the reactor of waste rubber waste plastic waste tire recycling pyrolysis plant
TRANSCRIPT
-
8/13/2019 The Reactor of Waste Rubber Waste Plastic Waste Tire Recycling Pyrolysis Plant
1/3
Henan DOING Mechanical Equipment Co.,ltd
Building 18, Area A, Yingxie Garden, Yingxie Road, Jinshui District, Zhengzhou, Henan Province, China
TEL: +86-371-56771821 +86-371-56771823 FAX: +86-371-86129922
E-mail: [email protected] Website: http://www.doinggroup.com/ 1
The reactor of waste rubber/waste plastic/waste tire recycling
pyrolysis plant
The host is composed by reactor base fire channel , insulation cover an
d power and etc,The material of our reactor can be Q245R Q345R boiler pla
te or 304 and 306 stainless.The thickness of the whole reactor body is 14mm
16mm or 18mm according to our pyrolysis machine capacity.
http://www.doinggroup.com/index.php?u=show-95.htmlhttp://www.doinggroup.com/index.php?u=show-95.htmlhttp://www.doinggroup.com/index.php?u=show-95.htmlhttp://www.doinggroup.com/index.php?u=show-95.htmlhttp://www.doinggroup.com/index.php?u=show-95.html -
8/13/2019 The Reactor of Waste Rubber Waste Plastic Waste Tire Recycling Pyrolysis Plant
2/3
Henan DOING Mechanical Equipment Co.,ltd
Building 18, Area A, Yingxie Garden, Yingxie Road, Jinshui District, Zhengzhou, Henan Province, China
TEL: +86-371-56771821 +86-371-56771823 FAX: +86-371-86129922
E-mail: [email protected] Website: http://www.doinggroup.com/ 2
Our reactor is manufactured exactly according to the standard of pressur
e vessel(boiler grade).The ellipsoidal head has a strong tension and better co
nnect with the reactor and therefore cannot be easily cracked under high pres
sure.
-
8/13/2019 The Reactor of Waste Rubber Waste Plastic Waste Tire Recycling Pyrolysis Plant
3/3
Henan DOING Mechanical Equipment Co.,ltd
Building 18, Area A, Yingxie Garden, Yingxie Road, Jinshui District, Zhengzhou, Henan Province, China
TEL: +86-371-56771821 +86-371-56771823 FAX: +86-371-86129922
E-mail: [email protected] Website: http://www.doinggroup.com/ 3
Our machine is welded two times,
spot welding first and automatic welding second,
to prolong the service life of reactor to the max.The service life of the reactor
will be 6 to 8 years.