cca proposal group2
TRANSCRIPT
8/6/2019 CCA Proposal Group2
http://slidepdf.com/reader/full/cca-proposal-group2 1/18
CCA Pro osals
Group 2
(South Asia)
or policies of the Asian Development Bank (ADB), or its Board of Governors, or the governments they represent.
ADB does not guarantee the accuracy of the data included in this paper and accepts no responsibility for any
consequence of their use. Terminology used may not necessarily be consistent with ADB official terms.
8/6/2019 CCA Proposal Group2
http://slidepdf.com/reader/full/cca-proposal-group2 2/18
Proposal – North East India
. , .of Arunacchal Pradesh, India
2. Project Title: Incorporation of Climate Change project to, u v u
Govt. of Arunacchal Pradesh.
3. Project Objectives
To amalgamate the climate change subject in all
, , .
To draft a re-amendment Policy, Bill, Act or Rules to beapproved by the competent authority as a top down
4. Project Partners
.
8/6/2019 CCA Proposal Group2
http://slidepdf.com/reader/full/cca-proposal-group2 3/18
Proposal – North East India
Main Project Activities
To study and analyze all the Policies, Acts, and.
subject appropriately.
Main Project Outputs
A sound re-amendment final draft of Policies,. .
Indicative budget
60,000USD
8/6/2019 CCA Proposal Group2
http://slidepdf.com/reader/full/cca-proposal-group2 4/18
Proposal – East India
. ,
2. Project Title: Climate change Implication on Water Resources ofORISSA, Piloting in Baitarani Basin.
3. Project Objectives
Create awareness of CC in the organization.
projection (2009 - 2012)
Review the ORISSA State Water Policy, 2007 and initiatean amendment of the policy for inclusion of impact andstrategies for CC (2009- 2011)
Creation of Pilot Baitarani River Basin Organisation (2009-
2010).
4. Project Partners
, .,& Environment, NAHRIM
8/6/2019 CCA Proposal Group2
http://slidepdf.com/reader/full/cca-proposal-group2 5/18
Main Project ActivitiesProposal – East India
o sem nar o or eng neers, p anners, ne ep an – e2009)
Hold Regional meeting on CC involving stakeholders of Baitarani.
Hold River basin worksho on CC im lication on water resources
Discussion for CC models for estimation of water balance in theriver basins- March, 09.
Finalize the river basin model- Dec, 09
- - .
Formulation of RBO of Baitarani Basin- 2009
Review OSWP 2007 and initiate for inclusion of CC implication –April- June 2009
Main Project Outputs
Proceedings and recommendations of seminar and workshop.
Amendment of OSWP
Formation of Baitarani RBO meeting the recommendation
Indicative budget
40M USD
8/6/2019 CCA Proposal Group2
http://slidepdf.com/reader/full/cca-proposal-group2 6/18
Proposal – Bangladesh
. . . .Bangladesh
1. Installation of surface water treatment plant toreduce intake of underground water for Khulna city.
2. Installation of Distribution of Line (supply pipe
water) for Khulna city.
3. Project Objective
Water supply for Khulna city people
4. Project Partners
ADB, JBIC (Japan Bank InternationalCorporation), World Bank
8/6/2019 CCA Proposal Group2
http://slidepdf.com/reader/full/cca-proposal-group2 7/18
Proposal – Bangladesh
Main Project Activities
Installation of surface water treatment
plant and Installation of Distribution pipeline system
Main Pro ect Out uts
Drinking supply
8/6/2019 CCA Proposal Group2
http://slidepdf.com/reader/full/cca-proposal-group2 8/18
Proposal – China
. ,Research Centre for Climate Change, Ministry of WaterResources, P.R. China
2. Project Title: Impact of CC on WR in typical river basins ofSouth Asia and adaptation strategies
3. Project Objectives Develop assessment methodology for CC impact on
WR
Seek fdor effective and feasible measures for water
security in each study basin
.
Members from South Asia countries, NAHRIM, ADB,Japan, etc.
8/6/2019 CCA Proposal Group2
http://slidepdf.com/reader/full/cca-proposal-group2 9/18
Proposal – China
Main Project Activities
Study methodology aiming at different basins.
Methodology training workshop
Main Project Outputs
Methodology Assessment of WR under CC
Strategy for CC adaptation.
a g a e a .
400,000USD (for China only for 2009)
8/6/2019 CCA Proposal Group2
http://slidepdf.com/reader/full/cca-proposal-group2 10/18
Proposal – Nepal
. ,
2. Project Title: Strengthening of Dept of Water InducedDisaster Prevention (DWIDP).
3. Project Objectives
To reduce the risk of floods, landslides on people,infrastructure human settlements
To strengthen capacity of DWIDP (Human Resources,
facilities) Awareness building among vulnerable groups
. , , ,
8/6/2019 CCA Proposal Group2
http://slidepdf.com/reader/full/cca-proposal-group2 11/18
Proposal – Nepal
a n ro ect ct v t es
1. Maintaining data
2. Training for technical staff and stakeholders
.
4. Intensive research in landslide and flood prone areas5. Campaigning through different media\
. department (equipment and other facilities)
Main Project Outputs
Establishment of computerised databank Development of sustainable and economical technologies
Mapping of hazardous and risk prone areas
Increase in stakeholder participation and consciousness
ncrease n emp oyee e c ency Effective implementation of programmes on water induced
disaster prevention
Indicative budget: USD 5,000,000
8/6/2019 CCA Proposal Group2
http://slidepdf.com/reader/full/cca-proposal-group2 12/18
roposa -
Project proponent: ICIMOD (+ WMO) Project title: Establishment of a regional flood information
Project objective: to enhance regional cooperation among thecountries in the HKH region for the timely exchange of flooddata and information
Project partners: Bangladesh: Bangladesh Water Development Board and
Meteorological Department
u an: epar men o nergy an epar men o eo ogy anMines
China: Meteorological Administration and Bureau of Hydrology
India: Central Water Commission India Meteorolo icalDepartmnet
Nepal: Department of Hydrology and Meteorology, Departmentof Water Induced Disaster Prevention
8/6/2019 CCA Proposal Group2
http://slidepdf.com/reader/full/cca-proposal-group2 13/18
Proposal – ICIMOD (cont.)
Phase 1 (2001-2005) completed: feasibility
Series of national consultations and technical
Full project document approved by
8/6/2019 CCA Proposal Group2
http://slidepdf.com/reader/full/cca-proposal-group2 14/18
Proposal - Icimod (cont.)
Main objectives (phase 2):1. To strengthen framework for cooperation on sharing
participating member countries
2. To establish a flood observation network in selected
3. To establish regional and national flood informationsystems to share real time data and info and increase
4. To enhance technical capacity of partners in floodforecasting and communication to the end users
. agreed among participating countries
8/6/2019 CCA Proposal Group2
http://slidepdf.com/reader/full/cca-proposal-group2 15/18
Proposal - Icimod (cont.)
Main outcomes:
information dissemination system for floods
in sub-basins within the Gan es-
Brahmaputra-Meghna and Indus River Basins
+ -
financing of approx. USD 500,000 by the
8/6/2019 CCA Proposal Group2
http://slidepdf.com/reader/full/cca-proposal-group2 16/18
Proposal – Sri Lanka
.
2. Project Title: Mechanization of Agriculture through SustainableEco System
3. Project Objectives
Increase water retaining capacity of soil texture in order toreduce variabilit of water table.
4. Project Partners
Internal officer – Head office staff, Resident project manager ande r s a
External organisation – Agriculture Dept., Env authority, forestDept, Wildlife Dept.
Stake holders – Farmers, commercial AG developers, poultryindustry developer, dairy industries developers,
External countries –China, Japan (Introducing machinery andequ pments or c opp ng, m x ng etc.
ADB, JWA – for funding if possible
8/6/2019 CCA Proposal Group2
http://slidepdf.com/reader/full/cca-proposal-group2 17/18
Proposal – Sri Lanka
Promote use of compose fertilizer by farmers as well as commercial
developers.
2009 =20% of 125,000 farmers
= o , armers
2011 =50% of 125,000 farmers
Reforestation
2009 = 700,000 plants
2010 =700,000 plants
2011 =700,000 plants
Training, awareness and monitoring programs
2009 = educate staff and 40% of farmers
2010 = refresher cost of staff and educate 60% of farnmers
Establish Cascade system
Investigate and promoting new cascade systems.
Indicative budget
6Mil USD