining Activity

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    27/55

    Stacker at Lower Wanagon OBS 

    Material deliverable up to 135 ktpd

    Stacker reposition & relocation using crawler mobile unit

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    28/55

    Stacker configuration 

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    29/55

    Monitoring & Control Technology 

    Dispatch System 

    Real-time, effective control of mine fleetallowing quick decision making

    Reliable system using GPS satellite and

    Terralite XPS transmitter technology

    Live Camera 

    • Real-Time monitoring

    • Reliable visual aids

    • Accessible world-wide

    Internet-based6

    Geotech Monitor ing 

    Slope stability radar 

    Robotic stations & prisms

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    30/55

    SLOPE MONITORING SYSTEM - SMS

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    31/55

    Extensometer at OBS 

    Extensometer is used to monitor subsurface lateral deformations.

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    32/55

    Global Positioning System (GPS) 

    Grasberg employs GPS system from Orion Monitoring Company. Single frequency GPS receiver andInteTrak software are used

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    33/55

    Robotic Total Station (RTS) 

    Robotic Total Station (RTS) is automatization of Total

    Station to read prisms target put on the area of interest.

    By doing periodic or continuous target reading

    displacement of the slope can be identified.

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    34/55

    ROBOTIC TOTAL STATION - PRISMS

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    35/55

    Slope Stability Radar (SSR) 

    Real-aperture radar (RAR) produced radar images by directing a narrow beam of energy perpendicularly

    to the slope. Each spots of area of interest are scanned by rotating the disk in horizontal and verticaldirection.

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    36/55

    SLOPE STABILITY RADAR

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    37/55

    SLOPE STABILITY RADAR DISPLAY

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    38/55

    Block cave mines Open stope w/ paste fill

    UNDERGROUND MINES 

    Grasberg Mine: Transition to Block Caving

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    39/55

    Grasberg Mine: Transition to Block Caving 

    January 2007 Open Pit

    2015 Final Pit (3055m)

    Block Cave Reserve (2815m)

    Kucing Liar Deposit

    (2605m)

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    40/55

    Grasberg B lock Cave Mine Design 

    GRS-BC Key Facts:

    970 Mt @ 1.09% Cu, 0.87 g/t Au

    Cutoff grade ca. 0.70% EqCu

    23 b lbs copper; 27 mm ozs gold (contained)

    2,356 drawpoints El Teniente-Style Layout 700,000 m2 footprint

    30m x 20m drawbells

    Mine Access via Light Rail (AB Adits)

    Gravity Drainage (AB Adits)

    Intake/Exhaust Adits

    Mining Rate: 160 ktpd

    Rail Haulage to a 4-Crusher Complex

    Incline conveyor to surface

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    41/55

    DOZ Mine Expansion Infrastructures (completed 2007) 

    Current Production 80 KTPD after: 2nd Crusher Installation  Additional Ventilation

    o Intake and Exhaust Aditso Three Mixed Flow Fans

    • 3.5m Diameter•

    1,600 kW motors

    Fan Chamber #1

    Big Gossan Mine

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    42/55

    Big Gossan MineOpen stope w/ paste fill 

    Reserves: 53 M tonnes

    2.19% Cu & 1.06 g/t Au

    Start production in 2008

    7,000 tpd in 2012

    Miner Training School

    Bi G Mi

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    43/55

    Big Gossan Mine Long Section View 

    HEAT Road

    Mill Area

    500m

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    44/55

    GRSBC Terminal

    KL Terminal

    AB Adits Portals

    MLZ Terminal

    BGN Terminal

    Common Infrastructure Project 

    Gateway to New Mines 18.6 km long twin-tunnel, 6.8m W x 6.0m H

    Conventional hi-speed drill and blast development

    Gravity drainage, ventilation and access

    Rail system designed forcontainer sized loads

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    45/55

     AB Tunnel Lay Out 

    i i

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    46/55

    Convergence Monitoring 

    Convergence monitoring is a good tool for learning about rock behavior and for monitoring the ground reaction asthe cave progresses in the DOZ mine. Even though the system is simple, the data produced is very useful.

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    47/55

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    48/55

    Microseismic & Numerical Modeling 

    Advance real time monitoring system for PTFI Underground Mines to determine: cave propagation, stress

    distribution, and damage prediction. Current UG PTFI mines (DOZ and BG) have implemented thismonitoring

    PLAN VIEW

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    49/55

    Microseismic Monitoring System 

    Magnitude and Energy Index are common parameters that used in the analysis

    Seismogenic zone

    SECTION VIEW

    ~30 m

    +0.9

    +1.4

    DD02W/South – 12 September

    2007

    Vibrating Wire Stress meter

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    50/55

    Vibrating Wire Stress meterand Smart MPBX 

    Vibrating wire stress meter determines stress change due to mining activities or other issues (i.e. earth

    quake, lithology impact, etc) while Smart MPBX (multi point borehole extensometer) to determinedisplacement at different point distance (i.e. displacement in the pillar)

    G d A l t

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    51/55

    Ground Accelerometer 

    Installation of Ground Acceleration Monitoring at Grasberg Area as Part of Regional Seismic Network to

    monitor ground motion/stability

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    52/55

    MINERALS PROCESSING 

    Concentrating Plant

    SAG Mill

    Flotation Process

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    53/55

     AMAMAPARE PORT 

    Concentrate dewateringplant

    Concentrate shipment

    Coal-fired power plant

    Cargo dock

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    54/55

    DWP Enclosed Shiploader 

  • 8/19/2019 Gatut Indo-German Mining Symp 13apr11

    55/55