easy on boarding carol cvitkovich director, global resource model

27
Easy On Boarding Carol Cvitkovich Director, Global Resource Model

Upload: derrick-boyd

Post on 26-Dec-2015

217 views

Category:

Documents


2 download

TRANSCRIPT

Easy On Boarding

Carol Cvitkovich Director, Global Resource Model

2

Easy On Boarding

Implementation projects are like maps, while each project has a common goal/destination but there may be several ways to get there.

3

What Will Be of Most Value?

Easy On Boarding

4

Goal of Easy On Boarding

Easy On-Boarding

Use of QAD Capabilities

Alignment with Business

Operations

Extensive alignment with

processes & best practice

Limited alignment with processes& best practice

Limited use of capabilities

Best in class use of capabilities

Optimal ROIEfficient TCO

Effective Business Performance

Sub Optimal ROIHigher TCO

Poor ROIHigh TCO

Higher Cost of Operations

Better ROIHigher Cost of Operations

Get customers here as quickly, efficiently & effectively as

possible

5

• Extend Q-Advantage methodology• Incorporate industry expertise• Leverage best practices• Reduce risk• Improve time to benefit• Lower implementation costs

Objectives

Easy On Boarding

6

General Multi-Site Build & Deploy Model

Easy On Boarding

Recruit and installprojectcore team

Collect and finalize genericrequirementsand to-beprocesses

Core Model Engineering

Implement Pilot Site

Approvemodel

forrollout

RolloutSite 2

RolloutSite n

S1

Sn

S2

S1

Coreinput

Refinements

Designcorrections

Generic change request and model enhancements

Input local requirements

RolloutSite 1

Centerof

Excellence

Roll-out supportSn

7

• Outcome focused• Industry based process models• Componentized• Standards based• Globally consistent• Utilize optimal resource mix• Fast, efficient, effective

Characteristics

Easy On Boarding

8

How We Accomplished This

Easy On Boarding

Structured Workshops

Industry Process Models Tools

TemplatesSoftware

Enhancements

9

How We Accomplished This

Easy On Boarding

Structured Workshops

Industry Process Models Tools

TemplatesSoftware

Enhancements

10

High Level Process Map

Easy On Boarding

11

Detailed Level Process Map

Easy On Boarding

12

Vertical Process Maps

Compliance Work Instructions

Training Material

Automotive 105 206 600 + 115 +

Life Sciences

108 137 600 + 115 +

Industrial 122 75 700+ 115 +

Electrical 123 75 700 + 115 +

Consumer Products

125 75 700 + 115 +

Food & Beverage

126 112 700 + 115 +

Process Models

Easy On Boarding

Standard and Enterprise Editions for all verticals

13

• Business Intelligence (BI)• Enterprise Asset Management (EAM)• Warehousing• Configurator• Field Services Scheduler (FSS)

Available Modules

Easy On Boarding

14

How We Accomplished This

Easy On Boarding

Structured Workshops

Industry Process Models Tools

TemplatesSoftware

Enhancements

15

• Project planning workshop• Project kickoff workshop• Business process workshop• Data conversion workshop• Test preparation workshop• Test sign-off workshop• Cutover plan workshop

Structured Workshops

Easy On Boarding

16

How We Accomplished This

Easy On Boarding

Structured Workshops

Software EnhancementsTemplates

Industry Process Models Tools

17

Delivery Tools

Easy On Boarding

Operational MetricsCompliance Check Points

Training Material

System Access Tool Tips Work Instructions

18

• Industry best practices- Automotive

• MMOG/LE

- Life Sciences• FDA 21CFR 820• ISO 13485-2003

- Food & Beverage• HACCP• ISO 22000

- Industrial, Electrical, Consumer Products• KPI Framework – Best practices

Compliance

Easy On Boarding

19

How We Accomplished This

Easy On Boarding

Structured Workshops

Software EnhancementsTemplates

Industry Process Models Tools

20

Easy On Boarding

PIP

PMP

Cutover Plan

Data Load Template

Workshop Template

Test Scripts

BPW

Delivery Templates

21

How We Accomplished This

Easy On Boarding

Structured Workshops

Software EnhancementsTemplates

Industry Process Models Tools

22

Software Enhancements

Easy On Boarding

• .NET UI• Browses and browse collections• Excelerator• Operational metrics

23

Easy On Boarding Used In

Easy On Boarding

• Core model development• Implement industry best practices • Single or multiple site implementations• Global implementations• Full QAD suite of products• Mix and match pre-defined components

24

Customer Success Story

Easy On Boarding

• Automotive Supplier• Global operations• Acquired new

manufacturing site running SAP

• Extremely short implementation drop dead date

• Maintain current system during implementation

• 3 month time line• Project involved:

- Train new users- Data extract and load- System

setup/configuration- System testing- Go-live/cutover

• Leverage EOB templates and tools

Background EOB Project

25

• Implement best practices• Reduce risk• Lower implementation costs• Decrease time to benefit

Because of our enhanced implementation methodology

Goals Achieved!

Easy On Boarding

To learn how you can achieve your goals with Easy On Boarding contact your sales rep or email us at

[email protected]!

26

• Carol Cvitkovich: [email protected]

Questions & Answers

Easy On Boarding

27

www.qad.com© QAD Inc 2012