8/6/2019 CCA Proposal Group2 http://slidepdf.com/reader/full/cca-proposal-group2 1/18 CCA Pro osals Group 2 (South Asia)  or policies of the Asian Development Bank (ADB), or its Board of Governors, or the governments they represent. ADB does not guarantee the accuracy of the data included in this paper and accepts no responsibility for any consequence of their use. Terminology used may not necessarily be consistent with ADB official terms.

Upload: adbwaterforall

Post on 07-Apr-2018

227 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CCA Proposal Group2

8/6/2019 CCA Proposal Group2

http://slidepdf.com/reader/full/cca-proposal-group2 1/18

CCA Pro osals

Group 2

(South Asia)

 

or policies of the Asian Development Bank (ADB), or its Board of Governors, or the governments they represent.

ADB does not guarantee the accuracy of the data included in this paper and accepts no responsibility for any

consequence of their use. Terminology used may not necessarily be consistent with ADB official terms.

Page 2: CCA Proposal Group2

8/6/2019 CCA Proposal Group2

http://slidepdf.com/reader/full/cca-proposal-group2 2/18

Proposal – North East India 

.   , .of Arunacchal Pradesh, India

2. Project Title: Incorporation of Climate Change project to, u v u

Govt. of Arunacchal Pradesh.

3. Project Objectives

To amalgamate the climate change subject in all

, , .

To draft a re-amendment Policy, Bill, Act or Rules to beapproved by the competent authority as a top down

4. Project Partners

.

Page 3: CCA Proposal Group2

8/6/2019 CCA Proposal Group2

http://slidepdf.com/reader/full/cca-proposal-group2 3/18

Proposal – North East India 

Main Project Activities

To study and analyze all the Policies, Acts, and.

subject appropriately.

Main Project Outputs

A sound re-amendment final draft of Policies,. .

Indicative budget

60,000USD

Page 4: CCA Proposal Group2

8/6/2019 CCA Proposal Group2

http://slidepdf.com/reader/full/cca-proposal-group2 4/18

Proposal – East India 

.   ,

2. Project Title: Climate change Implication on Water Resources ofORISSA, Piloting in Baitarani Basin.

3. Project Objectives

Create awareness of CC in the organization.

 projection (2009 - 2012)

Review the ORISSA State Water Policy, 2007 and initiatean amendment of the policy for inclusion of impact andstrategies for CC (2009- 2011)

Creation of Pilot Baitarani River Basin Organisation (2009-

2010).

4. Project Partners

, .,& Environment, NAHRIM

Page 5: CCA Proposal Group2

8/6/2019 CCA Proposal Group2

http://slidepdf.com/reader/full/cca-proposal-group2 5/18

Main Project ActivitiesProposal – East India 

o sem nar o or eng neers, p anners, ne ep an – e2009)

Hold Regional meeting on CC involving stakeholders of Baitarani.

Hold River basin worksho on CC im lication on water resources

Discussion for CC models for estimation of water balance in theriver basins- March, 09.

Finalize the river basin model- Dec, 09

- - .

Formulation of RBO of Baitarani Basin- 2009

Review OSWP 2007 and initiate for inclusion of CC implication –April- June 2009

Main Project Outputs

Proceedings and recommendations of seminar and workshop.

  Amendment of OSWP

Formation of Baitarani RBO meeting the recommendation

Indicative budget

40M USD

Page 6: CCA Proposal Group2

8/6/2019 CCA Proposal Group2

http://slidepdf.com/reader/full/cca-proposal-group2 6/18

Proposal – Bangladesh 

.   . . .Bangladesh

 

1. Installation of surface water treatment plant toreduce intake of underground water for Khulna city.

2. Installation of Distribution of Line (supply pipe

water) for Khulna city.

3. Project Objective

Water supply for Khulna city people

4. Project Partners

ADB, JBIC (Japan Bank InternationalCorporation), World Bank

Page 7: CCA Proposal Group2

8/6/2019 CCA Proposal Group2

http://slidepdf.com/reader/full/cca-proposal-group2 7/18

Proposal – Bangladesh 

Main Project Activities

Installation of surface water treatment

plant and Installation of Distribution pipeline system

Main Pro ect Out uts

Drinking supply

Page 8: CCA Proposal Group2

8/6/2019 CCA Proposal Group2

http://slidepdf.com/reader/full/cca-proposal-group2 8/18

Proposal – China 

.   ,Research Centre for Climate Change, Ministry of WaterResources, P.R. China

2. Project Title: Impact of CC on WR in typical river basins ofSouth Asia and adaptation strategies

3. Project Objectives Develop assessment methodology for CC impact on

WR

Seek fdor effective and feasible measures for water

security in each study basin

.

Members from South Asia countries, NAHRIM, ADB,Japan, etc.

Page 9: CCA Proposal Group2

8/6/2019 CCA Proposal Group2

http://slidepdf.com/reader/full/cca-proposal-group2 9/18

Proposal – China 

Main Project Activities

Study methodology aiming at different basins.

 

Methodology training workshop

Main Project Outputs

Methodology Assessment of WR under CC

Strategy for CC adaptation.

a g a e a .

 

400,000USD (for China only for 2009)

Page 10: CCA Proposal Group2

8/6/2019 CCA Proposal Group2

http://slidepdf.com/reader/full/cca-proposal-group2 10/18

Proposal – Nepal 

.   ,

2. Project Title: Strengthening of Dept of Water InducedDisaster Prevention (DWIDP).

3. Project Objectives

To reduce the risk of floods, landslides on people,infrastructure human settlements 

To strengthen capacity of DWIDP (Human Resources,

facilities) Awareness building among vulnerable groups

. , , ,

Page 11: CCA Proposal Group2

8/6/2019 CCA Proposal Group2

http://slidepdf.com/reader/full/cca-proposal-group2 11/18

Proposal – Nepal 

a n ro ect ct v t es

1. Maintaining data

2. Training for technical staff and stakeholders

.  

4. Intensive research in landslide and flood prone areas5. Campaigning through different media\ 

.  department (equipment and other facilities)

Main Project Outputs

Establishment of computerised databank Development of sustainable and economical technologies

Mapping of hazardous and risk prone areas

Increase in stakeholder participation and consciousness

ncrease n emp oyee e c ency Effective implementation of programmes on water induced

disaster prevention

Indicative budget: USD 5,000,000

Page 12: CCA Proposal Group2

8/6/2019 CCA Proposal Group2

http://slidepdf.com/reader/full/cca-proposal-group2 12/18

roposa -

Project proponent: ICIMOD (+ WMO) Project title: Establishment of a regional flood information

Project objective: to enhance regional cooperation among thecountries in the HKH region for the timely exchange of flooddata and information

Project partners: Bangladesh: Bangladesh Water Development Board and

Meteorological Department

u an: epar men o nergy an epar men o eo ogy anMines

China: Meteorological Administration and Bureau of Hydrology

India: Central Water Commission India Meteorolo icalDepartmnet

Nepal: Department of Hydrology and Meteorology, Departmentof Water Induced Disaster Prevention

Page 13: CCA Proposal Group2

8/6/2019 CCA Proposal Group2

http://slidepdf.com/reader/full/cca-proposal-group2 13/18

Proposal – ICIMOD (cont.)

Phase 1 (2001-2005) completed: feasibility

Series of national consultations and technical

Full project document approved by

Page 14: CCA Proposal Group2

8/6/2019 CCA Proposal Group2

http://slidepdf.com/reader/full/cca-proposal-group2 14/18

Proposal - Icimod (cont.)

Main objectives (phase 2):1. To strengthen framework for cooperation on sharing

participating member countries

2. To establish a flood observation network in selected

3. To establish regional and national flood informationsystems to share real time data and info and increase

4. To enhance technical capacity of partners in floodforecasting and communication to the end users

.  agreed among participating countries

Page 15: CCA Proposal Group2

8/6/2019 CCA Proposal Group2

http://slidepdf.com/reader/full/cca-proposal-group2 15/18

Proposal - Icimod (cont.)

Main outcomes:

information dissemination system for floods

in sub-basins within the Gan es- 

Brahmaputra-Meghna and Indus River Basins

+ - 

financing of approx. USD 500,000 by the

Page 16: CCA Proposal Group2

8/6/2019 CCA Proposal Group2

http://slidepdf.com/reader/full/cca-proposal-group2 16/18

Proposal – Sri Lanka 

.  

2. Project Title: Mechanization of Agriculture through SustainableEco System

3. Project Objectives

Increase water retaining capacity of soil texture in order toreduce variabilit of water table. 

4. Project Partners

Internal officer – Head office staff, Resident project manager ande r s a

External organisation – Agriculture Dept., Env authority, forestDept, Wildlife Dept.

Stake holders – Farmers, commercial AG developers, poultryindustry developer, dairy industries developers,

External countries –China, Japan (Introducing machinery andequ pments or c opp ng, m x ng etc.

ADB, JWA – for funding if possible

Page 17: CCA Proposal Group2

8/6/2019 CCA Proposal Group2

http://slidepdf.com/reader/full/cca-proposal-group2 17/18

Proposal – Sri Lanka 

  Promote use of compose fertilizer by farmers as well as commercial

developers.

2009 =20% of 125,000 farmers

= o , armers

2011 =50% of 125,000 farmers

Reforestation

2009 = 700,000 plants

2010 =700,000 plants

2011 =700,000 plants

Training, awareness and monitoring programs

2009 = educate staff and 40% of farmers

2010 = refresher cost of staff and educate 60% of farnmers

Establish Cascade system

Investigate and promoting new cascade systems.

Indicative budget

6Mil USD