funghi declaration

Upload: erin-sherbert

Post on 14-Apr-2018

233 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/30/2019 Funghi Declaration

    1/5

    I23456789

    10l lr21aIJ

    l4l5l6

    18l9202l222324257627

    DENNISJ. HERRERA, Statear r3s66sCity AttomeyKATE H. STACY,shre ar t2z3t3AUDREY WILLIAMS PEARSON,statear t78.u4ROBERTK. STONE,state ar tilszzDeputyCity AttorneysCity HaliI Dr. CarltonB. GoodiettPlace,Room234SanFrancisco, alifomia94 02-5408Telephone: (415) 554-4621Facsimile: (415) 554-4757E-Mail: [email protected] or RespondentsCity andCountyof SanFrancisco

    MARC BRIINO, an individualandRepresentativef SaveNorth Beach.

    vs.CITYAND COUNTYOF SANFRANCISCO,TAL.,

    Respondents.

    SUPERIOR OURTOF THE STATEOFCALIFORNIACOTINTYOF SAN FRANCISCO

    TJNLIMITED URISDICTIONCaseNo. CPF l2 - 512380DECLARATION OF JOHN FUNGHI INSUPPORTOF CITY AND COUNTY OF SANFRANCISCO'S OPPOSITION TOAPPLICATION FOR TEMPORARYRESTRAINING ORDERHearingDate:Hearing udge:Time:Place:

    August9,2012Judge acksonI I a.m.503DateActionFiled: July3l.Z0l2Trial Date: ttJa'AttachedDocuments:Requestor JudicialNotice

    I, JohnFunghi,declare hat the bllor.ving tatements re rueandaccurate nd arewithin my personalknowledge. f called, would estifyas ollorvs:

    l' I am heProgramManager br theSanFranciscoMunicipalTransportation gency,s(SFlvlTA)CentralSubwayPr

  • 7/30/2019 Funghi Declaration

    2/5

    I2aJ

    456-7

    8I

    t0l lt2l314l5l6t718t9202l22ZJ1AL' a

    25262728

    2. I am a licensed ivil engineerCalifbmiaLicenseNo. 42122)and hold a ClassAEngineering ndClassB Contractor's icense CalifbmiaLicenseNo. 644290).

    3. i have eviewedor am awareof thecontents f the bllowine documentselevanto thestatements ade n this Declaration:

    a. Third StreetLight Rail ProjectFinalEnvironmentalmpactStatement/EnvironmentalmpactReport EIS/EIR)certifiedn November 998;

    b. CentraiSubr.vayinalSupplemental IS/ElR certified n August2008;c. Recordof Decision ROD) ssuedn November 008;d. PreliminaryEngineering esignDrarvings atedOctober 008;e. Final DesignDrawings atedAugust201 ;i. Construction ontractCS-1252or Construction f Tunnels.ncludine

    Specifi ations ndDrawings.1. The Central SubrvayProject s Phase of the Third StreetLight Rail Project, an at-

    grade ight rail transit ine from Third andSunnydaleStreets Visitation Valley) to theCaltrainStationat 4th andKing Streets.Phase2 will extend he ight rail service rom 4thand King Streetso anundergroundsubway)portal ocatedat 4thandHarrisonStreets.The ight rail line .,vill hen un in atrvin-bore trnnel1.6 miles north under4'hStreetandStocktonStreetsnto Chinator.vn.Threesubwaystationsvill be constructed. t the MosconeConventionCenter,n Union Scluare.nd n Chinatown.The rail ines n the unnelswill terminate 50 betpast heChinatownStation, ut the unnelswillextendapproximately 000 fbetbeyond hat station nto North Beach, erminatingbelowColumbusAvenuebetrveenUnion and Powell Streets.The tunnelswill be dugusing unnel boringmachines.Eachmachines22 t'eetwide and35 feet ong,excluding he unninggear hatextends ehind achIBM an additional 00 fbet. EachTBM weighsapproximately 0 tons. The unnels vere xtendedinto NorthBeachbecause hat s thefirst locationnorthof theChinatownStation ,vherehere ssuttrcient paceo extract he TBMs. The unnelswill terminaten a shatt commonly et'erencedsthe "Retrieval haft") o be constructedn the right-of--wayn ColumbusAvenuebetween nionandPowellStreets.

  • 7/30/2019 Funghi Declaration

    3/5

    I2J

    4

    6

    89

    l011t2l3t4l5l6t7i8l9202l22!)

    242526ZI

    28

    5. As approved nderFinalDesign, heRetrievalShaflwill be46 feet n length,40 eetwide andr'vill extend38 feet rom thesurfaceof the roadwaymedian o the tunnelsbelow. TheRetrievalShaftwill be excavatedrom the surface, nd he shaft will be constructed singsecant iles(which areconcrete vith reinforcingsteel),steelbeamsandsteelplating.

    6' TheRetrievalShaftwill initially be used or the removalof theTBMs from the unnels.andcouldbeused or deliveryof materialso theChinatownStation,whichare ts designated"temporary"uses.After retrievalof the TBMs, theroadwaywill be reconstructed. he only remainingindicationof the presence f theundergroundunnelsandshaftwill be a 39 inchaccess ndventcover hatwill be ocated n themedianon columbusAvenue.

    7. In planninganddesigninghe centralSubr,vay roject,the SFMTA determined t leastas eariyas 2A05-2006hat theTBMs would be removed rom the ground hrougha retrievalshaft,sothat he esale r reuse alueof theTBMs at theconclusion f tunneling ctivitieswould not be ostorwasted,hereby educingconstruction osts. The SFMTA alsodetermined hat t would not procurethe TBMs itself' but would require he Contractor o do so,so that thecontractorwould be responsiblefor maintenancend repair,anddelay o construction ostsarising rom TBM f-ailure r breakdown.

    I' Thecharacterization f the tunnelextension nd he RetrievalShaftas ,,temporary',describeshe useof the tunnelsextension nd RetrievalShaft,not themeansor methodsofconstruction.As the SEIRnotes, he tunnelswould be used o storematerials.The final designs fthe RetrievalShaftprovide hat unnelsextension ndRetrievalShaftwill be constructed f concreteandsteelandr'vill be permanent ndergroundacilities. The preliminarydesigns f the tunnelsandRetrievalShaft* thedesignshat r.vere onsidered uring he environmentaleviewprocessbr theCentralSubwayProject indicatedhat he tunnelextensions ndRetrievalShaftwould beconstructed f concreteandsteeland would be permanent ndergroundacilities.

    9' Late n the inaldesignprocess,n approximately ay z0ll,the sFMTA consideredusinga retrievalshaftexcavatedhatusedonly temporary horing a shaft hat s essentially shoredconstruction it . The SFMTA included hat typeof shaftasan option to the unnelconstructioncontract CS- 252). A temporarilyshored etrievalshatiwould have o be backfllled ,vith oil afterremovalof he TBMs,whichwouldextend heconstructionurationand mpacts.

    Frrnohi r lecl ' C.r"- \ l^ i i I ' :on

  • 7/30/2019 Funghi Declaration

    4/5

    121J

    456

    8I

    l0l1t21aIJ

    t4l