CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT CPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013 * 1st/Final * For DPWH, only the region and PMO office are listed 18th CPES Release Page1 "R.R. Seismundo Construction & Supply" 10961 Widening of Surigao-Davao Coastal Rd., Km.1822+(-423)-Km.1822+821, Apokon Sect. 03/18/13 XI 17.793 125 O 0.355 0.240 0.150 0.030 0.045 0.050 87.00 - "R.R. Seismundo Construction & Supply" 10961 Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)-New Cortez- San Jose Carcor Panas Rd. 03/18/13 XI 45.784 179 O 0.338 0.231 0.150 0.030 0.045 0.050 84.40 - "R.R. Seismundo Construction & Supply" / Davao Concrete Products Joint Venture JV-12-116 Const. of Flood Control Structure (Sheet Piles & Grouted Riprap) Agusan River, Brgy. Inambatan 11/27/12 XI 27.838 240 O 0.333 0.240 0.150 0.030 0.040 0.050 84.30 - 11-18-70 Construction 32944 Road Concreting at Brgy. Sallacapo 02/28/09 I 0.855 18 C 0.375 0.200 0.300 - - - 87.50 *87.50% Satisfactory 121 Construction Corporation (Formerly: 121 Construction) 21686 Const. of Two (2) Storey MPB at Brgy. Malamig 08/10/11 NCR 1.868 60 C 0.483 0.200 0.300 - - - 98.30 *98.30% Outstanding 121 Construction Corporation (Formerly: 121 Construction) 21686 Const. of 2-Storey, 2-Classroom Sch. Bldg. at Heritage ES, Loma de Gato 04/15/11 III 2.472 120 C 0.419 0.200 0.300 - - - 91.90 89.10% V. Satisfactory 121 Construction Corporation (Formerly: 121 Construction) 21686 Const. of MPB, Brgy. Mabini J. Rizal 06/02/10 NCR 9.315 180 C 0.475 0.200 0.300 - - - 97.50 91.97% V. Satisfactory 2H2L Construction 16293 Impv't. of Drainage & Stairpathwalk, Brgy. Sta. Cruz 08/04/11 IVA 0.947 60 C 0.493 0.133 0.300 - - - 92.60 *92.60% V. Satisfactory 2H2L Construction 16293 Const. of 2-Storey Sch. Bldg., Famy E/S 08/11/11 IVA 3.856 60 C 0.453 0.138 0.300 - - - 89.10 *89.10% V. Satisfactory NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF EVALUATION FINAL RATING/ QUALITATIVE DESCRIPTION AMOUNT (Php, M) DUR (C.D.) CONTRACT *IMPL. AGENCY ESH RDR STATUS CPES VISIT RATING WMS MTL TIME FAC

Upload: others

Post on 23-Jun-2020

11 views

Category:

Documents


0 download

TRANSCRIPT

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page1

    "R.R. Seismundo Construction & Supply" 10961

    Widening of Surigao-Davao Coastal Rd., Km.1822+(-423)-Km.1822+821,

    Apokon Sect.03/18/13 XI 17.793 125 O 0.355 0.240 0.150 0.030 0.045 0.050 87.00 -

    "R.R. Seismundo Construction & Supply" 10961

    Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)-New Cortez-

    San Jose Carcor Panas Rd.03/18/13 XI 45.784 179 O 0.338 0.231 0.150 0.030 0.045 0.050 84.40 -

    "R.R. Seismundo Construction & Supply" / Davao Concrete Products

    Joint Venture

    JV-12-116Const. of Flood Control Structure

    (Sheet Piles & Grouted Riprap) Agusan River, Brgy. Inambatan

    11/27/12 XI 27.838 240 O 0.333 0.240 0.150 0.030 0.040 0.050 84.30 -

    11-18-70 Construction 32944 Road Concreting at Brgy. Sallacapo 02/28/09 I 0.855 18 C 0.375 0.200 0.300 - - - 87.50 *87.50%Satisfactory

    121 Construction Corporation (Formerly:

    121 Construction)21686 Const. of Two (2) Storey MPB at Brgy. Malamig 08/10/11 NCR 1.868 60 C 0.483 0.200 0.300 - - - 98.30

    *98.30% Outstanding

    121 Construction Corporation (Formerly:

    121 Construction)21686 Const. of 2-Storey, 2-Classroom Sch. Bldg. at Heritage ES, Loma de Gato 04/15/11 III 2.472 120 C 0.419 0.200 0.300 - - - 91.90

    89.10% V. Satisfactory

    121 Construction Corporation (Formerly:

    121 Construction)21686 Const. of MPB, Brgy. Mabini J. Rizal 06/02/10 NCR 9.315 180 C 0.475 0.200 0.300 - - - 97.50 91.97% V. Satisfactory

    2H2L Construction 16293 Impv't. of Drainage & Stairpathwalk, Brgy. Sta. Cruz 08/04/11 IVA 0.947 60 C 0.493 0.133 0.300 - - - 92.60*92.60%

    V. Satisfactory

    2H2L Construction 16293 Const. of 2-Storey Sch. Bldg., Famy E/S 08/11/11 IVA 3.856 60 C 0.453 0.138 0.300 - - - 89.10*89.10%

    V. Satisfactory

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page2

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    2H2L Construction 16293 Rehab. of 8th and 9th Streets, San Martin Subd., Brgy. San Isidro 08/04/11 IVA 1.789 90 C 0.440 0.133 0.300 - - - 87.30*87.30%

    Satisfactory

    2H2L Construction 16293 Const. of Two (2) Storey Sch. Bldg. Oogong E/S 04/04/11 IVA 0.999 60 C 0.382 0.200 0.300 - - - 88.20*88.20%

    Satisfactory

    2H2L Construction 16293 Const. of Two (2) Storey, Six (6) Classrooms Cainta E/S 04/15/11 IVA 7.848 150 C 0.389 0.200 0.300 - - - 88.9085.75%

    Satisfactory

    2H2L Construction 16293 Impvt. of Flood Control at So. Upper East Kamias & So. East Kamias 03/12/09 IVA 2.692 120 C 0.461 0.138 0.300 - - - 89.90*89.90%

    V. Satisfactory

    2H2L Construction 16293 Impvt. of Multi-Purpose Pavement at Brgy. Dela Paz & Brgy. San Isidro 03/12/09 IVA 3.748 150 C 0.479 0.133 0.300 - - - 91.20*91.20%

    V. Satisfactory

    2H2L Construction 16293Rehab./Reconst./Upgrading of

    Marikina-Victoria Valley-Antipolo Road

    08/26/09 IVA 19.222 180 C 0.475 0.200 0.300 - - - 97.50 91.86% V. Satisfactory

    2H2L Construction 16293Rehab./Reconst./Upgrading of

    Marikina-Victoria Valley-Antipolo Road

    05/18/09 IV-A 19.221 180 O 0.387 0.239 0.150 0.030 0.025 0.050 88.10 -

    2M Construction & Enterprises 33331

    Slope Protection (Grouted Riprap) along Isabela-Maluso Rd., Matarling

    Sect. at K15+190-K15+24903/13/13 IX 4.842 75 O 0.328 0.240 0.150 0.030 0.040 0.050 83.80 -

    2-R Construction & Supply 15304

    Prev. Maint. of Lingayen Capitol Loop Rd. (right), K0364+(-810)-

    K0364+24003/16/13 I 10.871 60 C 0.477 0.133 0.300 - - - 91.00 *91.00% V. Satisfactory

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page3

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    2-R Construction & Supply 15304

    Const. of Additional Classroom @ Comprehensive Nat'l. H/S 05/21/09 I 2.417 120 C 0.496 0.072 0.300 - - - 86.80

    *86.80% Satisfactory

    2-R Construction & Supply 15304

    Const. of Agno River Bank Protection, San Vicente 11/28/12 I 0.961 60 C 0.400 0.200 0.300 - - - 90.00

    *90.00% V. Satisfactory

    2-R Construction & Supply 15304

    Rehab. of Nansangaan Bridge along Villasis-Malasiqui-San Carlos Rd. 08/13/12 I 1.856 30 C 0.437 0.133 0.300 - - - 87.00

    *87.00% Satisfactory

    3A'S Builders 33251Rehab. of Tabango Flood Control

    along Jct. Calubian-San Isidro-Tabango-Villaba-Palompon Rd.,

    11/21/12 VIII 2.152 120 C 0.445 0.133 0.300 - - - 87.80 *87.80% Satisfactory

    3FS Construction 30464Road Upgrading (Gravel to Paved) of

    Bagahupi-Babatngon-Sta. Cruz-Barugo-Carigara Road

    04/06/11 VIII 19.108 180 C 0.459 0.176 0.300 - - - 93.50 90.62% V. Satisfactory

    3FS Construction 30464 Const. of Coastal Road 04/08/11 VIII 18.895 150 C 0.421 0.133 0.300 - - - 85.40 *85.40% Satisfactory

    3FS Construction 30464 Upgrading of Bagahupi-Babatngon-Sta. Cruz, Barugo-Carigara Rd. 03/11/10 VIII 19.289 230 C 0.497 0.189 0.300 - - - 98.6091.07%

    V. Satisfactory

    3FS Construction 30464 Const. of Grouted Riprap @ Brgy. 90 03/18/09 VIII 0.962 70 C 0.381 0.200 0.300 - - - 88.10 *88.10% Satisfactory

    3FS Construction 30464 Upgrading of Gov't. Center Road Network, Km.000+650-Km.000+843 03/30/12 VIII 3.690 110 C 0.439 0.133 0.300 - - - 87.2087.26%

    Satisfactory

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page4

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    3K Builders 27277 Const. of MPB, Natividad NHS (formerly: Narciso Ramos NHS) 08/12/11 I 1.918 100 C 0.460 0.133 0.300 - - - 89.30*89.30%

    V. Satisfactory

    3K Builders 27277Repair/Rehab. of MNR, Km.174+000 -

    Km.175+000 w/ exception Villasis Section

    06/10/10 I 9.996 32 C 0.455 0.133 0.300 - - - 88.80 88.80% Satisfactory

    3K Builders 27277Repair/Maint. Of Drainage Lateral

    along Bakit-bakit Jct. Umingan Rd., Pob.-Maseil-seil-Don Montano-Aloo

    11/27/12 I 4.339 45 C 0.443 0.200 0.300 - - - 94.30 *94.30% V. Satisfactory

    3K Rock Engineering 27908 Const. of Sch. Bldg. @ Diego Silang E/S 08/15/011 II 0.748 45 C 0.464 0.120 0.300 - - - 88.40*88.40%

    Satisfactory

    3K Rock Engineering 27908 Const. of One Unit Classroom School Building, San Antonio I/S 04/08/11 II 0.641 45 C 0.485 0.133 0.300 - - - 91.80*91.80%

    V. Satisfactory

    3K Rock Engineering 27908 Construction of Multi-Purpose Building, Magsaysay 09/03/09 II 0.572 45 C 0.407 0.200 0.300 - - - 90.70*90.70%

    V. Satisfactory

    3K Rock Engineering 27908 Const./Repair of Multi-Purpose Building 02/25/10 II 1.735 60 C 0.413 0.133 0.300 - - - 84.6084.60%

    Satisfactory

    3K Rock Engineering 27908 Const./Completion of MPB, Liwayway 06/05/10 II 1.445 60 C 0.441 0.133 0.300 - - - 87.40 87.40% Satisfactory

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page5

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    3K Rock Engineering 27908 Completion of Multi-Purpose Building, Gundaway 03/06/09 II 1.783 60 C 0.458 0.200 0.300 - - - 95.80*95.80%

    V.Satisfactory

    3K Rock Engineering 27908 Dibuluan River Irrigation Project 04/27/13 NIA 5.636 150 O 0.359 0.243 0.150 0.015 0.028 0.050 84.51 -

    3-L Construction 16745 Const. of 2 Storey Multi-Purpose Bldg. (Brgy. Hall), Brgy. San Gabriel 03/09/09 V 0.955 120 C 0.436 0.175 0.300 - - - 91.10*91.10%

    V. Satisfactory

    3-L Construction 16745 Road Upgrading (Gravel to Paved), Sipocot-Cabusao Road 09/09/09 V 6.555 150 C 0.418 0.200 0.300 - - - 91.8089.64%

    V. Satisfactory

    3RB Construction & Supply 19541

    Rehab./Reconst./Upgrading of Calamba-Sta. Cruz-Famy Road 08/09/11 IVA 8.125 75 C 0.393 0.133 0.300 - - - 82.60

    *82.60% Satisfactory

    3RB Construction & Supply 19541

    Road Upgrading of San Fernando North Road (San Jacinto Sect.) 08/11/11 V 19.100 165 C 0.391 0.133 0.300 - - - 82.40

    83.72% Satisfactory

    3RB Construction & Supply 19541 Const. of Sto. Cristo Seawall 05/28/10 V 2.876 150 C 0.458 0.133 0.300 - - - 89.10

    89.10% Satisfactory

    3RB Construction & Supply 19541

    Road Upgrading along DM Jct.-Leg.-Sto. Domingo-Tab.-Cam. Sur Bdry.,

    Tiwi-Tabaco Section02/24/09 V 19.233 150 C 0.488 0.133 0.300 - - - 92.10 84.30% Satisfactory

    3RB Construction & Supply 19541

    Impvt. of San Fernando North Road, San Jacinto Section 02/17/10 V 9.450 210 O 0.378 0.240 0.150 0.015 0.035 0.050 86.80 -

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page6

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    3RB Construction & Supply 19541

    Road Conc. & Impvt. of Barangay Road 02/22/10 V 0.959 160 C 0.396 0.139 0.300 - - - 83.50

    86.38% Satisfactory

    3RB Construction & Supply 19541

    Rehab./Reconst. Of Damaged Paved Nat'l Rds., Tublijon, Sorsogon City,

    Esperanza-Salvacion & Salvacion-Del Rosario

    08/04/12 V 27.332 50 C 0.456 0.133 0.300 - - - 88.90 *88.90% Satisfactory

    3RB Construction & Supply 19541

    Cluster VIII-Rehab. of Rds. on various locations at Daang Maharlika

    Km.889+556-Km.891+26108/06/12 VIII 10.044 171 C 0.375 0.200 0.300 - - - 87.50 *87.50% Satisfactory

    3RB Construction & Supply/Ajan Jaeda, Inc.

    (JV) JV-08-209 Const. of Tagas-Divino Rostro Bridge 09/01/09 V 19.179 202 O 0.384 0.240 0.150 0.030 0.033 0.050 88.70 -

    3rd Rock Builders and Supplies 34069

    Rehab. of Cabatling Bridge along Villasis-Malasiqui-San Carlos Rd.,

    Km.192+173, Cabatling08/13/12 I 2.784 90 C 0.417 0.200 0.300 - - - 91.70 88.94% Satisfactory

    3S Builders 18009 Repair and Rehab. of MPB (Municipal Hall) 04/09/11 VII 1.893 97 C 0.491 0.133 0.300 - - - 92.40*92.40%

    V. Satisfactory

    4 A's Construction 9446 Construction of 1-CL (7x9) Lupigue IS 09/05/09 II 1.108 45 C 0.454 0.133 0.300 - - - 88.70*88.70%

    Satisfactory

    4 A's Construction 9446 Const./Conc. of Road 02/23/10 II 4.822 330 C 0.413 0.133 0.300 - - - 84.60 84.60% Satisfactory

    4 A's Construction 9446 Asphalt Overlay of Daang Maharlika 03/03/09 II 1.929 30 C 0.464 0.133 0.300 - - - 89.70 *89.70% V.Satisfactory

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page7

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    4B Construction Corporation 23445

    Upgrading and Concreting of Subic-Philseco Road 03/03/09 III 41.616 180 C 0.407 0.163 0.300 - - - 87.00

    83.76% Satisfactory

    4B Construction Corporation 23445

    Rehab./Reconst./Upgrading of Damaged Paved National Road,

    Olongapo-Bugallon Road05/23/09 III 33.265 45 C 0.374 0.200 0.300 - - - 87.40 *87.40%Satisfactory

    4B Construction Corporation 23445

    Rehab./Reconst./Upgrading of Visayas Avenue (Km 164+236-

    Km.164+711 & Km. 164+872 - Km. 164+236

    08/06/11 III 14.802 24 C 0.453 0.135 0.300 - - - 88.80 *88.80% Satisfactory

    4B Construction Corporation 23445

    Preventive Maint. along Roman Expressway (Bal Sect.) K0120+279.82-K0123+434.42; (Cupang-Alauli Sect.)

    K0123+434.42-K0 125+000

    08/06/11 III 28.532 53 C 0.437 0.003 0.300 - - - 74.00 *74.00% Poor

    4B Construction Corporation 23445

    Rehab./Reconst./Upgrading of Damaged Paved National Roads at

    Subic-PHILSECO Rd.04/04/11 III 41.378 163 C 0.356 0.167 0.300 - - - 82.30 80.41% Unsatisfactory

    4B Construction Corporation 23445

    Repair/Rehab. of Paete-Famy Pob. Rd., Pangil-Siniloan Sect. Km.109+000 - Km.110+400

    05/25/10 IVA 9.608 20 C 0.472 0.133 0.300 - - - 90.50 90.50% V. Satisfactory

    4B Construction Corporation 23445

    Widening/Conc. of Calamba-Sta. Cruz-Famy Jct. Road (4 Lanes) 01/14/12 IVA 47.824 180 C 0.496 0.200 0.300 - - - 99.60

    82.08% Satisfactory

    4B Construction Corporation 23445

    Cluster No. 3: Rehab./Reconst./Upgrading of Jct. Layac-Balanga-Mariveles Port Rd., Mariveles Zigzag Rd, (K0158+098-

    K0159+195)

    03/21/12 III 8.435 168 O 0.327 0.200 0.150 0.030 0.065 0.050 82.20 -

    4B Construction Corporation 23445

    Rehab./Reconst./Upgrading of Damaged Pvmnt of Nat'l Rd. (MFO-2) (IS) Rizal Bdry.-Famy-Quezon Rd. A.)

    K0086+216-K0087+923; B.) K0089+000-K0089+900

    11/27/12 IVA 43.549 210 C 0.274 0.200 0.300 - - - 77.40 82.20% Satisfactory

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page8

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    4B Construction Corporation 23445

    Rehab./Reconst./Upgrading of Damaged Pav't. of Nat'l Rd. (MFO-2) (IS) Rizal Bdry.-Famy-Quezon Rd. a)

    K0086+216-K0087+923; b) K0089+000-K0089+900

    08/06/12 IVA 43.549 210 O 0.339 0.240 0.150 0.030 0.045 0.050 85.40 -

    4B Construction Corporation 23445

    Heavy Maintenance Works Along SCTEX 09/20/13 BCDA 55.843 120 O 0.378 0.200 0.150 0.030 0.023 0.050 83.13 -

    4B Construction Corporation 23445

    Heavy Maintenance Works Along SCTEX 12/06/13 BCDA 55.843 120 C 0.494 0.200 0.300 - - - 99.41

    89.64% V. Satisfactory

    5-1 Construction Corporation 33605

    Asset Preservation (Preventive Maintenance) of Ilocos Sur,

    Km.0011+519 to Km.0011+909 with exception

    08/11/11 NCR 1.908 30 C 0.462 0.200 0.300 - - - 96.20 *96.20% Outstanding

    525 Construction 28532 Angat River (Paltao Sect.), Paltao, Lumangbayan 03/18/13 III 4.772 60 C 0.444 0.133 0.300 - - - 87.70*87.70%

    Satisfactory

    525 Construction 28532 Rehab. of Sta. Rita-Biak na Bato via Pulong Bayabas Road 04/15/11 III 38.599 210 C 0.330 0.200 0.300 - - - 83.0089.66%

    V. Satisfactory

    525 Construction 28532 Rahab. of Sta. Rita-Biak na Bato via Pulong Bayabas Road 09/08/09 III 19.049 120 C 0.478 0.133 0.300 - - - 91.10*91.10%

    V. Satisfactory

    525 Construction 28532Rehab./Reconst./Upgrading of

    Damaged Paved Nat'l Roads along Manila North Road

    03/17/12 III 11.649 30 C 0.453 0.200 0.300 - - - 95.30 *95.30% V. Satisfactory

    525 Construction 28532 Conc. of Roads Bocaue Sect. 08/02/12 III 4.900 30 C 0.440 0.200 0.300 - - - 94.00 *94.00% V. Satisfactory

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page9

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    525 Construction / MGSCC (JV)

    JV-07-095/ SLI-SN-005104

    Rehabilitation/Improvement of Sta. Rita Biak na Bato Road 03/11/09 III 44.000 200 C 0.405 0.200 0.300 - - - 90.50

    *90.50% V.Satisfactory

    525 Construction/MGSCC Joint Venture JV-08-235

    Rehabilitation of Sta. Maria-Norzagaray Road 09/07/09 III 46.339 180 C 0.479 0.133 0.300 - - - 91.20

    86.64% Satisfactory

    5G Galvez Construction and Supply 34736

    Northern Samar First Engineering District Brgy. Dancalan 08/12/11 VIII 0.960 60 C 0.457 0.133 0.300 - - - 89.00

    *89.00% Satisfactory

    5G Galvez Construction and Supply 34736

    Conc. of Brgy. Pathway, Brgy. Doña Lucia 08/13/12 VIII 0.486 30 C 0.471 0.133 0.300 - - - 90.40

    *90.40% V. Satisfactory

    5G Galvez Construction and Supply 34736

    Conc. of Brgy. St., Avelino St. & Hillside Drive, UEP, Zone III 08/13/12 VIII 0.972 60 C 0.452 0.133 0.300 - - - 88.50

    *88.50% Satisfactory

    5G Galvez Construction and Supply 34736

    Rehab./Impv't. of Damaged Paved Nat'l Rd. along Catarman-Laoang,

    K0759+539-K0759+67108/13/12 VIII 2.154 60 C 0.488 0.133 0.300 - - - 92.10 87.72% Satisfactory

    5'S Construction & Supply 32404

    1.)Restoration of Rd. Cut along Jct. Bancal-Leon-Antique Bdry. Rd.,

    K0024+100-K0024+300; 2.)Reconst. Of Slope Protection along Jct. Bancal-Leon-Antique Bdry. Rd., K0037+750-

    K0037+780

    08/24/12 VI 2.182 75 C 0.419 0.200 0.300 - - - 91.90 *90.46% V. Satisfactory

    5's Construction and Supply 32404 Construction of Tuyan - CIP 08/31/13 NIA 1.795 120 O 0.359 0.240 0.150 0.025 0.061 0.050 88.50 -

    6 Jewels Construction 34737 Const. of Line Canal @ Inicbulan 08/17/11 IVA 0.496 45 C 0.484 0.133 0.300 - - - 91.70 *91.70% V. Satisfactory

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page10

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    6 Jewels Construction 34737

    Rehab./Reconst./Upgrading of Damaged Paved Nat'l Road (MFO-2)

    (IS) of Secondary Road along Bauan-Mabini Road K0173+169-K0173+270

    03/22/12 IVA 1.250 60 C 0.448 0.200 0.300 - - - 94.80 *94.80% V. Satisfactory

    6 Jewels Construction 34737 Const. of MPB at Bagalangit 11/23/12 IVA 4.995 134 C 0.484 0.133 0.300 - - - 91.70 *91.70% V. Satisfactory

    6 Jewels Construction 34737 Conc./Widening/Riprapping of Brgy. Rd. at Brgy. Sto. Tomas 08/16/12 IVA 1.995 60 C 0.439 0.133 0.300 - - - 87.20*87.20%

    Satisfactory

    628 Construction Enterprises 30049

    Construction of Two Classroom School Building at Lokeb Norte 03/06/09 I 1.369 70 C 0.429 0.178 0.300 - - - 90.70

    *90.70%V. Satisfactory

    628 Construction Enterprises 30049

    Rehab./Reconst./Upgrading of Damaged Nat'l Rds. Along Judge de Venecia Sr. Ave. Rd., Km. 207+456-

    Km. 207+832

    11/27/12 I 9.028 120 C 0.400 0.200 0.300 - - - 90.00 *90.00% V. Satisfactory

    6RM Construction and Development (Formerly:

    R.R. Mauricio Construction)

    174Conc. of San Juanico-Basey-Sohoton

    Rd., Km.000+000-Km.000+600 (Chainage)

    08/06/12 VIII 11.447 134 C 0.402 0.133 0.300 - - - 83.50 82.06% Satisfactory

    722 Construction 21923 Rehab./Reconst./Upgrading at Old Cagayan Valley Rd. (Baliuag Sect.) 06/10/10 III 9.547 80 C 0.460 0.133 0.300 - - - 89.3089.30%

    V. Satisfactory

    722 Construction 21923Rehab/Reconst./Upgrading of Old

    Cagayan Valley Road (Pulilan Section)

    05/28/09 III 9.543 45 C 0.359 0.200 0.300 - - - 85.90 *85.90%Satisfactory

    722 Construction 21923 Const. of Sch. Bldg., 2 Storey, 2 CL Banga E/S 03/10/09 III 2.290 100 C 0.472 0.133 0.300 - - - 90.5089.52%

    V.Satisfactory

    722 Construction 21923Const. of Multi-Purpose Bldg. Malinta E/S Lawang Bato E/S, Brgy. Lawang

    Bato & Natividad Homes03/03/09 NCR 1.882 90 C 0.405 0.136 0.300 - - - 84.10 *84.10% Satisfactory

    722 Construction 21923Rehab./Reconst./Upgrading of

    Damages Pavement along Mc Arthur Highway

    05/31/10 NCR 9.506 120 C 0.436 0.200 0.300 - - - 93.60 93.60% V. Satisfactory

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page11

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    722 Construction 21923 Rehab./Reconst./Upgrading along Rizal Avenue Extension 05/27/09 NCR 9.494 120 C 0.380 0.200 0.300 - - - 88.00*88.00%

    Satisfactory

    722 Construction 10221 Const. of MPB (Day Care) at Brgy. Polo 09/16/09 NCR 1.901 75 C 0.486 0.133 0.300 - - - 91.90*91.90%

    V. Satisfactory

    722 Construction, Inc. (Formerly: 722 Construction)

    21923 Impvt./Rehab. of Road, Sumandig Road, Brgy. Sumandig 08/17/11 III 1.914 70 C 0.405 0.200 0.300 - - - 90.50*90.50%

    V. Satisfactory

    722 Construction, Inc. (Formerly: 722 Construction)

    21923 Preventive Maint.Daang Maharlika Road. Km.43+792-Km.44+478.32 08/11/11 III 8.283 18 C 0.428 0.135 0.300 - - - 86.30*86.30%

    Satisfactory

    722 Construction, Inc. (Formerly: 722 Construction)

    21923

    Asphalt Overlay along NCR/Bulacan Bdry.-Bigte-Ipo Dam Road,

    Km.029+836-Km.029+(-149) w/ exception

    08/17/11 III 5.027 20 C 0.385 0.137 0.300 - - - 82.20 *82.20% Satisfactory

    722 Construction, Inc. (Formerly: 722 Construction)

    21923 Repair & Rehab. along MacArthur Highway Extension, Dalandanan 03/16/12 NCR 8.895 157 C 0.350 0.200 0.300 - - - 85.0085.66%

    Satisfactory

    722 Construction, Inc. (Formerly: 722 Construction)

    21923Preventive Maint. (IS) along Manila

    North Road (Calumpit Sect.) Km.47+000-Km.48+400

    03/14/12 III 10.744 22 C 0.463 0.200 0.300 - - - 96.30 *96.30% Outstanding

    722 Construction, Inc. (Formerly: 722 Construction)

    21923

    Const. of the First-Scale Pilot on "Use of Reinforced Portland Cement

    Concrete Pavement along Norzagaray-Bigte Road Minuyan

    11/30/12 III 6.326 120 C 0.324 0.200 0.300 - - - 82.40 *82.40% Satisfactory

    722 Construction, Inc. (Formerly: 722 Construction)

    21923Repair/Rehab./Impvt. of Rd. along

    Bocaue-San Jose Rd., Km0037+800-Km0042+000 w/ exception

    08/08/12 III 9.686 90 C 0.379 0.200 0.300 - - - 87.90 *87.90% Satisfactory

    722 Construction, Inc. (Formerly: 722 Construction)

    21923Repair/Rehab./Impvt. along MNR at

    Bocaue Sect. Km.25+000-Km.26+000 w/ exceptions

    08/02/12 III 4.849 8 C 0.378 0.200 0.300 - - - 87.80 *87.80% Satisfactory

    739 Builders 31174 Const. of Ten (10) CL, Two (2) Storey Sch. Bldg. At Ilocos Sur NHS 03/31/11 I 8.068 240 C 0.351 0.142 0.300 - - - 79.3083.36%

    Satisfactory

    739 Builders 31174 Construction of School Building, Pila E/S, Brgy. Pila 09/07/09 I 0.950 60 C 0.454 0.154 0.300 - - - 90.80*90.80%

    V. Satisfactory

    739 Builders 31174 Const. of Drainage Canal, Brgy. VII 05/29/10 I 1.141 80 C 0.444 0.133 0.300 - - - 87.70 87.70% Satisfactory

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page12

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    739 Builders 31174 Road Concreting, Brgy. Napo 02/28/09 I 0.950 20 C 0.364 0.200 0.300 - - - 86.40 *86.40%Satisfactory

    739 Builders 31174 Upgrading of Vigan-Sta. Catalina Rd., K0407+155-K0407+347 08/06/12 I 2.830 40 C 0.340 0.186 0.300 - - - 82.60*82.60%

    Satisfactory

    747 Builders & Trader 16892 Rehab./Impvt. of Manggahan Floodway Eastbank 03/12/09 IVA 14.367 170 C 0.473 0.133 0.300 - - - 90.6086.97%

    Satisfactory

    747 Builders & Trader 16892Proposed Rehab./Impvt. of Pres.

    Quirino Ave. West Bound (Singalong-Roxas Blvd.)

    05/24/10 NCR 14.475 20 C 0.442 0.200 0.300 - - - 94.20 94.20% V. Satisfactory

    747 Builders and Trader 16892 Rehab./Reconst./Upgrading of Antipolo Circumferential Road "A" 08/26/09 IVA 19.213 180 C 0.411 0.200 0.300 - - - 91.1088.70%

    Satisfactory

    8 Pillars Construction & General Merchandise 35120

    Repair/Rehab. of Rds. Amparo Village, Pedro Sa Baculio, El

    Salvador City03/12/13 X 0.979 45 C 0.361 0.200 0.300 - - - 86.10 *86.10% Satisfactory

    8 Pillars Construction & General Merchandise 35120

    Repair/Rehab. of Rds. Kalabaylay, El Salvador City 03/12/13 X 0.980 45 C 0.350 0.200 0.300 - - - 85.00

    *85.00% Satisfactory

    811 Trading & Construction 21215

    Impv't. of Jct. Nat'l. Rds.-Osmeña St.-Sitio Toong Road, Poblacion

    Carugay ARC08/09/11 IVB 20.482 160 C 0.448 0.133 0.300 - - - 88.10 *85.88% Satisfactory

    811 Trading & Construction 21215

    Impvt. of Jct. National Road-Osmeña Street-Sitio Toong Road Pob.

    Caguray ARC04/08/11 IVB 20.482 160 O 0.354 0.212 0.150 0.030 0.048 0.050 84.40 -

    811 Trading & Construction 21215

    Repair/Rehab. of Multi-Purpose Building (Phase II) 02/26/09 IV-B 0.288 27 C 0.463 0.133 0.300 - - - 89.60

    *89.60% V.Satisfactory

    811 Trading & Construction 21215

    Const. of Bongabong Flood Control (Downstream of Abutment "A") 03/16/12 IVB 9.117 165 O 0.335 0.240 0.150 0.030 0.035 0.050 84.00 -

    811 Trading & Construction 21215

    Repair/Impvt. of Pagbahan Revetment, Brgy. Talabaan 03/12/12 IVB 6.264 90 C 0.391 0.133 0.300 - - - 82.40

    *82.40% Satisfactory

    811 Trading & Construction 21215

    Const. of Bongabong Flood Control (Downstream of Abutment "A") 08/09/12 IVB 9.117 165 C 0.343 0.200 0.300 - - - 84.30

    84.12% Satisfactory

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page13

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    811 Trading & Construction 21215

    Impvt./Conc. of Calapan South Rd., Sta. Rita Sect. 08/09/12 IVB 26.189 167 C 0.280 0.200 0.300 - - - 78.00

    82.80% Satisfactory

    830 Builders & Developers Corp. 29781

    Const. of 1 CL 7m x 7m Sch. Bldg. at Lanatan Munting Tubig E/S 04/12/11 IVA 0.495 40 C 0.459 0.200 0.300 - - - 95.90

    *95.90% V. Satisfactory

    888 ACY Enterprises 32898Rehab./Reconst. Of Damaged Paved

    Nat'l. Road, Km.1004+000-Km.1012+000, Daang Maharlika

    03/28/12 VIII 27.476 260 C 0.282 0.133 0.300 - - - 71.50 *71.50% Poor

    888 ACY Enterprises 32898Reconst. (Conc. Paving) of Jct. LIR., Buenavista-Carmen, Danao-Getafe

    Road, Poblacion, Danao Sect.08/18/11 VII 9.541 240 C 0.328 0.200 0.000 - - - 52.80 66.93% Poor

    888 Acy Enterprises 32898Reconst. (Conc. Paving) of Loay

    Interior Rd., Trinidad & San Miguel Sect.

    03/31/11 VII 14.320 565 C 0.278 0.133 0.000 - - - 41.10 60.60% Poor

    888 ACY Enterprises/Chu Construction Joint

    VentureJV-11-536

    Conc. of Looc-Tugdan Airport, Sta.89+314.358-Sta.89+904 /

    Sta.97+864.67-Sta.100+168.9011/28/12 IVB 40.856 210 C 0.408 0.142 0.300 - - - 85.00 84.46% Satisfactory

    888 ACY Enterprises/CHU Construction Joint

    VentureJV-11-536 Conc. of Looc-Tugdan Airport 08/16/12 IVB 40.856 180 O 0.370 0.240 0.128 0.030 0.040 0.033 84.10 -

    8R'S Construction 22997

    Rehab./Reconst./Upgrading of Tigwi-Dampulan-Lipata-Yook-Libas Road,

    Km.76+024.92-Km.76+251.10 / Km.79+124-Km.79+680

    03/21/12 IVB 11.503 75 O 0.352 0.240 0.150 0.030 0.025 0.033 83.00 -

    8R'S Construction 22997

    Rehab./Reconst./Upgrading of Tigwi-Dampulan-Lipata-Yook-Libas Rd.,

    Km.76+024.92-Km.76+251.10 / Km.79+124-Km.79+680

    08/14/12 IVB 12.123 90 C 0.395 0.154 0.300 - - - 84.90 83.76% Satisfactory

    920 Factors & Enterprise 20387

    Repair/Rehab./Impv't. of Baguio-Bontoc Rd. (Halsema Highway)

    Km.253+650-Km.256+400 w/ exceptions

    03/12/13 CAR 9.997 180 C 0.454 0.133 0.300 - - - 88.70 *88.70% Satisfactory

    920 Factors & Enterprise 20387

    Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd. (IS) along Acop-Kapangan-Kibungan-Bakun

    Rd., K0278+532-K0279+815

    11/21/12 CAR 41.330 246 O 0.354 0.255 0.126 0.030 0.054 0.033 85.20 -

    920 Factors & Enterprise 20387

    Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd., Abra-

    Ilocos Sur Rd., K0389+000-K0390+097

    11/30/12 CAR 20.652 192 C 0.433 0.200 0.000 - - - 63.30 72.12% Poor

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page14

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    920 Factors & Enterprise 20387

    Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd. (IS) along Acop-Kapangan-Kibungan-Bakun

    Rd., K0278+532-K0279+815 (K0275+502-K0279+812 as per RBIA)

    08/01/12 CAR 41.330 180 O 0.321 0.300 0.114 0.010 0.037 0.033 81.50 -

    920 Factors & Enterprise 20387

    Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd,. Abra-

    Ilocos Sur Rd., K0389+000-K0390+097

    08/14/12 CAR 20.652 192 O 0.341 0.269 0.100 0.000 0.037 0.033 78.00 -

    920 Factors & Enterprises 20387

    Road Upgrading (Gravel to Conc.) Gurel-Bukod-Kabagan-Buguias-

    Abatan Road04/11/11 CAR 28.838 337 C 0.456 0.133 0.300 - - - 88.90 *88.90% Satisfactory

    A B Aponesto Construction, Parts &

    Supply22998

    Road Upgrading (Gravel to Paved) along Compostela-Cateel Road,

    Osmeña Section04/09/11 XI 18.892 180 C 0.372 0.200 0.300 - - - 87.20 85.82% Satisfactory

    A C J Construction Resources 10635

    Concreting of Poblacion Magpet-Nowa-Basak Road (Basak Section) 05/30/09 R-XII 18.797 180 O 0.336 0.300 0.000 0.024 0.055 0.050 76.50 -

    A C O Construction 13105

    Const. of Rotonda along National Highway (Zamboanga Peninsula) Cross Rd. Upgrading Project @

    Poblacion Ipil

    02/25/10 IX 2.829 115 O 0.319 0.300 0.000 0.020 0.042 0.033 71.40 -

    A C O Construction 13105Zamboanga Peninsula Crossroads Upgrading Project (Completion of

    Roundabout) Sta.1801+231.50 06/05/10 IX 1.861 60 C 0.476 0.133 0.300 - - - 90.90 90.90% V. Satisfactory

    A C O Construction 13105

    Const. of Rotonda along National Highway (Zamboanga Peninsula Crossroad Upgrading Project) at

    Poblacion Ipil

    06/05/10 IX 2.829 115 C 0.456 0.133 0.000 - - - 58.90 66.40% Poor

    A C O Construction 13105Rehab./Reconst./Upgrading of Ipil-

    Liloy-Sindangan Road Km.2007+240-Km.2008+369 w/ exception

    03/21/12 IX 11.616 236 C 0.465 0.185 0.300 - - - 95.00 82.52% Satisfactory

    A C O Construction 13105Rd. Upgrading (Gravel to Concrete) Crossing Sta. Clara-Sandayong Rd. Sect., Km.1790+015-Km.1780+615

    08/29/12 IX 12.853 209 C 0.391 0.133 0.300 - - - 82.40 84.32% Satisfactory

    A C O Construction 13105 Conc. of Liloy-Zamboanga del Norte-Ipil-Zamboanga Sibugay Rd. Ph. I 03/05/09 IX 14.306 150 C 0.425 0.147 0.300 - - - 87.2086.90%

    Satisfactory

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page15

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    A. De Guia Construction 18228 Const. of Flood Control Laoag 03/15/13 II 11.670 150 C 0.417 0.133 0.300 - - - 85.00 85.36% Satisfactory

    A. De Guia Construction 18228

    Rd. Upgrading (Gravel to Paved) (Int. Sect.) along Ilagan-Delfin Albano-

    Mallig Rd. a)K0436+214-K0437+124, b)K0438+375-K0438+375-K0438+437

    03/18/13 II 20.642 104 O 0.348 0.240 0.150 0.030 0.047 0.033 84.80 -

    A. De Guia Construction 18228

    Preventive Maintenance along Santiago-Tuguegarao Road @ A)

    KO368+620 - KO369+000, Aurora B) KO374+000 - KO375+500

    04/06/11 II 6.718 90 C 0.483 0.133 0.300 - - - 91.60 *91.60% V. Satisfactory

    A. De Guia Construction 18228 Restoration of Jones Revetment 04/11/11 II 4.825 90 C 0.450 0.133 0.300 - - - 88.30 *88.30% Satisfactory

    A. De Guia Construction 18228 Restoration of Brgy. I Revetment 04/11/11 II 4.825 90 C 0.425 0.133 0.300 - - - 85.80 *85.80% Satisfactory

    A. De Guia Construction 18228 Repair/Restoration of Flood Control, Sta.000+000 - Sta.000+120 04/11/11 II 9.650 90 C 0.400 0.133 0.300 - - - 83.30*83.30%

    Satisfactory

    A. De Guia Construction 18228

    Rehab./Reconst./Upgrading of Santiago-Baluarte-Quirino Bdry.

    Road; KO328+100 - KO331+000 w/ exception

    04/10/11 II 18.623 150 C 0.428 0.133 0.000 - - - 56.10 70.44% Poor

    A. De Guia Construction 18228Rehab./Reconst./Upgrading of

    Santiago-Tuguegarao Rd. Burucboc Sect.

    04/06/11 II 9.647 133 C 0.456 0.133 0.000 - - - 58.90 67.42% Poor

    A. De Guia Construction 18228Rehab./Reconst./Upgrading of Santiago-Tuguegarao Road,

    KO333+500 - KO334+85004/10/11 II 17.123 149 C 0.335 0.200 0.000 - - - 53.50 65.26% Poor

    A. De Guia Construction 18228Rehab./Reconst./Upgrading of

    Naguilian-San Mariano Rd., Villapaz Section

    08/25/09 II 19.296 104 C 0.420 0.200 0.300 - - - 92.00 92.84% V. Satisfactory

    A. De Guia Construction 18228 Concreting of Junction National -Potia Road 08/27/09 II 7.043 110 C 0.410 0.200 0.300 - - - 91.0091.42%

    V. Satisfactory

    A. De Guia Construction 18228 Rehab./Reconst. of Daang Maharlika Road, KO309+300-KO309+878 08/27/09 II 18.811 130 C 0.411 0.200 0.300 - - - 91.1091.10%

    V. Satisfactory

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page16

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    A. De Guia Construction 18228 Rehab./Reconst./Upgrading of Gamu-Roxas Road (Roxas Section) 02/23/10 II 19.293 240 C 0.402 0.133 0.300 - - - 83.5088.78%

    Satisfactory

    A. De Guia Construction 18228 Const./Completion/Continuation of Unfinished On-going Bridges 03/01/10 II 11.574 120 C 0.415 0.133 0.300 - - - 84.8086.78%

    Satisfactory

    A. De Guia Construction 18228

    Rehab./Reconst./Upgrading of Damaged Paved national Road,

    Daang Maharlika KO 320+000 - KO 321+000

    06/03/10 II 16.396 120 O 0.387 0.295 0.150 0.030 0.042 0.033 93.70 -

    A. De Guia Construction 18228

    Rehab./Reconst./Upgrading of Damaged Paved National Road Santiago-Baluarte-Quirino Bdry.

    Road KO326+(-)280 - KO328+000 w/

    08/27/10 II 15.432 149 C 0.292 0.200 0.300 - - - 79.20 87.24% Satisfactory

    A. De Guia Construction 18228

    Restoration of Road Slope & Slope Protection along Naguilian-San

    Mariano Road KO395+850 - KO401+800

    08/25/10 II 14.471 120 C 0.389 0.150 0.300 - - - 83.90 85.28% Satisfactory

    A. De Guia Construction 18228Road Upgrading (Gravel to Paved) of Jct. Ipil-Panang-Quirino Bdry. Road;

    KO366+058 - KO367+11808/27/10 II 17.373 149 C 0.403 0.146 0.300 - - - 84.90 84.90% Satisfactory

    A. De Guia Construction 18228 Const. of Gucab Flood Control Proj., Sta.000+000-Sta.000+448 11/27/12 II 15.633 150 C 0.435 0.133 0.300 - - - 86.80*86.80%

    Satisfactory

    A. De Guia Construction 18228 Const. of Flood Control, San Vicente 11/26/12 II 11.672 100 C 0.425 0.133 0.300 - - - 85.80 *85.80% Satisfactory

    A. De Guia Construction 18228 Prev. Maint. (IS) along Gamu-Roxas Road, K0395+000-K0396+057 08/08/12 II 6.762 120 C 0.376 0.200 0.300 - - - 87.60*87.60%

    Satisfactory

    A. De Guia Construction 18228 Const. of Camasi Small Water Impounding Project 08/07/12 II 29.201 320 O 0.368 0.293 0.113 0.023 0.042 0.033 87.20 -

    A. De Guia Construction 18228 Const. of Flood Control Projects in Isabela, Brgy. I FC 08/12/12 II 14.533 225 C 0.350 0.200 0.300 - - - 85.0086.38%

    Satisfactory

    A. De Guia Construction 18228Repair/Improvement/ Construction of

    MARIIS Main Canal, and Lateral under the PIDP.

    07/27/12 NIA 14.597 120 O 0.298 0.240 0.150 0.030 0.070 0.050 83.83 -

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page17

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    A. E. Belleza Builders Pamplona Ressettlement Project, Phase I 06/28/12 NHA 9.978 150 O 0.384 0.294 0.029 0.030 0.056 0.050 84.29 -

    A. E. Belleza Builders Pampolna Resettlement Project, Phase I 04/23-26/12 NHA 9.978 150 O 0.398 0.300 0.000 0.030 0.056 0.033 81.74 -

    A. E. Belleza Builders Pamplona Resettlement Project, Phase I 02/08/13 NHA 10.751 180 C 0.475 0.200 0.300 - - - 97.4888.80%

    Satisfactory

    A. Montalbo Trading and Construction 32684

    Const. of Multi-Purpose Building at Bigain 1st 03/01/10 IVA 1.135 30 C 0.450 0.200 0.300 - - - 95.00

    95.00% V. Satisfactory

    A. V. Construction and Supply 13202

    Ilayang Dupay Small Irrigation Project 09/07/13 NIA 4.789 C 0.348 0.200 0.300 - - - 84.78

    *84.78% Satisfactory

    A.A De Vera Construction 6191 Rehab./Expansion of Waterworks System 09/02/09 VII 4.510 240 C 0.417 0.133 0.300 - - - 85.00*85.00%

    Satisfactory

    A.A De Vera Construction 6191 Const./Rehab. of School Bldg. at Cogon E/S 06/05/10 VII 0.591 35 C 0.415 0.200 0.000 - - - 61.5061.50% Poor

    A.A De Vera Construction 6191 Const. of Water System Development Project 08/25/10 VII 1.413 90 C 0.497 0.133 0.300 - - - 93.0093.00%

    V. Satisfactory

    A.A De Vera Construction 6191 Const./Repair & Completion of Instructional Classroom, Corella CES 06/10/09 VII 0.504 105 C 0.492 0.200 0.300 - - - 99.20*99.20%

    Outstanding

    A.A De Vera Construction 6191Completion of Tagbilaran City

    Puericulture Center & Maternity House and Related Facilities

    06/10/09 VII 4.575 150 C 0.500 0.169 0.300 - - - 96.90 *96.90% Outstanding

    A.A De Vera Construction 6191 Const./Repair/Rehab. of Multi-Purpose Building 06/10/09 VII 0.460 105 C 0.483 0.154 0.300 - - - 93.7095.52%

    V. Satisfactory

    A.A De Vera Construction 6191 Completion of Multi-Purpose Building 03/04/09 VII 0.458 60 C 0.382 0.200 0.300 - - - 88.20*88.20%

    Satisfactory

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page18

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    A.A. De Vera Construction 6191 Const. of MPB, Basak 08/24/11 VII 1.835 120 C 0.485 0.133 0.300 - - - 91.80

    *91.80% V. Satisfactory

    A.A. De Vera Construction 6191 Const. of MPB, Songculan 08/23/11 VII 0.958 120 C 0.460 0.133 0.300 - - - 89.30

    *89.30% V. Satisfactory

    A.A. De Vera Construction 6191

    Const. of Employees Quarters, DPWH Bohol I 03/29/11 VII 4.710 210 C 0.485 0.162 0.300 - - - 94.70

    *94.70% V. Satisfactory

    A.A. De Vera Construction 6191

    Const. of MPB (School Stage) Loon North CES 03/29/11 VII 1.318 110 C 0.469 0.133 0.300 - - - 90.20

    *90.20% V. Satisfactory

    A.A. De Vera Construction/ YS Construction (JV)

    JV-11-184Upgrading of Rd. (Gravel to Paved)

    Jct. (TNR) Cortes-Balilihan-Catigbian-Macaas Rd., Km.44+587-Km.45+067

    08/08/12 VII 11.113 165 C 0.427 0.133 0.300 - - - 86.00 *86.00% Satisfactory

    A.B Aponesto Construction Parts &

    Supply22998

    Road Upgrading (Gravel to Paved) along Compostela-Cateel Rd.,

    Osmeña Sect.06/04/10 XI 18.892 180 O 0.355 0.238 0.150 0.030 0.045 0.033 85.10 -

    A.B Aponesto Construction, Parts &

    Supply22998 Concreting of Montevista-DNAS Road 03/01/10 XI 32.748 300 C 0.353 0.200 0.300 - - - 85.30

    88.48% Satisfactory

    A.B Taylan Construction & Development 25273

    Const. of RCBC and Canal along Manila North Road (Km. 483+040) 02/22/10 I 4.816 65 C 0.329 0.133 0.300 - - - 76.20

    76.20% Unsatisfactory

    A.B. Aponesto Const., Parts & Supply 22998

    Widening of Rd. along Daang Maharlika (Agusan-Davao Rd.),

    Linoan Sect.08/14/12 XI 31.630 122 C 0.416 0.200 0.300 - - - 91.60 *91.60% V. Satisfactory

    A.B. Taylan Const. & Development/L.S.D.

    Construction & Supplies (JV)

    JV-11-252 Prev. Maint. Nta'l Secondary Road, Laoag-Balacad Rd. 11/20/12 I 34.418 44 C 0.464 0.133 0.300 - - - 89.70*89.70%

    V. Satisfactory

    A.B. Taylan Construction & Development / Fiat

    Construction Services (JV)

    JV-11-392Const. of Laoag City By-Pass Rd. inc. RROW, Sta.0+000-1+640 & Sta.2+400-

    3+164.1903/22/13 I 59.922 300 O 0.328 0.300 0.150 0.030 0.045 0.033 88.60 -

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page19

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    A.B. Taylan Construction & Development / Fiat

    Construction Services (JV)

    JV-11-421Rehab./Reconst./Upgrading along MNR, Km.468+000-Km.483+664 (w/ exception), Batac-San Nicolas Sect.

    03/21/13 I 90.271 300 O 0.328 0.300 0.150 0.030 0.038 0.033 87.90 -

    A.B. Taylan Construction & Development / Fiat

    Construction Services (JV)

    JV-09-106Road Opening/Const. of Missing

    Links of Nat'l Rd., Solsona-Kabugao Road, Phase VI, Ilocos Norte Side

    08/01/11 I 192.447 540 C 0.464 0.145 0.300 - - - 90.90 87.30% Satisfactory

    A.B. Taylan Construction & Development/L.S.D.

    Construction & Supplies (JV)

    JV-12-197Assets Preservation of Nat'l Rds.,

    (Prev. Maint.) Batac-Espiritu (Banna) Rd., K0471+402-K0472+416

    03/21/13 I 11.730 46 O 0.305 0.300 0.000 0.030 0.040 0.033 70.80 -

    A.C Rivero Development Corporation 5122

    Rehab./Reconst./Upgrading of Bacolod South Road Km. 6+862-Km.

    8+350 w/ exception09/12/09 VI 26.470 280 O 0.331 0.282 0.150 0.030 0.045 0.033 87.10 -

    A.C Rivero Development Corporation 5122

    Const./Impvt. of Multi-Purpose Bldg. at Maasin City (Legislative Building) 03/06/09 VIII 0.934 75 C 0.500 0.133 0.300 - - - 93.30

    *93.30%V. Satisfactory

    A.C Rivero Development Corporation (Formerly:

    A.C. Rivero Const.)5122

    Rehab./Reconst./Upgrading of Bacolod South Rd. Km. 6+862 to Km.

    8+350 with exceptions03/06/10 VI 26.337 280 C 0.393 0.200 0.300 - - - 89.30 87.98% Satisfactory

    A.C Soliven Construction & General Merchandise 19278

    Channel Impvt./Slope Protection @ San Roque Creek, Camias Creek &

    San Vicente Creek02/23/10 III 4.781 60 C 0.445 0.177 0.300 - - - 92.20 92.20% V. Satisfactory

    A.C Soliven Construction & General Merchandise 19278

    Construction of 2 CL S.B. at La Paz H/S 09/01/09 III 0.974 90 C 0.483 0.133 0.300 - - - 91.60

    *91.60% V. Satisfactory

    A.C. Rivero Development Corporation (Formerly:

    A.C. Rivero Const.)5122 Const. of Subang Daku Bridge 08/16/11 VIII 18.890 518 C 0.486 0.200 0.300 - - - 98.60 91.60% V. Satisfactory

    A.C. Rivero Development Corporation (Formerly:

    A.C. Rivero Construction)5122

    Rehab./Strengthening of Divisoria Bridge along Bdry. Southern Leyte-

    Maasin-Macrohon-Sogod-Daang Maharlika Rd Divisoria

    03/16/13 VIII 13.668 144 O 0.322 0.300 0.150 0.030 0.045 0.050 89.70 -

    A.C. Rivero Development Corporation (Formerly:

    A.C. Rivero Construction)5122

    Rehab./Reconst. of Damaged Paved Nat'l Road, Palo-Carigara-Ormoc Road, Km.1009+000-Km.101+072

    03/24/12 VIII 14.995 162 O 0.323 0.228 0.150 0.030 0.045 0.050 82.60 -

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page20

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    A.C. Rivero Development Corporation (Formerly:

    A.C. Rivero Construction)5122 Const./Completion of Subang Daku Bridge, Subang Daku River 11/24/12 VIII 42.820 220 C 0.429 0.134 0.300 - - - 86.30

    90.68% V. Satisfactory

    A.C. Rivero Development Corporation (Formerly:

    A.C. Rivero Construction)5122

    Const./Impvt. of San Miguel-Jct. Buac Rd., Daang Maharlika Rd. (Km.1207+000-Km.1209+454.40)

    11/24/12 VIII 35.731 248 C 0.393 0.195 0.300 - - - 88.80 89.28% V. Satisfactory

    A.C. Rivero Development Corporation (Formerly:

    A.C. Rivero Construction)5122

    Upgrading/Conc. of San Juanico-Basey-Sohoton Rd., K0913+721.75-

    K0917+915.72 w/ exceptions11/28/12 VIII 47.065 260 O 0.374 0.240 0.150 0.030 0.045 0.033 87.20 -

    A.C. Rivero Development Corporation (Formerly:

    A.C. Rivero Construction)5122

    Replacement of Biak-Na-Bato Bridge along Vallehermosa-Canlaon City-

    Castellana Rd.08/10/12 VI 23.838 170 C 0.393 0.131 0.300 - - - 82.40 *82.40% Satisfactory

    A.C. Rivero Development Corporation (Formerly:

    A.C. Rivero Construction)5122 Const. of Subang Daku Bridge, Phase II 08/08/12 VIII 18.890 360 C 0.439 0.200 0.300 - - - 93.90

    93.60% V. Satisfactory

    A.C. Rivero Development Corporation (Formerly:

    A.C. Rivero Construction)5122

    Const./Completion of Subang Daku Bridge, Subang Daku River, San

    Miguel08/17/12 VIII 42.820 220 O 0.383 0.300 0.150 0.030 0.040 0.033 93.60 -

    A.C. Rivero Development Corporation (Formerly:

    A.C. Rivero Construction)5122

    Const./Impv't. of San Miguel-Jct. Buac Rd., Daang Maharlika Rd

    (Km1207+000 - Km1209+454.40)08/19/12 VIII 35.731 220 O 0.349 0.289 0.150 0.030 0.045 0.033 89.60 -

    A.C. Rivero Development Corporation (Formerly:

    A.C. Rivero Construction)5122

    Roadslip at Km.1059+200 along Jct. Himay-angan-Silago Abuyog Rd.,

    Brgy. Lepanto St.08/17/12 VIII 6.586 205 C 0.462 0.200 0.300 - - - 96.20 79.58% Unsatisfactory

    A.C. Rivero Development Corporation (Formerly:

    A.C. Rivero Construction)5122

    Upgrading/Conc. of San Juanico-Basey-Sohoton Rd., K0913+721.75-

    K0917+915.72, w/ exceptions08/07/12 VIII 47.065 200 O 0.357 0.240 0.150 0.030 0.040 0.033 85.00 -

    A.C. Soliven Construction & General Merchandise 19278

    Repair/Rehab. Of FMR at Brgy. Dalumpinas 08/12/11 I 0.950 23 C 0.491 0.133 0.300 - - - 92.40

    *92.40% V. Satisfactory

    A.C. Soliven Construction & General Merchandise 17278

    Upgrading of Capas-Botolan Rd. (Capas Sect.) K0124+805 to

    K0124+94708/05/11 III 1.843 30 C 0.377 0.200 0.300 - - - 87.70 *87.70% Satisfactory

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page21

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    A.C. Soliven Construction & General Merchandise 19278

    Const. of Two (2) Cl. Sch. Bldg. @ Aranguren High School 04/06/11 III 0.925 90 C 0.456 0.178 0.300 - - - 93.40

    *93.40% V. Satisfactory

    A.C. Soliven Construction & General Merchandise 19278

    Rehab. of Slope Protection in Tinang River (Sta. Monica Sect.) Sta.0+000 -

    Sta.0+279.50 with exception03/16/12 III 4.795 60 C 0.330 0.200 0.300 - - - 83.00 *83.30% Satisfactory

    A.C. Soliven Construction & General Merchandise 19278

    Rehab./Reconst./Upgrading of IS of Binalonan-Asingan Sta. Maria Rd., K0205+225-K0205+875, Sta. Maria

    Sect.

    08/10/12 I 5.046 45 C 0.359 0.200 0.300 - - - 85.90 *85.90% Satisfactory

    A.D Construction 6946 Conc. of Line Canal along National Road, Concepcion 09/09/09 IVA 1.442 90 C 0.371 0.200 0.300 - - - 87.10*87.10%

    Satisfactory

    A.D. Construction 6946 Impvt./Rehab. of San Jose Elem. School, District II 08/18/11 NCR 0.838 45 C 0.458 0.200 0.300 - - - 95.80*95.80%

    V. Satisfactory

    A.D. Construction 6946 Partial Completion of Jose P. Laurel H/S 04/04/11 NCR 1.571 60 C 0.486 0.192 0.300 - - - 97.80*97.80%

    Outstanding

    A.D. Construction 6946 Rehab. of Brgy. Rd. at Brgy. Sinisian East 08/14/12 IVA 0.978 45 C 0.442 0.133 0.300 - - - 87.50*87.50%

    Satisfactory

    A.D.P Construction & Supply 3466

    Impvt./Conc. of Access Road, Tubalan Port, Tubalan 06/14/10 XI 58.261 320 O 0.338 0.300 0.000 0.030 0.040 0.033 74.10 -

    A.D.P Construction & Supply 3466

    Impv't./Conc. Of Mana-Ticulon-Lagumit-Little Baguio Rd. 08/25/10 XI 47.455 571 C 0.292 0.133 0.000 - - - 42.50

    42.50% Poor

    A.D.P Construction & Supply 3466

    Rehab./Reconst./Upgrading of Damaged Paved National Road,

    Roxas City Boundary-Panitan Road-Jct. Bailan Road, Capiz (KM.112+750-

    08/31/10 VI 53.673 225 O 0.364 0.240 0.150 0.030 0.051 0.050 88.50 -

    A.D.P Construction & Supply 3466 Reconst. of Dumaguete North Road 03/12/09 VII 18.881 230 C 0.442 0.200 0.300 - - - 94.20

    82.14%Satisfactory

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page22

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    A.D.P. Const. & Supply 3466Const. of Slope Protection along Jct. Bancal-Leon-Antique Boundary Rd.,

    K0031+722-K0031+89103/22/13 VI 13.802 188 O 0.388 0.241 0.150 0.030 0.055 0.050 91.40 -

    A.D.P. Const. & Supply 3466 Road Upgrading of Sara-Concepcion Road 04/13/11 VI 66.819 328 C 0.421 0.176 0.300 - - - 89.7087.84%

    Satisfactory

    A.D.P. Const. & Supply 3466 Conc. of Pototan-Tina-Lambunao Road 04/12/11 VI 9.419 178 C 0.410 0.133 0.300 - - - 84.3087.54%

    Satisfactory

    A.D.P. Const. & Supply 3466 Repair/Reconst./Upgrading of Roxas City Bdry.-Panitan Jct. Bailan Road 04/11/11 VI 53.673 225 C 0.409 0.134 0.300 - - - 84.3086.61%

    Satisfactory

    A.D.P. Const. & Supply 3466 Const. of Various Drainage System at Roxas City 04/11/11 VI 28.854 240 C 0.432 0.133 0.300 - - - 86.50*86.50%

    Satisfactory

    A.D.S San Juan Construction 12853

    Conc. of Dionisio Anore St., Brgy. Mambog 02/16/10 IVA 1.728 90 C 0.427 0.200 0.300 - - - 92.70

    92.70% V. Satisfactory

    A.F.G Construction & Construction Supply 17161

    Const. of MPB (Covered Court) at San Enrique NHS 03/10/10 VI 1.925 78 C 0.405 0.200 0.300 - - - 90.50

    87.08% Satisfactory

    A.F.G Construction & Construction Supply 17161

    Rehab. of Amerang Flood Control, Tigum River, Brgy. Amerang 09/05/10 VI 8.159 257 C 0.456 0.133 0.000 - - - 58.90

    69.28% Poor

    A.F.G Construction & Construction Supply 17161

    Rehab. of Bacolod South Rd. (Hingaran Section) 09/15/09 VI 14.221 222 C 0.398 0.133 0.300 - - - 83.10

    83.88% Satisfactory

    A.F.G. Construction and Construction Supply 17161 Const. of Tangalan-Ibajay Rd. 03/19/13 VI 45.834 179 O 0.387 0.259 0.150 0.024 0.030 0.033 88.30 -

    A.F.G. Construction and Construction Supply 17161

    Rehab./Reconst./Upgrading of Jct. National Road, Sagay-Bato-Dian-ay-Marcelo-Balea Jct. National Road,

    Bato Sect.

    03/31/11 VI 37.184 210 C 0.448 0.135 0.300 - - - 88.30 83.38% Satisfactory

    A.F.G. Construction and Construction Supply 17161

    Rehab./Conc. of Bacolod North Rd., K0049+200-K0050+000 08/08/12 VI 13.583 177 C 0.402 0.132 0.300 - - - 83.40

    *83.40% Satisfactory

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page23

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    A.F.G. Construction and Construction Supply 17161

    Replacement/Const. of Tubog Bridge, Brgy. Tubog 08/15/12 VI 7.587 180 O 0.372 0.230 0.150 0.010 0.035 0.033 83.00 -

    A.G Cosipag Construction 12700 Balogo CIS 06/1-6/09 NIA 2.144 150 C 0.421 0.126 0.300 - - - 84.68

    *84.68% Satisfactory

    A.G Herrera Construction Corp. 26307

    Construction of Multi-Purpose Building, Sto. Cristo 06/01/09 III 2.381 80 C 0.488 0.133 0.300 - - - 92.10

    90.42% V. Satisfactory

    A.G. Herrera Construction Corp. 34166 Conc. of Rd. Brgy. Graceville 03/21/13 III 0.985 30 C 0.402 0.133 0.300 - - - 83.50

    *83.50% Satisfactory

    A.I.P Construction 32458 Road Concreting at Pinget Barangay 03/13/09 CAR 1.872 45 C 0.386 0.200 0.300 - - - 88.60 *88.60% Satisfactory

    A.I.P Construction 32458 Rehab. of Ambasing-Balugang FMR 08/27/10 CAR 0.800 268 C 0.439 0.133 0.300 - - - 87.20 87.20% Satisfactory

    A.I.P. Construction 32458 Rehab. of Kin-iway-Tamboan FMR 04/10/11 CAR 1.000 250 C 0.436 0.147 0.300 - - - 88.30 85.42% Satisfactory

    A.I.P. Construction 32458Restoration of Road cuts along

    Bontoc Baguio Road Alab Section (Km.383+619 - Km.384+124)

    04/09/11 CAR 1.732 70 C 0.340 0.200 0.300 - - - 84.00 82.68% Satisfactory

    A.J Lava Builders 22265 Const. of the Makinabang Baliuag FMR 11/24/08 III 4.769 62 C 0.296 0.300 0.300 - - - 89.60*89.60%

    V. Satisfactory

    A.J Lava Builders 22265 Impvt./Rehab. of MPB, Brgy. San Antonio 09/14/09 NCR 2.021 90 C 0.412 0.133 0.300 - - - 84.50*84.50%

    Satisfactory

    A.J Lava Builders 22265 Impv't./Rehab. of MPB and Alley Fernandez St., Brgy. San Antonio 06/04/10 NCR 0.961 45 C 0.455 0.200 0.300 - - - 95.5095.50%

    V. Satisfactory

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page24

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    A.J Taylan Construction Corporation 2336

    Road Opening/Const. of Missing Links of National Road, Solsona-Kabugao Road, Ilocos Norte Side

    09/09/09 I 48.199 300 O 0.379 0.250 0.150 0.030 0.050 0.033 89.20 -

    A.J. Lava Builders 22265Preventive Maintenance of San

    Mateo-Rodriguez Road, San Mateo-Rodriguez

    08/01/11 IVA 4.413 30 C 0.498 0.133 0.300 - - - 93.10 *93.10% V. Satisfactory

    A.J. Lava Builders 22265Repair & Maint. of Flood Control

    Structure (Slope Protection) along Teresa River

    03/14/12 IVA 2.941 60 C 0.443 0.133 0.300 - - - 87.60 *87.60% Satisfactory

    A.J. Lava Builders 22265 Rehab. of Rd. at Silangan Brgy. Geronimo 11/19/12 IVA 0.981 45 C 0.459 0.142 0.300 - - - 90.10*90.10%

    V. Satisfactory

    A.J. Lava Builders 22265Repair & Maint. of Flood Control &

    Drainage Structures along Rofriguez-San Jose-Quezon City Rd.

    11/19/12 IVA 2.449 90 O 0.337 0.300 0.150 0.030 0.025 0.033 87.50 -

    A.J. Lava Builders 22265Repair/Rehab./Impvt. of Teresa-

    Morong Rd. (K0034+150 to K0035+0, w/ exception)

    08/02/12 IVA 4.775 30 C 0.451 0.133 0.300 - - - 88.40 *88.40% Satisfactory

    A.J. Taylan Construction Corporation 2336

    Widening of MNR (Concrete Widening of Shoulder & Canal

    Structures)11/19/12 I 25.421 162 C 0.455 0.200 0.300 - - - 95.50 91.42% V. Satisfactory

    A.J. Taylan Construction Corporation 2336

    Reconst. of Garasgas Bridge along MNR 11/20/12 I 34.569 255 C 0.456 0.200 0.300 - - - 95.60

    91.22% V. Satisfactory

    A.J. Taylan Construction Corporation 2336

    CP 7-Rehab. of Flood Control Facilities in Bacarra, Dumalneg &

    Pasugon, all in the province of Ilocos Norte, (POPSTIRP)

    08/02/12 I / MFCP II 19.282 90 C 0.458 0.154 0.300 - - - 91.20 *91.20% V. Satisfactory

    A.J. Taylan Construction Corporation 2336

    Widening of MNR (Concrete Widening of Shoulder and Canal

    Structures)08/02/12 I 25.421 162 O 0.361 0.268 0.150 0.030 0.045 0.033 88.70 -

    A.J. Taylan Construction Corporation 2336

    Reconst. of Garasgas Bridge along Manila North Rd. 08/04/12 I 34.569 268 O 0.339 0.276 0.150 0.030 0.055 0.033 88.30 -

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page25

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    A.J. Taylan Construction Corporation / A.B. Taylan

    Construction & Dev't. JV-10-122

    Preventive Maintenance Nat'l Arterial Road, Manila North Rd., K0485+(-088)-

    K0485+462, Nangalisan03/18/12 I 21.632 150 C 0.408 0.200 0.300 - - - 90.80 *90.80% V. Satisfactory

    A.L Dare Construction 11932Const./Repair/Rehab. of Slope Protection along Porac River,

    Mabical Sect.08/16/10 III 14.344 90 C 0.481 0.133 0.300 - - - 91.40 91.40% V. Satisfactory

    A.L Gantuangco Construction 30872

    Construction of the Diversion Works and Canal System of Libertad CIP -

    Phase 211/15-20/2010 NIA 16.060 202 O 0.373 0.264 0.150 0.023 0.038 0.050 89.69 -

    A.L Gantuangco Construction 30872 Benolho CIS 10/6-10/08 NIA 3.720 90 O 0.277 0.180 0.050 0.020 0.038 0.100 66.50 -

    A.L. Dare Construction 11932 Impvt. along Kennon Road, Camp 4 04/14/11 CAR 7.177 150 C 0.388 0.200 0.300 - - - 88.80 85.98% Satisfactory

    A.L. Dare Construction 11932Repair/Rehab./Impvt. of San Antonio-Floridablanca Rd., Km0082+435.71-

    Km0083+000 w/ exceptions07/31/12 III 4.778 10 C 0.379 0.200 0.300 - - - 87.90 *87.90% Satisfactory

    A.L. Salazar Construction, Inc. 3899

    Const./Widening/Upgrading/Rehab. of Access Rd. to Taytay-Bantulan Port (Km.210+000-Km.214+211)

    03/12/13 IVB 89.312 450 O 0.364 0.300 0.030 0.030 0.055 0.033 81.20 -

    A.L. Salazar Construction, Inc. 3899

    Const./Widening/Upgrading/Rehab. of Access Road (Km.210+000-

    Km.214+211)08/03/12 IVB 81.362 349 O 0.332 0.240 0.150 0.030 0.045 0.050 84.70 -

    A.L.R Construction Corporation 24110 Completion of MPB at Brgy. Zapote 05/27/10 IVA 0.959 30 C 0.458 0.075 0.300 - - - 83.30

    83.30% Satisfactory

    A.L.R Construction Corporation 24110

    Completion of Two (2) Storey 4-CL at Landayan E/S 08/23/10 IVA 2.302 225 C 0.407 0.165 0.300 - - - 87.20

    87.06% Satisfactory

    A.L.R Construction Corporation 24110 Conc.of Road, Inday Subdivision 03/13/09 IVA 0.958 90 C 0.461 0.133 0.300 - - - 89.40

    *89.40% V. Satisfactory

    A.L.R Construction Corporation 24110

    Const.of Multi Purpose Pavement with Perimeter Fence, Marcelino M.

    Santos NHS03/13/09 IVA 0.957 90 C 0.480 0.133 0.300 - - - 91.30 *91.30% V. Satisfactory

    A.L.R Construction Corporation 24110

    Const. of Pedestrian Overpass (Phase II) Brgy. Pagsawitan 09/01/09 IVA 2.882 35 C 0.484 0.185 0.300 - - - 96.90

    *96.90% Outstanding

    A.L.R Construction Corporation 24110

    Const. of Multi-Purpose Building at Brgy. Timugan 09/03/09 IVA 2.111 40 C 0.389 0.155 0.300 - - - 84.40

    *84.40% Satisfactory

    A.L.R Construction Corporation 24110 Conc. of Roads, Brgy. San Luis 02/15/10 IVA 3.358 90 C 0.455 0.200 0.300 - - - 95.50

    95.50% V. Satisfactory

    A.L.R Construction Corporation 24110

    Completion of 2-Storey 4-CL @ Landayan E/S 02/24/10 IVA 5.030 225 O 0.354 0.300 0.150 0.015 0.018 0.033 87.00 -

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page26

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    A.L.R Construction Corporation 24110

    Construction of Overpass (Phase I), Pagsawitan 05/30/09 IV-A 3.849 129 C 0.482 0.133 0.300 - - - 91.50

    *91.50% V. Satisfactory

    A.L.R Construction Corporation 24110

    Const. of Pedestrian Overpass at Brgy. San Antonio and Biñan-Carmona Road Intersection

    06/01/09 IV-A 19.203 241 C 0.466 0.133 0.300 - - - 89.90 90.86% V. Satisfactory

    A.L.R Construction Corporation 24110

    Road Upgrading (Gravel to Paved-HDM-4) of Jct. MWCR (Bagong

    Silang)-Cabacao Diversion Road, Brgy. Cabacao

    08/28/10 IVB 9.649 145 C 0.409 0.198 0.300 - - - 90.70 88.60% Satisfactory

    A.L.R. Construction Corporation 24110

    Const. of Pedestrian Overpass, Old Manila South Road, Km.34+520 04/06/11 IVA 9.632 202 C 0.395 0.111 0.300 - - - 80.60

    85.64% Satisfactory

    A.L.R. Construction Corporation 24110

    Imprv't./Widening of Antipolo Diversion Rd. "I", First Legislative

    District11/22/12 IVA 13.095 180 C 0.413 0.200 0.300 - - - 91.30 90.46% V. Satisfactory

    A.L.R. Construction Corporation 24110

    Impv't./Widening of Antipolo Diversion Rd. "I" 1st Leg. District 07/31/12 IVA 13.095 180 O 0.387 0.240 0.150 0.030 0.043 0.050 90.00 -

    A.M Oreta & CO., Inc./IBC Int'l Builders Corp. (JV) JV-07-097

    Conc. of Iloilo-Caticlan Highway (Pototan-Passi-Capiz Bdry. Sect.) 05/31/10 VI 158.259 570 C 0.379 0.200 0.300 - - - 87.90

    87.82% Satisfactory

    A.M Oreta & CO., Inc./IBC Int'l Builders Corp. (JV) 7096

    Kalibo Airport Development Project (Asphalt Overlay of Runway,

    Extension of Apron and Construction of Drainage Canal)

    04/14/10 DOTC 283.188 360 C 0.449 0.200 0.300 - - - 94.90 92.40% V. Satisfactory

    A.M Robles Construction 28056 Construction of Water Supply @ Brgy. San Simon 03/02/09 I 0.530 40 C 0.415 0.184 0.300 - - - 89.90*89.90%

    V. Satisfactory

    A.M Robles Construction 28056 Completion of Multi-Purpose Building at Pinaglabanan 05/28/09 NCR 4.776 90 C 0.487 0.133 0.300 - - - 92.00*92.00%

    V. Satisfactory

    A.M. Chua Jr. Engineering & Construction

    33734Proposed Const./Rehab. of Rds. & Drainage along Comet & Sunflower

    Streets, Brgys. 18703/13/13 NCR 1.918 60 C 0.463 0.067 0.300 - - - 83.00 *83.00% Satisfactory

    A.M. Oreta / IBC (Joint Venture) JV-09-227

    Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rds. Iloilo-Capiz Rd. (Old Route), Catatuan-Janiuay-Lambunao-Calinog Sect.

    08/24/12 VI 143.043 390 C 0.416 0.200 0.300 - - - 91.60 *88.81% Satisfactory

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page27

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    A.M. Oreta / IBC (Joint Venture) JV-11-210

    Const. of Drainage System along Iloilo-Capiz Rd. (Old Route) Nat'l Rd.

    CPU Sect., Iloilo City08/06/12 VI 42.875 240 O 0.321 0.239 0.150 0.030 0.055 0.050 84.50 -

    A.M. Oreta / IBC (JV) JV-07-171Const. of CP-V, Pandan-Libertad-Antique Bdry. Rd., Sta.00+057 - Sta.27+762.66 with exception

    04/06/11 PJHL 409.901 707 C 0.418 0.200 0.300 - - - 91.80 *91.80% V. Satisfactory

    A.M. Oreta / IBC International (JV) JV-08-261

    Pototan Bridge along Iloilo-Capiz, (New Route) including Access Road

    to the New Airport04/10/11 VI 308.770 676 C 0.447 0.133 0.300 - - - 88.00 83.50% Satisfactory

    A.M. Oreta / IBC Joint Venture JV-09-266

    CP V-B Pandan-Libertad-Antique-Aklan Boundary Rd. Sta.012+074.62-

    Sta.017+230.70 inc. 12 Bridges11/23/12 PJHL 542.376 715 C 0.389 0.198 0.300 - - - 88.70 *88.70% Satisfactory

    A.P Consebido Construction & Trading 33616 Basey Irrigation Project 09/5-9/11 NIA 8.463 120 C 0.451 0.160 0.300 - - - 91.10

    91.07% V. Satisfactory

    A.P Consebido Construction and Trading 33616 Const. of MPB, Brgy. Alimanguan 08/20/10 IVB 0.974 114 C 0.447 0.200 0.300 - - - 94.70

    88.54% Satisfactory

    A.P Palacios Construction 29021 Const. of MPB, Brgy. Pingit 06/05/10 III 4.287 180 C 0.470 0.133 0.300 - - - 90.30

    90.30% V. Satisfactory

    A.P Palacios Construction 29021 Rehab./Impvt. of Dikidit-Suguit FTMR 09/08/09 III 4.723 150 O 0.300 0.300 0.150 0.030 0.050 0.033 86.30 -

    A.P. Consebido Construction and Trading 33616 Const. of Seawall at Brgy. Rizal 08/05/11 IVB 0.665 40 C 0.459 0.133 0.300 - - - 89.20

    *89.20% V. Satisfactory

    A.P. Consebido Construction and Trading 33616

    Repair/Maint. Of Flood Control Structure of Tulariquen Bridge,

    Revetment08/05/11 IVB 0.880 48 C 0.448 0.133 0.300 - - - 88.10 *88.10% Satisfactory

    A.P. Consebido Construction and Trading 33616

    Con. of Roads, Sitio Buayan, Brgy. New Cuyo 03/15/12 IVB 0.584 76 C 0.471 0.133 0.300 - - - 90.40

    *90.40% V. Satisfactory

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page28

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    A.P. Consebido Construction and Trading 33616

    Const. of MPB (District Health Clinic), San Vicente District E/S 03/17/12 IVB 0.969 137 C 0.469 0.122 0.300 - - - 89.10

    *89.10% V. Satisfactory

    A.P. Palacios Construction 29021

    Maint./Repair & Rehab. of Infra Facility/Flood Control & Drainage

    System, San Joaquin River Control11/27/12 III 3.000 97 C 0.350 0.200 0.300 - - - 85.00 *85.00% Satisfactory

    A.P. Palacios Construction 29021

    Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rds. (IS), Nat'l Secondary Rd., Baler-Casiguran Rd., (Baler-Dinadiawan Rd ) K0263+64-

    07/31/12 III 2.674 105 C 0.443 0.200 0.300 - - - 94.30 *94.30% V. Satisfactory

    A.P. Palacios Construction / Wilper

    Const., Inc. (JV)

    Rehab./Reconst./Upgrading of Damage Pave (SLAMAC) 04/09/11 III 46.297 240 C 0.419 0.188 0.300 - - - 90.70

    *90.70% V. Satisfactory

    A.P.B Construction 17055Repair/Rehab. of Baguio-Bauang

    Road, Km. 296+050-Km. 297+050 with exceptions

    08/29/10 CAR 4.891 47 C 0.456 0.176 0.300 - - - 93.20 93.40% V. Satisfactory

    A.P.B Construction 17055 Rehab. and Conc. of Road at Brgy. Balligi, Kias Barangay 03/03/10 CAR 1.248 60 C 0.384 0.158 0.300 - - - 84.2084.20%

    Satisfactory

    A.P.B. Construction 17055Rehab./Reconst./Upgrading of

    Damaged Paved National Road, PMA cut-off Road 2 K0+000-K0+360

    08/18/11 CAR 5.610 102 O 0.370 0.240 0.000 0.030 0.042 0.033 71.50 -

    A.P.O General Construction 7010

    Rehab./Reconst. of Dungon-Agat Section, Km. 216+648-Km. 217+723

    (V.S.) Camp 108/29/10 CAR 4.555 90 C 0.466 0.133 0.300 - - - 89.90 89.90% V. Satisfactory

    A.P.O. General Construction 7010

    Rehab./Reconst. along Gurel-Bokod-Kabayan-Buguias-Abatan Rd. 04/11/11 CAR 31.838 441 C 0.453 0.153 0.300 - - - 90.60

    *90.60% V. Satisfactory

    A.P.O. General Construction 7010

    Rd. Upgrading (gravel to concrete) along Acop-Kapangan-Kibungan-Bakun Rd., K0285+444-K0286+840 V.S. (K0285+423-K0286+836 as per RBIA) & K0345+470 K0348+000 V S

    11/21/12 CAR 59.896 237 O 0.333 0.240 0.150 0.015 0.047 0.050 83.50 -

    A.Q Loisaga Construction & General Services 32691 Const. of 2 CL in Quillo-Quillo E/S 09/01/09 IVA 2.023 120 C 0.470 0.133 0.300 - - - 90.30

    *90.30% V. Satisfactory

    A.R & Mark Builders 31673 Const. of @-CL Maramag CES 02/25/10 X 0.989 105 C 0.418 0.133 0.300 - - - 85.10 85.10% Satisfactory

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page29

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    A.R Lustre Jr. Construction 7680

    Rehab./Reconst./Upgrading of Damaged Paved Nat'l. Rds. At Bigaa-Plaridel via Bulacan and Malolos Rd.

    08/27/10 III 14.352 90 C 0.367 0.185 0.300 - - - 85.20 85.20% Satisfactory

    A.R Lustre Jr. Construction 7680

    Conc. of Puerto-Princesa-Sabang Road 09/11/09 IVB 48.140 284 C 0.419 0.200 0.300 - - - 91.90

    90.61%V. Satisfactory

    A.R Lustre Jr. Construction 7680

    Puerto Princesa Airport Development Project 8/13-14/09 DOTC 90.817 270 C 0.488 0.200 0.300 - - - 98.80

    98.80% Outstanding

    A.R Lustre Jr. Construction 7680

    Rehab/Reconst./Upgrading of Bigaa-Plaridel via Bulacan and Malolos

    Road05/28/09 III 13.077 75 C 0.449 0.196 0.300 - - - 94.50 *94.50%V. Satisfactory

    A.R Lustre Jr. Construction 7680

    Construction of Multi-Purpose Building 03/07/09 IV-B 0.383 90 C 0.481 0.107 0.300 - - - 88.80

    *88.80% Satisfactory

    A.R Lustre Jr. Construction 7680

    Repair/Rehab/Impvt. of Santiago-Syjuco E/S 09/17/09 NCR 0.482 45 C 0.482 0.000 0.300 - - - 78.20

    *78.20% Unsatisfactory

    A.R. & Mark Builders 31673 Const./Conc./Repair of Roads Brgy. Bugo 03/18/13 X 3.369 45 C 0.386 0.200 0.300 - - - 88.60*88.60%

    Satisfactory

    A.R. Lustre Jr. Construction 7680

    Conc. of Puerto Princesa South Rd. (Aborlan Sect. Km.60+024.80-

    Km.64+000 w/ exceptions)03/15/13 IVB 62.614 240 O 0.362 0.240 0.150 0.030 0.055 0.033 87.00 -

    A.R. Lustre Jr. Construction 7680

    Rd. Upgrading (Gravel to Conc.) Conc. of Puerto Princesa South Rd. (Labog-Punag Sect., Km.144+517-

    Km.147+454)

    03/14/13 IVB 60.671 265 C 0.417 0.133 0.300 - - - 85.00 86.65% Satisfactory

    A.R. Lustre Jr. Construction 7680

    Conc. of Puerto Princesa South Road Phase 2 08/11/11 IVB 7.481 95 C 0.410 0.133 0.300 - - - 84.30

    87.06% Satisfactory

    A.R. Lustre Jr. Construction 7680

    Asphalt Overlay of Capitol-Canigaran Road, Km.1+950.6-Km.2+264 08/09/11 IVB 1.023 51 C 0.428 0.133 0.300 - - - 86.10

    *86.10% Satisfactory

    A.R. Lustre Jr. Construction 7680 Conc. of Puerto Princesa South Road 03/31/11 IVB 38.600 217 C 0.441 0.133 0.300 - - - 87.40

    87.64% Satisfactory

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page30

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    A.R. Lustre Jr. Construction 7680

    Conc. of Tapul-Bahile Road, Km. 39+903.50-Km.40+560 03/19/12 IVB 8.567 75 C 0.417 0.200 0.300 - - - 91.70

    90.02% V. Satisfacfory

    A.R. Lustre Jr. Construction 7680

    Repair/Asphalt Overlay of Puerto Princesa South Road K0001+1024-

    K0001+61103/19/12 IVB 6.154 35 C 0.439 0.133 0.300 - - - 87.20 *87.20% Satisfactory

    A.R. Lustre Jr. Construction 7680

    Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rds., Pulilan-

    Calumpit Rd., Km.47+741.10-Km 49+766 w/ exception Pulilan &

    03/14/12 III 21.726 113 C 0.426 0.151 0.300 - - - 87.70 87.40% Satisfactory

    A.R. Lustre Jr. Construction 7680

    Conc. of Salvacion Sabang Stretch, K0039+675-K0041+534 (w/ exception) 07/30/12 IVB 19.293 135 C 0.380 0.200 0.300 - - - 88.00

    *88.00% Satisfactory

    A.R. Lustre Jr. Construction 7680

    Const. of Puerto Princesa Airport Development Project (Building and

    Industrial Plant)05/25/11 DOTC 38.547 210 C 0.417 0.200 0.300 - - - 91.70 91.70% V. Satisfactory

    A.R. Lustre Jr. Construction 7680

    Const. of Peurto Princesa Airport Development Project (Building and

    Industrial Plant)05/26/11 DOTC 102.128 300 C 0.438 0.200 0.300 - - - 93.80 93.80% V. Satisfactory

    A.R.L Construction 27645 Repair/Rehab. of School Building BSU 03/03/10 III 0.989 18 C 0.454 0.148 0.300 - - - 90.2090.20%

    V. Satisfactory

    A.R.L Construction 27645 Rehab/Impvt./Upgrading of Pulilan-Calumpit Road (Pulilan Section) 05/28/09 III 9.542 60 C 0.376 0.200 0.300 - - - 87.60*87.60%

    Satisfactory

    A.R.L Construction 27645Const. of Flood Control

    (Revetrment), Poblacion, San Sebastian, San Jose, Sta. Monica,

    09/04/09 III 6.697 80 C 0.400 0.133 0.300 - - - 83.30 *83.30% Satisfactory

    A.R.L Construction 27645 Upgrading/Conc. of Roads with Drainage Improvement 03/04/09 NCR 0.476 45 C 0.364 0.200 0.300 - - - 86.40*86.40%

    Satisfactory

    A.R.L Construction 27645Rehab./Reconst./Upgrading of

    Damaged Pavement along 7th Ave. East

    05/31/10 NCR 6.445 90 C 0.409 0.200 0.300 - - - 90.90 90.90% V. Satisfactory

    A.R.L. Construction 27645 Repair/Rehab. of MPB at Sta. Elena E/S 08/13/11 III 1.317 40 C 0.500 0.143 0.300 - - - 94.30*94.30%

    V. Satisfactory

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page31

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    A.R.L. Construction 27645

    Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rds. Pulilan

    Railroad Station Km.44+(-380)-Km.44+(-070)

    08/02/12 III 3.886 31 C 0.423 0.200 0.300 - - - 92.30 *92.30% V. Satisfactory

    A.S.M Francisco Dev't and Construction Corp. 19098 Proposed Exterior Repainting Works 03/24/09 U.P. 1.368 120 C 0.400 0.200 0.300 - - - 90.00

    90.00% V. Satisfactory

    A.S.S Construction 31509 Completion of Alaremil Building II 03/2-3/10 DOST 9.607 250 C 0.496 0.200 0.300 - - - 99.60 97.64% Outstanding

    A.S.S. Construction 31509 Completion of ACA Building II 05/14-15/09 DOST 9.631 210 O 0.380 0.296 0.150 0.030 0.062 0.050 96.80 -

    A.S.S. Construction 31509 Construction of Sports Complex 05/14-15/09 DOST 3.159 90 C 0.391 0.295 0.300 - - - 98.60 98.60% Outstanding

    A.S.S. Construction 31509 Partial Completion of vast set, PCASTRD & PCIERD bldg. 07/08/09 DOST 7.479 135 C 0.483 0.200 0.300 - - - 98.30*98.30%

    Outstanding

    A.S.T. Builders 34104

    Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd., Cebu-Balamban Transcentral Highway

    (Km.0007+860-Km.0008+400)

    08/24/11 VII 4.516 10 C 0.455 0.200 0.300 - - - 95.50 *95.50% V. Satisfactory

    A.S.V Construction Supply and Services 13490

    Const. of FMR, Venegas St., Brgy. Layac-Sta.Isabel 05/26/10 III 0.473 60 C 0.444 0.133 0.300 - - - 87.70

    87.70% Satisfactory

    A.S.V. Construction Supply and Services 13490

    Repair/Maint. of Naparing River Control 03/12/13 III 1.407 60 C 0.430 0.133 0.300 - - - 86.30

    *86.30% Satisfactory

    A.S.V. Construction Supply and Services 13490 Const./Impvt. of MPB 03/20/12 III 2.794 117 C 0.436 0.126 0.300 - - - 86.20

    87.81% Satisfactory

    A.S.V. Construction Supply and Services 13490

    Concrete Reblocking Junction Layac-Balanga-Mariveles Port Rd.,

    K0106+151-K0107+00003/24/12 III 4.778 122 C 0.411 0.133 0.300 - - - 84.40 85.90% Satisfactory

    A.S.V. Construction Supply and Services 13490

    Rehab. of MPB Phase I, Brgy. Townsite 08/10/12 III 0.485 58 C 0.427 0.200 0.300 - - - 92.70

    *92.70% V. Satisfactory

    A.T. Dumlao Construction, Inc.

    (Formerly: Andoni T. Dumlao Civil Engineer-

    Contractor)

    34028Replacement of San Pedro Bridge along Daang Maharlika (Surigao-

    Agusan Rd.) Brgy. San Pedro11/21/12 XIII 14.945 390 O 0.360 0.231 0.127 0.030 0.055 0.033 83.60 -

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2011 to December 31, 2013

    * 1st/Final* For DPWH, only the region and PMO office are listed 18th CPES Release Page32

    NAME OF CONSTRUCTOR

    LICENSE NO. PROJECT

    DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCY ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FAC

    A.T. Dumlao Construction, INC.

    (Formerly: Andoni T. Dumlao, Civil Engineer -

    Contractor)

    34028

    Repair/Reconst. Of Boan Bridge along Daang Maharlika (Agusan-

    Davao Road) Km.1331+632 - Km.1380+770 w/ exceptions

    03/18/13 XIII 12.910 315 C 0.416 0.133 0.300 - - - 84.90 86.82% Satisfactory

    A.T. Dumlao Construction, Inc.

    (Formerly: Andoni T. Dumlao, Civil Engineer -

    Contractor)

    34028Reconst. of Timamana Bridge along Daang Maharlika Highway (Surigao-

    Agusan Rd.), Brgy. Timamana03/14/13 XIII 24.213 496 O 0.305 0.252 0.150 0.030 0.056 0.050 84.30 -

    A.T. Dumlao Construction, Inc.

    (Formerly: Andoni T. Dumlao, Civil Engineer-

    Contractor)

    34028Replacement of San Pedro Bridge along Daang Maharlika (Surigao-

    Agusan Rd.), Brgy. San Pedro03/14/13 XIII 15.781 435 O 0.355 0.223 0.150 0.030 0.035 0.033 82.60 -

    A.T. Dumlao Construction, Inc.

    (Formerly: Andoni T. Dumlao, Civil Engineer-

    34028

    Rehab./Reconst. of Hubang Bridge along Daang Maharlika (Agusan-

    Davao Rd.) Km.1307+369-Km.1307+536

    03/09/13 XIII 19.141 380 O 0.338 0.300 0.000 0.030 0.058 0.033 75.90 -

    A.V. Bernal Construction & Trading Corp. 32999

    Asphalt Overlay along Tagaytay-Manila via Silang Road 08/18/11 IVA 4.468 14 C 0.481 0.133 0.300 - - - 91.40

    *91.40% V. Satisfactory

    A.Y.U. Engineering and Construction 25632

    Widening of Rd. from Luis Tatad Sr. St., Purok San Miguel passing

    through Sto. Niño to Santol St., Brgy. Buhangin

    03/21/13 XI 4.790 66 C 0.453 0.133 0.300 - - - 88.60 *88.60% Satisfactory

    A.Y.U. Engineering and Construction 25632

    Const. of MPB at Brgy. Sto. Niño, Tugbok District 03/12/13 XI 3.133 120 C 0.450 0.133 0.300 - - - 88.30

    *88.30% Satisfactory

    A.Y.U. Engineering and Construction 25632

    Completion of MPB at Barangay Duterte 08/24/11 XI 1.473 120 C 0.448 0.133 0.300 - - - 88.10

    *88.10% Satisfactory

    A.Y.U. Engineering and Construction 25632

    Conc. of Roads @ Brgy. Sto. Niño, Tugbok District 03/28/11 XI 2.825 210 C 0.368 0.200 0.300 - - - 86.80

    *86.80%