CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016 "R.R. Seismundo Construction & Supply" 10961 Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)- New Cortez-San Jose Carcor Panas Rd. 08/12/13 XI 45.784 205 O 0.245 0.300 0.150 0.030 0.050 0.033 80.80 - "R.R. Seismundo Construction & Supply" 10961 Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)- New Cortez-San Jose Carcor Panas Rd. 03/18/13 XI 45.784 179 O 0.338 0.231 0.150 0.030 0.045 0.050 84.40 - "R.R. Seismundo Construction & Supply" 10961 Widening of Surigao-Davao Coastal Rd., Km.1822+(-423)- Km.1822+821, Apokon Sect. 03/18/13 XI 17.793 125 O 0.355 0.240 0.150 0.030 0.045 0.050 87.00 - "R.R. Seismundo Construction & Supply" / Davao Concrete Products Joint Venture JV-12-116 Const. of Flood Control Structure (Sheet Piles & Grouted Riprap) Agusan River, Brgy. Inambatan 11/27/12 XI 27.838 240 O 0.333 0.240 0.150 0.030 0.040 0.050 84.30 - 121 Construction Corporation (Formerly: 121 Construction) 21686 Improvement/Concreting with Drainage System along Ballesteros Street 29/11/2014 NCR 6.684 120 O 0.355 0.240 0.150 0.030 0.035 0.033 84.30% 84.30% Satisfactory 12-30 CONSTRUCTION & SUPPLY 37025 Construction of 1-CL Trinidad Cario PS 11/13/15 Palawan 1st DEO 1.070 90 C 0.444 0.133 0.3 - - - 87.70% 87.7% Satisfactory 2M Construction & Enterprises 33331 Slope Protection (Grouted Riprap) along Isabela-Maluso Rd., Matarling Sect. at K15+190-K15+249 03/13/13 IX 4.842 75 O 0.328 0.240 0.150 0.030 0.040 0.050 83.80 - 2-R CONSTRUCTION & SUPPLY 15304 Off Carriage Improvement at Lingayen, Captiol Loop 11/06/2015 Pangasinan 2nd DEO 9.34 105 C 0.28 0.3 0.15 0.03 0.06 0.03 85.20% - 2-R CONSTRUCTION & SUPPLY 15304 Raising of Grade of Dike Agno River Basin Flood Control Project (Phase III), Brgy. Cabalitian, Asingan, Pangasinan 11/16/15 PANGASINAN 3RD DEO 9.167 120 OG 0.391 0.24 0.15 0.03 0.05 0.05 91.10% 91.1% Very Satisfactory 2-RCONSTRUCTION & SUPPLY 15304 Off Carriageway Improvement at Lingayen Capitol Loop, K0364+(-219) to K0364+836, Lingayen, Pangasinan 02/09/2016 Pangasinan 2nd DEO 9.34 105 C 0.473 0.133 0.3 - - - 90.60% *87.36% Satisfactory 3A'S BUILDERS 33251 Rehabilitation/Major Repair of Permanent Bridges Tagbinunga Bridge (B00549LT) along Daang Maharlika (LT), Mahaplag, Leyte 11/15/15 Leyte Fifth DEO 5.403 150 C 0.484 0.133 0.3 - - - 91.70% 91.7% Very Satisfactory 3C'SL CONSTRUCTION AND SUPPLY 36393 Construction/ Upgrading of Local Road 02/06/2015 AGUSAN DEL NORTE DEO 3.763 48 C 0.461 0.133 0.3 - - - 89.40% *89.4% Very Satisfactory 3K ROCK ENGINEERING 27908 Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Road including Drainage based on Pavement Management System/Highway Development & Management- 4 (HDM-4) (Intermittent Section), Asin Road, K0305+(-291) - K0305+958 12/06/2015 Baguio City DEO 22.149 170 C 0.414 0.196 0.3 - - - 90.97% *90.97% Very Satisfactory 3K ROCK ENGINEERING 27908 Road Upgrading (Unpaved to Paved) Based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) (Intermittent Sections) of Kabugao - Pudtol - Luna - Cagayan Bdry. Road, K0611+917 to K0612+961, K0612+973 to K0613+699, K0613+723 to K0614+500, Apayao 27/08/2015 CAR 75.709 221 O 0.363 0.241 0 0.03 0.061 0.033 72.80% - 3K Rock Engineering/RVC Construction (J.V.) 27908 Road Upgrading (Gravel to Concrete) of Asin -Nanganban - San Pascual Road K0270+594 - K0272+220 ; K0275+5311 - K0275+7178 16/08/2014 CAR 91.358 237 O 0.379 0.240 0.150 0.024 0.060 0.050 90.30 - 3RB Construction & Supply 19541 Prieto Diaz Port Development Project 08/19/15 DOTC 8.512 124 O 0.367 0.300 0.150 0.030 0.054 0.050 95.10 - 4B Construction Corporation 2014 heavy maintenance works along SCTEX lot 2 - Bridge revetment, slope and drainage repair works 10/31/14 BCDA 12.430 90 O 0.298 0.288 0.135 0.000 0.035 0.050 80.53 - 4B Construction Corporation Gumain Bridges Pier 5 & 6 Protection Works 02/05/15 BCDA 18.951 120 O 0.377 0.293 0.000 0.030 0.041 0.033 77.44 - 4B Construction Corporation Gumain Bridges Pier 5 & 6 Protection Works 11/20/14 BCDA 18.951 120 O 0.400 0.271 0.105 0.000 0.032 0.033 84.10 - 4B CONSTRUCTION CORPORATION 23445 Widening along Roman Expressway, K153+263 to K153+938, K153+938 to K154+780, Mariveles, Bataan 04/06/2015 Bataan 2nd DEO 22.523 99 C 0.4 0.2 0.3 - - - 90.00% *90% Very Satisfactory 5'S CONSTRUCTION & SUPPLY 32404 Construction of One (1) Storey, Two (2) Classroom School Building at Dumangas National High School 10/06/2015 Iloilo Second DEO 1.479 60 C 0.478 0.172 0.3 - - - 95.00% *95% Very Satisfactory 626 Construction and Trading 34990 Improvement of Balungao Hot and Cold Spring Resort 5/27/15 TIEZA 11.800 180 O 0.397 0.299 0 0.030 0.045 0.017 78.74 ESH RDR STATUS CPES VISIT RATING WMS MTL TIME FAC FINAL RATING/ QUALITATIVE DESCRIPTION AMOUNT (Php, M) DUR (C.D.) CONTRACT *IMPL. AGENCY NAME OF CONSTRUCTOR LICENSE NO. PROJECT DATE OF EVALUATION *1st/Final * For DPWH, only the region and PMO office are listed 24th CPES Release Page1

Upload: ngokien

Post on 09-Aug-2018

424 views

Category:

Documents


34 download

TRANSCRIPT

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    "R.R. Seismundo Construction & Supply" 10961Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)-

    New Cortez-San Jose Carcor Panas Rd.08/12/13 XI 45.784 205 O 0.245 0.300 0.150 0.030 0.050 0.033 80.80 -

    "R.R. Seismundo Construction & Supply" 10961Const./Widening/Upgrading/Rehab. of Del Pilar (San Juan)-

    New Cortez-San Jose Carcor Panas Rd.03/18/13 XI 45.784 179 O 0.338 0.231 0.150 0.030 0.045 0.050 84.40 -

    "R.R. Seismundo Construction & Supply" 10961Widening of Surigao-Davao Coastal Rd., Km.1822+(-423)-

    Km.1822+821, Apokon Sect.03/18/13 XI 17.793 125 O 0.355 0.240 0.150 0.030 0.045 0.050 87.00 -

    "R.R. Seismundo Construction & Supply" /

    Davao Concrete Products Joint VentureJV-12-116

    Const. of Flood Control Structure (Sheet Piles & Grouted

    Riprap) Agusan River, Brgy. Inambatan11/27/12 XI 27.838 240 O 0.333 0.240 0.150 0.030 0.040 0.050 84.30 -

    121 Construction Corporation (Formerly: 121

    Construction)21686

    Improvement/Concreting with Drainage System along

    Ballesteros Street29/11/2014 NCR 6.684 120 O 0.355 0.240 0.150 0.030 0.035 0.033 84.30%

    84.30%

    Satisfactory

    12-30 CONSTRUCTION & SUPPLY 37025Construction of 1-CL Trinidad Cario PS

    11/13/15Palawan 1st

    DEO1.070 90 C 0.444 0.133 0.3 - - - 87.70%

    87.7%

    Satisfactory

    2M Construction & Enterprises 33331Slope Protection (Grouted Riprap) along Isabela-Maluso Rd.,

    Matarling Sect. at K15+190-K15+24903/13/13 IX 4.842 75 O 0.328 0.240 0.150 0.030 0.040 0.050 83.80 -

    2-R CONSTRUCTION & SUPPLY 15304 Off Carriage Improvement at Lingayen, Captiol Loop 11/06/2015Pangasinan 2nd

    DEO9.34 105 C 0.28 0.3 0.15 0.03 0.06 0.03 85.20% -

    2-R CONSTRUCTION & SUPPLY 15304

    Raising of Grade of Dike Agno River Basin Flood Control

    Project (Phase III), Brgy. Cabalitian, Asingan, Pangasinan 11/16/15PANGASINAN

    3RD DEO9.167 120 OG 0.391 0.24 0.15 0.03 0.05 0.05 91.10%

    91.1%

    Very Satisfactory

    2-RCONSTRUCTION & SUPPLY 15304Off Carriageway Improvement at Lingayen Capitol Loop,

    K0364+(-219) to K0364+836, Lingayen, Pangasinan02/09/2016

    Pangasinan 2nd

    DEO9.34 105 C 0.473 0.133 0.3 - - - 90.60%

    *87.36%

    Satisfactory

    3A'S BUILDERS 33251

    Rehabilitation/Major Repair of Permanent Bridges

    Tagbinunga Bridge (B00549LT) along Daang Maharlika (LT),

    Mahaplag, Leyte

    11/15/15 Leyte Fifth DEO 5.403 150 C 0.484 0.133 0.3 - - - 91.70%91.7%

    Very Satisfactory

    3C'SL CONSTRUCTION AND SUPPLY 36393 Construction/ Upgrading of Local Road 02/06/2015AGUSAN DEL

    NORTE DEO3.763 48 C 0.461 0.133 0.3 - - - 89.40%

    *89.4% Very

    Satisfactory

    3K ROCK ENGINEERING 27908

    Rehabilitation/Reconstruction/Upgrading of Damaged Paved

    National Road including Drainage based on Pavement

    Management System/Highway Development & Management-

    4 (HDM-4) (Intermittent Section), Asin Road, K0305+(-291) -

    K0305+958

    12/06/2015Baguio City

    DEO22.149 170 C 0.414 0.196 0.3 - - - 90.97%

    *90.97% Very

    Satisfactory

    3K ROCK ENGINEERING 27908

    Road Upgrading (Unpaved to Paved) Based on Gravel Road

    Strategies, Traffic Benchmark for Upgrading to Paved Road

    Standards (HDM-4 Project Analysis) (Intermittent Sections)

    of Kabugao - Pudtol - Luna - Cagayan Bdry. Road,

    K0611+917 to K0612+961, K0612+973 to K0613+699,

    K0613+723 to K0614+500, Apayao

    27/08/2015 CAR 75.709 221 O 0.363 0.241 0 0.03 0.061 0.033 72.80% -

    3K Rock Engineering/RVC Construction (J.V.) 27908

    Road Upgrading (Gravel to Concrete) of Asin -Nanganban -

    San Pascual Road K0270+594 - K0272+220 ; K0275+5311 -

    K0275+7178

    16/08/2014 CAR 91.358 237 O 0.379 0.240 0.150 0.024 0.060 0.050 90.30 -

    3RB Construction & Supply 19541 Prieto Diaz Port Development Project 08/19/15 DOTC 8.512 124 O 0.367 0.300 0.150 0.030 0.054 0.050 95.10 -

    4B Construction Corporation2014 heavy maintenance works along SCTEX lot 2 - Bridge

    revetment, slope and drainage repair works10/31/14 BCDA 12.430 90 O 0.298 0.288 0.135 0.000 0.035 0.050 80.53 -

    4B Construction Corporation Gumain Bridges Pier 5 & 6 Protection Works 02/05/15 BCDA 18.951 120 O 0.377 0.293 0.000 0.030 0.041 0.033 77.44 -

    4B Construction Corporation Gumain Bridges Pier 5 & 6 Protection Works 11/20/14 BCDA 18.951 120 O 0.400 0.271 0.105 0.000 0.032 0.033 84.10 -

    4B CONSTRUCTION CORPORATION 23445Widening along Roman Expressway, K153+263 to K153+938,

    K153+938 to K154+780, Mariveles, Bataan04/06/2015

    Bataan 2nd

    DEO22.523 99 C 0.4 0.2 0.3 - - - 90.00%

    *90% Very

    Satisfactory

    5'S CONSTRUCTION & SUPPLY 32404Construction of One (1) Storey, Two (2) Classroom School

    Building at Dumangas National High School10/06/2015

    Iloilo Second

    DEO1.479 60 C 0.478 0.172 0.3 - - - 95.00%

    *95% Very

    Satisfactory

    626 Construction and Trading 34990 Improvement of Balungao Hot and Cold Spring Resort 5/27/15 TIEZA 11.800 180 O 0.397 0.299 0 0.030 0.045 0.017 78.74

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    *1st/Final

    * For DPWH, only the region and PMO office are listed

    24th CPES Release Page1

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    626 CONSTRUCTION AND TRADING 34990 Improvement of Hot and Cold Spring Resort 10/9/15 TIEZA 12.000 240 O 0.395 0.300 0.103 0.030 0.047 0.050 92.49 -

    626 CONSTRUCTION AND TRADING 34990 Improvement of Hot and Cold Spring Resort 11/25/15 TIEZA 12.000 240 C 0.473 0.200 0.300 97.3089.1%

    Very Satisfactory

    722 CONSTRUCTION INC (Formerly 722

    Construction)21923

    Repair/Rehabilitation/Improvement along Baliuag-Candaba

    Road, K0054+000 to K0057+000, Baliuag-Candaba Road,

    Baliuag, Bulacan

    26/08/2015Bulacan First

    DEO12.104 72 C 0.394 0.2 0.3 - - - 89.40%

    *82.86%

    Satisfactory

    722 CONSTRUCTION, INC. (Formerly: 722

    Construction)21923

    Construction/Rehabilitation of Road with Drainage,

    Barangay Poblacion II, Phase III Constantino, Municipality of

    Marilao, Bulacan 4th LD

    11/19/15Bulacan

    Second DEO6.509 90 C 0.493 0.133 0.3 - - - 92.60%

    92.6%

    Very Satisfactory

    722 Construction, Inc.(Formerly: 722

    Construction)21923

    Repair/Rehabilitation/Improvement along Baliuag-Candaba

    Road K0054+000 to K0057+00024/11/2014 III 12.104 72 O 0.295 0.240 0.150 0.030 0.037 0.033 78.50%

    78.50%

    Unsatisfactory

    739 BUILDERS 31174 Widening of Vigan - Sta. Catalina Road 05/06/2015Ilocos Sur 1st

    DEO15.404 96 C 0.22 0.2 0.3 - - - 72.00% *72% Poor

    808 CONSTRUCTION AND SUPPLY 18711 Construction of Local Roads, Ortiz-Baraoas-Roas 07/06/2015La Union 2nd

    DEO1.887 37 C 0.396 0.133 0.3 - - - 82.90% *82.9% Satisfactory

    888 ACY ENTERPRISES 32898

    Rehab/Major Repair of Permanent Bridges, Pandan Bridge,

    Along Brdy, S. leyte-Maasin-Macrohon-Sogod-Daang

    Maharlika

    03/06/2015Southern Leyte

    DEO8.812 150 O 0.4 0.24 0.15 0.03 0.052 0.033 90.50% -

    888 ACY ENTERPRISES 32898

    Rehabilitation/Major Repair of Permanent Bridge, Pandan

    Bridge along Bdry. Southern Leyte-Macrohon-Sogod-Daang

    Maharlika (BOO344LT), Sogod, Southern Leyte

    30/08/2015Southern Leyte

    DEO8.812 150 C 0.411 0.2 0.3 - - - 91.10%

    *90.74% Very

    Satisfactory

    888 ACY ENTERPRISES 32898

    Rehabilitation/Major Repair of Permanent Bridges, Pangi

    Bridge Along Daang Maharlika (B00597LT), Libagon,

    Southern Leyte

    11/16/15Southern Leyte

    DEO14.826 180 C 0.442 0.2 0.18 - - - 82.20%

    82.2%

    Satisfactory

    8R'S CONSTRUCTION 22997Concreting of Daig - Tumapon - Maybo Farm to Market Road,

    Boac, Marinduque01/09/2015

    Marinduque

    DEO23.211 195 C 0.442 0.137 0.3 - - - 87.90%

    *87.9%

    Satisfactory

    8R'S CONSTRUCTION 22997Concreting of Farm to Market Road, Brgy. Maligaya and

    Brgy. Buliasnin (Brgy. Buliasnin-Maligaya)11/16/15

    Marinduque

    DEO1.947 41 C 0.405 0.147 0.3 - - - 85.20%

    85.2%

    Satisfactory

    A B Aponesto Construction, Parts & Supply 22998

    Repair/Rehab of Agusan River Flood Control, Osmena

    Section, Compostela along Montevista Compostela New

    Bataan Maragusan Mati Bdry. Road.

    09/08/2014 XI 30.533 183 O 0.384 0.219 0.123 0.030 0.042 0.033 83.10 -

    A DE GUIA CONSTRUCTION 18228Construction of River Bank Protection, Siffu Flood Control

    Project, Sittio Gabit Section, Roxas, Isabela28/08/2015

    Isabela 2nd

    DEO18.346 215 O 0.354 0.3 0.15 0.03 0.04 0.05 92.40% -

    A DE GUIA CONSTRUCTION 18228Construction of River Bank Protection, Stiffu River Flood

    Control Project, Sitio Gabit Section, Roxas, Isabela11/14/15

    ISABELA 2ND

    DEO18.347 219 C 0.3 0.133 0.3 - - - 73.30%

    73.3%

    Poor

    A J TAYLAN CONSTRUCTION &

    DEVELOPMENT/JLP CONSTRUCTION &

    SUPPLY JOINT VENTURE

    JV-14-518

    Rehabilitation/Reconstruction/Upgrading of Damaged Paved

    National Roads including Drainage Based on Pavement

    Management System/Highway Development and

    Management- 4(HDM-4), Pinili-Nueva Era Road, K0453+(-224)-

    K0454+1013, K0455+884-K0456+433, Pinili Road, Ilocos

    Norte

    26/08/2015Ilocos Sur 2nd

    DEO37.519 219 O 0.355 0.209 0.15 0.03 0.051 0.05 84.50% -

    *1st/Final

    * For DPWH, only the region and PMO office are listed

    24th CPES Release Page2

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    A. C. RIVERO DEVELOPMENT CORPORATION

    (Formerly: A.C. Rivero Construction)5122

    Construction of Bridge at Dodiongan Box Culvert along Sta.

    Felomina-Bonbonon-Digkilaan-Rogongon Road, Barangay

    Bonbonon, Iligan City, K01526+078.00 to K01526+108.00, K0

    0+000.00 to K0 0+000.00

    08/06/2015Lanao del Norte

    Second DEO24.567 295 C 0.433 0.2 0.3 - - - 93.30%

    *90% Very

    Satisfactory

    A. De Guia Construction 18228

    Construction of Drainage System / Protection Works along

    Daang Maharlika, Isabela 4th LD K0311+590 - K0314+350,

    San Luis - Caquilingan

    27/10/2014 II 19.403 231 O 0.347 0.300 0.150 0.030 0.029 0.033 88.90%88.90%

    Satisfactory

    A. De Guia Construction 18228Construction/ Rehabilitation of Flood Control Projects,

    Nagassican Flood Control Projects, Sta. 0+000 to Sta. 0+22412/08/2014 II 19.500 184 O 0.288 0.248 0.150 0.030 0.055 0.050 82.10 -

    A. DE GUIA CONSTRUCTION 18228Construction of Drainage System/Protection Works along

    Daang Maharlika07/06/2015

    Isabela 4th

    DEO19.403 261 C 0.422 0.133 0.3 - - - 85.50%

    *87.54%

    Satisfactory

    A. DE GUIA CONSTRUCTION 18228

    Construction/Rehabilitation of Flood Control Projects in

    Isabela 4th DEO/4th LD-Nagassican Flood Control Project,

    Sta. 0+000 - Sta. 0+224

    07/06/2015Isabela 4th

    DEO19.5 214 C 0.365 0.2 0.3 - - - 86.50%

    *83.86%

    Satisfactory

    A. I. P. CONSTRUCTION 32458

    Rehabilitation/ Reconstruction/ Upgrading of Damaged

    Paved National Roads Including Drainage Based on

    Pavement Management System/ Highway Development and

    Management-4 (HDM-4) (Intermittent Sections), Lt. Tacay

    Road, K0308+(-599)-K0308+000 & K0308+616-K0308+754,

    11/9/15 Baguio City 13.442 104 C 0.415 0.195 0.300 - - - 91.00%87.82%

    Satisfactory

    A. J. LAVA BUILDERS CORP. (Formerly: A. J.

    Lava Builders)22265

    Flood Management Services Construction/Maintenance of

    Flood Mitigation Structures and Drainage System

    Improvement/Riprapping of Sitio Kapatagan River

    (Downstream), Brgy. San Jose, Antipolo City, 2nd LD

    11/11/15RIZAL 1ST

    DEO27.612 180 OG 0.39 0.24 0.15 0.03 0.06 0.05 92.00%

    92%

    Very Satisfactory

    A. M. Oreta and Co., Incorporated 108 Region 2-PIDP-CBIMO 09/19/15 NIA 80.788 690 O 0.370 0.300 0.130 0.030 0.060 0.050 94.00 -

    A. P. B. CONSTRUCTION 17055

    Network Development/ Widening of National Roads-

    Secondary Road-Abra-Ilocos Norte Road K0409+000-

    K0409+100, K0409+115-K409+178, K0409+307-K0409+404,

    K0409+531-K0409+648, K0409+748-K0410+139, K0410+159-

    K0410+360, K0410+369-K0410+777, K0411+050-K0411+220,

    K0412+122-K0412+499, K0413+000-K0414+354, K0414+764-

    K0415+747, K0416+175-K0416+445, K041

    11/20/15 Regional Office 81.971 286 OG 0.318 0.29 0.15 0.022 0.045 0.033 85.80%85.8%

    Satisfactory

    A. SANDOVAL CONSTRUCTION & SUPPLY 35991

    Construction and Maintenance of Bridges along National

    Roads - Retrofitting/Strengthening of Permanent Bridges

    Leviste Bridge 1 (B03170LZ) along Talisay - Laurel -

    Agoncillo Road, Laurel, Batangas

    11/13/15BATANGAS

    3RD DEO4.557 150 C 0.372 0.2 0.3 - - - 87.20%

    87.2%

    Satisfactory

    A.A. DE VERA CONSTRUCTION 6191

    Concreting /Road Upgrading (Unpaved to Paved) Jct. (TNR)

    Cortes-Balilihan-Catigbian-Macaas Road, K0046+592.75 -

    K0046+858.9, Tubigon, Bohol

    11/16/15 Bohol 1st 8.485 155 C 0.344 0.2 0.3 - - - 84.40%84.4%

    Satisfactory

    A.B. OPEA BUILDERS 33996

    Concreting of Barangay Roads, Brgy. Sooc-Haluban, Lupi,

    Camarines Sur 11/12/15Camarines Sur

    Fifth DEO1.881 60 C 0.359 0.172 0.3 - - - 83.10%

    83.1%

    Satisfactory

    A.C. MOJARES CONSTRUCTION, INC. 1771Concreting and Sidewalk Improvement of Phase 2, Scout

    Tobias St., Brgy. Laging Handa, Quezon City03/06/2014

    Quezon City

    2nd DEO10.018 207 O 0.394 0.24 0.15 0.015 0.028 0.05 87.70% -

    A.C. MOJARES CONSTRUCTION, INC. (DOING

    BUSINESS UNDER THE NAME AND STYLE OF

    A.C. MOJARES CONSTRUCTION)

    1771

    Construction/Improvement of Road and Bridge, Brgy.

    Obrero and Kristong Hari, Quezon City12/4/15 QC 2nd DEO 9.105 102 C 0.481 0.133 0.3 - - - 91.40%

    91.4%

    Very Satisfactory

    A.C. Rivero Development Corporation

    (Formerly: A.C. Rivero Construction)5122

    Const./Completion of Subang Daku Bridge, Subang Daku

    River, San Miguel08/17/12 VIII 42.820 220 O 0.383 0.300 0.150 0.030 0.040 0.033 93.60 -

    A.C. Rivero Development Corporation

    (Formerly: A.C. Rivero Construction)5122

    Const./Impv't. of San Miguel-Jct. Buac Rd., Daang Maharlika

    Rd (Km1207+000 - Km1209+454.40)08/19/12 VIII 35.731 220 O 0.349 0.289 0.150 0.030 0.045 0.033 89.60 -

    *1st/Final

    * For DPWH, only the region and PMO office are listed

    24th CPES Release Page3

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    A.C. Rivero Development Corporation

    (Formerly: A.C. Rivero Construction)5122

    Upgrading/Conc. of San Juanico-Basey-Sohoton Rd.,

    K0913+721.75-K0917+915.72, w/ exceptions08/07/12 VIII 47.065 200 O 0.357 0.240 0.150 0.030 0.040 0.033 85.00 -

    A.C. RIVERO DEVELOPMENT CORPORATION

    (Formerly: A.C. Rivero Construction)5122

    Rehab/Major Repair of Permanent Bridges, Amparo Bridge,

    Along Bdry, S. Leyte- Maasin-Macrohon-Sogod-Daang

    Maharlika

    03/06/2015Southern Leyte

    DEO8.928 150 C 0.426 0.133 0.3 - - - 85.90% *85.9% Satisfactory

    A.C. RIVERO DEVELOPMENT CORPORATION

    (Formerly: A.C. Rivero Construction)5122

    Off-Carriageway Improvement along Jct. Taft - Oras - San

    Policarpio-Arteche Road, K0950+000 - K0955+00029/06/2015

    Eastern Samar

    DEO33.355 150 O 0.297 0.3 0.15 0.03 0.04 0.033 85.00% -

    A.C. RIVERO DEVELOPMENT CORPORATION

    (Formerly: A.C. Rivero Construction)5122

    Completion of Dodiongan Bridge along Sta. Felomina-

    Bonbonon-Digkilaan-Rogongon Road, Brgy. Bonbonon,

    Iligan City K01526+058-K01526+118, K01526+910-

    K01526+297

    03/09/2015Lanao del Norte

    2nd DEO37.105 236 O 0.384 0.285 0.15 0.02 0.045 0.05 93.40% -

    A.C. RIVERO DEVELOPMENT CORPORATION

    (Formerly: A.C. Rivero Construction)5122

    Replacement of Permanent Weak Bridge, Ramon Magsaysay

    Bridge (B0469MN) along Jct. Switch-Jct.Monte Alegre Road29/08/2015

    Zamboanga del

    Sur 1st29.101 230 O 0.288 0.299 0.15 0.03 0.051 0.05 86.79% -

    A.C. RIVERO DEVELOPMENT CORPORATION

    (Formerly: A.C. Rivero Construction)5122

    Construction and Maintenance of Bridges along National

    Rd. (Replacement of Permanent Weak Bridge) at Olingan

    Bridge along Dipolog-Oroquieta National Road, Olingan,

    Dipolog City, Zamboanga del Norte

    11/16/15Zamboanga Del

    Norte 1st DEO21.218 220 OG 0.371 0.22 0.15 0.022 0.042 0.05 85.50%

    85.5%

    Satisfactory

    A.C. RIVERO DEVELOPMENT

    CORPORATION/JQD CONSTRUCTION AND

    GENERAL SERVICES JOINT VENTURE

    JV-14-1038

    Rehabilitation/Major Repair of Permanent Weak Bridges,

    Otikon Bridge Along Daang Maharlika (B00598LT), Libagon,

    Southern Leyte11/16/15

    Southern Leyte

    DEO31.056 195 OG 0.249 0.3 0.15 0.03 0.06 0.05 83.90%

    83.9%

    Satisfactory

    A.C. SOLIVEN CONSTRUCTION & GENERAL

    MERCHANDISE19278

    Construction of River Bank Protection along Marusay River,

    San Vicente Section10/06/2015

    Pangasinan 4th

    DEO18.228 116 C 0.35 0.2 0.3 - - - 85.00% *85% Satisfactory

    A.C. SOLIVEN CONSTRUCTION & GENERAL

    MERCHANDISE19278

    Construction of Bank Protection Works, Agnooo River Basin

    Flood Control Project (Phase III) Brgy. Bantog, Asingan,

    Pangasinan

    11/16/15PANGASINAN

    3RD DEO18.336 180 OG 0.389 0.24 0.15 0.03 0.055 0.05 91.40%

    91.4%

    Very Satisfactory

    A.D.P CONST. & SUPPLY 3466

    Network Development, Widening of National Road,

    Secondary Road along Roxas City-Cagay-Sibaguan

    Balijuagan-Cudian-Ivisan Road Chainage 0-200, Chainage

    942-1182 (0-200(0+304.50) (K0104+122.50) 942-1182

    (K0104+760-K0105+000)

    02/09/2015 Capiz 1st 10.341 121 C 0.418 0.133 0.3 - - - 85.10%*85.1%

    Satisfactory

    A.D.P Construction & Supply 3466 Impvt./Conc. of Access Road, Tubalan Port, Tubalan 06/14/10 XI 58.261 320 O 0.338 0.300 0.000 0.030 0.040 0.033 74.10 -

    A.D.P Construction & Supply 3466

    Rehab./Reconst./Upgrading of Damaged Paved National

    Road, Roxas City Boundary-Panitan Road-Jct. Bailan Road,

    Capiz (KM.112+750-Km.122+705) with exception

    08/31/10 VI 53.673 225 O 0.364 0.240 0.150 0.030 0.051 0.050 88.50 -

    A.D.P Construction & Supply 3466

    Malag-it Box Culvert along Iloilo East Coast-Capiz Road

    (Construction of Malag-it Bridge along Iloilo East Coast-

    Capiz Road)

    29/10/2014 VI 35.132 240 O 0.388 0.249 0.000 0.030 0.054 0.033 75.40%75.40%

    Unsatisfactory

    A.D.P Construction & Supply 3466Widening of Caradio-an Bridge alog Bacolod South Road,

    Barangay Caradio-an23/10/2014 VI 24.804 273 O 0.378 0.221 0.034 0.030 0.045 0.033 74.10%

    74.10%

    Poor

    A.D.P Construction & Supply 3466Construction/Rehab. Of Drainage System along Balasan-

    Carles Road, Brgy. Barosbos29/10/2014 VI 43.954 274 O 0.373 0.218 0.150 0.030 0.054 0.050 87.50%

    87.50%

    Satisfactory

    A.D.P Construction & Supply 3466 Construction of Multi-Purpose Building 28/10/2014 VI 4.227 120 O 0.362 0.214 0.121 0.030 0.049 0.050 82.60%82.60%

    Satisfactory

    A.D.P Construction & Supply 3466

    Road Upgrading (Gravel to Paved) along Davao-Sarangani

    Coastal Road km. 1671+600 to km. 1673+060, Biton-Lanao

    Section

    07/08/2014 XI 40.082 208 O 0.014 0.300 0.000 0.030 0.014 0.000 35.80 -

    A.D.P Construction & Supply 3466Rd. Upgrading (Gravel to Paved) along Davao-Sarangani

    Coastal Rd., Km.1671+600-Km.1673+060, Biton-Lanao Sect.08/06/13 XI 40.082 179 O 0.322 0.248 0.000 0.030 0.033 0.033 66.60 -

    A.D.P Construction & Supply 3466Const. of Slope Protection along Jct. Bancal-Leon-Antique

    Boundary Rd., K0031+722-K0031+89103/22/13 VI 13.802 188 O 0.388 0.241 0.150 0.030 0.055 0.050 91.40 -

    *1st/Final

    * For DPWH, only the region and PMO office are listed

    24th CPES Release Page4

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    A.D.P. CONST. & SUPPLY 3466

    Network Development, Widening of National Road,

    Secondary Road along Roxas City, Cagay-Sibaguan

    Balijuangan-Cudian-Ijisan Road

    06/06/2015 Capiz First DEO 10.341 121 O 0.368 0.251 0.105 0.03 0.035 0.033 82.20% -

    A.D.P. CONST. & SUPPLY 3466 Widening of Sara-San Dionisio Road 09/06/2015 Iloilo Third DEO 26.054 175 O 0.344 0.252 0.15 0.022 0.035 0.05 85.30% -

    A.D.P. CONST. & SUPPLY 3466Construction of Drainage System along Iloilo East Coast

    Capiz Road09/06/2015 Iloilo Third DEO 44.467 252 O 0.37 0.247 0.15 0.022 0.035 0.05 87.40% -

    A.D.P. CONST. & SUPPLY 3466Retrofitting/Strengthening of Cabiri-an Bridge (B00165PN)

    along Guimbal-Tubungan Road03/06/2015 Iloilo First DEO 9.3 90 C 0.5 0.133 0.3 - - - 93.30%

    *93.3% Very

    Satisfactory

    A.D.P. CONST. & SUPPLY 3466Widening of Sara - San Dionisio Road, K0203+ (-882) -

    K0203+24329/08/2015 Iloilo 3rd 26.054 175 C 0.449 0.133 0.3 - - - 88.20%

    *87.3%

    Satisfactory

    A.D.P. CONST. & SUPPLY 3466

    Construction/Improvement of Access Road Leading to

    Declared Tourism Destination, Hanay-Hanay Road leading to

    Twin Lake, San Jose, 2nd District, Negros Oriental11/11/15

    Negros Oriental

    2nd DEO9.310 131 C 0.457 0.133 0.3 - - - 89.00%

    89%

    Satisfactory

    A.F.G. CONSTRUCTION AND

    CONSTRUCTION SUPPLY17161

    Rehabilitation/Reconstruction/Upgrading of Damaged Paved

    National Road including Drainage Based on Pavement

    Management System / Highway Development and

    Management - 4 (HDM-4) (Intermittent Section) along

    Hinigaran - Isabela Road, K0058+263 - K0059+000

    27/08/2015Negros

    Occidental 2nd12.674 127 O 0.358 0.239 0.15 0.03 0.05 0.033 86.00% -

    A.F.G. Construction and Construction Supply 17161Odiong-Sibalom-San Remegio-Leon Rd. Upgrading (Gravel

    to Paved), Km. 129+328-Km. 131+27508/15/13 VI 40.453 179 O 0.336 0.240 0.150 0.030 0.037 0.033 82.60 -

    A.F.G. Construction and Construction Supply 17161Const. of Two (2) Storey, Eight (8) Cl Sch. Bldg., Leonora

    Salapantan NHS08/22/13 VI 8.949 150 O 0.347 0.200 0.108 0.030 0.032 0.033 75.00 -

    A.F.G. Construction and Construction Supply 17161 Const. of Tangalan-Ibajay Rd. 03/19/13 VI 45.834 179 O 0.387 0.259 0.150 0.024 0.030 0.033 88.30 -

    A.F.G. Construction and Construction Supply 17161 Replacement/Const. of Tubog Bridge, Brgy. Tubog 08/15/12 VI 7.587 180 O 0.372 0.230 0.150 0.010 0.035 0.033 83.00 -

    A.F.G. CONSTRUCTION AND CONSTRUCTION

    SUPPLY17161

    Construction of 2-CL Alimanguan National High School

    Brgy. Alimanguan05/06/2015

    Palawan 1st

    DEO1.721 120 O 0.36 0.24 0.15 0.03 0.047 0.033 86.00% -

    A.F.G. CONSTRUCTION AND CONSTRUCTION

    SUPPLY17161

    Construction/Improvement of J.M. Basa-Gen. Hughes-Fort

    San Pedro Road02/06/2015 Iloilo City DEO 23.375 155 C 0.386 0.2 0.3 - - - 88.60% *88.6% Satisfactory

    A.F.G. CONSTRUCTION AND CONSTRUCTION

    SUPPLY17161

    Widening of Jct. New Sagay - Old Sagay Rd with drainage,

    K0084 + (-828) - K0085+337, Sagay City, Negros Occidental 11/19/15Regional Office,

    NIR49.212 245 C 0.44 0.135 0.3 - - - 87.50%

    87.5%

    Satisfactory

    A.F.G. CONSTRUCTION AND CONSTRUCTION

    SUPPLY17161

    Construction/Upgrading/Rehabilitation of Drainage along

    Bacolod North Road, K0005+(-135) - K0006+622, Talisay City,

    Negros Occidental

    11/18/15

    Negros

    Occidental 1st

    DEO

    9.297 252 C 0.454 0.133 0.3 - - - 88.70%88.7%

    Satisfactory

    A.F.G. CONSTRUCTION AND CONSTRUCTION

    SUPPLY17161

    Rehabilitation /Reconstruction/ Upgrading of Damaged

    Paved National Road including Drainage Based on

    Pavement Management System / Highway Development and

    Management - 4 (HDM-4) (Intermittent Section), along

    Hinigaran-Isabela Road, K0058+263 - K0059+000, Barangay

    Paticui, Hinigaran, Negros Occidental

    11/16/15

    Negros

    Occidental 2nd

    DEO

    12.674 157 C 0.427 0.134 0.3 - - - 86.10%86.04%

    Satisfactory

    A.F.G. CONSTRUCTION AND CONSTRUCTION

    SUPPLY/REDSON CONSTRUCTION AND

    SUPPLIES (JOINT VENTURE)

    JV-13-257Rehab./Reconstruction/Upgrading/Concreting of Access

    Road Leading to Gawahon Resort, with exceptions12/06/2015

    Negros First

    DEO36.23 280 C 0.356 0.2 0.3 - - - 85.60% *85.6% Satisfactory

    A.F.G. CONSTRUCTION AND SUPPLY 27999

    Construction of Farm to Market Road, Barangay

    Laguinbanwa West, Numancia, Aklan11/16/15 Aklan 4.652 80 C 0.421 0.2 0.3 - - - 92.10%

    92.1%

    Very Satisfactory

    *1st/Final

    * For DPWH, only the region and PMO office are listed

    24th CPES Release Page5

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    A.I.P. CONSTRUCTION 32458

    Rehabilitation/Reconstruction/Upgrading of Damaged Paved

    National Roads including Drainage Based on Pavement

    Management System/Highway Development and

    Management-4 (HDM-4) (Intermittent Section), Lt. Takay

    Road, K0308+(-599) to K0308+000 & K0308+616 to

    K0308+754, Baguio City

    04/09/2015Baguio City

    DEO13.442 104 O 0.36 0.228 0.15 0.03 0.056 0.05 87.40% -

    A.J Taylan Construction Corporation 2336Road Opening/Const. of Missing Links of National Road,

    Solsona-Kabugao Road, Ilocos Norte Side09/09/09 I 48.199 300 O 0.379 0.250 0.150 0.030 0.050 0.033 89.20 -

    A.J. Lava Builders 22265Repair & Maint. of Flood Control & Drainage Structures

    along Rofriguez-San Jose-Quezon City Rd.11/19/12 IVA 2.449 90 O 0.337 0.300 0.150 0.030 0.025 0.033 87.50 -

    A.J. LAVA BUILDERS CORP. (Formerly: A.J.

    Lava Builders)22265

    National Road Services - Network Development - Widening

    of National Road - Arterial Roads, Marikina-Infanta Roads,

    K0 035+540 - K0 036+440, K0 037+290 - K0 037+484

    26/08/2015 Rizal 1st 19.6 180 C 0.454 0.133 0.3 - - - 88.70%*88.7%

    Satisfactory

    A.J. Taylan Construction Corp/FR Espiritu Jr.

    Builders (JV)JV-14-074 Additional Priority Flood Control Project 21/10/2014 I 41.179 163 O 0.299 0.276 0.150 0.030 0.056 0.050 86.10%

    86.10%

    Satisfactory

    A.J. TAYLAN CONSTRUCTION CORPORATION 2336

    Laoag River Basin Flood and Sabo Project, Concrete

    Revetment along Bongo River Brgy. Sta. Monica, Sitio 2,

    San Nicolas, Ilocos Norte

    11/13/15

    ILOCOS

    NORTE 2ND

    DEO

    9.650 194 OG 0.38 0.24 0.15 0.03 0.055 0.05 90.50%90.5%

    Very Satisfactory

    A.J. Taylan Construction Corporation/Zedik

    Builders (JV)JV-13-345

    Road Upgrading (Gravel to Paved) Based on Gravel Road

    Strategies, Traffic Benchmark for Upgrading to Paved

    Standard (HDM-4 Project Analysis) of Piniti-Banna (Espiritu)

    Road

    08/08/2014 I 28.942 236 O 0.380 0.240 0.150 0.030 0.055 0.033 88.80 -

    A.L Gantuangco Construction 30872Construction of the Diversion Works and Canal System of

    Libertad CIP - Phase 211/15-20/2010 NIA 16.060 202 O 0.373 0.264 0.150 0.023 0.038 0.050 89.69 -

    A.L Gantuangco Construction 30872 Benolho CIS 10/6-10/08 NIA 3.720 90 O 0.277 0.180 0.050 0.020 0.038 0.100 66.50 -

    A.L. Dare Construction 11932Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd. (Int.

    Sect.) at Candaba-San Miguel Rd., K0070+290-K0071+18407/29/13 III 11.909 139 O 0.319 0.240 0.136 0.030 0.055 0.033 81.30

    A.L. DARE CONSTRUCTION -Rehabilitation/Construction of Slope Protection along

    Cabetican, Bacolor, Pampanga01/06/2015

    Pampanga 1st

    DEO6.32 118 C 0.333 0.2 0.3 - - - 83.30% *83.3% Satisfactory

    A.L. SALAZAR CONSTRUCTION INC. 3899Drainage Improvement of Commonwealth Avenue Drive to

    Zuzuaregui, Brgy. Batasan Hills, Quezon City25/08/2015 QC 1st DEO 17.562 270 O 0.38 0.24 0.15 0.023 0.045 0.05 88.80% -

    A.L. Salazar Construction, Inc. 3899Rehabiliation/Improvement of drainage System along C-3

    Road22/11/2014 NCR 17.425 209 O 0.380 0.240 0.150 0.030 0.045 0.033 87.80%

    87.80%

    Satisfactory

    A.L. Salazar Construction, Inc. 3899Const./Widening/Upgrading/Rehab. of Access Rd. to Taytay-

    Bantulan Port (Km.210+000-Km.214+211)03/12/13 IVB 89.312 450 O 0.364 0.300 0.030 0.030 0.055 0.033 81.20 -

    A.L. Salazar Construction, Inc. 3899Const./Widening/Upgrading/Rehab. of Access Road

    (Km.210+000-Km.214+211)08/03/12 IVB 81.362 349 O 0.332 0.240 0.150 0.030 0.045 0.050 84.70 -

    A.L.R. Construction Corporation 24110 Completion of 2-Storey 4-CL @ Landayan E/S 02/24/10 IVA 5.030 225 O 0.354 0.300 0.150 0.015 0.018 0.033 87.00 -

    A.M. AYUNAN CONSTRUCTION 13983Construction/Rehabilitation of Brgy Hall

    11/11/15Cotabato First

    DEO0.924 75 OG 0.363 0.16 0.052 0.03 0 0.016 62.10%

    62.1%

    Poor

    A.M. Oreta & Co., Inc./IBC Int'l Builders Corp.

    (JV)JV-07096 Kalibo Airport Development Project 06/17/15 DOTC 287.056 360 O 0.381 0.300 0.150 0.020 0.044 0.033 92.80 -

    A.M. Oreta / IBC (Joint Venture) JV-11-210Const. of Drainage System along Iloilo-Capiz Rd. (Old

    Route) Nat'l Rd. CPU Sect., Iloilo City08/06/12 VI 42.875 240 O 0.321 0.239 0.150 0.030 0.055 0.050 84.50 -

    A.M. TABAYAG BUILDERS 15008

    Construction/Concreting of Local Road, Lower Bayao,

    Tukuran, Zamboanga del Sur 11/13/15Zamboanga Del

    Sur 1st DEO2.938 45 C 0.422 0.133 0.3 - - - 85.50%

    85.5%

    Satisfactory

    A.P Palacios Construction 29021 Rehab./Impvt. of Dikidit-Suguit FTMR 09/08/09 III 4.723 150 O 0.300 0.300 0.150 0.030 0.050 0.033 86.30 -

    A.P. CONSEBIDO CONSTRUCTION AND

    TRADING33616

    Cnstruction of Barangay Road (New Road with PCCP

    Surfacing), Brgy. Tagumpay Sta. 000+008.10- Sta. 000+22504/06/2015

    Palawan 1st

    DEO1.866 40 C 0.456 0.133 0.3 - - - 88.90% *88.9% Satisfactory

    A.P. CONSEBIDO CONSTRUCTION AND

    TRADING33616

    Construction of Barangay Road (New Road with PCCP

    Surfacing) Brgy, Tagumpay Sta. 000+0008.10-Sta.

    000+225.00, Roxas, Palawan

    26/08/2015 Palawan I DEO 1.866 40 C 0.425 0.136 0.3 - - - 86.10%*86.1%

    Satisfactory

    A.P. CONSEBIDO CONSTRUCTION AND

    TRADING33616

    Repair/Maintenance of Tagbulan River Revetment,

    K0143+955, Roxas-Taytay Road, Brgy. Minara11/13/15

    Palawan 1st

    DEO2.415 45 C 0.428 0.133 0.3 - - - 86.10%

    86.1%

    Satisfactory

    A.P.B. Construction 17055Rehab./Reconst./Upgrading of Damaged Paved National

    Road, PMA cut-off Road 2 K0+000-K0+36008/18/11 CAR 5.610 102 O 0.370 0.240 0.000 0.030 0.042 0.033 71.50 -

    *1st/Final

    * For DPWH, only the region and PMO office are listed

    24th CPES Release Page6

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    A.P.B. CONSTRUCTION 17055

    Off-Carriageway Improvement along Baguio-Bontoc Road,

    K0253+(-586) to K0253+000, K0259+450 to K0259+600,

    K0260+500 to K0262+000

    02/06/2015Benguet 1st

    DEO18.999 150 O 0.333 0.274 0.149 0.03 0.05 0.035 87.10% -

    A.P.B. CONSTRUCTION 17055

    Improvement/Upgrading of Naguilian-Bagulin Road Leading

    to Tudingan Falls and Kedlap Burial Cave Sta. 266+980 to

    Sta. 271+279, Naguilian, La Union

    30/08/2015La Union 2nd

    DEO41.295 179 O 0.335 0.287 0.15 0.023 0.037 0.05 88.20% -

    A.P.O. General Construction 7010

    Road Upgrading (Gravel to Paved) along Acop-Kapangan-

    Kibungan-Bakun Road, K0283+636 - K0283+796, K0287+621 -

    K0287+685, K0289+214 - K0289+473, K0289+549 -

    K0289+709, K0290+901 - K0291+000, K0292+016 -

    K0292+114, K0298+781 - K0299+514, K0299+531 - K0299+816

    20/11/2014 CAR 72.026 267 O 0.362 0.240 0.150 0.030 0.061 0.050 89.30%89.30%

    Very Satisfactory

    A.P.O. General Construction 7010Rd. Upgrading (Gravel to Paved) Int. Sect., Acop-Kapangan-

    Kibungan-Bakun Rd., K0348+000-K0349+00008/01/13 CAR 23.654 207 O 0.356 0.239 0.150 0.023 0.048 0.050 86.60 -

    A.P.O. General Construction 7010

    Rd. Upgrading (gravel to concrete) along Acop-Kapangan-

    Kibungan-Bakun Rd., K0285+444-K0286+840 V.S.

    (K0285+423-K0286+836 as per RBIA) & K0345+470-

    K0348+000 V.S. (K0345+500-K0348+000 as per RBIA)

    11/21/12 CAR 59.896 237 O 0.333 0.240 0.150 0.015 0.047 0.050 83.50 -

    A.P.O. GENERAL CONSTRUCTION 7010

    Road Upgrading (Gravel to Paved) along Acop-Kapangan-

    Kibungan-Bakun Road, K0283+636 - K0283+796, K0287+621 -

    K0287+685, K0289+214 - K0289+473, K0289+549 -

    K0289+709, K0290+901 - K0291+000, K0292+016 -

    K0929+114, K0296+781 - K0299+514, K0299+531 - k0299+816

    03/06/2015 CAR 72.026 267 C 0.398 0.175 0.3 - - - 87.30% *88.5% Satisfactory

    A.P.O. GENERAL CONSTRUCTION 7010

    Road Upgrading (Unpaved to Paved) Based on Gravel Road

    Strategies, Traffic Benchmark for Upgrading to Paved Road

    Standards (HDM-4 Project Analysis) (Intermittent Sections)

    along Mt. Province - Ifugao Road (Kiling - Paracelis Section),

    K0460+508 to K0460+868, K0467+904 to K0469+000,

    K0471+451 to K0472+061, K0473+155 to K0473+582,

    K0474+350 to K0474+368, K0477+312 to K0477+341,

    Paracelis, Mt. Province

    29/08/2015 CAR 54.883 237 O 0.367 0.246 0.15 0.03 0.051 0.05 89.40% -

    A.R. & Mark Builders 31673 Const. of Multi-Purpose Building, BUSECO Compound 21/10/2014 X 7.920 124 O 0.304 0.240 0.017 0.010 0.022 0.033 62.60%62.60%

    Poor

    A.R. & Mark Builders 31673Const. of 1-Storey, 1-CL & 1-Storey, 1-CL Kinder at Maramag

    South PS, Pob.08/08/13 X 1.448 187 O 0.393 0.235 0.120 0.030 0.023 0.033 83.40 -

    A.R. & MARK BUILDERS 31673

    Cluster 2014-28, Construction of Roads; Municipalities of El

    Salvador (Brgy. Sinaloc, Bolisong, Himaya, Sambulawan);

    Jasaan (Brgy. Kimaya, Luz Banson), Misamis Oriental11/16/15

    Misamis

    Oriental 2nd8.348 105 C 0.207 0.2 0.3 - - - 70.70%

    70.7%

    Poor

    A.R. Lustre Jr. Construction 7680Conc. of Puerto Princesa South Rd. (Aborlan Sect.

    Km.60+024.80-Km.64+000 w/ exceptions)03/15/13 IVB 62.614 240 O 0.362 0.240 0.150 0.030 0.055 0.033 87.00 -

    A.R. Lustre, Jr. Construction 7680Const. of Taguliat Bridge along PPSR-JCT-Napsan-

    Apurawan Rd., K0037+67508/15/13 IVB 18.839 515 O 0.373 0.300 0.047 0.030 0.042 0.033 82.50 -

    A.R.T. DWELL LIFESTYLE STORE and ECO

    BUILDERS38284

    Rehab./Reconst./Upgrading of Damaged Paved National

    Road Including Drainage Based on Pavement Management

    System Highway Development & Management-4 (Intermittent

    Section), Angeles-Porac-Floridablanca-Dinalupihan Road at

    K0084+(-305) - K0084+122

    11/13/15Pampanga

    Third DEO5.855 75 C 0.458 0.133 0.3 - - - 89.10%

    89.1%

    Very Satisfactory

    A.S.S. Construction 31509 Completion of ACA Building II 05/14-15/09 DOST 9.631 210 O 0.380 0.296 0.150 0.030 0.062 0.050 96.80 -

    A.S.T. BUILDERS 34104Widening of National Roads, Secondary Roads, R. Palma

    Street, Chainage 0 - Chainage 38, Chainage 0 - Chainage 37903/09/2015 Cebu City 7.71 150 C 0.432 0.178 0.3 - - - 91.00%

    *91% Very

    Satisfactory

    A.T. DUMLAO CONSTRUCTION INC. 34028

    Rehabilitation/Reconstruction of National Roads with Slips,

    Slope Collapse and Landslide along NRJ Cuevas-Bislig

    Road, K1378+327 - K1378+443 (RBIA Chainage), K1378+320 -

    K1378+450 (Survey), (S00464MN), Trento, Agusan del Sur)

    11/11/15Agusan del Sur

    2nd DEO25.215 208 OG 0.383 0.252 0.15 0.03 0.045 0.05 91.00%

    91%

    Very Satisfactory

    *1st/Final

    * For DPWH, only the region and PMO office are listed

    24th CPES Release Page7

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    A.T. DUMLAO CONSTRUCTION, INC. 34028

    Construction/Widening of Adlayan Bridge Along Daang

    Maharlika (Agusan-Davao Section) (B00914MN) K1307+585-

    K1307+614.80

    25/08/2015Agusan del Sur

    2nd36.641 377 C 0.463 0.133 0.3 - - - 89.60%

    *85.52%

    Satisfactory

    A.T. Dumlao Construction, Inc. (Formerly:

    Andoni T. Dumalao Civil Engineer -

    Contractor)

    34028

    Construction/Widening of Adlayan Bridge along Daang

    Maharlika (Agusan - Davao Section) K1307+585 -

    K1307+614.8

    08/08/2014 XIII 36.650 196 O 0.400 0.240 0.060 0.030 0.065 0.033 82.80 -

    A.T. Dumlao Construction, Inc. (Formerly:

    Andoni T. Dumlao Civil Engineer-Contractor)34028

    Replacement of San Pedro Bridge along Daang Maharlika

    (Surigao-Agusan Rd.) Brgy. San Pedro11/21/12 XIII 14.945 390 O 0.360 0.231 0.127 0.030 0.055 0.033 83.60 -

    A.T. Dumlao Construction, Inc. (Formerly:

    Andoni T. Dumlao Civil Engineer-Contractor)34028

    Replacement of Lengigon Bridge (Temporary to Permanent)

    along Argao - Moalboal Road, Municipality of Argao24/10/2014 VII 12.230 270 O 0.400 0.300 0.000 0.030 0.055 0.000 78.50%

    78.50%

    Unsatisfactory

    A.T. Dumlao Construction, Inc. (Formerly:

    Andoni T. Dumlao, Civil Engineer - Contractor)34028

    Reconst. of Timamana Bridge along Daang Maharlika

    Highway (Surigao-Agusan Rd.), Brgy. Timamana03/14/13 XIII 24.213 496 O 0.305 0.252 0.150 0.030 0.056 0.050 84.30 -

    A.T. DUMLAO CONSTRUCTION, INC.

    (Formerly: Andoni T. Dumlao, Civil Engineer -

    Contractor)

    34028Widening of Permanent Bridge (from 1 lane to 2 lane) at

    Sumaguan Bridge along Argao - Moalboal Road29/08/2015 Cebu 4th 24.872 191 C 0.355 0.2 0.3 - - - 85.50%

    *85.5%

    Satisfactory

    A.T. Dumlao Construction, Inc. (Formerly:

    Andoni T. Dumlao, Civil Engineer-Contractor)34028

    Replacement of San Pedro Bridge along Daang Maharlika

    (Surigao-Agusan Rd.), Brgy. San Pedro03/14/13 XIII 15.781 435 O 0.355 0.223 0.150 0.030 0.035 0.033 82.60 -

    A.T. Dumlao Construction, Inc. (Formerly:

    Andoni T. Dumlao, Civil Engineer-Contractor)34028

    Rehab./Reconst. of Hubang Bridge along Daang Maharlika

    (Agusan-Davao Rd.) Km.1307+369-Km.1307+53603/09/13 XIII 19.141 380 O 0.338 0.300 0.000 0.030 0.058 0.033 75.90 -

    A.T. DUMLAO CONSTRUCTION, INC.

    (Formerly: Andoni T. Dumlao, Civil Engineer-

    Contractor)

    34028Replacement of Lengigon Bridge( Temporary to Permanent)

    along Argao-Boalboal Road11/06/2015

    Cebu Fourth

    DEO13.23 300 C 0.477 0.16 0.3 - - - 93.70%

    *84.58%

    Satisfactory

    A.V. CONSTRUCTION & SUPPLY (Formerly:

    A.V. Construction)13202

    Construction of Two (2) Storey, Two (2) Classroom School

    Building at Marcos E/S12/06/2015

    Laguna 3rd

    DEO4.196 90 C 0.365 0.161 0.3 - - - 82.60% *82.6% Satisfactory

    A.V. CONSTRUCTION AND SUPPLY

    (Formerly: A.V. Construction)13202

    Concreting of Tiguion-Canaon-Talao Farm to Market Road11/16/15

    Marinduque

    DEO5.698 85 C 0.449 0.133 0.3 - - - 88.20%

    88.2%

    Satisfactory

    A.V.M. Construction and Supplies 114114 NHA Bayside Subdivision Housing Project 10/24/14 NHA 19.225 330 O 0.376 0.300 0.095 0.030 0.023 0.033 85.74 -

    A.Y.U. ENGINEERING AND CONSTRUCTION 25632

    Improvement/Rehabilitation @ Quimpo Boulevard Ecowest

    Drive, Ecoland, Barangay Bucana, Brgy. 76-A, Davao City 11/19/15Davao City 1st

    DEO0.000 149 C 0.479 0.133 0.3 - - - 91.20%

    91.2%

    Very Satisfactory

    AB Aponesto Construction, Parts & Supply 22998Conc. of Lublub-Bolilac-Salad Road, Km.277+707.50-

    Km.278+71109/05/10 VI 14.425 192 O 0.356 0.240 0.150 0.030 0.042 0.033 85.10 -

    ABJ CONTRACTOR SERVICES 35865Construction of Farm-to-Market Road, Guiwan, Zamboanga

    City11/18/15

    Zamboanga

    City DEO2.819 68 C 0.402 0.133 0.3 - - - 83.50%

    83.5%

    Satisfactory

    Abulug Construction Company, Inc. 5593 Const. of Colony Road 11/13/08 II 2.894 120 O 0.329 0.240 0.100 0.030 0.033 0.100 83.20 -

    Abulug Developers & Builders Co., Inc. 2366Reblocking along Manila North Road (Fugu Bdry.-Bangag

    Section)05/21/09 II 19.299 210 O 0.368 0.240 0.150 0.030 0.051 0.033 87.20 -

    AC RIVERO DEVELOPMENT CORPORATION 5122

    Const./Imprv't of Access Road to Sabsaban Falls & Eco Park

    11/10/15Palawan 2nd

    Deo31.345 172 OG 0.308 0.3 0.15 0.006 0.035 0.033 83.20%

    83.2%

    Satisfactory

    AC Rivero Development Corporation

    (Formerly: AC Rivero Construction)5122

    Const. of Bridge at Dodiongan Box Culvert along Sta.

    Felomina-Bonbon-Digkilaan-Rogongon Road29/10/2014 X 24.567 295 O 0.339 0.278 0.150 0.010 0.051 0.050 87.80%

    87.80%

    Satisfactory

    ACCELERATED METAL TECHNOLOGY &

    CONSTRUCTION, INC. (Formerly: A.M.

    Tumolva Construction and Development

    Corp.)

    32073Construction of Multi-Purpose Building at Delnacia Subd.,

    Brgy. Talipapa, Quezon City25/08/2015 QC 1st DEO 4.749 120 C 0.487 0.2 0.3 - - - 98.70%

    *98.7%

    Outstanding

    Accuracy Builders Enterprise 27507 Rehabilitation of Banaue Hotel Roofing 01/13/14 TIEZA 19.880 180 S 0.304 0.300 0.052 0.150 0.008 0.033 71.14 -

    ACJ Construction Resources 10635

    Road Upgrading of Nat'l Rd. (Gravel to Concrete) Nat'l

    Secondary Rd., Km.1628+584-Km.1630+803 along

    Kidapawan-Magpet-Pangao-an Rd.

    08/17/11 XII 24.178 180 O 0.342 0.300 0.000 0.030 0.045 0.033 75.00 -

    ACJ Construction Resources 10635Conc. of Paco-Roxas-Arakan Road Kiyaab-Antipas Section

    (Km. 1648+300-Km.1649+385.63)09/05/09 XII 16.826 150 O 0.324 0.300 0.150 0.015 0.042 0.050 88.10 -

    ACJ Construction Resources 10635Concreting of Poblacion Magpet-Nowa Road (Nowa Basak

    Sect.) 03/10/09 XII 18.798 180 O 0.356 0.284 0.150 0.030 0.035 0.050 90.50 -

    *1st/Final

    * For DPWH, only the region and PMO office are listed

    24th CPES Release Page8

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    ACJ Construction Resources 10635

    Rd. Upgrading (Gravel to Conc.) Nat'l Secondary Rd.,

    K1657+(-247)-K1659+824 along Paco-Roxas-Arakan Valley

    Rd.

    08/10/12 XII 46.844 384 O 0.354 0.244 0.150 0.030 0.051 0.050 87.90 -

    Acme Builders Corporation 6442Rd. Upgrading of Tigbao-Sta. Fe-San Miguel Rd., K0910+000-

    K0911+500 & K0913+000-K0913+90008/22/13 VIII 55.416 270 O 0.383 0.240 0.150 0.012 0.042 0.050 87.70 -

    Acme Builders Corporation 6442Rehab./Strengthening of Rosales Bridge along Daang

    Maharlika (SM) (San Isidro-San Juanico Bridge)08/14/13 VIII 25.251 165 O 0.393 0.242 0.150 0.030 0.060 0.033 90.80 -

    Acme Builders Corporation 6442Rehab./Reconst./Impvt./Upgrading of Damaged Pavement,

    Tacloban Baybay South Rd.06/17/10 VIII 34.600 150 O 0.366 0.300 0.150 0.030 0.032 0.033 91.10 -

    Acme Builders Corporation 6442 Construction of Bagacay Bridge 03/02/09 VIII 39.122 332 O 0.319 0.288 0.000 0.030 0.023 0.050 71.00 -

    Acme Builders Corporation / B. Vicencio

    ConstructionJV-07-066

    Const. of Palo East By Pass Road (Const. of Bernard Reed II

    Bridge)08/31/09 VIII 57.823 616 O 0.384 0.240 0.150 0.030 0.047 0.033 88.40 -

    Acme Builders Corporation / MWJ

    Construction (JV)JV-08-243

    Const. of Albuera-Burauen Road including Bridges, Burauen

    Sect.09/02/09 VIII 47.235 240 O 0.352 0.245 0.150 0.030 0.045 0.050 87.20 -

    Adfil Corporation 14437Rehab./Reconst. of Damaged Paved National Roads

    Gingoog-Calveria-Villanueva Road09/10/09 X 96.400 405 O 0.259 0.300 0.150 0.030 0.061 0.050 85.00 -

    Adfil Corporation 14437Const./Improvement of Road to Support River Rhine Cruise

    leading to Banza Ruins, Barangay Banza14/08/2014 XIII 26.706 148 O 0.332 0.254 0.150 0.030 0.070 0.050 88.60 -

    Adfil Corporation 14437

    Rehab./Reconstruction/Replacement/Retrofitting of

    Magsaysay Bridge along Butuan - Cagayan de Oro - Iligan

    (Agusan - Misamis Oriental)

    15/08/2014 XIII 36.843 234 O 0.384 0.234 0.150 0.030 0.047 0.050 89.50 -

    Adfil Corporation 14437Construction of Agusan - Bukidnon Road, Sta. 1262+260 -

    Sta. 1265+12005/08/2014 XIII 40.140 209 O 0.360 0.264 0.150 0.030 0.037 0.050 89.10 -

    Adfil Corporation 14437Repair/Maintenance with Asphalt Overlay of Tabon-Tabon

    Slip along Agusan- Davao Road06/17/10 XIII 32.364 225 O 0.371 0.240 0.150 0.030 0.055 0.033 87.90 -

    Adfil Corporation 14437 Rehab. of Magsaysay Bridge along Iligan City 09/09/10 XIII 48.161 300 O 0.352 0.300 0.150 0.030 0.055 0.050 93.70 -

    Adfil Corporation 14437

    Rehab./Reconst. of Damaged Paved National Rd. along

    Butuan City-CDO-Iligan Rd.,(Agusan-Misamis Oriental

    Sect.)Libertad-Bancasi Sect.

    09/16/09 XIII 54.954 285 O 0.371 0.300 0.150 0.030 0.055 0.050 95.60 -

    Adfil Corporation 14437Const./Completion/Continuation of Unfinished Bridge and

    Approaches, Brgy. Libertad09/16/09 XIII 23.830 195 O 0.364 0.300 0.150 0.030 0.055 0.050 94.90 -

    Adfil Corporation 14437 Concreting of NRJ-Bahbah-Talacogon Rd. 09/13/09 XIII 15.872 225 O 0.371 0.244 0.150 0.030 0.065 0.050 91.00 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Construction of Agusan-Bukidnon Road, Sta. 1262+260 -

    Sta. 1265+12021/10/2014 XIII 40.140 271 O 0.387 0.182 0.150 0.024 0.065 0.050 85.80%

    85.80%

    Satisfactory

    Adfil Corporation (Formerly: Adfil

    Construction)14437 Rehab./Reconst. of Ampayon Bridge along Daang Maharlika 08/23/13 XIII 19.207 219 O 0.397 0.240 0.150 0.018 0.040 0.050 89.50 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Widening/Conc. of Add'l. Lane Both Directions along Butuan

    City-Cagayan de Oro-Iligan Rd., K1249+461-K1253+310.5008/06/13 XIII 86.661 240 O 0.390 0.238 0.150 0.030 0.035 0.050 89.30 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Road Upgrading (Gravel to Paved) of Butuan City-Pianing-

    Tandag Road, K1237+055 - K1240+040, with exceptions30/10/2014 XIII 127.287 270 O 0.346 0.240 0.150 0.024 0.056 0.050 86.60%

    86.60%

    Satisfactory

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Reconstruction/Replacement/Completion of Minusong

    Bridge along Butuan-Cagayan de Oro-Iligan Road (Agusan--

    Misamis Oriental), Km1269+217

    21/10/2014 XIII 34.627 270 O 0.343 0.286 0.150 0.030 0.065 0.050 92.40%92.40%

    Very Satisfactory

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Rehab./Reconst./Replacement/Retrofitting of Salvacion

    Bridge along NRJ Cuevas - Bislig Road, K1374+670 -

    K1374+731

    08/08/2014 XIII 36.656 196 O 0.400 0.200 0.150 0.030 0.042 0.050 87.20 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Rehab./Reconst./Upgrading of Butuan City-Cagayan de Oro-

    Iligan City Rd. a)K1494+049-K1495+240; b)K1499+692-

    K1499+712; c)K1500+678-K1500+902; d)K1501+905-

    K1507+000; e)K1508+000-K1508+919

    03/12/13 X 48.167 285 O 0.293 0.271 0.150 0.010 0.050 0.050 82.40 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rds.,

    Butuan City-Cagayan de Oro City-Iligan City Rd.:

    a.)K1494+049-K1495+240; b.)K1499+692-K1499+712;

    c.)k1500+678-K1500+902; d.)K1501+905-K1507+000;

    e.)K1508+000-K1508+919

    11/23/12 X 44.537 255 O 0.332 0.300 0.150 0.030 0.040 0.050 90.20 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437 Rehab./Reconst. of Ampayon Bridge along Daang Maharlika 03/21/13 XIII 18.426 171 O 0.390 0.300 0.150 0.030 0.054 0.033 95.70 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Widening/Conc. of Add'l Lane along Daang Maharlika

    (Agusan-Surigao Rd.) Cabadbaran City Sect., Sta.1213+540-

    Sta.1215+520

    03/11/13 XIII 29.059 142 O 0.365 0.300 0.150 0.030 0.050 0.033 92.80 -

    *1st/Final

    * For DPWH, only the region and PMO office are listed

    24th CPES Release Page9

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Completion of Maraput Bridge along Daang Maharlika

    (Surigao-Agusan Rd.), Sta.1207+19203/11/13 XIII 9.115 120 O 0.348 0.300 0.150 0.030 0.037 0.033 89.80 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Const./Impv't of Rd. to Support River Rhine Cruise, Banza

    Ruins03/21/13 XIII 29.509 155 O 0.313 0.300 0.150 0.024 0.060 0.033 88.00 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Completion of La Union Bridge along Pandanon-Magallanes

    Rd.03/11/13 XIII 15.889 150 O 0.312 0.300 0.150 0.020 0.047 0.033 86.20 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Conc. of Agusan-Malaybalay Road, Km. 1283+183.50-

    Km.1284+78003/31/12 XIII 39.495 300 O 0.351 0.300 0.150 0.030 0.040 0.050 92.10 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Widening of Butuan-Cagayan de Oro-Iligan Rd. (Agusan-

    Misamis Oriental Sect.) Pob., Buenavista Sect.08/06/12 XIII 24.129 255 O 0.336 0.296 0.150 0.030 0.055 0.033 90.00 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437 Rehab. of Salvacion (Crossing Luna Flood Control) 08/20/12 XIII 16.733 285 O 0.375 0.240 0.150 0.030 0.050 0.050 89.50 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Widening of Daang Maharlika (Agusan-Usrigao Rd.) Pob.,

    Cabadbaran Sect.08/06/12 XIII 27.390 255 O 0.370 0.240 0.150 0.030 0.050 0.050 89.00 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Rehab./Reconst./Strengthening of Minusong Bridge along

    Butuan-Cagayan de Oro-Iligan (Agusan Misamis Oriental)

    Km.1269+217, Aclan, Nasipit

    08/06/12 XIII 28.848 270 O 0.383 0.246 0.150 0.030 0.045 0.033 88.70 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Rehab./Reconst./Strengthening of Minusuang Bridge along

    Daang Maharlika (Surigao-Agusan Rd.) Km.1206+56108/07/12 XIII 23.512 270 O 0.326 0.240 0.150 0.030 0.055 0.050 85.10 -

    Adfil Corporation (Formerly: Adfil

    Construction)14437

    Rehab./Reconst./Strengthening of Maraput Bridge along

    Daang Maharlika (Surigao-Agusan Rd.) Km.1207+192, Brgy.

    Victory

    08/07/12 XIII 23.512 285 O 0.325 0.240 0.150 0.030 0.055 0.050 85.00 -

    ADFIL CORPORATION (Formerly: Adfil

    Construction)14437

    Construction/Upgrading of Banza to Magallanes Road

    leading to Centennial Tree and Beaches, Magallanes,

    Agusan del Norte

    11/19/15Agusan del

    Norte DEO37.219 185 C 0.403 0.2 0.3 - - - 90.30%

    90.3%

    Very Satisfactory

    ADFIL CORPORATION (Formerly: Adfil

    Construction)14437

    Widening of Daang Maharlika (Agusan-Davao Section),

    K1304+(-404) - K1307-471, K1309+138.1 - K1312+810, San

    Francisco, Agusan del Sur

    11/11/15 Regional Office 169.799 300 OG 0.257 0.3 0.15 0.03 0.065 0.033 83.50%83.5%

    Satisfactory

    ADFIL CORPORATION (Formerly: Adfil

    Construction)14437

    Widening of Permanent Bridges to more than 2 lanes, Wawa

    Bridge (B00896MN) along Daang Maharlika (Agusan-Davao

    Road Section), Brgy. Wawa, Sibagat, Agusan del Sur11/9/15 Regional Office 207.695 340 OG 0.317 0.24 0.15 0.03 0.055 0.033 82.50%

    82.5%

    Satisfactory

    Adige Sta. Clara (JV) JV-06-032DPWH Component Project under the Help for Catubig

    Agricultural Advancement Proj.05/30/09 VIII 519.663 1,073 O 0.378 0.300 0.150 0.030 0.050 0.050 95.80 -

    Adige Sta. Clara (JV) JV-06-032DPWH Component Project under the HELP for Catubig

    Agricultural Project (HCAAP)08/25/08 VIII 448.581 734 O 0.377 0.300 0.070 0.030 0.050 0.067 89.40 -

    Adimre Construction 25534 Taytay Airport Development Project 07/22/15 DOTC 10.794 154 O 0.390 0.300 0.033 0.030 0.044 0.050 84.70 -

    Adimre Construction 25534 Marinduque Airport Development Project 08/07/15 DOTC 6.293 120 O 0.384 0.300 0.150 0.015 0.035 0.050 93.40 -

    Adimre Construction 25534 Balagtas Port Development Project 07/10/14 DOTC 7.802 180 O 0.385 0.300 0.150 0.020 0.040 0.033 92.80 -

    Adimre Construction 25534 Obando Port Development Project 08/18/14 DOTC 8.109 194 O 0.378 0.300 0.150 0.010 0.016 0.033 88.65 -

    Adimre Construction 25534 Malolos Port Development Project 08/19/14 DOTC 9.625 254 O 0.397 0.300 0.150 0.010 0.009 0.050 91.56 -

    Adimre Construction 25534 Const. of Three Storey Six CL Sch. Bldg. Tibagan NHS 08/14/13 III 7.027 180 O 0.326 0.240 0.150 0.030 0.047 0.033 82.60 -

    Adimre Construction 25534Const. of Drainage Canal along Pulilan-Calumpit Rd., Pulilan

    Section Km. 46+000-Km. 47+20008/02/12 III 11.886 170 O 0.376 0.283 0.150 0.022 0.060 0.050 94.10 -

    Adimre Construction 25534 Meycauayan Port Development Project 07/09/14 DOTC 8.300 150 O 0.385 0.300 0.150 0.020 0.035 0.033 92.30 -

    ADIMRE CONSTRUCTION 25534 Marinduque Airport Development Project 11/12/15 DOTC 6.293 120 C 0.498 0.200 0.300 - - - 99.7595.31% V.

    Satisfactory

    ADIMRE CONSTRUCTION 25534 Taytay Airport Development Project 12/17/15 DOTC 10.794 105 C 0.440 0.200 0.300 - - - 94.0488.43%

    Satisfactory

    ADIMRE CONSTRUCTION 25534 Puerto Princesa Airport Development Project 03/29/16 DOTC 64.553 420 O 0.353 0.300 0.150 0.020 0.039 0.050 91.23 -

    *1st/Final

    * For DPWH, only the region and PMO office are listed

    24th CPES Release Page10

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    Adimre Construction 25534 Puerto Princesa Airport Development Project 9/20/16 DOTC 64.553 420 O 0.396 0.300 0.062 0.020 0.039 0.033 85.05 -

    ADP Construction & Supply 3466 Const. of Sta. Barbara Catching DAM and Canal Struc. 04/05/14 NIA 16.962 150 O 0.327 0.245 0.150 0.018 0.032 0.050 82.20 -

    ADP Construction & Supply 3466 Const. of Various CIP's Package 1 - Badbaran CIP 04/13/13 NIA 24.770 210 O 0.348 0.249 0.150 0.000 0.027 0.050 82.40 -

    ADP CONSTRUCTION AND SUPPLY 3466

    Construction of Juaneza-Aguirre-Malapaya Farm-to-Market

    Road (Sta. 0+000-Sta.4+000 with exceptions), Sara, Iloilo 11/14/15 Iloilo 3rd 47.767 190 C 0.365 0.2 0.3 - - - 86.50%86.5%

    Satisfactory

    ADP CONSTRUCTION AND SUPPLY 3466

    Reconstruction/Improvement of Dumalag Municipal Road,

    Brgy. Poblacion, Dumalag, Capiz (Section I) 11/13/15 Capiz 2nd 35.960 224 OG 0.366 0.232 0.15 0.03 0.07 0.05 89.80%89.8%

    Very Satisfactory

    Advance Foundation Const. System Corp. /

    Abulug Developer Builders Const. Inc. (JV)JV-09-289

    Const. of Gov. Edgar R. Lara Bridge along Cagayan-Apayao

    Road03/30/11 II 112.029 240 O 0.360 0.300 0.000 0.023 0.051 0.017 75.10 -

    Advance Tech Construction & Trading Corp. 35288 Cabucgayan Seaport Construction 08/11/15 DOTC 8.606 240 O 0.400 0.300 0.150 0.015 0.029 0.050 94.42 -

    Advance Tech Construction & Trading Corp/ 35288 Miag-ao Feeder Port Development 11/16/16 DOTC 7.161 120 O 0.400 0.300 0.150 0.020 0.041 0.050 96.08 -

    Advance Tech Construction & Trading

    Corporation35288 Construction of Brgy. Iquiran Wharf 10/14/15 DOTC 9.438 180 O 0.400 0.300 0.150 0.020 0.018 0.050 93.75 -

    Advance Tech Construction & Trading

    Corporation35288 Construction of Iquiran Wharf 01/21/16 DOTC 9.438 180 C 0.492 0.200 0.300 - - - 99.15

    95.91%

    V. Satisfactory

    Advance Tech Construction & Trading

    Corporation35288 Cabucgayan Port Development Project 02/16/16 DOTC 8.602 240 C 0.467 0.200 0.300 - - - 96.70

    95.30%

    V. Satisfactory

    ADVANCED FOUNDATION CONSTRUCTION

    SYSTEM CORP./PULSAR CONSTRUCTION

    (JV)

    JV-13-601

    Construction and Maintenance of Bridges along National

    Roads-Construction of Bridges-On-going, Lucban Bridge

    along Manila North Road

    01/06/2015Regional Office

    No. I278.183 674 O 0.398 0.3 0.15 0.024 0.05 0.033 95.50% -

    Advanced Foundation Construction System,

    Corp.15449

    Lucban Bridge & Approaches Phase I along Manila North

    Rd.08/01/13 II 153.067 450 O 0.328 0.300 0.150 0.030 0.056 0.033 89.70 -

    Advanced Foundtaion Construction System

    Corp./Pulsar Construction(JV)JV-13-601

    Construction and Maintenance of Bridges along National

    Roads - Construction of Bridges - On going; Lucban Bridge

    along Manila North Road

    22/10/2014 II 253.267 650 O 0.456 0.225 0.150 0.030 0.033 0.033 92.70%92.70%

    Very Satisfactory

    Advanced Matrix Construction Inc. 32873 Structural Retrofitting of Buildings at PICC Phase 1 1/27/16 BSP 36.535 240 C 0.481 0.200 0.300 - - - 98.1092.50%

    Very Satisfactory

    Advanced Matrix Construction Inc. 32873Rehabilitation of Common Maintenance Shop (CMS) at BSP,

    SPC1/27/16 BSP 19.053 188 C 0.466 0.200 0.119 - - - 78.50

    86.90%

    Satisfactory

    Advanced Matrix Construction Inc. 32873 Full Upgrading of Toilets at PICC 1/26/16 BSP 29.298 210 C 0.481 0.200 0.300 - - - 98.1093.50%

    Very Satisfactory

    Advanced Matrix Construction Inc. 32873 New Roofing System for Building E Roofdeck 3/2/16 BSP 23.296 321 C 0.469 0.200 0.194 - - - 86.3084.30%

    Satisfactory

    Advanced Matrix Construction Incorporated 32873 Rehabilitation of Building B Lighting System 10/08/13 BPS 2.000 60 O 0.346 0.279 0.150 0.030 0.035 0.050 89.00 -

    Advanced Matrix Construction Incorporated 32873Proposed Renovation of Executive Offices Located at 5th

    Floor, 5-Storey Building-Phase IV03/06/14 BSP 14.500 146 C 0.431 0.200 0.300 - - - 93.10

    *93.10%

    V. Satisfactory

    Advanced Matrix Construction, Inc. 32873 New Roofing System for Building E Roofdeck 11/19/14 BSP 22.300 120 O 0.389 0.300 0.071 0.020 0.030 0.025 83.50 -

    *1st/Final

    * For DPWH, only the region and PMO office are listed

    24th CPES Release Page11

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    Advanced Matrix Construction, IncorporatedImprovement of BSP-SPC Parking Lot at BSP Security Plant

    Complex03/31/13 BSP 13.800 180 O 0.399 0.190 0.150 0.030 0.051 0.050 87.00 -

    AEJ Hardware Construction & Enterprises 34740

    Repair/Rehab. of Licomo Failed Rd. Shoulder along Maria

    Clara Lobregat Highway (Pagadian-ZC Rd.), K1851+500-

    K1851+600

    03/11/13 IX 1.880 64 O 0.363 0.240 0.124 0.030 0.035 0.033 82.50 -

    AFG CONSTRUCTION AND SUPPLY 17161

    Construction of Academic Building at: 6. Construction of 2-

    CL Alimanguan National High School, Brgy. Alimanguan,

    San Vicente, Palawan

    26/08/2015 Palawan I DEO 1.712 120 C 0.485 0.167 0.3 - - - 95.20%*95.2% Very

    Satisfactory

    Agafer Construction 7912 Const. of Cagayan River Control 11/11/08 II 14.241 240 O 0.318 0.160 0.030 0.030 0.033 0.133 70.40 -

    AGUERO CONSTRUCTION 23338

    Cluster XII- Construction of Classrooms in Areas

    Experiencing Acute classroom Shortage in Lake Sebu,

    South Cotabato (1 Unit-2CL/1 Unit-3CL & 1 Unit-1CL)

    02/06/2015South Cotabato

    DEO4.808 210 C 0.45 0.133 0.3 - - - 88.30% *88.3% Satisfactory

    AGUINSOD GENERAL CONSTRUCTION 34741

    Construction of Slope Protection/Retaining Wall along Pico-

    Lamtang Road, K0256+300 - K0256+420, K0258+163 -

    K0258+235, K0259+670 - K0259+700, K0260+665 -

    K0260+725, K0262+500 - K0262+585

    02/06/2015Benguet 1st

    DEO8.292 120 O 0.237 0.3 0.15 0.02 0.045 0.05 80.20% -

    AHMADI BUILDERS 31752

    Construction of roads at Iligan City a) Purok 8, Upper

    Tominobo, Iligan City, b) Purok Mauswagon to Purok Pag-

    asa, Barangay Ditucalan, Iligan City, c) Purok 5, Barangay

    Sta. Elena, Iligan City

    08/06/2015Lanao del Norte

    Second DEO1.927 45 C 0.424 0.2 0.3 - - - 92.40%

    *92.4% Very

    Satisfactory

    Ahnex Builders & Ready Mix Corporation 32296 Widening of Cavite-Batangas Rd., Km.22+000-Km.23+653 11/23/12 IVA 30.797 369 O 0.352 0.300 0.106 0.022 0.050 0.033 86.30 -

    Ahnex Builders & Ready Mix Corporation 32296Widening of Governors Drive (Carmona-Dasmarias-Trece

    Martires City Rd.) inc. Drainage System08/15/12 IVA 38.813 190 O 0.366 0.300 0.081 0.030 0.055 0.033 86.50 -

    AJ TAYLAN CONSTRUCTION

    CORPORATION/DJCM

    CNSTRUCTION/ALTHEA CONSTRUCTION (JV)

    JV-14-867

    Rehabilitation/Reconstruction of National Roads with Slips,

    Slope Collapse and Landslide, Batac-Pinili via Maipag Road,

    K0472+520, K0479+192, K0479+735, Batac, Ilocos Norte11/12/15

    REGIONAL

    OFFICE56.537 242 C 0.478 0.147 0.3 - - - 92.50%

    92.5%

    Very Satisfactory

    AJ Tylan Const., Corp./DJCM Const/VVH

    Const., Corp./ZEDIK Builders (DAVZ JV)JV-13-702

    Construction and Maintenance of Bridges along National

    Roads-Widening of Permanent Bridges, Subec Bridge along

    MNR

    21/10/2014 I 36.706 304 O 0.330 0.249 0.150 0.030 0.056 0.050 86.50%86.50%

    Satisfactory

    Ajan Jaeda, inc. 17869Corollary Works for Banquerohan Resettlement Project, Ph.

    29/14-18/09 NHA 30.991 150 O 0.398 0.245 0.015 0.024 0.070 0.050 80.15 -

    Ajan Jeada, Inc. 17869 Impv't. of Bahi-Cagubulacao Rd. (Cagraray Eco Park) 08/03/11 V 18.989 221 O 0.317 0.300 0.150 0.030 0.045 0.033 87.50 -

    AJYSC Marketing 26924Completion of Drainage Canal along Dulawan-Marbel Rd.

    (New Carment Sect.)03/11/13 XII 17.419 214 O 0.364 0.300 0.000 0.030 0.050 0.033 77.70 -

    AJYSC Marketing 26924Const./Replacement of Banga Bridge and Approaches

    Phase II03/08/10 XII 24.657 240 O 0.350 0.240 0.150 0.030 0.040 0.033 84.30 -

    AJYSC Marketing 26924Rehab./Improvement of Bulok Bridge along Marbel-Makar

    Road06/05/09 R-XII 4.764 90 O 0.271 0.300 0.150 0.030 0.059 0.050 86.00 -

    AJYSC Marketing 26924Completion of Drainage Canal along Dulawan-Marbel Rd.,

    New Carmen Sect.11/24/12 XII 17.419 214 O 0.359 0.300 0.102 0.030 0.055 0.000 84.60 -

    AJYSC Marketing 26924Completion of Drainage Canal along Dulawqan-Marbel Rd.

    (New Carment Sect.)08/08/12 XII 17.419 196 O 0.386 0.300 0.085 0.030 0.045 0.033 87.90 -

    AJYSC MARKETING 26924Repair/Rehab./Improvement along Dulawan-Marbel Road

    (Grio- Tacurong Section) 03/06/2015

    Sultan Kudarat

    1st DEO10.349 143 C 0.441 0.133 0.3 - - - 87.40% *87.4% Satisfactory

    AJYSC MARKETING 26924Construction of Revetment at the Side of Damaged River

    Bank of Banga Bridge along Cotabato-Marbel Road02/06/2015

    South Cotabato

    DEO5.798 150 C 0.398 0.133 0.3 - - - 83.10% *83.1% Satisfactory

    AJYSC MARKETING 26924

    Midsayap-Marbel Road, K1777+409-K1780+1020 ( with

    exceptions), Luayan-Dumadalig Section, Tantangan, South

    Cotabato Modified to: MF01- Widening of Secondary Road-

    Midsayap-Marbel Road, K1777+353-K1779+553.16 ( with

    exceptions), Luayan-Dumadalig Section

    02/06/2015South Cotabato

    DEO43.944 174 O 0.358 0.24 0.15 0.03 0.02 0.033 83.10% -

    *1st/Final

    * For DPWH, only the region and PMO office are listed

    24th CPES Release Page12

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    AJYSC MARKETING 26924

    Midsayap-Marbel Road K1777+353 to K1779+553.16 with

    exception Luayan-Dumadalig Section, Tantangan South

    Cotabato, 2nd LD

    11/9/15South Cotabato

    First DEO47.958 234 OG 0.36 0.248 0.15 0.03 0.042 0.05 88.00%

    88%

    Satisfactory

    AJYSC MARKETING 26924

    Construction and Namleaning of Bridges along National

    Roads- Widening of Permanent Bridges to more than 2

    lanes, Bawing Bridge along Makar-Kiamba Road11/18/15

    South Cotabato

    Second DEO25.481 176 OG 0.346 0.3 0 0 0.023 0 66.90%

    66.9%

    Poor

    AJYSC MARKETING 26924

    Construction/Rehabilitation of Drainage Protection Works

    along National Roads - Nationwide: Construction of the

    Revetment along the Damaged Riverbank of Banga Bridge

    along Cotabato-Marbel Road

    02/09/2015 South Cotabato 5.24 98 C 0.411 0.147 0.3 - - - 85.80%*85.8%

    Satisfactory

    AKH Construction and Trading Corporation 20759

    Preventive Maintenance Based on Pavement Management

    System/Highway Development and Management-4 (HDM-4)

    along V. Mapa Street

    24/11/2014 NCR 22.598 206 O 0.381 0.240 0.150 0.030 0.045 0.033 87.90%87.90%

    Satisfactory

    AKH Construction and Trading Corporation 20759Proposed Repair/Rehab. Of Road along Jalandoni St., CCP

    Complex17/08/2014 NCR 8.100 90 O 0.446 0.215 0.150 0.030 0.040 0.030 91.10 -

    AKH Construction and Trading Corporation 20759

    Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd.

    (Int. Sect.) of Mendiola Extension (Chainage 0000-Chainage

    0119, A) Prev. Maint. (Int. Sect.) of Mendiola (Chainage 0119-

    085)

    03/13/13 NCR 2.678 69 O 0.366 0.200 0.150 0.030 0.048 0.033 82.70 -

    AKH CONSTRUCTION AND TRADING

    CORPORATION20759

    Concrete Reblocking along commonwealth Ave., Quezon

    City, K0017+061 - K0020+(-262), K0016+938 - K0019+731,

    Quezon City

    06/06/2015 NCR 17.988 273 O 0.387 0.24 0.15 0.024 0.056 0.05 90.70% -

    AKH CONSTRUCTION AND TRADING

    CORPORATION20759

    Rehabilitation/Reconstruction/Upgrading of Damaged South

    Super Highway East Service Road, K13+890 to K16+793,

    Paraaque City

    03/09/2015 NCR 27.364 165 O 0.376 0.24 0.15 0.03 0.053 0.05 89.90% -

    AKN Construction Corporation (Formerly:

    AKN Construction)11845

    Slope Protection of Estero Tripa De Gallina, Barangay

    Bangkal19/11/2014 NCR 17.321 150 O 0.357 0.300 0.059 0.030 0.049 0.050 84.50%

    84.50%

    Satisfactory

    AKN Construction Corporation (Formerly:

    AKN Construction)11845

    Widening/Conc. of R-10 inc. ROW, (Const. of Footbridge at

    corner Pacheco)04/15/11 NCR 17.977 248 O 0.371 0.296 0.150 0.030 0.035 0.050 93.20 -

    AKN Construction Corporation (Formerly:

    AKN Construction)11845

    Rehab./Reconstruction of Muntinlupa Insular Prison Road

    and its Vicinity, Brgy. Poblacion09/09/09 NCR 19.113 100 O 0.297 0.219 0.150 0.023 0.035 0.050 77.40 -

    AKN CONSTRUCTION CORPORATION

    (Formerly: AKN Construction)11845

    Dredging of Marala River, (from C-3 to C-4), Sta. 1+400 to

    Sta. 2+750, Navotas City06/06/2015 NCR 50.541 120 C 0.48 0.2 0.3 - - - 98.00% *98% Outstanding

    AKN CONTRUCTION CORP. 11845Dredging of Paranaque River Mouth (Phase I), Paranaque

    City, Metro Manila12/3/15

    Metro Manila

    2nd DEO86.133 240 OG 0.4 0.2 0.05 0.036 0.25 - 93.60%

    93.6%

    Very Satisfactory

    AL CHRIS CONSTRUCTION 12406Health Facilities and Multi-Purpose Buildings (Cluster II) a)

    Construction of Public Market27/08/2015 Bohol 2.877 140 C 0.473 0.078 0.3 - - - 85.10%

    *85.1%

    Satisfactory

    AL Chris Construction 12406BERRRP-Candumayao (Catigbian) - Cabanugan (San Isidro)

    rd.01/19/15 Bohol 8.874 209 O 0.338 0.300 0.066 0.030 0.051 0.050 83.50 -

    AL HUSSEIN CONSTRUCTION 18438

    Rehabilitation/Reconstruction of National Road with Slips,

    Collapse and Landslides, Lanao del Norte Interior

    Circumferential Road (LDN1CR), K1536+610-K1536+750;

    K1544+120-K1544+725, Tagoloan, Lanao del Norte

    03/09/2015Lanao del Norte

    1st DEO44.744 205 O 0.384 0.24 0.15 0.03 0.06 0.05 91.40% -

    Al-B Construction 11740Rehab./Reconst./Upgrading along Angeles-Porac-

    Floridablanca-Dinalupihan Rd.06/01/10 III 18.839 90 O 0.389 0.240 0.150 0.030 0.047 0.033 88.90 -

    AL-B DEVELOPMENT CORP./PING-ANN'S

    CONSTRUCTION AND TRADING (JV)JV-14-075 Reconstruction of Loboc River Terminal 8/27/15 TIEZA 19.500 240 C 0.481 0.200 0.300 98.10

    93.9%

    Very Satisfactory

    AL-B DEVELOPMENT CORPORATION

    (Formerly ALB Construction)11740

    Network Development, Widening of National Roads, (Arterial

    Roads-Outside N1), Angeles-Porac-Floridablanca-

    Dinalupihan Road at KO084+(-615) to KO085+(-024), Angeles

    City, Pamapanga 1st LD

    29/08/2015Pampanga

    Third DEO34.069 210 O 0.379 0.24 0.15 0.03 0.07 0.05 91.90% -

    AL-B Dev't Corp./ Ping-Ann's Construction

    and Trading (JV)JV-14-075 Reconstruction of Loboc River Terminal 6/24/15 TIEZA 19.550 240 O 0.375 0.300 0.097 0.030 0.070 0.050 92.10 -

    ALBERTO UY CONSTRUCTION &

    DEVELOPMENT20924

    Rehabilitation/Upgrading of Mapang (Taas) Formon Road,

    Bongabong, Oriental Mindoro28/08/2015

    Southern

    Mindoro DEO14.477 149 O 0.368 0.24 0.15 0.03 0.057 0.05 89.50% -

    ALBERTO UY CONSTRUCTION &

    DEVELOPMENT20924

    Rehab./Upgrading of Mapang Road (Taas) Formon Road11/19/15

    Southern

    Mindoro DEO14.477 149 C 0.471 0.133 0.3 - - - 90.40%

    90.4%

    Very Satisfactory

    *1st/Final

    * For DPWH, only the region and PMO office are listed

    24th CPES Release Page13

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    Alcel Construction 15129

    Road Upgrading (Gravel-Paved) Along Gurel-Bokod-

    Kabayan-Buguias-Abatan Road, K0338+481-K0339+838,

    Kabayan, Benguet

    14/08/2014 CAR 46.461 240 O 0.361 0.240 0.150 0.023 0.050 0.050 87.40 -

    Alcel Construction 15129 Const. of Access Rd. to Airport, Alaminos City Airport 03/15/13 I 1.821 45 O 0.390 0.300 0.150 0.010 0.023 0.033 90.60 -

    Alcel Construction 15129 Const. of Access Rd. for Alaminos Airport (Phase I) 08/16/12 I 17.991 253 O 0.384 0.240 0.150 0.030 0.045 0.033 88.20 -

    ALCEL CONSTRUCTION 15129

    Rehabilitation/Improvement of Gurel - Bokod - Kabayan -

    Buguias - Abatan Road Including ROW, Bokod and Kabayan

    Section, K0301+(-797) - K0326+004 (I.S.)

    26/02/2015 CAR 97 403 C 0.392 0.2 0.3 - - - 89.20%*89.2% Very

    Satisfactory

    ALCEL CONSTRUCTION 15129

    Rehabilitation/Reconstruction/Upgrading of Alaminos-

    Bolinao Road, K0325+000 to K0326+000, K0321+(-204) to

    K0323+133, Alaminos City, Pangasinan

    01/09/2015Pangasinan 1st

    DEO43.823 240 O 0.331 0.3 0.15 0.023 0.042 0.05 89.60% -

    ALCEL CONSTRUCTION 15129Construction of Road (Baywalk) Brgy. Libsong East,

    Lingayen to Baybay Lopez, Binmaley, Pangasinan11/19/15

    PANGASINAN

    2ND DEO28.812 180 C 0.376 0.24 0.15 0.03 0.05 0.05 89.60%

    89.6%

    Very Satisfactory

    Alcel Construction/Oriental Sales Center and

    Contractor (J.V.)JV-12-432

    Prev. Maint. of Manila North Rd. K0169+700-K0172+105 w/

    exception w/n the District08/09/13 I 34.285 150 O 0.345 0.300 0.150 0.030 0.047 0.033 90.50 -

    Alebon Genuine Merchandising 26300Widening of Butuan City - Cagayan de Oro City - Ilagan City

    Road Km1425+500 - Km.1426+50004/08/2014 X 18.578 191 O 0.383 0.300 0.150 0.030 0.040 0.050 95.30 -

    Alebon Genuine Merchandising 26300Construction of Concrete Revetment along Kinoguitan By-

    Pass Road11/08/2014 X 13.482 210 O 0.383 0.300 0.150 0.030 0.047 0.033 94.30 -

    Alebon Genuine Merchandising 26300 Widening of Carmen-Patag-Bulua Rd., Bulua-Patag Sect. 03/11/13 X 4.198 37 O 0.371 0.244 0.150 0.010 0.037 0.050 86.20 -

    ALEBON GENUINE MERCHANDISING 26300

    Rehab/Reconst/Upgrading of Damaged Paved National

    Roads Including Drainage Based on Pavement Management

    System/Highway Development and Management-4 (HDM-4)

    (Intermittent Section) CDO-Cadre Circumferential Ext., Rd.,

    Chainage 0-556.00, Cagayan de Oro City

    11/06/2015

    Cagayan de

    Oro City First

    DEO

    8.865 170 O 0.353 0.3 0.15 0.02 0.025 0.05 89.80% -

    Al-Fahdel Const. and Eng'g 17953Conc./Impvt. of Tubod-Ganassi Road (Caniogan Sect.) Sta.

    1602+000-Sta. 1603+000 with exception06/05/09 X 18.126 150 O 0.344 0.265 0.150 0.015 0.043 0.050 86.70 -

    Al-Fahdel Const. and Eng'g. 17953Repair/Rehab. of Rd. Slip (down) along Dobleston-Butadon

    Nat'l Rd. (Secondary Rd.), K2007+860-K2007+90011/28/12 X 3.790 59 O 0.363 0.226 0.150 0.030 0.023 0.033 82.50 -

    Alfalfa Construction 29712Road Upgrading of Banaue-Hungduan Benguet Bdry. Road

    Hapao-Abatan Section04/08/11 CAR 16.560 177 O 0.385 0.300 0.090 0.010 0.054 0.017 85.60 -

    Alfie's Const. & Const. Supply, Inc. (Formerly:

    Alfie's Construction & Const. Supply)17162

    Completion of Binalbagan Bridge 2 - Km. 66+910 along

    Hinigaran-Isabela Road03/05/09 VI 45.049 809 O 0.316 0.300 0.150 0.030 0.040 0.033 86.90 -

    Alfie's Const. & Const. Supply, Inc. (Formerly:

    Alfie's Construction & Const. Supply)17162 Road Upgrading, Jct. Palencia-Boy Scout, Campsite Road 03/05/09 VI 66.624 553 O 0.263 0.296 0.150 0.030 0.050 0.033 82.20 -

    Alfie's Construction & Const. Supply, Inc.

    (Formerly: Alfie's Construction & Construction

    Supply)

    17162Const. of Access Rd. for Himoga-an Bridge, Bacolod North

    Rd., Sta. 71+035.20-Sta. 74+557.2008/12/13 VI 109.290 310 O 0.342 0.240 0.150 0.030 0.042 0.050 85.40 -

    Alfie's Construction & Const. Supply, Inc.

    (Formerly: Alfie's Construction & Construction

    Supply)

    17162Road Upgrading of Villahermoso-Canla-on City-La

    Castellana Road, K0074+205-K0074+99508/10/13 VI 23.131 182 O 0.356 0.206 0.047 0.030 0.035 0.033 70.70 -

    Alfie's Construction & Construction Supply

    Inc. (Formerly: Alfie's Construction and

    Construction Supply)

    17162Conc. of Nat'l Rd. along Bacolod South Rd., K0086+061-

    K0088+00308/11/12 VI 32.631 222 O 0.242 0.300 0.150 0.030 0.050 0.050 82.20 -

    Alfie's Construction & Construction Supply

    Inc. (Formerly: Alfie's Construction and

    Construction Supply)

    17162

    Road Upgrading (Gravel to Paved) Based on Gravel Road

    Strategies, Traffic Benchmark for Upgrading to Paved Road

    Standard (HDM-4 Project Analysis - Intermittent Sections)

    National Secondary Road, Kabankalan Jct. Salong Tapi

    Dacongcogon Bantayan Road - Package B

    24/10/2014 VI 48.461 209 O 0.361 0.232 0.150 0.030 0.048 0.033 85.40%0%

    Poor

    *1st/Final

    * For DPWH, only the region and PMO office are listed

    24th CPES Release Page14

  • CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT

    CPES Reports-On-going and Completed Projects from January 1, 2014 to December 31, 2016

    ESH RDRSTATUS CPES VISIT RATINGWMS MTL TIME FAC

    FINAL RATING/

    QUALITATIVE

    DESCRIPTION

    AMOUNT

    (Php, M)

    DUR

    (C.D.)

    CONTRACT*IMPL.

    AGENCYNAME OF CONSTRUCTOR

    LICENSE

    NO.PROJECT

    DATE OF

    EVALUATION

    Alfies Construction & Construction Supply,

    Inc.17162

    Conc. of Junction Bearin-Salong-Tapi-Dacongcogon-

    Bantayan Raod (Km. 99+675.50-Km.131+142.75 w/ exception,

    Brgy. Salong & Batayan

    09/17/09 VI 79.400 400 O 0.304 0.300 0.150 0.030 0.035 0.033 85.20 -

    ALFIE'S CONSTRUCTION & CONSTRUCTION

    SUPPLY, INC. (Formerly: Alfie's Construction

    & Construction Supply)

    17162Rehabilitation/Reconstruction/Upgrading of Bacolod North

    Road, 25/08/2015

    Regional Office

    No.VI65.069 250 O 0.357 0.24 0.15 0.03 0.06 0.05 88.70% -

    ALFIE'S CONSTRUCTION & CONSTRUCTION

    SUPPLY, INC. (Formerly: Alfie's Construction

    & Construction Supply)

    17162

    Construction/Replacement of Permanent Weak Bridges

    along National Road, Tapi Bridge (B00211NR), along

    Kabankalan Jct. Salong Tapi Dacongcogon Bantayan Road,

    Brgy. Tapi, Kabankalan City, Negros Occidental

    11/14/15

    Negros

    Occidental 3rd

    DEO

    10.094 286 OG 0.363 0.241 0.15 0.03 0.045 0.05 87.90%87.9%

    Satisfactory

    ALFIE'S CONSTRUCTION & CONSTRUCTION

    SUPPLY, INC. (Formerly: Alfie's Construction

    & Construction Supply)

    17162

    Widening of National Roads along Bacolod South Road,

    K0048+542-K0051+468; K0052+444-K0053+600; K0064+250-

    K0065+360, Hinigaran, Negros Occidental11/16/15

    Regional Office,

    NIR119.102 310 OG 0.373 0.238 0.15 0.03 0.055 0.05 89.60%

    89.6%

    Very Satisfactory

    ALFIE'S CONSTRUCTION & CONSTRUCTION

    SUPPLY, INC. (Formerly: Alfie's Construction

    & Construction Supply)

    17162

    Widening of Bacolod Circumferential Road (South) with

    Drainage (including RROW), K0006+451 - K0011+476,

    Bacolod City, Negros Occidental11/9/15

    Regional Office,

    NIR81.443 255 OG 0.337 0.3 0.078 0.03 0.06 0.033 83.80%

    83.8%

    Satisfactory

    ALFIE'S CONSTRUCTION & CONSTRUCTION

    SUPPLY, INC. (Formerly: Alfie's Construction

    & Construction Supply)

    17162

    Rehabilitation/Reconstruction/Upgrading of Damaged Paved

    National Road along Bacolod North Road, K0039+771-

    K0040+288; K0061+420-K0062+000; K0075+903-K0075+953;

    K0076+620-K0077+000; K0080+060-K0081+000; K0081+558-

    K0082+000; K0082+000-K0083+000; K0036+902-K0036+952;

    K0038+200-K0038+406; K0041+843-K0042+300; K0042+500-

    K0043+000, Manapla, Negros Occidental

    11/19/15Regional Office,

    NIR75.626 265 OG 0.34 0.214 0.15 0.03 0.055 0.05 83.90%

    83.9%

    Satisfactory

    ALFIE'S CONSTRUCTION & CONSTRUCTION

    SUPPLY, INC. (Formerly: Alfie's Construction

    & Construction Supply)

    17162

    Rehabilitation/Reconstruction/Upgrading of Bacolod North

    Road, K0086+000 - K0087+000, K0087+540 - K0088+327,

    K0088+362 - K0090+933, Sagay City, Negros Occidental11/19/15

    Regional Office,

    NIR68.500 280 OG 0.371 0.237 0.15 0.03 0.055 0.05 89.30%

    89.3%

    Very Satisfactory

    Alfie's Construction & Construction Supply,

    Inc. (Formerly: Alfie's Construction &

    Construction Supply)

    17162Const. of the Remaining Structures: Himogaan Bridge, Sta.

    71+035.20-Sta. 74+557.2008/12/13 VI 116.246 505 O 0.376 0.240 0.150 0.030 0.042 0.050 88.80 -

    ALFREDO D. SANTOS