cresp iii management board meeting february 27, 2012 pi: shlomo p. neuman

26
CRESP III RNL 03: Quantifying and Reducing Uncertainties in Characterization, Flow- Transport Analysis and Monitoring of Subsurface Remediation and Waste Storage Sites CRESP III Management Board Meeting February 27, 2012 PI: Shlomo P. Neuman Dept of Hydrology and Water Resources, University of Arizona, Tucson

Upload: vega

Post on 23-Feb-2016

27 views

Category:

Documents


0 download

DESCRIPTION

CRESP III RNL 03: Quantifying and Reducing Uncertainties in Characterization, Flow-Transport Analysis and Monitoring of Subsurface Remediation and Waste Storage Sites. CRESP III Management Board Meeting February 27, 2012 PI: Shlomo P. Neuman Dept of Hydrology and Water Resources, - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: CRESP III Management Board Meeting February 27, 2012 PI: Shlomo P. Neuman

CRESP III RNL 03: Quantifying and Reducing Uncertainties in

Characterization, Flow-Transport Analysis and Monitoring of

Subsurface Remediation and Waste Storage Sites

CRESP III Management Board MeetingFebruary 27, 2012

PI: Shlomo P. Neuman

Dept of Hydrology and Water Resources, University of Arizona, Tucson

Page 2: CRESP III Management Board Meeting February 27, 2012 PI: Shlomo P. Neuman

Project ObjectivesDevelop/demonstrate tools that would provide quantitative information to decision makers about uncertainties associated with

characterization, flow-transport analysis and monitoring of subsurface remediation and waste storage sites

potential of additional characterization and monitoring data to help reduce these uncertainties and risks associated with particular decisions

Page 3: CRESP III Management Board Meeting February 27, 2012 PI: Shlomo P. Neuman

Relevance and Impact to DOE

Accounting for scale phenomena and the worth of data within the framework of a comprehensive risk and uncertainty assessment methodology, such as we propose, would greatly enhance confidence in DOE decisions concerning subsurface remediation and waste storage sites

Page 4: CRESP III Management Board Meeting February 27, 2012 PI: Shlomo P. Neuman

Recent Accomplishments

• Pumping test inference of deep vadose zone properties

• Multimodel Bayesian method to assess the worth

of data• Characterizing the scaling properties of hydrologic

quantities varying randomly in space – time

Page 5: CRESP III Management Board Meeting February 27, 2012 PI: Shlomo P. Neuman

Pumping Test Inference of Deep Vadose Zone Properties

The Problem: There presently is no good way to assess

large (field) scale vadose zone hydraulic properties at depth

Infiltration experiments and laboratory samples limited mostly to shallow depths

The Solution: Infer such properties by pumping water from saturated zone beneath deep vadose zoneWork Products: 1 doctoral dissertation, 2 papers in archival journal, 1 paper in WM2011

Page 6: CRESP III Management Board Meeting February 27, 2012 PI: Shlomo P. Neuman

Pumping Test Inference of Deep Vadose Zone Properties

Borden Test Layout:

Page 7: CRESP III Management Board Meeting February 27, 2012 PI: Shlomo P. Neuman

Pumping Test Inference of Deep Vadose Zone Properties

Borden Best-Fit Solution:

Page 8: CRESP III Management Board Meeting February 27, 2012 PI: Shlomo P. Neuman

Pumping Test Inference of Deep Vadose Zone Properties

Borden Best-Fit Parameter Estimates:

Page 9: CRESP III Management Board Meeting February 27, 2012 PI: Shlomo P. Neuman

Pumping Test Inference of Deep Vadose Zone Properties

Borden Vadose Zone Characteristic Estimates:

Page 10: CRESP III Management Board Meeting February 27, 2012 PI: Shlomo P. Neuman

Multimodel Bayesian Method to Assess the Worth of Data

The Problem: Traditional worth of data analyses do not

consider conceptual & parameter uncertainties Bias and underestimation of uncertainty

The Solution: Multimodel Bayesian approach in cost-risk- benefit frameworkWork Products: 1 doctoral dissertation, 2 papers in archival journals (1 invited in special issue on risk and uncertainty assessment), 1 paper in WM2011, 1 invited paper in International Groundwater Conference proceedings

Page 11: CRESP III Management Board Meeting February 27, 2012 PI: Shlomo P. Neuman

Multimodel Bayesian Method to Assess the Worth of Data

Apache Leap Research Site (ALRS) example:

-25

-20

-15

-10

-5

0

Z( m)

-100

1020

3040

-100

1020

30

W2aV2

X2Y2

Z2

Y3 Unsaturated fractured tuff 1-m-scale packer tests Conducted with air Matrix virtually saturated Tests see mainly fractures 184 log10 k data k in m2

Page 12: CRESP III Management Board Meeting February 27, 2012 PI: Shlomo P. Neuman

Multimodel Bayesian Method to Assess the Worth of Data

ALRS cross validation exercise:

-25

-20

-15

-10

-5

0

Z( m)

-100

1020

3040

-100

1020

30

W2aV2

X2Y2

Z2

Y3

Cross Validation CasesCV I: D = W2a, Y3, Z2 C1 = X2 C2 = Y2CV II: D = W2a, X2, Y2 C1 = V2 C2 = Z2D = given data; C = newGiven funds to drill / testonly one hole in each CV,should it be C1 or C2?

Page 13: CRESP III Management Board Meeting February 27, 2012 PI: Shlomo P. Neuman

Multimodel Bayesian Method to Assess the Worth of Data

ALRS alternative model fits:

Multimodel (variogram) geostatistical analysis:• Power (Pow0)• Exponential (Exp0)• Spherical (Sph0)

Fits based on(a)– (b) D(c) – (d) D + C’1

(e) – (f) D + C’2

0 5 10 15 20 250

0.2

0.4

0.6

0.8

1

Separation distance (m)

Var

iogr

am

(a)

Sample variogramExp0Sph0Pow 0

0 5 10 15 20 250

0.2

0.4

0.6

0.8

1

Separation distance (m)

Var

iogr

am

(c)

Sample variogramExp0Sph0Pow 0

0 5 10 15 20 250

0.2

0.4

0.6

0.8

1

Separation distance (m)

Var

iogr

am

(e)

Sample variogramExp0Sph0Pow 0

0 5 10 15 20 250

0.2

0.4

0.6

0.8

Separation distance (m)

Var

iogr

am

(b)

Sample variogramExp0Sph0Pow 0

0 5 10 15 20 250

0.2

0.4

0.6

0.8

Separation distance (m)

Var

iogr

am

(d)

Sample variogramExp0Sph0Pow 0

0 5 10 15 20 250

0.2

0.4

0.6

0.8

Separation distance (m)

Var

iogr

am

(f)

Sample variogramExp0Sph0Pow 0

CV IICV I

Page 14: CRESP III Management Board Meeting February 27, 2012 PI: Shlomo P. Neuman

Multimodel Bayesian Method to Assess the Worth of Data

ALRS prior & preposterior uncertainty measures:

Page 15: CRESP III Management Board Meeting February 27, 2012 PI: Shlomo P. Neuman

Multimodel Bayesian Method to Assess the Worth of Data

ALRS posterior & preposterior uncertainty reduction measures:

Though preposterior and posterior measuresdiffer, both select borehole X2 in CV I and V2in CV II

Page 16: CRESP III Management Board Meeting February 27, 2012 PI: Shlomo P. Neuman

Scaling Properties of Space – Time Variables

The Problem: Earth and environmental variables span

multiple space – time scales Their multiscale statistics remain poorly

understoodThe Solution:

New model that unifies seemingly disparate fractal / multifractal Gaussian / non-Gaussian power-law / breakdown scaling behaviors

New statistical inference method based on it Application to synthetic / field / lab data

Work Products: Multiple papers in varied archival journals; invited / keynote talks at AGU / PEDOFRACT

Page 17: CRESP III Management Board Meeting February 27, 2012 PI: Shlomo P. Neuman

Scaling Properties of Space – Time Variables

AGU Invited Talk: Are log permeabilities Gaussian? Their increments may tell.

The Problem: Log permeabilities appear to be Gaussian or

nearly so (say beta) Their increments are often heavy tailed Can these be reconciled?

The Solution: Demonstrate consistency with our scaling

model Apply model to ALRS log permeability data

Page 18: CRESP III Management Board Meeting February 27, 2012 PI: Shlomo P. Neuman

Scaling Properties of Space – Time Variables

ALRS log k data are close to Gaussian Their increments show heavy tails

Page 19: CRESP III Management Board Meeting February 27, 2012 PI: Shlomo P. Neuman

Scaling Properties of Space – Time Variables

Can fit Levy distributions to increments Levy index increases with separation scale (lag) s toward Gaussian value of 2 Consistent with our model and Hurst scaling exponent H = 0.33

Page 20: CRESP III Management Board Meeting February 27, 2012 PI: Shlomo P. Neuman

Scaling Properties of Space – Time Variables

Model generated signal:

Page 21: CRESP III Management Board Meeting February 27, 2012 PI: Shlomo P. Neuman

Scaling Properties of Space – Time Variables

Model generated signal:

Page 22: CRESP III Management Board Meeting February 27, 2012 PI: Shlomo P. Neuman

Scaling Properties of Space – Time Variables

ALRS log k signal (highly irregular, notunlike synthetic signal):

Page 23: CRESP III Management Board Meeting February 27, 2012 PI: Shlomo P. Neuman

Scaling Properties of Space – Time Variables

We conclude: ALRS log k is Levy with index slightly smaller than Gaussian value of 2 Statistics of earth and environmental variables should be inferred jointly from data and their increments in a mutually consistent manner

Page 24: CRESP III Management Board Meeting February 27, 2012 PI: Shlomo P. Neuman

Scaling Properties of Space – Time Variables

Additional key findings: Multifractal scaling, exhibited by many earth and environmental variables, is fully reproduced by our (truncated monofractal) signals; as such it is likely an artifact of sampling Our model reproduces observed power-law breakdown at small / large lags Our model is the first to explain the widely observed phenomenon of Extended Self Similarity (ESS)

Page 25: CRESP III Management Board Meeting February 27, 2012 PI: Shlomo P. Neuman

Current / Future Efforts(with Co-PI Prof. Marcel Schaap)

• Explore extreme value statistics of measured and

synthetic signals that scale in the above manner• Develop a data base of pedologic and hydraulic

properties of samples from the Hanford 200 Area vadose zone

• Use neural network, statistical and inverse methods to estimate vadose zone hydraulic properties at Hanford 200 Area and at Maricopa, AZ.

Page 26: CRESP III Management Board Meeting February 27, 2012 PI: Shlomo P. Neuman

Comment by PNNL Colleague• There was some effort to develop a database of

physical and hydraulic properties and to port these to the HEIS database. That work was supported by one of the site contractors, CHPRC.

• Unfortunately the project was discontinued in Jan 2011, after CHPRC over-ran their budget on a large-scale pump-and-treat system on site, and no data were actually put into HEIS. There has been no mention of restarting that effort.

• Unless DOE/CHPRC/other decides to fund that effort again, it will not happen.