design· and construction of waste paper' recycling plant
TRANSCRIPT
-
7/25/2019 Design and Construction of Waste Paper' Recycling Plant
1/12
J
/
' \
I
DESIGN
AND
CONSTRUCTION
OF
WASTE PAPER'
RECYCLING PLANT
BY
";'OCHOR SPENCER CHIDI
:
: ~ E G . N O . 9615254EH
DEPARTMENT
OF
CHEMICAL ENGINEERING
. FEDERAL UNIVERSITY
OF
TECHNOLOGY MINNA
.
..
.. ...... ...
.. ,
.
/
. .
. .
" A FINAL YEAR RESEARCH PROJECT SUBMITTED
IN PARTIAL.
FULFILMENT
OF
THE REQUIREMENTS, FOR THE AWARD
OF
. BACHELOR DEGREE
IN
ENGINEERING B.ENG)
FEBRUARY 2002
-
7/25/2019 Design and Construction of Waste Paper' Recycling Plant
2/12
DECLARATION
declare that this project work was conducted by me; under the able
andsupervision of Engr. M A Olutoye. Department of chemical
Minna Niger state. During the
academic session.
Signature
:
-
7/25/2019 Design and Construction of Waste Paper' Recycling Plant
3/12
CERtiFICATION
is to certify, that this work; Design and construction of waste paper
plant was carried out by Master Ochor Spencer of chemical
Engineering Technology,
. university of technology Minna
In
partial fulfillment of the
award
Degreein chemical Engineering.
APPROVED BY:
- - - - - - - - - - - - ~ - - - - - - - - - - -
G'R M.A.OLUTOYE
DATE
,
r
',-:-. '.- , . ' ~ ~ '
ROJECT
S U P E R V I S O R
J O ODIGURE
DATE
\
EAD
OF
DEPARTMENT)
- - - - - - - - - - - - - - - - - - - ~ - - - - - - - - -
.
ERNAL EXAMINAL
DATE
-
7/25/2019 Design and Construction of Waste Paper' Recycling Plant
4/12
/
, DEDIC TION
to
dedicate
this
work,
to an those
who have
in one way
or
the other
buted it's the realization. They include my mum and Dad: MR
and
MRS
, ... -,.,- - /