east fork swimming pool district - cvswim.com

29
C F STRUCTURAL GROUP, LLC B R 5425 Louie Lane, Suite 2C Reno, Nevada 89511 (775) 525-1113 DIRECTORY VICINITY MAP LOCATION MAP GENERAL NOTES BUILDING CODES SHEET INDEX SCOPE OF WORK BID ALTERNATES 681 Sierra Rose Dr., Ste. B | Reno, Nevada 89511 | 775.826.9010 4600 South Syracuse, 9th Floor | Denver, Colorado 80237 | 303.256.6598 pkelectrical.com © 2008 2011PKElectrical, Inc. FAX: PHONE: RENO, NEVADA 89511 (775) 826-1918 (775) 826-1919 5434 LONGLEY LANE CR-ENG.COM WEB: MINDEN, NEVADA 89423 1600 STATE ROUTE 88 EAST FORK SWIMMING POOL DISTRICT HVAC REPLACEMENT 1600 STATE ROUTE 88 MINDEN, NEVADA 89423 FOR CARSON VALLEY SWIM CENTER CONSULTANTS FOR OWNER MECHANICAL ELECTRICAL NO SCALE THE PROJECT SPECIFICATIONS AND DRAWINGS ARE A DOCUMENT SET AND SHOULD NOT BE SEPARATED. INFORMATION AND REFERENCES ARE CONTAINED IN ALL SPECIFICATIONS AND DRAWINGS. 1. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FULLY UNDERSTAND THE COMPLETE SET OF SPECIFICATIONS AND THE DRAWINGS FOR THIS PROJECT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW ALL OF THE INFORMATION CONTAINED IN THE SPECIFICATIONS AND DRAWINGS, INCLUDING ALL OTHER DISCIPLINES (ARCHITECTURAL, ELECTRICAL, STRUCTURAL, ETC.) PRIOR TO BID AND CONSTRUCTION. 2. THE INFORMATION INDICATED ON THESE DRAWINGS AS EXISTING IS BASED UPON INFORMATION TAKEN FROM AS-BUILT DRAWINGS, FIELD INVESTIGATION, AND INFORMATION OBTAINED FROM SUBMITTAL DATA, ETC. THE PLANS DO NOT GUARANTEE ACCURACY BUT ARE ONLY AN INDICATION OF EXISTING CONDITIONS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY EXACT CONDITIONS SUCH AS EQUIPMENT PLACEMENT, DUCTWORK (SIZE, ROUTING, AND ELEVATION), PIPING (SIZE, ROUTING, AND ELEVATION), ETC. THE DRAWINGS ARE INTENDED TO PROVIDE THE CONTRACTOR AN INDICATION OF THE SYSTEM INSTALLED IN THE FACILITY TO DATE. IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO MAKE ADJUSTMENTS TO THE DRAWING INFORMATION AS REQUIRED TO MATCH EXISTING FIELD CONDITIONS. 4. THE CONTRACTOR SHALL INSTALL THE NEW EQUIPMENT, DUCTWORK, AND PIPING AROUND ALL EXISTING OBSTACLES INCLUDING: ELECTRICAL CONDUIT, DOMESTIC WATER PIPING, WASTE AND VENT PIPING, CHILLED AND HEATING WATER PIPING, AND FIRE SPRINKLER PIPING. PROVIDE OFFSETS TO AVOID RELOCATION OF OTHER UTILITIES. RELOCATE UTILITIES IF THEY ARE IN CONFLICT WITH THE MECHANICAL SYSTEM INSTALLATION, CAUSE DEVIATIONS IN THE DESIGN INTENT, UNSATISFACTORY OPERATION, NOISY CONDITIONS, OR INTERFERE WITH MAINTENANCE. IT IS THE MECHANICAL CONTRACTOR'S RESPONSIBILITY TO COORDINATE ANY UTILITY RELOCATION WITH THE APPROPRIATE SUBCONTRACTOR. 3. MINDEN, NV 2012 INTERNATIONAL BUILDING CODE 2012 INTERNATIONAL FIRE CODE 2012 INTERNATIONAL ENERGY CONSERVATION CODE 2012 UNIFORM MECHANICAL CODE 2012 UNIFORM PLUMBING CODE 2011 NATIONAL ELECTRICAL CODE STRUCTURAL IRONWOO D DR MA CKLAND AVE U.S H W Y 395 I RO N W O OD DR C OUN T Y RD BE L A RRA ST Z A L D I A D R I RO N W O OD DR M A H O G A N Y D R L O N G L E A F P L O A K WOOD DR TAM ARA CK DR MAHOGANY DR L UCE RNE ST LUC ERN E ST H W Y 8 8 U . S H W Y 3 9 5 PROJECT LOCATION H W Y 8 8 MAHOGANY DR C O U NTY R D CARSON VALLEY SWIM CENTER H W Y 8 8 AREA OF WORK NO SCALE CONTACT: CHUN LEE, P.E. PROJECT MANAGER DOUGLAS HIGH SCHOOL EAST FORK SWIMMING POOL CENTER 1600 STATE ROUTE 88 MINDEN, NV 89423 CONTACTS: DIRECTOR (775) 782-8840 SCOTT McCULLOUGH PROJECT MANAGER (775) 790-5212 CONTACT: CHRIS ROPER, S.E. PRINCIPAL ENGINEER CONTACT: DUGAN HADLER PROJECT MANAGER SHANNON HARRIS 1. DEMOLISH EXISTING SOLAR WATER STORAGE TANK AND REPLACE WITH NEW ONE. CONTRACTOR TO REPIPE BACK TO EXISTING PIPING. THE NEW SOLAR WATER STORAGE TANK SUPPORTS WILL NEED TO IN THE SAME LOCATION AS EXISTING. THE HEAT EXCHANGERS AND PIPING LOCATED NEXT TO SOLAR WATER STORAGE TANK MAY NEED TO BE REMOVED AND REINSTALLED IN ORDER TO FACILITATE THE REPLACEMENT OF THE SOLAR WATER STORAGE TANK. THE EXISTING AIRHANDLER (AH-1) LOCATED IN THE MEZZANINE OF THE MECHANICAL ROOM AND CORRESPONDING OUTDOOR CORRESPONDING CONDENSING UNIT AND REFRIGERANT PIPING IS TO BE REPLACED WITH NEW. THE ASSOCIATED DUCTWORK AND REFRIGERANT PIPING ASSOCIATED WITH THE DEMOLISHED DEHUMIDIFICATION UNIT (DH-1) IS TO BE REMOVED. THE EXISTING MAKE-UP AIR UNIT LOCATED IN THE EXISTING OUTDOOR MECHANICAL YARD IS TO BE REPLACED WITH NEW. THE EXISTING DEHUMIDICATION UNIT (DH-2), CORRESPONDING DUCTWORK, REFRIGERANT AND HYDRONIC PIPING, AND OUTDOOR CONDENSING UNIT ARE TO BE REMOVED. THE EXISTING MECHANICAL YARD ON THE WEST SIDE OF THE BUILDING IS TO BE ENLARGED PER THE STRUCTURAL DRAWINGS TO FACILITATE THE INSTALLATION OF A NEW DEHUMIDIFICATION UNIT AND (2) CONDENSING UNITS IN THE YARD. (4) EXISTING WINDOWS ARE TO BE REMOVED AND (4) SIDEWALL EXHAUST FANS ARE TO BE INSTALLED IN THEIR LOCATION WITH DUCTWORK SHOWN. THE EXISTING MURAL ON THE WEST INTERIOR WALL IS NOT TO BE DISTURBED. THE SUPPLY DUCT IN THE POOL ROOM TO BE FABRICAIR COMBI 70 (OR APPROVED EQUAL) FABRIC DUCT AND FABRIC DUCT AIR DISTRIBUTION WITH 10-YEAR WARRANTY WITH MANUFACTURER'S HANGERS AND SUPPORTS. RETURN DUCT TO BE 316 STAINLESS STEEL PER SPECIFICATIONS. 1. SUPPLY DUCT IN THE POOL ROOM TO BE GALVANIZED STEEL DUCTWORK PER SMACNA STANDARDS TH PAINT-GRIP FINISH. DUCT PRESSURE CLASS SHALL BE THE SAME LISTED IN THE SPECIFICATIONS. DUCT TO BE PAINTED TO MATCH EXISTING. SUPPORTS ARE TO BE STAINLESS STEEL PER SPECIFICATIONS. RETURN DUCT TO BE 316 STAINLESS STEEL PER SPECIFICATIONS. AIR DISTRIBUTION TO BE WHAT IS SHOWN ON DRAWINGS. 2. THE SUPPLY DUCTWORK AND SUPPORTS IN THE POOL ROOM ARE TO BE STAINLESS STEEL PER SPECIFICATIONS. RETURN DUCT TO BE 316 STAINLESS STEEL PER SPECIFICATIONS. AIR DISTRIBUTION TO BE WHAT IS SHOWN ON DRAWINGS. DRAWN BY: CHECKED BY: PROJECT NO: DESIGNED BY: DATE: CONSULTANT: SHEET NUMBER: DESCRIPTION REV. DATE REVISIONS: APPROVED BY: - - - - - - - - - - SEAL: - - - - - THESE DRAWINGS ARE INSTRUMENTS OF SERVICE AND THE DESIGNS ARE THE EXCLUSIVE PROPERTY OF CR ENGINEERING. THIS DRAWING MAY NOT BE REPRODUCED IN ANY WAY, INCLUDING DESIGN CONCEPTS AND IDEAS, WITHOUT THE EXPRESS WRITTEN AUTHORIZATION FROM CR ENGINEERING. MECHANICAL ENGINEERING CONSULTANT 5434 LONGLEY LANE RENO, NEVADA 89511 PHONE: 775.826.1919 FAX: 775.826.1918 WEB: CR-ENG.COM MGB CL CLR CLR PERMIT SET ADDENDUM 2 07/29/16 1 1600 STATE ROUTE 88 T0.1 07/13/2016 103915 CARSON VALLEY SWIM CENTER - HVAC REPLACEMENT MINDEN, NV 89423 COVER SHEET MECHANICAL MP0.1 MECHANICAL ABBREVIATIONS, LEGEND, CALCULATIONS, AND SCHEDULES MP0.2 MECHANICAL SCHEDULES MP1.0 OVERALL MECHANICAL DEMOLITION FLOOR PLAN MP1.1 ENLARGED MECHANICAL ROOM DEMOLITION FLOOR PLAN MP1.2 ENLARGED MECHANICAL ROOM MEZZANINE DEMOLITION FLOOR PLAN MP1.3 ENLARGED MECHANICAL YARD DEMOLITION FLOOR PLAN MP2.0 OVERALL MECHANICAL FLOOR PLAN MP2.1 ENLARGED MECHANICAL ROOM FLOOR PLAN MP2.2 ENLARGED MECHANICAL ROOM MEZZANINE FLOOR PLAN MP2.3 ENLARGED MECHANICAL YARD PLAN MP2.4 ENLARGED MECHANICAL YARD WEST PLAN MP3.1 MECHANICAL ROOM DEMOLITION SECTION MP3.2 MECHANICAL ROOM SECTION MP3.3 WEST WALL ELEVATION MP3.4 SOUTH WALL MECHANICAL ELEVATION MP4.1 MECHANICAL ROOM DEMOLITION ISOMETRIC MP4.2 MECHANICAL ROOM DEMOLITION ENLARGED ISOMETRIC MP4.3 BOYS LOCKER ROOM MECHANICAL DEMOLITION ISOMETRIC MP4.4 MECHANICAL ROOM ISOMETRIC MP4.5 MECHANICAL ROOM ENLARGED ISOMETRIC MP4.6 WEST MECHANICAL YARD ISOMETRIC MP5.1 DEMOLITION MECHANICAL PIPING DIAGRAMS MP5.2 DOMESTIC HOT WATER AND SOLAR DOMESTIC HOT WATER PIPING DIAGRAMS MP5.3 HOT WATER DEMOLITION PIPING DIAGRAM MP6.1 MECHANICAL DETAILS MP6.2 MECHANICAL UNIT PLANS MP7.1 CONTROL DIAGRAM AND SEQUECNCE OF OPERATION MP7.2 CONTROL DIAGRAMS GENERAL T0.1 COVER SHEET STRUCTURAL S0.1 STRUCTURAL NOTES & SPECIFICATIONS S1.1 STRUCTURAL PLANS S2.1 STRUCTURAL ELEVATIONS, SECTIONS & DETAILS ELECTRICAL E0.1 LEGENDS & DRAWING SCHEDULE E0.2 EXISTING ONELINE DIAGRAM E0.3 NEW ONELINE DIAGRAM E0.4 FIXTURE SCHEDULE, ENERGY COMPLIANCE CALCULATIONS, & LIGHTING CONTROL SCHEDULE E0.5 PANEL SCHEDULES E0.6 MCC SCHEDULES E0.7 DETAILS E1.0 ELECTRICAL SITE PLAN E1.1 OVERALL ELECTRICAL PLAN E2.1 PARTIAL ELECTRICAL DEMOLITION PLAN - NORTH E2.2 PARTIAL ELECTRICAL DEMOLITION PLAN - SOUTH E2.3 MECHANICAL ROOM DEMOLITION PLAN - MEZZANINE E2.4 MECHANICAL YARD DEMOLITION PLAN - SOUTH E3.1 PARTIAL LIGHTING PLAN - NORTH E4.1 PARTIAL POWER & SIGNAL PLAN - NORTH E4.2 PARTIAL POWER & SIGNAL PLAN -SOUTH E4.3 MECHANICAL ROOM NEW WORK POWER PLAN - MEZZANINE E4.4 MECHANICAL YARD POWER PLAN - SOUTH E4.5 MECHANICAL YARD POWER PLAN - WEST 1 1 1

Upload: others

Post on 18-Dec-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

CF STRUCTURAL GROUP, LLCBR

5425 Louie Lane, Suite 2CReno, Nevada 89511

(775) 525-1113

DIRECTORYVICINITY MAP LOCATION MAP

GENERAL NOTES

BUILDING CODES

SHEET INDEX

SCOPE OF WORK

BID ALTERNATES

681 Sierra Rose Dr., Ste. B | Reno, Nevada 89511 | 775.826.90104600 South Syracuse, 9th Floor | Denver, Colorado 80237 | 303.256.6598pkelectrical.com © 2008 2011 PK Electrical, Inc.

FAX:PHONE:RENO, NEVADA 89511

(775) 826-1918(775) 826-1919

5434 LONGLEY LANE

CR-ENG.COMWEB:

MINDEN, NEVADA 894231600 STATE ROUTE 88

EAST FORK SWIMMING POOL DISTRICT

HVAC REPLACEMENT1600 STATE ROUTE 88

MINDEN, NEVADA 89423FOR

CARSON VALLEY SWIM CENTER

CONSULTANTS

FOR

OWNER

MECHANICAL

ELECTRICAL

NO SCALE

THE PROJECT SPECIFICATIONS AND DRAWINGS ARE A DOCUMENT SET AND SHOULD NOT BESEPARATED. INFORMATION AND REFERENCES ARE CONTAINED IN ALL SPECIFICATIONS ANDDRAWINGS.

1.

IT IS THE CONTRACTOR'S RESPONSIBILITY TO FULLY UNDERSTAND THE COMPLETE SET OFSPECIFICATIONS AND THE DRAWINGS FOR THIS PROJECT. IT IS THE CONTRACTOR'S RESPONSIBILITY TOREVIEW ALL OF THE INFORMATION CONTAINED IN THE SPECIFICATIONS AND DRAWINGS, INCLUDINGALL OTHER DISCIPLINES (ARCHITECTURAL, ELECTRICAL, STRUCTURAL, ETC.) PRIOR TO BID ANDCONSTRUCTION.

2.

THE INFORMATION INDICATED ON THESE DRAWINGS AS EXISTING IS BASED UPON INFORMATIONTAKEN FROM AS-BUILT DRAWINGS, FIELD INVESTIGATION, AND INFORMATION OBTAINED FROMSUBMITTAL DATA, ETC. THE PLANS DO NOT GUARANTEE ACCURACY BUT ARE ONLY AN INDICATIONOF EXISTING CONDITIONS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY EXACTCONDITIONS SUCH AS EQUIPMENT PLACEMENT, DUCTWORK (SIZE, ROUTING, AND ELEVATION),PIPING (SIZE, ROUTING, AND ELEVATION), ETC. THE DRAWINGS ARE INTENDED TO PROVIDE THECONTRACTOR AN INDICATION OF THE SYSTEM INSTALLED IN THE FACILITY TO DATE. IT WILL BE THECONTRACTOR'S RESPONSIBILITY TO MAKE ADJUSTMENTS TO THE DRAWING INFORMATION ASREQUIRED TO MATCH EXISTING FIELD CONDITIONS.

4.

THE CONTRACTOR SHALL INSTALL THE NEW EQUIPMENT, DUCTWORK, AND PIPING AROUND ALLEXISTING OBSTACLES INCLUDING: ELECTRICAL CONDUIT, DOMESTIC WATER PIPING, WASTE ANDVENT PIPING, CHILLED AND HEATING WATER PIPING, AND FIRE SPRINKLER PIPING. PROVIDE OFFSETSTO AVOID RELOCATION OF OTHER UTILITIES. RELOCATE UTILITIES IF THEY ARE IN CONFLICT WITH THEMECHANICAL SYSTEM INSTALLATION, CAUSE DEVIATIONS IN THE DESIGN INTENT, UNSATISFACTORYOPERATION, NOISY CONDITIONS, OR INTERFERE WITH MAINTENANCE. IT IS THE MECHANICALCONTRACTOR'S RESPONSIBILITY TO COORDINATE ANY UTILITY RELOCATION WITH THE APPROPRIATESUBCONTRACTOR.

3.

MINDEN, NV

2012 INTERNATIONAL BUILDING CODE

2012 INTERNATIONAL FIRE CODE

2012 INTERNATIONAL ENERGY CONSERVATION CODE

2012 UNIFORM MECHANICAL CODE

2012 UNIFORM PLUMBING CODE

2011 NATIONAL ELECTRICAL CODE

STRUCTURAL

IRONWOOD DR

MACKLAND AVE

U.S HWY 395

IRONWOOD DR

COUNTY RD

BELARRA ST

ZALDIA DR

IRONWOOD DR

MA

HO

GA

NY

DR

LON

GLE

AF

PL

OAKWOOD DR

TAMARACK DR

MAHOGANY DR

LUC

ERN

E ST

LUC

ERN

E ST

HW

Y 8

8U

.S H

WY

395

PROJECTLOCATION

HW

Y 8

8

MAHOGANY DR

COUNTY RD

CARSON VALLEYSWIM CENTER

HW

Y 8

8

AREA OF WORK

NO SCALE

CONTACT: CHUN LEE, P.E.PROJECT MANAGER

DOUGLASHIGH

SCHOOL

EAST FORK SWIMMING POOL CENTER1600 STATE ROUTE 88MINDEN, NV 89423CONTACTS:

DIRECTOR (775) 782-8840

SCOTT McCULLOUGH PROJECT MANAGER

(775) 790-5212

CONTACT: CHRIS ROPER, S.E. PRINCIPAL ENGINEER

CONTACT: DUGAN HADLERPROJECT MANAGER

SHANNON HARRIS

1. DEMOLISH EXISTING SOLAR WATER STORAGE TANK AND REPLACE WITH NEW ONE. CONTRACTORTO REPIPE BACK TO EXISTING PIPING. THE NEW SOLAR WATER STORAGE TANK SUPPORTS WILL NEEDTO IN THE SAME LOCATION AS EXISTING. THE HEAT EXCHANGERS AND PIPING LOCATED NEXT TOSOLAR WATER STORAGE TANK MAY NEED TO BE REMOVED AND REINSTALLED IN ORDER TOFACILITATE THE REPLACEMENT OF THE SOLAR WATER STORAGE TANK. THE EXISTING AIRHANDLER(AH-1) LOCATED IN THE MEZZANINE OF THE MECHANICAL ROOM AND CORRESPONDINGOUTDOOR CORRESPONDING CONDENSING UNIT AND REFRIGERANT PIPING IS TO BE REPLACEDWITH NEW. THE ASSOCIATED DUCTWORK AND REFRIGERANT PIPING ASSOCIATED WITH THEDEMOLISHED DEHUMIDIFICATION UNIT (DH-1) IS TO BE REMOVED. THE EXISTING MAKE-UP AIR UNITLOCATED IN THE EXISTING OUTDOOR MECHANICAL YARD IS TO BE REPLACED WITH NEW. THEEXISTING DEHUMIDICATION UNIT (DH-2), CORRESPONDING DUCTWORK, REFRIGERANT ANDHYDRONIC PIPING, AND OUTDOOR CONDENSING UNIT ARE TO BE REMOVED. THE EXISTINGMECHANICAL YARD ON THE WEST SIDE OF THE BUILDING IS TO BE ENLARGED PER THE STRUCTURALDRAWINGS TO FACILITATE THE INSTALLATION OF A NEW DEHUMIDIFICATION UNIT AND (2)CONDENSING UNITS IN THE YARD. (4) EXISTING WINDOWS ARE TO BE REMOVED AND (4) SIDEWALLEXHAUST FANS ARE TO BE INSTALLED IN THEIR LOCATION WITH DUCTWORK SHOWN. THE EXISTINGMURAL ON THE WEST INTERIOR WALL IS NOT TO BE DISTURBED. THE SUPPLY DUCT IN THE POOLROOM TO BE FABRICAIR COMBI 70 (OR APPROVED EQUAL) FABRIC DUCT AND FABRIC DUCT AIRDISTRIBUTION WITH 10-YEAR WARRANTY WITH MANUFACTURER'S HANGERS AND SUPPORTS. RETURNDUCT TO BE 316 STAINLESS STEEL PER SPECIFICATIONS.

1. SUPPLY DUCT IN THE POOL ROOM TO BE GALVANIZED STEEL DUCTWORK PER SMACNA STANDARDSTH PAINT-GRIP FINISH. DUCT PRESSURE CLASS SHALL BE THE SAME LISTED IN THE SPECIFICATIONS.DUCT TO BE PAINTED TO MATCH EXISTING. SUPPORTS ARE TO BE STAINLESS STEEL PERSPECIFICATIONS. RETURN DUCT TO BE 316 STAINLESS STEEL PER SPECIFICATIONS. AIR DISTRIBUTIONTO BE WHAT IS SHOWN ON DRAWINGS.

2. THE SUPPLY DUCTWORK AND SUPPORTS IN THE POOL ROOM ARE TO BE STAINLESS STEEL PERSPECIFICATIONS. RETURN DUCT TO BE 316 STAINLESS STEEL PER SPECIFICATIONS. AIR DISTRIBUTIONTO BE WHAT IS SHOWN ON DRAWINGS.

DRAWN BY:

CHECKED BY:

PROJECT NO:

DESIGNED BY:

DATE:

CONSULTANT:

SHEET NUMBER:

DESCRIPTIONREV. DATE

REVISIONS:

APPROVED BY:

- -

- -

- -

- -

- -

SEAL:

-

-

-

-

-

THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.

MECHANICAL ENGINEERING CONSULTANT

5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919

FAX: 775.826.1918WEB: CR-ENG.COM

MGB

CL

CLR

CLR

PERMIT SET

ADDENDUM 2 07/29/161

1600

STA

TE R

OU

TE 8

8

T0.1

07/13/2016

103915

CA

RSO

N V

ALL

EY S

WIM

CEN

TER

- H

VAC

REP

LAC

EMEN

T

MIN

DEN

, NV

8942

3

CO

VER

SHEE

T

MECHANICALMP0.1 MECHANICAL ABBREVIATIONS, LEGEND, CALCULATIONS, AND SCHEDULESMP0.2 MECHANICAL SCHEDULESMP1.0 OVERALL MECHANICAL DEMOLITION FLOOR PLANMP1.1 ENLARGED MECHANICAL ROOM DEMOLITION FLOOR PLANMP1.2 ENLARGED MECHANICAL ROOM MEZZANINE DEMOLITION FLOOR PLANMP1.3 ENLARGED MECHANICAL YARD DEMOLITION FLOOR PLANMP2.0 OVERALL MECHANICAL FLOOR PLANMP2.1 ENLARGED MECHANICAL ROOM FLOOR PLANMP2.2 ENLARGED MECHANICAL ROOM MEZZANINE FLOOR PLANMP2.3 ENLARGED MECHANICAL YARD PLANMP2.4 ENLARGED MECHANICAL YARD WEST PLANMP3.1 MECHANICAL ROOM DEMOLITION SECTIONMP3.2 MECHANICAL ROOM SECTIONMP3.3 WEST WALL ELEVATIONMP3.4 SOUTH WALL MECHANICAL ELEVATIONMP4.1 MECHANICAL ROOM DEMOLITION ISOMETRICMP4.2 MECHANICAL ROOM DEMOLITION ENLARGED ISOMETRICMP4.3 BOYS LOCKER ROOM MECHANICAL DEMOLITION ISOMETRICMP4.4 MECHANICAL ROOM ISOMETRICMP4.5 MECHANICAL ROOM ENLARGED ISOMETRICMP4.6 WEST MECHANICAL YARD ISOMETRICMP5.1 DEMOLITION MECHANICAL PIPING DIAGRAMSMP5.2 DOMESTIC HOT WATER AND SOLAR DOMESTIC HOT WATER PIPING DIAGRAMSMP5.3 HOT WATER DEMOLITION PIPING DIAGRAMMP6.1 MECHANICAL DETAILSMP6.2 MECHANICAL UNIT PLANSMP7.1 CONTROL DIAGRAM AND SEQUECNCE OF OPERATIONMP7.2 CONTROL DIAGRAMS

GENERALT0.1 COVER SHEET

STRUCTURALS0.1 STRUCTURAL NOTES & SPECIFICATIONSS1.1 STRUCTURAL PLANSS2.1 STRUCTURAL ELEVATIONS, SECTIONS & DETAILS

ELECTRICALE0.1 LEGENDS & DRAWING SCHEDULEE0.2 EXISTING ONELINE DIAGRAME0.3 NEW ONELINE DIAGRAME0.4 FIXTURE SCHEDULE, ENERGY COMPLIANCE CALCULATIONS, & LIGHTING

CONTROL SCHEDULEE0.5 PANEL SCHEDULESE0.6 MCC SCHEDULESE0.7 DETAILSE1.0 ELECTRICAL SITE PLANE1.1 OVERALL ELECTRICAL PLANE2.1 PARTIAL ELECTRICAL DEMOLITION PLAN - NORTHE2.2 PARTIAL ELECTRICAL DEMOLITION PLAN - SOUTHE2.3 MECHANICAL ROOM DEMOLITION PLAN - MEZZANINEE2.4 MECHANICAL YARD DEMOLITION PLAN - SOUTHE3.1 PARTIAL LIGHTING PLAN - NORTHE4.1 PARTIAL POWER & SIGNAL PLAN - NORTHE4.2 PARTIAL POWER & SIGNAL PLAN -SOUTHE4.3 MECHANICAL ROOM NEW WORK POWER PLAN - MEZZANINEE4.4 MECHANICAL YARD POWER PLAN - SOUTHE4.5 MECHANICAL YARD POWER PLAN - WEST

1

1

1

PROJECT NOTES

SOLAR STORAGE TANK - LOCHINVAR MODEL DOMESTIC HOT WATER STORAGE TANK WITH LOCHINVAR MODEL LTWX10054-4 TUBE BUNDLE. TANK STORAGE CAPACITYSHALL BE 1,400 GALLONS. TANK TO BE HORIZONTAL CONFIGURATION WITH DIMENSIONS OF 60" DIAMETER BY 120" LONG AND CONSTRUCTED OF STEEL AND GLASSLINED. TANK SHALL HAVE INTERNAL BAFFLE FOR MIXING OF WATER. STORAGE TANK OPTIONS: LIFTING LUGS, MANWAY, 125 PSI TEMPERATURE AND PRESSURE RELIEFVALVE, AND TEMPERATURE AND PRESSURE GAUGE. TANK SHALL BE ASME CERTIFIED AND “HLW” STAMPED. SUPPORTS ARE TO BE LOCATED IN EXISTING LOCATIONELECTRICAL REQUIREMENTS: NONE.OPERATING WEIGHT: 15,000 LBS.

2½"

SOLAR RETURN TO PANELS 2½"

PTRV 2"

DRAIN 2"

SOLAR SUPPLY FROM PANELS

2½"

POOL RETURN 2½"

POOL SUPPLY

LOBBY 111

DEFAULTOCCUPANT

DENSITY(PEOPLE/1,000 SF)

PEOPLEOUTDOOR

AIR RATE(CFM EACH)

CALCULATEDNUMBER OF

PEOPLE

CALCULATEDMINIMUMPEOPLE

OUTDOOR AIRREQUIRED

(CFM)

AREAOUTDOOR

AIR RATE(CFM/SF)

CALCULATEDMINIMUM

AREAOUTDOOR

AIR REQUIRED(CFM)

ZONE AIRDISTRIBUTIONEFFECTIVENESS

TOTALMINIMUMOUTDOOR

AIR REQUIRED(CFM)

OFFICE 114

LIFE GUARD 108

FIRST AID 107

WOMENS FOYER 106

STAIRS

WORK ROOM 113

MEZZANINE

ROOM OR AREA NAME

LOBBY

OFFICE

CORRIDOR

SPECTATOR

7.5 0.06 30 25 188 49 0.8 300

5 1 5 8 0.8 20

5 1 5 9 0.8 20

5 1 5 7 0.8 15

- - - 14 0.8 20

- - - 9 0.8 15

7.5 17 128 33 0.8 205

7.5 210 1575 84 0.8 2,075

CALCULATION BASED ON CHAPTER 4 "VENTILATION AIR SUPPLY" OF THE 2012 UMC AND ASHRAE STANDARD 62.1-2010 "OUTDOOR AIR REQUIREMENTS FOR VENTILATION"

5

5

5

-

-

30

150

FLOORAREA(SF)

OCCUPANCY CATEGORY

CORRIDOR

LOBBY

810

120

140

115

230

150

535

1,400

TOTAL OUTSIDE AIR REQUIRED 2,670

OFFICE

OFFICE

0.06

0.06

0.06

0.06

0.06

0.06

0.06

SST-1

PLUMBING FIXTURE SCHEDULE

SYMBOL LEGENDABBREVIATIONS

MECHANICAL PIPE MATERIAL SCHEDULE

MECHANICAL PIPE INSULATION SCHEDULE

OUTSIDE AIR CALCULATION

BACKFLOW PREVENTERBFP

LOW PRESSURE GAS PIPING

EQUIPMENT OR CONDENSATE DRAIN PIPING

G G

D

HOT WATER RETURN

HW

TW TW

HWR

CW

HOT WATER

TEMPERED WATER

COLD WATER

PRESSURE REDUCING VALVEPRV

PIPE BRANCH, TOP CONNECTION

PIPE BRANCH, BOTTOM CONNECTION

CLEANOUT OR WALL CLEANOUT

FLOOR CLEANOUT OR GRADE CLEANOUT

PRESSURE AND TEMPERATURE RELIEF VALVE

FCO,GCO

FS

FD

FLOOR SINK

FLOOR DRAIN

CO,WCO

PTRV

BACKFLOW PREVENTER

GAS PRESSURE REGULATOR

FLOW CONTROL (BALANCE) VALVE

GPR

GC

GV

CV

FCV

BFV

GAS COCK

GATE VALVE

CHECK VALVE

BUTTERFLY VALVE

BFP

BV BALL VALVE

POOL SUPPLY/ RETURN PIPINGPS/R

SOLAR HOT WATER SUPPLY/ RETURN PIPINGSHS/RSHS/R

PS/R

D

CFH CUBIC FEET PER HOUR

FPS FEET PER SECOND

DHW DOMESTIC HOT WATER

DOMESTIC HOT WATER RETURNDHWR

MARK FIXTURE CONNECTION SIZE DESCRIPTION

PIPE ELBOW UP

TOTAL STATIC PRESSURE

WATER COLUMN/GAUGE

TYP

TSP

WC/WG

TYPICAL

GALLONS PER MINUTE

REVOLUTIONS PER MINUTE

TOTAL DYNAMIC HEAD

THOUSAND BRITISH THERMAL UNITS PER HOUR

DRY BULB, WET BULB TEMPERATURE

ENTERING/LEAVING AIR TEMPERATURE

ENTERING/LEAVING WATER TEMPERATURE

CUBIC FEET PER MINUTE

EXTERNAL STATIC PRESSURE

DIFFERENTIAL PRESSURE

MBH

(N)

TDH

RPM

HP

GPM

FPM

NEW

HORSEPOWER

FEET PER MINUTE

EAT/LAT

EWT/LWT

(E)

ESP

CFM

DP

DB,WB

EXISTING

BELOW FINISHED FLOOR/GRADE

REFRIGERANT SUCTION PIPING

POINT OF CONNECTION

ABOVE FINISHED FLOOR/GRADE

POINT OF DISCONNECT

HOT WATER SUPPLY/RETURN PIPING

TEMPERED WATER SUPPLY/RETURN PIPING

REFRIGERANT LIQUID PIPING

BFF/BFG

AFF/AFG

AF

RS RS

POC

AIR FILTER

HWS/HWR

TWS/TWR

RL RL

HWS/R

TWS/R

PRESSURE SENSOR, TEMPERATURE SENSOR WITH WELL

PRESSURE GAUGE, TEMPERATURE GAUGE

FLEXIBLE PIPE CONNECTOR

PIPE BRANCH, TOP CONNECTION

PIPE BRANCH, BOTTOM CONNECTION

TP

P T

M

FLEX

WATER METER

PIPE RISER

PIPE TEE

PIPE DROP

BFV BUTTERFLY VALVE

PIPE CAP OR PLUG

FLOW CONTROL (BALANCE) VALVE

PRESSURE AND TEMPERATURE RELIEF VALVE

TEMPERATURE CONTROL VALVE (2-WAY OR 3-WAY)

PRESSURE REDUCING VALVE

TRIPLE DUTY VALVETDV

ELL

STR

PIPE ELBOW

PIPE ELBOW DOWN

STRAINER

PIPE BREAK

UNION

PRV

TCV

PTRV

GV

FCV

CV

GATE VALVE

CHECK VALVE

SPRING WOUND BYPASS TIMER @ 48" AFF

THERMOSTAT OR TEMPERATURE SENSOR @ 48" AFF

EXHAUST/RETURN GRILLE

SIDE WALL DIFFUSER

MOTORIZED ACTUATOR

BV

SW

EG/RG

BALL VALVE

T TSTAT

B

M

PARALLEL BLADE DAMPER

DUCT SIZE - FIRST SIZE IS SIDE SHOWN

POSITIVE PRESSURE DUCT SECTION - FIRST SIZE IS TOP

NEGATIVE PRESSURE DUCT SECTION - FIRST SIZE IS TOP

OPPOSED BLADE DAMPER

MANUAL VOLUME DAMPER

FLEXIBLE DUCT CONNECTOR

PBD

OBD

MVD

(L) LINED DUCT

FLEXIBLE DUCT

OA

20x10

SA

RA

EA

OUTSIDE AIR

SUPPLY AIR

RETURN AIR

EXHAUST AIR

ABBR.SYMBOL DESCRIPTION

DEMOLISH(D)

DOOR GRILLEDG

R REGISTER

TRANSFER GRILLETG

AIR PRESSURE DROPAPD

BRAKE HORSEPOWERBHP

BRITISH THERMAL UNITS PER HOURBTUH

DIAMETERDIA

ACFM ACTUAL CUBIC FEET PER MINUTE

FLA FULL LOAD AMPERES

FT FOOT

KW KILOWATT

LBS POUNDS

MAXIMUM OVERCURRENT PROTECTIONMOCP

PSI POUNDS PER SQUARE INCH

PSIG POUNDS PER SQUARE INCH GAUGE

V VOLTS

W WATT

IN INCH

SEASONAL ENERGY EFFICIENCY RATIOSEER

ENERGY EFFICIENCY RATIOEER

COEFFICIENT OF PERFORMANCECOP

PUMPP

AMPEREA

MINIMUM EFFICIENCY REPORTING VALUEMERV

MINIMUMMIN

MAX MAXIMUM

HZ HERTZ

EFFICIENCYEFF

DECIBELS, A-WEIGHTED MEASUREMENTdBA

MINIMUM CIRCUIT AMPACITYMCA

RATED LOAD AMPERESRLA

LRA LOCKED ROTOR AMPERES

VALVE FLOW COEFFICIENTCv

NC NOISE CRITERIA

PPM PARTS PER MILLION

FT SQUARE FOOT

FT CUBIC FOOT3

IN SQUARE INCH

IN CUBIC INCH

DOWNDN

GAUGEGA

2

3

2

M WATER METER

POD

DEMOLISH(D)

1. PROVIDE ALL NECESSARY LABOR, MATERIALS, EQUIPMENT, SERVICES AND INSURANCES TO COMPLETETHE HEATING, VENTILATING AND AIR CONDITIONING WORK WITHIN THE FULL INTENT OF THEDRAWINGS AND SPECIFICATIONS CONTAINED HEREON AND TO THE ENTIRE SATISFACTION OF THEENGINEER.

2. CONTRACTOR SHALL PROVIDE ALL PERMITS AND FEES AS REQUIRED FOR THE WORK.

3. WORK SHALL BE IN ACCORDANCE WITH 2012 IBC, 2012 IFC, 2012 IECC, 2012 UMC, 2012 UPC,NFPA, NEC, AND ALL APPLICABLE CODES, RULES AND LOCAL REQUIREMENTS.

4. CONTRACTOR SHALL CHECK AND VERIFY ALL SIZES, DIMENSIONS, AND CONDITIONS BEFORESTARTING ANY WORK. ANY DEVIATIONS OR PROBLEMS SHALL BE TRANSMITTED TO THE ENGINEERFOR REVIEW.

5. SUBMISSION OF A BID PROPOSAL, DIRECTLY OR INDIRECTLY BY THE CONTRACTOR FOR THIS WORKSHALL IMPLY THAT THE BIDDER HAS EXAMINED THE JOB SITE AND UNDERSTANDS THE CONDITIONSTHAT MAY AFFECT THE PERFORMANCE OF THE WORK. CONTRACTOR IS EXPECTED TO CONTACT THEENGINEER FOR ANY PARTICULAR PROBLEMS AND CLEAR UP ANY POSSIBLE MISUNDERSTANDINGBEFORE BID IS SUBMITTED. NO CONSIDERATION OR ALLOWANCE WILL BE GRANTED FOR ANYALLEGED MISUNDERSTANDING OF THE CONTRACT DOCUMENTS AND THE WORK TO BEACCOMPLISHED.

6. THE CONTRACTOR SHALL PROVIDE ALL SLEEVES, OPENINGS, CUTTING, AND PATCHING NECESSARYFOR THE INSTALLATION OF THE WORK. CUTTING AND PATCHING SHALL BE DONE BY WORKMENSKILLED IN THE TRADES REQUIRED.

7. THE CONTRACTOR SHALL PROVIDE ALL RIGGING, HANDLING OF MATERIALS AND EQUIPMENT, ANDTHE NECESSARY PROTECTION FOR MATERIALS AND EQUIPMENT.

8. TOOLS AND EQUIPMENT WILL BE STORED IN OWNER DESIGNATED AREAS ONLY.

9. THE CONTRACTOR WILL PROTECT THE WORK AND MATERIAL AGAINST DIRT, THEFT, INJURY, ORDAMAGE UNTIL ACCEPTED BY OWNER. ALL WORK SHALL BE TURNED OVER TO OWNER CLEAN ANDIN PERFECT CONDITION, READY FOR SATISFACTORY SERVICE.

10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE DONE TO THE EXISTING BUILDING,PIPING OR EQUIPMENT.

11. PROVIDE 96 HOUR ADVANCE WRITTEN NOTICE TO THE CARSON VALLEY SWIM CENTER BOARD FORSERVICE SHUT DOWNS. ALTERATIONS TO EXISTING SERVICE PIPING SHALL BE MADE AT TIMES THATWILL LEAST AFFECT THE OPERATION OF THE FACILITY.

12. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING CEILING TILES FOR PIPE DEMOLITION,REPLACING CEILING TILES AFTER NEW PIPE INSTALLATION, AND REPLACING ANY DAMAGED CEILINGTILES CAUSED BY CONSTRUCTION. CONTRACTOR SHALL DETERMINE EXTENT OF CEILING TILESREMOVAL PRIOR TO BID.

13. PATCH AND MATCH COLOR OF ANY OPENING OR DISTURBANCE OF EXISTING STRUCTURE.

SYSTEM TAG SIZE (IN) MATERIAL FITTINGS

1. SEE SPECIFICATION FOR ADDITIONAL INFORMATION REGARDING PIPE MATERIAL.

EQUIPMENT DRAIN ALLD WROT COPPER/SOLDER JOINTS

ALLREFRIGERANT LIQUID & SUCTION RL/RS ASTM B280, COPPER ASME B16.22 WROT COPPER/BRAZED JOINTS

SCHEDULE/TYPE

M

ACR

HOT WATER SUPPLY / RETURN HWS/HWR

ASTM B88, COPPER

3 AND LARGER

2 TO 21/2

ASTM A53, STEEL ASME B16.9 STEEL/WELDED JOINTS

11/2 AND SMALLER ASTM B88, COPPER L

40

ASME B16.22 WROT COPPER/SOLDER JOINTS

ASTM B88, COPPER L ASME B16.22 WROT COPPER/BRAZED JOINTSHOT WATER SUPPLY / RETURN

HOT WATER SUPPLY / RETURN

HWS/HWR

HWS/HWR

GENERAL NOTES:

SYSTEM TAG SIZE (IN) THICKNESS (IN)

1. SEE SPECIFICATION FOR ADDITIONAL INFORMATION REGARDING PIPE INSULATION.

2. PROVIDE PIPE INSULATION JACKET PER SPECIFICATIONS. ALL EXTERIOR PIPE INSULATION TO BE JACKETED.

3. POLYISOCYANURATE INSULATED PIPING IS TO BE COVERED WITH PVC JACKET.

LOCATION TYPE

REFRIGERANT LIQUID & SUCTION INTERIOR

EXTERIORALL

ALL 1

2

RL/RS

REFRIGERANT LIQUID & SUCTION RL/RS

HOT WATER SUPPLY / RETURN HWS/HWR

11/2 AND LARGER

1/2-11/4 INTERIOR FIBERGLASS 1½

2

ALL 2

FLEXIBLE ELASTOMERIC

POLYISOCYANURATE FOAM

INTERIOR

EXTERIOR

FIBERGLASSHOT WATER SUPPLY / RETURN HWS/HWR

HOT WATER SUPPLY / RETURN HWS/HWR

FLEXIBLE ELASTOMERIC

GENERAL NOTES:

POOL SUPPLY / RETURN PS/PR

2 AND LARGER

11/2 AND SMALLER ASTM B88, COPPER L ASME B16.22 WROT COPPER/SOLDER JOINTS

ASTM B88, COPPER L ASME B16.22 WROT COPPER/BRAZED JOINTSPOOL SUPPLY / RETURN PS/PR

SOLAR SUPPLY / RETURN SHS/SHR

3 AND LARGER

2 TO 21/2

ASTM A53, STEEL ASME B16.9 STEEL/WELDED JOINTS

11/2 AND SMALLER ASTM B88, COPPER L

40

ASME B16.22 WROT COPPER/SOLDER JOINTS

ASTM B88, COPPER L ASME B16.22 WROT COPPER/SOLDER JOINTSSOLAR SUPPLY / RETURN

SOLAR SUPPLY / RETURN

SHS/SHR

SHS/SHR

11/2 AND LARGER 2

ALL 2POLYISOCYANURATE FOAM

INTERIOR

EXTERIOR

FIBERGLASSPOOL HEATING WATER SUPPLY / RETURN PS/PR

POOL HEATING WATER SUPPLY / RETURN PS/PR

2HOT WATER SUPPLY / RETURN (INSIDE POOL ROOM) HWS/HWR

POOL HEATING WATER SUPPLY / RETURN (INSIDE POOL ROOM)

ALL FLEXIBLE ELASTOMERICINTERIOR

ALLPS/PR 2INTERIOR FLEXIBLE ELASTOMERIC

ALL 2INTERIOR FIBERGLASSSOLAR HEATING WATER SUPPLY / RETURN SHS/SHR

HOT GAS BYPASSHGBP

DRAWN BY:

CHECKED BY:

PROJECT NO:

DESIGNED BY:

DATE:

CONSULTANT:

SHEET NUMBER:

DESCRIPTIONREV. DATE

REVISIONS:

APPROVED BY:

- -

- -

- -

- -

- -

SEAL:

-

-

-

-

-

THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.

MECHANICAL ENGINEERING CONSULTANT

5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919

FAX: 775.826.1918WEB: CR-ENG.COM

MGB

CL

CLR

CLR

PERMIT SET

ADDENDUM 2 07/29/161

1600

STA

TE R

OU

TE 8

8

MP0.1

07/13/2016

103915

CA

RSO

N V

ALL

EY S

WIM

CEN

TER

- H

VAC

REP

LAC

EMEN

T

MIN

DEN

, NV

8942

3

MEC

HA

NIC

AL

ABB

REVI

ATI

ON

S, L

EGEN

D, C

ALC

ULA

TIO

NS,

AN

D S

CH

EDU

LES

1

LOUVER SCHEDULE

PLUMBING FIXTURE AND EQUIPMENT SCHEDULE

6034603ACH550ABBEF-1EF1

OPTIONSHZPHASEVOLTSHP

ELECTRICALMODELMANUFACTURER

A,B,C,D

VFD~

EQUIPMENT SERVED

6034603ACH550ABBEF-2EF2 A,B,C,D

6034603ACH550ABBEF-3EF3 A,B,C,D

6034603ACH550ABBEF-4EF4 A,B,C,D

OPERATINGWEIGHT

(LBS)

AIRFLOW(ACFM)

ESP(IN WC)

MOTOR(HP)

WHEELSPEED(RPM)

SOUND POWER(OCTAVES 1-8)

1. ALUMINUM HOUSING

2. ALUMINUM WHEEL

3. ADJUSTABLE MOTOR PULLEY

1 POOL GREENHECK CWB-300-20 300 460/3/60 4.8 SIDEWALL BELT 10,750 0.5 750 3 82,89,86,76,74,71,64,59 19.1 82 70 A,B,C,D

2

3

4

UNIT OPTIONSdBALwASONES

SOUND PERFORMANCE

DRIVE TYPEFAN TYPEFLAVOLTS/Ø/HzMODELMANUFACTURERSERVICE

UNIT GENERAL DATA ELECTRICAL FAN PERFORMANCE

GENERAL NOTES: UNIT FEATURES: UNIT OPTIONS:

TAG TYPE FACE FRAME MODEL REMARKSMANUF.

CD-1 AIR CONCEPTS SUPPLY PLAQUE DUCT SPD

RG-1 TITUS RETURN EGG CRATE DUCT 50F

SG-1 DRUM DL-SSAIR CONCEPTS SUPPLY DUCT

GENERAL NOTES: OPTIONS

1. ALL DRIVES TO BE SUPPLIED BY CONTROLS CONTRACTOR,WIRED BY ELECTRICAL CONTRACTOR. CONTROLSCONTRACTOR TO COORDINATE WITH EQUIPMENTMANUFACTURER FOR INSTALLATION AND START-UPREQUIREMENTS.

2. COORDINATE EXACT LOCATION WITH ELECTRICAL DRAWINGS.

POOL GREENHECK CWB-300-20 300 460/3/60 4.8 SIDEWALL BELT 0.5 3 82,89,86,76,74,71,64,59 19.1 82 70 A,B,C,D

POOL GREENHECK CWB-300-20 300 460/3/60 4.8 SIDEWALL BELT 0.5 3 82,89,86,76,74,71,64,59 19.1 82 70 A,B,C,D

POOL GREENHECK CWB-300-20 300 460/3/60 4.8 SIDEWALL BELT 0.5 3 82,89,86,76,74,71,64,59 19.1 82 70 A,B,C,D

SERVICE MANUFACTURER MODELOPERATING

WEIGHT(LBS)

UNIT GENERAL DATA ELECTRICAL

VOLTS/Ø/Hz MCA MOCP

1A 5,200 460/3/60 24 25DH-1 DECTRON KVG427

COOLING PERFORMANCE

TOTAL SENSIBLE

-- 733 733

CAPACITY (MBH)AMBIENTDESIGN

TEMPERATURE(°F DB/WB)

105/61

UNIT OPTIONS

A,B,F

GENERAL NOTES: UNIT FEATURES: UNIT OPTIONS:

1. ALL CAPACITIES SHOWN FOR 4,500 FEET ELEVATION.

2. ALL ELECTRICAL COMPONENTS SHALL BE UL OR ETL LISTED.

1. R410A REFRIGERANT SYSTEM.

2. LOUVERED HAIL GUARDS

A. LOW AMBIENT CONTROL WITH CONDENSER FAN SPEED CONTROL

B. REFRIGERATION SERVICE VALVE

C. 115V TRANSFORMER

D. PHASE FAILURE

E. HOT GAS BYPASS TEE

F. 4 STAGE COOLING

2

MIN EFFICIENCY

SEER EER

11.4

AH-1 DAIKIN RCS025D 2,000 50 60 -- 276 276 A,B,C,D,E,F11460/3/60

GENERAL NOTES: OPTIONS:

CAPACITY(MBH)

AIRFLOW(CFM)

MAXAPD

(IN WC)

EAT(°F)

LAT(°F)

FLUIDFLOW(GPM)

MAXWPD

(FT WC)

LWT(°F)

EWT(°F)

1,507 43,000 10 76 108 160 15 180 160 2 8

ROWS FINS/IN

HOT WATER HEATING PERFORMANCE

FLUID

40% GLYCOL

CIRCUITS

44

EAT(°F db/wb)

LAT(°F db)

DX COOLING

CAPACITY (MBH)

SENSIBLETOTAL

1,3041,885 100/61 75

ROOMTEMPERATURE

(°F db)

DESIGN CONDITION

86

RELATIVEHUMIDITY(%)

50

SUMMERAMBIENT DESIGN

(°F db/wb)

95/61

WINTER AMBIENTDESIGN

(°F db/wb)

0/0

DEHUMIDIFICATIONLOAD (LB/HR)

460

OPERATINGWEIGHT

(LBS)

SIZE(DIA)

MAXAIRFLOW(ACFM)

MIN OAAIRFLOW(ACFM)

ESP(IN WC)

TSP(IN WC)

MOTOR(HP)

CAPACITY(MBH)

AIRFLOW(CFM)

MAXAPD

(IN WC)

EAT(°F)

LAT(°F)

FLUIDFLOW(GPM)

MAXWPD

(FT WC)

LWT(°F)

EWT(°F)

CAPACITY (MBH)AIRFLOW

(CFM)

MAXAPD

(IN WC)

LAT(°F)

UNIT OPTIONS

1. ALL CAPACITIES SHOWN FOR 4,500 FEET ELEVATION.

2. ALL ELECTRICAL COMPONENTS SHALL BE UL OR ETL LISTED.

3. HEATING COIL TO BE SIZED FOR 40% PROPYLENE GLYCOL FLUID.

1. PRE FILTERS: 2" PLEATED, MERV 832 QTY - 20x20x2500 FPM FACE VELOCITYAPD: 0.50"WC (DIRTY)

2. PRE FILTERS: 2" PLEATED, MERV 83 QTY - 16x20x2500 FPM FACE VELOCITYAPD: 0.50"WC (DIRTY)

A. UNIT SHALL COME IN 3 SPLITS

B. FACTORY WIRED AND MOUNTED VFD

C. LOW LEAKAGE OUTSIDE AIR AND RETURN AIR DAMPERS

D. PREMIUM EFFICIENT MOTOR

E. FILTER GAUGE

F. DUCT MOUNTED SMOKE DETECTOR

EAT(°F DB/WB)

FACEVELOCITY

(FPM)

FACESIZE(SF)

FACEVELOCITY

(FPM)

FACESIZE(SF)

1 LOBBY AREA DAIKIN CAH017GDGC 4,000 460/3/60 17.9 25 1 PLENUM 8,00027 2,675 2.5 4.1 10 374 8,000 500 16 2 40 95 37 5 180 160 2 10 357 272 12,000 493 24.3 5 80 / 61 55 4 10 A,B,C,D,E,F

SERVICE MANUFACTURER MODEL VOLTS/Ø/Hz FLA MOCP

ELECTRICALUNIT GENERAL DATA

TYPEQTY

SUPPLY FAN

ROWS FINS/INTOTAL SENSIBLE

ROWS FINS/IN

DIRECT EXPANSION COOLING PERFORMANCEHOT WATER HEATING PERFORMANCE

UNIT OPTIONS:

AIR FILTER DATA:

10,750

10,750

10,750

750

750

750

EG-1 TITUS EXHAUST SINGLE DEFLECTION DUCT 350RL-SS

UNIT OPTIONS:GENERAL NOTES:

1B 4,000 460/3/60 18 20DH-1 DECTRON KVG345 -- 571 571 A,B,F11.4

1. ALL CAPACITIES SHOWN FOR 4,500 FEET ELEVATION.

2. ALL ELECTRICAL COMPONENTS SHALL BE UL OR ETL LISTED.

3. HEATING COIL TO BE SIZED FOR 40% PROPYLENE GLYCOL FLUID.

1. PRE FILTERS: 4" PLEATED, MERV 133 QTY - 24x24x4500 FPM FACE VELOCITYAPD: 1.00"WC (DIRTY)

2. PRE FILTERS: 4" PLEATED, MERV 133 QTY - 12x24x4500 FPM FACE VELOCITYAPD: 1.00"WC (DIRTY)

UNIT OPTIONS:

AIR FILTER DATA:

UNIT OPTIONS:GENERAL NOTES:

105/61

105/61

F. BLYGOLD, ANTI MICROBIAL COIL COATING

G. BACNET MICROPROCESSOR CONTROLLER

H. DIRTY FILTER SENSOR

I. RETURN AIR TEMPERATURE SENSOR

J. RETURN AIR HUMIDITY SENSOR

K. OUTDOOR TEMPERATURE SENSOR

L. FACTORY MOUNTED AND WIRED NON-FUSED DISCONNECT

M. MANUFACTURER'S CONTROLS FOR REMOTE PURGE (FIELD WIRED ANDCONFIGURED)

N. DUCT MOUNTED SMOKE DETECTOR

O. HOT GAS BYPASS

A. PROVIDE WITH 5% INPUT LINE REACTORS

B. PROVIDE AND INSTALL BACNET COMMUNICATION CARDS

C. MANUFACTURER'S CIRCUIT BREAKER TYPE DISCONNECT

D. MANUFACTURER'S NEMA 3R ENCLOSURE, FOR OUTDOORINSTALLATION

A. BACKDRAFT DAMPER.

B. PREMIUM EFFICIENT MOTOR SUITABLE FOR USE WITH VARIABLEFREQUENCY DRIVE (VFD).

C. STAINLESS STEEL BIRD SCREEN.

D. HI-PRO POLYSTER COATING ON ALL INTERNAL PARTS OF THE FANWHICH COMES IN CONTACT OF THE AIR STREAM.

1. ALL CAPACITIES LISTED ARE AT 4,500 FEET ELEVATION

2. ALL FANS SHALL BEAR THE AMCA CERTIFICATED RATING SEAL FOR SOUND ANDAIR PERFORMANCE.

3. FAN SHALL BE UL 705 LISTED

4. WHEELS SHALL BE STATICALLY AND DYNAMICALLY BALANCED IN ACCORDANCETO AMCA STANDARD 204-05.

5. LwA - A WEIGHTED SOUND DATA BASED ON ANSI S1.4

6. dBA - A WEIGHTED SOUND PRESSURE BASED ON 11.5 dB ATTENUATION PEROCTAVE BAND AT 5 FT - NOT LICENSED AMCA INTERNATIONAL

7. SONES CALCULATED USING AMCA 301 AT 5FT

1. OUTSIDE AIR DAMPER. DAMPERS SHALL BE SIZED FOR NO GREATER THAN 0.15"WC PRESSURE DROP AND 800 FPM VELOCITY THROUGH THE FREE AREA.

2. PREMIUM EFFICIENCY FAN MOTOR.

3. FACTORY INSTALLED AIR VENTS AT THE TOP OF EACH COIL.

A. SUPPLY FANS CONTROLLED BY FACTORY WIRED AND MOUNTED VARIABLEFREQUENCY DRIVES (VFD)

B. FACTORY WIRED, PIPED, AND TESTED 3-WAY MODULATING HEATING HOTWATER CONTROL VALVE

C. DOUBLE WALL CONSTRUCTION

D. 2" INSULATION

E. EPOXY COATED FAN

L

SIZE TDH(FT)

IMP. DIA.(IN)

FLUIDFLOW(GPM)

MINEFF.(%)

SUCTION(IN)

UNIT OPTIONDISCH.(IN)

TRIPLE DUTYVALVE MODEL

TRIPLE DUTYVALVE SIZE

(IN)

TRIPLE DUTYPRESS DROP

(PSI)

SUCTIONDIFFUSERMODEL

FRAME SIZEMOTOR

INFORMATION FOR INLINE POOL PUMPS SCHEDULED ABOVE

A. TEFC PREMIUM EFFICIENCY MOTOR

OPTIONS FOR PUMPS SCHEDULED ABOVE

OPERATINGWEIGHT (LBS)

PP-1 (E) TRAINING POOL PENTAIR WHISPERFLO-XFK-8 150 2AAB INLINE 40 60 POOL 7 60 2" 2" N/A N/A N/A N/A N/A 2 460/3/60 1,750 A

RPMV/Ph/HzHPTYPEMODELMANUFACTURERSERVICE

UNIT GENERAL DATA

PP-2 (E) INDOOR MAIN POOL 150 2AAB INLINE 120 60 POOL 7 60 3" 3" N/A N/A N/A N/A N/A 5 1,750PENTAIR WHISPERFLO-XFK-20 460/3/60 A

THRU

GENERAL

1. DESCRIPTION: MAINTENANCE FREE, CLOSE COUPLED, CENTRIFUGAL PUMP DESIGNEDFOR USE WITH POOL WATER.

2. PUMP TO BE NSF-50 COMPLIANT

PUMP

1. PUMP SHALL BE CLASS 30 CAST IRON WITH UNION CONNECTIONS.

2. IMPELLER SHALL BE PLASTIC

MOTOR

1. PREMIUM EFFICIENCY.

2. MOTOR SHALL MEET NEMA SPECIFICATIONS AND BE NON-OVERLOADING FOR ENTIREPUMP CURVE.

HEAT TRACERAYCHEM MODEL 5XL2-CR HEATING CABLES, COMPONENTS, AND CONTROLS TO PREVENTPIPES FROM FREEZING. HEAT TRACE SHALL BE CONSTRUCTED OF (2) 16 AWG NICKEL-COPPERBUS WIRES EMBEDDED IN A SELF REGULATING POLYMER CORE. CABLE SHALL BE COVERED BYA POLYOLEFIN DIELECTRIC STANDARD JACKET. TOTAL LENGTH OF NEW HEAT TRACE SHALL BE200 FT. PROVIDE HEAT TRACE WITH 120V POWER KIT, AMBIENT TEMPERATURE SENSOR,GROUND FAULT DEVICE, END SEAL KITS, SPLICE KITS, LABEL KIT, AND TEE KITS AS REQUIRED.HEAT TRACE TO PROVIDE AUTOMATIC 24-HOUR FREEZE PROTECTION. ELEC.: 120V/1Ø/60Hz(5W PER 1 FOOT) = 1,000 WATTS

3. BUILT IN BASKET STRAINER

1. OUTSIDE AIR DAMPER. DAMPERS SHALL BE SIZED FOR NO GREATER THAN 0.15"WC PRESSURE DROP AND 800 FPM VELOCITY THROUGH THE FREE AREA.

2. PREMIUM EFFICIENCY FAN MOTOR.

3. FACTORY INSTALLED AIR VENTS AT THE TOP OF EACH COIL.

DEHUMIDIFICATION UNIT SCHEDULE

MAKE-UP AIR UNIT SCHEDULE

EQUIPMENT SCHEDULE

EXHAUST FAN SCHEDULE

AIR DISTRIBUTION SCHEDULE

VFD SCHEDULE

CONDENSING UNIT SCHEDULE

AIR HANDLER SCHEDULE

PUMP SCHEDULE

DH-1 RETURN1

GENERAL NOTES: OPTIONS:

A,B43,00041.74 0.05

PRESSUREDROP (IN.

W.C.)

FREE AREA(SQ. FT.)

AIRFLOW(CFM) OPTIONS

WIDTH(IN)

HEIGHT(IN)

FACE SIZE

MODELMANUFACTURERSERVICE

RETURN AIR

FUNCTION

1,030

FACEVELOCITY

(FPM)

1,100

FACEVELOCITY

FOR WATERPENETRATION

(FPM)

GREENHECK ESD-403 84 132

1. 4" DEEP DRAINABLE BLADE LOUVER

2. LOUVER TO BE CONSTRUCTED OF MINIMUM0.081 THICK EXTRUDED ALUMINUM FRAME WITHMINIMUM 0.081 EXTRUDED ALUMINUM BLADE

A. CHANNEL FRAME

B. HI-PRO POLYSTER FINISH, PROVIDE OWNERWITH COLOR SAMPLES WITH SUBMITTALS

DRAIN 3/4"

DRAIN 3/4"

3/4"COLD WATER

EF~

NECK DIA.DIFFUSER

AIRFLOWTHROW

8-24x24 CD-1

200 CFM 4W

12x12 CD-1

200 CFM 4W

RECTANGULAR NECK:

DIFFUSER

THROWAIRFLOW

NECK DIA.

NOTE:

ROUND NECK:

FRAME SIZE

COLOR SHALL BE OFF-WHITE WITHINTERIOR FLAT BLACK UNLESS NOTEDOTHERWISE.

SLOT WIDTH

(V)ERT. OR (H)ORIZ. THROW(WALL SIDE, ROOM SIDE)

200 CFM (V,H)

48 - 2 - 1 LSD-1

# OF SLOTS

DIFFUSER

ADJUSTMENT

LENGTH

AIRFLOW

LINEAR SLOT:

CU~

DH~ SERVICE MANUFACTURER MODEL

OPERATINGWEIGHT (LBS)

ELECTRICAL

VOLTS/Ø/HZ MCA MOCP

SUPPLYAIRFLOW

(CFM)

WHEELSPEED(RPM) SOUND POWER LEVEL

(OCTAVES 1-8)

UNIT OPTIONS

SUPPLY AIREXTERNAL

STATICPRESSURE

(in wc)

460/3/60 A,B,C,D,E,F,G,H,I,J,K,L,M,N

UNIT GENERAL DATA

1 INDOOR POOL DECTRON RS-404/484C 30,000 262 300 43,000 1.50 1,780 92,89,96,93,92,87,82,78

MUA~

1. ALL CAPACITIES SHOWN FOR 4,500 FEET ELEVATION

2. UNIT SHALL BE ETL OR UL LISTED TO ANSI 283.4

3. MOTORS SHALL MEET EPACT AND NEMA 1210 EFFICIENCIES

1. G90 GALVANIZED STEEL CONSTRUCTION WITH BAKED ENAMEL PAINT

STANDARD FEATURES:

SERVICE MANUFACTURER MODEL OPERATINGWEIGHT (LBS)

ELECTRICAL

VOLTS/Ø/HZ HP MCA MOCP

AIRFLOW(CFM)

WHEELSPEED(RPM) HEATING TYPE GAS TYPE ENTERING

AIR (°F)LEAVINGAIR (°F)

MAXINPUT(MBH)

OUTPUT(MBH)

THERMALEFFICIENCY

(%)

HEATING PERFORMANCE

COOLINGTYPE

ENTERINGAIR (°F)

LEAVINGAIR (°F)

EVAPEFF.(%)

MEDIATYPE

COOLING PERFORMANCE SOUND CRITERIA (MAXIMUM ALLOWABLE RATINGS)

SOUND POWER LEVEL(OCTAVES 1-8)

SONESUNIT OPTIONS

82.065.0100 GLASSdek800 103 400 272

EXTERNALSTATIC

PRESSURE(in wc)

460/3/60 A,B,C,D,E,F,G,H,I,J,K,L,M

UNIT GENERAL DATA

1 SLIDE TOWER GREENHECK IGX-115-H22 1,600 0.5 5.1 15 3,000 0.50 674 INDIRECT NATURAL EVAP 73,81,80,85,82,73,73,76 26

RETURN AIREXTERNAL

STATICPRESSURE

(in wc)

0.50

OUTSIDEAIRFLOW

(CFM)

4,500

AH~

VOLTS/Ø/HZ MCA MOCP

120/1/60 10 15

I. STAINLESS STEEL HEAT EXCHANGER

J. DUCT MOUNTED SMOKE DETECTOR.SYSTEM SENSOR MODEL D4120W (ORAPPROVED EQUAL). RATED FOR OUTDOORUSE WITH EXTRA SET OF CONTACTS FORCONNECTING TO (E) FIRE ALARM CONTROLPANEL.

L. 12" GLASSDEK EVAPORATIVE COOLINGMEDIA

M. CONTROLS CONTRACTOR TO PROVIDEAUTO DRAIN AND FLUSH EVAPORATIVECONTROLS.

SOUND CRITERIA (MAXIMUMALLOWABLE RATINGS)

E. MOTORIZED INLET AIR DAMPER

F. 4 TO 1 ELECTRONIC FURNACE MODULATION

G. PREMIUM EFFICIENCY SUPPLY FAN MOTOR

H. 2-10Vdc FURNACE TEMPERATURE CONTROL.DISCHARGE OVERRIDE BY CONTROLSCONTRACTOR

A. 24" HIGH SEISMIC CURB FOR MOUNTINGON CONCRETE SLAB

B. NEOPRENE BLOWER VIBRATION ISOLATION

C. INLET AIR TEMPERATURE SENSOR

D. FREEZESTAT

TYPE#

HT1

HT6

MARK FIXTURE CONNECTION SIZE DESCRIPTION

DRAIN VALVE - HONEYWELL MODEL #VBN2BK3S0CM 2-WAY FLOW CONTROL VALVE AND ACTUATOR (PROVIDED BY CONTROLSCONTRACTOR, INSTALLED BY CONTRACTOR). VALVE SHALL BE 3/4'' WITH FPT CONNECTIONS AND STAINLESS STEEL BALL WITHREINFORCED TEFLON SEATS. VALVE ACTUATOR SHALL BE 24 VAC WITH SPRING RETURN. PROVIDE AND INSTALLMANUFACTURER'S NEMA 3R ENCLOSURE FOR OUTDOOR USE.

DRAIN VALVE - HONEYWELL MODEL #VBN2BK3S0CM 2-WAY FLOW CONTROL VALVE AND ACTUATOR (PROVIDED BY CONTROLSCONTRACTOR, INSTALLED BY CONTRACTOR). VALVE SHALL BE 3/4'' WITH FPT CONNECTIONS AND STAINLESS STEEL BALL WITHREINFORCED TEFLON SEATS. VALVE ACTUATOR SHALL BE 24 VAC WITH SPRING RETURN. PROVIDE AND INSTALLMANUFACTURER'S NEMA 3R ENCLOSURE FOR OUTDOOR USE.

FILL VALVE - HONEYWELL MODEL #VBN2BK3S0CM 2-WAY FLOW CONTROL VALVE AND ACTUATOR (PROVIDED BY CONTROLSCONTRACTOR, INSTALLED BY CONTRACTOR). VALVE SHALL BE 3/4'' WITH FPT CONNECTIONS AND STAINLESS STEEL BALL WITHREINFORCED TEFLON SEATS. VALVE ACTUATOR SHALL BE 24 VAC WITH SPRING RETURN. PROVIDE AND INSTALLMANUFACTURER'S NEMA 3R ENCLOSURE FOR OUTDOOR USE.

DV-1

DV-2

FV-1

DRAWN BY:

CHECKED BY:

PROJECT NO:

DESIGNED BY:

DATE:

CONSULTANT:

SHEET NUMBER:

DESCRIPTIONREV. DATE

REVISIONS:

APPROVED BY:

- -

- -

- -

- -

- -

SEAL:

-

-

-

-

-

THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.

MECHANICAL ENGINEERING CONSULTANT

5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919

FAX: 775.826.1918WEB: CR-ENG.COM

MGB

CL

CLR

CLR

PERMIT SET

ADDENDUM 2 07/29/161

1600

STA

TE R

OU

TE 8

8

MP0.2

07/13/2016

103915

CA

RSO

N V

ALL

EY S

WIM

CEN

TER

- H

VAC

REP

LAC

EMEN

T

MIN

DEN

, NV

8942

3

MEC

HA

NIC

AL

SCH

EDU

LES

1

SCHEDULES HAVE BEEN REVISED

EXISTING EXERCISE POOL

MODIFIED TRAINING POOL

EXISTING INDOOR POOL

RECEIVINGPOOL

EXISTING POOL

MP1.1A

MP1.21

MP1.3A

NO WORK INTHIS AREA

(D) 4'x4' WINDOWS INCLUDINGMULLION AND FRAMES FORINSTALLATION OF SIDEWALLEXHAUST FAN (TYP-4)

(E) 36"Ø SA

(E)

32"

Ø S

A

(E) 32"Ø SA

(E)

28"

Ø S

A (

E) 2

4"Ø

SA

(E) 36"x36" SA

(E) 36"x36" RA

(E) DEHUMIDIFICATION UNIT

(E) CONDENSING UNIT

(D) 24"Ø SA (D) 22"Ø SA (D) 18"Ø SA

(D) 2

8"Ø

SA

(D) 3

0"Ø

SA

(D) 3

2"Ø

SA

(D) 3

4"Ø

SA

(D) 26"Ø SA

(D) 34"Ø SA

(E) 34"Ø SA

(D) 24"Ø SA

(D) 12"Ø SA

(D) 28"Ø SA (D) 22"Ø SA

CONDENSING UNITREMOVED AS PART OFPHASE 1. (D) ASSOCIATEDREFRIGERANT PIPING.

(D) CMU WALL, SEESTRUCTURAL DRAWINGS

(D) REFRIGERANT PIPING

MEZZANINE

FIRST FLOOR

(D) REFRIGERANT PIPING

(D) UNDERGROUNDREFRIGERANT PIPING

(D) UNDERGROUNDREFRIGERANT PIPING

(E) HWS, HWR & PS, PR

DEMO DUCTWORK AND ALLASSOCIATED SUPPORTS

DEMO DUCTWORK AND ALLASSOCIATED SUPPORTS

DEMO DUCTWORK AND ALLASSOCIATED SUPPORTS

(E) PVC SLEEVE

(D) CONDENSING UNITCOMPLETE INCLUDINGSUPPORTS, ELECTRICAL,AND REFRIGERANTPIPING.

(D) TREE COMPLETE INCLUDINGROOTS (TYP-2)

(D) SHED RELOCATED PEROWNERS REQUEST (TYP-2)

DRAWN BY:

CHECKED BY:

PROJECT NO:

DESIGNED BY:

DATE:

CONSULTANT:

SHEET NUMBER:

DESCRIPTIONREV. DATE

REVISIONS:

APPROVED BY:

- -

- -

- -

- -

- -

SEAL:

-

-

-

-

-

THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.

MECHANICAL ENGINEERING CONSULTANT

5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919

FAX: 775.826.1918WEB: CR-ENG.COM

MGB

CL

CLR

CLR

PERMIT SET

ADDENDUM 2 07/29/161

1600

STA

TE R

OU

TE 8

8

MP1.0

07/13/2016

103915

CA

RSO

N V

ALL

EY S

WIM

CEN

TER

- H

VAC

REP

LAC

EMEN

T

MIN

DEN

, NV

8942

3

OVE

RALL

MEC

HA

NIC

AL

DEM

OLI

TIO

N F

LOO

R PL

AN

SCALE: 1/8" = 1'-0" MP1.0

AOVERALL MECHANICAL DEMOLITION FLOOR PLAN

1

2 ADDENDUM 2 7/28/16

1

(E) BOILER (B-1)

(E) BOILER (B-2)

(E) BOILER (B-3)

(E) 3/4"CW

(E) 3/4"HWR

(E) 3/4"HWS

(E) 1"HWS

(E) 1"HWR

(E) 1 1/2"CW

(E) 3"HWS

(E) 3"HWS

(E) 3"HWS

(E) 2"G

(E) 4"G

(E) 3"HWR

(E) 5"HWS

(E) 2"PS

(E) 2"PR

(E) 1 1/2"CW

(E) 4"HWR

(E) 4"HWS

(E) 2 1/2"HWS

(E) 2 1/2"HWR

(E) 2"D

(E) 1"HWR

(E) 1"HWS

(E) 1"SHS

(E) 1 1/2"CW

(E) 2"SHR

(E) 2 1/2"CW

(E) 1 1/2"PS

(E) 3/4"CW

(E) 1 1/4"CW

(E) 3"HWR

(E) 4"HWS

(E) 5"HWR

(E) PLENUM

(E) POOL FILTER(E) POOL FILTER

(E) POOL FILTER

(E) FLOOR DRAIN (TYP-2)

(E) POOL CHARCOALFILTER (TYP-5)

(E) FLUE(E) FLUE

(E) FLUE

(E) COMBUSTIONAIR (TYP-3)

(E) AIRSEPARATOR

(E) POOLFILTER

(E) POOL FILTER

(E) HEATING HOTWATER EXPANSIONTANK

(E) HEATING HOTWATER PUMP

(E) HEATING HOTWATER MAKEUP

(E) 1"SHS

(E) HEATING HOTWATER EXPANSIONTANK

(E) 96x48LOUVER

(E) 1 1/2"PR (E) 4"CW

(D) REFRIGERANTPIPING (TYP-4)

(E) 4"G

(E) 1"HWS

(E) 3"HWR

(E) 2"SHR

(E) CIRCULATION PUMP

(E) GAS METER

(E) 1"PR

(E) 1 1/2"CW

(E) 4"SHR

(E) 1"PS

(E) 1"PR

(E) 4"PR

(E) 4"PR

(E) 3"PS

(E) 1"PR

(E) 1"PS

(E) 3"PR

(E) 4"SHR

1MP3.1

(D) UNDERGROUNDREFRIGERANT PIPING(TYP-4)

(D) UNDERGROUNDREFRIGERANT PIPING(TYP-4)

2"PS

(E) PUMP

(E) PUMP

(E) PUMP

(E) PUMP

(E) PUMP

(E) CAPS

(E) PUMP

(E) 8"Ø EA

(E) 1 1/2"PR

(E) 2"PR

(E) 2"PS

(E) 2"PR

(E) 2"PS

1

DRAWN BY:

CHECKED BY:

PROJECT NO:

DESIGNED BY:

DATE:

CONSULTANT:

SHEET NUMBER:

DESCRIPTIONREV. DATE

REVISIONS:

APPROVED BY:

- -

- -

- -

- -

- -

SEAL:

-

-

-

-

-

THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.

MECHANICAL ENGINEERING CONSULTANT

5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919

FAX: 775.826.1918WEB: CR-ENG.COM

MGB

CL

CLR

CLR

PERMIT SET

ADDENDUM 2 07/29/161

1600

STA

TE R

OU

TE 8

8

MP1.1

07/13/2016

103915

CA

RSO

N V

ALL

EY S

WIM

CEN

TER

- H

VAC

REP

LAC

EMEN

T

MIN

DEN

, NV

8942

3

ENLA

RGED

MEC

HA

NIC

AL

ROO

M D

EMO

LITI

ON

FLO

OR

PLA

N

SCALE: 1/2" = 1'-0" MP1.1

AMECHANICAL ROOM DEMOLITION 1ST FLOOR PLAN

(E) 38"x38" OA

(E)

38"

x38"

OA

(E) 72"x96" OA

(D) 89"x38" (E) 34"Ø SA

(E) 40"Ø RA

(D) 48"x48"

(D

) 34"

Ø

(D) 30"x36"

(D) DUCT TRANSITION

(D) AIR HANDLER (AH-1)COMPLETE, INCLUDING SUPPORTS

(D) SOLARSTORAGE TANK

(E) 2"PS

(E) 2"PR

(E) 1"HWS

(E) 2"HWS

(E) 2"HWR

(E) 2"HWS

(E) 2"HWR

(E) 4"PR

(E) 4"HWS

(E) 4"HWR (E) 1 1/2"HWS

(E) 1"PR

(E) 1"HWR

(E) 1"PS

(E) 2"HWR (E) 2"HWS

(E) 1"HWS

(E) 1"PS

(E) 4"HWS

(E) 3"HWR

(E) 1"HWS

(E) 2"HWS

(E) 3"PS

(E) 3"HWS (E) 3"HWS

(E) 3"HWR

(E) 3"PR

(E) 1"SHS

(E) 2"SHS

(E) 2"HWR

(E) 2"HWS

(E) 4"PR

(E) 4"HWR

(E) 2"PS

(E) 2"HWR

(E) 2"HWS

(E) 2"PR

(E) 4"SHR

(E) 4"HWS (E) 1 1/2"HWS

(E) 1 1/2"HWR

(E) 8"Ø EA

(E) 1 1/2"HWS

(E) 6"RD

(E) 2"HWR

(E) 2"HWS

(E) 2"D

(E) 2"D

(E) 2"SHR

(E) 2"SHS

(E) 1"HWS

(E) 1"HWR

(E) 1/2"D

(E) 2"HWS

(E) 2"HWR

(E) 2"PS

(E) 2"PR

(E) 1"TWR

(E) 2"TW

(E) 2 1/2"CW

(E) 1"TW

(E) 2"CW

(D) UNIT HEATER

(E) 2"SHR

(E) HEATEXCHANGER (2)

(E) HEATEXCHANGER

(E) HEATEXCHANGER

(E) HEATEXCHANGER

(E) 8"Ø COMBUSTION AIR

(E) 8"ØCOMBUSTION AIR

(E) 8"ØCOMBUSTION AIR

(E) 12"ØFLUE

(E) 12"Ø FLUE

(E) 12"Ø FLUE

1MP3.1

(E) 1"HWS

(E) 8"Ø OA

(E) 8"Ø OA

(E) 8"Ø O

A

(E) 5"HWS

(E) 3"HWR

(E) 3"HWS

(E) 3"HWS

(E) 5"HWS

(E) 3"HWR

(E) AIRSEPARATOR

(E) 1 1/2"HWS

(E) 1"HWS

(E) 1"CW (D) 3/4"HWS,R

(D) PUMPON RISER

(D) 2"HWR

(D) 2"HWS

(D) 38"x38" OA

(D) REFRIGERANTPIPING COMPLETE,INCLUDINGSUPPORTS

(D) REFRIGERANTPIPING COMPLETE,INCLUDING SUPPORTS

(D) REFRIGERANTPIPING COMPLETE,INCLUDING SUPPORTS

(D) 2"HWS, 2"HWR, FROMDEHUMIDIFICATION UNITRACKED ON WALL

CAP 2"HWS, 2"HWR AT RISER

2"PR

EXISTING HEAT EXCHANGERS ANDASSOCIATED PIPING NEEDS TO BE REMOVEDAND REINSTALLED TO FACILITATE REMOVALAND REINSTALLATION OF SOLAR STORAGETANK.

DRAWN BY:

CHECKED BY:

PROJECT NO:

DESIGNED BY:

DATE:

CONSULTANT:

SHEET NUMBER:

DESCRIPTIONREV. DATE

REVISIONS:

APPROVED BY:

- -

- -

- -

- -

- -

SEAL:

-

-

-

-

-

THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.

MECHANICAL ENGINEERING CONSULTANT

5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919

FAX: 775.826.1918WEB: CR-ENG.COM

MGB

CL

CLR

CLR

PERMIT SET

ADDENDUM 2 07/29/161

1600

STA

TE R

OU

TE 8

8

MP1.2

07/13/2016

103915

CA

RSO

N V

ALL

EY S

WIM

CEN

TER

- H

VAC

REP

LAC

EMEN

T

MIN

DEN

, NV

8942

3

ENLA

RGED

MEC

HA

NIC

AL

ROO

M M

EZZA

NIN

E D

EMO

LITI

ON

FLO

OR

PLA

N

SCALE: 3/8" = 1'-0" MP1.2

1MECHANICAL ROOM DEMOLITION MEZZANINE FLOOR PLAN

1

(E) 8"Ø EA

(E) 8"Ø SA

(E) 16"Ø SA

(E)

12"

Ø S

A

(E) 14"Ø SA

(E)

12"

Ø S

A

(E)

10"

Ø S

A

(E) 14"Ø SA

(E) 8"Ø EA

(D) REFRIGERANTPIPING

(D) 28"x28" SA (D) 54"x50" SA (D) 30"Ø SA

(D) 42"x53 SA UPTO INTAKE HOODON ROOF

(D) 1 1/2"HWS, HWR

(E) 2"PS, 2"PR,(D) 1 1/2"HWS, &(D) 1 1/2" HWR

(D) HEATEXCHSANGER

(D) CONDENSING UNITCOMPLETE INCLUDINGELECTRICAL

(D) MAKE-UP AIR UNITCOMPLETE INCLUDINGSUPPORTS

(E) CONDENSING UNIT

(E) CONDENSING UNIT

(E) FLOOR SINK

(D) REFRIGERANTPIPING

(E

) 19"

x19"

SA

(E) 3/4"CW

(E) 1"G

(D) 30"x30" UP TO INTAKEHOOD ON ROOF

(D) 29"x13" RA

(D) 16"x14" SA

CAP 29"x13" RA,SEAL WATER TIGHT

(E)

10"

Ø S

A

118

MECHANICALROOM

109

MENS LOCKERROOM

(E)

16"

Ø S

A

(E) 2"CW

(E) 1"TW

(E) 2"CW

(E) 1"TW

(E) 1"TWR

(E) 2"TW

(E) 2 1/2"CW

(E) 1 1/2"CW

(E) 1 1/2"TW

(D) ERC PUMP

(E) 2"G

FOR WORK IN THIS AREASEE FROM M1.01 ANDP1.01 PROJECT NO. 107716

DRAWN BY:

CHECKED BY:

PROJECT NO:

DESIGNED BY:

DATE:

CONSULTANT:

SHEET NUMBER:

DESCRIPTIONREV. DATE

REVISIONS:

APPROVED BY:

- -

- -

- -

- -

- -

SEAL:

-

-

-

-

-

THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.

MECHANICAL ENGINEERING CONSULTANT

5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919

FAX: 775.826.1918WEB: CR-ENG.COM

MGB

CL

CLR

CLR

PERMIT SET

ADDENDUM 2 07/29/161

1600

STA

TE R

OU

TE 8

8

MP1.3

07/13/2016

103915

CA

RSO

N V

ALL

EY S

WIM

CEN

TER

- H

VAC

REP

LAC

EMEN

T

MIN

DEN

, NV

8942

3

ENLA

RGED

MEC

HA

NIC

AL

YARD

DEM

OLI

TIO

N F

LOO

R PL

AN

SCALE: 1/2" = 1'-0" MP1.3

AENLARGED MECHANICAL DEMOLITION FLOOR PLAN

1

EXISTING EXERCISE POOL

MODIFIED TRAINING POOL

EXISTING INDOOR POOL

RECEIVINGPOOL

EXISTING POOL

1MP3.3

MP2.1A

MP2.3A

MP2.4A

2CU

4EF

1MP3.4

36"Ø SA

36"

Ø S

A

38"

Ø S

A

38"

Ø S

A

48"Ø SA

36x6 SG-1750 CFM(TYP-16)

36x6 SG-1750 CFM(TYP-14)

36x6 SG-11,000 CFM(TYP-7)

36x6 SG-11,000 CFM

36x6 SG-1650 CFM(TYP-6)

2MP3.4

(N) REFRIGERANTPIPING

FIRST FLOOR

(E) 36"Ø SA

(E)

32"

Ø S

A

(E) 32"Ø SA

(E)

28"

Ø S

A (

E) 2

4"Ø

SA

30x10 SG-1750 CFM(TYP-4)

4"HWS

4"HWR

3"PS

3"PR

2"PS

2"PR

(E) PVC SLEEVE

(E) PVC SLEEVECAP EXISTING 34"Ø SA

NO WORK INTHIS AREA

(E) 1 5/8"RSL

(E) 1 5/8"RSL

(E) 7/8"RSL

(E) 7/8"RSL

DRAWN BY:

CHECKED BY:

PROJECT NO:

DESIGNED BY:

DATE:

CONSULTANT:

SHEET NUMBER:

DESCRIPTIONREV. DATE

REVISIONS:

APPROVED BY:

- -

- -

- -

- -

- -

SEAL:

-

-

-

-

-

THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.

MECHANICAL ENGINEERING CONSULTANT

5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919

FAX: 775.826.1918WEB: CR-ENG.COM

MGB

CL

CLR

CLR

PERMIT SET

ADDENDUM 2 07/29/161

1600

STA

TE R

OU

TE 8

8

MP2.0

07/13/2016

103915

CA

RSO

N V

ALL

EY S

WIM

CEN

TER

- H

VAC

REP

LAC

EMEN

T

MIN

DEN

, NV

8942

3

OVE

RALL

MEC

HA

NIC

AL

FLO

OR

PLA

N

SCALE: 1/8" = 1'-0" MP2.0

AOVERALL MECHANICAL FLOOR PLAN

1

(E) BOILER (B-1)

(E) BOILER (B-2)

(E) BOILER (B-3)

(E) PLENUM

(E) POOL FILTER

(E) POOL FILTER

(E) POOL FILTER

(E) FLOOR DRAIN (TYP-2)

(E) POOL CHARCOALFILTER (TYP-5)

(E) FLUE (TYP-3)

(E) COMBUSTIONAIR (TYP-3)

(E) AIRSEPARATOR

(E) POOLFILTER

(E) POOL FILTER

(E) HEATING HOTWATER EXPANSIONTANK

(E) HEATING HOTWATER PUMP

(E) CHEMICAL FEEDTANK

(E) DOMESTICWATEREXPANSION TANK

(E) 96x48 LOUVER

(E) 3/4"HWR

(E) 3/4"HWS

(E) 1"HWS

(E) 1"HWR

(E) 4"G

(E) 1 1/2"G

(E) 3"HWS

(E) 3"HWS

(E) 3"HWS

(E) 2"G

(E) 4"G

(E) 3"HWR

(E) 5"HWS

(E) 2"PS

(E) 2"PR

(E) 4"HWR

(E) 2 1/2"HWS

(E) 2 1/2"HWR

(E) 2"PS

(E) 2"PR

(E) 2"D

(E) 1"HWR

(E) 1"HWS

(E) 1"SHS

(E) 2"SHR

(E) 1 1/2"PS (E) 3"HWR

(E) 4"HWS

(E) 5"HWR

(E) 1"SHS

(E) 1 1/2"PS

1 5/8"RS & 7/8"RLFROM CU-2 UP, MP2.2FOR CONTINUATION(TYP-2)

(E) 1 1/2"HWS

(E) 1 1/2"HWR

(E) 3"HWR

(E) 5"HWR

(E) 3/4"CW

(E) 4"CW

(E) 4"HWS

(E) SOLAR HEATING WATER PUMP

(E) 2"PTRV FROM ST-1

(E) 2"D FROM ST-1

(E) 2"PTRV FROM WH-1

(E) 1"D FROM WH-1 CONDENSATENEUTRALIZATION KIT

(E) 1"D FROM WH-1

(E) 2"PTRV FROM WH-2

(E) FLOOR DRAIN

(E) 1"D FROM WH-2 CONDENSATENEUTRALIZATION KIT

(E) 1"D FROM WH-2

(E) 1 1/2"PR

(E) 2"PS

(E) 4"PR

(E) 1 1/2"PR

(E) 4"SHR

(E) 4"CW

(E) 2"CW

(E) 1"PS (E) 1"PR (E) 2"PR

(E) 3"PS

(E) 2"PS

(E) 1"PR

(E) 1"PS

(E) 3"PR

(E) 2 1/2"CW

(E) 2"CW

(E) 1 1/2"CW

(E) 4"CW

(E) FLOOR SINK

(E) 4"SHR

(E) 3/4"CW

(E) 2"G UP

(E) PUMP

(E) PUMP

(E) PUMP

(E) PUMP

(E) 2 1/2"CW(E) PUMP

(E) CAPS

(E) PUMP

119

FOYER

139

TELEPHONE

125

ELECT.

(E) 8"Ø EA

(E) PUMP

127

MECHANICAL

126

STORAGE

1"D

1"D FROM AH-1

4"HWR

4"HWS

DRAWN BY:

CHECKED BY:

PROJECT NO:

DESIGNED BY:

DATE:

CONSULTANT:

SHEET NUMBER:

DESCRIPTIONREV. DATE

REVISIONS:

APPROVED BY:

- -

- -

- -

- -

- -

SEAL:

-

-

-

-

-

THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.

MECHANICAL ENGINEERING CONSULTANT

5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919

FAX: 775.826.1918WEB: CR-ENG.COM

MGB

CL

CLR

CLR

PERMIT SET

ADDENDUM 2 07/29/161

1600

STA

TE R

OU

TE 8

8

MP2.1

07/13/2016

103915

CA

RSO

N V

ALL

EY S

WIM

CEN

TER

- H

VAC

REP

LAC

EMEN

T

MIN

DEN

, NV

8942

3

ENLA

RGED

MEC

HA

NIC

AL

ROO

M F

LOO

R PL

AN

SCALE: 1/2" = 1'-0" MP2.1

AMECHANICAL ROOM 1ST FLOOR PLAN

1

(E) 38"x38" OA

(E)

38"

x38"

OA

(E) 72"x96" OA

(E) 34"Ø SA

(E) 40"Ø RA

(E) 2"PS

(E) 2"PR

(E) 2"HWS

(E) 2"HWR

(E) 4"HWS

(E) 4"HWR (E) 1 1/2"HWS

(E) 1"PR

(E) 1"PS

(E) 2"HWR

(E) 2"HWS

(E) 1"HWS

(E) 1"PS (E) 4"HWS

(E) 3"HWR

(E) 1"HWS

(E) 2"HWS

(E) 3"PR

(E) 1"SHS

(E) 2"SHS

(E) 2"HWR

(E) 2"HWS

(E) 4"HWR

(E) 2"PS

(E) 2"HWR (E) 2"HWS

(E) 2"PR

(E) 4"SHR (E) 4"HWS (E) 1 1/2"HWS

(E) 1 1/2"HWR

(E) 6"RD

(E) 2"HWR

(E) 2"HWS

(E) 2"D

(E) 2"D

(E) 2"SHR

(E) 2"SHS

(E) 1"HWS

(E) 1"HWR

(E) 1/2"D

(E) 1"TWR

(E) 2"TW

(E) 2 1/2"CW

(E) 1"TW

(E) 2"CW

(E) HEATEXCHANGER

(E) HEATEXCHANGER

(E) HEATEXCHANGER

(E) HEAT EXCHANGER

(E) HEAT EXCHANGER

1 5/8"RS & 7/8"RLREFRIGERANT PIPINGTO AH-1 (TYP-2)

(E) BOILER 1

(E) BOILER 3

(E) BOILER 2

(E) 2"CW

(E) 2"DHW

(E) 1"CW

(E) 2"TW

(E) 1"TWR

(E) 4"DHW

(E) 3"DHWR

(E) 1 1/2"G

(E) 4"Ø FLUE AND 4"ØCOMBUSTIONAIR TO CONCENTRICVENT KIT (TYP-2)

(E) MANUFACTURERS CONDENSATENEUTRALIZATION KIT (TYP-2)

(E) 1"D

(E) 1"D

(E) 2"D

(E) 2 1/2"CW

(E) PTRV

(E) 2"CW, 2"HW, 2"TW,1"TWR AND 1"TWRTO TS-1

SST-1

(E) 2"PTRV

(E) 4"G

(E) 2"G

(E) 5"HWS

(E) 3"HWS

(E) 3"HWS

(E) 3"HWS

(E) 8"Ø OA

(E) 8"Ø OA

(E) 8"Ø OA

(E) 5"HWS

(E) 5"HWS

(E) 1"HWS

(E) 3"HWR

(E) 2"HWS

(E) 2"HWR

(E) 1"D

(E) 2"D

(E) 2"D

(E) 1"D

1MP3.2

4"Ø FLUE

(E) 4"ØFLUE

(E) 1"CW

(E) TEMPERING STATION

(E) EXPANSION TANK

(E) CIRCULATIONPUMP

(E) CIRCULATIONPUMP

(E) WATER HEATER

(E) WATERHEATER

(E) STORAGETANK

(E) CIRCULATIONPUMP

22"x38" OA 2

2"x3

8" O

A

22"x38" OA

36"x22" SA

2 1/2"HWS,R

(E)

38"

Ø S

A

(E) 36"Ø SA

1AH

1 5/8"RS & 7/8"RLDOWN, SEE MP2.1FOR CONTINUATION

(E) 2 1/2"HWS

2"PR

3"PR

3"PS

4"HWR

4"HWS

DUCT MOUNTEDSMOKE DETECTOR

(E) UNIT HEATER

66"x18" INTERNALLYLINED OA PLENUM

1"D

4"HWS

4"HWR

2"PR

2"PS 3"PR

3"PS

1PP

2PP

2"PR 2"PS

DRAWN BY:

CHECKED BY:

PROJECT NO:

DESIGNED BY:

DATE:

CONSULTANT:

SHEET NUMBER:

DESCRIPTIONREV. DATE

REVISIONS:

APPROVED BY:

- -

- -

- -

- -

- -

SEAL:

-

-

-

-

-

THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.

MECHANICAL ENGINEERING CONSULTANT

5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919

FAX: 775.826.1918WEB: CR-ENG.COM

MGB

CL

CLR

CLR

PERMIT SET

ADDENDUM 2 07/29/161

1600

STA

TE R

OU

TE 8

8

MP2.2

07/13/2016

103915

CA

RSO

N V

ALL

EY S

WIM

CEN

TER

- H

VAC

REP

LAC

EMEN

T

MIN

DEN

, NV

8942

3

ENLA

RGED

MEC

HA

NIC

AL

ROO

M M

EZZA

NIN

E FL

OO

R PL

AN

SCALE: 3/8" = 1'-0" MP2.2

AMECHANICAL ROOM MEZZANINE FLOOR PLAN

1

1

158

ADA FAMILY

141

STORAGE

107

CONCESSIONS

159

FOYER

115

OFFICE

163

FIRESPRINKLER

ROOM

(E) 1

9x19

SA

(E) FLOOR SINK

INSTALLED (DV-1) TO DRAINOF MUA-1 AND (DV-2) ONCOLD WATER TO MUA-1.PROVIDED BY CONTROLSCONTRACTOR AND INSTALLEDBY CONTRACTOR.

MUA-1 IS ON A 24"HIGH SERVICE CURB

39"x41"SADISCHARGE

1MUA

19"x19" SA

DUCT MOUNTEDSMOKE DETECTOR

(E) 6"Ø SA

(E

) 10"

Ø S

A (

E) 1

0"Ø

SA

(E

) 16"

Ø S

A

(E

) 12"

Ø S

A

(E) 14"Ø SA

(E

) 12"

Ø S

A

(E) 16"Ø SA

(E) 18"Ø SA

(E) 8"Ø EA

(E

) 8"Ø

EA

(E) 8"Ø SA (

E) 1

0"Ø

SA

118

MECHANICALROOM

109

MENS LOCKERROOM

(E) 2"CW

(E) 1"TW

(E) 1"TW

(E) 1 1/2"CW

(E) 1/2"CW

(E) 3/4"CW

(E) 3/4"TW

(E) 3/4"CW

(E) 1"G

(E) 2"G

(E) 2 1/2"CW (E) 2"TW

(E) 2"CW

(E) 1"TW

(E) 1"TWR

(E) 1 1/2"CW

(E) 1 1/2"TW

FOR WORK IN THIS AREA SEEFROM M2.01 AND P2.01PROJECT NO. 107716

FV-1

DRAWN BY:

CHECKED BY:

PROJECT NO:

DESIGNED BY:

DATE:

CONSULTANT:

SHEET NUMBER:

DESCRIPTIONREV. DATE

REVISIONS:

APPROVED BY:

- -

- -

- -

- -

- -

SEAL:

-

-

-

-

-

THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.

MECHANICAL ENGINEERING CONSULTANT

5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919

FAX: 775.826.1918WEB: CR-ENG.COM

MGB

CL

CLR

CLR

PERMIT SET

ADDENDUM 2 07/29/161

1600

STA

TE R

OU

TE 8

8

MP2.3

07/13/2016

103915

CA

RSO

N V

ALL

EY S

WIM

CEN

TER

- H

VAC

REP

LAC

EMEN

T

MIN

DEN

, NV

8942

3

ENLA

RGED

MEC

HA

NIC

AL

YARD

PLA

N

SCALE: 1/2" = 1'-0" MP2.3

AENLARGED MECHANICAL FLOOR PLAN

1

1ACU

1DH

1EF

2EF

3EF

EF-1VFD

EF-2VFD

EF-3VFD

EF-4VFD

1BCU

ACESS DOOR LOCATION

11' -

9"

(E) ROOF ACCESSLADDER

(E) ROOF ACCESSPLATFORM

NEW SCREEN WALL,SEE STRUCTURALDRAWINGS

56"

x48"

SA

60"

x52"

SA

64x16 EA 64"x16"EA 64x16 EA

1 1/8"HGBP

1 1/8"HGBP

1 1/8"RL

1 1/8"RL

4' -

0"

104"x44"RA RISER FROM DH-190"x54"SA RISERFROM DH-1

L1

84"x32"RAPLENUM TO84"x132" L-1

56"x48" SA

2"PR

2"PS

3"PR

3"PS

4"HWR

4"HWS

84"x132" RA

84"

x132

" RA

(E) 2"PR

(E) 2"PS

(E) 2"HWR

(E) 2"HWS

HT4

HT3

HT2

HT1

HT5

HT6

38"Ø SA 48"Ø SA 38"Ø SA

T

DH-1 TEMPERATURE SENSOR

DH-1 HUMIDISTAT SENSOR

HU

30x10 SG-1750 CFM(TYP-4)

DRAWN BY:

CHECKED BY:

PROJECT NO:

DESIGNED BY:

DATE:

CONSULTANT:

SHEET NUMBER:

DESCRIPTIONREV. DATE

REVISIONS:

APPROVED BY:

- -

- -

- -

- -

- -

SEAL:

-

-

-

-

-

THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.

MECHANICAL ENGINEERING CONSULTANT

5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919

FAX: 775.826.1918WEB: CR-ENG.COM

MGB

CL

CLR

CLR

PERMIT SET

ADDENDUM 2 07/29/161

1600

STA

TE R

OU

TE 8

8

MP2.4

07/13/2016

103915

CA

RSO

N V

ALL

EY S

WIM

CEN

TER

- H

VAC

REP

LAC

EMEN

T

MIN

DEN

, NV

8942

3

ENLA

RGED

MEC

HA

NIC

AL

YARD

WES

T PL

AN

SCALE: 1/2" = 1'-0" MP2.4

AENLARGED MECHANICAL YARD WEST FLOOR PLAN

1

1

MECHANICAL 2NDFLOOR PLAN

110' - 0"

(E) HEATING HOTWATER EXPANSIONTANK

(E) 1"HWS

(E) 1"HWR

(E) 1/2"D

(E) 2"HWS

(E) 2"HWR

(E) 2"PS

(E) 2"PR

(E) 2"SHS

(E) 2"SHR

(E) 2"D

(E) 2"HWS

(E) 2"HWR

(E) 6"RD

(E) 1 1/2"HWR (E) 1 1/2"HWS

(E) 1 1/2"HWS

(E) 1 1/2"HWR

(E) 2"D

(E) 1"HWR

(E) 1"SHS

(E) 1 1/2"PR

(E) 4"HWS

(E) 2 1/2"HWR

(E) 1"HS

(E) 2"D

(E) 2"HWR

(E) 2"SHS

(E) CIRCULATIONPUMP

(D) SOLAR STORAGE TANK.

(D) 2"CW

(D) TANK SUPPORTS(TYP-2)

(E) WATER HEATER

1MP3.4

(D) 2"HWR

(D) 2"HWS

(E) 1 1/2"G (E) 2"G

(E) 1 1/2"HWS

(E) 1 1/2"HWR

(D) 2"

(D) 2"

(E) 2"D (E) 2"SHS

(E) 2"PR

(E) 2"PS

(E) 2"HWR

(E) 3/4"CW

(E) PUMP

(E) 5"HWS

(E) 5"HWR

(E) 2"HWS

(E) 2"HWR

(E) 4"HWS (E) 4"HWR

(E) 2"PS

(E) 2"PR

(E) 2"PR

(E) 2"PS

(E) PUMP

(E) HEAT EXCHANGER

DRAWN BY:

CHECKED BY:

PROJECT NO:

DESIGNED BY:

DATE:

CONSULTANT:

SHEET NUMBER:

DESCRIPTIONREV. DATE

REVISIONS:

APPROVED BY:

- -

- -

- -

- -

- -

SEAL:

-

-

-

-

-

THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.

MECHANICAL ENGINEERING CONSULTANT

5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919

FAX: 775.826.1918WEB: CR-ENG.COM

MGB

CL

CLR

CLR

PERMIT SET

ADDENDUM 2 07/29/161

1600

STA

TE R

OU

TE 8

8

MP3.1

07/13/2016

103915

CA

RSO

N V

ALL

EY S

WIM

CEN

TER

- H

VAC

REP

LAC

EMEN

T

MIN

DEN

, NV

8942

3

MEC

HA

NIC

AL

ROO

M D

EMO

LITI

ON

SEC

TIO

N

SCALE: 1/2" = 1'-0" MP3.1

1MECHANICAL DEMOLITION SECTION

1

MECHANICAL 2NDFLOOR PLAN

110' - 0"

DEMOLITION ROOFPLAN

120' - 0"

Level 1100' - 0"

(E) 2"HWR

(E) 2"HWR

(E) 2"SHS

(E) 1 1/2"HWR

(E) 3/4"HWR

(E) 3/4"HWS

(E) 1"HWS

(E) 6"RD

(E) 1 1/2"HWR

(E) 1 1/2"HWS

(E) 2"SHR

(E) 2 1/2"HWR

(E) 2"D

(E) 2"PR

(E) 2"PS

(E) 2"HWR

(E) 2"HWS

(E) 2 1/2"HWR

(E) 2"SHR

(E) 2"SHS

(E) 2"HWR

(E) 2"HWS

(E) 2"D

(E) 1 1/2"HWR

(E) 1 1/2"HWS (E) 1 1/2"PS

(E) 1 1/2"PR

(E) 1/2"CW

(E) 3/4"CW

SST-1

(E) 1"HWS

(E) 1"HS

(E) 5"HWR

INSTALL NEW SUPPORTS AT EXISTINGSUPPPORT LOCATION. CONTRACTORTO COORDINATE LOCATION PRIORTO ORDERING TANK (TYP-2)

(E) 2"SHS

(E) 2"SHR

1 1/2"G

2"G

(E) HEAT EXCHANGER

(E) CIRULATIONPUMP

(E) CIRULATIONPUMP

(E) 2"HWR

(E) 2"HWS

CONTRACTOR TO COORDINATELOCATION OF PIPINGCONNECTION WITH EXISTINGPIPING PRIOR TO ORDERING TANK

1 1/2"PS

1 1/2"PR

2"SHS

2"D

4"Ø FLUE

4"Ø COMBUSTION AIR

CONCENTRIC VENT KIT

(E) 2"G

(E) WATER HEATER

CAP (E) PIPE

2"PR

2"PS

3"PR

3"PS

(E) 2"D

(E) HEATING HOTWATER EXPANSIONTANK

(E) PUMP

DRAWN BY:

CHECKED BY:

PROJECT NO:

DESIGNED BY:

DATE:

CONSULTANT:

SHEET NUMBER:

DESCRIPTIONREV. DATE

REVISIONS:

APPROVED BY:

- -

- -

- -

- -

- -

SEAL:

-

-

-

-

-

THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.

MECHANICAL ENGINEERING CONSULTANT

5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919

FAX: 775.826.1918WEB: CR-ENG.COM

MGB

CL

CLR

CLR

PERMIT SET

ADDENDUM 2 07/29/161

1600

STA

TE R

OU

TE 8

8

MP3.2

07/13/2016

103915

CA

RSO

N V

ALL

EY S

WIM

CEN

TER

- H

VAC

REP

LAC

EMEN

T

MIN

DEN

, NV

8942

3

MEC

HA

NIC

AL

ROO

M S

ECTI

ON

SCALE: 1/2" = 1'-0" MP3.2

1MECHANICAL SECTION

1

60x48 EG-110,750 CFM

60x48 EG-110,750 CFM

(E) RETURNGRILLE

3EF

4EF

2EF

64"x16"EA PLENUMN

60x48 EG-110,750 CFM

64"x16"EA PLENUMN

(E) MURAL IS NOT TOBE DISTURBED

EF-1VFD

EF-2VFD

EF-3VFD

EF-4VFD

ON EXTERIOR ON EXTERIOR ON EXTERIOR ON EXTERIOR

L1

60"x52" SA

64"

x16"

EA

64"

x16"

EA

64"

x16"

EA

3"PR

3"PS

4"HWR

4"HWS

(E) 36"ØSA

2"PS

2"PR

(E) 2"PR

(E) 2"PS

(E) 2"HWR

(E) 2"HWS

DRAWN BY:

CHECKED BY:

PROJECT NO:

DESIGNED BY:

DATE:

CONSULTANT:

SHEET NUMBER:

DESCRIPTIONREV. DATE

REVISIONS:

APPROVED BY:

- -

- -

- -

- -

- -

SEAL:

-

-

-

-

-

THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.

MECHANICAL ENGINEERING CONSULTANT

5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919

FAX: 775.826.1918WEB: CR-ENG.COM

MGB

CL

CLR

CLR

PERMIT SET

ADDENDUM 2 07/29/161

1600

STA

TE R

OU

TE 8

8

MP3.3

07/13/2016

103915

CA

RSO

N V

ALL

EY S

WIM

CEN

TER

- H

VAC

REP

LAC

EMEN

T

MIN

DEN

, NV

8942

3

WES

T W

ALL

ELE

VATI

ON

SCALE: 1/2" = 1'-0" MP3.3

1WEST WALL MECHANICAL ELEVATION

1

38"Ø SA

36x6 SG-1750 CFM(TYP-16)

4"HWS

4"HWR

3"PS

3"PR

2"PS

2"PR

(E) 2"PR

(E) 1/2"D

(E) 2"HWS

(E) 2"HWR

(E) 2"PS

(E) 2"PR

119

FOYER

1MP3.4

38"Ø SA 48"Ø SA

30x10 SG-1750 CFM(TYP-4)

60"x52" SA PLENUM

(E) 2"PR

(E) 2"PS

(E) 2"HWR

(E) 2"HWS

38"Ø SA

119

FOYER

2"PS

2"PR

3"PR 3"PS

4"HWR 4"HWS

DRAWN BY:

CHECKED BY:

PROJECT NO:

DESIGNED BY:

DATE:

CONSULTANT:

SHEET NUMBER:

DESCRIPTIONREV. DATE

REVISIONS:

APPROVED BY:

- -

- -

- -

- -

- -

SEAL:

-

-

-

-

-

THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.

MECHANICAL ENGINEERING CONSULTANT

5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919

FAX: 775.826.1918WEB: CR-ENG.COM

MGB

CL

CLR

CLR

PERMIT SET

ADDENDUM 2 07/29/161

1600

STA

TE R

OU

TE 8

8

MP3.4

07/13/2016

103915

CA

RSO

N V

ALL

EY S

WIM

CEN

TER

- H

VAC

REP

LAC

EMEN

T

MIN

DEN

, NV

8942

3

SOU

TH W

ALL

MEC

HA

NIC

AL

ELEV

ATI

ON

SCALE: 1/4" = 1'-0" MP3.4

1MECHANICAL SECTION (SOUTH)

SCALE: 1/4" = 1'-0" MP3.4

2MECHANICAL SECTION (WEST)

1

1

(E) 2 1/2"CW

(E) 2"TW

(E) 1"TWR

(E) 2"SHS

(E) 2"SHR

(E) 2"D

(E) 2"HWS

(E) 1"HWS

(E) 1"HWR

(E) 1/2"D

(E) 2"HWR

(E) 2"PS

(E) 2"PR

(E) 3/4"CW

(E) 5"HWR

(E) 38"x3

8" OA

(E) 89"x3

8"

(E) 40"Ø RA

(E) 34"Ø SA

(D) 34"Ø

(E) 4"HWS

(E) 4"HWR

(E) 2"HWS

(E) 3"HWR

(E) 3"PR

(E) 3"HWS

(E) 3"PS

(E) 1"HWR

(E) 1"PS

(E) 1"PR

(E) 1"HWS

(E) 4"G

(E)

8"Ø

EA

(E)

6"R

D

(E) 5"HWS

(E) 2"HWS

(E) 1 1/2"HWS

(E) 3"HWR

(E) 1 1/2"PS

(E) 2"HWS

(E) 4"PR

(E) 1 1/4"CW

(E) 2"PR

(E) 2"PS

(E) 1"HWR

(E) 1"HWS

(E) 3"HWS

(E) 1 1/2"HWS

(E) DUCT TRANSLATION

(D) REFRIGERANTPIPING

(D) REFRIGERANTPIPING

(E) 2"D

(E) 4"CW

(E) 3/4"CW

(E) 1"SHS

(E) POOL FILTER

(E) POOL FILTER

(E) BOILER(TYP-3)

(E) 96"x48"LOUVER

(E) 1"HWS

(E) DOMESTIC WATEREXPANSION TANK

(E) UNIT HEATER

(E) PLENUM

(E) AIRSEPARATOR

(D) STORAGETANK

(E) AIR HANDLER (AH-1)

(D) 48"x48"

(D) UNIT HEATER

(E) 6"RD

(E) 12"Ø FLUE

(E) 12"Ø FLUE

(E) 12"Ø FLUE

(E) 8"ØCOMBUSTION AIR

(E) 8"ØCOMBUSTION AIR

(E) 8"ØCOMBUSTION AIR

(D) 2"

(D) 2"

2"PS

(D) 38"x38" OA

(D) 30"x36" SA

(D) 3/4"

(D) 3/4"

(D) 2"HWS, 2"HWR, 11/2"SHS & 1 1/2"SHR

(E) TEMPERINGSTATION

(E) WATERHEATER

(D) PUMP

(E) HEATEXCHANGER

(E) PUMP

(E) PUMP

(E) PUMP

(E) 4"HWS

(E) PUMP

(E) PUMP

(E) PUMP

(E) 2"PS

(E) 2"PR

(E) 2"PR

(E) 1 1/2"PR

(E) PUMP

DRAWN BY:

CHECKED BY:

PROJECT NO:

DESIGNED BY:

DATE:

CONSULTANT:

SHEET NUMBER:

DESCRIPTIONREV. DATE

REVISIONS:

APPROVED BY:

- -

- -

- -

- -

- -

SEAL:

-

-

-

-

-

THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.

MECHANICAL ENGINEERING CONSULTANT

5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919

FAX: 775.826.1918WEB: CR-ENG.COM

MGB

CL

CLR

CLR

PERMIT SET

ADDENDUM 2 07/29/161

1600

STA

TE R

OU

TE 8

8

MP4.1

07/13/2016

103915

CA

RSO

N V

ALL

EY S

WIM

CEN

TER

- H

VAC

REP

LAC

EMEN

T

MIN

DEN

, NV

8942

3

MEC

HA

NIC

AL

ROO

M D

EMO

LITI

ON

ISO

MET

RIC

SCALE : NONE MP4.1

1MECHANICAL ROOM DEMOLITION ISOMETRIC

1

(E) 2"PS

(E) 3"PS

(E) 3"PR

(E) 1"PS

(D) 1 1/2"SHS

(E) 2"PR

(E) 2"PS

(E) HEAT EXCHANGER(HE-1)

(E) 4"HWS

(E) 4"HWR

(E) 4"HWS

(E) 4"HWR

(E)

4"H

WS

(E)

4"H

WR

(E) HEAT EXCHANGER(HE-4)

(E) 3"HWR

(E) 3"PR

(E) 3"HWS

(E) 3"HWS

(E) 2"HWS

(E) 3"HWR

(E) 1"PR

(E) 1"HWS

(E) 1"HWR

(E) 2"HWS

(E) 2"HWR

(E) 1"PR

(E) 1"PS

(E) 1"HWS

(E) 1"HWR

(E) 1"HWS

(E) 2"HWR

(E) 2"PR

(E) 2"PS

(E) 4"HWR

(E) 2"HWR

(E) 4"SHR

(E) 2"PR

(E) 4"PR

(E) 4"SHR

(E) 2"PS

(E) 2"PS

(E) HEATEXCHANGER(HE-7)

(E) HEATEXCHANGER(HE-2)

(E) HEAT EXCHANGER(HE-3)

(E) HEAT EXCHANGER(HE-5)

(E) 4"HWS

(E) 4"HWR

(E) 4"HWS

(E) 2"HWS

(E) 2"HWR

(D) 2"PS

DRAWN BY:

CHECKED BY:

PROJECT NO:

DESIGNED BY:

DATE:

CONSULTANT:

SHEET NUMBER:

DESCRIPTIONREV. DATE

REVISIONS:

APPROVED BY:

- -

- -

- -

- -

- -

SEAL:

-

-

-

-

-

THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.

MECHANICAL ENGINEERING CONSULTANT

5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919

FAX: 775.826.1918WEB: CR-ENG.COM

MGB

CL

CLR

CLR

PERMIT SET

ADDENDUM 2 07/29/161

1600

STA

TE R

OU

TE 8

8

MP4.2

07/13/2016

103915

CA

RSO

N V

ALL

EY S

WIM

CEN

TER

- H

VAC

REP

LAC

EMEN

T

MIN

DEN

, NV

8942

3

MEC

HA

NIC

AL

ROO

M D

EMO

LITI

ON

EN

LARG

ED IS

OM

ETRI

C

SCALE : NONE MP4.2

1MECHANICAL ROOM DEMOLITION ENLARGED ISOMETRIC

1

(NO WORK SHOW, PROVIDED FOR INFORMATION)

12"Ø

(E) 2"HWS

(E) 2"HWR

(E) 2"CW

(E) 1 1/2"TW

(E) 1 1/2"CW

(E) 1 1/2"TW

(E) 1 1/2"CW

(E) 1"TWR

(E) 2 1/2"CW

(E) 2"TW

(E) 1"TW

(D) 24"Ø

(D) 28"Ø

(D) 30"Ø

(D) 22"Ø

(D) 28"x28"

(D

) 42"

x53"

(D) 24"Ø

(D) 54"x50"

(E) 2"CW

(E) 16"Ø SA

(E) 12"Ø SA

(E) 1

6"Ø SA

(E) 14"Ø SA

(E) 1"TW

(E) 1 1/2"CW

(D) 3/8"

(D) 3/8"

(E) 2"CW

(E) 3/4"TW

(E) 3/4"CW

(E) 3/4"TW

(E) 3/4"TW

(E) 3/4"CW

(E) 1/2"CW

(E) 14"Ø SA

(E) 12"Ø SA

(E)

12"

Ø S

A

(E)

12"

Ø S

A

(D) CONDENSINGUNIT COMPLETEINCLUDINGELECTRICAL

(D) MAKEUP AIR UNIT

(D) 29"x13"

(D) 16"x14"

(E) 19"x22" RA

(E) 19"x19" SA

(D) REFRIGERANTPIPING

(D) 42"x53 SA UP TOINTAKE HOOD ON ROOF

(D) 2"PS, 2"PR, 1 1/2"HS, & 1 1/2" HR

(D) 1 1/2"HS, HR 1"TWR

2"TW

2 1/2"CW

(D) 30"x30" UP TOINTAKE HOOD ONROOF

(D) REFRIGERANT PIPING

(E) 8"Ø SA

(E)

10"

Ø S

A

(E) SUPPLY DIFFUSER (TYP)

(E) 6"Ø SA

(E) 10"Ø SA

(E) 6"Ø SA

(E) 1

0"Ø SA

(E) 6"Ø EA

(E) EXHAUST FAN

(E) 2"G

(E) CONDENSING UNIT

(E) CONDENSING UNIT

(D) ERC PUMP

20"Ø SA

DRAWN BY:

CHECKED BY:

PROJECT NO:

DESIGNED BY:

DATE:

CONSULTANT:

SHEET NUMBER:

DESCRIPTIONREV. DATE

REVISIONS:

APPROVED BY:

- -

- -

- -

- -

- -

SEAL:

-

-

-

-

-

THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.

MECHANICAL ENGINEERING CONSULTANT

5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919

FAX: 775.826.1918WEB: CR-ENG.COM

MGB

CL

CLR

CLR

PERMIT SET

ADDENDUM 2 07/29/161

1600

STA

TE R

OU

TE 8

8

MP4.3

07/13/2016

103915

CA

RSO

N V

ALL

EY S

WIM

CEN

TER

- H

VAC

REP

LAC

EMEN

T

MIN

DEN

, NV

8942

3

BOYS

LO

CKE

R RO

OM

MEC

HA

NIC

AL

DEM

OLI

TIO

N IS

OM

ETRI

C

SCALE : NONE MP4.3

1BOYS LOCKER ROOM MECHANICAL DEMOLITION ISOEMTRIC

1

(N) REFRIGERANTPIPING (TYP-4)

(E) POOL FILTER(E) POOL FILTER

(E) BOILER (TYP-3)

(E) 96"x48" LOUVER

(E) DOMESTIC WATEREXPANSION TANK

(E) UNIT HEATER

(E) PLENUM

(E) AIRSEPARATOR

(E) 38"x3

8" OA

(E) 40"Ø RA

(E) 34"Ø SA

(E)

8"Ø

EA

(E) 2 1/2"CW

(E) 2"TW

(E) 1"TWR

(E) 2"PS

(E) 2"PR

(E) 2"HWR

(E) 2"SHS

(E) 2"SHR (E) 2"D

(E) 2"HWS

(E) 1"HWS

(E) 1"HWR

(E) 1/2"D

(E) 2"HWR (E) 2"PS

(E) 2"PR

(E) 3/4"CW

(E) 5"HWR

(E) 4"HWS

(E) 4"HWS

(E) 4"HWR

(E) 2"HWR

(E) 2"PR

(E) 3"HWR

(E) 3"PR

(E) 3"HWS

(E) 3"PS

(E) 4"G

(E)

6"R

D

(E) 5"HWS

(E) 2"HWS

(E) 4"PR

(E) 1 1/4"CW

(E) 2"PR

(E) 2"PS (E) 1"HWR

(E) 1"HWS

(E) 3"HWS

(E) 1 1/2"HWS

(E) 2"D

(E) 4"CW

(E) 3/4"CW

(E) 1"SHS

(E) 1"HWS

(E) 6"RD

SST-1

(E) 2"G

(E) 1 1/2"HWS

(E) 1 1/2"HWR

(E) 3/4"HWS

(E) 3/4"HWR

(E) 2"PS

(E) 2"SHS

(E) 2"D

(E) 2 1/2"CW

(E) 1 1/2"G

(E) 2"TW

(E) 1"TWR

(E) 1 1/2"G

(E) 2"D

(E) 2"DHW

(E) 2"CW

(E) 3"DHWR

(E) 3"DHWR

(E) 4"DHW (E) 4"DHWR

(E) 3"DHWR

(E) 12"Ø FLUE

(E) 12"Ø FLUE

(E) 12"Ø FLUE

(E) 8"ØCOMBUSTION AIR

(E) 8"ØCOMBUSTION AIR

(E) 8"ØCOMBUSTION AIR

(E) CONCENTRICVENT KIT

(E) CONCENTRICVENT KIT

4"Ø FLUE

4"Ø FLUE

(E) 4"Ø FLUE

(E) 4"Ø FLUE

2"SHS

2"D

22"x38" O

A

22"x38" OA

22"x38" O

A

1AH

1 5/8"RS & 7/8"RL FROMCU-2 UP, TO AH-1 (TYP-2)

2 1/2"HWS,R

22"x20" RA

36"x22" SA

36"x22" SA

76"x22" SA

22"x66" RA

(E) TEMPERINGSTATION

(E) WATERHEATER

2"PR

2"PS

3"PR

3"PS

4"HWR

4"HWS

(E) 2"D

1 1/2"PS

1 1/2"PR

2 1/2"HWS

2 1/2"HWR

1PP

2PP

DRAWN BY:

CHECKED BY:

PROJECT NO:

DESIGNED BY:

DATE:

CONSULTANT:

SHEET NUMBER:

DESCRIPTIONREV. DATE

REVISIONS:

APPROVED BY:

- -

- -

- -

- -

- -

SEAL:

-

-

-

-

-

THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.

MECHANICAL ENGINEERING CONSULTANT

5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919

FAX: 775.826.1918WEB: CR-ENG.COM

MGB

CL

CLR

CLR

PERMIT SET

ADDENDUM 2 07/29/161

1600

STA

TE R

OU

TE 8

8

MP4.4

07/13/2016

103915

CA

RSO

N V

ALL

EY S

WIM

CEN

TER

- H

VAC

REP

LAC

EMEN

T

MIN

DEN

, NV

8942

3

MEC

HA

NIC

AL

ROO

M IS

OM

ETRI

C

SCALE : NONE MP4.4

1MECHANICAL ROOM ISOMETRIC 1

(E) 2"PS

(E) 3"PS

(E) 3"PR

(E) 1"PS

(D) 1 1/2"SHS

(E) 2"PR

(E) 2"PS

(E) HEATEXCHANGER(HE-1)

(E) 4"HWS

(E) 4"HWR

(E) 4"HWS

(E) 4"HWR

(E)

4"H

WS

(E)

4"H

WR

(E) HEAT EXCHANGER(HE-4)

(E) 3"HWR

(E) 3"PR

(E) 3"HWS

(E) 3"HWS

(E) 2"HWS

(E) 3"HWR

(E) 1"PR

(E) 1"HWS

(E) 1"HWR

(E) 2"HWS

(E) 2"HWR

(E) 1"PR

(E) 1"PS

(E) 1"HWS

(E) 1"HWR

(E) 1"HWS

(E) 2"HWR

(E) 2"PR

(E) 2"PS

(E) 4"HWR

(E) 2"HWR

(E) 4"SHR

(E) 2"PR

(E) 4"PR

(E) 4"SHR

(E) 2"PS

(E) 2"PS

(E) HEATEXCHANGER(HE-7)

(E) HEATEXCHANGER(HE-2)

(E) HEAT EXCHANGER(HE-3)

(E) HEAT EXCHANGER(HE-5)

(E) 4"HWS

(E) 4"HWR

(E) 4"HWS

(E) 2"HWS

(E) 2"HWR

2"PR

2"PS

3"PR

3"PS

1PP

2PP

3"PR

2"PS

2"PR

MANUAL AIRVENT

3/4"D

STRAINER

TEMPERATUREGAUGE

DRAWN BY:

CHECKED BY:

PROJECT NO:

DESIGNED BY:

DATE:

CONSULTANT:

SHEET NUMBER:

DESCRIPTIONREV. DATE

REVISIONS:

APPROVED BY:

- -

- -

- -

- -

- -

SEAL:

-

-

-

-

-

THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.

MECHANICAL ENGINEERING CONSULTANT

5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919

FAX: 775.826.1918WEB: CR-ENG.COM

MGB

CL

CLR

CLR

PERMIT SET

ADDENDUM 2 07/29/161

1600

STA

TE R

OU

TE 8

8

MP4.5

07/13/2016

103915

CA

RSO

N V

ALL

EY S

WIM

CEN

TER

- H

VAC

REP

LAC

EMEN

T

MIN

DEN

, NV

8942

3

MEC

HA

NIC

AL

ROO

M E

NLA

RGED

ISO

MET

RIC

SCALE: MP4.5

1MECHANICAL ROOM ENLARGED ISOMETRIC

1

1BCU

1DH

3EF

2EF

1EF

64"

x16"

EA

56"

x48"

SA

56"x48" SA

44"x104" RA

84"x132" RA

1ACU

1 1/8"RL

1 1/8"HGBP

1 1/8"RL

1 1/8"HGBP

64"

x16"

EA

84"x132" RA

54"x90" SA

DRAWN BY:

CHECKED BY:

PROJECT NO:

DESIGNED BY:

DATE:

CONSULTANT:

SHEET NUMBER:

DESCRIPTIONREV. DATE

REVISIONS:

APPROVED BY:

- -

- -

- -

- -

- -

SEAL:

-

-

-

-

-

THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.

MECHANICAL ENGINEERING CONSULTANT

5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919

FAX: 775.826.1918WEB: CR-ENG.COM

MGB

CL

CLR

CLR

PERMIT SET

ADDENDUM 2 07/29/161

1600

STA

TE R

OU

TE 8

8

MP4.6

07/13/2016

103915

CA

RSO

N V

ALL

EY S

WIM

CEN

TER

- H

VAC

REP

LAC

EMEN

T

MIN

DEN

, NV

8942

3

WES

T M

ECH

AN

ICA

L YA

RD IS

OM

ETRI

C

SCALE: MP4.6

1WEST MECHANINCAL YARD ISOMETRIC

L1

VFDEF-4

VFDEF-3

VFDEF-2

VFDEF-1

1

T

SOLAR DOMESTIC HOT WATER DEMOLITION PIPING DIAGRAM

AH-1 & CU-2 REFRIGERANT PIPING DIAGRAM

SCALE: NONE

1MP5.1

(E) 3"CW(E) 3"CW

NORMALLY OPEN

NORMALLY CLOSED

(E) BACK FLOW

(E) 2" POOLWATER MAKE-UP

(E) PUMP

2"PS/PR

(E) 2½"SHR

(E) COLLECTOR ARRAY

(D) SOLAR WATERSTORAGE TANK

(E) AIR VENT

(E) COLLECTOR ARRAY

(E) AIR VENT

(E) COLLECTORARRAY

(E) AIR VENT

(E) 2"SHS

(E) 2½"SHS

TX VALVE(TYP)

SOLENOID VALVE(TYP)

FILTER DRYER (TYP)

SCALE: NONE

2MP5.1

SIGHT GLASS (TYP)

AH1

CU2

7/8"RL

1 5/8"RS

MINIMUM 4'-0" HIGH,1 1/8"SUCTION RISER (TYP-2)

7/8"RL

1 5/8"RS

(E) PVC SLEEVE

CHECK VALVE(TYP-2)

DRAWN BY:

CHECKED BY:

PROJECT NO:

DESIGNED BY:

DATE:

CONSULTANT:

SHEET NUMBER:

DESCRIPTIONREV. DATE

REVISIONS:

APPROVED BY:

- -

- -

- -

- -

- -

SEAL:

-

-

-

-

-

THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.

MECHANICAL ENGINEERING CONSULTANT

5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919

FAX: 775.826.1918WEB: CR-ENG.COM

MGB

CL

CLR

CLR

PERMIT SET

ADDENDUM 2 07/29/161

1600

STA

TE R

OU

TE 8

8

MP5.1

07/13/2016

103915

CA

RSO

N V

ALL

EY S

WIM

CEN

TER

- H

VAC

REP

LAC

EMEN

T

MIN

DEN

, NV

8942

3

DEM

OLI

TIO

N M

ECH

AN

ICA

L PI

PIN

G D

IAG

RAM

S

REMOVED PHASE I FROM DIAGRAM

1

1

T

SOLAR DOMESTIC HOT WATER PIPING DIAGRAMSCALE: NONE

(E) 3"CW(E) 3"CW

NORMALLY OPEN

NORMALLY CLOSED

(E) BACK FLOW

(E) 2" POOLWATERMAKE-UP

(E) PUMP

(E) 2"SHS/R

(E) 2½"SHR

(E) COLLECTOR ARRAY

(E) AIR VENT

(E) COLLECTOR ARRAY

(E) AIR VENT

(E) COLLECTORARRAY

(E) AIR VENT

(E) 2"SHS

(E) 2½"SHS

SST-1

1MP5.2

DRAWN BY:

CHECKED BY:

PROJECT NO:

DESIGNED BY:

DATE:

CONSULTANT:

SHEET NUMBER:

DESCRIPTIONREV. DATE

REVISIONS:

APPROVED BY:

- -

- -

- -

- -

- -

SEAL:

-

-

-

-

-

THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.

MECHANICAL ENGINEERING CONSULTANT

5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919

FAX: 775.826.1918WEB: CR-ENG.COM

MGB

CL

CLR

CLR

PERMIT SET

ADDENDUM 2 07/29/161

1600

STA

TE R

OU

TE 8

8

MP5.2

07/13/2016

103915

CA

RSO

N V

ALL

EY S

WIM

CEN

TER

- H

VAC

REP

LAC

EMEN

T

MIN

DEN

, NV

8942

3

DO

MES

TIC

HO

T W

ATE

R A

ND

SO

LAR

DO

MES

TIC

HO

T W

ATE

R PI

PIN

G D

IAG

RAM

S

1

T

TT

T

T

T

T

T

T

T

T

TT

T

TT

T

TT

T

TT

T

TT

T

T

T

T

T

T

T

T

TT

T

TT

T

TT

T

TT

PP

PP

PP

PP

PP

PP

PP

T

T

PPP

PP

PP

PP

PP

T

PP

PP

PP

PP

PP

PP

PP PP

PP

T P

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP PP

PP

T

PP

PP

PP

PP

PP

PP

T

T

PPP

PP

PP

PP

PP

PP

T

T

PPP

PP

PP

PP

PP

PP

T

T

PPP

PP

PP

PP

PP

PP

T

T

PPP

PP

PP

PP

PP

PP

PP

PP

T

T

PPP

PP

PP

T

PP

PP

PP

PP

PP

PP

PP PP

PP

T P

PP

PP

PP

PP

PP

PP

PP

PP

PP PP

PP

T

PP

PP

PP

PP

PP

PP

T

T

PPP

PP

PP

PP

PP

PP

T

T

PPP

PP

PP

PP

PP

PP

T

T

PPP

PP

PP

PP

T

T

PPP

PP

PP PP

PP

PP PP

PP

PP

NEW PIPING DIAGRAMDEMOLITION PIPING DIAGRAM 2MP5.3SCALE: NONE

1MP5.3SCALE: NONE

(E) HEATEXCHANGERHE-4

(E) HEATEXCHANGERHE-5

(E) HEATEXCHANGERHE-3

(E) HEATEXCHANGER HE-2

(E) HEATEXCHANGER HE-1

(E) HEATEXCHANGERHE-7

(E) HEATEXCHANGERHE-6

(E) PUMP P-13

(E) PUMP P-10

(E) PUMP P-12

(E) PUMP P-9

(E) PUMP P-7

(E) PUMP P-3

(D) PUMP P-4

(D) PUMP P-8

(E) PUMP P-14

(E) PUMP P-11

(D) PUMP P-3

(E) GLYCOLCHANGING CUP

(D) HEATING COILHC-2 AT DH-2

(E) EXPANSIONTANK

(E) RADIANTHEATER RH-

TO (E)RADIANTHEATER RH-

(E) 5"HWS/R

(E) 2½"HWS/R

(E) 2"HWS/R

(E) 2"HWS/R

(E) 5"HWS/R

(E) 2"HWS/R

(E) 4"HWS/R

(E) 2"PS/R

(E) 2"HWS/R

(D) 1½"HWS/R

(E) 2½"HWS/R

(E) 2½"HWS/R

(D) 1/2"HWS/R

(E) 1½"HWS/R

(D) AIRHANDLER AH-1

(E) FLOWCONTROL VALVE

(D) HEATINGCOIL HC-1AT AH-1

(D) UNITHEATER UH-1(E) 2"HWS/R

(E) 1½"PS/R

(E) 4"HWS/R

(E) 4"HWS/R

(E) 4"HWS/R

(E) 3"HWS/R

(D) DEHUMIDIFIER DH-1

(D) DEHUMIDIFIERDH-2

(E) 3"PS/R

(E) 1"PS/R

(E) 2"PS/R

(D) 2"PS/R

(E) 3"PS/R

(D) 1½"HWS/R

(E) 4"PS/R

(E) 1"PS/R

(E) 1"HWS/R

(E) 1"HWS

(E) 1"HWR

(E) 2"HWS

(E) 2"HWR

(E) 4"HWS/R

(E) 4"PS/R

(D) 2"HWS/R

(E) 2"HWS/R

(E) 2"HWS/R

(E) 1"HWS

(E) 1"HWR

HEATING COILIN AIR HANDLERAH-2

(E) SUPPLY TOOUTDOOR POOL

(E) SUPPLY TOOUTDOOR POOL

(E) SUPPLY TOEXERCISE POOL

(E) SUPPLY TOACTIVITY POOL

(E) SUPPLY TOINDOOR POOL

(E) 5"HWS/R

(E) UNIT HEATER

(E) 1"HWS/R

(E) 2"PS/R TOINDOOR POOL

(E) DEHUMIDIFIERDH-3

(E) 1"HWS/R TOCHLORINEBUILDING

(E) HEATEXCHANGERHE-4

(E) HEATEXCHANGERHE-5

(E) HEATEXCHANGERHE-3

(E) HEATEXCHANGER HE-2

(E) HEATEXCHANGERHE-1

(E) HEATEXCHANGERHE-7

(E) HEATEXCHANGERHE-6

(E) PUMP P-13

(E) PUMP P-10

(E) PUMP P-12

(E) PUMP P-9

(E) PUMP P-7

(E) PUMP P-3

(E) PUMP P-14

(E) PUMP P-11

(E) GLYCOLCHANGING CUP

(E) EXPANSIONTANK

(E) RADIANTHEATER RH-

TO (E)RADIANTHEATER RH-

(E) 5"HWS/R

(E) 2½"HWS/R

(E) 2"HWS/R

(E) 2"HWS/R(E) 5"HWS/R

(E) 2"HWS/R

(E) 4"HWS/R

(E) 2"PS/R

(E) 2"HWS/R

(E) 2½"HWS/R

(E) 2½"HWS/R

(E) 1½"HWS/R

(E) FLOWCONTROL VALVE

(E) 2"HWS/R

(E) 1½"PS/R

(E) 4"HWS/R

(E) 4"HWS/R

(E) 4"HWS/R

(E) 3"HWS/R

(E) DEHUMIDIFIERDH-3

(E) 3"PS/R

(E) 1"PS/R

(E) 2"PS/R(E) 3"PS/R

(E) 4"PS/R

(E) 1"PS/R

(E) 1"HWS/R

(E) 1"HWS

(E) 1"HWR

(E) 2"HWS

(E) 2"HWR

(E) 4"HWS/R

(E) 4"PS/R

(E) 2"HWS/R

(E) 2"HWS/R

(E) 1"HWS

(E) 1"HWR

HEATING COILIN AIR HANDLERAH-2

(E) SUPPLY TOOUTDOOR POOL

(E) SUPPLY TOOUTDOOR POOL

(E) SUPPLY TOEXERCISE POOL

(E) SUPPLY TOACTIVITY POOL

(E) SUPPLY TOINDOOR POOL

(E) 5"HWS/R

(E) UNIT HEATER

(E) 1"HWS/R

(E) 2"PS/R TOINDOOR POOL

(E) 1"HWS/R TOCHLORINEBUILDING

DH-1, HEATRECOVERY COIL

3/4"D (TYP)

AUTOMATICAIR VENT (TYP)

PP1

3"PS/R

DH-1, HEATRECOVERY COIL

AUTOMATICAIR VENT (TYP)

PP2

2"PS/R

CAP (E) 2"PS/R

CAP (E) PIPING(TYP-5)

4"HWS/R

DH1

12"MAX

12"MAX

DRAWN BY:

CHECKED BY:

PROJECT NO:

DESIGNED BY:

DATE:

CONSULTANT:

SHEET NUMBER:

DESCRIPTIONREV. DATE

REVISIONS:

APPROVED BY:

- -

- -

- -

- -

- -

SEAL:

-

-

-

-

-

THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.

MECHANICAL ENGINEERING CONSULTANT

5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919

FAX: 775.826.1918WEB: CR-ENG.COM

MGB

CL

CLR

CLR

PERMIT SET

ADDENDUM 2 07/29/161

1600

STA

TE R

OU

TE 8

8

MP5.3

07/13/2016

103915

CA

RSO

N V

ALL

EY S

WIM

CEN

TER

- H

VAC

REP

LAC

EMEN

T

MIN

DEN

, NV

8942

3

HO

T W

ATE

R D

EMO

LITI

ON

PIP

ING

DIA

GRA

M

1

DUCT SUPPORT DETAILSCALE: NONE

PIPE CLAMPS

UNISTRUT

REFRIGERANT PIPING (TYP)

B-LINE C-PORT SERIESSUPPORT (OR APPROVEDEQUAL)

1MP6.1

2MP6.1SCALE: NONE

REFRIGERANT PIPING.PROVIDE ISOLATIONBETWEEN COPPER PIPE ANDSTEEL CHANNEL/CLAMPASSEMBLY

HANGER ROD SECURETO STRUCTURE

1 5/8" 12 GAGECHANNEL OR2"x2"x1/4" ANGLE

PIPE CLAMP (TYP)

REFRIGERANT PIPINGINSULATION. SEESPECIFICATIONS FORREQUIREMENTS

1" MAX

4MP6.1SCALE: NONE

UNI-STRUT CROSSSUPPORT BRACE. BOLTPIPE CLAMP UNI-STRUTCHANNEL (TYPICAL)

PIPE CAP

PIPE CLAMP

ALUMINUM OR STAINLESSSTEEL JACKET

2"R-MAX RIGIDINSULATION

SA DUCT ON ROOF

REPAIR ROOF INSULATIONECT. INSTALL FLASHING &SEAL WATER TIGHT

4"x4"x1/4" STEEL BASEPLATE ATTACHED TOROOF AS REQUIRED

EXISTING ROOF DECK

6MP6.1SCALE: NONE

SECURE ANGLE BRACKET TO

2½" CONCRETE ANCHOR(TYP-4)

18 GAUGE ANGLE BRACKET(TYP-4)

SECURE CONDENSING UNITTO ANGLE BRACKET WITH 1/2"#8 SHEET METAL SCREW (TYP-4)

CONCRETE EQUIPMENT PAD

CONDENSING UNIT

3MP6.1SCALE: NONE

10MP6.1SCALE: NONE

ROUND TAPW/O FITTING

CUSHIONHEAD

ROUND TAPW/O FITTING

ROUND W/CONICAL TAP

RECTANGULAR TAPW/O FITTING

ROUND TAP W/HEEL FITTING

ROUNDLATERAL TAP

RECTANGULAR TAPW/ HEEL FITTING

ROUNDY-FITTING

RECTANGULARY-FITTING

SHORT RADIUS45° ELBOW

RECTANGULARMITERED ELBOW W/

TURNING VANES

SQUARE TOROUND

TRANSITION

SHORT RADIUS90° ELBOW

LONG RADIUS45° ELBOW

LONG RADIUS90° ELBOW

RECTANGULARMITERED ELBOW W/O

TURNING VANES

SQUARE TOROUND W/OTRANSITION

NOTE: APPROVED FITTINGS ARE NOTINTERCHANGABLE. SEE PLANS FOR DUCTLAYOUT AND PREFERREDFITTING.

NOTE: ALSO SEAL JOINT BETWEEN FLASHING AND DUCT WITH EXTERIOR WEATHER-PROOFING SEALANT.SEALANT SHALL BE DESIGN POLYMERICS DP-1010 DUCT SEALANT. APPLY SEALANT IN STRICTCONFORMANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS.

(APPLIES TO FRAME WALLS ONLY - NOT MASONRY OR CONCRETE)TO ALLOW FOR SECURING OF FLASHING TO WALL FRAMINGPROVIDE FRAMING AROUND DUCT OPENING

3" x 2" 24 GAUGE PVC-CLAD SHEET METAL FLASHING (CONTINUOUS/4-SIDED)

SECURE FLASHING TO WALL FRAMING W/ APPROVED FASTENERS & WASHERS.INSTALLED PER ROOF MEMBRANE MANUFACTURER'S WRITTEN INSTRUCTIONS.

SIZE WALL OPENING & FLASHING TO PROVIDE MAXIMUM 1/4" SPACE

BETWEEN ALL SIDES OF DUCT AND OPENING/FLASHING.

APPROVED URETHANE SEALANT

SINGLE PLY MEMBRANE (FULLY ADHERED TO WALL SURFACE)

BACKER ROD & APPROVED URETHANE SEALANT

APPROVED FASTENERS & WASHERS @ 4" O.C.

RECTANGULAR DUCT

SEE NOTE BELOW

SCALE: NONE

8MP6.1

1½"Ø GALVANIZED PIPESUPPORT AT 6'-0'' ONCENTER & AT EACHCORNER. TREAT ALLWELDS WITH COLDGALVANIZED COMPOUND

MAXIMUM PIPE/TUBING SUPPORT SPACING

PIPE MATERIAL

6

SPACING (FT)SIZE (IN)

1-1/2 AND SMALLER

2 AND LARGER 10

SPACING (FT)

ALL

SIZE (IN)

6

BLACK STEEL

1/2

3/4 - 1 8

1-1/4 AND LARGER 10

1/2

3/4 - 1

1-1/4 AND LARGER

6

8

EVERY FLOOR LEVEL

ALLABS ALL

3CPVC

1 AND SMALLER

1¼ AND LARGER 4ALL

COPPER PIPEOR TUBING

BASE AND EACHFLOOR. PROVIDE

MID-STORY GUIDES

EACH FLOOR, NOTTO EXCEED 10 FT

BASE AND EACHFLOOR

VERTICALHORIZONTAL

GENERAL NOTES:

1. PROVIDE FOR EXPANSION EVERY 30 FEET

2. PROVIDE SUPPORT AT EVERY CHANGE IN DIRECTION

3. NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE

41

1

ADJUSTABLE ROLLER HANGERTO 1000 LB. UNIFORM LOADTRAPEZE HANGER FOR UP

ADJUSTABLE CLEVIS HANGER

INSULATION

HANGER ROD

SADDLE

WELD

HANGER RODS

HANGER ROD

10 - 12

1/2 - 4

5 - 8

BAND

1/2

5/8

3/8

NOMINAL PIPE ORTUBE SIZE

(IN)

MINIMUM RODDIAMETER

(IN)

1 5/8" 12 GAUGECHANNEL OR2"x2"x1/4" ANGLE

PROVIDE INSULATIONSHIELD & INSERT FORALL PIPING

INSULATION SHIELD ATHANGER

PROVIDE HIGHCOMPRESSIVE STRENGTHINSULATION INSERT UNDERINSULATION SHIELD

PIPE INSULATION

SCALE: NONE

7MP6.1

SCALE: NONE

11MP6.1

PLAN VIEW

FRONT VIEWELEVATION VIEW

REAR VIEW

CENTRIFUGAL PLENNUMSUPPLY FAN

76x22 SA OPENING

HINGED ACCESSDOOR WITHLOCKING CAM,TYP-ALL

DX COIL

HEATING HOTWATER COIL2" MERV 13

FINAL FILTER

2" MERV 8PRE-FILTERS

DX COIL

HEATING HOTWATER COIL

2" MERV 13FINAL FILTER

2" MERV 8PRE-FILTERS

66x18 RADAMPER

66x18 RA OPENING

66x18 RAOPENING

66x18 RADAMPER

66x18 RADAMPER

MIXING BOX

76x22 SAOPENING

76x22 SAOPENING

DX COILCONNECTION

HEATINGHOT WATERCONNECTION

NOTES:

1. SMOKE DETECTOR FURNISHED, MOUNTED, AND WIRED BY CONTRACTOR.

2. INSTALL PER MANUFACTURE'S INSTALLATION INSTRUCTIONS.

3. PROVIDE ACCESS DOOR AT SAMPLING TUBES.

4. DETECTOR TO BE MOUNTED IN SUPPLY AIR DUCT UNLESS OTHERWISE NOTED.

5MP6.1SCALE: NONE

INTAKE TUBE

MOUNTING PLATE

EXHAUST TUBE

MOUNTING NUTS

DUCT WIDTH

DU

CT

HEI

GH

T

FLEXIBLE CONDUITAS REQUIRED FORPOWER ANDCONTROL CIRCUIT

NEOPRENE GASKET

DUCT

SMOKEDETECTOR

SEALANT

PLUG

SLOPE 1/4" PER 12"

RETURN

SUPPLY

COIL

AIR

PT

PT

PT

PT

BALL VALVE (TYP)

CALIBRATED MANUALBALANCE VALVE

CONTROL VALVE

UNION (TYP)

PRESSURE & TEMPERATURETEST PORT (TYP)

MANUAL AIR VENT

STRAINER

36"x36" MINIMUM SERVICE AREA.COORDINATE WITH OTHERTRADES TO MAINTAIN SPACE FREEOF PIPING, DUCT, CONDUIT,CEILING WIRES, ETC.

FLEXIBLE CONNECTION (TYP)

LOW PRESSURE GASGAS COCK

GROUND JOINT UNION

6"DIRTTRAP

SCALE: NONE

9

EQUIPMENT

MP6.1

FULL GAS PIPE SIZEFLEXIBLE CONNECTOR,METRAFLEX STRAIGHTGAS FLEX CONNECTOR(OR APPROVED EQUAL)

REDUCER(IF NEEDED)

TYPICAL PIPE HANGER DETAIL

AIR HANDLING UNIT (AH-1) DETAIL

REFRIGERANTPIPING SUPPORT DETAIL

REFRIGERANT PIPINGSUPPORT DETAIL

DUCT MOUNTEDSMOKE DETECTOR DETAIL

CONDENSING UNITANCHOR DETAIL

3-WAY COIL PIPING DETAIL

LOW PRESSUREDUCT FITTINGS DETAIL

APPROVED UNACCEPTABLE

RECTANGULAR DUCT THRU VERTICAL WALL FLASHING DETAIL

EQUIPMENT GAS PIPING DETAIL

DRAWN BY:

CHECKED BY:

PROJECT NO:

DESIGNED BY:

DATE:

CONSULTANT:

SHEET NUMBER:

DESCRIPTIONREV. DATE

REVISIONS:

APPROVED BY:

- -

- -

- -

- -

- -

SEAL:

-

-

-

-

-

THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.

MECHANICAL ENGINEERING CONSULTANT

5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919

FAX: 775.826.1918WEB: CR-ENG.COM

MGB

CL

CLR

CLR

PERMIT SET

ADDENDUM 2 07/29/161

1600

STA

TE R

OU

TE 8

8

MP6.1

07/13/2016

103915

CA

RSO

N V

ALL

EY S

WIM

CEN

TER

- H

VAC

REP

LAC

EMEN

T

MIN

DEN

, NV

8942

3

MEC

HA

NIC

AL

DET

AIL

S

1

CO

ILA

CC

ESS

FILT

ERA

CC

ESS

ADDITIONALLIFTING LUG (TYP)

FILT

ERA

CC

ESS

UN

ITA

CC

ESS

CO

-AX

AC

CES

S

ELEC

.A

CC

ESS

VFD

AC

CES

S

UN

ITA

CC

ESS

BLO

WER

AC

CES

S

BLO

WER

AC

CES

S

LEFT HAND SIDE VIEW

TOP VIEW

FRONT VIEW

RA

SA

LIFTING LUGS: 6"LONG, 2½"Ø HOLE (TYP)

BASE: 12"H

SA OUTLET SIZE(96x54)

HEAT RECOVERY COIL

MIN EA OUTLETOUTLET CWMOTORIZED DAMPERAND HOODS

RA FILTERS

EVAPORATOR

TOP OA INLET CWMOTORIZED DAMPERS,FILTERS, AND HOOD

OA FILTERS

REHEATCOIL

SA BLOWERS

COMPRESSORS

COOLED AIR ACCONNECTIONS

MIN EA BLOWER

RA DAMPER

DRAIN PIPE: DRIP PANCW 1½" O.D.RA INLET (106x44)

ELECTRICAL SECTION CWOPERATOR PANEL AND DEADFRONT NON-FUSED DISCONNECTSWITCHVFD CONTROLLERS

POOL WATERCONNECTIONS

POOL WATERHEATERS

HOT WATER COIL

SCALE: NONE

1MP6.2

OA

RA

SA

44"

15"

104"96"

113"

7 3/4

408"

120" 6"

34"

134"

EA

54"

HINGED ACCESSDOORS WITHLOCKING CAMS

DEHUMIDIFICATION UNIT (DH-1) DETAIL DRAWN BY:

CHECKED BY:

PROJECT NO:

DESIGNED BY:

DATE:

CONSULTANT:

SHEET NUMBER:

DESCRIPTIONREV. DATE

REVISIONS:

APPROVED BY:

- -

- -

- -

- -

- -

SEAL:

-

-

-

-

-

THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.

MECHANICAL ENGINEERING CONSULTANT

5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919

FAX: 775.826.1918WEB: CR-ENG.COM

MGB

CL

CLR

CLR

PERMIT SET

ADDENDUM 2 07/29/161

1600

STA

TE R

OU

TE 8

8

MP6.2

07/13/2016

103915

CA

RSO

N V

ALL

EY S

WIM

CEN

TER

- H

VAC

REP

LAC

EMEN

T

MIN

DEN

, NV

8942

3

MEC

HA

NIC

AL

UN

IT P

LAN

S

1

DS

DSDS

460/3

460/3

120V

COMMUNICATION BUS

EVAPORATIVESECTION

MUA CONTROLLER

(N) RELAY

DDC LEAVING AIRTEMPERATURESENSOR

FACTORY LEAVINGAIR TEMPERATURESENSOR

EXISTING ROOMTEMPERATURE SENSOR

EXISTING RELAY

EXISTING SLIDE TOWEREXHAUST FAN (EF-13B)

EXISTING SLIDE TOWEREXHAUST FAN (EF-13A)

EXISTING SLIDE TOWER DDC CONTROLLER

460/3

COMMUNICATION BUS

C

C

H

C

T/H RM

460/3

EXISTINGEXHAUST FAN(EF-6)

460/3

EXISTINGEXHAUST FAN(EF-6)

120V

TEMPERATURE CONTROL SYMBOL LEGEND

CONTROL NOTESMAKE-UP AIRSEQUENCE OF OPERATION

AIR HANDLERS (AH-1)SEQUENCE OF OPERATION

SLIDE TOWER MAKEUP UNIT CONTROL DIAGRAM

AIR HANDLER (AH-1 & CU-2) CONTROL DIAGRAM

BY MECHANICAL CONTRACTOR

TRANSFORMER (SIZE & VOLTAGE AS REQUIRED)

SMOKE DETECTOR

RELAY (POLES AND VOLTAGE AS REQUIRED)

BY ELECTRICAL CONTRACTOR

OUTSIDE AIR TEMPERATURE/HUMIDITY SENSOR

MODULATING ACTUATOR (BELIMO)

TX

E

M

VFD VARIABLE FREQUENCY DRIVE

TMA

TS

TSA

TRA

SD

S

RTS

MS

R

OA

OSP

M

TEMPERATURE SENSOR (PENCIL TYPE)

ROOM TEMPERATURE SENSOR

TEMPERATURE - MIXED AIR SENSOR

TEMPERATURE - SUPPLY AIR SENSOR

TEMPERATURE - RETURN AIR SENSOR

ALARM STROBE

OUTDOOR STATIC PRESSURE SENSOR

MOTOR STARTER

FS

H

DS

DSP

DP

AS

CS

DMSD

SYMBOL

DIFFERENTIAL PRESSURE SENSOR

DISCONNECT SWITCH (FUSED)

DUCT STATIC PRESSURE SENSOR

FLOW SWITCH

ALARM HORN

AVERAGING SENSOR

CURRENT SENSOR/SWITCH

DUCT MOUNTED SMOKE DETECTOR

DESCRIPTION

RCV

ACV AIR HANDLER HOT WATER CONTROL VALVE (BELIMO)

BSP BUILDING STATIC PRESSURE SENSOR

REHEAT HOT WATER CONTROL VALVE

HDS HIGH DUCT STATIC PRESSURE SENSOR

1.

2.

3.

4.

5.

6.

EXISTING BUILDING CONTROL SYSTEM IS AN ALERTON SYSTEM.

CONTROLS CONTRACTOR CONTACT:BUILDING CONTROL SERVICES (BCS)8521 WHITE FIR STREETRENO, NEVADA 89523PH: (775) 826-8998CONTACT: TOM HULBERT

ALL WIRING TO BE IN CONDUIT. PLENUM RATED CABLE WITH J-HOOKS IS ALLOWED FOR ABOVECEILING INSTALLATION.

CONTROL SYSTEM CONTRACTOR SHALL PROVIDE A COMPLETE DIRECT DIGITAL CONTROL SYSTEM.PROVIDE AND INSTALL ALL NECESSARY WIRING TO MAKE SYSTEM OPERATIONAL ALL WIRING SHALL BEIN CONDUIT WITH ANY SPLICES MADE IN JUNCTION BOXES, REFER TO CONTROL DIAGRAMS ANDSEQUENCE OF OPERATION ON DRAWINGS.

CONTROLS CONTRACTOR SHALL CONNECT NEW CONTROLLERS TO THE CONTROL NETWORK ANDADD NEW GRAPHICS.

CONTROLS CONTRACTOR TO COORDINATE UNIT LABELING ON GRAPHICS, THERMOSTAT, ANDCONTROLLER WITH CARSON VALLEY SWIM CENTER PRIOR TO INSTALLATION.

EXHAUST FAN

HUMIDITY SENSORHS

EF

RAT RETURN AIR TEMPERATURE SENSOR

5. WHENEVER VENTILATION ONLY IS REQUIRED, ROOM THERMOSTAT DE-ENERGIZESHEATING AND EVAPORATIVE COOLING PUMP ON MUA-1.

6. EVAPORATIVE COOLER FILL AND DRAIN VALVES BV ARE POSITIONED TO DRAIN SUMP FOR 1HOUR AT 1:00 AM DAILY THROUGH DOC.

1. WHENEVER EXISTING PRESSURE SWITCH IS DE-ENERGIZED, ROOM THERMOSTAT DE-ENERGIZESMAXITROL HEATING CONTROL, EVAPORATIVE COOLER PUMP, SUPPLY AIR AND EXHAUST AIRFANS. CLOSES OA DAMPER OPENS MINUTES LATER AND ENERGIZES NIGHT LOW LIMITSETPONT.

3. EXISTING THERMOSTAT INTERNAL BY-PASS SWITCH OVERRIDES TIME CLOCK AND PLACES UNITIN "OCCUPIED CYCLE" MODE FOR PROGRAMMED LENGTH OF TIME.

1. PRODUCTS OF COMBUSTION DETECTOR POCD DE-ENERGICES MUA UNIT EXHAUST AIRFANS AND CLOSES OA DAMPER WHENEVER SMOKE IS PRESENT.

2. MUS UNIT SAFETY DEVICES DE-ENERGIZE UNIT UN ACCORDANCE WITH MANUFACTURER'SREQUIREMENTS WHENEVER ACTIVATED.

3. EVAPORATIVE COOLER FILL AND DRAIN VALVE ARE POSITIONED TO DRAIN SUMPWHENEVER OA TEMPERATURE FALLS BELOW SETPOINT.

4. MUA UNIT INTERNAL SUPPLY AIR MAXITROL 44 TEMPERATURE SENSOR OVERRIDES ROOMTEMPERATURE SENSOR TRM WHENEVER SUPPLY AIR TEMPERATURES EXCEED HIGH OR LOWLIMITS.

A. OCCUPIED CYCLE

B. UNOCCUPIED CYCLE

C. SAFETY CONTROLS

D. OPERATOR'S TERMINAL

1. EXISTING PRESSURE SWITCH "P" ENERGIZES MAKE-UP AIR UNIT (MUA-1) THROUGH DDCCONTROLLER WHENEVER EXISTING SLIDE LOUVER PUMPS START.

2. EXISTING ROOM THERMOSTAT OPENS OA DAMPER STARTS SUPPLY AIR ON MUA-1 ANDEXISTING SLIDE TOWER EXHAUST FANS.

3. WHENEVER COOLING IS REQUIRED BY ROOM THERMOSTAT HEATING ISDE-ENERGIZED AND EVAPORATIVE COOLER PUMP STARTS ON MUA-1.

1. MUA-1 COMMAND (ON/OFF).

2. MUA-1 CODE COMMAND (HEATING/COOLING).

3. ROOM TEMPERATURE SET POINT COMMAND (HEATING/COOLING/NIGHT LOW LIMITS).

4. CURRENT ROOM TEMPERATURE.

5. CURRENT OA TEMPERATURE (GLOBAL).

6. OA TEMPERATURE CHANGE OVER COMMAND (HEATING/COOLING).

7. ALARM ROOM TEMPERATURE (HIGH/LOW).

8. ALARM UNIT FAILURE (OFF).

4. WHENEVER HEATING IS REQUIRED, ROOM THERMOSTAT ENERGIZES GAS CONTROL VALVEON MUA-1 IN ACCORDANCE WITH MUA-1 MANUFACTURER REQUIREMENTS.

2. WHENEVER ROOM TEMPERATURE FALLS BELOW NIGHT LOW LIMIT SET POINT MUA-1OUTSIDE AIR DAMPER OPENS AND GAS CONTROL VALVE IS ENERGIZED.

A. WARM-UP CYCLE

B. OCCUPIED CYCLE

C. UNOCCUPIED CYCLE

D. SAFETY CONTROL

1. FREEZE THERMOSTAT DE-ENERGIZES UNIT WHENEVER TEMPERATURE FALLS BELOWSETPOINT, OA DAMPERS CLOSE AND HEATING HOT WATER VALVE VH OPENS FULLY.

2. PRODUCTS OF COMBUSTION DETECTOR DE-ENERGIZES UNIT IN ACCORDANCEWITH MANUFACTURER'S REQUIREMENTS.

1. ROOM TEMPERATURE SENSOR IN CONJUNCTION WITH EXISTING GLOBAL OA SENSORSTARTS SUPPLY AIR FAN AND ENERGIZES CONTROLS UTILIZING EXISTING OA SENSOR,STARTS SUPPLY AIR FAN AND ENERGIZES CONTROLS UTILIZING OPTIMUM STARTPROGRAM TO REACH "OCCUPIED CYCLE" ROOM TEMPERATURE AT SCHEDULED TIMEOFOCCUPANCY.

2. OA DAMPER REMAINS CLOSED.

3. HEATING WATER VALVE IS FULL OPEN.

1. SUPPLY AIR FAN STARTS IF NOT ALREADY RUNNING THROUGH "WARM-UP CYCLE" ATPROGRAMMED TIME.

2. OA DAMPERS OPEN TO MINIMUM POSITION AND INTERLOCKED EXISTING EXHAUST AIRFANS START.

3. MIXED AIR TEMPERATURE SENSOR MODULATES OA AND RA DAMPERS TOMAINTAIN SETPOINT. RETURN AIR TEMPERATURE/ HUMIDITY SENSOR OVERRIDESMIXED AIR SENSOR AND CLOSES OA DAMPER.

4. EXISTING ROOM TEMPERATURE/ HUMIDITY SENSOR MODULATES HEATING WATER VALVEAND CYCLES CONDENSING UNIT IN SEQUENCE TO MAINTAIN HEATING/ COOLINGTEMPERATURE SETPOINTS.

5. ROOM AND RETURN AIR TEMPERATURE/ HUMIDITY SENSORS MONITOR RESPECTIVERELATIVE HUMIDITY CONDITIONS (NOTE THAT THEY MAY BEUSED FOR CONTROL IF CONDITIONS WARRANT).

1. SUPPLY AIR FAN STOPS AT PROGRAMMED. OA DAMPERS CLOSE, INTERLOCKEDEXHAUST AIR FANS STOP AND HEATING WATER VALVES VH OPEN.

2. OA DAMPERS CLOSE, INTERLOCKED EXHAUST AIR FANS STOP AND HEATING WATERVALVES VH OPEN. ROOM TEMPERATURE/ HUMIDITY SENSOR T/HRM RESETS TO THENIGHT LOW LIMIT SETPOINT AND CYCLES TO MAINTAIN SETPOINT.

3. ROOM SENSOR INTERNAL BY-PASS TIMER OVERRIDES THE NIGHT LOW LIMIT FUNCTIONAND PLACES THE SYSTEM IN "OCCUPIED CYCLE" MODE FOR PRE-PROGRAMMEDLENGTH OF TIME.

E. OPERATOR'S TERMINAL

1. FAN COMMAND.2. SUPPLY AIR TEMPERATURE SETPOINT COMMAND.3. SUPPLY AIR TEMPERATURE ALARM COMMAND.4. MIXED AIR ROOM TEMPERATURE SETPOINT COMMAND.5. ROOM TEMPERATURE SETPOINT COMMAND.6. ROOM TEMPERATURE ALARM COMMAND.7. CURRENT ROOM TEMPERATURE.8. CURRENT ROOM RELATIVE HUMIDITY.9. CURRENT SUPPLY AIR TEMPERATURE.10. CURRENT MIXED AIR TEMPERATURE.11. CURRENT RETURN AIR TEMPERATURE.12. CURRENT RETURN AIR RELATIVE HUMIDITY.13. CURRENT OA TEMPERATURE (GLOBAL).14. CURRENT VALVE POSITION COMMAND (%OPEN).15. CURRENT OA DAMPER POSITION COMAND (%OPEN).16. ALARM ROOM TEMPERATURE (HIGH/LOW).17. ALARM ROOM RELATIVE HUMIDITY (HIGH/LOW).18. ALARM AIR COOLED CONDENSER FAILURE.19 ALARM PCOD ACTIVATED.20. ALARM FREEZE THERMOSTAT ACTIVATED.

R

M

R

MSMS

MSMS

RTS

LAT

LAT

MUA1

1MP7.1SCALE: NONE

2MP7.1SCALE: NONE

R R

DS

OAT

M

TRA

MATTSA TF

120V

AH-1 DDC CONTROLLER

HWR

HWS

OA SA

120V

TX DS

MSMS MSMS

EA

TX DS

VFD

DMSD

CU2

AH1

EA

EXISTING

DMSD

M

M

M

NO

NO

NC

NORMALLY CLOSED

NO

NC

NORMALLY OPEN

DV-1

DV-2

FV-1

DRAWN BY:

CHECKED BY:

PROJECT NO:

DESIGNED BY:

DATE:

CONSULTANT:

SHEET NUMBER:

DESCRIPTIONREV. DATE

REVISIONS:

APPROVED BY:

- -

- -

- -

- -

- -

SEAL:

-

-

-

-

-

THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.

MECHANICAL ENGINEERING CONSULTANT

5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919

FAX: 775.826.1918WEB: CR-ENG.COM

MGB

CL

CLR

CLR

PERMIT SET

ADDENDUM 2 07/29/161

1600

STA

TE R

OU

TE 8

8

MP7.1

07/13/2016

103915

CA

RSO

N V

ALL

EY S

WIM

CEN

TER

- H

VAC

REP

LAC

EMEN

T

MIN

DEN

, NV

8942

3

CO

NTR

OL

DIA

GRA

M A

ND

SEQ

UEC

NC

E O

F O

PERA

TIO

N

1

T T

T T

120V

120V

DEHUMIDIFICATION UNIT (DH-1) SEQUENCE OF OPERATION

DEHUMIDIFICATION UNIT CONTROLLER DIAGRAM

DH-1 CONTROL NOTESA. SUPPLY AIR POWER

EXHAUST AIR POWERB.

EXHAUST AIR DAMPER(S)C.

OUTDOOR AIR DAMPERD.

DEHUMIDIFICATION MODEE.

POOL WATER HEATING MODEF.

1. OPERATION IS CONTINUOUS.

2. BLOWER STOPS AND ALL MOTORIZED DAMPERS CLOSE ON:

a. POWER FAILUREb. FIRESTAT ALARMc. FREEZESTAT ALARMd. REMOTE OFF CONTROL (MANUAL)

1. EF1 BLOWER OPERATION IS CONTINUOUS AND CAN BE CONTROLLED BY AN OCCUPIED/UNOCCUPIED SIGNAL FROM THE BMS TO MAINTAIN A NEGATIVE SPACE PRESSUREDEHUMIDIFICATION UNIT (DH-1) INTERNAL EXHAUST FAN EXHAUSTS 10%%% MORE AIR THAN IS INTRODUCED THROUGH THE OUTDOOR AIR OPENING AT MINIMUM SETPOINT.

2. REMOTE EXHAUST FANS (EF-1, EF-2, EF-3, AND EF-4) OPERATES ONLY ON CALL FOR DEHUMIDIFICATION UNIT (DH-1) PURGE MODE OR ECONOMIZER MODE.

3. BLOWERS STOP AND ALL EXHAUST AIR MOTORIZED DAMPERS CLOSE ON:

POWER FAILUREFIRESTAT ALARMFREEZESTAT ALARMREMOTE OFF CONTROL (MANUAL OR FROM BMS)

1. DAMPER IS NORMALLY CLOSED (UNOCCUPIED MODE).

2. ON AN OCCUPIED SIGNAL FROM THE BMS OR SEVEN_DAY TIME CLOCK THE DAMPER OPENS TO THE MINIMUM SETPOINT. RETURN AIR IS EXHAUSTED TO MAINTAIN NEGATIVEPRESSURE IN THE NATATORIUM.

3. ON SECOND STAGE EXHAUST SIGNAL THE DAMPER OPENS TO ALLOW SECOND STAGE EXHAUST FROM THE SPACE.

4. ON DEHUMIDIFICATION UNIT (DH-1) PURGE MODE SIGNAL THE DAMPER OPENS FULLY TO EVACUATE 100% INDOOR AIR FROM THE SPACE.

5. ALL MOTORIZED DAMPERS CLOSE ON SUPPLY AIR BLOWER STOP.

1. DAMPER IS NORMALLY CLOSED (UNOCCUPIED MODE).

2. ON AN OCCUPIED SIGNAL FROM THE BMS OR SEVEN_DAY TIME CLOCK THE DAMPER OPENS TO THE MINIMUM SETPOINT. OUTDOOR AIR IS INTRODUCED TO MEET THE LOCALCODE REQUIREMENTS.

3. ON DEHUMIDIFICATION UNIT (DH-1) PURGE MODE SIGNAL THE DAMPER OPENS FULLY TO EVACUATE MAXIMUM AIRFLOW FROM THE SPACE.

4. ALL MOTORIZED DAMPERS CLOSE ON SUPPLY AIR BLOWER STOP.

1. DEHUMIDIFICATION MODE OCCURS WHEN THE ROOM RELATIVE HUMIDITY RISES ABOVE SETPOINT OF 50%RH (ADJUSTABLE THROUGH BMS).

a. THE OUTDOOR AIR SENSORS (TEMPERATURE AND %RH) WILL VERIFY IF ECONOMIZER DEHUMIDIFICATION IS POSSIBLE. THE MICROPROCESSOR'S FLOATING SETPOINT VERIFIESTHAT THE OUTDOOR AIR IS COOLER AND DRYER THAN THE ACTUAL INDOOR CONDITION.

b. IF OUTDOOR AIR IS NOT SUITABLE FOR ECONOMIZER OPERATION, COMPRESSOR #1 AND 2 STARTS TO OPERATE IN "FIRST STAGE DEHUMIDIFICATION AND HOT GAS REHEATMODE". THE HOT GAS REHEAT COIL IS ENERGIZED.

c. COMPRESSOR #1 AND 2 STARTS TO OPERATE IN "FIRST STAGE DEHUMIDIFICATION AND HOT GAS REHEAT MODE". THE HOT GAS REHEAT COIL IS ENERGIZED.

d. IF THE ROOM RELATIVE HUMIDITY CLIMBS BY AN ADDITIONAL 5%RH OR IF HIGH LIMIT OF 60%RH IS REACHED, COMPRESSOR #3 AND 4 STARTS TO OPERATE AS WELL. THEUNIT IS IN "SECOND STAGE DEHUMIDIFICATION AND HOT GAS REHEAT MODE".

1. POOL WATER HEATING MODE OCCURS WHEN THE POOL WATER TEMPERATURE DROPS 1°F BELOW SETPOINT.

a. STAGE #1A: IF THE COMPRESSOR IS ALREADY OPERATING IN DEHUMIDIFICATION MODE OR COOLING MODE THE COMPRESSOR HOT GAS IS USED FOR WATER HEATING.

b. STAGE #1B: IF ALL ROOM CONDITIONS ARE SATISFIED [I.E. COMPRESSOR IS OFF], THE MICROPROCESSOR WILL SEND A SIGNAL TO THE AUXILIARY POOL WATER HEATER TOMAINTAIN WATER TEMPERATURE.

c. STAGE #2: IF THE COMPRESSOR IS ALREADY OPERATING IN STAGE #1 POOL WATER HEATING MODE AND THERE IS A CALL FOR 2ND STAGE POOL WATER HEATING [2°FBELOW SETPOINT], THEN THE MICROPROCESSOR WILL SEND A SIGNAL TO THE AUXILIARY POOL WATER HEATER TO MAINTAIN WATER TEMPERATURE.

d. STAGE #2: IF COMPRESSOR #3_4 IS ALREADY OPERATING IN 2ND STAGE DEHUMIDIFICATION MODE OR 2ND STAGE COOLING MODE AND THERE IS A CALL FOR 2ND STAGEPOOL WATER HEATING [2°F BELOW SETPOINT], COMPRESSOR #2 HOT GAS IS USED TO MAINTAIN WATER TEMPERATURE.

e. STAGE #3: IF THE POOL WATER DROPS 3°F BELOW SETPOINT, A CALL FOR 3RD STAGE POOL WATER HEATING OCCURS AND THE MICROPROCESSOR WILL ALSO SEND ASIGNAL THE AUXILIARY POOL WATER HEATER TO MAINTAIN WATER TEMPERATURE.

f. COMPRESSOR OPERATION IN DEHUMIDIFICATION MODE AND COOLING MODE IS NEVER INTERRUPTED BY LACK OF WATER FLOW TO THE UNIT.

g. SHOULD WATER FLOW BE INTERRUPTED, THE MICROPROCESSOR WILL LOCK OUT WATER HEATING MODE AND DISPLAY LOW WATER FLOW' MESSAGE ON THE OPERATORPANEL. ALL OTHER MODES OF OPERATION WILL OPERATE NORMALLY.

a.b.c.d.

MS

CS

460V

MS

CS

460V

CU1A

CU1B

OAT

VFD

MS CS 460V

DSPM

M

M

DS

460V

VFD

CSENABLEINPUT SPEEDOUTPUT SPEEDALARM

DS

460V

VFD

CSENABLEINPUT SPEEDOUTPUT SPEEDALARM

DS

460V

VFD

CSENABLEINPUT SPEEDOUTPUT SPEEDALARM

DS

460V

VFD

CSENABLEINPUT SPEEDOUTPUT SPEEDALARM

RTS HS

EF1

EF2

EF3

EF4

VFDEF-2

DH1

HEATING COIL

EVAPORATOR COILUNITCONTROLLER

INTERNALEXHAUST FAN

SARA

EA

OA

EXHAUST AIRDAMPER

RETURN AIRDAMPEROUTSIDE AIRDAMPER

HEAT RECOVERYCOIL

DEHUMIDIFICATION UNIT CONTROLLER (PROVIDED W/ EQUIPMENT )

1MP7.2SCALE: NONE

G. COOLING MODE

ECONOMIZER MODEH.

SPACE HEATING MODEI.

DEHUMIDIFICATION UNIT (DH-1) PURGE MODEJ.

SMART SAVER HEAT RECOVERYK.

ZERO AIR REHEAT MODEL.

1. WHEN THERE IS A CALL FOR DEHUMIDIFICATION & THE SPACE TEMPERATURE IS IN THE DEADBAND, BOTH THE AIR REHEAT COIL & THE (REMOTE) OUTDOOR AIR COOLED AREACTIVATED TO ACHIEVE A NEUTRAL SUPPLY AIR TEMPERATURE.

2. LEAD/LAG MODE: COMPRESSOR STARTING ORDER SHALL ALTERNATE TO MAINTAIN EQUAL RUN TIME.

1. DURING OCCUPIED PERIOD, THE OUTDOOR AIR DAMPERS OPEN TO MINIMUM POSITION. EXHAUST AIR BLOWER EF1 IS ACTIVATED. HEAT CONTAINED IN THE EXHAUST AIR ISTRANSFERRED TO THE INCOMING OUTDOOR AIR VIA THE AIR_TO_REFRIGERANT HEAT EXCHANGERS.

2. DURING UNOCCUPIED PERIOD, THE OUTDOOR AIR DAMPERS AND EXHAUST AIR BACKDRAFT DAMPERS STAY IN CLOSED POSITION.

1. DEHUMIDIFICATION UNIT (DH-1) PURGE MODE OCCURS ON A CALL FOR DEHUMIDIFICATION UNIT (DH-1) PURGE MODE FROM DEHUMIDIFICATION UNIT (DH-1)OPERATORPANEL OR REMOTE PUSH BUTTON (BY OTHERS) MOMENTARY SIGNAL. THIS TIMER_OPERATED MODE (2_20 MINUTES) IS INTENDED TO VENTILATE THE SPACE WITH ONE COMPLETEAIR CHANGE AND THEN AUTOMATICALLY RESUME NORMAL OPERATION.

a. DEHUMIDIFICATION UNIT (DH-1) COMPRESSOR(S) ARE STOPPED.

b. FACE AND BYPASS DAMPERS ON EVAPORATOR CLOSE PARTIALLY.

c. OUTDOOR AIR DAMPER OPENS FULLY TO ALLOW 100% OUTDOOR AIR INTO THE DRY_O_TRON®.

d. EXHAUST AIR DAMPER(S) OPEN(S) FULLY.

e. REMOTE EXHAUST FANS (EF-1, EF-2, EF-3, AND EF-4) OPERATE TO EVACUATE MAXIMUM AIRFLOW FROM THE SPACE.

f. OUTDOOR AIR DAMPER OPENS TO ALLOW 100% OUTDOOR AIR INTO THE DRY_O_TRON®.

g. AUTOMATED PURGE SCHEDULED TO BE ACTIVATED 15 MINUTES AFTER CLOSE (UNOCCUPIED PERIOD) AND 1 HOUR PRIOR TO OPENING (OCCUPIED PERIOD).

h. SMART PURGE: IF OA TEMPERATURE IS BELOW 65°F ONLY PREHEAT SA TO 65°F.

1. COOLING MODE OCCURS WHEN THE SPACE TEMPERATURE IS ABOVE SETPOINT.

a. THE OUTDOOR AIR SENSORS (TEMPERATURE AND %RH) VERIFY IF ECONOMIZER COOLING IS POSSIBLE. THE MICROPROCESSOR'S FLOATING SETPOINT VERIFIES THAT THEOUTDOOR AIR IS COOLER AND DRYER THAN THE ACTUAL INDOOR CONDITION.

b. IF OUTDOOR AIR IS NOT SUITABLE FOR ECONOMIZER COOLING, COMPRESSOR #1 STARTS TO OPERATE IN "FIRST STAGE COOLING MODE".

c. IF THE ROOM TEMPERATURE CONTINUES TO CLIMB BY 1°F, COMPRESSOR #2_4 STARTS TO OPERATE IN "SECOND STAGE COOLING MODE".

d. THE OUTDOOR AIR SENSORS (TEMPERATURE AND %RH) WILL VERIFY IF ECONOMIZER COOLING IS POSSIBLE.

e. IF OUTDOOR AIR IS NOT SUITABLE FOR ECONOMIZER COOLING, COMPRESSOR STARTS TO OPERATE IN "COOLING MODE".

f. COMPRESSOR STARTS TO OPERATE IN "COOLING MODE".

2. THE (REMOTE) OUTDOOR AIR_COOLED CONDENSER REJECTS COMPRESSORS' TOTAL HEAT OF REJECTION AS REQUIRED. POOL WATER HEATING MODE OCCURS WHEN THE POOLWATER TEMPERATURE DROPS 1°F BELOW SETPOINT.

1. ECONOMIZER MODE WILL OPERATE WHENEVER OUTDOOR CONDITIONS PERMIT AND OVERRIDE COMPRESSOR OPERATION.

a. IF THERE IS A CALL FOR COOLING, THE MICROPROCESSOR WILL VERIFY THAT THE OUTDOOR TEMPERATURE IS SUITABLE. IF YES, THE UNIT WILL OPERATE IN ECONOMIZERCOOLING MODE.

b. IF THERE IS A CALL FOR DEHUMIDIFICATION, THE MICROPROCESSOR WILL VERIFY THAT THE OUTDOOR MOISTURE LEVEL IS SUITABLE. IF YES AND THE OUTDOORTEMPERATURE IS NEUTRAL TO THE SPACE, THE UNIT WILL OPERATE IN ECONOMIZER DEHUMIDIFICATION MODE.

c. IF THERE IS A CALL FOR BOTH COOLING AND DEHUMIDIFICATION, THE MICROPROCESSOR WILL VERIFY THAT THE OUTDOOR TEMPERATURE AND THE OUTDOOR MOISTURELEVEL ARE SUITABLE. IF YES, THE UNIT WILL OPERATE IN ECONOMIZER COOLING AND DEHUMIDIFICATION MODE.

d. DURING ECONOMIZER MODE THE MOTORIZED O/A DAMPER OPENS TO 100% AND R/A DAMPERS (EVAPORATOR FACE AND BYPASS DAMPER) FULLY CLOSE. SUPPLY FAN ANDALL EXHAUST FANS (EF1 & EF2) VENTILATE THE SPACE WITH 100% OUTDOOR AIR.

1. HEATING MODE OCCURS WHEN THE SPACE TEMPERATURE DROPS BELOW SETPOINT.

a. IF THE ROOM TEMPERATURE DROPS BELOW SETPOINT THE DRY_O_TRON®'S MICROPROCESSOR WILL SEND A 10V DC SIGNAL AND UP TO 2 STAGE ON_OFF SIGNAL TO ASPACE HEATING COIL (FACTORY MOUNTED) TO MAINTAIN SPACE TEMPERATURE. ACCURACY IS ACHIEVED THROUGH A PID (PROPORTIONING/INTEGRAL/DERIVATIVE)HEATING CONTROL TO ELIMINATE STALLED ROOM TEMPERATURES.

b. IF THE ROOM TEMPERATURE DROPS BELOW SETPOINT THE DRY_O_TRON®'S MICROPROCESSOR WILL SEND A SIGNAL TO A HOT WATER SPACE HEATING COIL (FACTORYMOUNTED) TO MAINTAIN SPACE TEMPERATURE.

c. UNIT MOUNTED HEATING COIL FREEZE PROTECTION MODE; IF HEATING COIL AVERAGE LEAVING AIR TEMPERATURE FALLS BELOW 45°F (ADJUSTABLE) THE BLOWERS SHUTDOWN, ALL DAMPERS CLOSE AND CONTROL VALVES SHOULD FAIL TO FULL OPEN.

ALERTON CONTROLLER

FILTERS

DP

TSA

DMSDRSA

MAT

TX DS

TX DS

OAT

VFDEF-3

VFDEF-4

VFDEF-1

HWR

HWS

PP1

MS

CS

460V

PP2

MS

CS

460V

1. EQUIPMENT MANUFACTURER IS TO COORDINATE WITH CONTROLS CONTRACTOR A MINIMUM OF 2WORKING DAYS PRIOR TO BID.

2. DH-1 EQUIPMENT MANUFACTURER TO PROVIDE BACKNET MSTP INTERFACE, PROGRAMMING,START-UP AND TESTING.

3. DH-1 SUPPLY AND EXHAUST FAN VARIABLE FREQUENCY DRIVES (VFD) ARE TO BE FACTORY INSTALLED,WIRED, MOUNTED, AND TESTED.

E

E

EEEE

BACNET

BACNET

BACNET

BACNET

E

M M

M M M M

M

M

M

M

M

M M

E E

M

M

M

M

M ME

M

M

M M

M

E

M

MMM

NEWTEMPERATURESENSOR INPOOL SUPPLY(TYP-2)

MM

MM

DRAWN BY:

CHECKED BY:

PROJECT NO:

DESIGNED BY:

DATE:

CONSULTANT:

SHEET NUMBER:

DESCRIPTIONREV. DATE

REVISIONS:

APPROVED BY:

- -

- -

- -

- -

- -

SEAL:

-

-

-

-

-

THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND THE DESIGNS ARE THE EXCLUSIVE PROPERTYOF CR ENGINEERING. THIS DRAWING MAY NOT BEREPRODUCED IN ANY WAY, INCLUDING DESIGNCONCEPTS AND IDEAS, WITHOUT THE EXPRESSWRITTEN AUTHORIZATION FROM CR ENGINEERING.

MECHANICAL ENGINEERING CONSULTANT

5434 LONGLEY LANERENO, NEVADA 89511PHONE: 775.826.1919

FAX: 775.826.1918WEB: CR-ENG.COM

MGB

CL

CLR

CLR

PERMIT SET

ADDENDUM 2 07/29/161

1600

STA

TE R

OU

TE 8

8

MP7.2

07/13/2016

103915

CA

RSO

N V

ALL

EY S

WIM

CEN

TER

- H

VAC

REP

LAC

EMEN

T

MIN

DEN

, NV

8942

3

CO

NTR

OL

DIA

GRA

MS

1