eglinton crosstown construction update · our central west open house will feature the following...

39
EGLINTON CROSSTOWN CONSTRUCTION UPDATE CENTRAL WEST OPEN HOUSE | MARCH 03, 2020

Upload: others

Post on 19-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

EGLINTON CROSSTOWN CONSTRUCTION UPDATE

CENTRAL WEST OPEN HOUSE | MARCH 03, 2020

Page 2: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Welcome

Our Central West Open House will feature the following stations:

• Fairbank

• Oakwood

• Cedarvale

• Forest Hill

• Chaplin

• Avenue

• and Eglinton

2

Page 3: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Agenda

3

• Welcome from Beth Tzedec

• Introduction

• Behind the Scenes Construction Progress Video

• Construction Update

– Milestones in 2019

– Remaining Work in 2020

Page 4: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Eglinton Crosstown LRT Project

• A 19-kilometre route separated from regular traffic • 10-kilometres underground; 9-kilometres at surface in east • 15 underground stations and 10 surface stops • A maintenance and storage facility • Transit communications system • Links to 54 bus routes, 3 subway stations, GO Transit, UP Express station

4

Page 5: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

2019 Project Highlights

5

Page 6: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

6

First Light Rail Vehicle on Mainline

Page 7: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Fairbank Station Renderings

MAIN ENTRANCE SECONDARY ENTRANCE

SERVICE BUILDING EXTERIOR PLAZA

Page 8: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Fairbank Station: What to Expect

Year What to Expect

Milestone

• Start of structural steel installation

Remaining work for

2020

• Completion of deep excavation and concrete works

• Structural steel and panels installed at entrances

• Reduced road occupancy during utilities reinstatement work

• Begin road restoration and landscaping

Page 9: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Fairbank Station Progress Photo

Page 10: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Fairbank Station Progress Photos

DEEP EXCAVATION MAIN ENTRANCE CONCRETE AND

STRUCTURAL STEEL

Page 11: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Oakwood Station Renderings

MAIN ENTRANCE

CONCOURSE

SECONDARY ENTERANCE

PLATFORM

Page 12: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Oakwood Station: What to Expect

Year What to Expect

Milestone

• Mining completed in 2019

Remaining Work for

2020

• Completion of final lining works, including installation

waterproofing, rebar and formwork

• Completion of concrete works

• Installation of structural steel and panels at entrances

Page 13: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Oakwood Station Progress Photo

13

Page 14: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Oakwood Station Progress Photos

FORMWORK INSTALLATION WATERPROOFING

Page 15: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Cedarvale Station Renderings

MAIN ENTRANCE

SECONDARY ENTRANCE

EXTERIOR PLAZA

TERTIARY ENTERANCE

Page 16: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Cedarvale Station: What to Expect

Year What to Expect

2019

Milestone

• Underpinning complete

Remaining

Work for 2020

• Completion of deep excavation

• Closure of Eglinton West Station bus loop to construct the Cedarvale Station concourse roof

• Traffic configuration changes

Page 17: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

17

TTC Station Underpinning

Page 18: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

January 2020 Underpinned subway tunnel

Page 19: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Cedarvale Station Progress Photos

TTC UNDERPINNING DEEP EXCAVATION

Page 20: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Eglinton West Bus Loop Reroute –

Effective end of March

20

Page 21: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Forest Hill Station Renderings

MAIN ENTRANCE SECONDARY ENTRANCE

PLATFORM LOBBY

Page 22: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Forest Hill Station: What to Expect

Year What to Expect

Remaining

Work for 2020

• Deep excavation and concrete works

• Completion of utility works

• Traffic bridge removal

• Traffic configuration changes and reinstatement of some turns at Bathurst St and Eglinton Ave

• Installation of structural steel and panels at entrances

• Completion of the Secondary Entrance

Page 23: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Forest Hill Station Progress Photo

23

Page 24: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Forest Hill Station Progress Photos

SECONDARY ENTRANCE CONSTRUCTION

DEEP EXCAVATION BENEATH STATION ROOF

Page 25: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Chaplin Station Renderings

MAIN ENTRANCE SECONDARY ENTRANCE

PLATFORM TERTIARY ENTRANCE

Page 26: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Chaplin Station: What to Expect

Year What to Expect

Milestone

• All station roof pours complete

Remaining Work for 2020

• Deep excavation and concrete works

• Intersection closure for traffic bridge removal

• Traffic configuration changes

• Installation of structural steel and panels at entrances

Page 27: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Chaplin Station Progress Photo

27

Page 28: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Chaplin Station Progress Photos

MAIN ENTRANCE/DEEP EXCAVATION

DEEP EXCAVATION BENEATH THE STATION ROOF

Page 29: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Avenue Station Renderings

Station Features Accessible main entrance

Covered & uncovered bicycle parking

Retail space in main entrance??

SECONDARY ENTRANCE

MAIN ENTRANCE

MAIN ENTRANCE INTERIOR

AERIAL VIEW

Page 30: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Avenue Station Mining Progress

Page 31: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Avenue Station: What to Expect

Year What to Expect

Milestone

• Completion of mining excavation in summer 2020

Remaining Work

for 2020

• Completion of concrete works at entrances

• Completion of final lining works, including installation waterproofing, rebar and formwork

• Begin installation of structural steel and panels at entrances

• Begin implementation of Eglinton Connects

Page 32: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Avenue Station Progress Photo

32

Page 33: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Avenue Station Progress Photos

FINAL LINING WORKS FINAL LINING WORKS

Page 34: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Eglinton Station Renderings

Station Features Accessible main entrance

Covered & uncovered bicycle parking

Retail space in main entrance??

LOBBY

PLATFORM

TTC SERVICE BUILDING (BERWICK AVE)

MAIN ENTRANCE

Page 35: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Eglinton Station: What to Expect

Year What to Expect

Milestone

• All pedestrian crosswalks open at intersection

• Start of underpinning work

Remaining Work for 2020

• Deep excavation

• Removal of tunnel boring machines

• TTC station underpinning

• Construction of the south ventilation building at Berwick Ave

• Construction of the north tunnel ventilation shaft

Page 36: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Eglinton Station Progress Photo

36

Page 37: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

Eglinton Station Progress Photos

MAIN ENTRANCE DEEP EXCAVATION

Page 38: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue

38

QUESTIONS & ANSWERS

Any questions?

Page 39: EGLINTON CROSSTOWN CONSTRUCTION UPDATE · Our Central West Open House will feature the following stations: • Fairbank • Oakwood • Cedarvale • Forest Hill • Chaplin • Avenue