ciap-pdcb constructors performance ... report 15th...ciap-pdcb constructors performance summary...

728
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT CPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012 11-18-70 Construction 32944 Road Concreting at Brgy. Sallacapo 02/28/09 I 0.855 18 C 0.375 0.200 0.300 - - - 87.50 *87.50% Satisfactory 121 Construction Corporation (Formerly: 121 Construction) 21686 Const. of Two (2) Storey MPB at Brgy. Malamig 08/10/11 NCR 1.868 60 C 0.483 0.200 0.300 - - - 98.30 *98.30% Outstanding 121 Construction Corporation (Formerly: 121 Construction) 21686 Const. of 2-Storey, 2-Classroom Sch. Bldg. at Heritage ES, Loma de Gato 04/15/11 III 2.472 120 C 0.419 0.200 0.300 - - - 91.90 89.10% V. Satisfactory 121 Construction Corporation (Formerly: 121 Construction) 21686 Const. of MPB, Brgy. Mabini J. Rizal 06/02/10 NCR 9.315 180 C 0.475 0.200 0.300 - - - 97.50 91.97% V. Satisfactory 2H2L Construction 16293 Impv't. of Drainage & Stairpathwalk, Brgy. Sta. Cruz 08/04/11 IVA 0.947 60 C 0.493 0.133 0.300 - - - 92.60 *92.60% V. Satisfactory 2H2L Construction 16293 Const. of 2-Storey Sch. Bldg., Famy E/S 08/11/11 IVA 3.856 60 C 0.453 0.138 0.300 - - - 89.10 *89.10% V. Satisfactory 2H2L Construction 16293 Rehab. of 8th and 9th Streets, San Martin Subd., Brgy. San Isidro 08/04/11 IVA 1.789 90 C 0.440 0.133 0.300 - - - 87.30 *87.30% Satisfactory 2H2L Construction 16293 Const. of Two (2) Storey, Six (6) Classrooms Cainta E/S 04/15/11 IVA 7.848 150 C 0.389 0.200 0.300 - - - 88.90 85.75% Satisfactory 2H2L Construction 16293 Impvt. of Flood Control at So. Upper East Kamias & So. East Kamias 03/12/09 IVA 2.692 120 C 0.461 0.138 0.300 - - - 89.90 *89.90% V. Satisfactory 2H2L Construction 16293 Impvt. of Multi-Purpose Pavement at Brgy. Dela Paz & Brgy. San Isidro 03/12/09 IVA 3.748 150 C 0.479 0.133 0.300 - - - 91.20 *91.20% V. Satisfactory ESH RDR STATUS CPES VISIT RATING WMS MTL TIME FAC PROJECT DATE OF EVALUATION FINAL RATING/ QUALITATIVE DESCRIPTION AMOUNT (Php, M) DUR (C.D.) CONTRACT *IMPL. AGENCY NAME OF CONSTRUCTOR LICENSE NO. * 1st/Final * For DPWH, only the region and PMO office are listed 15th CPES Release Page1

Upload: dangthuy

Post on 05-May-2018

264 views

Category:

Documents


11 download

TRANSCRIPT

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    11-18-70 Construction 32944 Road Concreting at Brgy. Sallacapo 02/28/09 I 0.855 18 C 0.375 0.200 0.300 - - - 87.50 *87.50%Satisfactory

    121 Construction Corporation (Formerly:

    121 Construction)21686 Const. of Two (2) Storey MPB at Brgy. Malamig 08/10/11 NCR 1.868 60 C 0.483 0.200 0.300 - - - 98.30

    *98.30% Outstanding

    121 Construction Corporation (Formerly:

    121 Construction)21686 Const. of 2-Storey, 2-Classroom Sch. Bldg. at Heritage ES, Loma de Gato 04/15/11 III 2.472 120 C 0.419 0.200 0.300 - - - 91.90

    89.10% V. Satisfactory

    121 Construction Corporation (Formerly:

    121 Construction)21686 Const. of MPB, Brgy. Mabini J. Rizal 06/02/10 NCR 9.315 180 C 0.475 0.200 0.300 - - - 97.50 91.97% V. Satisfactory

    2H2L Construction 16293 Impv't. of Drainage & Stairpathwalk, Brgy. Sta. Cruz 08/04/11 IVA 0.947 60 C 0.493 0.133 0.300 - - - 92.60*92.60%

    V. Satisfactory

    2H2L Construction 16293 Const. of 2-Storey Sch. Bldg., Famy E/S 08/11/11 IVA 3.856 60 C 0.453 0.138 0.300 - - - 89.10*89.10%

    V. Satisfactory

    2H2L Construction 16293 Rehab. of 8th and 9th Streets, San Martin Subd., Brgy. San Isidro 08/04/11 IVA 1.789 90 C 0.440 0.133 0.300 - - - 87.30*87.30%

    Satisfactory

    2H2L Construction 16293 Const. of Two (2) Storey, Six (6) Classrooms Cainta E/S 04/15/11 IVA 7.848 150 C 0.389 0.200 0.300 - - - 88.9085.75%

    Satisfactory

    2H2L Construction 16293 Impvt. of Flood Control at So. Upper East Kamias & So. East Kamias 03/12/09 IVA 2.692 120 C 0.461 0.138 0.300 - - - 89.90*89.90%

    V. Satisfactory

    2H2L Construction 16293 Impvt. of Multi-Purpose Pavement at Brgy. Dela Paz & Brgy. San Isidro 03/12/09 IVA 3.748 150 C 0.479 0.133 0.300 - - - 91.20*91.20%

    V. Satisfactory

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page1

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    2H2L Construction 16293Rehab./Reconst./Upgrading of

    Marikina-Victoria Valley-Antipolo Road

    08/26/09 IVA 19.222 180 C 0.475 0.200 0.300 - - - 97.50 91.86% V. Satisfactory

    2H2L Construction 16293Rehab./Reconst./Upgrading of

    Marikina-Victoria Valley-Antipolo Road

    05/18/09 IV-A 19.221 180 O 0.387 0.239 0.150 0.030 0.025 0.050 88.10 -

    2-R Construction & Supply 15304

    Const. of Additional Classroom @ Comprehensive Nat'l. H/S 05/21/09 I 2.417 120 C 0.496 0.072 0.300 - - - 86.80

    *86.80% Satisfactory

    3FS Construction 30464 Upgrading of Gov't. Center Road Network, Km.000+650-Km.000+843 08/25/11 VIII 3.690 110 O 0.390 0.240 0.150 0.030 0.030 0.033 87.30 -

    3FS Construction 30464Road Upgrading (Gravel to Paved) of

    Bagahupi-Babatngon-Sta. Cruz-Barugo-Carigara Road

    04/06/11 VIII 19.108 180 C 0.459 0.176 0.300 - - - 93.50 90.62% V. Satisfactory

    3FS Construction 30464 Const. of Coastal Road 04/08/11 VIII 18.895 150 C 0.421 0.133 0.300 - - - 85.40 *85.40% Satisfactory

    3FS Construction 30464 Upgrading of Bagahupi-Babatngon-Sta. Cruz, Barugo-Carigara Rd. 03/11/10 VIII 19.289 230 C 0.497 0.189 0.300 - - - 98.6091.07%

    V. Satisfactory

    3FS Construction 30464 Const. of Grouted Riprap @ Brgy. 90 03/18/09 VIII 0.962 70 C 0.381 0.200 0.300 - - - 88.10 *88.10% Satisfactory

    3K Builders 27277 Const. of MPB, Natividad NHS (formerly: Narciso Ramos NHS) 08/12/11 I 1.918 100 C 0.460 0.133 0.300 - - - 89.30*89.30%

    V. Satisfactory

    3K Builders 27277Repair/Rehab. of MNR, Km.174+000 -

    Km.175+000 w/ exception Villasis Section

    06/10/10 I 9.996 32 C 0.455 0.133 0.300 - - - 88.80 88.80% Satisfactory

    3K Rock Engineering 27908 Const. of Sch. Bldg. @ Diego Silang E/S 08/15/011 II 0.748 45 C 0.464 0.120 0.300 - - - 88.40*88.40%

    Satisfactory

    3K Rock Engineering 27908 Const. of One Unit Classroom School Building, San Antonio I/S 04/08/11 II 0.641 45 C 0.485 0.133 0.300 - - - 91.80*91.80%

    V. Satisfactory

    3K Rock Engineering 27908 Construction of Multi-Purpose Building, Magsaysay 09/03/09 II 0.572 45 C 0.407 0.200 0.300 - - - 90.70*90.70%

    V. Satisfactory

    3K Rock Engineering 27908 Const./Repair of Multi-Purpose Building 02/25/10 II 1.735 60 C 0.413 0.133 0.300 - - - 84.6084.60%

    Satisfactory

    3K Rock Engineering 27908 Const./Completion of MPB, Liwayway 06/05/10 II 1.445 60 C 0.441 0.133 0.300 - - - 87.4087.40%

    Satisfactory

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page2

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    3K Rock Engineering 27908 Completion of Multi-Purpose Building, Gundaway 03/06/09 II 1.783 60 C 0.458 0.200 0.300 - - - 95.80*95.80%

    V.Satisfactory

    3-L Construction 16745 Const. of 2 Storey Multi-Purpose Bldg. (Brgy. Hall), Brgy. San Gabriel 03/09/09 V 0.955 120 C 0.436 0.175 0.300 - - - 91.10*91.10%

    V. Satisfactory

    3-L Construction 16745 Road Upgrading (Gravel to Paved), Sipocot-Cabusao Road 09/09/09 V 6.555 150 C 0.418 0.200 0.300 - - - 91.8089.64%

    V. Satisfactory

    3RB Construction & Supply 19541

    Rehab./Reconst./Upgrading of Calamba-Sta. Cruz-Famy Road 08/09/11 IVA 8.125 75 C 0.393 0.133 0.300 - - - 82.60

    *82.60% Satisfactory

    3RB Construction & Supply 19541

    Road Upgrading of San Fernando North Road (San Jacinto Sect.) 08/11/11 V 19.100 165 C 0.391 0.133 0.300 - - - 82.40

    83.72% Satisfactory

    3RB Construction & Supply 19541 Const. of Sto. Cristo Seawall 05/28/10 V 2.876 150 C 0.458 0.133 0.300 - - - 89.10

    89.10% Satisfactory

    3RB Construction & Supply 19541

    Road Upgrading along DM Jct.-Leg.-Sto. Domingo-Tab.-Cam. Sur Bdry.,

    Tiwi-Tabaco Section02/24/09 V 19.233 150 C 0.488 0.133 0.300 - - - 92.10 84.30% Satisfactory

    3RB Construction & Supply 19541

    Impvt. of San Fernando North Road, San Jacinto Section 02/17/10 V 9.450 210 O 0.378 0.240 0.150 0.015 0.035 0.050 86.80 -

    3RB Construction & Supply 19541

    Road Conc. & Impvt. of Barangay Road 02/22/10 V 0.959 160 C 0.396 0.139 0.300 - - - 83.50

    86.38% Satisfactory

    3RB Construction & Supply/Ajan Jaeda, Inc.

    (JV) JV-08-209 Const. of Tagas-Divino Rostro Bridge 09/01/09 V 19.179 202 O 0.384 0.240 0.150 0.030 0.033 0.050 88.70 -

    3S Builders 18009 Repair and Rehab. of MPB (Municipal Hall) 04/09/11 VII 1.893 97 C 0.491 0.133 0.300 - - - 92.40*92.40%

    V. Satisfactory

    4 A's Construction 9446 Construction of 1-CL (7x9) Lupigue IS 09/05/09 II 1.108 45 C 0.454 0.133 0.300 - - - 88.70*88.70%

    Satisfactory

    4 A's Construction 9446 Const./Conc. of Road 02/23/10 II 4.822 330 C 0.413 0.133 0.300 - - - 84.60 84.60% Satisfactory

    4 A's Construction 9446 Asphalt Overlay of Daang Maharlika 03/03/09 II 1.929 30 C 0.464 0.133 0.300 - - - 89.70 *89.70% V.Satisfactory

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page3

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    4B Construction Corporation 23445

    Upgrading and Concreting of Subic-Philseco Road 03/03/09 III 41.616 180 C 0.407 0.163 0.300 - - - 87.00

    83.76% Satisfactory

    4B Construction Corporation 23445

    Rehab./Reconst./Upgrading of Damaged Paved National Road,

    Olongapo-Bugallon Road05/23/09 III 33.265 45 C 0.374 0.200 0.300 - - - 87.40 *87.40%Satisfactory

    4B Construction Corporation 23445

    Preventive Maint. along Roman Expressway (Bal Sect.)

    K0120+279.82-K0123+434.42; (Cupang-Alauli Sect.) K0123+434.42-

    K0 125+000

    08/06/11 III 28.532 53 C 0.437 0.003 0.300 - - - 74.00 *74.00% Poor

    4B Construction Corporation 23445

    Rehab./Reconst./Upgrading of Visayas Avenue (Km 164+236-

    Km.164+711 & Km. 164+872 - Km. 164+236

    08/06/11 III 14.802 24 C 0.453 0.135 0.300 - - - 88.80 *88.80% Satisfactory

    4B Construction Corporation 23445

    Widening/Conc. of Calamba-Sta. Cruz-Famy Jct. Road (4 Lanes) 08/10/11 IVA 45.081 120 O 0.323 0.240 0.011 0.030 0.050 0.050 70.40 -

    4B Construction Corporation 23445

    Rehab./Reconst./Upgrading of Damaged Paved National Roads at

    Subic-PHILSECO Rd.04/04/11 III 41.378 163 C 0.356 0.167 0.300 - - - 82.30 80.41% Unsatisfactory

    4B Construction Corporation 23445

    Repair/Rehab. of Paete-Famy Pob. Rd., Pangil-Siniloan Sect. Km.109+000 - Km.110+400

    05/25/10 IVA 9.608 20 C 0.472 0.133 0.300 - - - 90.50 90.50% V. Satisfactory

    5-1 Construction Corporation 33605

    Asset Preservation (Preventive Maintenance) of Ilocos Sur,

    Km.0011+519 to Km.0011+909 with exception

    08/11/11 NCR 1.908 30 C 0.462 0.200 0.300 - - - 96.20 *96.20% Outstanding

    525 Construction 28532 Rehab. of Sta. Rita-Biak na Bato via Pulong Bayabas Road 04/15/11 III 38.599 210 C 0.330 0.200 0.300 - - - 83.0089.66%

    V. Satisfactory

    525 Construction 28532 Rahab. of Sta. Rita-Biak na Bato via Pulong Bayabas Road 09/08/09 III 19.049 120 C 0.478 0.133 0.300 - - - 91.10*91.10%

    V. Satisfactory

    525 Construction / MGSCC (JV)

    JV-07-095/ SLI-SN-005104

    Rehabilitation/Improvement of Sta. Rita Biak na Bato Road 03/11/09 III 44.000 200 C 0.405 0.200 0.300 - - - 90.50

    *90.50% V.Satisfactory

    525 Construction/MGSCC Joint Venture JV-08-235

    Rehabilitation of Sta. Maria-Norzagaray Road 09/07/09 III 46.339 180 C 0.479 0.133 0.300 - - - 91.20

    86.64% Satisfactory

    5G Galvez Construction and Supply 34736

    Northern Samar First Engineering District Brgy. Dancalan 08/12/11 VIII 0.960 60 C 0.457 0.133 0.300 - - - 89.00

    *89.00% Satisfactory

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page4

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    6 Jewels Construction 34737 Const. of Line Canal @ Inicbulan 08/17/11 IVA 0.496 45 C 0.484 0.133 0.300 - - - 91.70 *91.70% V. Satisfactory

    628 Construction Enterprises 30049

    Construction of Two Classroom School Building at Lokeb Norte 03/06/09 I 1.369 70 C 0.429 0.178 0.300 - - - 90.70

    *90.70%V. Satisfactory

    722 Construction 21923 Rehab./Reconst./Upgrading at Old Cagayan Valley Rd. (Baliuag Sect.) 06/10/10 III 9.547 80 C 0.460 0.133 0.300 - - - 89.3089.30%

    V. Satisfactory

    722 Construction 21923Rehab/Reconst./Upgrading of Old

    Cagayan Valley Road (Pulilan Section)

    05/28/09 III 9.543 45 C 0.359 0.200 0.300 - - - 85.90 *85.90%Satisfactory

    722 Construction 21923 Const. of Sch. Bldg., 2 Storey, 2 CL Banga E/S 03/10/09 III 2.290 100 C 0.472 0.133 0.300 - - - 90.5089.52%

    V.Satisfactory

    722 Construction 21923Const. of Multi-Purpose Bldg.

    Malinta E/S Lawang Bato E/S, Brgy. Lawang Bato & Natividad Homes

    03/03/09 NCR 1.882 90 C 0.405 0.136 0.300 - - - 84.10 *84.10% Satisfactory

    722 Construction 21923Rehab./Reconst./Upgrading of

    Damages Pavement along Mc Arthur Highway

    05/31/10 NCR 9.506 120 C 0.436 0.200 0.300 - - - 93.60 93.60% V. Satisfactory

    722 Construction 21923 Rehab./Reconst./Upgrading along Rizal Avenue Extension 05/27/09 NCR 9.494 120 C 0.380 0.200 0.300 - - - 88.00*88.00%

    Satisfactory

    722 Construction 10221 Const. of MPB (Day Care) at Brgy. Polo 09/16/09 NCR 1.901 75 C 0.486 0.133 0.300 - - - 91.90*91.90%

    V. Satisfactory

    722 Construction, Inc. (Formerly: 722 Construction)

    21923 Repair and Rehab. along MacArthur Highway Extension, Dalandanan 08/02/11 NCR 8.895 157 O 0.363 0.240 0.150 0.030 0.045 0.033 86.10 -

    722 Construction, Inc. (Formerly: 722 Construction)

    21923 Impvt./Rehab. of Road, Sumandig Road, Brgy. Sumandig 08/17/11 III 1.914 70 C 0.405 0.200 0.300 - - - 90.50*90.50%

    V. Satisfactory

    722 Construction, Inc. (Formerly: 722 Construction)

    21923 Preventive Maint.Daang Maharlika Road. Km.43+792-Km.44+478.32 08/11/11 III 8.283 18 C 0.428 0.135 0.300 - - - 86.30*86.30%

    Satisfactory

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page5

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    722 Construction, Inc. (Formerly: 722 Construction)

    21923

    Asphalt Overlay along NCR/Bulacan Bdry.-Bigte-Ipo Dam Road,

    Km.029+836-Km.029+(-149) w/ exception

    08/17/11 III 5.027 20 C 0.385 0.137 0.300 - - - 82.20 *82.20% Satisfactory

    739 Builders 31174 Const. of Ten (10) CL, Two (2) Storey Sch. Bldg. At Ilocos Sur NHS 03/31/11 I 8.068 240 C 0.351 0.142 0.300 - - - 79.3083.36%

    Satisfactory

    739 Builders 31174 Construction of School Building, Pila E/S, Brgy. Pila 09/07/09 I 0.950 60 C 0.454 0.154 0.300 - - - 90.80*90.80%

    V. Satisfactory

    739 Builders 31174 Const. of Drainage Canal, Brgy. VII 05/29/10 I 1.141 80 C 0.444 0.133 0.300 - - - 87.70 87.70% Satisfactory

    739 Builders 31174 Road Concreting, Brgy. Napo 02/28/09 I 0.950 20 C 0.364 0.200 0.300 - - - 86.40 *86.40%Satisfactory

    747 Builders & Trader 16892 Rehab./Impvt. of Manggahan Floodway Eastbank 03/12/09 IVA 14.367 170 C 0.473 0.133 0.300 - - - 90.6086.97%

    Satisfactory

    747 Builders & Trader 16892Proposed Rehab./Impvt. of Pres.

    Quirino Ave. West Bound (Singalong-Roxas Blvd.)

    05/24/10 NCR 14.475 20 C 0.442 0.200 0.300 - - - 94.20 94.20% V. Satisfactory

    747 Builders and Trader 16892 Rehab./Reconst./Upgrading of Antipolo Circumferential Road "A" 08/26/09 IVA 19.213 180 C 0.411 0.200 0.300 - - - 91.1088.70%

    Satisfactory

    811 Trading & Construction 21215

    Impv't. of Jct. Nat'l. Rds.-Osmea St.-Sitio Toong Road, Poblacion

    Carugay ARC08/09/11 IVB 20.482 160 C 0.448 0.133 0.300 - - - 88.10 *85.88% Satisfactory

    811 Trading & Construction 21215

    Impvt. of Jct. National Road-Osmea Street-Sitio Toong Road Pob.

    Caguray ARC04/08/11 IVB 20.482 160 O 0.354 0.212 0.150 0.030 0.048 0.050 84.40 -

    811 Trading & Construction 21215

    Repair/Rehab. of Multi-Purpose Building (Phase II) 02/26/09 IV-B 0.288 27 C 0.463 0.133 0.300 - - - 89.60

    *89.60% V.Satisfactory

    830 Builders & Developers Corp. 29781

    Const. of 1 CL 7m x 7m Sch. Bldg. at Lanatan Munting Tubig E/S 04/12/11 IVA 0.495 40 C 0.459 0.200 0.300 - - - 95.90

    *95.90% V. Satisfactory

    888 ACY Enterprises 32898Reconst. (Conc. Paving) of Jct. LIR., Buenavista-Carmen, Danao-Getafe

    Road, Poblacion, Danao Sect.08/18/11 VII 9.541 240 C 0.328 0.200 0.000 - - - 52.80 66.93% Poor

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page6

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    888 Acy Enterprises 32898Reconst. (Conc. Paving) of Loay

    Interior Rd., Trinidad & San Miguel Sect.

    03/31/11 VII 14.320 565 C 0.278 0.133 0.000 - - - 41.10 60.60% Poor

    920 Factors & Enterprises 20387

    Road Upgrading (Gravel to Conc.) Gurel-Bukod-Kabagan-Buguias-

    Abatan Road04/11/11 CAR 28.838 337 C 0.456 0.133 0.300 - - - 88.90 *88.90% Satisfactory

    A B Aponesto Construction, Parts &

    Supply22998

    Road Upgrading (Gravel to Paved) along Compostela-Cateel Road,

    Osmea Section04/09/11 XI 18.892 180 C 0.372 0.200 0.300 - - - 87.20 85.82% Satisfactory

    A C J Construction Resources 10635

    Concreting of Poblacion Magpet-Nowa-Basak Road (Basak Section) 05/30/09 R-XII 18.797 180 O 0.336 0.300 0.000 0.024 0.055 0.050 76.50 -

    A C O Construction 13105Rehab./Upgrading of Ipil-Liloy-

    Sindangan Road Km. 2007+240-Km. 2008+369

    08/11/11 IX 10.787 101 O 0.362 0.300 0.000 0.030 0.050 0.000 74.20 -

    A C O Construction 13105

    Const. of Rotonda along National Highway (Zamboanga Peninsula) Cross Rd. Upgrading Project @

    Poblacion Ipil

    02/25/10 IX 2.829 115 O 0.319 0.300 0.000 0.020 0.042 0.033 71.40 -

    A C O Construction 13105Zamboanga Peninsula Crossroads Upgrading Project (Completion of

    Roundabout) Sta.1801+231.50 06/05/10 IX 1.861 60 C 0.476 0.133 0.300 - - - 90.90 90.90% V. Satisfactory

    A C O Construction 13105

    Const. of Rotonda along National Highway (Zamboanga Peninsula Crossroad Upgrading Project) at

    Poblacion Ipil

    06/05/10 IX 2.829 115 C 0.456 0.133 0.000 - - - 58.90 66.40% Poor

    A C O Construction 13105 Conc. of Liloy-Zamboanga del Norte-Ipil-Zamboanga Sibugay Rd. Ph. I 03/05/09 IX 14.306 150 C 0.425 0.147 0.300 - - - 87.2086.90%

    Satisfactory

    A. De Guia Construction 18228

    Preventive Maintenance along Santiago-Tuguegarao Road @ A)

    KO368+620 - KO369+000, Aurora B) KO374+000 - KO375+500

    04/06/11 II 6.718 90 C 0.483 0.133 0.300 - - - 91.60 *91.60% V. Satisfactory

    A. De Guia Construction 18228 Restoration of Jones Revetment 04/11/11 II 4.825 90 C 0.450 0.133 0.300 - - - 88.30 *88.30% Satisfactory

    A. De Guia Construction 18228 Restoration of Brgy. I Revetment 04/11/11 II 4.825 90 C 0.425 0.133 0.300 - - - 85.80 *85.80% Satisfactory

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page7

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    A. De Guia Construction 18228 Repair/Restoration of Flood Control, Sta.000+000 - Sta.000+120 04/11/11 II 9.650 90 C 0.400 0.133 0.300 - - - 83.30*83.30%

    Satisfactory

    A. De Guia Construction 18228

    Rehab./Reconst./Upgrading of Santiago-Baluarte-Quirino Bdry.

    Road; KO328+100 - KO331+000 w/ exception

    04/10/11 II 18.623 150 C 0.428 0.133 0.000 - - - 56.10 70.44% Poor

    A. De Guia Construction 18228Rehab./Reconst./Upgrading of

    Santiago-Tuguegarao Rd. Burucboc Sect.

    04/06/11 II 9.647 133 C 0.456 0.133 0.000 - - - 58.90 67.42% Poor

    A. De Guia Construction 18228Rehab./Reconst./Upgrading of Santiago-Tuguegarao Road,

    KO333+500 - KO334+85004/10/11 II 17.123 149 C 0.335 0.200 0.000 - - - 53.50 65.26% Poor

    A. De Guia Construction 18228Rehab./Reconst./Upgrading of

    Naguilian-San Mariano Rd., Villapaz Section

    08/25/09 II 19.296 104 C 0.420 0.200 0.300 - - - 92.00 92.84% V. Satisfactory

    A. De Guia Construction 18228 Concreting of Junction National -Potia Road 08/27/09 II 7.043 110 C 0.410 0.200 0.300 - - - 91.0091.42%

    V. Satisfactory

    A. De Guia Construction 18228 Rehab./Reconst. of Daang Maharlika Road, KO309+300-KO309+878 08/27/09 II 18.811 130 C 0.411 0.200 0.300 - - - 91.1091.10%

    V. Satisfactory

    A. De Guia Construction 18228 Rehab./Reconst./Upgrading of Gamu-Roxas Road (Roxas Section) 02/23/10 II 19.293 240 C 0.402 0.133 0.300 - - - 83.5088.78%

    Satisfactory

    A. De Guia Construction 18228 Const./Completion/Continuation of Unfinished On-going Bridges 03/01/10 II 11.574 120 C 0.415 0.133 0.300 - - - 84.8086.78%

    Satisfactory

    A. De Guia Construction 18228

    Rehab./Reconst./Upgrading of Damaged Paved national Road,

    Daang Maharlika KO 320+000 - KO 321+000

    06/03/10 II 16.396 120 O 0.387 0.295 0.150 0.030 0.042 0.033 93.70 -

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page8

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    A. De Guia Construction 18228

    Rehab./Reconst./Upgrading of Damaged Paved National Road

    Santiago-Baluarte-Quirino Bdry. Road KO326+(-)280 - KO328+000 w/

    exception

    08/27/10 II 15.432 149 C 0.292 0.200 0.300 - - - 79.20 87.24% Satisfactory

    A. De Guia Construction 18228

    Restoration of Road Slope & Slope Protection along Naguilian-San

    Mariano Road KO395+850 - KO401+800

    08/25/10 II 14.471 120 C 0.389 0.150 0.300 - - - 83.90 85.28% Satisfactory

    A. De Guia Construction 18228Road Upgrading (Gravel to Paved) of Jct. Ipil-Panang-Quirino Bdry. Road;

    KO366+058 - KO367+11808/27/10 II 17.373 149 C 0.403 0.146 0.300 - - - 84.90 84.90% Satisfactory

    A. E. Belleza Builders Pampolna Resettlement Project, Phase I 04/23-26/12 NHA 9.978 150 O 0.398 0.300 0.000 0.030 0.056 0.033 81.74 -

    A. Montalbo Trading and Construction 32684

    Const. of Multi-Purpose Building at Bigain 1st 03/01/10 IVA 1.135 30 C 0.450 0.200 0.300 - - - 95.00

    95.00% V. Satisfactory

    A.A De Vera Construction 6191 Rehab./Expansion of Waterworks System 09/02/09 VII 4.510 240 C 0.417 0.133 0.300 - - - 85.00*85.00%

    Satisfactory

    A.A De Vera Construction 6191 Const./Rehab. of School Bldg. at Cogon E/S 06/05/10 VII 0.591 35 C 0.415 0.200 0.000 - - - 61.5061.50% Poor

    A.A De Vera Construction 6191 Const. of Water System Development Project 08/25/10 VII 1.413 90 C 0.497 0.133 0.300 - - - 93.0093.00%

    V. Satisfactory

    A.A De Vera Construction 6191 Const./Repair & Completion of Instructional Classroom, Corella CES 06/10/09 VII 0.504 105 C 0.492 0.200 0.300 - - - 99.20*99.20%

    Outstanding

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page9

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    A.A De Vera Construction 6191Completion of Tagbilaran City

    Puericulture Center & Maternity House and Related Facilities

    06/10/09 VII 4.575 150 C 0.500 0.169 0.300 - - - 96.90 *96.90% Outstanding

    A.A De Vera Construction 6191 Const./Repair/Rehab. of Multi-Purpose Building 06/10/09 VII 0.460 105 C 0.483 0.154 0.300 - - - 93.7095.52%

    V. Satisfactory

    A.A De Vera Construction 6191 Completion of Multi-Purpose Building 03/04/09 VII 0.458 60 C 0.382 0.200 0.300 - - - 88.20*88.20%

    Satisfactory

    A.A. De Vera Construction 6191 Const. of MPB, Basak 08/24/11 VII 1.835 120 C 0.485 0.133 0.300 - - - 91.80

    *91.80% V. Satisfactory

    A.A. De Vera Construction 6191 Const. of MPB, Songculan 08/23/11 VII 0.958 120 C 0.460 0.133 0.300 - - - 89.30

    *89.30% V. Satisfactory

    A.A. De Vera Construction 6191

    Const. of Employees Quarters, DPWH Bohol I 03/29/11 VII 4.710 210 C 0.485 0.162 0.300 - - - 94.70

    *94.70% V. Satisfactory

    A.A. De Vera Construction 6191

    Const. of MPB (School Stage) Loon North CES 03/29/11 VII 1.318 110 C 0.469 0.133 0.300 - - - 90.20

    *90.20% V. Satisfactory

    A.B Aponesto Construction Parts &

    Supply22998

    Road Upgrading (Gravel to Paved) along Compostela-Cateel Rd.,

    Osmea Sect.06/04/10 XI 18.892 180 O 0.355 0.238 0.150 0.030 0.045 0.033 85.10 -

    A.B Aponesto Construction, Parts &

    Supply22998 Concreting of Montevista-DNAS Road 03/01/10 XI 32.748 300 C 0.353 0.200 0.300 - - - 85.30

    88.48% Satisfactory

    A.B Taylan Construction & Development 25273

    Const. of RCBC and Canal along Manila North Road (Km. 483+040) 02/22/10 I 4.816 65 C 0.329 0.133 0.300 - - - 76.20

    76.20% Unsatisfactory

    A.B. Taylan Construction & Development / Fiat

    Construction Services (JV)

    JV-09-106Road Opening/Const. of Missing

    Links of Nat'l Rd., Solsona-Kabugao Road, Phase VI, Ilocos Norte Side

    08/01/11 I 192.447 540 C 0.464 0.145 0.300 - - - 90.90 87.30% Satisfactory

    A.C Rivero Development Corporation 5122

    Rehab./Reconst./Upgrading of Bacolod South Road Km. 6+862-Km.

    8+350 w/ exception09/12/09 VI 26.470 280 O 0.331 0.282 0.150 0.030 0.045 0.033 87.10 -

    A.C Rivero Development Corporation 5122

    Const./Impvt. of Multi-Purpose Bldg. at Maasin City (Legislative Building) 03/06/09 VIII 0.934 75 C 0.500 0.133 0.300 - - - 93.30

    *93.30%V. Satisfactory

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page10

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    A.C Rivero Development Corporation (Formerly:

    A.C. Rivero Const.)5122

    Rehab./Reconst./Upgrading of Bacolod South Rd. Km. 6+862 to Km.

    8+350 with exceptions03/06/10 VI 26.337 280 C 0.393 0.200 0.300 - - - 89.30 87.98% Satisfactory

    A.C Soliven Construction & General Merchandise 19278

    Channel Impvt./Slope Protection @ San Roque Creek, Camias Creek &

    San Vicente Creek02/23/10 III 4.781 60 C 0.445 0.177 0.300 - - - 92.20 92.20% V. Satisfactory

    A.C Soliven Construction & General Merchandise 19278

    Construction of 2 CL S.B. at La Paz H/S 09/01/09 III 0.974 90 C 0.483 0.133 0.300 - - - 91.60

    *91.60% V. Satisfactory

    A.C. Rivero Development Corporation (Formerly:

    A.C. Rivero Const.)5122 Const. of Subang Daku Bridge Phase II 08/16/11 VIII 18.890 360 O 0.376 0.300 0.150 0.030 0.045 0.033 93.40 -

    A.C. Rivero Development Corporation (Formerly:

    A.C. Rivero Const.)5122 Const. of Subang Daku Bridge 08/16/11 VIII 18.890 518 C 0.486 0.200 0.300 - - - 98.60 91.60% V. Satisfactory

    A.C. Soliven Construction & General

    Merchandise19278 Repair/Rehab. Of FMR at Brgy. Dalumpinas 08/12/11 I 0.950 23 C 0.491 0.133 0.300 - - - 92.40

    *92.40% V. Satisfactory

    A.C. Soliven Construction & General

    Merchandise17278

    Upgrading of Capas-Botolan Rd. (Capas Sect.) K0124+805 to

    K0124+94708/05/11 III 1.843 30 C 0.377 0.200 0.300 - - - 87.70 *87.70% Satisfactory

    A.C. Soliven Construction & General

    Merchandise19278 Const. of Two (2) Cl. Sch. Bldg. @ Aranguren High School 04/06/11 III 0.925 90 C 0.456 0.178 0.300 - - - 93.40

    *93.40% V. Satisfactory

    A.D Construction 6946 Conc. of Line Canal along National Road, Concepcion 09/09/09 IVA 1.442 90 C 0.371 0.200 0.300 - - - 87.10*87.10%

    Satisfactory

    A.D. Construction 6946 Impvt./Rehab. of San Jose Elem. School, District II 08/18/11 NCR 0.838 45 C 0.458 0.200 0.300 - - - 95.80*95.80%

    V. Satisfactory

    A.D. Construction 6946 Partial Completion of Jose P. Laurel H/S 04/04/11 NCR 1.571 60 C 0.486 0.192 0.300 - - - 97.80*97.80%

    Outstanding

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page11

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    A.D.P Construction & Supply 3466

    Impvt./Conc. of Access Road, Tubalan Port, Tubalan 06/14/10 XI 58.261 320 O 0.338 0.300 0.000 0.030 0.040 0.033 74.10 -

    A.D.P Construction & Supply 3466

    Impv't./Conc. Of Mana-Ticulon-Lagumit-Little Baguio Rd. 08/25/10 XI 47.455 571 C 0.292 0.133 0.000 - - - 42.50

    42.50% Poor

    A.D.P Construction & Supply 3466

    Rehab./Reconst./Upgrading of Damaged Paved National Road,

    Roxas City Boundary-Panitan Road-Jct. Bailan Road, Capiz (KM.112+750-

    Km 122+705) with exception

    08/31/10 VI 53.673 225 O 0.364 0.240 0.150 0.030 0.051 0.050 88.50 -

    A.D.P Construction & Supply 3466 Reconst. of Dumaguete North Road 03/12/09 VII 18.881 230 C 0.442 0.200 0.300 - - - 94.20

    82.14%Satisfactory

    A.D.P. Const. & Supply 3466 Road Upgrading of Sara-Concepcion Road 04/13/11 VI 66.819 328 C 0.421 0.176 0.300 - - - 89.7087.84%

    Satisfactory

    A.D.P. Const. & Supply 3466 Conc. of Pototan-Tina-Lambunao Road 04/12/11 VI 9.419 178 C 0.410 0.133 0.300 - - - 84.3087.54%

    Satisfactory

    A.D.P. Const. & Supply 3466 Repair/Reconst./Upgrading of Roxas City Bdry.-Panitan Jct. Bailan Road 04/11/11 VI 53.673 225 C 0.409 0.134 0.300 - - - 84.3086.61%

    Satisfactory

    A.D.P. Const. & Supply 3466 Const. of Various Drainage System at Roxas City 04/11/11 VI 28.854 240 C 0.432 0.133 0.300 - - - 86.50*86.50%

    Satisfactory

    A.D.S San Juan Construction 12853

    Conc. of Dionisio Anore St., Brgy. Mambog 02/16/10 IVA 1.728 90 C 0.427 0.200 0.300 - - - 92.70

    92.70% V. Satisfactory

    A.F.G Construction & Construction Supply 17161

    Const. of MPB (Covered Court) at San Enrique NHS 03/10/10 VI 1.925 78 C 0.405 0.200 0.300 - - - 90.50

    87.08% Satisfactory

    A.F.G Construction & Construction Supply 17161

    Rehab. of Amerang Flood Control, Tigum River, Brgy. Amerang 09/05/10 VI 8.159 257 C 0.456 0.133 0.000 - - - 58.90

    69.28% Poor

    A.F.G Construction & Construction Supply 17161

    Rehab. of Bacolod South Rd. (Hingaran Section) 09/15/09 VI 14.221 222 C 0.398 0.133 0.300 - - - 83.10

    83.88% Satisfactory

    A.F.G. Construction and Construction Supply 17161

    Rehab./Reconst./Upgrading of Jct. National Road, Sagay-Bato-Dian-ay-Marcelo-Balea Jct. National Road,

    Bato Sect.

    03/31/11 VI 37.184 210 C 0.448 0.135 0.300 - - - 88.30 83.38% Satisfactory

    A.G Cosipag Construction 12700 Balogo CIS 06/1-6/09 NIA 2.144 150 C 0.421 0.126 0.300 - - - 84.68

    *84.68% Satisfactory

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page12

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    A.G Herrera Construction Corp. 26307

    Construction of Multi-Purpose Building, Sto. Cristo 06/01/09 III 2.381 80 C 0.488 0.133 0.300 - - - 92.10

    90.42% V. Satisfactory

    A.I.P Construction 32458 Road Concreting at Pinget Barangay 03/13/09 CAR 1.872 45 C 0.386 0.200 0.300 - - - 88.60 *88.60% Satisfactory

    A.I.P Construction 32458 Rehab. of Ambasing-Balugang FMR 08/27/10 CAR 0.800 268 C 0.439 0.133 0.300 - - - 87.20 87.20% Satisfactory

    A.I.P. Construction 32458 Rehab. of Kin-iway-Tamboan FMR 04/10/11 CAR 1.000 250 C 0.436 0.147 0.300 - - - 88.30 85.42% Satisfactory

    A.I.P. Construction 32458Restoration of Road cuts along

    Bontoc Baguio Road Alab Section (Km.383+619 - Km.384+124)

    04/09/11 CAR 1.732 70 C 0.340 0.200 0.300 - - - 84.00 82.68% Satisfactory

    A.J Lava Builders 22265 Const. of the Makinabang Baliuag FMR 11/24/08 III 4.769 62 C 0.296 0.300 0.300 - - - 89.60*89.60%

    V. Satisfactory

    A.J Lava Builders 22265 Impvt./Rehab. of MPB, Brgy. San Antonio 09/14/09 NCR 2.021 90 C 0.412 0.133 0.300 - - - 84.50*84.50%

    Satisfactory

    A.J Lava Builders 22265 Impv't./Rehab. of MPB and Alley Fernandez St., Brgy. San Antonio 06/04/10 NCR 0.961 45 C 0.455 0.200 0.300 - - - 95.5095.50%

    V. Satisfactory

    A.J Taylan Construction Corporation 2336

    Road Opening/Const. of Missing Links of National Road, Solsona-Kabugao Road, Ilocos Norte Side

    09/09/09 I 48.199 300 O 0.379 0.250 0.150 0.030 0.050 0.033 89.20 -

    A.J. Lava Builders 22265Preventive Maintenance of San

    Mateo-Rodriguez Road, San Mateo-Rodriguez

    08/01/11 IVA 4.413 30 C 0.498 0.133 0.300 - - - 93.10 *93.10% V. Satisfactory

    A.L Dare Construction 11932Const./Repair/Rehab. of Slope Protection along Porac River,

    Mabical Sect.08/16/10 III 14.344 90 C 0.481 0.133 0.300 - - - 91.40 91.40% V. Satisfactory

    A.L Gantuangco Construction 30872

    Construction of the Diversion Works and Canal System of Libertad CIP -

    Phase 211/15-20/2010 NIA 16.060 202 O 0.373 0.264 0.150 0.023 0.038 0.050 89.69 -

    A.L Gantuangco Construction 30872 Benolho CIS 10/6-10/08 NIA 3.720 90 O 0.277 0.180 0.050 0.020 0.038 0.100 66.50 -

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page13

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    A.L. Dare Construction 11932 Impvt. along Kennon Road, Camp 4 04/14/11 CAR 7.177 150 C 0.388 0.200 0.300 - - - 88.80 85.98% Satisfactory

    A.L.R Construction Corporation 24110 Completion of MPB at Brgy. Zapote 05/27/10 IVA 0.959 30 C 0.458 0.075 0.300 - - - 83.30

    83.30% Satisfactory

    A.L.R Construction Corporation 24110

    Completion of Two (2) Storey 4-CL at Landayan E/S 08/23/10 IVA 2.302 225 C 0.407 0.165 0.300 - - - 87.20

    87.06% Satisfactory

    A.L.R Construction Corporation 24110 Conc.of Road, Inday Subdivision 03/13/09 IVA 0.958 90 C 0.461 0.133 0.300 - - - 89.40

    *89.40% V. Satisfactory

    A.L.R Construction Corporation 24110

    Const.of Multi Purpose Pavement with Perimeter Fence, Marcelino M.

    Santos NHS03/13/09 IVA 0.957 90 C 0.480 0.133 0.300 - - - 91.30 *91.30% V. Satisfactory

    A.L.R Construction Corporation 24110

    Const. of Pedestrian Overpass (Phase II) Brgy. Pagsawitan 09/01/09 IVA 2.882 35 C 0.484 0.185 0.300 - - - 96.90

    *96.90% Outstanding

    A.L.R Construction Corporation 24110

    Const. of Multi-Purpose Building at Brgy. Timugan 09/03/09 IVA 2.111 40 C 0.389 0.155 0.300 - - - 84.40

    *84.40% Satisfactory

    A.L.R Construction Corporation 24110 Conc. of Roads, Brgy. San Luis 02/15/10 IVA 3.358 90 C 0.455 0.200 0.300 - - - 95.50

    95.50% V. Satisfactory

    A.L.R Construction Corporation 24110

    Completion of 2-Storey 4-CL @ Landayan E/S 02/24/10 IVA 5.030 225 O 0.354 0.300 0.150 0.015 0.018 0.033 87.00 -

    A.L.R Construction Corporation 24110

    Construction of Overpass (Phase I), Pagsawitan 05/30/09 IV-A 3.849 129 C 0.482 0.133 0.300 - - - 91.50

    *91.50% V. Satisfactory

    A.L.R Construction Corporation 24110

    Const. of Pedestrian Overpass at Brgy. San Antonio and Bian-

    Carmona Road Intersection06/01/09 IV-A 19.203 241 C 0.466 0.133 0.300 - - - 89.90 90.86% V. Satisfactory

    A.L.R Construction Corporation 24110

    Road Upgrading (Gravel to Paved-HDM-4) of Jct. MWCR (Bagong

    Silang)-Cabacao Diversion Road, Brgy. Cabacao

    08/28/10 IVB 9.649 145 C 0.409 0.198 0.300 - - - 90.70 88.60% Satisfactory

    A.L.R. Construction Corporation 24110

    Const. of Pedestrian Overpass, Old Manila South Road, Km.34+520 04/06/11 IVA 9.632 202 C 0.395 0.111 0.300 - - - 80.60

    85.64% Satisfactory

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page14

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    A.M Oreta & CO., Inc./IBC Int'l Builders Corp. (JV) JV-07-097

    Conc. of Iloilo-Caticlan Highway (Pototan-Passi-Capiz Bdry. Sect.) 05/31/10 VI 158.259 570 C 0.379 0.200 0.300 - - - 87.90

    87.82% Satisfactory

    A.M Oreta & CO., Inc./IBC Int'l Builders Corp. (JV) 7096

    Kalibo Airport Development Project (Asphalt Overlay of Runway,

    Extension of Apron and Construction of Drainage Canal)

    04/14/10 DOTC 283.188 360 C 0.449 0.200 0.300 - - - 94.90 92.40% V. Satisfactory

    A.M Robles Construction 28056 Construction of Water Supply @ Brgy. San Simon 03/02/09 I 0.530 40 C 0.415 0.184 0.300 - - - 89.90*89.90%

    V. Satisfactory

    A.M Robles Construction 28056 Completion of Multi-Purpose Building at Pinaglabanan 05/28/09 NCR 4.776 90 C 0.487 0.133 0.300 - - - 92.00*92.00%

    V. Satisfactory

    A.M. Oreta / IBC (JV) JV-09-227

    Rehab./Reconst./Upgrading of Damaged Paved Nat'l Roads, Iloilo-

    Capiz Rd. (Old Route) Cabatuan-Janiuay-Lambunao-Calinog Sect.

    08/23/11 VI 143.049 360 O 0.345 0.200 0.150 0.030 0.059 0.050 83.40 -

    A.M. Oreta / IBC (JV) JV-07-171Const. of CP-V, Pandan-Libertad-Antique Bdry. Rd., Sta.00+057 - Sta.27+762.66 with exception

    04/06/11 PJHL 409.901 707 C 0.418 0.200 0.300 - - - 91.80 *91.80% V. Satisfactory

    A.M. Oreta / IBC (JV) JV-09-227Rehab./Reconst./Upgrading of Iloilo-Capiz Road (Old Route) Cabatuan-Janiuay-Lambunao-Calinog Sect.

    04/10/11 VI 143.049 360 O 0.336 0.300 0.150 0.030 0.056 0.033 90.50 -

    A.M. Oreta / IBC International (JV) JV-08-261

    Pototan Bridge along Iloilo-Capiz, (New Route) including Access Road

    to the New Airport04/10/11 VI 308.770 676 C 0.447 0.133 0.300 - - - 88.00 83.50% Satisfactory

    A.P Consebido Construction & Trading 33616 Basey Irrigation Project 09/5-9/11 NIA 8.463 120 C 0.451 0.160 0.300 - - - 91.10

    91.07% V. Satisfactory

    A.P Consebido Construction and Trading 33616 Const. of MPB, Brgy. Alimanguan 08/20/10 IVB 0.974 114 C 0.447 0.200 0.300 - - - 94.70

    88.54% Satisfactory

    A.P Palacios Construction 29021 Const. of MPB, Brgy. Pingit 06/05/10 III 4.287 180 C 0.470 0.133 0.300 - - - 90.30

    90.30% V. Satisfactory

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page15

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    A.P Palacios Construction 29021 Rehab./Impvt. of Dikidit-Suguit FTMR 09/08/09 III 4.723 150 O 0.300 0.300 0.150 0.030 0.050 0.033 86.30 -

    A.P. Consebido Construction and Trading 33616 Const. of Seawall at Brgy. Rizal 08/05/11 IVB 0.665 40 C 0.459 0.133 0.300 - - - 89.20

    *89.20% V. Satisfactory

    A.P. Consebido Construction and Trading 33616

    Repair/Maint. Of Flood Control Structure of Tulariquen Bridge,

    Revetment08/05/11 IVB 0.880 48 C 0.448 0.133 0.300 - - - 88.10 *88.10% Satisfactory

    A.P. Palacios Construction / Wilper

    Const., Inc. (JV)

    Rehab./Reconst./Upgrading of Damage Pave (SLAMAC) 04/09/11 III 46.297 240 C 0.419 0.188 0.300 - - - 90.70

    *90.70% V. Satisfactory

    A.P.B Construction 17055Repair/Rehab. of Baguio-Bauang Road, Km. 296+050-Km. 297+050

    with exceptions08/29/10 CAR 4.891 47 C 0.456 0.176 0.300 - - - 93.20 93.40% V. Satisfactory

    A.P.B Construction 17055 Rehab. and Conc. of Road at Brgy. Balligi, Kias Barangay 03/03/10 CAR 1.248 60 C 0.384 0.158 0.300 - - - 84.2084.20%

    Satisfactory

    A.P.B. Construction 17055Rehab./Reconst./Upgrading of

    Damaged Paved National Road, PMA cut-off Road 2 K0+000-K0+360

    08/18/11 CAR 5.610 102 O 0.370 0.240 0.000 0.030 0.042 0.033 71.50 -

    A.P.O General Construction 7010

    Rehab./Reconst. of Dungon-Agat Section, Km. 216+648-Km. 217+723

    (V.S.) Camp 108/29/10 CAR 4.555 90 C 0.466 0.133 0.300 - - - 89.90 89.90% V. Satisfactory

    A.P.O. General Construction 7010

    Rehab./Reconst. along Gurel-Bokod-Kabayan-Buguias-Abatan Rd. 04/11/11 CAR 31.838 441 C 0.453 0.153 0.300 - - - 90.60

    *90.60% V. Satisfactory

    A.Q Loisaga Construction & General

    Services32691 Const. of 2 CL in Quillo-Quillo E/S 09/01/09 IVA 2.023 120 C 0.470 0.133 0.300 - - - 90.30 *90.30% V. Satisfactory

    A.R & Mark Builders 31673 Const. of @-CL Maramag CES 02/25/10 X 0.989 105 C 0.418 0.133 0.300 - - - 85.10 85.10% Satisfactory

    A.R Lustre Jr. Construction 7680

    Rehab./Reconst./Upgrading of Damaged Paved Nat'l. Rds. At Bigaa-Plaridel via Bulacan and Malolos Rd.

    08/27/10 III 14.352 90 C 0.367 0.185 0.300 - - - 85.20 85.20% Satisfactory

    A.R Lustre Jr. Construction 7680

    Conc. of Puerto-Princesa-Sabang Road 09/11/09 IVB 48.140 284 C 0.419 0.200 0.300 - - - 91.90

    90.61%V. Satisfactory

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page16

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    A.R Lustre Jr. Construction 7680

    Puerto Princesa Airport Development Project 8/13-14/09 DOTC 90.817 270 C 0.488 0.200 0.300 - - - 98.80

    98.80% Outstanding

    A.R Lustre Jr. Construction 7680

    Rehab/Reconst./Upgrading of Bigaa-Plaridel via Bulacan and Malolos

    Road05/28/09 III 13.077 75 C 0.449 0.196 0.300 - - - 94.50 *94.50%V. Satisfactory

    A.R Lustre Jr. Construction 7680

    Construction of Multi-Purpose Building 03/07/09 IV-B 0.383 90 C 0.481 0.107 0.300 - - - 88.80

    *88.80% Satisfactory

    A.R Lustre Jr. Construction 7680

    Repair/Rehab/Impvt. of Santiago-Syjuco E/S 09/17/09 NCR 0.482 45 C 0.482 0.000 0.300 - - - 78.20

    *78.20% Unsatisfactory

    A.R. Lustre Jr. Construction 7680

    Rehab./Reconst./Upgrading of Damaged Paved Nat'l Roads Pulilan

    & Calumpit08/12/11 III 21.726 113 O 0.313 0.300 0.136 0.030 0.060 0.033 87.20 -

    A.R. Lustre Jr. Construction 7680

    Conc. of Tapul-Bahile Road, Km.39+903.50-Km.40+560 08/09/11 IVB 9.214 75 O 0.375 0.237 0.150 0.023 0.054 0.050 88.90 -

    A.R. Lustre Jr. Construction 7680

    Conc. of Puerto Princesa South Road Phase 2 08/11/11 IVB 7.481 95 C 0.410 0.133 0.300 - - - 84.30

    87.06% Satisfactory

    A.R. Lustre Jr. Construction 7680

    Asphalt Overlay of Capitol-Canigaran Road, Km.1+950.6-Km.2+264 08/09/11 IVB 1.023 51 C 0.428 0.133 0.300 - - - 86.10

    *86.10% Satisfactory

    A.R. Lustre Jr. Construction 7680

    Conc. of Puerto Princesa South Road 03/31/11 IVB 38.600 217 C 0.441 0.133 0.300 - - - 87.40

    87.64% Satisfactory

    A.R. Lustre Jr. Construction 7680

    Const. of Puerto Princesa Airport Development Project (Building and

    Industrial Plant)05/25/11 DOTC 38.547 210 C 0.417 0.200 0.300 - - - 91.70 91.70% V. Satisfactory

    A.R. Lustre Jr. Construction 7680

    Const. of Peurto Princesa Airport Development Project (Building and

    Industrial Plant)05/26/11 DOTC 102.128 300 C 0.438 0.200 0.300 - - - 93.80 93.80% V. Satisfactory

    A.R.L Construction 27645 Repair/Rehab. of School Building BSU 03/03/10 III 0.989 18 C 0.454 0.148 0.300 - - - 90.2090.20%

    V. Satisfactory

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page17

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    A.R.L Construction 27645 Rehab/Impvt./Upgrading of Pulilan-Calumpit Road (Pulilan Section) 05/28/09 III 9.542 60 C 0.376 0.200 0.300 - - - 87.60*87.60%

    Satisfactory

    A.R.L Construction 27645Const. of Flood Control

    (Revetrment), Poblacion, San Sebastian, San Jose, Sta. Monica,

    09/04/09 III 6.697 80 C 0.400 0.133 0.300 - - - 83.30 *83.30% Satisfactory

    A.R.L Construction 27645 Upgrading/Conc. of Roads with Drainage Improvement 03/04/09 NCR 0.476 45 C 0.364 0.200 0.300 - - - 86.40*86.40%

    Satisfactory

    A.R.L Construction 27645Rehab./Reconst./Upgrading of

    Damaged Pavement along 7th Ave. East

    05/31/10 NCR 6.445 90 C 0.409 0.200 0.300 - - - 90.90 90.90% V. Satisfactory

    A.R.L. Construction 27645 Repair/Rehab. of MPB at Sta. Elena E/S 08/13/11 III 1.317 40 C 0.500 0.143 0.300 - - - 94.30*94.30%

    V. Satisfactory

    A.S.M Francisco Dev't and Construction Corp. 19098 Proposed Exterior Repainting Works 03/24/09 U.P. 1.368 120 C 0.400 0.200 0.300 - - - 90.00

    90.00% V. Satisfactory

    A.S.S Construction 31509 Completion of Alaremil Building II 03/2-3/10 DOST 9.607 250 C 0.496 0.200 0.300 - - - 99.60 97.64% Outstanding

    A.S.S. Construction 31509 Completion of ACA Building II 05/14-15/09 DOST 9.631 210 O 0.380 0.296 0.150 0.030 0.062 0.050 96.80 -

    A.S.S. Construction 31509 Construction of Sports Complex 05/14-15/09 DOST 3.159 90 C 0.391 0.295 0.300 - - - 98.60 98.60% Outstanding

    A.S.S. Construction 31509 Partial Completion of vast set, PCASTRD & PCIERD bldg. 07/08/09 DOST 7.479 135 C 0.483 0.200 0.300 - - - 98.30*98.30%

    Outstanding

    A.S.T. Builders 34104

    Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd., Cebu-Balamban Transcentral Highway

    (Km.0007+860-Km.0008+400)

    08/24/11 VII 4.516 10 C 0.455 0.200 0.300 - - - 95.50 *95.50% V. Satisfactory

    A.S.V Construction Supply and Services 13490

    Const. of FMR, Venegas St., Brgy. Layac-Sta.Isabel 05/26/10 III 0.473 60 C 0.444 0.133 0.300 - - - 87.70

    87.70% Satisfactory

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page18

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    A.S.V. Construction Supply and Services 13490 Const./Impvt. of MPB 08/04/11 III 2.794 104 O 0.392 0.233 0.150 0.022 0.038 0.050 88.50 -

    A.S.V. Construction Supply and Services 13490

    Concrete Reblocking of Jct. Layac-Balanga-Mariveles Port Rd.,

    Km.106+151-Km.107+00008/04/11 III 4.778 109 O 0.383 0.225 0.150 0.030 0.048 0.033 86.90 -

    A.V. Bernal Construction & Trading Corp. 32999

    Asphalt Overlay along Tagaytay-Manila via Silang Road 08/18/11 IVA 4.468 14 C 0.481 0.133 0.300 - - - 91.40

    *91.40% V. Satisfactory

    A.Y.U. Engineering and Construction 25632

    Completion of MPB at Barangay Duterte 08/24/11 XI 1.473 120 C 0.448 0.133 0.300 - - - 88.10

    *88.10% Satisfactory

    A.Y.U. Engineering and Construction 25632

    Conc. of Roads @ Brgy. Sto. Nio, Tugbok District 03/28/11 XI 2.825 210 C 0.368 0.200 0.300 - - - 86.80

    *86.80% Satisfactory

    AB Aponesto Construction, Parts &

    Supply22998 Conc. of Lublub-Bolilac-Salad Road, Km.277+707.50-Km.278+711 09/05/10 VI 14.425 192 O 0.356 0.240 0.150 0.030 0.042 0.033 85.10 -

    Abesco Construction & Development Corp. 2934

    Construction of Multi-Purpose Building @ Cupang Elem. School 05/21/09 III 3.273 88 C 0.484 0.133 0.300 - - - 91.70

    90.23%V. Satisfactory

    Abu Construction 22313 Const. of MPB, Brgy. Caloocan 08/20/11 XII 2.657 105 C 0.497 0.125 0.300 - - - 92.20 *92.20% V. Satisfactory

    Abu Construction 22313 Const. of MPB, Brgy. Panay 08/20/11 XII 2.695 105 C 0.499 0.124 0.300 - - - 92.30 87.61% Satisfactory

    Abu Construction 22313 Rehab. of FTMR at Jct. Prv'l. Road Pob. Tamnag Lutayan-Mamali 08/19/11 XII 1.825 62 C 0.340 0.200 0.300 - - - 84.00*84.00%

    Satisfactory

    Abu Construction 22313 Rehab. of FTMR at Jct. Prv'l. Rd. at Blingkong, Lutayan-Bayasong 08/19/11 XII 1.781 62 C 0.330 0.200 0.300 - - - 83.00*83.00%

    Satisfactory

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page19

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    Abu Construction 22313 Const. of Multi-Purpose Building 06/10/10 XII 1.926 126 C 0.494 0.133 0.300 - - - 92.70 92.70% V. Satisfactory

    Abu Construction 22313 Completion of MPB (Mini Gym) at Brgy. San Rafael 06/08/10 XII 1.897 65 C 0.386 0.133 0.300 - - - 81.9081.90%

    Unsatisfactory

    Abu Construction 22313 Completion of MPB (Gym) at Brgy. Baras 06/08/10 XII 0.764 65 C 0.339 0.133 0.300 - - - 77.2077.20%

    Unsatisfactory

    Abulug Construction Company, Inc. 5593

    Reblocking along Bangag-Allapacan-Magapit Road (BAMR), KO686+400-

    KO687+20009/08/09 II 7.999 150 C 0.406 0.200 0.300 - - - 90.60 *90.60% V. Satisfactory

    Abulug Construction Company, Inc. 5593

    Concrete Paving of Ballesteros Road (Washington & Luna St.,) 09/08/09 II 1.930 150 C 0.405 0.200 0.300 - - - 90.50

    88.94% Satisfactory

    Abulug Construction Company, Inc. 5593 Const. of Zitanga Brgy. Roads 02/17/10 II 9.648 132 C 0.370 0.200 0.300 - - - 87.00

    88.14% Satisfactory

    Abulug Construction Company, Inc. 5593

    Rehab. of Ballesteros Central School Building 02/17/10 II 0.192 60 C 0.437 0.133 0.300 - - - 87.00

    87.00% Satisfactory

    Abulug Construction Company, Inc. 5593 Construction of Deepwell 02/18/10 II 0.289 60 C 0.396 0.133 0.300 - - - 82.90

    82.90% Satisfactory

    Abulug Construction Company, Inc. 5593 Const. of Colony Road 11/13/08 II 2.894 120 O 0.329 0.240 0.100 0.030 0.033 0.100 83.20 -

    Abulug Construction Company, Inc. 5593

    Concreting of Jct. Claveria-Dibalio-Luzon Road 05/21/09 II 9.648 273 C 0.485 0.133 0.300 - - - 91.80

    88.95% Satisfactory

    Abulug Construction Company, Inc. 5593 Const. of Public Market (Phase II) 02/23/09 II 1.446 269 C 0.476 0.133 0.300 - - - 90.90

    87.40% Satisfactory

    Abulug Construction Company, Inc. 5593 Lucban River Control Project 02/29/09 II 3.858 347 C 0.417 0.133 0.300 - - - 85.00

    83.35% Satisfactory

    Abulug Developers & Builders Co., Inc. 2366 Conc. of Luna Street at Centro West 05/24/10 II 0.964 120 C 0.434 0.200 0.300 - - - 93.40

    93.40% V. Satisfactory

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page20

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    Abulug Developers & Builders Co., Inc. 2366

    Emergency Restoration of Cadcadir Bridge #1 Approach KO 600+(-)595

    Phase I05/24/10 II 0.995 90 C 0.419 0.200 0.300 - - - 91.90 91.90% V. Satisfactory

    Abulug Developers & Builders Co., Inc. 2366

    Restoration of Scoured Approaches & Eroded Bank of Cadcadir Bridge 2

    KO 602+723 Phase II05/24/10 II 0.771 90 C 0.408 0.200 0.300 - - - 90.80 90.80% V. Satisfactory

    Abulug Developers & Builders Co., Inc. 2366

    Restoration of Scoured Approaches & Eroded Bank of Cadcadir Bridge 1

    Phase II, KO 600+ (-594)05/24/10 II 0.963 90 C 0.467 0.134 0.300 - - - 90.10 90.10% V. Satisfactory

    Abulug Developers & Builders Co., Inc. 2366

    Reblocking along Manila North Road (Ballesteros-Abulug Section) 09/08/09 II 18.527 210 C 0.407 0.200 0.300 - - - 90.70

    89.38% V. Satisfactory

    Abulug Developers & Builders Co., Inc. 2366 Construction of 1-CL Bessang E/S 09/08/09 II 0.484 60 C 0.404 0.181 0.300 - - - 88.50

    *88.50% Satisfactory

    Abulug Developers & Builders Co., Inc. 2366

    Emergency/Rehab. of Slope Protection KO 590+640, MNR 02/17/10 II 1.495 90 C 0.417 0.200 0.300 - - - 91.70

    91.70% V. Satisfactory

    Abulug Developers & Builders Co., Inc. 2366

    Emergency/Rehab. of Slope Protection KO 590+340, MNR 02/17/10 II 0.995 90 C 0.467 0.133 0.300 - - - 90.00

    90.00% V. Satisfactory

    Abulug Developers & Builders Co., Inc. 2366 Concrete Paving of Jones Street 02/12/10 II 0.868 90 C 0.384 0.200 0.300 - - - 88.40

    88.40% Satisfactory

    Abulug Developers & Builders Co., Inc. 2366

    Reblocking along Manila North Road (/Fugu Bdry. - Bangag Sect.) 02/17/10 II 19.299 234 C 0.394 0.200 0.300 - - - 89.40

    88.08% Satisfactory

    Abulug Developers & Builders Co., Inc. 2366

    Rehab./Regravelling of Curva to Capallepaan Farm-to-Market Road 02/18/10 II 0.675 60 C 0.353 0.200 0.300 - - - 85.30

    85.30% Satisfactory

    Abulug Developers & Builders Co., Inc. 2366

    Road Opening of Pimpila Farm-to-Market Road 02/17/10 II 0.820 75 C 0.348 0.200 0.300 - - - 84.80

    84.80% Satisfactory

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page21

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    Abulug Developers & Builders Co., Inc. 2366

    Reblocking along Manila North Road (Fugu Bdry.-Bangag Section) 05/21/09 II 19.299 210 O 0.368 0.240 0.150 0.030 0.051 0.033 87.20 -

    Abulug Developers and Builders Co., Inc. 2366

    Rehab./Upgrading of Manila North Road 08/03/11 II 40.496 402 C 0.403 0.137 0.300 - - - 84.00

    86.46% Satisfactory

    Abulug Developers and Builders Co., Inc.

    (Formerly: F. Vargas Construction)

    2366 Restoration of River Control Project along Goron & Langgangan River 03/31/11 II 12.542 179 C 0.445 0.133 0.300 - - - 87.8092.90%

    V. Satisfactory

    Abulug Developers and Builders Co., Inc.

    (Formerly: F. Vargas Construction)

    2366 Conc. along Cadcadir-Kabugao Road 03/31/11 II 5.015 166 C 0.423 0.133 0.300 - - - 85.60 89.32% V. Satisfactory

    Abulug Developers and Builders Co., Inc.

    (Formerly: F. Vargas Construction)

    2366 Const. of Namuac Bridge Protection Works 03/31/11 II 9.647 180 C 0.426 0.133 0.300 - - - 85.90*85.90%

    Satisfactory

    Abulug Developers and Builders Co., Inc.

    (Formerly: F. Vargas Construction)

    2366 Rehab. of Pamplona Bridge, Phase 3 03/30/11 II 14.473 210 C 0.417 0.133 0.300 - - - 85.00 *85.00% Satisfactory

    Abulug Developers and Builders Co., Inc.

    (Formerly: F. Vargas Construction)

    2366 Const. of Lucban Flood Control Project, (Ph-3) 03/30/11 II 17.368 240 C 0.407 0.133 0.300 - - - 84.00*84.00%

    Satisfactory

    Abulug Developers and Builders Co., Inc.

    (Formerly: F. Vargas Construction)

    2366 Const. of Sto. Tomas Farm-to-Market Road 03/31/11 II 0.962 199 C 0.410 0.133 0.300 - - - 84.3084.00%

    Satisfactory

    Abulug Developers and Builders Co., Inc.

    (Formerly: F. Vargas Construction)

    2366 Restoration of Slope Protection KO591+320 - KO591+353, MNR 08/19/10 II 1.928 120 C 0.434 0.200 0.300 - - - 93.4093.40%

    V. Satisfactory

    Abulug Developers and Builders Co., Inc.

    (Formerly: F. Vargas Construction)

    2366 Const. of Slope Protection at KO673+000 - KO673+853 MNR 08/19/10 II 1.929 90 C 0.420 0.200 0.300 - - - 92.0092.00%

    V. Satisfactory

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page22

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    Abulug Developers and Builders Co., Inc.

    (Formerly: F. Vargas Construction)

    2366Emergency Rehab. of Slope

    Protection KO600+525 - KO602+200, MNR

    08/19/10 II 4.195 90 C 0.347 0.200 0.300 - - - 84.70 87.58% Satisfactory

    Abulug Developers and Builders Co., Inc.

    (Formerly: F. Vargas Construction)

    2366 Conc. along Claveria Dibalio-Luzon-Cagayan Bdry. Road 08/19/10 II 2.938 153 C 0.374 0.200 0.300 - - - 87.4087.40%

    Satisfactory

    Abulug Developers and Builders Co., Inc.

    (Formerly: F. Vargas Construction)

    2366 Retrofitting of Pamplona Bridge, Manila North Road 02/24/09 II 10.290 180 C 0.386 0.200 0.300 - - - 88.6082.96%

    Satisfactory

    Aca Construction & Supply 10784

    Construction of Multi-Purpose Building, Bancagan 02/26/09 I 0.096 30 C 0.417 0.133 0.300 - - - 85.00

    *85.00%Satisfactory

    Aca Construction & Supply 10784 Construction of Water Supply 02/26/09 I 0.096 30 C 0.338 0.188 0.300 - - - 82.60

    *82.60%Satisfactory

    Aca Construction & Supply 10784 Repair of Farm-to-Market Road 02/26/09 I 0.480 30 C 0.343 0.200 0.300 - - - 84.30

    *84.30%Satisfactory

    Acer Industrial/Solid Rock Construction Joint

    Venture

    SLI-SN-005433/JV-

    08-217

    Rehabilitation of Libingan ng mga Bayani Road-MRT Road 05/27/09 NCR 4.694 75 C 0.396 0.133 0.300 - - - 82.90

    *82.90% Satisfactory

    ACJ Construction Resources 10635

    Road Upgrading of Nat'l Rd. (Gravel to Concrete) Nat'l Secondary Rd., Km.1628+584-Km.1630+803 along Kidapawan-Magpet-Pangao-an Rd.

    08/17/11 XII 24.178 180 O 0.342 0.300 0.000 0.030 0.045 0.033 75.00 -

    ACJ Construction Resources 10635

    Road Upgrading of Nat'l Rd. (Gravel to Concrete) Nat'l Secondary Rd.,

    Km.1629+(-124) - Km.1630+133 along Magpet-Nowa-Doroluman-Greenfield

    Rd.

    08/17/11 XII 22.850 200 O 0.350 0.278 0.000 0.030 0.040 0.033 73.10 -

    ACJ Construction Resources 10635

    Conc. of Magpet Binay-Noa-basak-Arakan Road (Noa-Bagumbayan

    Sect.)04/02/11 XII 18.363 224 C 0.410 0.140 0.300 - - - 85.00 *85.00% Satisfactory

    ACJ Construction Resources 10635

    Conc. Of Paco-Roxas-Arakan Valley Road, Luhong Section along Paco-

    Roxas-Arakan Valley Road04/02/11 XII 18.453 200 C 0.391 0.145 0.300 - - - 83.60 *83.60% Satisfactory

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page23

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    ACJ Construction Resources 10635

    Conc. of Paco-Roxas-Arakan Road Kiyaab-Antipas Section (Km. 1648+300-Km.1649+385.63)

    09/05/09 XII 16.826 150 O 0.324 0.300 0.150 0.015 0.042 0.050 88.10 -

    ACJ Construction Resources 10635

    Conc. of Poblacion-Magpet-Nowa Road, Nowa-Basak Section w/

    exception09/05/09 XII 18.798 200 C 0.358 0.200 0.300 - - - 85.80 84.30% Satisfactory

    ACJ Construction Resources 10635

    Asphalt Overlay along Davao-Cotabato Rd., Saguing Section 03/01/10 XII 6.765 68 C 0.429 0.200 0.300 - - - 92.90

    92.90% V. Satisfactory

    ACJ Construction Resources 10635

    Const. of Kinamalig Bridge including Concrete Paving of Approach along

    Paco-Roxas-Arakan03/02/10 XII 12.815 202 C 0.384 0.142 0.300 - - - 82.60 86.08% Satisfactory

    ACJ Construction Resources 10635

    Conc. of Paco-Roxas-Arakan Road, Kiyab-Antipas Section, Km. 1648+300-Km. 1649+385.63

    03/02/10 XII 16.826 175 C 0.379 0.143 0.300 - - - 82.20 85.71% Satisfactory

    ACJ Construction Resources 10635

    Conc. of Paco-Roxas-Arakan Road, inclined Gap Ipuan Section, Km. 1640+374.10 - Km. 1646+794.28

    03/02/10 XII 13.144 189 C 0.394 0.145 0.300 - - - 83.90 83.90% Satisfactory

    ACJ Construction Resources 10635

    Rehab./Reconst. of Damaged Paved along Makilala-Allah Junction Road,

    La Esperanza Section06/05/10 XII 9.961 55 C 0.436 0.133 0.300 - - - 86.90 86.90% Satisfactory

    ACJ Construction Resources 10635

    Rehab./Reconst. of Damage Paved along Matalam-M'lang-Bagontapay

    Road06/05/10 XII 14.307 60 C 0.424 0.133 0.300 - - - 85.70 85.70% Satisfactory

    ACJ Construction Resources 10635

    Road Upgrading of Matalam-Mlang-Bagontapay Road, Additional Lane

    (Poblacion Section)08/27/10 XII 18.338 153 C 0.476 0.127 0.300 - - - 90.30 90.30% V. Satisfactory

    ACJ Construction Resources 10635

    Concreting of Paco-Roxas-Arakan Road (Luhong-Kiyaab Section) 05/30/09 R-XII 18.566 205 C 0.338 0.200 0.300 - - - 83.80

    88.42% Satisifactory

    ACJ Construction Resources 10635

    Concreting of Poblacion Magpet-Nowa Road (Nowa Basak Sect.) 03/10/09 XII 18.798 180 O 0.356 0.284 0.150 0.030 0.035 0.050 90.50 -

    Acme Builders Corp./MWJ Construction

    JV JV-08-243

    Conc. of Burauen-Albuena Road Km. 98+986.50-Km. 986+857.50 w/

    exceptions02/22/10 VIII 46.887 240 C 0.411 0.200 0.300 - - - 91.10 91.10% V. Satisactory

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page24

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    Acme Builders Corporation 6442

    Const. Of Nijaga Bridge along Calbayog Diversion Road (Phase II) 08/17/11 VIII 37.279 300 O 0.383 0.182 0.150 0.030 0.055 0.033 83.30 -

    Acme Builders Corporation 6442

    Repair/Rehab. of Mainit Bridge along Palo-Carigara-Ormoc Road 08/24/11 VIII 14.198 120 C 0.481 0.174 0.300 - - - 95.50

    *95.50% V. Satisfactory

    Acme Builders Corporation 6442

    Const./Completion/Continuation/On-going of Nijaga Bridge along

    Calbayog Diversion Road, Brgy. Nijaga

    04/02/11 VIII 27.000 180 C 0.474 0.133 0.300 - - - 90.70 *90.70% V. Satisfactory

    Acme Builders Corporation 6442

    Const. of Palo-East-By-Pass Road (including Bridge) 03/28/11 VIII 28.783 125 C 0.447 0.133 0.300 - - - 88.00

    88.48% Satisfactory

    Acme Builders Corporation 6442

    Const. of Nijaga Bridge Along Calbayog Diversion Road (Phase II) 04/02/11 VIII 37.279 300 O 0.400 0.240 0.150 0.020 0.040 0.033 88.30 -

    Acme Builders Corporation 6442

    Rehab./Reconst./Upgrading of Daang Maharlika, Palo-Tolosa Road Sect.,

    Km.915+500 - Km.921+70004/06/11 VIII 24.050 200 C 0.423 0.133 0.300 - - - 85.60 87.04% Satisfactory

    Acme Builders Corporation 6442 Const. of Palo East By-Pass Road 03/11/10 VIII 19.260 240 C 0.436 0.200 0.300 - - - 93.60

    89.76% V. Satisfactory

    Acme Builders Corporation 6442

    Rehab./Reconst./Impvt./Upgrading of Damaged Pavement, Tacloban

    Baybay South Rd.06/17/10 VIII 34.600 150 O 0.366 0.300 0.150 0.030 0.032 0.033 91.10 -

    Acme Builders Corporation 6442

    Rehab./Reconst./Impvt./Upgrading of Damaged Pavement, Tacloban

    Baybay South Road09/08/10 VIII 33.358 150 C 0.398 0.133 0.300 - - - 83.10 87.90% Satisfactory

    Acme Builders Corporation 6442 Construction of Sinugbuhan Bridge 06/04/09 VI 33.384 676 C 0.441 0.133 0.300 - - - 87.40

    85.20% Satisfactory

    Acme Builders Corporation 6442

    Asphalt Overlay along Tigbao-Pulak-Sta. Fe Road, Km 925+370-Km

    926+37903/18/09 VIII 11.310 90 C 0.393 0.133 0.300 - - - 82.60 *82.60%Satisfactory

    Acme Builders Corporation 6442 Construction of Bagacay Bridge 03/02/09 VIII 39.122 332 O 0.319 0.288 0.000 0.030 0.023 0.050 71.00 -

    Acme Builders Corporation 6442 Rehabilitation of Mahayahay Creek 03/03/09 VIII 6.709 170 C 0.375 0.133 0.300 - - - 80.80

    84.10%Satisfactory

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page25

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    Acme Builders Corporation / B. Vicencio

    ConstructionJV-07-066 Const. of Palo East By Pass Road (Const. of Bernard Reed II Bridge) 08/31/09 VIII 57.823 616 O 0.384 0.240 0.150 0.030 0.047 0.033 88.40 -

    Acme Builders Corporation / MWJ Construction (JV)

    JV-08-243 Const. of Albuera-Burauen Road including Bridges, Burauen Sect. 09/02/09 VIII 47.235 240 O 0.352 0.245 0.150 0.030 0.045 0.050 87.20 -

    ACV Construction & Surveying 10903

    Concreting of FMR @ Various Brgys., Urbiztondo and Mangatarem 03/09/09 I 3.838 60 C 0.353 0.200 0.300 - - - 85.30

    *85.30%Satisfactory

    ADB Dynamic Builders & Supply 33359

    Repair/Rehab. of St., Brgy. Dalupirit; Rehab. of San Roque St., Brgy.

    Vinisitahan; Rehab./Repair of St., Brgy. Pilar

    03/07/09 VIII 1.437 60 C 0.463 0.200 0.300 - - - 96.30 *96.30% Outstanding

    Adelfa & Charlie Enterprises 11569

    Construction of MPP Brgy. Hibulangan 03/11/09 VIII 0.142 30 C 0.433 0.133 0.300 - - - 86.60

    *86.60%Satisfactory

    Adfil Corporation 14437Rehab. of Magaboy and Lucena Bridge Approaches-Slope/Bank

    Protection06/13/10 XIII 4.709 105 C 0.450 0.200 0.300 - - - 95.00 95.00% V. Satisfactory

    Adfil Corporation 14437 Rehab. of River Dike 06/01/10 XIII 9.649 150 C 0.408 0.179 0.300 - - - 88.70 88.46% Satisfactory

    Adfil Corporation 14437Repair/Maintenance with Asphalt

    Overlay of Tabon-Tabon Slip along Agusan- Davao Road

    06/17/10 XIII 32.364 225 O 0.371 0.240 0.150 0.030 0.055 0.033 87.90 -

    Adfil Corporation 14437 Rehab. of Magsaysay Bridge along Iligan City 09/09/10 XIII 48.161 300 O 0.352 0.300 0.150 0.030 0.055 0.050 93.70 -

    Adfil Corporation 14437 Completion/Continuation of Libertad Bridge & Approaches 09/08/10 XIII 11.224 180 C 0.462 0.189 0.300 - - - 95.1092.58%

    V. Satisfactory

    Adfil Corporation 14437Rehab./Along Reconst. of Daang

    Maharlika (Agusan-Surigao Road) Ampayon-Taguibo Sect.

    09/09/10 XIII 35.253 270 C 0.400 0.200 0.300 - - - 90.00 90.54% V. Satisfactory

    Adfil Corporation 14437Repair/Maintenance with Asphalt

    Overlay of Tabon-Tabon Slip along Agusan-Davao Road

    09/06/10 XIII 32.398 225 C 0.440 0.133 0.300 - - - 87.30 87.66% Satisfactory

    Adfil Corporation 14437Rehab./Reconst. of Damaged Paved National Roads Gingoog-Calveria-

    Villanueva Road09/10/09 X 96.400 405 O 0.259 0.300 0.150 0.030 0.061 0.050 85.00 -

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page26

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    Adfil Corporation 14437 Rehab./Reconst. of NRJ Bahbah-Talacogon Road 06/09/09 XIII 19.263 220 C 0.485 0.200 0.300 - - - 98.50*98.50%

    Outstanding

    Adfil Corporation 14437

    Repair/Rehab./Impvt. of Roads & Bridges along the National Highway Epoxy Sealing of Cracks in concrete girder, deck slab & conc. Pavement

    (injectable epoxy) along Bahbah, Talacogon Road

    06/09/09 XIII 9.429 180 C 0.464 0.200 0.300 - - - 96.40 *96.40% Outstanding

    Adfil Corporation 14437 Rehabilitation/Concreting of Tagcatong-Vinapor Road 05/25/09 XIII 9.629 210 C 0.489 0.133 0.300 - - - 92.20*92.20%

    V. Satisfactory

    Adfil Corporation 14437 Conc. of Dapa-Junction Cancohoy Road 03/07/09 XIII 28.451 241 C 0.414 0.200 0.300 - - - 91.4088.94%

    Satisfactory

    Adfil Corporation 14437Rehab./Reconst. of Damaged Paved

    National Road along Agusan-Misamis Road

    03/02/09 XIII 9.634 180 C 0.405 0.200 0.300 - - - 90.50 86.36% Satisfactory

    Adfil Corporation 14437Rehab./Reconst. of Damaged Paved

    National Road along Agusan-Surigao Road

    03/03/09 XIII 9.635 180 C 0.408 0.200 0.300 - - - 90.80 87.50% Satisfactory

    Adfil Corporation 14437Repair/Reconst. of Butuan City-

    Cagayan de Oro-Iligan Road (Agusan-Misamis Oriental Road) inc. Bridge

    03/18/09 XIII 19.198 210 C 0.402 0.200 0.300 - - - 90.20 89.06% V.Satisfactory

    Adfil Corporation 14437 Repair/Rehab. of NRJ Bahbah-Talacogon Road 03/20/09 XIII 9.633 188 C 0.431 0.200 0.300 - - - 93.1087.04%

    Satisfactory

    Adfil Corporation 14437

    Rehab./Reconst. of Damaged Paved National Rd. along Butuan City-CDO-Iligan Rd.,(Agusan-Misamis Oriental

    Sect.)Libertad-Bancasi Sect.

    09/16/09 XIII 54.954 285 O 0.371 0.300 0.150 0.030 0.055 0.050 95.60 -

    Adfil Corporation 14437Const./Completion/Continuation of Unfinished Bridge and Approaches,

    Brgy. Libertad09/16/09 XIII 23.830 195 O 0.364 0.300 0.150 0.030 0.055 0.050 94.90 -

    Adfil Corporation 14437 Rehab. of NRJ-Bahbah-Talacogon Rd. 09/13/09 XIII 14.427 210 C 0.416 0.194 0.300 - - - 91.0094.66%

    V.Satisfactory

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page27

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    Adfil Corporation 14437 Concreting of NRJ-Bahbah-Talacogon Rd. 09/13/09 XIII 15.872 225 O 0.371 0.244 0.150 0.030 0.065 0.050 91.00 -

    Adfil Corporation (Formerly: Adfil Construction)

    14437 Conc. of Butuan City-Pianing/Tandag Road 08/24/11 XIII 14.808 180 O 0.341 0.300 0.150 0.030 0.048 0.050 91.90 -

    Adfil Corporation (Formerly: Adfil Construction)

    14437

    Widening/Conc. of Additional Lane Both Directions along Butuan City-

    Cagayan de Oro-Iligan Road, Ampayon-Baan Section

    08/24/11 XIII 26.233 240 O 0.338 0.300 0.150 0.030 0.048 0.050 91.60 -

    Adfil Corporation (Formerly: Adfil Construction)

    14437Reconst. of Slip Sect. along Daang

    Maharlika (Agusan-Davao Road) Lapinigan Sect.

    08/22/11 XIII 17.326 220 O 0.378 0.263 0.150 0.030 0.043 0.050 91.40 -

    Adfil Corporation (Formerly: Adfil Construction)

    14437 Conc. of Butuan City-Pianing/Tandag Road 08/24/11 XIII 9.021 105 C 0.474 0.133 0.300 - - - 90.7091.24%

    V. Satisfactory

    Adfil Corporation (Formerly: Adfil Construction)

    14437 Const. of Hawaiian-Salug-Sinakungan Road 08/26/11 XIII 86.118 334 C 0.430 0.181 0.300 - - - 91.10*91.10%

    V. Satisfactory

    Adfil Corporation (Formerly: Adfil Construction)

    14437 Rehab. of Wawa Bridge along Agusan-Davao Road 08/26/11 XIII 110.847 469 C 0.469 0.133 0.300 - - - 90.2090.68%

    V. Satisfactory

    Adfil Corporation (Formerly: Adfil Construction)

    14437Repair of Taguibo Bridge and

    Approaches along Daang Maharlika (Surigao-Agusan Road)

    08/23/11 XIII 8.671 90 C 0.459 0.143 0.300 - - - 90.20 *90.20% V. Satisfactory

    Adfil Corporation (Formerly: Adfil Construction)

    14437Completion of Bislig Bridge along

    Surigao-Davao Coastal Road (Demolition of Old Bridge-Phase I)

    08/17/11 XIII 13.043 285 O 0.334 - 0.200 0.050 0.062 0.250 89.60 -

    Adfil Corporation (Formerly: Adfil Construction)

    14437Conc. of NRJ Cuevas-Bislig Road,

    Phase II, Sta. 1375+369-Sta. 1380+840

    08/22/11 XIII 26.309 245 O 0.349 0.271 0.150 0.030 0.043 0.050 89.30 -

    Adfil Corporation (Formerly: Adfil Construction)

    14437 Overlay of Daang Maharlika (Surigao-Agusan Sect.) 08/09/11 XIII 11.604 75 C 0.438 0.133 0.300 - - - 87.10*87.10%

    Satisfactory

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page28

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    Adfil Corporation (Formerly: Adfil Construction)

    14437 Reconst. of Maglambing Bridge and Approaches 08/17/11 XIII 65.519 521 O 0.376 0.288 0.104 0.030 0.032 0.017 84.70 -

    Adfil Corporation (Formerly: Adfil Construction)

    14437 Const. of Tubay-Lake Mainit Circ. Road, Tubay-Jabonga 08/09/11 XIII 96.417 438 C 0.445 0.026 0.300 - - - 77.1082.56%

    Satisfactory

    Adfil Corporation (Formerly: Adfil Construction)

    14437Rehab. of Taguibo Steel Bridge

    along Daang Maharlika (Surigao-Agusan Road), Brgy. Taguibo

    04/11/11 XIII 9.601 180 C 0.500 0.133 0.300 - - - 93.30 *93.30% V. Satisfactory

    Adfil Corporation (Formerly: Adfil Construction)

    14437 Conc. of Pulang Lupa-Sta. Josefa Road 04/01/11 XIII 19.249 195 C 0.439 0.200 0.300 - - - 93.9092.91%

    V. Satisfactory

    Adfil Corporation (Formerly: Adfil Construction)

    14437Rehab. of Magsaysay Bridge along Iligan City-Cagayan de Oro-Butuan

    City Road04/13/11 XIII 48.161 300 C 0.476 0.134 0.300 - - - 91.00 92.62% V. Satisfactory

    Adfil Corporation (Formerly: Adfil Construction)

    14437 Conc./Repair of Slip along NRJ-Cuevas-Sampaguita Rd. 04/01/11 XIII 47.951 470 C 0.478 0.133 0.300 - - - 91.1091.19%

    V. Satisfactory

    Adfil Corporation (Formerly: Adfil Construction)

    14437Rehab./Reconst. of Butuan-Cagayan

    de Oro-Iligan Road inc. Bridges (Agusan-Mis. Or. Road)

    04/12/11 XIII 8.595 105 C 0.474 0.133 0.300 - - - 90.70 *90.70% V. Satisfactory

    Adfil Corporation (Formerly: Adfil Construction)

    14437 Reconst. of Maglambing Bridge and Approaches 04/02/11 XIII 96.519 521 O 0.343 0.300 0.150 0.030 0.048 0.033 90.40 -

    Adfil Corporation (Formerly: Adfil Construction)

    14437 Conc. of NRJ Cuevas-Bislig Road, Phase II 04/01/11 XIII 26.309 245 O 0.377 0.247 0.150 0.030 0.048 0.050 90.20 -

    Adfil Corporation (Formerly: Adfil Construction)

    14437 Conc. of Butuan City-Pianing-Tandag Road 04/13/11 XIII 18.905 270 C 0.347 0.200 0.300 - - - 84.7088.96%

    Satisfactory

    Adfil Corporation (Formerly: Adfil Construction)

    14437 Conc. of NRJ Cuevas-Sampaguita Road 04/01/11 XIII 60.039 270 C 0.367 0.200 0.300 - - - 86.7088.14%

    Satisfactory

    Adfil Corporation (Formerly: Adfil Construction)

    14437Rehab. of Butuan City-Cagayan de Oro-Iligan Road (Agusan-Misamis

    Oriental Road)04/11/11 XIII 105.122 210 C 0.322 0.200 0.300 - - - 82.20 86.70% Satisfactory

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page29

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    Adfil Corporation (Formerly: Adfil Construction)

    14437 Const. of River Dike Protection, Brgy. Agao 03/10/10 XIII 9.556 90 C 0.485 0.133 0.300 - - - 91.8091.80%

    V.Satisfactory

    Adfil Corporation (Formerly: Adfil Construction)

    14437Impv't./Rehab. of Iligan-Cagayan-

    Butuan Rd. (Agusan-Misamis Oriental Section)

    02/23/10 XIII 67.446 180 C 0.480 0.133 0.300 - - - 91.30 91.30% V.Satisfactory

    Adfil Corporation (Formerly: Adfil Construction)

    14437 Const./Conc. of NRJ San Francisco-Bahi Rd. 03/07/10 XIII 28.892 330 C 0.431 0.133 0.300 - - - 86.4091.20%

    V.Satisfactory

    Adfil Corporation (Formerly: Adfil Construction)

    14437 Upgrading/Conc. of NRJ Cuevas-Bislig Rd. 03/07/10 XIII 28.874 315 C 0.485 0.133 0.300 - - - 91.8090.66%

    V.Satisfactory

    Adfil Corporation (Formerly: Adfil Construction)

    14437 Conc. of Dapa-Del Carmen (Sayak-Airport Rd.) 02/26/10 XIII 75.947 390 C 0.456 0.133 0.300 - - - 88.9088.90%

    Satisfactory

    Adfil Corporation (Formerly: Adfil Construction)

    14437 Rehab./Reconst. of Damaged Rd. Gingoog-Claveria-Villanueva Rd. 03/10/10 X 96.400 405 C 0.437 0.200 0.300 - - - 93.7089.71%

    V.Satisfactory

    Adfil Corporation/RID Corporation (JV) JV-06-022

    Repair/Rehab. of Patin-ay Bridge along Agusan-Davao Road, Patin-ay 06/08/09 XIII 23.749 658 C 0.458 0.200 0.300 - - - 95.80

    91.84% V. Satisfactory

    Adige Sta. Clara (JV) JV-06-032DPWH Component Project under the

    Help for Catubig Agricultural Advancement Proj.

    05/30/09 VIII 519.663 1,073 O 0.378 0.300 0.150 0.030 0.050 0.050 95.80 -

    Adige Sta. Clara (JV) JV-06-032DPWH Component Project under the

    HELP for Catubig Agricultural Project (HCAAP)

    08/25/08 VIII 448.581 734 O 0.377 0.300 0.070 0.030 0.050 0.067 89.40 -

    Adimre Construction 25534 Marilao Port Development Project 08/20/09 DOTC 2.862 60 C 0.451 0.200 0.300 - - - 95.10 *95.10% V. Satisfactory

    Adimre Construction 25534 Sta. Cruz Port Development Project 08/20/09 DOTC 0.960 30 C 0.460 0.200 0.300 - - - 96.00 96.00% V. Satisfactory

    Adimre Construction 25534 Sasmuan Port Development Project 08/20/09 DOTC 2.871 60 C 0.459 0.200 0.300 - - - 95.90 95.90% V. Satisfactory

    Adimre Construction 25534 Hagonoy Port Development Project 10/02/09 DOTC 0.949 30 C 0.460 0.200 0.300 - - - 96.00 96.00% Outstanding

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page30

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    Adimre Construction 25534 Baguio Airport Development Project 04/04/09 DOTC 861.940 60 C 0.435 0.181 0.300 - - - 91.60 91.60% V. Satisfactory

    Adimre Construction 25534

    Dumaguete Airport Dev't Project (Completion of Imprv't of Terminal Building and Purchase/ Installation

    of Bagage Conveyor)

    01/21/10 DOTC 13.500 90 C 0.402 0.199 0.300 - - - 90.10 90.10% V.Satisfactory

    Adimre Construction 25534Tuguegarao Airport Dev't Project

    (Continuation of Widening of Runway)

    03/04/10 DOTC 9.588 90 C 0.452 0.200 0.300 - - - 95.20 95.20% V.Satisfactory

    Adimre Construction 25534

    Tuguegarao Airport Dev't Project (Continuation of Widening of

    Runway and Improvement of Fire Station Building)

    03/04/10 DOTC 12.490 90 C 0.458 0.200 0.300 - - - 95.80 95.80% V.Satisfactory

    Adimre Construction 25534

    Laoag Airport Development Project (Upgrading of Radar Area,

    Continuation of Perimeter Fence Construction of Drainage System)

    04/09/10 DOTC 9.604 120 C - 0.419 0.200 0.300 - - 91.90 91.90% V. Satisfactory

    Adimre Construction 25534Laoag Airport Development Project

    (Improvement of Fire Station Building)

    04/09/10 DOTC 4.821 120 C 0.464 0.200 0.300 - - - 96.40 96.40% Outstanding

    Adimre Construction 25534Laoag Airport Development Project

    (Shoulder Grade Correction including Drainage System)

    04/09/10 DOTC 4.793 75 C 0.410 0.200 0.300 - - - 91.00 91.00% V. Satisfactory

    Adimre Construction 25534Tuguegarao Airport Development Project (Repair/Rehabilitation of

    Terminal Building)09/10/10 DOTC 1.927 90 C 0.449 0.200 0.300 - - - 94.90 94.90% V. Satisfactory

    Adimre Construction 25534 Canalate Port Development Project (Improvement of Port) 12/03/10 DOTC 1.919 60 C 0.458 0.200 0.300 - - - 95.8095.80%

    V. Satisfactory

    Adimre Construction 25534Const. of Standard One Classroom

    School Building (Modified) at GITMES

    09/05/09 III 0.526 24 C 0.442 0.133 0.300 - - - 87.50 *87.50% Satisfactory

    Adimre Construction 25534

    Camiguin Ports Cluster Project (Construction of Seawall Enclosure

    at Benoni Port and Repair of Causeway at Catarman Port)

    02/17/11 DOTC 6.231 60 C 0.419 0.200 0.300 - - - 91.90 91.90% V. Satisfactory

    * 1st/Final* For DPWH, only the region and PMO office are listed 15th CPES Release Page31

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 01, 2010 to June 30, 2012

    ESH RDRSTATUSCPES VISIT

    RATINGWMS MTL TIME FACPROJECT DATE OF EVALUATION

    FINAL RATING/ QUALITATIVE DESCRIPTION

    AMOUNT (Php, M) DUR (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF

    CONSTRUCTORLICENSE

    NO.

    ADP Const. & Supply 3466 Impvt./Conc. of Access Road, Tubalan Port, Tubalan 04/01/11 XI 58.261 320 C 0.135 0.200 0.000 - - - 33.5061.25% Poor

    Adriot Construction 11169 Const. of Bridge, Brgy. Conversion 08/11/11 III 1.137 45 C 0.467 0.200 0.300 - - - 96.70 *96.70% Outstanding

    Adroit Construction 11169 Const. of 2-CL, Sta. Barbara E/S 04/08/11 III 1.324 60 C 0.45 0.048 0.300 - - - 79.80 *79.80% Unsatisfactory

    Adroit Construction 11169 Completion of Bridge, General Luna 2nd Phase 03/02/09 III 3.026 30 C 0.332 0.200 0.300 - - - 83.20*83.20%

    Satisfactory

    Adroit Construction 11169 Concreting of Brgy. Maligaya Road 03/02/09 III 1.867 25 C 0.404 0.133 0.300 - - - 83.70 *83.70%Satisfactory

    Advance Foundation Const. System Corp. /

    Abulug Developer Builders Const. Inc. (JV)

    JV-09-289 Const. of Gov. Edgar R. Lara Bridge along Cagayan-Apayao Road 03/30/11 II 112.029 240 O 0.360 0.300 0.000 0.023 0.051 0.017 75.10 -

    Advanced Foundation - IBC (JV) JV-09-265

    Replacement of E. Marcos Bridge, Km.28+310 along Maasin-Cabatuan

    Roa