DIVISION OF SHOREEROSION THE EARLY YEARS The Division was established in the Ohio Department of Natural Resources on 11 August 1949with the enactment of Amended Senate 8i13. The Dvisio'n was created as the Divi- sion of BeachErosion. and the name was dunged in September 1951to the Division of Shore Erosion. Resporsibilities of the Dvision came from a section of the Department of Public Works. Substtute S€nateBill 236 er iacted on 1 May 1935had created a Beach Erosion Board within that department, and duties and responsibilities were expanded by Substitute SenateBill 34 enacted on 28 June 1945. The first Chief of the Division was F.O. "Bamey" Kugel (Fig. 10.1),who kansferred from the Deparhnent of Public works to the newly created ODNR. lohn R Hyland (Fig. 10.2)became Assistant Chief of the Division in 1955and Chief on 1 March 1960when Bamey was appointed Chief Engineer by Director Eagon. Also in 1950, fames A. Swartzmiller was appointed Assistant Chief of the Division. John Hyland remained as Chief until the 1 0 James A. Swartsmlller - Division was abolished on 2 November1951, TheDivision's offices were located on the elevmth floor of the State Office(Ohio Depart- ments) Building at 65South Front Street in downtown Columbus. A LakeErie Officewas established in Sandusky in 1953 and was located in the Ohio Fisheries Building owned by the Division of Wildlife. SHORE EROSION PROIECTS Theprimary function of the Division when fust created in 1949 wa6to assist con- structionof projects to provide sho're protection alongtheLakeErieshorcline(6eePlate 10),a contimration of the work previowly doneby the LakeErie Section of the Dqlar tment of PublicWorks. Irr the early years, the Division could assist with constr uction only for the protectionof publiely ovuned lands. The Division could pay up to two.thirds of the cost of shore pmtectionhom funds appropriated for such purposes by the General Assembly. HouseBill ,[33, aspassed by the 101st General Assembly, becanre effective on 30October 1955 and expanded the assbtance progr am to allow Figurtl.A.1. F.O. "Baft er!" Kagel, fisl Chief a f lhc Ditisiott of Shof a t:.r asion, l94tt-1960. Figure10.2. lohnR.. Hylaud, secand Chiz f oJ theDiLtiian of Short Erosion, 196(11951.

Upload: nguyennhan

Post on 07-Mar-2018

220 views

Category:

Documents


3 download

TRANSCRIPT

DIVISION OFSHORE EROSION

THE EARLY YEARS

The Division was established in the OhioDepartment of Natural Resources on 11 August1949 with the enactment of Amended Senate8i13. The Dvisio'n was created as the Divi-sion of Beach Erosion. and the name wasdunged in September 1951 to the Division ofShore Erosion. Resporsibilities of the Dvisioncame from a section of the Department ofPublic Works. Substtute S€nate Bill 236er iacted on 1 May 1935 had created a BeachErosion Board within that department, andduties and responsibilities were expanded bySubstitute Senate Bill 34 enacted on 28 June1945.

The first Chief of the Division was F.O."Bamey" Kugel (Fig. 10.1), who kansferredfrom the Deparhnent of Public works to thenewly created ODNR. lohn R Hyland (Fig.10.2) became Assistant Chief of the Division in1955 and Chief on 1 March 1960 when Bameywas appointed Chief Engineer by DirectorEagon. Also in 1950, fames A. Swartzmillerwas appointed Assistant Chief of the Division.

John Hyland remained as Chief until the

1 0

James A. Swartsmlller

-

Division was abolished on 2 November 1951,The Division's offices were located on the

elevmth floor of the State Office (Ohio Depart-ments) Building at 65 South Front Street indowntown Columbus. A Lake Erie Office wasestablished in Sandusky in 1953 and waslocated in the Ohio Fisheries Building ownedby the Division of Wildlife.

SHORE EROSION PROIECTS

The primary function of the Divisionwhen fust created in 1949 wa6 to assist con-struction of projects to provide sho're protectionalongtheLakeErieshorcline(6eePlate 10),acontimration of the work previowly done bythe Lake Erie Section of the Dqlar tment ofPublic Works. Irr the early years, the Divisioncould assist with constr uction only for theprotection of publiely ovuned lands. TheDivision could pay up to two.thirds of the costof shore pmtection hom funds appropriated forsuch purposes by the General Assembly.House Bill ,[33, as passed by the 101st GeneralAssembly, becanre effective on 30 October 1955and expanded the assbtance progr am to allow

Figur t l .A .1 . F .O."Baft er!" Kagel, f islChief a f lhc Ditisiott ofShof a t:.r asion, l94tt-1960.

Figure10.2. lohnR..Hylaud, secand Chiz f oJthe DiLtiian of ShortErosion, 196(11951.

the Dvision also to participaie in the protection of privateproperty along Lake Erie. Participation in the protection ofprivate property was limited to one-third the cost. Manyproiects were constructed for the protection of publicprope*y. However, no projects were constructed forprivate property prctection. The procedures to be followed,including public bidding, and the requirement that erosionprotection be substantial, made the two-thirds costs for theprivate owners considerably more expensive than theycould afford. Usually the private owners would constructprotection in stages accor ding to their ability to pay. Thistype of protection was not very ef fective and in most caseswas a waste of the property owners' money.

House Bill 433 also included requirements that anyshore protection constructed along Lake Erie must be donethrough a permit issued by the Dvision of Shore Erosion.This legislation was an attempt to control the type of erosionprotection being constructed and also to bring some unifor-mity in the type of protection provided. The permit require-ment was only for erosion protection facilities. Many othertypes of projects were constructed along the lake whichseriously affected erosion processes in which the Dvisionhad no contro| therefore, this permit program never reallymaterialized into a beneficial program. The erosion permitswere also a duplication of permits required by the UnitedStates Army Corps of Engineers. The Corps perrnits wererequired for any $pe of construction along the lakg and thispermitting program was considerably more effective.

The Erosion Act of 1955 (Flouse Bill Z), as passed bythe 101st General Assembly, also expanded a firnction ofthe Division regarding the extraction of minerals from Lake

Ltql ! r '1 . i l ) . -J . i l j . . , t t l f i .1

/ r i lhr ' ' r l i r i r r r . L r rs l r l i ; r r rs i l i , | t i i t t : [d iL ' i i ] t L i tkr

l:),a /ri Clfirl,lrlirJ |./krfrrr ' r , l l f r ' r ' s l / r ) i I i i la f l ] r i l ( r , i , !1

: ;n i1 0t f ipt1 lu t l t lL l t l r :Ilil;1f-/oi? ol (i'ai!,{i.rrl

Sut te4.

The Divisions

Erie. Prio( to 1955. the Dvbion contr olled the removal of

sand and gravel from designated and approved dredging

areas in the lake. Sald and gravel was temoved fot com-

mercial purposes and the Division was Paid a royalty of 15

cents per cubic yard. The Erosion Act expanded this pro-

gram to allow the removal of gas, oil and other minerais

from and under the bed of the lake.

After enactment of the legislation, salt mines were

established beneath Lake Erie at FairPort Harbor and

Cleveland through a lease arrangement with the Division'

Royalties received from the salt removed and from the sand

removal operation were used for erosion Protection con-

struction. The salt mine at Fairport Harbor was oPened in

1955 and extends to a depth of 2025 fuet. The salt seam is 22

feet thick and the mining technique used was the "loom and

pillar" concept. Full production of the mine in the late

1960's reached 3fi) to 500 tons per hour. The Cleveland

mine was star ted in 19,57 and experienced considerable

difficulty with ground-water problems. It was necessary to

grout an 88-foot-thick s€am of sandstone to eliminate water

problems. The main shaft for ihe Cleveland mine is 1816

feet deep and the mine was opened for production in 1951

(Fig. 10.3).The enactment of the Er osion Act also genemted much

interest in ddlling for oil and gas in Lake Erie. Thispro-

gram, however, never really became established due to

environmental concems regarding possible spills and

pollution of the lake waters.With the funds derived from royalties for sand and

gravel dredging within the lake and from salt removed from

under the lake along with funds appropriated by the

General Assembly, a number ofshore erosion constructionprojectswere completed. Mostof

these projects were done in

cooperation with local political

entities. Atotal of23projectswere completed from 1959 to 1951

at a total cost of $905,100. Nine ofthese proiects were in Otf awacounty (Fig. 10.4), four in Erie

19,19-1989

County, fow in Lake County, two in LorainCounty, two in Cuyahoga County (Fig. 10.5),and two in Ashtabula County. Proiecis con-structed in cooperation with local entities are tobe maintained by the local entity, an adminis-trative arrangement designed to assure thatcontinued pr otection would remain in place.

IVAIIEIiWAYS SAFETY PROCIdA, lv1S

The 101st General Assembly also cteatedthe Waterways Safety Commission within theDvision of Shore Erosion through the ErosionAct which became effective 30 September 1955.The Commission was created:

1) To advise and make recommendations to the Chief of theDivision conceming plans and programs for the construc-tion, maintenance, repair, ard operation of refuge harborsandotherproiecb for theharbo,ring, docking, and storage oflight-d.aft (recreational) vessels in accordance with provi-sions of the Act (Fig. 10.6).

2) To advise and make recommendations to the Chief as tomethods of coordinatht the shore erosion proiects of theDivisionwith therefugeof recr€ationalvesselharborproiects.

3) To consider and make recommendations upon anv matterwhich was brought to its aftention.

4) To submit to the Govemor bimnially recommendations foramendments to the laws relative to refuge and recreationalharbor projects.

The Commission membership consisted of the ODNRDirector and four member s appointed by the Govemor withthe consent of the Senate. The Chief of Dvision of ShoreErosion served as Secretary. The first members of theComnission were Director Marion; A.F. Wakefield, Vermil-ion; Henry ]. Watterson, Rocky Riveq Dr. Byron fohnson,Ashtabula; and Dr. K.D. Arnsbary, Pomeroy.

Along with the Commissiory the General Assemblycreated a Waterways Safety Fund which was to be used foracquiring, cons&ucting, and maintaining refuge and recre-ational vessel harbor pr ojects, charmels, and facilities forvessels in the navigable waters lying within the boundaries

-

l t , t i t i r ' i l l . . ! ,1 ' , , r i i i i . r f i r r i ;

Sl .?L, i : ' t i ' l i i ) r ! : r . r : r ' 1: , i r ,l 'a lar i r i ' r l a1r1l : r l i i l i i74f i r ' , r i ; r ) j i . i r . ; i r i i r r 'i l i l , is ic ; t r r , . - r i i r . i r f I r , r i r I i

l i r r ; ; ' r ' i l i / r , : ; r ' l , r ' r ' r1 i ' r ' : r l r i . ,i : ' t i : ' ; | , ! t ! l i " i : t ' i i ' , ' L ' i i i i t lr ! i / r - , / j ' . i n , t , , , , , i . /

5 i r : i i r l ra/ r r i i i r | i ) r f ( l j : r ' i i r , I 't : t t r i j l ' i 'J l i i i i : : t i t l ! i i ! r rj i r ; r r , / r ; r i f l ra,? l_ iJ / r ;i ) l i j1 , , i ( - r r i r , r i i / . l )Lr l rr -ot i r l r i : ,1; l . ' i i ' i r r r ' , , i rn l r t i , t l i r ' r i r l r ( ' j r i Sl i r r ' l !

r ' r q / , r ' i ' : i l ' i . t j r , i i . i , j , i : ;

. r \ r . a r i i i ' , i l r i . : , r r ; i ( l r l r ,

r r t t i ; t i t j i j t ' J ; , : - r , 1 i ' " i . , r r r i

i , r . \ a f t i a , r r i l r i ' , / ; r , r l , ) ; l

/ l r s r ' j r r r i i r ' r ; i i ! : l r i r ;

iui i l r ; ;c. i i r i : t i r ,1,. , ;r t l i t i t i i i .

of Ohio which are under the lurisdiction of the federalgovemment. The Liquid Fuel Tax Law was also amended tothe extent that the Marine Gasoline Fuel Tax, which waspreviously refunded upon application to owners of pleasurecraft, would be deposited to the credit of the WaterwaysSafety Fund. In subsequmt years since the original act in1955,theMarineFuelTax has been increased and has beenthe source of funds for a heavy conskuction program forboating improvernents by the Division of Watercraft withinthe Department.

IAKFi ERIE RFrgl lAR{ lT- i

Soon afier the Division was created, a geologicalresearch program on Lake Erie was developed. It wasstarted on a part-time basis in 1950, and Dr. Howard J.Pincus of the Geology Depar tment of The Ohio State Uni-versilr was in charge. From 1950 to 1953, the program wasstaffed by Dr. Pincus and Ohio State University students,with part-time technical and clerical assistance. The pro-gram operated full-time during summer field seasons. In1953, the research program was expanded with the estab-lishment of the year-round office in Sandusky which wasstaffed with a ful1-time geologist and hydrographer. ]amesL. Verber was in charge of this office ftom 1953 to 1958. In1959 until 1961. Robert P. Hartley administer ed the office.Dr. Pincus resigned from the program in 1950.

143

The types of research conducted included the completemapping of the Ohio Lake Erie shoreline with emphasis onengineering geology, mapping of bottom deposits, study ofbluff recession, subsurface data along the shoreline, bedrockgeology under the lake, wave refraction diagrams, effects ofice on the shoreline and on structutes in the lake. andstudies on water levels, currents, wind, and water tempera-fures.

The main emphasis of this research in the early yearswas placed on identifying and rmderstanding shore pro-cesses along the Lake Erie shoreline, particularly on thecauses and effects of shore erosion. I-rr later years, thisresearch was expanded to achieve a better understanding oflake processes, and to conkibute information on naturalresources lying within the state's boundaries.

A significant result of this early research was theestablishment of a baseline along 262 miles of the Lake Erieshoreline, with both horizontal and vertical control pointscoffelated with existing United States Geological Surveybench marks and triangulation stations. The baseline wasused to record shoreline topography a considerable distanceshoreward from the water's edge and to perform a hydro-graphic survey approximately 2000 feei offshore. Thesedata were used as a basis to make comparisons resulting inan accurate deterrnination of erosion or accretion ratesanywhere along the shoreline.

The results of this early research also proved invalu-able in preparing and publishing a shore etosion masterplan for Lake Erie in cooperation with the Corps of Engi-neers. This master plan was published in twelve reports

144

The Divisions

and covered the lake shore from the Michigan-Ohio line to

the Ohio-Pemslvania line. The reports are detailed and

include discussions of the geology and coastal characteris-

tics. beach and bluff composition, comparative profiles.

investigations of existing protective structures and shoreline

changes. and recommended effective and economical

methods of preventing erosion. These reports have been

used extensively by private property owners living along

the lake and as a basis for planning and desigrring many

erosion protection pr oiects. The extensive research Pre-formed by the Division throughout the 1950's has been

recorded in published and rmpublished documents located

in the Division of Geological Survey and is still used extm-

sively to understand befter the lake and its processes.

.ABC}LISFI]VTEN'I OF TIIE I]IVISION

kr 1961, the Dvision of Shore Erosion was abolished

by the 1&lth General Assembly upon enactment of

Amended House BiIl 379 which became effecdve on 2

November 1961. The functions and programs of the Dvi-

sion were trarsferred to other departmental unlts. The

shore erosion coqrerative construction program and the

boating improvements construction program, along with

the issuing of shore erosion perrdts. were transfurred to the

newly created Of fice of Chief Engineer. The Waterways

Safety Commission, Waterways Safety Fund, and relatedduties and functions with this program were transferred to

the Dvision of Watercraft. The rcsponsibilities for lake Erie

research and miner al extraction permits were transferred to

the Division of Geological Suwey. All funding equipment.

supplies, and personnel were transfened with the respective

programs. and the Dvision ceased to exist.

-REFERENCES

19€-1989

Di\rision of Shore Eroeion Armual Reports. 1951-1960. Ohio DePartment ofNatural Re€owces.

Herderdo4 Charles E. 1979. The Lake Erie geologjcal research progam.195G1970, Technical Report 252. Cenler for'LkeErie Area Rese-arc6,Ohio State University. Columbus, 67PP.