fireside chat february 27, 2012

11
FIRESIDE CHAT February 27, 2012

Upload: elaine

Post on 24-Feb-2016

37 views

Category:

Documents


0 download

DESCRIPTION

FIRESIDE CHAT February 27, 2012. Pews. Ratigan-SchottlerPioneer Refinishing Delivered/Installed Solid Oak PewsStrip/refinish$42,200 597’ – 42 pewsReplace kneelers$13,000 Total$57,392$55,200 deduct (assist)($1,319) Tax(6%)$ 3,364.38$ - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: FIRESIDE CHAT February 27, 2012

FIRESIDE CHATFebruary 27, 2012

Page 2: FIRESIDE CHAT February 27, 2012

Pews

Ratigan-Schottler Pioneer Refinishing

Delivered/Installed Solid Oak Pews Strip/refinish $42,200597’ – 42 pews Replace kneelers $13,000

Total $57,392 $55,200deduct (assist) ($1,319)Tax(6%) $ 3,364.38 $

Pew sponsorship – $1,500 per pew (38)

Page 3: FIRESIDE CHAT February 27, 2012
Page 4: FIRESIDE CHAT February 27, 2012

Gunder Church Furniture$53,256.36

Includes delivery, installation, & taxes

Requires two people to assist installers

Page 5: FIRESIDE CHAT February 27, 2012

CARPET

Hanson Furniture Zem’s Furniture

Carpet/glue $14,066.76 $10,830.07(with $950 rebate)Installation/demolish $ 4,870.00 $ 3,820.50

Plus tax $ 1,193.21 $ 879.03

The sanctuary needs new underlayment Does not include to glue carpet direct, the altar may need removal.it also.

The two long steps need repair.

Page 6: FIRESIDE CHAT February 27, 2012

Conrad-Schmitt$150,000 - $206,000

(Mural in the of sanctuary and front wall, if done separately, will cost $94,380.)

Decorate all plastered surfaces above the main floor of St. Lawrence to include sanctuary, nave, balcony, and narthax, not stairways or vestibules.

23kt gold leaf to be applied in different locations within the church.

With mural of God the Father receiving His Son, the bid would be $178,380, which includes the fiberglass covering of the large cracks. Without the mural, deduct $10,000. Additional $28,310 to fiberglass all large flat wall and ceiling surfaces with an 18 mil thick polymer coat.

All large cracks will be routed out, caulked and covered with fiberglass mesh. Large “living” cracks may reappear, but this is the best procedure to prevent any recurrence.

Page 7: FIRESIDE CHAT February 27, 2012
Page 8: FIRESIDE CHAT February 27, 2012
Page 9: FIRESIDE CHAT February 27, 2012

RIEHLE

$120,000 - $175,000 + taxes(Art work of sanctuary and front wall, if done separately, will cost $80,000.)

Decorate all plastered surfaces above the main floor of St. Lawrence to include sanctuary, nave, balcony, narthax, and stairway.

Install polymer system to all walls and ceilings.

Furnish steel scaffold. Owner to unload and load scaffold.

Custom made reredos

Page 10: FIRESIDE CHAT February 27, 2012
Page 11: FIRESIDE CHAT February 27, 2012