    1/7

    Draft Survey: Specimen of Calculation

    The Ships Particulars shown :

    Name of Vessel : MV. OCEAN BALL, Port of Registry (POR) : Panama,

    Length Over All (LOA) : 182.00 M, Length Between Perpendiculars (LBP) : 179.00 M, Breath (B) : 32.20 M, Depth (D) : 17.15 M, Gross Tonnage (GT) : 28,342 MT, Net Tonnage (NT) : 17,664 MT, Summer Draft (SD) : 12.163 M, Summer Deadweight (DWT) : 52,998 MT, Light Ship (LS) : 7,780 MT, Constant (CS) : 320 MT, Fore Distance to Perpendicular (Fd) : 1.70 M, After Distance to Perpendicular (Ad) : 9.45 M.See Picture :

    The Surveyor came onboard and made Draft Survey to determine the quantity of cargo on arrival.

    - Fore Draft Port (FP) : 10.79 M / Fore Draft Starboard (FS) : 10.81 M.

    - Mid Draft Port (MP) : 10.90 M / Mid Draft Starboard (MS) : 11.03 M.

    - Aft Draft Port (AP) : 11.16 M / Aft Draft Starboard (AF) : 11.19 M.

    - Density of Sea Water Sample (Den) : 1.021.

    - Ballast Water (BW) : 265.00 Cubic Meter at Density 1.025,Fresh Water (FW) : 183.00 MT.

    - Fuel Oil (FO) : 612.00 MT, - Diesel Oil (DO) : 161.00 MT,Lub Oil (LO) : 29.00 MT.

    The Draft Survey Calculation is described as below :

    Raw Draft Calculation

    - Fore Mean (Fm) = (FP + FS) / 2 = (10.79 + 10.81) / 2 = 21.60 / 2 = 10.800 M.

    - Mid Mean (Mm) = (MP + MS) / 2 = (10.90 + 11.03) / 2 = 21.93 / 2 = 10.965 M.

    - Aft Mean (Am) = (AP + AS) / 2 = (11.16 + 10.19) / 2 = 22.35 / 2 = 11.175 M.

    - Apparent Trim (AT) = AmFm = 11.17510.800 = 0.375 M.

    - Length Between Mark (LBM) = LBP(Fd + Ad) = 179.00(1.70 + 9.45)

    = 167.85 M

    http://sevensurveyor.com/draft-survey-specimen-of-calculation/http://sevensurveyor.com/http://sevensurveyor.com/draft-survey-specimen-of-calculation/
  • 7/27/2019 Draft Survey SPECIMEN.docx

    2/7

    Draft Correction to Distance to Perpendicular.

    - Fore Correction (Fc) = (Fd x AT) / LBM = (1.70 x 0.375) / 167.85 = 0.003798

    = 0.004 M (rounded to 3 Decimals).

    - Mid Correction (Mc) = (Md x AT) / LBM = (0.00 x 0.375) / 167.85

    = 0.000 M (Not Available)

    - Aft Correction (Ac) = (Ad x AT) / LBM = (9.45 x 0.375) / 167.85 = 0.021112

    = 0.021 M (rounded to 3 Decimals).

    True Draft and True Trim- Fore Draft Corrected (Fcd) = Fm + Fc = 10.800 + (-0.004) = 10.796 M.

    - Mid Draft Corrected (Mcd) = Mm + Mc = 10.965 + 0.000 = 10.965 M.

    - Aft Draft Corrected (Acd) = Am + Ac = 11.175 + 0.021 = 11.196 M.

    - True Trim (TT) = AcmFcm = 11.19610.796 = 0.400 M.

    Final Draft Calculation

    - Fore and Aft Mean (FAm) = (Fcd + Acd) / 2 = (10.796 + 11.196) / 2 = 21.992 /2 = 10.996 M.

    - Mean of Mean Draft (MM) = (Mcd + FAm / 2) = (10.965 + 10.996) /2 = 21.961 / 2 = 10.9805 M.

    - Quarter Mean (MMM) = (MM + Mcd) /2 = (10.9805 + 10.965) /2 = 21.9455 /2 = 10.97275 M

    = 10.973 M.

    - Or MMM = {(Fcd x 1) + (Acd x 1) + (Mcd x 6)} / 8 = {(10.796 x 1) + (11.196 x 1) + (10.996 x 6)} / 8= (10.796 + 11.196 + 65.790) / 8 = 87.782 / 8 = 10.97275 M = 10.973 M.

    Hydrostatic Table

    Refer to the Table, we could obtain :

    Displacement (Disp)

    - Disp at 10.970 M : 54,266.860 MT (DISP. FULL).

    - Disp at 10.980 M : 54,321.070 MT (DISP. FULL).

    - Disp at 10.973 M : 54,266.860 +[ {(10.973 - 10.970) / (10.980 - 10.970)}

    x (54,321.070 - 54,266.860)]

    = 54,266.860 {(0.003 /0.010) x 54.210} = 54,266.86 + (0.3 x 54.210)= 54,266.860 + 16.263 = 54,283.123 MT

    Ton Per Centimeter (TPC)

    - TPC at 10.970 M : 54.210 MT (Below TPC on Table).

    - TPC at 10.980 M : 54.220 MT (Below TPC on Table).

    - TPC at 10.973 M : 54.210 +[ {(10.973 - 10.970) / (10.980 - 10.970)}

    x (54.220 - 54.210)]

    = 54.210 {(0.003 /0.010) x 0.010} = 54.210 + (0.3 x 0.010)

    = 54.210 + 0.003 = 54.213 MT.

    Longitudinal Centre Flotation (LCF)

    - LCF at 10.970 M : 1.180 MT (Below LCF on Table).- LCF at 10.980 M : 1.190 MT (Below LCF on Table).

    - LCF at 10.973 M : 1.180 +[ {(10.973 - 10.970) / (10.980 - 10.970)} x (1.190 - 1.180)]

    = 1.180 {(0.003 /0.010) x 0.010} = 1.180 + (0.3 x 0.010) = 1.180 + 0.003 = 1.183 M.

  • 7/27/2019 Draft Survey SPECIMEN.docx

    3/7

  • 7/27/2019 Draft Survey SPECIMEN.docx

    4/7

    Moment To Change Trim(MTC)

    - MTC = MTC 1MTC 2.

    - MTC 1 = MMM + 0.5 = 10.973 + 0.5 = 11.473 M.

    - MTC 1 at 11.470 M : 709.610 (Below Table).

    - MTC 1 at 11.480 M : 710.060 (Below Table).

    - MTC 1 at 11.473 M : 709.610 +[ {(11.473 - 11.470) / (11.480 - 11.470)} x (710.060 - 709.610)]

    = 709.610 {(0.003 /0.010) x 0.450} = 709.610 + (0.3 x 0.450) = 709.610 + 0.135 = 709.745.

    http://sevensurveyor.com/wp-content/uploads/2010/01/table-2.jpg
  • 7/27/2019 Draft Survey SPECIMEN.docx

    5/7

    - MTC 2 = MMM - 0.5 = 10.973 - 0.5 = 10.473 M.

    - MTC 2 at 10.470 M : 686.460 (Below MTC on Table).

    - MTC 2 at 10.480 M : 686.770 (Below MTC on Table).

    - MTC 2 at 10.473 M : 686.460 +[ {(10.473 - 10.470) / (10.480 - 10.470)}

    x (686.770 - 686.460)]

    = 686.460 {(0.003 /0.010) x 0.310} = 686.460 + (0.3 x 0.310) = 686.460 + 0.093 = 686.553.

    So, MTC = MTC 1MTC 2 = 709.745686.553 = 23.192.

    **** From the above results, we collected the data as follows:

    - Disp = 54,283.123 MT,

    - True Trim (TT) = 0.400 M,

    - LBP = 179.00 M,

    - TPC = 54.213,LCF = 1.183,

    - MCT = 23.192.

    http://sevensurveyor.com/wp-content/uploads/2010/01/table-3.jpg
  • 7/27/2019 Draft Survey SPECIMEN.docx

    6/7

    First Trim Correction (FTc)

    - FTc = (TT x TPC x LCF x 100) / LBP = (0.400 x 54.213 x 1.183 x 100) / 179.000

    = 256.35916 / 179.00 = 14.331615 = 14.332 MT.

    Second Trim Correction (STc)

    - STc = (TT x TT x MTC x 50) / LBP = (0.400 x 0.400 x 23.192 x 50) / 179.000

    = 185.536 / 179.00 = 1. 036514 = 1.037 MT.

    Displacement Corrected to Trim (DispT)

    - DispT = Disp + (FTc + STc) = 54,283.123 + (14.332 + 1.037) = 54,283.123 + 15.369= 54,298.492 MT.

    Density Correction (Denc)

    - Actual Density (ADen) = Sample Sea Water Density = 1.021

    - Denc = DispT x {(ADen1.025) / 1.025} = 54,298.492 x {(1.0211.025) / 1.025}

    = 54,298.492 x (-0.004 / 1.025)

    = 54,298.492 x (-0.0039024) = -211.896554 = -211.897 MT.

    Displacement Corrected to Density (DispDenc)

    - DispDenc = DispT + Denc = 54,298.492 + (-211.897) = 54,086.595 MT.

    Deductible Weight (Deduct)

    - BW = 265.00 x 1.025 = 271. 625 MT,FW = 183.000 MT,FO = 612.000 MT,- DO = 161.000 MT,LO = 29.000 MT.

    - Total Deduct = 1,256.625 MT.

    Displacement Minus to Deductible Weight = Net Displacement (NDisp)

    - NDisp = DispDenc - Deduct = 54,086.5951,256.625 = 52,829.970 MT.

    Estimated Cargo onboard (EstCOB)

    - To estimated quantity cargo onboard, we need to know about Light Ship and Constant. Light Ship and

    Constant data is provided on the Ships Loading Manual.

    For the new ship, we could refer to the Constanton the Manual, but for the old ship it Constant may vary,

    please refer to the Chief Officer Constant Declaration or Draft Survey Previous Port, or we could calculate it

    in the final survey after the Ship completing to discharge her cargoes (empty Ship).- Light Ship (LS) = 7,780.000 MT,Constant (CS) = 320.000 MT.

    - EstCOB = NDisp(LS + CS) = 52,829.970(7,780.000 + 320.00)

    = 52,829.9707,100.000 = 44,729.970 MT.

    See the following Draft Survey Report Form..