Company Presentation

A Leader in Equipment Manufacturing, Engineering and Integrated Solution Provider in Energy,

Chemical, Liquid Food Industries

Page 3: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Green Energy Clean Logistics Good Life

www.enricgroup.com

Page 4: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Contents

01 Introduction

02 Strategy and Vision

03 Energy Equipment

04 Chemical Equipment

05 Liquid Food Equipment

06 Global R&D Layout

07 Management System

08 Value-Added Services

09 Future Prospect

www.enricgroup.com

Page 5: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Introduction 01

Page 6: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Vehicles Containers

Airport

Facilities

Logistics

Service

Energy,Chemical &

Food Equipment Offshore

Finance Real Estate

About CIMC

China International Marine Containers (Group) Ltd. (CIMC), the world

leading supplier of logistics and energy equipment, headquartered in

Shenzhen of China, is dedicated to supplying high-quality and reliable

equipment and services, including containers, vehicles, energy, chemical and

food equipment, offshore equipment, logistics services, airport facilities, etc..

The prosperity of the businesses is supported by both CIMC Finance

Company Limited that provides professional capital management and by

CIMC Capital Ltd. that offers comprehensive financial solutions. As a

diversified multinational operation group that shoulders the mission of global

serving, CIMC has over 300 member enterprises and 4 listed companies in

Asia, North America, Europe and Australia, and an extensive sales network

that covers more than 100 countries and regions.

In 2015, the Group realized revenues totaling 58.69 billion RMB.

Page 7: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

CIMC Enric Holdings Ltd., in short CIMC Enric, is a company

listed on the Hong Kong Joint Stock Exchange Main Board

(3899.HK), and is CIMC’s division providing energy, chemical and

liquid food equipment manufacturer and engineering services. We

provides the customers with key equipment for transportation, storage

and processing as well as engineering services and integrated

solutions. Following several years of swift development, CIMC Enric

has grown into a leading player in the industry as a provider of

integrated services and manufacturer of key equipment, with over 20

subsidiaries in China and worldwide, operating more than 20

manufacturing bases and internationally advanced R&D centers in

China, Germany, the Netherlands, Denmark and Belgium. The sales

network covers Europe, South America, Central Asia, Southeast Asia

as well as China, Thailand, Nigeria, Pakistan and Uzbekistan, and is

currently expanding in North America.

In 2015, the company achieved a total sales income of 8.24 billion

RMB.

About CIMC ENRIC

Page 8: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Note: TGE is a company whose operations

have been assigned to CIMC Enric, but its

assets are not part of the listed company.

Organization Chart

CIMC ENRIC

Engineering

Chemical

Equipment

Liquid

Food

Equipment

Functions

Strategic

Development

Corporate

Management

HR &

Administration

Finance

IT

Technical

Marketing

Investor

Relations

Zhangjiagang

CIMC Sanctum

Cryogenic

Equipment Co.,

Ltd.

Shijiazhuang

Enric Gas

Equipment

Co., Ltd.

Jingmen

Hongtu

Special

Aircraft

Manufactu

ring Co.,

Ltd.

Enric

(Langfang)

Energy

Equipment

Integration

Co., Ltd.

Nantong

CIMC

Energy

Equipment

Co., Ltd.

Enric

(Bengbu)

Compressor

Co., Ltd.

Energy

Equipment

Business

Center

Nantong

CIMC

Tank

Equipme

nt Co.,

Ltd.

Burg

Service

CETSE

Nantong

CIMC Enric

Food

Equipment

Co., Ltd.

CETP

TGE

Gas

Enginerring

Liaoning

CIMC

Hashenleng

gas

liquefaction

Plant Co.,

Ltd.

Nanjing

Yangzi

Petrochemical

Design &

Engineering

Co., Ltd.

Page 9: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

History

2001

2004

2007

2008

2009

2011

2012

2014 Entered tank

container business

Acquisition of

Zhangjiagang

Sanctum; enters the

cryogenic storage and

transportation business

Acquisition of TGE from

Germany, the world

leader in main contracting

gas engineering projects;

acquisition of Enric

Energy Equipment

Holdings

Acquisition of Nanjing

Yangzi Petrochemical

Design & Engineering

Co., Ltd.

Acquisition of

Ziemann from

Germany; enhances

its competitiveness as

main contractor for

liquid food projects

Acquisition

Sichuan Jinke

Cryogenic

Engineering Co.,

Ltd.

.

Acquisition of Harbin

Cryogenic Gas

Liquefaction Plant

Co.,Ltd

Consolidation

through acquisitions

The business comprises the whole process chain of LNG handling.

The process chain covers energy, chemical and food industries.

Entered food storage

and transportation

sector; acquisition of

Holvrieka from the

Netherlands, world

leader in storage of

liquid food.

acquisition of Enric

Energy Equipment

Holdings.

2015

Acquisition of

Jingmen Hongtu

Special Aircraft

Manufacturing CO.,

LTD.

2016

Acquisition Briggs

Group LTD.

Page 10: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Langfang

Chengdu Beijing

Bengbu

Nantong

Zhangjiagang

Shijiazhuang

Shanghai

Shenzhen(HQ)

HQ(3899)

Germany

Denmark

Belgium

UK

Netherlands

Mexico

USA

Harbin

Global Bases

3 main lines of business;

20 + subsidiaries worldwide;

2 main service centers: China and Europe

11000+ employees worldwide

1100+ international employees

1000+ mid and high level R&D staff

Page 11: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Core Competences

Equipment

Manufacturing

Engineering

Services

Integrated

Solutions

Manufactured key equipment for

the energy, chemical and food

industries and form a vertical

platform for superior machinery

based on a global technological

platform and the integration of

resources,.

Created a platform for the EPC

engineering services in the energy,

chemical and liquid food industries,

with using the key equipment as a

cornerstone and integrating the

internal resources.

Provided integrated solutions for the

energy, chemical and liquid food industries

based on the global EPC experiences and

core technologies.

Page 12: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Strategy and Vision 02

Page 13: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Strategy and Vision

Mission: To contribute to the technological advancement and

industrial development of the global energy, chemical and liquid food

equipment markets; to maximise value of the company’s

stakeholders; to contribute to greener, cleaner & better living.

Vision:To be a world-leading manufacturer of specialised

equipment and provider of engineering services for energy,

chemical and liquid food industries.

Page 14: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

LNG Tanker

LNG Tank/Container

Multimodal Shipment

Natural Gas Pipeline

CNG

Mother / Standard /

Daughter Station

Gas Vehicles

LNG

Filling Station /

Tanker

Gas Vehicles

Household Gas

Onshore LNG

Gasification Station

Natural Gas

Extraction and

Processing

LNG

Liquefaction

Plant

Large LNG

Liquefaction

Plant

Natu

ral G

as In

du

strial C

ycle

LNG Transportation

Energy:

Development Strategy for the Natural

Gas Sector

Yellow: active business;

Red: newly involved;

White: not involved

Strategy and Vision

Committed to clean energy, and strongly expand the business of

natural gas equipment, engineering and integrated solutions;

Consolidating leadership in domestic market, and strive to open up

the international markets through multiple channels;

Exploiting opportunities in the upstream and maritime sectors of the

natural gas as well as other related new energy fields.

Page 15: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Provide chemical logistic solution—integrated solution for industrial

/liquefied-industrial gas

Ch

emica

l Ind

ustry

Lo

gistics C

ha

in

Chemical :

Development Strategy for the Chemical

Sector

Yellow: Existing ;

White: not involved

Strategy and Vision

Intermodal Tank

Container

End user

Tank Truck

Chemical Plant Chemicals Storage

Facilities / Port

Ch

em

ica

ls

Pip

elin

e

Strengthen market position in the standard tank containers market.

Actively promote special tank containers, in short term, focus on gas/

carbon steel thank containers; medium/long-term, actively develop

LNG/railway tank containers; proliferation of tank container in China

and “One-belt One-road” policy mean good prospects for intermodal

transportation.

Page 16: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Vertica

l: Beer in

du

stry

Liquid Food: Development Strategy for the Liquid

Food Sector

Strategy and Vision

Vertical expansion: continuous improvement of brewing engineering

capCapability; considering entrance into bottling business and

develop whole brewery construction capCapability.

Malting

Saccharification

Fermentation

Packaging

Tank clearing

Ma

nu

fa

ct

ur

in

g o

f s

ta

in

le

ss

st

ee

l

ta

nk

s f

or

o

th

er

i

nd

us

tr

ie

s

Non

-beer liq

uid

food

ind

ustry

(dairy

/win

e, etc.)

Yellow:Existing;

Red: newly involved;

White: not involved

Horizontal expansion: actively develop non-alcoholic beverage

market.

Market development: With a strong base in the Chinese and

European market, strive to expand our North and South American

market, as well as other international markets.

Page 17: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Energy Equipment 03

Page 18: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Leading Chinese NG equipment manufacturer.

Comprehensive products covers the entire NG industry value chain

Energy Equipment

Upstream (extraction)

Midstream (storage and transportation)

Downstream (consumption)

NG/CBM liquefaction

Wellhead gas recovery device

LNG receiving terminal

CNG trailers

CNG cylinders

CNG :

LNG tank trucks

LNG tanks

Large-scale LNG tank

EPC projects.

LNG:

CNG refueling stations

On-vehicle CNG

cylinders

CNG:

LNG refueling station

On-vehicle LNG fuel

tanks

LNG gas supply system.

LNG:

Page 19: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Energy Equipment and Engineering

Page 20: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

First production line for high pressure

seamless gas cylinder in China.

World’s leading provider.

Inner circumferential winding high capacity

cylinder designed under ISO 11515 standard-

world first. The only company in China

designs, manufactures, sells and inspects.

Related products: CNG trailers, CNG storage

cylinder, high pressure industrial gas trailers

etc.

Energy Equipment

High Pressure Gas Storage

and Transportation

Product Series

Page 21: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

The largest LNG Storage and transportation

equipment producer in China with largest capacity

and advanced technology in the world.

Related p r o d uc t : L NG c r yo ge n i c l i q u i d

transportation truck, s m a l l -scale LNG g a s

supplying systems (1-20m3), LNG cryogenic tanks

(50-5000m3), Large-scale LNG storage tank

(1000-50000m3), cryogenic industrial gas

transportation truck etc.

Cryogenic Liquid

Transportation Trucks/

Tanks Product Series

Energy Equipment

Page 22: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Integrated gas supply system with storage,

pressurising , regasifying , pressure regulating,

gauging & odorising functions.

Widely used in coal-to-gas conversion projects

in Beijing-Tianjin-Hebei area, improving air

quality and reducing smog.

Used in distributed energy resources.

Own brands with a wide variety of

specification.

能源装备产品业务介绍

Small-scale and mid-scale

cryogenic gas supply

equipment

Energy Equipment

Page 23: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Well-known in China LPG transportation truck market with a 35-year manufacturing experience.

Related products: LPG Transportation Truck, Propane Transportation Truck, Propene Transportation

Truck and Liquid Ammonia Transportation Truck.

能源装备产品业务介绍

Medium-Pressure Gas

Storage and Transportation

Product Series

Energy Equipment

Page 24: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

A leading position in China currently 40+ LNG projects with an aggregate processing capacity 2020 million cubic metres /day.

The first and largest coke gas liquefaction equipment in China; advanced technology and equipment for seperation and refining.

A leading positon in China market of processing around 200 million cubic metre /day.

能源装备产品业务介绍

Natural Gas/Coalbed

Methane/Coke Gas Liquefaction

Engineering

Energy Equipment

Page 25: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Engineering

Completed: LNG Storage Tank Project in Ningbo, Zhejiang (3

x 160, 000 m³); LNG Terminal at Sinis, Portugal ( 2 x 120, 000

m³ , 1 x 150, 000 m³); LNG Terminal in Spain (2 x 150, 000 m³);

Cryogenic Ethylene Storage Facility, Taiwan (5 X 80, 000 m³).

Under construction: Shenzhen Gas LNG Tanks(4 x 160, 000

m); Zhoushan Receiving Terminal Project etc.

Large-scale Chemical Engineering/ LNG

Storage Tanks/LNG Receiving Terminal

Engineering Services

Page 26: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Integrated Solutions

Page 27: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Target

A commercial service model unique to CIMC Enric

Creating solutions that bring new and outstanding

value for customer’s benefits by systematically

analyzing and evaluating customer needs, and based

on our manufacturing and engineering

capCapabilities, to develop new derivative products

and services.

Enhancing our core compet i t iveness in the

market wi th the purpose of maximizing

cus tomer va lue .

Page 28: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Onshore Upstream NG Industry

Acceptance

and Processing Liquefaction

Well Head Gas

and Light

Hydrocarbon

Recovery

Solutions

Coke Gas /

Coalbed

Methane

Gasification

Capability to act as EPC

contractor for large-scale projects

of LNG storage and handling.

Capability to provide the main equipment

(excluding refrigeration box) of a

liquefaction plant with a capacity between

50.000 and 2.000.000 m3 / day, as well as

small-scale cylinder-shaped liquefaction

units with a capacity between 50000 and

100000 m3 / day;

Own the self-developed technology for

units with a capacity of up to 500.000 m3)/

day, and can provide feasibility analysis,

basic installation and engineering design.

Capability and strong

practical experience in

building well-head gas

recovery and light

hydrocarbons recovery

systems with a capacity

between 10.000 and 220.000

m3 //day, and to perform the

related process technology

design, joint commissioning

and service training.

Capability to manufacture

the main compressors,

pressurized vessels,

storage tanks and some

purification units.

Page 29: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Onshore Midstream NG Industry

Storage Transportation

Small and medium-scale LNG

storage tanks (1000~30000m3; 60~

500m3);

Cryogenic liquid cluster tanks;

Cryogenic liquid spheric tank;

Storage tanks for LNG-powered

ships (5~20m3));

design and manufacturing etc.

LNG transportation trucks;

CNG transportation trucks;

LPG transportation trucks;

manufacturing and design etc.

Page 30: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

All solutions for equipment manufacturing,

system integration, process line selection,

training for equipment commissioning and

service, project consulting, feasibility analysis,

project and process design for LNG filling

station projects.

LNG refueling station Capabilities

Terminal construction Capabilities

Design and manufacture of on-vehicle CNG cylinder;

Design and manufacture of LNG on-vehicle cylinder;

Total solutions for oil-to-gas conversion of CNG / LNG

tankers and ships.

All solutions for equipment manufacturing,

system integration, process line selection,

training for equipment commissioning and

service, project consulting, feasibility

analysis, project and process design for CNG

filling station projects.

CNG refueling station Capabilities

All solutions for equipment manufacturing,

system integration, process line selection,

training for equipment commissioning and

service, project consulting, feasibility

analysis, project and process design.

LNG gasification station Capabilities

Onshore Downstream NG Industry

Page 31: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Integrated Solutions

Land-based Modular LNG refuelling Station

Fast construction time, high efficiency, can be built in one day.

Small building surface, saves cost on land acquisition;

Reduced investment cost, maximization of economic return.

Land-based Oil and Gas CNG refuelling Station

Strong design and manufacturing capCapabilities , with over 1000

successful cases in domestic.

Solved the problem of high oil temperature in summer and oil

return as well as large pressure decreasing while refilling gas at

peak times

Providing value-added services of intellectualized remote monitor

in M2M era. .

Land-based LNG Liquefaction Plant

Strong Capabilities for manufacturing, engineering and design ;

Have mature handling experience; have Capabilities for the in-

depth analysis per customer requirements;

Page 32: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Offshore LNG Storage, Transportation and Application

Track record in marine storage and transportation of LNG such as On-board Fuel Tanks for LNG powered vessels and On-

board Storage Tank for barges

awarded CCS factory certification.

Type-C Tank for LNG marine transportation.

Integrated Solutions

Page 33: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Distributed Energy Applications

Assisting customer in pre-assessments and feasibility research, such as: calculation of

gas consumption, channels of gas supplies and the LNG supply chain etc.

Have the Capabilities to provide Integrated Solution, including manufacturing, design,

engineering and financial services etc.

• Coordinating financial

Financial services Planning

• Jointing planning

项目可研

• Jointing feasibility research

• Integrated design

Designing

• LNG receiving terminal engineering

• LNG gas supply system

Engineering

• Large-scale LNG storage tank

• LNG transportation trucks

Manufacturing

Researching

Integrated Solutions

Page 34: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Customer Network

Page 35: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Chemical Equipment 04

Page 36: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Equipment for the Chemical Industry

Providing integrated solutions of intelligent

monitoring and intermodal transportation

value-added services in the new M2M era with

strong Capabilities of manufacturing,

designing and engineering etc.

ISO Liquid tanks Gas tanks

Powder tanks Tank repairing and

reconditioning services

Chemical Equipment

Equipment

Equipment Solutions

Page 37: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Production area Technical employees Annual capacity

90000+㎡ 3000+ 20000+ units

Chemical Equipment

Page 38: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

History of Chemical Equipment

2001

2004

2008

2011

2012

2014

2015

Started production

Biggest ISO tank manufacturer

Delivered 13, 000 tanks worldwide

delivered 16, 000 tanks worldwide

10 years anniversary of

CIMC Tank

delivered 140, 000 globally

Delivered 180, 000

globally

Page 39: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Portfolio of Chemical Equipment

One-stop shop on

tank container

Global market share

over 50%

World championship Pemium clients all

over the world

ISO-T11

Liquid Tank

container

T50

Gas Tank

Container

T75

Cryogenic Tank

Container

World Champion Products

Page 40: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

液体罐箱

主要用于装载高纯氨、乙二醇、液氯、牛奶、液钠等介质; 其中按结构的不同, 又分为ISO标准液体罐箱 (梁式、框架式、八爪式等)和特种罐箱 ( SWAP BODY /WIDE

BODY/OFFSHORE)等.

气体罐箱

主要用于装载液氮、液氨等深冷液体以及高压气体等介质; 其中按照压力的不同, 又分为T50和T75等种类.

FEA center

Competitive Advantages

By means of mathematical approximation, the geometric and

loading situation can be simulated.

High precision calculation, can be adapted to any kind of

difficult environment.

Page 41: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

液体罐箱

主要用于装载高纯氨、乙二醇、液氯、牛奶、液钠等介质; 其中按结构的不同, 又分为ISO标准液体罐箱 (梁式、框架式、八爪式等)和特种罐箱 ( SWAP BODY /WIDE

BODY/OFFSHORE)等.

气体罐箱

CFD of Thermal transfer& liquids analysis

Through the elaboration of numerical value by calculator and image

projection, it is possible to analyze the liquid flow, heat transmission and

other physical phenomena inside the tank container

Strong capCapability of adaptation and broad field of application

Helps to efficiently enhance the functions and utilization ratio of the tank

containers

Competitive Advantages

Page 42: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

液体罐箱

主要用于装载高纯氨、乙二醇、液氯、牛奶、液钠等介质; 其中按结构的不同, 又分为ISO标准液体罐箱 (梁式、框架式、八爪式等)和特种罐箱 ( SWAP BODY /WIDE

BODY/OFFSHORE)等.

气体罐箱

主要用于装载液氮、液氨等深冷液体以及高压气体等介质; 其中按照压力的不同, 又分为T50和T75等种类.

ATP Test & Certification

Having d i r e c t a n a l y s i s for

various aspects of the tank

container can be done and faults

causing irregularities through a

dedicated technical software.

Competitive Advantage Competitive Advantages

Page 43: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Provide intermodal vessel/truck/railway transportation solution for liquefied/ gas/ powder. Example as below::

Fixed / mobile storage

Tank container—marine

Chemicals / LNG receiving

terminal

Fixed / mobile gas refill

Tank container—

land

Use in mechanical field Tanks container—railway

Chemical plant

Advantage of intermodal transportation: safe, flexible and environment friendly

LEG/LNG/LPG vessel

Intermodal Transportation Solution

Page 44: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Hawaii intermodal project,

providing LNG to Pacific Islands

Case Study of Intermodal Solution

Page 45: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Customer Network

Page 46: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Liquid Food Equipment 05

Page 47: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Horizontal: Non-Brewing Industry

Design & manufacture stainless steel

storage tanks for :

Fruit juice, dairy, carbonated drinks

etc.

spirits

Biotech and chemical

Pharmaceutical

Vertical: Brewing Industry

Brewing Process EPC (including

raw material system,

saccharification, fermentation &

stand-alone system etc.)

Two world-renowned brands

A renowned German company founded over 160 years ago-world leading brewery

EPC contractor

A renowned Dutch company-leading European supplier of stationary storage

tanks

A renowned Britain company providing engineering services and key equipment

for the industries of brewery, pharmacy, yeast and bio-fuel.

Horizontal

Vertica

l

Liquid Food Equipment

Page 48: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Carlsberg (Dali, Yunnan) EPC Project (2015)

First EPC project on beer fermentation( 2013)

—AB InBev (Suqian)

Ziemann’s first saccharification (2013)

—AB InBev (Jishui)

DOHLER Fruit Juice Cylinder EPC project (2015)

Cases Study

Page 49: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Piedras Negras 10m (30m) hl

Zacatecas 22m hl

Tuxtepec 18m hl

Guayaquil (Brewhouse)

Cali 3.5m hl Bucaramanga

(Brewhouse)

S’Hertogenbosch (Brewhouse)

Moscow Breweries 5.8m hl

St. Pölten (Brewhouse)

Murthal 0.5m hl

Boonrand Up to 6m hl

Ho Chi Minh City 0.5m hl

Warnervale 0.5m hl

Pakse 0.5m hl

Cebrasa (Brewhouse)

Meran (Brewhouse)

AMA (Brewhouse)

Matube / Beira (Brewhouse)

Cincinnati, OH

Brewhouse

Global Cases Display

Abroad projects / partial

Page 50: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Dali

Dazhulin

Jishui

Baoding

Jinlongquan

Suqian

Harbin

Wuhan

Zhengzhou

Shangqiu

Taiwan

Fuzhou

Weinan

Zhangjiakou

Hechuan

Liangping Bozhou

Shizhu

盐城 Zhenjiang

Tongzhou

Dafeng

Domestic projects/Partial

Global Cases Display

Page 52: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Global R&D Network 06

Page 53: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Global R&D Network

Luxembourg

Born

Worldwide Interactive R&D Network 秘鲁

秘鲁

Luxembourg

(Netherlands)

Easterly

(U. K).. Born/

Ludwigsburg

(Germany)

China Beijing

Shenzhen

Shanghai

Nantong

Chengdu

Zhang jiagang

Shenzhen (PRC) Shanghai (PRC)

Beijing (PRC)

Zhang jiagang (PRC)

Suzhou (PRC)

Born& Ludwigsburg(Germany)

Chengdu (PRC)

Luxembourg (Netherlands)

Nantong (PRC)

Eastleign,(U.K.)

Suzhou

Page 54: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Over 570 patents and 60 inventions registered in China

Leading the industry with a healthy growth

Approved patent Layout Globally of CIMC ENRIC: USA, Germany, Japan, Australia, South Africa, Columbia,

Russia, Canada, Indonesia, U.K., Peru, Pakistan, Thailand and Turkey etc.

Advanced Technology and Industry Status

8 internationally recognized PCT patents, 29 patents filed

for worldwide application, 19 of whom registered.

Contributed to the redaction of 21 national standards for

pressurized vessels and 15 standards.

Page 55: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

License for the Design of Pressurized Vessels

A1/A2/A3/C2/C3/D1/D2/SAD/GB1/GB2

GC1 (1)/GC1 (2)/GC1 (3)/GC2/GC3/GD1/GD2

License for the Design and Manufacturing of Pressurized Vessels、

Equivalent to Grade 2/3 Manufacturing License for Safety Equipment

A1/A2/A3/B1/B2/B3/C2/C3/D1/D2

GB1/GC1/GC2Certification for the Installation of Pressure Tubes, Grade 1

Pressurized Vessels and Electric

Certified by ABS (USA), BV, CCS (China), GL (Germany), LR (UK)

and other Maritime Certification Agencies.

Certified by the American Society of Mechanical Engineers ASME

and awarded with U/U2 stamp

ISO 9001: 2008 Quality System Certificate

ISO 14001: 2004 Environmental Management Certificate

OHSAS 18001: 2007 Professional Health and Safety Management Certificate

Holds CCC / CE certification, explosion-proof certification, DOT

certification and the World Manufacturer’s Code certificate

Approved Licenses and Certifications

Page 56: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Management System 07

Page 57: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Management

System

Management System

Social

Responsibility

Quality

Control

H R

Production and

Manufacturing

5S Business

Planning

Management

System

Improvement

Page 58: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

5S Business Planning System

5S Strategy Management System since 2012

Evaluation

Strategic

planning Business plan

Management

report

Internal

Audit

Strategy

Strategy Planning

Annual Planning & Budgeting

Management Report

Internal Audit

Evaluation

Page 59: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

ONE—OPTIMIZATION NEVER ENDING

Management System Improvement

Introduction Self assessment and improvements;

Stamp out wasteful manufacturing ;

Increase production efficiency;

Implement of objectives

Benefits 8 companies executed 9 modules, coverage rates 57% in

3 years,

1500 improvement programs have been activated, for a

benefit of almost 100 million RMB

Page 60: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

CUSTOMER

INVESTOR EMPLOYEE

SOCIETY SUPPLIER

Social Responsibility System

Customer Establish and upgrade the key account management system;

strive to provide the customer with technically advanced and

reliable equipment for the energy, chemical and food industry.

Employee

Establish a comprehensive system to protect the interests and

rights of the employees;

put the employees in condition to receive any kind of training and

further education;

continuously improve the remuneration and bonus system.

Investor

Continuously increase the stock value of the listed company to

ensure a good return on investment;

Obey all laws and regulations concerning the release of

information related to the company, as per relevant rules valid

for public companies.

Society Actively promote reduction of energy consumption and

emissions, and strive for sustainCapability;

take active part in volunteer activities.

Supplier

Maintain a friendly win-win relationship of mutual

interest with the vendors;

establish all sorts of strategic partnership with the major

suppliers.

Page 61: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Quality Control System

Aiming at “zero” defect rate;

Striving for “Quality within the process” ;

Implymenting guideline of “Quality first, customer above all”;

Establishing a “Quality brand” within the industry.

Page 62: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Manufacturing strategy is to Build a “world-class factory” and an “Green factory”;.

Establish “oasis production lines” and “oasis work groups” and gradually propagate the system within all branches.

Pursue the goal of world-class manufacturing and continuously improve profitCapability,.

Manufacturing System

Page 63: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

The core HR principles is “prosperous nation and

rich people” and “people first and joint cause” ;

Establishing a work system to tap and manage

human resources, bonus system, employee

training and further education program to provide

the employees with a direct career development;

Improving the efficiency, performance and

proactivity of employees, exploit their full

potential;

Providing the employees with a safe, healthy,

dignified and harmonious working environment.

Human Resources System

Page 64: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Value- Added Services 08

Page 65: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Financial Services

Financial services are provided by CIMC

Leasing Ltd., a company belonging to CIMC

Group;

Taylor-made and flexible in order to satisfy

customers’ demands;

Aimed at alleviating financial burden for

customer and improving cash-flow, facilitating

asset value.

Lessor (Client) CIMC Leasing Ltd.

Purchasing contract and

payment of goods

Supplying equipment and

provides service

Leasing contract and

payment

Equipment Supplier (CIMC Enric)

Page 66: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Intelligent pressure gauge Intelligent level gauge Oil consumption measurer Vacuum measurer Intelligent thermometer

Intelligent sensor equipment

Intelligent Internet Plus Services

GPRS Main sensor I-BOX data terminal

Terminals

GPS

Cryogenic storage and transportation equipment

Manufacturer Operator Enduser Phone inquiry Customer service

Customer portal application software and help desk

Intelligent

controlling

systems

LNG refuelling station

CIMC TANK U

Internet management system

for Gas filling station CIMC TANK MILES

LNG offshore

equipment

CIMC TANK MILES and TANK U

Page 67: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Future Prospect 09

Page 68: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Future Vision

Future With its strong brand name, CIMC ENRIC will

promote the idea of low carbon economy;

provide clients with products and services that are more environmental friendly, safer and more

efficient;

strive to become a leader in equipment manufacturer, engineering service and integrated solution

provider in energy, chemical, liquid food equipment industries;

contribute to the technological advancement and industrial development for the global energy,

chemical and liquid food equipment markets; contributes to a better living for all mankind

Page 69: Company Presentation Presentation of CIMC ENRIC (2016... · system integration, process line selection, training for equipment commissioning andtraining service, project consulting

Tel: 86-755-26691130

Fax: 86-755-26693117

http: // www.enricgroup.com

Headquarter: 3/F, CIMC Group R&D Center,

2, Gangwan Avenue, Shekou Industrial Area, Shenzhen,

Guangdong (P.C: 518067)

HongKong Office: Unit 908 - 9/F, Fairmont House

8 Cotton Tree Drive, Central, Hong Kong

Tel: 852-2528 9386

Fax: 852-2865 9877

http: // www.enricgroup.com