battery charger training manual
DESCRIPTION
electricalTRANSCRIPT
l )
r t+'.;l.dSlt a;s3nlJf aSJ.AJfSaudi Electricity Gompany
ARA$IAN BEMCO CONTRACTING CO- LTD.INDUSTRTAL & FOW€R pftOJECTS - DEVELOPmS A CONTRACTOR9
QURAYYAII COMBINED CYCLE POWER PLANT
INTEGRATED TRAINING MANUAL
DC SYSTEM
Battery charger Training Manual
Rev. Description Date Checked Released Date Type of doc.
Pag. N°
Pag. Tot.
- First Issue 24.06.2009 V.Lomonico 24.06.2009 A4 1 149 Approved Date P.Conti 24.06.2009 Cod. JGE411929
COMMESSA - JOB :
0 8 0 A 1 6 9 6
ORDINE N° - ORDER N°
B I O - Q U R - O 4 2 R E V . B D T D 2 1 . 0 4 . 2 0 0 8
CLIENTE - CUSTOMER :
DESCRIZIONE PROGETTO - PROJECT DESCRIPTION :
C O N S T R U C T I O N O F Q U R A Y Y A H O P E N C Y C L E G A S T U R B I N E P O W E R P L A N T
B A T T E R I E S , B A T T E R Y C H A R G E R S & U P S S Y S T E M S IMPIANTO - SITE :
QURAYYAH SAUDI ARABIA
TITOLO - TITLE :
BATTERY CHARGER TRAINING MANUAL
MATRICOLA - PART NUMBER :
113-116-117-118-119-120-126 / 08
CODICE DOC. - DOCUMENT NUMBER :
JGE411929
Il presente documento è di esclusiva della BORRI S.r.l. che tutelerà i propri diritti a termine di legge This document remains the exlusive property of BORRI S.r.l. and we reserve all rights according to copyright laws
Battery charger Training Manual
Rev. Description Date Checked Released Date Type of doc.
Pag. N°
Pag. Tot.
- First Issue 24.06.2009 V.Lomonico 24.06.2009 A4 2 149 Approved Date P.Conti 24.06.2009 Cod. JGE411929
BATTERY CHARGER TRAINING MANUAL
Index of sections Code
1 – BATTERY CHARGER TECH DATA JUD407772
2 – BATTERY CHARGER INSTALLATION,
OPERATING AND MAINTENANCE MANUAL JGE410502
3 – TEST PROCEDURE JUD411352
4 – BATTERY CHARGER CONFIGURATION JUD411353
5 – BATTERY CHARGER BLOCK DIAGRAM JUD411354
6 – BATTERY CHARGER MAINTENANCE JUD411546
7 – BATTERY CHARGER TROUBLESHOOTING PROCEDURES JUD411295
8 – BATTERY CHARGER APPENDIX SERVICE MANUAL JUD411479
Operating instr. for termal probe mounting on RTB.e JUD409515
Operating instr. for N_FS3011 board mounting JUD409517
Operating instr. for battery recharge LEM use JUD409518
BATTERY CHARGER
SERIES “ RTB_E ” GENERAL
TECHNICAL DATA
BATTERY CHARGER General data
Rev. Descrizione Description
Data Date
Emesso Issued
Controllato Checked
Approvato Approved
Lingua Language
Pagina Page
di Pag. of Pag.
First Issue 24/10/05 A.Ferri E. Simoni E. Simoni A Revision 07/06/07 P.Conti E. Simoni E. Simoni E 1 14 B Revision JSE410375 17/03/08 P.Conti E. Simoni E. Simoni Codice / Code
JUD407772
BATTERY CHARGER – GENERAL TECHNICAL DATA
Index
1 INTRODUCTION..............................2
2 GENERAL DESCRIPTION ..............2
3 TECHNICAL CHARACTERISTICS..2
4 PROGRAMMING AND PARAMETER SETTING..........................................2
5 ALARMS, STATUS AND SIGNALS 2
6 FRONT PANEL................................3
7 BATTERY CHARGER FUNCTIONS3 7.1 AUTOMATIC RECHARGE OF THE
BATTERY .................................................3 7.1.1 Recharge IU according to the DIN
41773 standard ........................................4 7.1.2 I1 I2 U recharge........................................4
7.1.3 U1 U2 I recharge ..................................... 4 7.2 TIMED BOOST CHARGE........................ 4 7.3 MANUAL RECHARGE ............................ 5
8 PARALLEL REDUNDANT OPERATION ....................................5
9 DESIGN STANDARDS ....................6
10 MECHANICAL LAYOUT..................6
11 SINGLE-LINE DIAGRAM.................6
12 DATASHEETS .................................7 12.1 RTB_E 24VDC OUTPUT ......................... 7 12.2 RTB_E 48VDC OUTPUT ......................... 9 12.3 RTB_E 110VDC OUTPUT ..................... 11 12.4 RTB_E 220VDC OUTPUT ..................... 13
Index of pictures
Picture 1 – Front panel ................................................3 Picture 2 – IU recharge................................................4 Picture 3 – I1 I2 U recharge.........................................4 Picture 4 – U1 U2 I recharge .......................................4 Picture 5 – Timed recharge .........................................5
Picture 6 – RTB_e in parallel with single battery ......... 5 Picture 7 – RTB_e in parallel with two separated batteries ...................................................................... 5 Picture 8 – Single-line diagram ................................... 6
BATTERY CHARGER General data
2 of 14 JUD407772 Rev.B JSE410375 17/03/08
1 INTRODUCTION The Rectifier-Battery Charger (RTB_e) is a
static thyristor AC/DC converter, controlled by a 16-bit microprocessor. The control is full digital and the structure of the software is open. This allows us to configure the system and to modify its operation according to the customer’s Technical Specification (ST).
2 GENERAL DESCRIPTION The RTB_e rectifier converts the alternate
voltage in the input, with frequency and amplitude variable according to the ST, into a continuous output voltage that is stabilized in voltage and controlled in current, by means of a three-phase SCR rectifier bridge (6 pulses version) or a couple of bridges connected in parallel (12 pulses version).
The galvanic isolation of the input mains (when required by the ST) is carried out by means of a transformer. Additional protection against power surges, under and over voltage are included as a standard. Optionally we can provide a grounded screen between the and secondary windings and semiconductor fast transient protection devices (varistors).
A programmable soft-start, reducing the inrush current of the rectifier during the start up, is included as a standard.
The system is provided with an alphanumeric display interface and keyboard (front panel) for the programming of the parameters and the visualisation of the measurements. Also RS232 for PC remote and RS485 (MODBUS protocol) interfaces are available.
In “Manual Regulation” mode it is possible to set the output rectifier voltage by means of external potentiometers. In this modality a maximum current limitation (to be set) is also active.
The transfer command “AUTOMATIC/MANUAL” and vice-versa is activated by means of key on the front panel; it is also possible to carry out the same command through the remote PC.
The front panel shows the operating status of the equipment, all the measures, the alarms and settings. The memory history can store up to 500 events in a non volatile memory with calendar.
The system can be interfaced with similar equipment through a digital link for parallel operation with the equal sharing of the load (+/-5% tolerance) and automatic exclusion of the faulty unit.
The different parts composing a standard Rectifier-Battery Charger are: 1. Input MCCB and output Load switch (battery
breaker in option) 2. Insulation transformer
3. 6 or 12 pulses thyristor bridge 4. Output filter (to reduce the voltage the ripple
at < 1%) 5. Front panel with LCD, Keyboard, Leds and
Power Flow Diagram 6. Voltage control loop, total current and
battery current individual control loops
3 TECHNICAL CHARACTERISTICS For technical characteristics see the attached
data sheet.
4 PROGRAMMING AND PARAMETER SETTING
The parameter menu on the front panel allows to adjust the various intervention thresholds for the alarms and the status changes of the equipment.
In alternative the programming can be carried out by PC connected to the serial port RS232, using the dedicated software.
At the end of the setting the modified parameters must be memorized in the non-volatile memory (EEPROM).
5 ALARMS, STATUS AND SIGNALS
The RTB_e control system offers the following list of alarms and statuses to help the user to better understand the status of the Rectifier and Battery. For the complete description of the alarms and statuses below mentioned see the chapter FRONT PANEL of the Operating Manual.
ALARM DESCRIPTION Fix Progr.
A1 Mains Fault x A2 Blown Fuses x A3 High Temperature x A4 Overload x A4 Thermal Image x A5 Max Out Voltage x A6 Min Out Voltage x A7 Charging Fault x A8 Fans Failure x A9 Open C. Breaker x
A91 RICB Open A92 BCB Open A93 ROCB Open
A10 Earth Fault x A11 Free Description x A12 Free Description x A13 Free Description x A14 Free Description x A15 EEProm Error x A16 Emergency Level x
RTB_e General data
Rev.B JSE410375 17/03/08 JUD407772 3 of 14
The first column indicates the alarm code. The alarm A4 stands for both overload and thermal image (see the chapter FRONT PANEL). The alarm A9 is splitted into three sub-alarms to show which breaker is actually open. The alarms from A11 to A14 are programmable by the system engineering.
STATUS DESCRIPTION Fix Progr.
S1 Rectifier OK x S2 Battery Discharge x
S21 Level 1 x S22 Level 2 x S23 Level 3 x
S3 Battery Charge x S31 Floating Charge x S32 Boost Charge x S33 Manual Charge x
S4 Battery OK x The first column indicates the status code.
The status S2 is split into three sub-status to show which level of discharge has been reached. The status S3 is divided into three sub-status to show which recharge type is actually active.
Each alarms and status can be remotely transferred by the means of a free voltage, two positions, relay contact. The Signaling card ARC#1 is included as a standard.
ARC #1
RELAY MEANING RL1 Mains Fault RL2 Rectifier OK RL3 Open Circuit Breaker RL4 Overload or Thermal Image RL5 Rectifier Max Voltage RL6 Rectifier Min Voltage
ARC #2
RELAY MEANING RL1 Charging Fault RL2 Earth Fault RL3 Free Description RL4 Free Description RL5 Free Description RL6 Free Description
ARC #3
RELAY MEANING RL1 Level 1 RL2 Level 2 RL3 Level 3 RL4 Battery Discharge
6 FRONT PANEL The RTB_e front panel consists in an 4 rows
alphanumeric display and 16 operating keys. It allows the complete monitoring of the RTB_e status and the setting of all operating parameters.
The power flow diagram facilitates the comprehension of the operating status.
Picture 1 – Front panel
The front panel main functions are: - Show all the relevant input and output
current, voltage and frequency measures - Show all the alarms and status of the
RTB_e - Set all the relevant functional parameters
and set-points - Show the events history The following remote connections are also
available: 1. Through an RS232 protocol 2. Through a ModBus RS485 protocol A periodical programmable automatic test of
the status of the batteries is also possible. In case of mains fault the RTB_e can provide a signalling (optical or through free contacts) of up to four pre-programmed discharging levels of the battery (voltage relay function).
7 BATTERY CHARGER FUNCTIONS
When the RTB_e is used as rectifier and battery charger it can carry out the following functions (selectable according to the requirements of the ST): 7.1 AUTOMATIC RECHARGE OF THE
BATTERY When selected the rectifier recharges the
battery automatically, according to the predefined modalities. The recharging cycle begins consequently according to one of the following events (which are programmable):
- Mains failure for a period longer than the programmed value
- Intervention of the current threshold. - Intervention of the voltage threshold.
BATTERY CHARGER General data
4 of 14 JUD407772 Rev.B JSE410375 17/03/08
- Timed boost charge The predefined cycles can be programmed in
the Menu Parameters. 7.1.1 Recharge IU according to the DIN
41773 standard The recharge is divided in two different
phases: - Phase 1: the current is constant and the
voltage increases. - Phase 2: the current decreases and the
voltage is constant. When the recharging current goes below a
certain value the battery is assumed fully recharged and the cycle ends. Consequently the output voltage is set at the floating level. During the floating the battery voltage is controlled as minimum value in order to avoid undesirable discharges, and as maximum value in order to avoid excessive heating of the electrolyte. The “thermal compensation” of the floating voltage in function of the battery temperature can be added as an option.
Picture 2 – IU recharge
7.1.2 I1 I2 U recharge This recharge is used mainly for Ni-Cd
batteries. During the recharge a boost charge of approx. 125% is provided, to compensate the losses in discharge and recharge of the battery (estimated in approx. 25%). The recharge works as follows:
If the mains fails for a time longer than the programmable threshold, when the mains returns the output voltage of the rectifier switches to a level higher than the floating, called boost charge and a safety timer is activated. If the recharging current exceeds the programmed threshold, normally a certain percent of C10, the voltage is maintained and a first phase of boost charge starts, where the current is constant and the voltage is increasing.
After a certain time the current starts to decrease and the voltage remains constant at the boost charge level. This is the second phase of the boost charge. Finally, when the current go down below the programmed level for the return in floating, the output voltage of the rectifier is
taken back to floating. If this does not happen within the max. programmed time, the safety timer blocks the charge and the voltage is forced to floating. This event generates an alarm.
Picture 3 – I1 I2 U recharge
7.1.3 U1 U2 I recharge This recharge is used mainly for Ni-Cd
batteries. During the recharge a boost charge of approx. 125% is provided, to compensate the losses in discharge and recharge of the battery (estimated in approx. 25%). The recharge works as follows:
If the mains fails for a time which is longer than the programmable threshold, when the mains returns the output voltage of the RTB_e switches to a level higher than the floating, called boost charge and a safety timer is activated.
If the recharging voltage doesn’t exceed the programmed crossing threshold, normally a certain percent of the floating, the voltage is maintained and a first phase of boost charge starts, where the current is constant and the voltage is increasing.
After a certain time the recharging voltage reaches the programmed level for the second phase of boost charge; a timer is started and the battery is kept under boost charge conditions for the time programmed. After this time has elapsed the output voltage of the rectifier is switched back to the floating value. If this does not happen within the maximum programmed time, the safety timer block the charge and the voltage is forced to floating. This event generates an alarm.
Picture 4 – U1 U2 I recharge
7.2 TIMED BOOST CHARGE This recharge is used mainly for Ni-Cd
batteries. During the recharge a boost charge of approx. 125% is provided, to compensate the
RTB_e General data
Rev.B JSE410375 17/03/08 JUD407772 5 of 14
losses in discharge and recharge of the battery (estimated in approx. 25%). The recharge works as follows:
If the mains fails for a time longer than the programmable threshold, when the mains returns the output voltage of the rectifier switches to a level higher than the floating, called boost charge for a pre-programmed time. The boost charge command can also be associated to an external command.
Picture 5 – Timed recharge
7.3 MANUAL RECHARGE The manual recharge of the battery, called
also of forming or of equalizing is a function offered by the RTB_e that allows the operator to carry out a recharge under his own manual control. This modality of recharge can be used to form the battery after that it has been stocked for a long period, or after that the electrolyte has been filled up, in the case of batteries having been shipped dry, or in order to equalize the voltage of the battery cells after having been used for a certain period.
The manual recharge procedure is described in detail in the relevant menu of the FRONT PANEL chapter of the Operating Manual. Generally, when manual recharge is selected it is possible to change manually the output voltage by means of a potentiometer to vary the recharging battery current. Such current is however always limited to a pre-selectable maximum value.
8 PARALLEL REDUNDANT OPERATION
Two rectifiers can operate in parallel redundant configuration, connected through blocking diodes to a single DC bus-bar, where the DC loads and one or two battery banks are connected.
Picture 6 – RTB_e in parallel with single battery
Picture 7 – RTB_e in parallel with two separated batteries
The rectifiers are connected by means of a communication cable, through which all the information necessary for the current sharing and the alarms management are exchanged.
During the floating charge each RTB_e supply the 50% of the total load (Active Current Sharing), therefore in case of failure of one unit the load is supplied by the remaining rectifier without affecting the DC bus-bar.
During a mains failure the batteries supply the necessary energy.
The battery charging cycle is automatically started upon the mains return; during the current limitation phase (operation as current generator) the current is completely supplied by the RTB_e #1, whereas the RTB_e #2 follows the DC bus-bar voltage without supplying any current. In case of failure of the RTB_e #1 the load is supplied by the RTB_e #2, still operative, without affecting the DC bus-bar. At the end of the current limitation phase the Active Current Sharing control is restored.
In case two batteries are connected to the DC bus-bar the recharge is carried out limiting the battery that absorbs the highest current.
The Active Current Sharing and the current limitation on the double battery are automatically enabled or disabled according to the position of
BATTERY CHARGER General data
6 of 14 JUD407772 Rev.B JSE410375 17/03/08
the bus-tie, if provided between the two rectifiers, and the rectifier output switches ROCB.
9 DESIGN STANDARDS Quality / Environment : ISO 9001:2000
EN 14001 Rectifier basic standard : EN 60146 EMC standard : EN 61000-6-2
EN 61000-6-4 Performances : EN 62040-3 Power transformers : IEC 60076 Low voltage switchgear : IEC 60439
CEI 60947-2 Cables : CEI 20-38
CEI 20-22 CEI 20-14
Safety : EN 50178 EN 62040-1-2
Protection degree : IEC 60529 Mechanical : EN 60439-1
EN 62040-1 Semiconductors : EN 60146 Protection devices : EN 60127 Contactors : EN 60947-4 Lamps : EN 60945-5
10 MECHANICAL LAYOUT The following drawings are given as examples
of mechanical layout for the rectifier series RTB_e. Width and depth varies according to the
voltage and current ratings; further details are given in the datasheet.
Version 1 : IP20
Version 2 : IP31
11 SINGLE-LINE DIAGRAM
Picture 8 – Single-line diagram
RTB_e General data
Rev.B JSE410375 17/03/08 JUD407772 7 of 14
12 DATASHEETS 12.1 RTB_E 24VDC OUTPUT
RTB_e 24Vdc - SIZE (A) 50 100 150 200 300 400 500 600 800 1000
ELECTRICAL DATA
Input Voltage (Vac) 400 ± 10% 3Wires (Other voltages are available on request)
Input frequency 50÷60 Hz ± 5Hz Input short circuit current (at 400Vac, IEC Standard) ≤16KA rms (other on request)
Max. Input Power kVA at 100% load , nominal input 1,95 3,90 5,85 7,62 11,4 15,2 18,6 22,3 29,8 37,2
Input Current distortion at nominal load (THD%)
≤27 % with 6 pulses bridge (standard) ≤12 % with 12 pulses bridge (on request)
≤6 % % with 12 pulses plus input THD filter (on request) Input Power Factor (At nominal input voltage, 100% load)
≥ 0,75 (No manual charge provided)
Output Voltage (Vdc) -Nominal : -Floating :
-Boost : -Equalizing : (Manual Charge)
48 Vdc
2,2÷2,3 V/cell for Lead acid battery (Adjustable)
1,4÷1,5 V/cell for NiCd battery (Adjustable)
2,4÷2,45 V/cell for Lead acid battery (Adjustable) 1,5÷1,65 V/cell for NiCd battery (Adjustable)
up to 2,7 V/cell for Lead acid battery
up to 1,7 V/cell for NiCd battery
Forced boost push button (on request) Thermal compensation for sealed lead acid battery (on request)
Output Ripple ≤1%rms (other on request) Overload capability < 120% for 20 min. / < 150% for 2 min. / > 150% for 20 sec. Battery recharging system See the above description
25% ≥63 ≥63 ≥63 ≥64 ≥64 ≥65 ≥66 ≥66 ≥67 ≥67 50% ≥70 ≥70 ≥70 ≥71 ≥72 ≥72 ≥73 ≥73 ≥74 ≥74 75% ≥74 ≥74 ≥74 ≥75 ≥75 ≥76 ≥76 ≥77 ≥77 ≥77
Efficiency at nominal load (%)
100% ≥82 ≥82 ≥82 ≥84 ≥84 ≥84 ≥86 ≥86 ≥86 ≥86 Parallelability (on request) Active Load Sharing - CAN bus Connection
Heat dissipation at nominal load - kW 0,263 0,527 0,790 0,914 1,37 1,83 1,95 2,34 3,13 3,91 Cable wiring See above mentioned standards
BATTERY CHARGER General data
8 of 14 JUD407772 Rev.B JSE410375 17/03/08
RTB_e 24Vdc - SIZE (A) 50 100 150 200 300 400 500 600 800 1000
ENVIRONMENTAL DATA
Acoustic noise level (according EN 50091) - dB < 65 < 68 < 70 EMI EN 61000-6-2 /EN 61000-6-4 Operating Temperature (°C) -10 .. +40 Storage Temperature (°C) -20 .. +70 Relative Humidity (non condens.) < 95% (with tropicalization on request)
Ventilation Natural up to 500 A Altitude (mt. above see level) < 2000 ( de-rating According EN62040-3)
MECHANICAL DATA
Protection degree (IEC60529) IP 20 (other on request) Painting colour and type RAL 7035, ≥ 60μm (others on request) Dimensions (mm) (<IP 41) - W 600 800 1000 - D 800 800 800 - H 2100 2100 2100Weights (Kg) 220 230 240 260 300 360 430 590 770 860 Input/output cable connection Bottom Side (Top Side on Request) Transport Base provided: for forklift handling
(for lifting belts and load balancing hooks -on request) Transport mechanical stress According to EN 62040-1 Restricted Installation 30 cm from ceiling
Air inlet from the front. Air outlet from the top and rear Accessibility Front
GENERAL
Measures Commands Adjustable Values Input Voltage Rectifier On / Off Floating Voltage Batt. Discharge Level 1 Input Current Boost On / Off Battery Current (Lim.) Batt. Discharge Level 2
Input Frequency Voltage Boost Boost Voltage Batt. Discharge Level 3 Input Power Current Boost Time after Mains Fault Output Max.Voltage
Input Power Factor Normal / Manual Safety Timer (in Hours) Output Min. Voltage Output Voltage Battery Test Float to Boost Current Floating Voltage Low Battery Voltage Rectifier Reset Boost to Float Current Floating Voltage High Output Current Float to Boost Voltage Min Input Voltage Battery Current Boost to Float Voltage Max Input Voltage
Internal Temp. (opt.) Eq. Starting Voltage Minimum Input Freq. Battery Temp. (opt.) Total Current (Output) Maximum Input Freq. Battery Temp. (opt.) Emergency Voltage
RTB_e General data
Rev.B JSE410375 17/03/08 JUD407772 9 of 14
12.2 RTB_E 48VDC OUTPUT
RTB_e 48Vdc - SIZE (A) 50 100 150 200 300 400 500 600 800 1000
ELECTRICAL DATA
Input Voltage (Vac) 400 ± 10% 3Wires (Other voltages are available on request)
Input frequency 50÷60 Hz ± 5Hz Input short circuit current (at 400Vac, IEC Standard) ≤16KA rms (other on request)
Max. Input Power kVA at 100% load , nominal input 3,77 7,53 11,3 14,7 22,1 29,4 36,0 42,7 56,9 71,1
Input Current distortion at nominal load (THD%)
≤27 % with 6 pulses bridge (standard) ≤12 % with 12 pulses bridge (on request)
≤6 % % with 12 pulses plus input THD filter (on request) Input Power Factor (At nominal input voltage, 100% load)
≥ 0,75 (No manual charge provided)
Output Voltage (Vdc) -Nominal : -Floating :
-Boost : -Equalizing : (Manual Charge)
48 Vdc
2,2÷2,3 V/cell for Lead acid battery (Adjustable)
1,4÷1,5 V/cell for NiCd battery (Adjustable)
2,4÷2,45 V/cell for Lead acid battery (Adjustable) 1,5÷1,65 V/cell for NiCd battery (Adjustable)
up to 2,7 V/cell for Lead acid battery
up to 1,7 V/cell for NiCd battery
Forced boost push button (on request) Thermal compensation for sealed lead acid battery (on request)
Output Ripple ≤1%rms (other on request) Overload capability < 120% for 20 min. / < 150% for 2 min. / > 150% for 20 sec. Battery recharging system See the above description
25% ≥65 ≥65 ≥66 ≥68 ≥68 ≥68 ≥69 ≥69 ≥69 ≥69 50% ≥73 ≥73 ≥73 ≥75 ≥75 ≥75 ≥77 ≥77 ≥79 ≥80 75% ≥76 ≥76 ≥77 ≥80 ≥80 ≥80 ≥82 ≥83 ≥83 ≥84
Efficiency at nominal load (%)
100% ≥85 ≥85 ≥85 ≥87 ≥87 ≥87 ≥89 ≥90 ≥90 ≥90 Parallelability (on request) Active Load Sharing - CAN bus Connection
Heat dissipation at nominal load – kW 0,424 0,847 1,27 1,43 2,15 2,87 2,97 3,20 4,27 5,33 Cable wiring See above mentioned standards
BATTERY CHARGER General data
10 of 14 JUD407772 Rev.B JSE410375 17/03/08
RTB_e 48Vdc - SIZE (A) 50 100 150 200 300 400 500 600 800 1000
ENVIRONMENTAL DATA
Acoustic noise level (according EN 50091) - dB < 65 < 68 < 70 EMI EN 61000-6-2 /EN 61000-6-4 Operating Temperature (°C) -10 .. +40 Storage Temperature (°C) -20 .. +70 Relative Humidity (non condens.) < 95% (with tropicalization on request)
Ventilation Natural up to 500 A Altitude (mt. above see level) < 2000 ( de-rating According EN62040-3)
MECHANICAL DATA
Protection degree (IEC60529) IP 20 (other on request) Painting colour and type RAL 7035, ≥ 60μm (others on request) Dimensions (mm) (<IP 41) - W 600 800 1000 - D 800 800 800 - H 2100 2100 2100 Weights (Kg) 250 270 290 320 380 450 530 700 900 1010Input/output cable connection Bottom Side (Top Side on Request) Transport Base provided: for forklift handling
(for lifting belts and load balancing hooks -on request) Transport mechanical stress According to EN 62040-1 Restricted Installation 30 cm from ceiling
Air inlet from the front. Air outlet from the top and rear Accessibility Front
GENERAL
Measures Commands Adjustable Values Input Voltage Rectifier On / Off Floating Voltage Batt. Discharge Level 1 Input Current Boost On / Off Battery Current (Lim.) Batt. Discharge Level 2
Input Frequency Voltage Boost Boost Voltage Batt. Discharge Level 3 Input Power Current Boost Time after Mains Fault Output Max.Voltage
Input Power Factor Normal / Manual Safety Timer (in Hours) Output Min. Voltage Output Voltage Battery Test Float to Boost Current Floating Voltage Low Battery Voltage Rectifier Reset Boost to Float Current Floating Voltage High Output Current Float to Boost Voltage Min Input Voltage Battery Current Boost to Float Voltage Max Input Voltage
Internal Temp. (opt.) Eq. Starting Voltage Minimum Input Freq. Battery Temp. (opt.) Total Current (Output) Maximum Input Freq. Battery Temp. (opt.) Emergency Voltage
RTB_e General data
Rev.B JSE410375 17/03/08 JUD407772 11 of 14
12.3 RTB_E 110VDC OUTPUT
RTB_e 110Vdc - SIZE (A) 50 100 150 200 300 400 500 600 800 1000
ELECTRICAL DATA
Input Voltage (Vac) 400 ± 10% 3Wires (Other voltages are available on request)
Input frequency 50÷60 Hz ± 5Hz Input short circuit current (at 400Vac, IEC Standard) ≤16KA rms (other on request)
Max. Input Power kVA at 100% load , nominal input 8,43 16,9 25,3 33,3 48,9 65,2 80,6 96 128 160
Input Current distortion at nominal load (THD%)
≤27 % with 6 pulses bridge (standard) ≤12 % with 12 pulses bridge (on request)
≤6 % % with 12 pulses plus input THD filter (on request) Input Power Factor (At nominal input voltage, 100% load)
≥ 0,75 (No manual charge provided)
Output Voltage (Vdc) -Nominal : -Floating :
-Boost : -Equalizing : (Manual Charge)
110 Vdc
2,2÷2,3 V/cell for Lead acid battery (Adjustable)
1,4÷1,5 V/cell for NiCd battery (Adjustable)
2,4÷2,45 V/cell for Lead acid battery (Adjustable) 1,5÷1,65 V/cell for NiCd battery (Adjustable)
up to 2,7 V/cell for Lead acid battery
up to 1,7 V/cell for NiCd battery
Forced boost push button (on request) Thermal compensation for sealed lead acid battery (on request)
Output Ripple ≤1%rms (other on request) Overload capability < 120% for 20 min. / < 150% for 2 min. / > 150% for 20 sec. Battery recharging system See the above description
25% ≥68 ≥68 ≥68 ≥69 ≥69 ≥69 ≥70 ≥70 ≥70 ≥70 50% ≥75 ≥75 ≥75 ≥84 ≥84 ≥84 ≥85 ≥85 ≥85 ≥85 75% ≥80 ≥80 ≥80 ≥85 ≥85 ≥85 ≥88 ≥88 ≥88 ≥88
Efficiency at nominal load (%)
100% ≥87 ≥87 ≥87 ≥88 ≥90 ≥90 ≥91 ≥92 ≥92 ≥92 Parallelability (on request) Active Load Sharing - CAN bus Connection
Heat dissipation at nominal load – kW 0,822 1,64 2,45 3,00 3,67 4,89 5,44 5,74 7,65 9,57 Cable wiring See above mentioned standards
BATTERY CHARGER General data
12 of 14 JUD407772 Rev.B JSE410375 17/03/08
RTB_e 110Vdc - SIZE (A) 50 100 150 200 300 400 500 600 800 1000
ENVIRONMENTAL DATA
Acoustic noise level (according EN 50091) - dB < 65 < 68 < 70 EMI EN 61000-6-2 /EN 61000-6-4 Operating Temperature (°C) -10 .. +40 Storage Temperature (°C) -20 .. +70 Relative Humidity (non condens.) < 95% (with tropicalization on request)
Ventilation Natural up to 500 A Altitude (mt. above see level) < 2000 ( de-rating According EN62040-3)
MECHANICAL DATA
Protection degree (IEC60529) IP 20 (other on request) Painting colour and type RAL 7035, ≥ 60μm (others on request) Dimensions (mm) (<IP 41) - W 600 800 1000 1000 - D 800 800 800 1000 - H 2100 2100 2100 2100 Weights (Kg) 280 320 380 450 520 600 700 800 980 1200Input/output cable connection Bottom Side (Top Side on Request) Transport Base provided: for forklift handling
(for lifting belts and load balancing hooks -on request) Transport mechanical stress According to EN 62040-1 Restricted Installation 30 cm from ceiling
Air inlet from the front. Air outlet from the top and rear Accessibility Front
GENERAL
Measures Commands Adjustable Values Input Voltage Rectifier On / Off Floating Voltage Batt. Discharge Level 1 Input Current Boost On / Off Battery Current (Lim.) Batt. Discharge Level 2
Input Frequency Voltage Boost Boost Voltage Batt. Discharge Level 3 Input Power Current Boost Time after Mains Fault Output Max.Voltage
Input Power Factor Normal / Manual Safety Timer (in Hours) Output Min. Voltage Output Voltage Battery Test Float to Boost Current Floating Voltage Low Battery Voltage Rectifier Reset Boost to Float Current Floating Voltage High Output Current Float to Boost Voltage Min Input Voltage Battery Current Boost to Float Voltage Max Input Voltage
Internal Temp. (opt.) Eq. Starting Voltage Minimum Input Freq. Battery Temp. (opt.) Total Current (Output) Maximum Input Freq. Battery Temp. (opt.) Emergency Voltage
RTB_e General data
Rev.B JSE410375 17/03/08 JUD407772 13 of 14
12.4 RTB_E 220VDC OUTPUT
RTB_e 220Vdc - SIZE (A) 50 100 150 200 300 400 500 600 800 1000
ELECTRICAL DATA
Input Voltage (Vac) 400 ± 10% 3Wires (Other voltages are available on request)
Input frequency 50÷60 Hz ± 5Hz Input short circuit current (at 400Vac, IEC Standard) ≤16KA rms (other on request)
Max. Input Power kVA at 100% load , nominal input 16,7 33,3 50 66 98 129 160 191 252 315
Input Current distortion at nominal load (THD%)
≤27 % with 6 pulses bridge (standard) ≤12 % with 12 pulses bridge (on request)
≤6 % % with 12 pulses plus input THD filter (on request) Input Power Factor (At nominal input voltage, 100% load)
≥ 0,75 (No manual charge provided)
Output Voltage (Vdc) -Nominal : -Floating :
-Boost : -Equalizing : (Manual Charge)
220 Vdc
2,2÷2,3 V/cell for Lead acid battery (Adjustable)
1,4÷1,5 V/cell for NiCd battery (Adjustable)
2,4÷2,45 V/cell for Lead acid battery (Adjustable) 1,5÷1,65 V/cell for NiCd battery (Adjustable)
up to 2,7 V/cell for Lead acid battery
up to 1,7 V/cell for NiCd battery
Forced boost push button (on request) Thermal compensation for sealed lead acid battery (on request)
Output Ripple ≤1%rms (other on request) Overload capability < 120% for 20 min. / < 150% for 2 min. / > 150% for 20 sec. Battery recharging system See the above description
25% ≥68 ≥68 ≥68 ≥69 ≥69 ≥69 ≥70 ≥70 ≥70 ≥70 50% ≥75 ≥75 ≥75 ≥84 ≥84 ≥84 ≥85 ≥85 ≥85 ≥85 75% ≥80 ≥80 ≥80 ≥85 ≥85 ≥85 ≥88 ≥88 ≥88 ≥88
Efficiency at nominal load (%)
100% ≥88 ≥88 ≥88 ≥89 ≥90 ≥91 ≥92 ≥92 ≥93 ≥93 Parallelability (on request) Active Load Sharing - CAN bus Connection
Heat dissipation at nominal load – kW 1,50 3,00 4,50 5,44 7,33 8,70 9,57 11,48 13,25 16,56Cable wiring See above mentioned standards
BATTERY CHARGER General data
14 of 14 JUD407772 Rev.B JSE410375 17/03/08
RTB_e 220Vdc - SIZE (A) 50 100 150 200 300 400 500 600 800 1000
ENVIRONMENTAL DATA
Acoustic noise level (according EN 50091) - dB < 65 < 68 < 70 EMI EN 61000-6-2 /EN 61000-6-4 Operating Temperature (°C) -10 .. +40 Storage Temperature (°C) -20 .. +70 Relative Humidity (non condens.) < 95% (with tropicalization on request)
Ventilation Natural up to 500 A Altitude (mt. above see level) < 2000 ( de-rating According EN62040-3)
MECHANICAL DATA
Protection degree (IEC60529) IP 20 (other on request) Painting colour and type RAL 7035, ≥ 60μm (others on request) Dimensions (mm) (<IP 22) - W 600 800 1000 1200 1000 1000 - D 800 800 800 800 800 1000 - H 2100 2100 2100 2100 2100 2100 Weights (Kg) 330 460 550 630 750 870 970 1050 1350 1500Input/output cable connection Bottom Side (Top Side on Request) Transport Base provided: for forklift handling
(for lifting belts and load balancing hooks -on request) Transport mechanical stress According to EN 62040-1 Restricted Installation 30 cm from ceiling
Air inlet from the front. Air outlet from the top and rear Accessibility Front
GENERAL
Measures Commands Adjustable Values Input Voltage Rectifier On / Off Floating Voltage Batt. Discharge Level 1 Input Current Boost On / Off Battery Current (Lim.) Batt. Discharge Level 2
Input Frequency Voltage Boost Boost Voltage Batt. Discharge Level 3 Input Power Current Boost Time after Mains Fault Output Max.Voltage
Input Power Factor Normal / Manual Safety Timer (in Hours) Output Min. Voltage Output Voltage Battery Test Float to Boost Current Floating Voltage Low Battery Voltage Rectifier Reset Boost to Float Current Floating Voltage High Output Current Float to Boost Voltage Min Input Voltage Battery Current Boost to Float Voltage Max Input Voltage
Internal Temp. (opt.) Eq. Starting Voltage Minimum Input Freq. Battery Temp. (opt.) Total Current (Output) Maximum Input Freq. Battery Temp. (opt.) Emergency Voltage
Battery Charger Installation, Operating and Maintenance Manual
Rev. Description Date Checked Released Date Type of doc.
Pag. N°
Pag. Tot.
- First Issue 10.12.2008 V.Lomonico 10.12.2008 A4 1 70 Approved Date P.Conti 10.12.2008 Cod. JGE410502
COMMESSA - JOB :
0 8 0 A 1 6 9 6
CLIENTE - CUSTOMER :
ORDINE N° - ORDER N°
B I O - Q U R - O 4 2 R E V . B D T D 2 1 . 0 4 . 2 0 0 8
DESCRIZIONE PROGETTO - PROJECT DESCRIPTION :
C O N S T R U C T I O N O F Q U R A Y Y A H O P E N C Y C L E G A S T U R B I N E P O W E R P L A N T
B A T T E R I E S , B A T T E R Y C H A R G E R S & U P S S Y S T E M S IMPIANTO - SITE :
QURAYYAH SAUDI ARABIA
TITOLO - TITLE :
BATTERY CHARGER INSTALLATION, OPERATING AND MAINTENANCE MANUAL
MATRICOLA - PART NUMBER :
113-116-117-118-119-120-126 / 08
CODICE DOC. - DOCUMENT NUMBER :
JGE410502
Il presente documento è di esclusiva della BORRI S.r.l. che tutelerà i propri diritti a termine di legge This document remains the exlusive property of BORRI S.r.l. and we reserve all rights according to copyright laws
Battery Charger Installation, Operating and Maintenance Manual
Rev. Description Date Checked Released Date Type of doc.
Pag. N°
Pag. Tot.
- First Issue 10.12.2008 V.Lomonico 10.12.2008 A4 2 70 Approved Date P.Conti 10.12.2008 Cod. JGE410502
INDEX
1. RTB.e GENERAL DESCRIPTION AND INSTALLATION ……………………. 3 2. RTB.e FRONT PANEL ………….………………………………………………. 15 3. START-UP AND SHUT DOWN……………………………………………………. 70
RTB.e general description and installation
Issued 10.12.2008 JGE410502 1 of 11
RTB.e GENERAL DESCRIPTION AND INSTALLATION
Index
1. INTRODUCTION .................................................................................. 3 2. RTB.E GENERAL DESCRIPTION ...................................................... 4
2.1 TYPOLOGY ...................................................................................................... 4 2.1.1 Basic structure ......................................................................................... 4 2.1.2 Protection ................................................................................................. 5 2.1.3 User interface ........................................................................................... 6
2.2 SYSTEM CONFIGURATION ............................................................................ 6 2.2.1 6 Pulses Rectifier ..................................................................................... 6 2.2.3 Front panel ................................................................................................ 6
3. BATTERY CHARGER FUNCTIONS ................................................... 7
3.1 AUTOMATIC RECHARGE OF THE BATTERY ............................................... 7 3.1.1 Automatic recharge of the battery .......................................................... 7 3.1.2 Recharge IU according to the DIN 41773 standard .............................. 7 3.1.3 I1 I2 U recharge ........................................................................................ 8 3.1.4 U1 U2 I recharge ....................................................................................... 8 3.1.5 Manual recharge ....................................................................................... 9
4. INSTALLATION ................................................................................. 10 4.1 RECEIPT OF THE RTB.E ............................................................................... 10 4.2 RTB.E HANDLING .......................................................................................... 10 4.3 POSITIONING ON SITE ................................................................................. 10
4.3.1 Basic plant, static load and weights ..................................................... 10 4.3.2 Distances to be observed ...................................................................... 10
4.4 ELECTRICAL CONNECTIONS ...................................................................... 11 4.4.1 Terminal boards ..................................................................................... 11
4.5 EXTERNAL BATTERY AND BATTERY FUSE BOX ..................................... 11
RTB.e general description and installation
2 of 11 JGE410502 Issued 10.12.2008
Index of picture
Picture 1 – Drawing of principles .................................................................................................................. 5 Picture 2 – 12 pulse rectifier ......................................................................................................................... 6 Picture 3 – IU recharge ................................................................................................................................. 7 Picture 4 – I1 I2 U recharge .......................................................................................................................... 8 Picture 5 – U1 U2 I recharge ........................................................................................................................ 9
RTB.e general description and installation
Issued 10.12.2008 JGE410502 3 of 11
1. INTRODUCTION
The purpose of this manual is to briefly describe the parts of the RTB.e, and to guide the electrician or user for the correct installation of the equipment on site.
The electrician or the user will have to read and carry out correctly the instructions given in this manual, with particolar attention to the safety requirements in compliance with the CEI 64-8 standards and the DPR 46-90.
The manufacturer declines any responsability of damage to people or things,
deriving from the non-fulfilment of the instructions. The RTB.e system consists in one 6 pulse rectifier with SCR (thyristor) technology
developed as per Technical Specification 46-TMSS-02 rev. 0, as supply system for continuous loads and battery-charger.
For this purpose the manual must be integrated with the Technical Drawings (TD), the Technical Specification 46-TMSS-02 rev. 0 (TS) and the Data Sheet (DS) to be applied with the RTB.e system.
As all the functions of control and regulation are carried out completely digitally, by means of the use of a 16 bit microprocessor, the user interface, which is the front panel, allows to vary all the operating parameters such as the output voltage, the max. battery current and so on.
We recommend expert personnel to carry out such functions. In order to protect the system from wrong programming the menu’s are protected by password. The password is different for each system and will be communicated to the user during the installation.
RTB.e general description and installation
4 of 11 JGE410502 Issued 10.12.2008
2. RTB.e GENERAL DESCRIPTION
2.1 TYPOLOGY The RTB.e rectifier converts the alternate voltage in the input, 480Vac 3Ph 60Hz, into
a continuous output voltage 125Vdc that is stabilized in voltage and controlled in current, by means of a three-phase SCR rectifier bridge (6 pulses version).
The galvanic isolation of the input mains is carried out by means of a power transformer DY11 480/131Vac 3Ph 60Hz.
ATTENTION
The RTB.e can be connected to a battery system and therefore supplied during the absence of mains . Ensure that no voltages are present, both alternate than continuous, before operating inside the RTB.e equipment.
2.1.1 Basic structure The RTB.e basic structure, which is documented in the TD drawings, is the following:
• The input mains is filtered by the high frequency emission filter (EMI), protected
by the input surge suppressor (MOV) and enters the primary of the input transformer T1, trough the Q1-RICB breaker.
• Both the syncronization signals for the control of the SCR firing angle and the
measurement of the input currents are taken from the auxiliary transformer T9 and T10 connected to the primary side of input transformer T1.
• The supply voltage for the control logics (redounded from the battery) is taken
from the secondary side. The SCR bridge is connected to the secondary by means of the proctection fuses.
• The control logic mounted in the rack named DR16 is composed by the
following boards: BP-DR16 Cod. N_TR3004 Interconnection panel
PS-DR16 Cod. N_TR3005 Power supply DR16-COMP Cod. N_TR3006 Control board (CPU)
• The firing of the SCR’s is controlled by the DR16 board and is carried out by
means of the board: RTF Cod. N_TR3002 SCR firing board
• The rectified and controlled voltage is filtered by the group L1 (series chokes),
C1 (parallel capacitor), calculated in function of the maximum ripple allowed in the TS.
RTB.e general description and installation
Issued 10.12.2008 JGE410502 5 of 11
• At the output of that group, the feedback voltage for the voltage control is taken upstream the blocking diode DB; the measurement of the total output current (for the total limitation) is always carried out by the lem U1 and the discharge and recharge current by the lem U2 and voltage of the battery are also measured.
• The RTB.e output is connected to the DC distribution input Q5-QGD switch by
means of the Q2-ROCB switch. The DC distribution is connected to the Battery Fuse Box by means of Q7-BCB switch.
Picture 1 – Drawing of principles
2.1.2 Protection The main protections of the RTB.e are listed below: The thermal protection of the brigde is carried out both by thermoswitches, which are
placed on each heat sink, and by calculation of the thermal image. The thermal image is calculated measuring the output current. If it exceeds by 100%
the nominal current but remains lower than 120%, the overload is accepted for 20 minutes before the RTB.e is stopped.
Over 120% normally the output current limitation intervenes and the RTB.e works as a current generator.
If the output current is between 120 % and 150 % the overcurrent is accepted for 2 minutes before the RTB.e is stopped. Above 150% the overcurrent is accepted for 20 seconds only.
The electrical protection of the bridges is carried out by means of a fuses placed on each input phase and in series to the SCR. In addition, the ouput current limitation limits the peak current supplied by the each SCR.
The correct value of the supplied voltages is checked by means of the double measurement of the output and battery voltage. Moreover the correct operation of the control loop is also verified.
Each step of the battery recharge is controlled and supervised by a safety timer.
RTB.e general description and installation
6 of 11 JGE410502 Issued 10.12.2008
2.1.3 User interface The user can interface with the RTB.e system by means of the following devices: - Front panel SFP with alphanumeric LCD display. - Serial port RS232 and control software. - Free voltage contact board (ARC card N_TR3009).
2.2 SYSTEM CONFIGURATION
2.2.1 6 Pulses Rectifier The configuration of the RTB.e is a 6 pulses three phase SCR bridge. It is
dimentioned to supply a continuous load and to recharge the battery at the maximum recharging current provided in the TS and DS. The standard value of the harmonic distortion (THD) re-injected into the mains by a 6 pulse rectifier is < 27%.
Picture 2 – 6 pulse rectifier
2.2.3 Front panel The front panel RTB.e is composed by a 4-row alphanumeric display at plus an
alphanumeric multi-function keyboard. It allows the complete monitoring of the RTB.e status, the programming of the paramenters and the execution of the main functions.
The power flow diagram helps to comprehend the RTB.e operating status and the system conditions. For further information see chapter “FRONT PANEL”.
RTB.e general description and installation
Issued 10.12.2008 JGE410502 7 of 11
3. BATTERY CHARGER FUNCTIONS
The RTB.e used as rectifier and battery charger can carry out the following functions according to the requirements of the ST and DS: 3.1 AUTOMATIC RECHARGE OF THE BATTERY
3.1.1 Automatic recharge of the battery The automatic recharging cycle begins consequently according to one of the
following events (which are programmable): - Mains failure for a longer period than the programmed value - Intervention of the current threshold. - Intervention of the voltage threshold.
The predefined cycles can be programmed in the Menu Parameters. The automatic recharging cycle is programmed for intervention of current threshold.
3.1.2 Recharge IU according to the DIN 41773 standard The recharge undergoes to phases: - Phase 1: the current is constant and the voltage increases. - Phase 2: the current decreases and the voltage is constant. When the recharging current goes below a certain value the battery is assumed fully
recharged and the cycle ends. Consequently the output voltage is set at the floating level. During the floating the battery voltage is controlled as minimum value in order to avoid undesirable discharges, and towards as maximum value in order to avoid excessive heating of the electrolyte. The “thermal compensation” of the floating voltage in function of the battery temperature can be added as an option.
Picture 3 – IU recharge
RTB.e general description and installation
8 of 11 JGE410502 Issued 10.12.2008
3.1.3 I1 I2 U recharge This recharge is used mainly for Ni-Cd batteries. During the recharge a boost charge
of approx. 125% is provided, to compensate the losses in discharge and recharge of the battery (estimated in approx. 25%). The recharge works as follows:
If the mains fails for a time which is longer than the programmable threshold, when
the mains returns the output voltage of the RTB.e is taken to a higher level than the floating, called boost charge and a safety timer is activated. If the recharging current exceeds the programmed crossing threshold, normally a certain percent of C10, the voltage is maintained and a first phase of boost charge starts, in which the current is constant and the voltage is increasing.
After a certain time the current starts to decrease and the voltage remains constant at the level of boost charge. This is the second phase of the boost charge. Finally, when the current goes below the programmed level for the return in floating, the output voltage of the RTB.e is taken back to floating. If this does not happen within the max. programmed time, the safety timer intervenes and the voltage is forced to floating. This event generates an alarm.
Picture 4 – I1 I2 U recharge
3.1.4 U1 U2 I recharge This recharge is used mainly for Ni-Cd batteries. During the recharge a boost charge
of approx. 125% is provided, to compensate the losses in discharge and recharge of the battery (estimated in approx. 25%). The recharge works as follows:
If the mains fails for a time which is longer than the programmable threshold, when
the mains returns the output voltage of the RTB.e is taken to a higher level than the floating, called boost charge and a safety timer is activated.
If the recharging voltage doesn’t exceed the programmed crossing threshold, normally a certain percent of the floating, the voltage is maintained and a first phase of boost charge starts, in which the current is constant and the voltage is increasing.
After a certain time the recharging voltage reaches the programmed level for the second phase of boost charge; a timer is started and the battery is kept under boost
RTB.e general description and installation
Issued 10.12.2008 JGE410502 9 of 11
charge conditions for the time programmed. After this time has elapsed the output voltage of the RTB.e is brought back to the floating value. If this does not happen within the maximum programmed time, the safety timer intervenes and the voltage is forced to floating. This event generates an alarm.
Picture 5 – U1 U2 I recharge
3.1.5 Manual recharge The manual recharge of the battery, called also of forming or of equalizing is a
function offered by the RTB.e that allows the operator to carry out a recharge under his own manual control. This modality of recharge can be used to form the battery after that it has been stocked for a long period, or after that the electrolyte has been filled up, in the case of batteries having been shipped dry, or in order to equalize the voltage of the battery cells after having been used for a certain period.
The manual recharge procedure is described in detail in the relevant menu of the FRONT PANEL chapter. Generally, when manual recharge is selected it is possibile to intervene manually on the output voltage by means of a potentiometer to vary the recharging battery current. Such current is however always limited to a preselectable maximum value.
RTB.e general description and installation
10 of 11 JGE410502 Issued 10.12.2008
4. INSTALLATION
Th installation of the RTB.e must be carried out by qualified personnel. The information contained in this manual will have to be integrated with the technical monograph, the technical specification and all technical back-up documentation. In order to verify the updated status of such documentation please contact our Technical Office.
4.1 RECEIPT OF THE RTB.e Upon receipt of the RTB.e remove the packaging and carried out an accurate visual
control, in order to make sure that the equipment has not been damaged during transport.
IMPORTANT In case of damage during transport, please submit your claim directly to the
shipping agency immediately after reception of the equipment. If the RTB.e is not installed immediately, keep it stocked in vertical position as
indicated on the packaging, and stock it in a dry and sheltered place and cover it with a packaging to protect it from dust.
4.2 RTB.e HANDLING For the handling of the RTB.e before its final positioning we suggest to leave it on its
wooden pallet to avoid risks of overturning. Before final positioning, remove the RTB.e from its palled removing the fixing bolts. The RTB.e can be lifted and moved by means of a forklift or by eyebolts. Please
verify the back-up documentation before handling. 4.3 POSITIONING ON SITE
The RTB.e must be installed in a clean ,dry and possibly not dusty place. The installer must ensure that the environment has enough air exchange so that the equipment can cool itself adeguately. Should this not be guaranteed then the environment will have to be cooled adeguately.
If the technical specification provides of a IPxx protection degree higher than IP20, the installer will have to ensure that the environment is compatible with the requested protection degree.
4.3.1 Basic plant, static load and weights The relevant data of the RTB.e are contained in the Technical Drawings in annex.
4.3.2 Distances to be observed Unless other given indications contained in the Technical Drawings, below we are
suggesting the distances to be observed: Minimum distance from the rear wall: x = 50 mm. Minimum distance from the top : y = 500 mm. Minimum distance from the front wall: d = 1000 mm.
RTB.e general description and installation
Issued 10.12.2008 JGE410502 11 of 11
4.4 ELECTRICAL CONNECTIONS The electrical connections are part of the installation and must be carried out by
specialized personnel, following the indication of the Technical Drawings. The RTB.e manufacturer is not responsible of the electrical connection. It is recommended to carry out the installation and input and output electrical connections according to the local standards.
During the electrical installations take special care to respect the sequence of the input phases.
ATTENTION
The connection to the mains has to be carried out by interposing protections fuses between the mains and the RTB.e.
The use of residual protection devices in the mains supply line of the RTB.e is not recommended; the current dispersion to the ground, due to the RFI filters is quite high and can cause undesired protection interventions.
In compliance with the EN50091-1 standards , differential devices with settable intervention threshold can be used, in order to keep into consideration the current dispersion of the RTB.e.
4.4.1 Terminal boards The position of the input, output and signalling terminal boards is shown in the
Technical Drawings. It is recommended to consider the recommended cable sections. 4.5 EXTERNAL BATTERY AND BATTERY FUSE BOX
The external battery is used to keep the output loads energized even in the case of mains failure. During the battery discharge, the control logic of the RTB.e remains supplied allowing the signalling of the discharge levels.
IMPORTANT
The battery voltage is present inside the RTB.e even in case of mains failure. Disconnect the external battery before maintenance.
The battery switch is assembled inside the DC distribution panel and between RTB.e
and Battery banks there is a Battery Fuse Box with power protection fuses, battery voltage and current instruments and Battery High Impedance monitor.
Connect the auxiliary contact to the RTB.e according to the indications on the Technical Drawings.
Front Panel
Issued 10.12.2008 JGE410502 1 of 45
FRONT PANEL
Index
1. INTRODUCTION ............................................................................. 3 2. DESCRIPTION................................................................................ 4
2.1 DESCRIPTION OF THE PANEL ................................................................ 4 2.1.1 Flow diagram ..................................................................................... 4 2.1.2 Alarm and signalling panel ............................................................... 4
LED 6 ⇒ MAINS OK ................................................................... 4
LED 7 ⇒ RECTIFIER OK ............................................................ 4
LED 8 ⇒ FLOATING CHARGE .................................................. 4
LED 9 ⇒ BOOST CHARGE ........................................................ 4
LED 10 ⇒ MANUAL CHARGE ..................................................... 4 LED 11 ⇒ LOW DC VOLTAGE .................................................... 4
LED 12 ⇒ HIGH DC VOLTAGE.................................................... 4
LED 13 ⇒ BLOWN FUSES/RICB TRIP ........................................ 4
LED 14 ⇒ OVERLOAD ................................................................. 4 LED 15 ⇒ DIODE FAILURE 3. LCD DISPLAY MANAGEMENT 4
3. LCD DISPLAY MANAGEMENT ..................................................... 5
3.1 DEFAULT .................................................................................................. 5 3.2 KEY MENU’S ............................................................................................. 5
3.2.1 On-off ................................................................................................. 7 3.2.2 Clock settings .................................................................................... 8 3.2.3 Measures ........................................................................................... 8 3.2.4 Alarms-Statuses .............................................................................. 10 3.2.5 Boost ................................................................................................ 16 3.2.6 Normal-Manual ................................................................................ 16 3.2.7 Reset ................................................................................................ 18
Front Panel
2 of 45 JGE410502 Issued 10.12.2008
3.2.8 Parameter ........................................................................................ 19 3.2.8.1 Parameters Boost Charge .......................................................... 19
a) CURRENT BOOST, or rather recharge I1 I2 U ................................. 22 b) VOLTAGE BOOST, or rather recharge U1 U2 I ............................... 24
3.2.8.2 Parameters Manual Charge ........................................................ 27 3.2.8.3 Parameters Battery Data ............................................................. 29
c) Recharge IU according to the DIN 41773 standard ......................... 30 d) Discharge level settings .................................................................... 32
3.2.8.4 Parameters Input Data ................................................................ 34 3.2.8.5 Parameters Output Data ............................................................. 34 3.2.8.6 Parameters Battery Info .............................................................. 37 3.2.8.7 Parameters Default Parameters ................................................. 38
3.2.9 Status ............................................................................................... 39 3.2.10 History .......................................................................................... 41
4. SFP SYSTEM DATA ..................................................................... 43
4.1 75A 125VDC BLOCK DC SYSTEMS ...................................................... 43 4.2 160A 125VDC STATION DC SYSTEMS ................................................. 44 4.3 300A 125VDC GAS COMPRESSOR DC SYSTEMS .............................. 45
Drawings index
Figure 1 – RTB.e front panel ................................................................................................................. 3 Figure 2 – Charge I1 I2 U ................................................................................................................... 24 Figure 3 – Recharge U1 U2 I .............................................................................................................. 27 Figure 4 – Recharge IU ....................................................................................................................... 30
Front Panel
Issued 10.12.2008 JGE410502 3 of 45
1. INTRODUCTION
The RTB.e front panel consists in an 4 rows alphanumeric display and 16 operating keys. It allows the complete monitoring of the RTB.e status and the setting of all operating parameters.
The power flow diagram facilitates the comprehension of the operating status.
Figure 1 – RTB.e front panel
Front Panel
4 of 45 JGE410502 Issued 10.12.2008
2. DESCRIPTION
2.1 DESCRIPTION OF THE PANEL The figure 1 shows the front panel that is divided in three parts. The higher left
hand part represents the power flow diagram; underneath the alarm and signalling panel with leds and finally on the right side the 4 rows display and the alphanumeric keyboard.
2.1.1 Flow diagram
LED 1 ⇒ Green light on = Rectifier Mains presence Red light on = Otherwise
LED 2 ⇒ Green light on = RTB.e operating. Red light on = RTB.e failure or blocked Switched off for mains failure. LED 3 ⇒ Green light on = Rectifier in floating charge. Orange light on = Rectifier in rapid charge.
LED 4 ⇒ Green light on = Battery in recharge and ok.
Orange light on = Battery in discharge or battery test. Red light on = Battery KO.
LED 5 ⇒ Green light on = Output OK and ROCB closed.
Red light on = Otherwise.
2.1.2 Alarm and signalling panel
LED 6 ⇒ MAINS OK
LED 7 ⇒ RECTIFIER OK LED 8 ⇒ FLOATING CHARGE LED 9 ⇒ BOOST CHARGE LED 10 ⇒ MANUAL CHARGE LED 11 ⇒ LOW DC VOLTAGE LED 12 ⇒ HIGH DC VOLTAGE LED 13 ⇒ BLOWN FUSES/RICB TRIP LED 14 ⇒ OVERLOAD LED 15 ⇒ DIODE FAILURE
Front Panel
Issued 10.12.2008 JGE410502 5 of 45
3. LCD DISPLAY MANAGEMENT
3.1 DEFAULT RECTIFIER CHARGER FLOATING CHARGE VDC = xxx V IDC = yyy A
The default screen is shown on the LCD panel when the RTB.e is operating
normally (no submenu selected); it shows the equipment name, the charge status, the measures of the output voltage (125Vdc) and current (???). If there is any alarm active a * is shown on the second row. By pressing any operating key the relevant menu is entered, from which it is possible to access all the following listed operations.
NOTE
In this section all the value “xxx”, “yyy”, “fff”, “zzz” are depending of the size of the battery charger as per technical specification TS and data sheet DS.
See chapter 4 for detailed system value.
3.2 KEY MENU’S By pressing an operating key the relevant menu is accessed and it is possible to
see the status, alarms and measurement, to send commands and to carry out settings. The menu’s can be classified as follows:
S
ON/OFF
Menu: ON-OFF MENU Type: SETTING Password: NO It is accessed by pressing the key
S
CLOCK
Menu: CLOCK SETTINGS Type: SETTING Password: NO It is accessed by pressing the key
S
MEASURES
Menu: MEASURES Type: VISUALISATION Password: NO It is accessed by pressing the key
S
ALARMS
Menu: ALARMS-STATUSES Type: VISUALISATION Password: NO It is accessed by pressing the key
Front Panel
6 of 45 JGE410502 Issued 10.12.2008
ESC
EXIT
Function: ESCAPE AND SILENCE Type: COMMAND Password: NO It is carried out by pressing the key
1
BOOST
Menu: CALL BOOST CHARGE Type: COMMAND Password: NO It is accessed by pressing the key
2
NOR/MAN
Menu: NORMAL-MANUAL Type: COMMAND Password: NO It is accessed by pressing the key
4
RESET
Menu: RECTIFIER RESET Type: COMMAND Password: NO It is accessed by pressing the key
8
PARAMETER
Menu: PARAMETERS Type: SETTINGS Password: YES It is accessed by pressing the key
9
STATUS
Menu: BATTERY STATUS Tipe: VISUALISATION and COMMAND Password: NO It is accessed by pressing the key
0
HISTORY
Menu: HYSTORY Type: SETTINGS Password: YES It is accessed by pressing the key
ENT
Function: ENTER KEY Type: COMMAND Password: NO It is accessed by pressing the key
Front Panel
Issued 10.12.2008 JGE410502 7 of 45
3.2.1 On-off This menu is entered by pressing the key:
S
ON/OFF
Menu: ON-OFF MENU Type: SETTING Password: NO It is accessed by pressing the key
In the menu the following screen is entered:
ON-OFF MENU NOW SET AT: ON PRESS 0 TO MODIFY
After having pressed the key:
0
HISTORY
Following Submenu is entered:
ON-OFF MENU
NOW SET AT: ON + OR – FOR CHANGE
AND CONFIRM
If you press following keys in this submenu:
5
+
Or
6
-
If the RTB.e is on it will shutdown or viceversa.
NOTE This key works as a two position ON-OFF switch which remains positioned on
the last selected position. This means that if you have selected ON, the RTB.e starts-up automatically until OFF is selected. It is possible to support this command with a manual switch which in its turn blocks the start-up of the RTB.e. For this purpose consult the Technical Monograph.
Front Panel
8 of 45 JGE410502 Issued 10.12.2008
3.2.2 Clock settings The menu is entered by pressing the key command:
S
CLOCK
Menu: CLOCK SETTINGS Type: SETTINGS Password: NO It is accessed by pressing the key
In the menu the following screen is entered:
CLOCK SETTINGS da mo ye ho mi 00 00 00 00 00 12 12 03 15 52 30
The last line shows, in this order, the present date, in the format “day month year”
and the present time in the format “ hours minutes second”. The alphanumeric keyboard enables the update. The numbers enter from right to left in the third line.
At the end of data entering press the key:
ENT
To confirm.
NOTE
The correct entering of the date and hour is essential for the correct operation of the alarms history.
3.2.3 Measures The menu is entered by pressing the key:
S
MEASURES
Menu: MEASURES Type: VISUALISATION Password: NO It is accessed by pressing the key
In the menu the following screen is entered:
MEASURES Ph: U V W Vin: xxx xxx xxx V Iin: yyy yyy yyy A
The second line shows which input phase the measure refers to. The third and
fourth line show, respectively, the three input voltages (phase-neutral) and the three input currents of the RTB.e.
Front Panel
Issued 10.12.2008 JGE410502 9 of 45
If in this menu the down key is pressed:
7
The following measures are accessed:
MEASURES
FREQUENCY:fff HZ IN.POWER:zzz KVA P. FACTOR: 80 %
The second line shows the frequency of the input mains in Hertz. The third line
represents the total input power in kVA. The fourth line shows the RTB.e input power factor in % meaning that 80% indicate 0.8.
If in this menu the down key is pressed:
7
The following measures are accessed:
MEASURES
RECT BATT VOLT: xxx xxx V CURR: yyy yyy A
The second line shows which point the measure refers to, respectively the
rectifier output and the battery terminals. The third line shows the relevant voltages. The fourth line shows the relevant currents in ampere.
If in this menu the down key is pressed:
7
The following measures are accessed:
MEASURES TEMPERATURE
BATTERY: 38 °C INTERNAL: 40 °C
The third line shows the internal temperature of the RTB.e, the fourth line the
battery temperature. These indications are options. For this purpose please consult the Technical Monograph.
Front Panel
10 of 45 JGE410502 Issued 10.12.2008
NOTE The arrows up (key 3) is for backward browsing. By using the ESCAPE key you
can exit from any point.
3.2.4 Alarms-Statuses The menu is entered by pressing the key:
S
ALARMS
Menu: ALARMS-STATUSES Type: VISUALISATION Password: NO It is accessed by pressing the key
In the menu the following screen is entered:
ALARMS-STATUSES Use Arrows Up & Down To Browse The Pages Press ESC To Exit
If you press the up and down keys in this menu:
7
3
The alarms and present statuses are scrolled:
Front Panel
Issued 10.12.2008 JGE410502 11 of 45
List of alarms List of statuses A1 MAINS FAULT S1 RECTIFIER OK A2 BLOWN FUSES A3 HIGH TEMPERATURE A4 OVERLOAD A5 MAX OUTPUT VOLTAGE S2 BATTERY DISCHARGE A6 MIN OUTPUT VOLTAGE S2-1 DISCHARGE LEVEL 1° A7 CHARGING FAULT S2-2 DISCHARGE LEVEL 2° A8 FANS FAILURE S2-3 DISCHARGE LEVEL 3° A9 OPEN CIRCUIT BREAKER A10 EARTH FAULT A11 PROGRAMMABLE - 1 S3 BATTERY ON CHARGE A12 PROGRAMMABLE - 2 S3-1 FLOATING CHARGE A13 PROGRAMMABLE - 3 S3-2 BOOST CHARGE A14 PROGRAMMABLE - 4 S3-3 MANUAL CHARGE A15 EEPROM FAULT S4 BATTERY OK A16 EMERGENCY VOLTAGE S4 BATTERY NOT OK
When the menu is entered the statuses and alarms, are visualised in increasing
order. Each new alarm activates a buzzer for 30 seconds. The alarms remain visualised until they are present and are registered automatically, together with the statuses, in the events history, with date and hour at each change.
The alphanumeric display offers, moreover, the complete diagnosis of the system, by means of the visualisation of 15 alarm causes and 4 operating statuses.
Each alarm is associated with a code, which is stored in the events history, and a description in order to facilitate the troubleshooting.
A1: Mains Fault A1:Mains Fault RTB.e mains input failure due to: Wrong sequence 1. wrong sequence Out of Tolerance 2. out of tolerance
Depending on which cause is shown, check the input phase sequences, or the
input voltage and frequency, comparing them with the operating limits allowed in the technical specification.
A2: Blown Fuses A2:Blown Fuses RTB.e input fuses blown on the: Blown Fuses On
Bridge 1 SCR bridge number 1 Bridge 2 SCR bridge number 2
Front Panel
12 of 45 JGE410502 Issued 10.12.2008
The SCR bridge number 1 is always present (6 pulse configuration). The SCR
bridge number 2 is present only in the double bridge configuration (12 pulses configuration). When one of the fuses blown, the relevant bridge is shutdown.
A3: High Temperature A3:High Temperature High temperature of the heatsink relevant to: High Temperature On
Bridge 1 SCR bridge number 1 Bridge 2 SCR bridge number 2
The SCR bridge number 1 is always present (6 pulse configuration). The SCR
bridge number 2 is present only in the configuration with double bridge configuration (12 pulses configuration). When one of the thermal probes intervenes, the relevant bridge is shutdown.
A4: Overload A4:Overload Iout total current supplied by RTB.e exceeds Rectifier Current In nominal shown in the technical specification.
> Than The overload is managed Nominal Current as follows:
if In < Iout < In*1.2 the overload is kept for 20 minutes;
if In*1.2 < Iout < In*1.5 the overload is kept for 2 minutes
if Iout > In*1.5 the overload is kept for 20 seconds.
At the end of the time RTB.e shuts down for 20 minutes. In this case the following screen is shown:
A4:Thermal Image Rectifier Stopped
For 20 Minutes After The Overload
After 20 minutes the RTB.e starts up again automatically. If overload continues
the countdown starts again.
A5: Max Out Voltage A5:Max Out Voltage Vout output voltage of the RTB.e exceeds Stop for Out Volt the max. programmed threshold.
> Than Such thresh. depends on the variable MAX_VRECT Output Max Voltage as follows:
If Vout > MAX_VRECT the alarm is delayed for a programmable time. All the parameters can be checked and varied in the menu PARAMETERS (see)
or from the serial port, by means of the suitable software interface.
Front Panel
Issued 10.12.2008 JGE410502 13 of 45
At the end of the time the RTB.e shuts down automatically and does not restart until it is RESET (see).
A6: Min Out Voltage A6:Min Out Voltage Vout, the output voltage of the RTB.e, goes belows Stop for Out Volt the minimum programmed threshold.
< Than Such threshold depends on the variable MIN_VRECT Output Min Voltage as follows:
The condition Vout < MIN_VRECT causes a delayed alarm. All the parameters can be checked and varied in the menu PARAMETERS (see) or
from the serial port, by means of the suitable software interface. At the end of the time the alarm becomes active. The alarm resets automatically
if the condition Vout > MIN_VRECT returns.
A7: Charging Fault A7:Charging Fault RTB.e charging system failure due to: Wrong Floating High 1. high floating voltage Wrong Floating Low 2. low floating voltage Safety Timer Active 3. safety timer activation
Wrong Floating High: If, in floating voltage, the V_batteria > MAX_VBAT
the alarm is delayed for a programmable time. At the end of the time the RTB.e shuts down automatically and does not restart until it is RESET (see). Wrong Floating Low: If, in floating voltage, the V_batteria < MIN_VBAT the
alarms is activated after the programmable delay. Safety Timer Active: If, in boost charge, the safety timer is active, the
RTB.e returns to floating and the alarm is activated and remains memorized until a RESET (see) is carried out.
Al the parameters can be checked and varied in the menu PARAMETERS (see) or
from the serial port, by means of the suitable software interface.
A8: Fans Failure A8: Fans Failure The fans cooling monitoring board of the
Alarm From RTB.e has intervened. Fans Monitor
Card
The presence of fans depends on the type of cooling (forced cooling or natural
ventilation ). For further information consult the Technical Monograph.
Front Panel
14 of 45 JGE410502 Issued 10.12.2008
A9: Open C. Breaker A9: Open C. Breaker One of the breakers of the RTB.e in open:
RICB Open 1. mains input breaker BCB Open 2. battery breaker
ROCB Open 3. output breaker The presence and the type of the breakers depends on the RTB.e configuration. For more information consult the technical monograph
A10: Earth Fault A10: Earth Fault The earth fault relay signal has intervened
Alarm From due to an isolation loss towards earth Earth Fault of one of the controlled poles. Monitor Card
The presence and type of earth fault relay depends on the RTB.e configuration.
For more information consult the Technical Monograph.. The alarms A12, A13 and A14 are programmable. For more information please
consult the Technical Monograph.
A15: EEProm Error A15: EEProm Error An internal error has occurred. Internal Error It is necessary to contact the Service. Contact the Service
A16: Emergency Volt A16:Emergency Level The output voltage Vout of the RTB.e is forced
Output Voltage to a programmed fixed level. Forced at Such level depends on the variable LIVELLO4 and
The Emergency is forced by means, of an external contact. The LEVEL4 can be checked and varied in the menu PARAMETERS (see) or from
the serial port, by means of the suitable software interface.
S1: Rectifier OK S1: Rectifier OK No alarms are active.
No Active Alarms Present
Front Panel
Issued 10.12.2008 JGE410502 15 of 45
S2: Battery Discharge S2:Battery Discharge The battery is in discharge (due to mains failure)
Level 1 1. the discharge has reached the 1° Level Level 2 2. the discharge has reached the 2° Level Level 3 3. the discharge has reached the 3° Level
During the battery discharge the RTB.e can monitor the voltage and signal the
reaching of one or more programmable discharge levels. Each of the three levels, LEVEL1, LEVEL2 and LEVEL3, can be checked and
varied in the menu PARAMETERS (see) or from the serial port, by means of the suitable software interface.
For more information please consult the Technical Monograph.
S3: Battery Charge S2:Battery Charge The battery is charged in the following mode: Float Charge Mode 1. Floating Charge Boost Charge Mode 2. Boost Charge Manual Charge Mode 3. Manual Charge
The battery recharge mode of the RTB.e can be enabled and varied in the menu
PARAMETERS (see) or from the serial port, by means of the suitable software interface.
The choices to carry out depend on the type of battery installed. For more information consult the Technical Monograph and Technical Specification.
The recharging procedures are described in the chapter RTB.e General Description And Installation.
S4: Battery OK S4: Battery OK The battery is completely efficient as:
Battery Connected 1. it is connected to the load Battery Test OK 2. the last battery test was OK.
In case one of the conditions is not ok , the status changes as follows:
S4: Battery not OK S4: Battery not OK The battery is not completely efficient as: Batt. Not Connect. 1. it is not connected to the load Battery Test not OK 2. the last battery test was not ok.
The alarm Battery Test not OK does not reset automatically. It is necessary to
RESET (see), after having checked and repaired the battery.
Front Panel
16 of 45 JGE410502 Issued 10.12.2008
The battery test modes on the RTB.e can be enabled and varied in the menu PARAMETERS (see) or from the serial port, by means of the suitable software interface.
The choices to carry out depends on the type of battery installed. For more information consult the Technical Monograph and Technical Specification.
3.2.5 Boost The menu is entered by pressing the key command:
1
BOOST
Menu: CALL BOOST CHARGE Type: COMMAND Password: NO It is accessed by pressing the key
In the menu the following screen is entered:
CALL RECH.BOOST MENU Press ENTER
TO CALL BOOST Press ESC To Exit
By pressing the ENTER key the RTB.e brings the output voltage to the
programmed level for the boost charge SETP_VDC_BOOST. The level is maintained for 30 seconds and then returns to floating. All the battery recharge modes and the relevant levels can be enabled and varied in the menu PARAMETERS (see) or from the serial port, by means of the suitable software interface. For more information consult the Technical Monograph and Technical Specification.
3.2.6 Normal-Manual The menu is entered by pressing the key command:
2
NOR/MAN
Menu: NORMAL-MANUAL Type: COMMAND Password: NO It is accessed by pressing the key
In the menu the following screen is entered:
NORMAL-MANUAL MENU NOW SET AT: NORMAL PRESS 0 TO MODIFY
Front Panel
Issued 10.12.2008 JGE410502 17 of 45
After having pressed the key:
0
HISTORY
The submenu is entered:
NORMAL-MANUAL MENU NOW SET AT: NORMAL + OR – FOR CHANGE
AND CONFIRM
If in this submenu the following keys are pressed:
5
+
and
6
-
If the RTB.e is set on Manual it switches to Normal and viceversa.
NOTE This key works as a two positions switch M-A that remains positioned on the last
selected position. This means that if NORMAL has been selected the RTB.e remains in Normal mode until the operating mode is changed into in MANUAL.
Normally the RTB.e is used to recharge the battery automatically and therefore
the NORMAL mode is selected. The battery manual recharge, called also equalizing, is a function offered by the
RTB.e to allow the operator to carry out a recharge under his own manual control. This recharge modality can be used to form the battery after it has been stocked
for a long period, or after having filled it up with electrolyte, in case of dry delivered batteries, or to equalize the voltage of the battery cells after these have been used for a certain time.
The manual recharge procedure is the following:
Step 1: With RTB.e shutdown the battery voltage that has to be equalized is measured.
Step 2: Enter menu PARAMETERS, menu MANUAL CHARGE (See 3.2.8.2 Parameters Manual Charge), and set, in the following order :
a. The setup voltage (SETP_VDC_EQUAL) in Volt. b. The max charge current (CORR_LIM_EQUAL) in Amp. c. The max time of permanence (MAXTIME EQUAL) in minutes.
Step 3: The regulation potentiometer is positioned at approx. 10%. Step 4: Enter the menu NORMAL-MANUAL and select the MANUAL mode; in
this way the position of the potentiometer is read as starting setup voltage for the equalizing charge.
Front Panel
18 of 45 JGE410502 Issued 10.12.2008
Step 5: Start-up the RTB.e. The voltage goes to the starting set-up value. By means of the potentiometer the voltage of the batteries to be equalized can be varied, controlling the recharge current in conformity with the battery specifications. The current however cannot go over the set limit. If it remains in this condition for a longer time than the set limit the voltage returns automatically to the starting setup value.
Step 6: At the end of the procedure shutdown the RTB.e and select again the NORMAL mode; in this way the automatic recharge system is enabled again.
Step 7: Re-start the RTB.e. This procedure can be repeated several time to fraction the forming charge in
several steps with the current limits in different times.
IMPORTANT The manual recharge function or equalizing cannot be used for all types of
batteries. The responsibility of the correct use of the batteries is of the operator. We recommend the use of the manual charge only by specialized personnel.
The choices to carry out and the recharging mode depend on the type of battery installed. For more information consult the Technical Monograph and the Technical Specification.
3.2.7 Reset The menu is entered by pressing the key command:
4
RESET
Menu: RECTIFIER RESET Type: COMMAND Password: NO It is accessed by pressing the key
In the menu the following screen is entered:
RECTIFIER RESET MENU Press ENTER TO RESET
Press ESC To Exit
If the key ENTER is pressed the RTB.e carries out a general reset of all the stored
error conditions, or rather of those that do not reset automatically when the anomaly has terminated. Such conditions are forced in the following way:
Front Panel
Issued 10.12.2008 JGE410502 19 of 45
TIMEOUT_B = 0 Cancels the intervention of the boost charge safety timer TIMER_BOOST = 0 Zeroing of the boost charge safety timer BOOST = 0 Cancels the intervention of the boost charge recall relay TIMER_EQUAL = 0 Zeroing of the manual charge safety timer MAX_RAD = 0 Cancels the intervention of the max output voltage relay TEMPO_MAX_RAD = 0 Zeroing of the max output voltage intervention relay WRONG_HIGH = 0 Cancels the intervention of the max floating voltage relay TEMPO_MAX_BAT = 0 Zeroing of the max floating voltage intervention relay TEST_OK =1 Resets the battery test not OK alarm.
3.2.8 Parameter The menu is entered by pressing the key command:
8
PARAMETER
Menu: PARAMETERS Type: SETTINGS Password: Yes It is accessed by pressing the key
In the menu the following screen, in which the password has to be entered, is
accessed :
MENU PASS.PROTECTED INSERT THE PASSWORD
**** AND PRESS ENTER
Only if the correct password of 4 numbers is entered the next submenus can be
used. Once entered, the correct password remains active for about 5 minutes.
NOTE The qualifying password is different for each RTB.e. For more information please
consult the Technical Monograph. The menu of the parameters enables to vary the operating modalities of the
various procedures which are programmed on the RTB.e, that are the thresholds and the delays of the protection interventions. For this purpose we recommend the use only by specialised personnel.
7
3
All the available submenus are browsed:
Depending on the entered submenus various screens and options are shown.
3.2.8.1 Parameters Boost Charge In this submenu all parameters relevant to the boost charge can be varied.
Front Panel
20 of 45 JGE410502 Issued 10.12.2008
The next screen allows to select the mode with which the RTB.e performs the boost charge of the battery; or rather for:
Intervention of the voltage threshold VOLTAGE BOOST Intervention of the current threshold CURRENT BOOST
BOOST CHARGE MODE
VOLTAGE BOOST PRESS 0 TO MODIFY ARROWS TO SELECT
After having pressed the key:
0
HISTORY
The submenu is entered:
BOOST CHARGE MODE
VOLTAGE BOOST + OR – TO CHANGE ENTER TO CONFIRM
If you press the following key in this submenu:
5
+
And
6
-
If the RTB.e is set in VOLTAGE BOOST, it switches to CURRENT BOOST and
viceversa.
BOOST CHARGE MODE VOLTAGE BOOST
+ OR – TO CHANGE ENTER TO CONFIRM
IMPORTANT
Normally the boost charge mode depends on the battery type. For this reason the mode, once chosen, should never be varied. For more information consult the Technical Monograph.
Front Panel
Issued 10.12.2008 JGE410502 21 of 45
The next screen allows to select the delay, after mains failure, with which the RTB.e forces the output voltage to start the boost charge. Such delay is useful to avoid that, at each short mains interruption, RTB.e restarts in boost charge.
MAINS F.DELAY(SEC) NOW SET AT: 0120 PRESS 0 TO MODIFY ARROWS TO SELECT
After having pressed the key:
0
HISTORY
The submenu is entered:
MAINS F.DELAY(SEC) NOW SET AT: 0120
0000 ENTER TO CONFIRM
By means of the alphanumeric keyboard a new delay in seconds can be set
which is memorized in the variable MAX_TIME_MAINS_FAULT. The next screen allows to select the time of intervention of the boost charge
safety timer, after which the RTB.e, forces the output voltage again to floating. If the RTB.e for any reason does not exit the boost charge, the battery voltage is taken anyhow back to floating and an alarm is given.
SAFETY TIMER (MIN) NOW SET AT: 0480 PRESS 0 TO MODIFY ARROWS TO NAVIGATE
After having pressed the key:
0
HISTORY
The submenu is entered:
SAFETY TIMER (MIN) NOW SET AT: 0480
0000 ENTER TO CONFIRM
By means of an alphanumeric keyboard the new time in minutes can be set
which is memorized in the variable SAFETY_TIME_B.
Front Panel
22 of 45 JGE410502 Issued 10.12.2008
Now the two modes of boost charge are described, and the relevant parameters
that can be changed in this submenu:
a) CURRENT BOOST, or rather recharge I1 I2 U This recharge is mainly used for Ni-Cd batteries. During the recharge the over-
charge of about 125% is provided (called also boost-charge), to compensate the losses in discharge and charge of the battery (estimated in about 25% ). The recharge takes place as follows:
If the mains fails for a time exceeding the programmed time in
MAX_TIME_MAINS_FAULT, at the restart the output voltage of the RTB.e is taken to a higher level than floating, called boost charge and a safety timer is activated.
The next screen sets the voltage of the boost charge:
BOOST CHARGE VOLTAGE NOW SET AT: xxx
PRESS 0 TO MODIFY ARROWS TO SELECT
After having pressed the key:
0
HISTORY
The submenu is entered
BOOST CHARGE VOLTAGE
NOW SET AT: xxx 000.0
ENTER TO CONFIRM
By means of the alphanumeric display a new voltage in Volt can be set. That
voltage will be memorized in SETP_VDC_BOOST. If the boost charge current exceeds the programmed threshold, normally a
certain percent of C10, the set point of the voltage is maintained at the boost level and a first phase of boost charge starts in which the current is constant and the voltage is increasing.
The next screen show how to set the crossing threshold:
FLOAT-BOOST CURRENT NOW SET AT: yyy
PRESS 0 TO MODIFY ARROWS TO NAVIGATE
Front Panel
Issued 10.12.2008 JGE410502 23 of 45
After having pressed the key:
0
HISTORY
The submenu is entered:
FLOAT-BOOST CURRENT
NOW SET AT: yyy 000.0
ENTER TO CONFIRM
By means of the alphanumeric keyboard a new current in Ampere can be set.
That current is memorized in the variable CORR_FLOAT_BOOST.
After a certain time the current starts to decrease and the voltage remains constant at the level of boost charge. This is the second phase of the boost charge. Finally, when the current goes below the programmed level for the return in floating the output voltage of the RTB.e it is taken back to floating.
The following screen shows how to set the return threshold:
BOOST-FLOAT CURRENT NOW SET AT: yyy
PRESS 0 TO MODIFY ARROWS TO NAVIGATE
After having pressed the key:
0
HISTORY
The submenu is entered:
BOOST-FLOAT CURRENT NOW SET AT: yyy
000.0 ENTER TO CONFIRM
By means of an alphanumeric display a new current in Ampere can be set. That
current is memorized in the variable CORR_BOOST_FLOAT.
If this does not happen within the maximum time programmed in SAFETY_TIME_B, the safety timer intervenes and the voltage is forced to floating. This event generates an alarm.
Front Panel
24 of 45 JGE410502 Issued 10.12.2008
Figure 2 – Charge I1 I2 U
b) VOLTAGE BOOST, or rather recharge U1 U2 I This recharge is mainly used for Ni-Cd batteries. During the recharge the over-
charge of about 125% is provided (called also boost-charge), to compensate the losses in discharge and charge of the battery (estimated in about 25% ). The recharge takes place as follows:
If the mains fails for a time exceeding the programmed time in MAX_TIME_MAINS_FAULT, at the restart, the output voltage of the RTB.e is taken to a higher level than floating, called boost charge and a safety timer is activated.
The following screen enables to set the boost charge:
BOOST CHARGE VOLTAGE NOW SET AT: xxx
PRESS 0 TO MODIFY ARROWS TO SELECT
After having pressed the key:
0
HISTORY
The submenu is entered:
Front Panel
Issued 10.12.2008 JGE410502 25 of 45
BOOST CHARGE VOLTAGE
NOW SET AT: xxx 000.0
ENTER TO CONFIRM
By means of the alphanumeric keyboard a new voltage in Volt can be set. That
voltage is memorized in the variable SETP_VDC_BOOST.
If in the boost charge condition the battery voltage does not exceed the programmed voltage threshold, normally a certain percentage of floating, the boost charge voltage set point is maintained and a first phase of boost charge starts in which the current is constant and the voltage increasing.
The following screen shows how to set the voltage threshold:
FLOAT-BOOST VOLTAGE NOW SET AT: xxx
PRESS 0 TO MODIFY ARROWS TO NAVIGATE
After having pressed the key:
0
HISTORY
The submenu is entered:
FLOAT-BOOST VOLTAGE
NOW SET AT: xxx 000.0
ENTER TO CONFIRM
By means of the alphanumeric keyboard a new voltage in Volt can be set. That
voltage is memorized in the variable VOLT_FLOAT_BOOST.
After a certain time that the voltage increases it exceeds the programmed level for the return in floating and, after a programmed delay, the output voltage of the RTB.e it is taken back to floating.
The following screen show how to set the return threshold:
BOOST-FLOAT VOLTAGE NOW SET AT: xxx
PRESS 0 TO MODIFY ARROWS TO NAVIGATE
Front Panel
26 of 45 JGE410502 Issued 10.12.2008
After having pressed the key:
0
HISTORY
The submenu is entered:
BOOST-FLOAT VOLTAGE
NOW SET AT: xxx 000.0
ENTER TO CONFIRM
By means of the alphanumeric keyboard a new voltage in Volt can be set. That
voltage is memorized in the variable VOLT_BOOST_FLOAT.
The next screen allows to select the delay of the return from boost to float after that the recharging voltage has reached the VOLT_BOOST_FLOAT level.
D. BOOST-FLOAT (MIN)
NOW SET AT: xxx PRESS 0 TO MODIFY ARROWS TO NAVIGATE
After having pressed the key:
0
HISTORY
The submenu is entered:
D. BOOST-FLOAT (MIN)
NOW SET AT: xxx 0000
ENTER TO CONFIRM
By means of an alphanumeric keyboard the new time in minutes can be set
which is memorized in the variable MAXTEMPO_BOOST_FLOAT. If the voltage doesn’t return automatically to the floating before the maximum
time programmed in SAFETY_TIME_B, the safety timer intervenes and the voltage is forced to floating. This event generates an alarm.
Front Panel
Issued 10.12.2008 JGE410502 27 of 45
Figure 3 – Recharge U1 U2 I
3.2.8.2 Parameters Manual Charge In this submenu all parameters relevant to the manual or equalizing charge can
be set. The next screen enables to set the starting voltage for the manual charge:
EQUAL.START. VOLTAGE NOW SET AT: xxx
PRESS 0 TO MODIFY ARROWS TO NAVIGATE
After having pressed the key:
0
HISTORY
The submenu is entered:
EQUAL.START. VOLTAGE
NOW SET AT: xxx 000.0
ENTER TO CONFIRM
By means of the alphanumeric keyboard a new voltage in Volt can be set. That
voltage is memorized in the variable SETP_VDC_EQUAL.
The next screen enables to set up the max recharging current of the battery during the manual charge (limitation).
Front Panel
28 of 45 JGE410502 Issued 10.12.2008
EQUAL. MAX CURRENT NOW SET AT: yyy
PRESS 0 TO MODIFY ARROWS TO SELECT
After having pressed the key:
0
HISTORY
The submenu is entered:
EQUAL. MAX CURRENT NOW SET AT: yyy
000.0 ENTER TO CONFIRM
By means of the alphanumeric keyboard a new current in Ampere can be set.
That current is memorized in the variable CORR_LIM_EQUAL.
The next screen enables to select the intervention time of the manual charge safety timer, after which the RTB.e forces the output voltage back again to the starting value.
EQUAL. TIMER (MIN) NOW SET AT: 0540 PRESS 0 TO MODIFY ARROWS TO NAVIGATE
After having pressed the key:
0
HISTORY
The submenu is entered:
EQUAL. TIMER (MIN) NOW SET AT: 0540
0000 ENTER TO CONFIRM
By means of an alphanumeric keyboard a new time in minutes can be set which
is memorized in the variable MAXTIME_EQUAL.
NOTE The procedure of manual charge is described in the relevant paragraph in menu
3.2.6 Normal-Manual.
Front Panel
Issued 10.12.2008 JGE410502 29 of 45
3.2.8.3 Parameters Battery Data In this submenu all the relevant parameters for the maximum recharging current
of the battery and the battery floating voltage can be set. The next screen enables to set the battery floating voltage:
FLOATING VOLTAGE NOW SET AT: xxx
PRESS 0 TO MODIFY ARROWS TO NAVIGATE
After having pressed the key:
0
HISTORY
The submenu is entered:
FLOATING VOLTAGE NOW SET AT: xxx
000.0 ENTER TO CONFIRM
By means of an alphanumeric keyboard a new voltage in Volt can be set.
That voltage is memorized in the variable SETP_VDC_FLOAT.
The next screen enables to set the maximum recharging current of the battery during the automatic charge.
RECHARGE MAX CURRENT
NOW SET AT: yyy PRESS 0 TO MODIFY ARROWS TO NAVIGATE
After having pressed the key:
0
HISTORY
The submenu is entered:
RECHARGE MAX CURRENT NOW SET AT: yyy
000.0 ENTER TO CONFIRM
Front Panel
30 of 45 JGE410502 Issued 10.12.2008
By means of an alphanumeric keyboard a new current in Ampere can be set.That current is memorized in the variable CORR_LIM_AUTO.
Adjusting these two parameters it is possible to set the following recharge function:
c) Recharge IU according to the DIN 41773 standard The recharge takes place in two phases : Phase 1: the current is constant and the voltage increases Phase 2: the current decreases and the voltage is constant When the current of recharge goes below a certain value the battery is
considered recharged and the cycles ends. Consequently the output voltage is set back to the floating voltage.
Figure 4 – Recharge IU
During floating the battery voltage is controlled towards the minimum level in order to avoid undesired discharges and towards the maximum level in order avoid an excessive heating of the electrolyte. (For the same reason an option for thermal compensation of the floating voltage – battery voltage versus battery temperature - can be added).
The next screen enables to set the minimum floating voltage:
LOW FLOATING LEVEL NOW SET AT: xxx
PRESS 0 TO MODIFY ARROWS TO NAVIGATE
Front Panel
Issued 10.12.2008 JGE410502 31 of 45
After having pressed the key:
0
HISTORY
The submenu is entered:
LOW FLOATING LEVEL NOW SET AT: xxx
000.0 ENTER TO CONFIRM
By means of an alphanumeric keyboard a new voltage in Volt can be set.
That voltage is memorized in the variable MIN_VBAT. If the battery voltage goes below this threshold and alarm is given.
The next screen enables to set the maximum floating voltage:
HIGH FLOATING LEVEL NOW SET AT: xxx
PRESS 0 TO MODIFY ARROWS TO NAVIGATE
After having pressed the key:
0
HISTORY
The submenu is entered:
HIGH FLOATING LEVEL
NOW SET AT: xxx 000.0
ENTER TO CONFIRM
By means of an alphanumeric keyboard a new voltage in Volt can be set. That voltage is memorized in the variable MAX_VBAT. If the battery voltage
exceeds this threshold an alarm is given and the RTB.e is shut down in permanent mode (it has to be RESET).
The next screen enables to the delay time for the intervention of the maximum floating voltage, after which the RTB.e shuts down and generates an alarm:
HIGH FLOAT DELAY (S) NOW SET AT: 0005 PRESS 0 TO MODIFY ARROWS TO NAVIGATE
Front Panel
32 of 45 JGE410502 Issued 10.12.2008
After having pressed the key:
0
HISTORY
The submenu is entered:
HIGH FLOAT DELAY (S)
NOW SET AT: 0005 0000
ENTER TO CONFIRM
By means of an alphanumeric keyboard a new time in seconds can be set which
is memorized in the variable MAX_TEMPO_MAX_BAT.
d) Discharge level settings During the discharge of the battery (mains fault) the control logic of the RTB.e
remains active and voltage threshold levels can be set to signal the discharge levels reached by the battery.
The next screen enables to set the first discharge level:
DISCHARGE LEVEL 1 NOW SET AT: xxx
PRESS 0 TO MODIFY ARROWS TO NAVIGATE
After having pressed the key:
0
HISTORY
The submenu is entered:
DISCHARGE LEVEL 1 NOW SET AT: xxx
000.0 ENTER TO CONFIRM
By means of an alphanumeric keyboard a new voltage in Volt can be set.
That voltage is memorized in the variable LIVELLO1. If the battery voltage goes below this threshold an alarm is given.
The next screen enables to set the second discharge level:
DISCHARGE LEVEL 2 NOW SET AT: xxx
PRESS 0 TO MODIFY ARROWS TO NAVIGATE
After having pressed the key:
Front Panel
Issued 10.12.2008 JGE410502 33 of 45
0
HISTORY
The submenu is entered:
DISCHARGE LEVEL 2 NOW SET AT: xxx
000.0 ENTER TO CONFIRM
By means of an alphanumeric keyboard a new voltage in Volt can be set.
That voltage is memorized in the variable LIVELLO2. If the battery voltage goes below this threshold an alarm is given.
The next screen enables to set the third discharge level:
DISCHARGE LEVEL 3 NOW SET AT: xxx
PRESS 0 TO MODIFY ARROWS TO NAVIGATE
After having pressed the key:
0
HISTORY
The submenu is entered:
DISCHARGE LEVEL 3 NOW SET AT: xxx
000.0 ENTER TO CONFIRM
By means of an alphanumeric keyboard a new voltage in Volt can be set.
That voltage is memorized in the variable LIVELLO3. If the battery voltage goes below this threshold an alarm is given.
NOTE The management of the discharge levels and the above described recharge
modalities depend on the type of battery and application. For more information consult the Technical Monograph and the Technical Specification.
Front Panel
34 of 45 JGE410502 Issued 10.12.2008
3.2.8.4 Parameters Input Data In this submenu all the control parameters relevant to the RTB.e input can be
visualized. The next screen shows the frequency limits:
FREQUENCY MAX fff HZ NOM fff HZ MIN fff HZ
Using the keys:
7
3
All the available screens can be browsed.
The following screen shows the input voltage limits in Volt:
VOLTAGE MAX xxx Vac NOM xxx Vac MIN xxx Vac
3.2.8.5 Parameters Output Data In this submenu all the control parameters relevant to the RTB.e voltage and
current output can be visualized. Some are fix and others can be varied. The next screen shows the nominal value of the output voltage in Volt::
OUTPUT DATA NOMINAL VOLTAGE
VALUE: xxx ARROWS TO NAVIGATE
Using the keys:
7
3
All the available screens can be browsed.
The next screen shows the nominal output current in Ampere: OUTPUT DATA
NOMINAL CURRENT VALUE: yyy ARROWS TO NAVIGATE
Front Panel
Issued 10.12.2008 JGE410502 35 of 45
The next screen shows the maximum output current in Ampere (total output current limitation):
OUTPUT DATA MAX TOTAL CURRENT
VALUE: yyy ARROWS TO NAVIGATE
The next screen enables to set the threshold of maximum output voltage of the RTB.e:
MAX OUTPUT VOLTAGE NOW SET AT: xxx
PRESS 0 TO MODIFY ARROWS TO NAVIGATE
After having pressed the key:
0
HISTORY
The submenu is entered:
MAX OUTPUT VOLTAGE NOW SET AT: xxx
000.0 ENTER TO CONFIRM
By means of an alphanumeric keyboard a new voltage in Volt can be set. That voltage is memorized in the variable MAX_VRECT. If the output voltage
exceeds this threshold an alarm is given and the RTB.e is shut down in permanent mode (it has to be RESET).
The next screen enables to adjust the delay time for the intervention of the maximum output voltage, after which the RTB.e shuts down and generates an alarm.
MAX-VOUT DELAY (S) NOW SET AT: 0005 PRESS 0 TO MODIFY ARROWS TO NAVIGATE
After having pressed the key:
0
HISTORY
The submenu is entered:
Front Panel
36 of 45 JGE410502 Issued 10.12.2008
MAX-VOUT DELAY (S) NOW SET AT: 0005
0000 ENTER TO CONFIRM
By means of an alphanumeric keyboard a new time in seconds can be set which
is memorized in the variable MAX_TEMPO_MAX_RAD. The next screen enables to set the minimum output voltage:
MIN OUTPUT VOLTAGE NOW SET AT: xxx
PRESS 0 TO MODIFY ARROWS TO NAVIGATE
After having pressed the key:
0
HISTORY
The submenu is entered:
MIN OUTPUT VOLTAGE NOW SET AT: xxx
000.0 ENTER TO CONFIRM
By means of an alphanumeric keyboard a new voltage in Volt can be set.
That voltage is memorized in the variable MIN_VRECT If the output voltage goes below this threshold an alarm is given.
The next screen enables to set the emergency voltage level to which the output voltage of the RTB.e can be forced by means of an external contact:
EMERGENCY LEVEL NOW SET AT: xxx
PRESS 0 TO MODIFY ARROWS TO NAVIGATE
After having pressed the key:
0
HISTORY
The submenu is entered:
Front Panel
Issued 10.12.2008 JGE410502 37 of 45
EMERGENCY LEVEL NOW SET AT: xxx
000.0 ENTER TO CONFIRM
By means of an alphanumeric keyboard a new voltage in Volt can be set.
That voltage is memorized in the variable LIVELLO4. If the contact is active, the output voltage is forced to the set value and an alarm is given.
NOTE
The presence of the emergency output level depends on the type of application. For more information please consult the Technical Monograph and the Technical
Specification.
3.2.8.6 Parameters Battery Info In this submenu the parameters relevant to the type of battery installed can be
visualized and varied with the RTB.e. This screen enables to set the battery capacity in Ampere-hour.
BATTERY SIZE (Ah) NOW SET AT: yyy
PRESS 0 TO MODIFY ARROWS TO NAVIGATE
After having pressed the key:
0
HISTORY
The submenu is entered:
BATTERY SIZE (Ah) NOW SET AT: yyy
000.0 ENTER TO CONFIRM
By means of the alphanumeric keyboard a new capacity in Ampere-hour can be
set. The next screen shows to set the battery installation date in format mm/yy
(month/year):
BATTERY INST. DATE NOW SET AT: 21/03 PRESS 0 TO MODIFY ARROWS TO NAVIGATE
Front Panel
38 of 45 JGE410502 Issued 10.12.2008
After having pressed the key:
0
HISTORY
The submenu is entered:
BATTERY INST. DATE NOW SET AT: 21/03
000.0 ENTER TO CONFIRM
By means of the alphanumeric keyboard a new date of installation can be set.
The figures enter from right to left and therefore to set May/2002 you need to digit 05 and then 02 and press ENTER.
IMPORTANT
The setting of the correct capacity is mandatory for a correct calculation of the residual battery autonomy.
For more information please consult the Technical Monograph and the Technical Specification.
3.2.8.7 Parameters Default Parameters This submenu enables to recall all the default operating parameters of the RTB.e,
or rather those that were memorized in the factory. The next screen enables to recall the default settings.
PRESS 0 TO RELOAD THE DEFAULT
PAMETERS; THEN RESTART THE RECTIFIER
After having pressed the key:
0
HISTORY
The RTB.e must be shutdown and completely restarted in order to reload the
default parameters. NOTE
The reloading of the default parameters cancels all the previous settings. The use of this function is recommended only by specialized personnel.
For more information please consult the Technical Monograph and the Technical Specification.
Front Panel
Issued 10.12.2008 JGE410502 39 of 45
3.2.9 Status This menu is entered by pressing the command:
9
STATUS
Menu: BATTERY STATUS Type: VISUALISATION and COMMAND Password: YES It is accessed by pressing the key
In the menu the next screen is entered:
MENU PASS.PROTECTED INSERT THE PASSWORD
**** AND PRESS ENTER
Only if the correct password of 4 numbers is entered the next submenus can be
used. Once entered, the correct password remains active for about 5 minutes.
NOTE The qualifying password is different for each RTB.e. For more information please
consult the Technical Monograph. If the automatic recharge mode is active, the following screen is shown:
BATTERY STATUS Battery Charged
At 095 % PRESS 0 TO TEST
The third row indicates the % of the recharged autonomy. The fourth row indicates if the battery test is enabled. The enabling of the test depends on setting (see the Technical Monograph and the Technical Specification), on the last test status (if ok) and on the recharged autonomy > 90%. If the test is enabled and you press the key:
0
HISTORY
The battery test starts and the following screen is shown:
BATTERY IN TEST Vbat: xxx Ibat: yyy Time: 150 End: 180 PRESS 0 TO STOP
Front Panel
40 of 45 JGE410502 Issued 10.12.2008
On the second row the battery voltage and current are shown. The third row represents the remaining autonomy in minutes.
The test works as follows:
Step 1: The output voltage of the RTB.e is set at the first dicharge level LIVELLO1.
Step 2: The battery discharges at the current Idisc which depends on the connected load.
Step 3: The discharging current Idisc is compared to the output nominal current of the RTB.e Inom.
Step 4: The battery is discharged for Tdisc = Inom / Idisc (minutes), up to the max time of: Tdisc ≤ 3 (minutes). Step 5: If LIVELLO1 is reached, the test is stopped, the floating voltage is
restored and the test fails TEST_OK = 0. If during Tdisc, the battery voltage doesn’t reach LIVELLO1 the RTB.e is set back to the floating and the test is successful (TEST_OK = 1).
Step 6: If, during the test, the 0 Key is pressed the test is stopped, the RTB.e is set back to the floating and the variable TEST_OK is not changed.
IMPORTANT
The responsibility of the correct use of the batteries is of the operator. We recommend the use of the manual charge only by specialized personnel.
If the test fails, la variable TEST_OK = 0 is memorized until the RESET (see). The status S4 (Battery OK or Battery Not OK) depends on the value of the
variable TEST_OK. If the battery is discharging the following screen is shown:
BATTERY STATUS Battery Dicharge
Vbat: xxx Ibat: yyy Aut: 0020 (MIN)
On the third row the battery voltage and current are shown. The fourth row
represents the remaining autonomy in minutes. If the manual charge is selected the following screen is shown:
BATTERY STATUS MANUAL CHARGE STATUS Vbat: xxx Ibat: yyy Timer: 0050 (MIN)
Front Panel
Issued 10.12.2008 JGE410502 41 of 45
On the third row the battery voltage and current are shown. The fourth row represents the recharging time in minutes.
NOTE
This menu can be used to verify the correct operation of the RTB.e. Its use is not strictly necessary during the current use of the RTB.e.
3.2.10 History The RTB.e memorizes up to 500 alarm events with relevant indication of the
date and time. When the alarm 501 is memorized the first is cancelled and so on. The relevant menu is entered by pressing the key:
0
HISTORY
Menu: HYSTORY Type: SETTINGS Password: Yes It is accessed by pressing the key
In the menu the next screen is entered:
MENU PASS.PROTECTED INSERT THE PASSWORD
**** AND PRESS ENTER
Only if the correct password of 4 numbers is entered the next submenus can be
used. Once entered, the correct password remains active for about 5 minutes.
NOTE The qualifying password is different for each RTB.e. For more information please
consult the Technical Monograph. If the password is correct, the following screen is shown:
1. ALARMS HISTORY 2. RESET HISTORY
PRESS ESC TO EXIT
After having pressed the key:
1
BOOST
The events history which is structured as follows is accessed:
Front Panel
42 of 45 JGE410502 Issued 10.12.2008
A11* 05 01 03 09:20 A12* 05 01 03 09:19
A11 05 01 03 09:15 A12 05 01 03 09:15
Using the keys:
7
3
You can browse up and down the alarms event memory
The star after the code indicates when the alarm has ended:
If, instead, inside the following screen:
1. Alarms History 2. Reset History
Press ESC To Exit
The following key is pressed:
2
NOR/MAN
The cancelling of the events history is accessed
If inside the following screen:
RESET HISTORY PRESS ENTER TO CONTINUE ESC To Exit
The following key is pressed:
ENT
The alarms history is cancelled.
IMPORTANT
The cancelling of the alarms history can cause the irreversible loss of important information necessary for the service and maintenance of the RTB.e. This operation is therefore recommended to be carried out by competent personnel during service.
Code Date
Time
Front Panel
Issued 10.12.2008 JGE410502 43 of 45
4. SFP SYSTEM DATA
4.1 75A 125VDC BLOCK DC SYSTEMS INPUT VOLTAGE Ph-N 277 Vac INPUT FREQUENCY 60 Hz INPUT CURRENT 16 A INPUT POWER 13,1 kVA FLOATING 129,3 Vdc BOOST 136,3 Vdc RECTIFIER CURRENT 75 A BATTERY CURRENT 31 A FLOAT-BOOST CURRENT 28 A BOOST-FLOAT CURRENT 11 A FLOAT-BOOST VOLTAGE 104 Vdc BOOST-FLOAT VOLTAGE 136 Vdc EQUAL. START VOLTAGE 90 Vdc EQUAL. MAX. CURRENT 31 A RECHARGE MAX. CURRENT 31 A LOW FLOATING LEVEL 126 Vdc HIGH FLOATING LEVEL 132 Vdc DISCHARGE LEVEL 1 110 Vdc DISCHARGE LEVEL 2 108 Vdc DISCHARGE LEVEL 3 106 Vdc FREQUENCY MAX 62 Hz FREQUENCY NOMINAL 60 Hz FREQUENCY MIN 58 Hz NOMINAL OUTPUT CURRENT 75 A MAX. OUTPUT CURRENT 80 A MAX. OUTPUT VOLTAGE 145 Vdc EMERGENCY LEVEL N.U. BATTERY SIZE 308 Ah
Front Panel
44 of 45 JGE410502 Issued 10.12.2008
4.2 160A 125VDC STATION DC SYSTEMS
INPUT VOLTAGE Ph-N 277 Vac INPUT FREQUENCY 60 Hz INPUT CURRENT 16 A INPUT POWER 13,1 kVA FLOATING 129,3 Vdc BOOST 136,3 Vdc RECTIFIER CURRENT 160 A BATTERY CURRENT 61 A FLOAT-BOOST CURRENT 54 A BOOST-FLOAT CURRENT 18 A FLOAT-BOOST VOLTAGE 104 Vdc BOOST-FLOAT VOLTAGE 136 Vdc EQUAL. START VOLTAGE 90 Vdc EQUAL. MAX. CURRENT 61 A RECHARGE MAX. CURRENT 61 A LOW FLOATING LEVEL 126 Vdc HIGH FLOATING LEVEL 132 Vdc DISCHARGE LEVEL 1 110 Vdc DISCHARGE LEVEL 2 108 Vdc DISCHARGE LEVEL 3 106 Vdc FREQUENCY MAX 62 Hz FREQUENCY NOMINAL 60 Hz FREQUENCY MIN 58 Hz NOMINAL OUTPUT CURRENT 160 A MAX. OUTPUT CURRENT 170 A MAX. OUTPUT VOLTAGE 145 Vdc EMERGENCY LEVEL N.U. BATTERY SIZE 609 Ah
Front Panel
Issued 10.12.2008 JGE410502 45 of 45
4.3 300A 125VDC GAS COMPRESSOR DC SYSTEMS
INPUT VOLTAGE Ph-N 277 Vac INPUT FREQUENCY 60 Hz INPUT CURRENT 16 A INPUT POWER 13,1 kVA FLOATING 129,3 Vdc BOOST 136,3 Vdc RECTIFIER CURRENT 300 A BATTERY CURRENT 122 A FLOAT-BOOST CURRENT 109 A BOOST-FLOAT CURRENT 42 A FLOAT-BOOST VOLTAGE 104 Vdc BOOST-FLOAT VOLTAGE 136 Vdc EQUAL. START VOLTAGE 90 Vdc EQUAL. MAX. CURRENT 122 A RECHARGE MAX. CURRENT 122 A LOW FLOATING LEVEL 126 Vdc HIGH FLOATING LEVEL 132 Vdc DISCHARGE LEVEL 1 110 Vdc DISCHARGE LEVEL 2 108 Vdc DISCHARGE LEVEL 3 106 Vdc FREQUENCY MAX 62 Hz FREQUENCY NOMINAL 60 Hz FREQUENCY MIN 58 Hz NOMINAL OUTPUT CURRENT 300 A MAX. OUTPUT CURRENT 310 A MAX. OUTPUT VOLTAGE 145 Vdc EMERGENCY LEVEL N.U. BATTERY SIZE 1218 Ah
Start-up and Shutdown
Issued 10.12.2008 JGE410502 1 of 6
START-UP AND SHUTDOWN
Index
1. INTRODUCTION ................................................................................. 2
2. START-UP PROCEDURE .................................................................. 2
3. PROCEDURE OF SHUTDOWN AND DISCONNECTION ................. 4
4. SIMPLE SHUTDOWN PROCEDURE ................................................. 6
Start-up and Shut-down
2 of 6 JGE410502 Issued 10.12.2008
1. INTRODUCTION
The following procedures show the Start-up and Shutdown procedure for the RTB.e. Further information could be contained in the Technical Specification and in the Technical Monograph. It is recommended to consult all the available documentation before carrying out the procedures which follow.
NOTE
Here is indicated the function and position of each circuit breaker that will be mentioned in this manual.
Q1-RICB RTB.e mains input circuit breaker. Q2-ROCB RTB.e output circuit breaker. Q7-BCB Battery breaker
IMPORTANT Any operation carried out both for the connection or disconnection of RTB.e from the
mains, the battery and the loads must be carried out by skilled personnel. The manufacturer declines any responsibility of damage caused by the equipment
due to wrong operations.
2. START-UP PROCEDURE
To start-up the RTB.e proceed as follows: 1) Close Q1-RICB and wait that the display goes on. 2) If the RTB.e is off (status OFF) following screen is shown:
RECTIFIER CHARGER
SWITCHED OFF PRESS ON TO START
3) Pressing the key:
S
ON/OFF
Start-up and Shutdown
Issued 10.12.2008 JGE410502 3 of 6
In the menu following screens are entered:
ON-OFF MENU
NOW SET AT: OFF PRESS 0 TO MODIFY
After having pressed the key:
0
HISTORY
The submenu is entered:
If in this submenu following keys are pressed:
5
+
Or
6
-
The RTB.e starts up and the following screen is shown .
RECTIFIER CHARGER
SWITCHED ON Wait Please
Startup in Progress
IMPORTANT This key works as two position ON-OFF switch which remains on the last
chosen position. This means that if ON was selected, the RTB.e start-up automatically until OFF is chosen.
ON-OFF MENU NOW SET TO: OFF + OR – FOR CHANGE
AND CONFIRM
Start-up and Shut-down
4 of 6 JGE410502 Issued 10.12.2008
4) If the start-up is positive the following screen will show on the display and the buzzer starts:
RECTIFIER CHARGER
CLOSE BCB VDC = 240 V IDC = 000 A
NOTE
The output voltage measure depends on the characteristics of the RTB.e. Please check the Technical Monograph in annex:
5) Close Q7-BCB.
6) Close Q2-ROCB.
7) When the start up is finished the following screen will be shown.
RECTIFIER CHARGER FLOATING VOLTAGE
VDC = 240 V IDC = 000 A
3. PROCEDURE OF SHUTDOWN AND DISCONNECTION
To stop the RTB.e follow this procedure: 1) Press the key:
S
ON/OFF
The following screen is shown:
ON-OFF MENU
NOW SET AT: ON PRESS 0 TO MODIFY
After having pressed the key:
0
HISTORY
The submenu is entered::
Start-up and Shutdown
Issued 10.12.2008 JGE410502 5 of 6
If in this submenu following keys are pressed:
5
+
Or
6
-
The RTB.e shuts down and and on the display following is shown:
RECTIFIER CHARGER SWITCHED OFF PRESS ON TO START
IMPORTANT
This keys works as two position ON-OFF switch which remains on the last chosen position. This means that if ON was selected, the RTB.e start-up automatically until OFF is chosen.
2) Open Q1-RICB.
3) Open Q7-BCB. 4) Open Q2-ROCB.
IMPORTANT
Before carrying out the opening of the RTB.e breakers check if this operation could cause any damage to the supplied loads.
For this purpose consult the Technical Monograph in annex.
ON-OFF MENU NOW SET AT: ON + OR – FOR CHANGE
AND CONFIRM
Start-up and Shut-down
6 of 6 JGE410502 Issued 10.12.2008
4. SIMPLE SHUTDOWN PROCEDURE
The RTB.e can be disconnected from the mains from the battery and from the loads (without shutdown from an external key or from the front panel) proceeding as follows:
1) Open Q1-RICB.
2) Open Q7-BCB. 3) Open Q2-ROCB.
IMPORTANT
Before carrying out the opening of the RTB.e breakers check if this operation could cause any damage to the supplied loads.
For this purpose consult the Technical Monograph in annex.
BATTERY CHARGER Test Procedure
Rev. Descrizione Description
Data Date
Emesso Issued
Controllato Checked
Approvato Approved
Lingua Language
Pagina Page
di Pag. of Pag.
/ First Issue 28/01/09 P. Conti E. Simoni E. Simoni I 1 16 Codice / Code
JUD411352
BATTERY CHARGER TEST PROCEDURE
Index
1. INTRODUCTION.................................................................................. 3
2. VISUAL CHECK .................................................................................. 3
3. SWITCH AND JUMPERS SETTING ................................................... 3
4. SETTING OF THE STARTING PARAMETERS.................................. 4
5. START-UP IN MANUAL MODE .......................................................... 6
6. START-UP IN AUTOMATIC MODE .................................................... 9
7. LOAD TESTS .................................................................................... 10
8. SETTING OF THE MANUAL CHARGE ............................................ 12
9. SETTING OF THE BOOST CHARGE ............................................... 12
10. SETTING OF THE THERMAL PROBE (RECHARGING VOLTAGE COMPENSATION).................................................................................... 13
11. FINAL TEST .................................................................................... 13
12. TEST OF THE RTB.E SYSTEM IN PARALLEL REDUNDANT CONFIGURATION .................................................................................... 14
BATTERY CHARGER Test Procedure
2 of 16 JUD411352 First Issue 28/01/09
Drawing index
Figure 1 – DWG 1......................................................................................................................................... 3 Table 1 – jumper settings JP1, JP2, JP3, JP8 and JP9 pcboard DR16-COMP........................................... 3 Table 2 – jumper settings JP10, JP11, JP12 and JP13 board DR16-COMP............................................... 4 Dwg. 2 – 6 pulse rectifier output without DC filter (ADEG080)................................................................... 7 Dwg. 3 – 6 pulse rectifier output without DC filter (ADEG080).................................................................. 8
BATTERY CHARGER Test Procedure
First Issue 28/01/09 JUD411352 3 of 16
1. INTRODUCTION
The scope of this procedure is to guide the technician through the correct final testing of the equipment.
2. VISUAL CHECK
1) Check the wiring harness 1) Ensure that all the cables and connectors are correctly identified by the code
and relevant number in compliance with the electric diagram. 2) Check that the cables or the power bars section are those indicated on the
relevant wiring list.
3. SWITCH AND JUMPERS SETTING
1) Set SW1 of board DR16-COMP (N_FS3006) as required from the technical specification.
Dip n. Status Description
Off Battery test disabled 1 On Battery test enabled Off Rapid Charge disabled 2 On Rapid charge enabled Off Manual Charge disabled 3 On Manual Charge enabled Off Parallel configuration disabled 4 On Parallel configuration enabled
Figure 1 – DWG 1
The Dips 4, 5, 6, 7, 8 are not used presently and must be left on Off position.
2) Set jumpers JP1, JP2, JP3, JP8 and JP9 according to the following table comparing the nominal and recharging current of the system with the type of Hall effect ammeter on the equipment.
I out nominal
Hall effect ammeter ratio
I batteryrecharge
I total of the output
I share
JP1 JP2 I Max Sat. JP8 JP9 I Max Sat. JP3 I Max Sat. 50 A 2000/1 yes no 108A Yes no 202A yes 30A 100 A yes no 108A Yes no 202A yes 30A 150 A No yes 300A no Yes 300A yes 30A 200 A No yes 300A no Yes 300A yes 30A 250 A yes yes 408A Yes Yes 502A yes 30A 300 A 4000/1 No yes 600A no Yes 600A yes 60A 500 A 5000/1 No yes 750A no Yes 750A yes 76A 750 A yes yes 816A Yes Yes 1004A yes 76A
>950 A Please refer to Operating Instructions PB132008
Table 1 – jumper settings JP1, JP2, JP3, JP8 and JP9 pcboard DR16-COMP
BATTERY CHARGER Test Procedure
4 of 16 JUD411352 First Issue 28/01/09
3) Set jumpers JP10, JP11, JP12 and JP13 according to the following table and in function of the output voltage type of the rectifier.
4) Voltage: Rectifier Battery
JP10 JP11 JP12 JP13 24-48-110 Vdc No No No No
220-380 Vdc yes yes yes yes
Table 2 – jumper settings JP10, JP11, JP12 and JP13 board DR16-COMP
4. SETTING OF THE STARTING PARAMETERS
1) Disconnect the positive pole of the dc capacitors that compose the DC filter taking care not to disconnect the bars + and – of rectifier from the voltage feedback (cable connected to M15 of the Back-Panel board). Disconnect the filter capacitor terminals from the filters assembled before the RICB and BCB switches.
2) Without inserting boards DR16-COMP and PS-DR16, close the input switch
RICB powering up the system. Check on the back-side of the Back-Panel the following connectors:
M20: verifying the presence of the primary voltage of the input transformer. M1: verifying the presence of the secondary voltage of the auxiliary transformer.
Give particular attention to the phase sequence of the three phase trio on the two above mentioned connections.
3) Open RICB and insert the boards DR16-COMP and PS-DR16 with the relevant
aluminium front covers. Ensure that both boards are correctly connected to the Back-panel terminals. The board PS-DR16 must be inserted in the left slide.
4) Open contact 19-20 of M18 on the Back-panel board in order to put the
modulation of the rectifier bridge in OFF mode for the next start-up. 5) Start-up the system by closing RICB. Check that following Leds are on of the
board PS-DR16.
Led +15 V Green fix on Led -15 V Green fix on Led +5 SER Green fix on Led +5 FIR Green fix on
Led +5 SPI Green fix on Led -12 SPI Green fix on
6) Check that following Leds are on of the microprocessor board DR16-COMP.
BATTERY CHARGER Test Procedure
First Issue 28/01/09 JUD411352 5 of 16
Led MicroOk Green flashing Led +5 V Green fix on Phase Sequence Green fix on
Verify that front panel transmits the start-up errors.
7) Silence the buzzer by means of the relevant push button and send the
command MEEE000. Press the push button Parameters, enter the password and scroll the surfing keys until you reach the menu Default Parameters ; follow the instructions of the this submenu.
8) Once you have carried out the instructions open RICB and wait until the boards
are unenergized.
9) Connect, by means of the communication board SER-DR16 on the rectifier, the PC with the test software. Close RICB again. For approximately 5 seconds the microprocessor will download the given default parameters. After this lapse of time, check that the PC communicates correctly with the system and that on the Parameters Panel of the PC the data correspond to the required ones.
10) On the test software click the key PID Panel to check the parameters of the
proportional and supplementary control that have to be set as follows::
KC_BATT = 100 Can be changed with KCBAxxx KBI_BATT = 10 Can be changed with KIBAxxx KC_CTOT = 100 Can be changed with KCTOxxx KBI_CTOT = 10 Can be changed with KITOxxx
KC_V = 100 (*) Can be changed with KCFRxxx KBI_V = 20 Can be changed with KIFRxxx
Only for 12 pulse configuration, send the following commands, to force to zero the unbalancement of the two bridges.
BPOR000 BNER000
Check on the DR16 Test that the value Balance Compensation is zero.
Send command MEEE000 to memorize the performed settings.
11) Measure the input voltage of the system, phase – neutral, and set the relevant
readings by means of the following commands:
TIFRxxx xxx = value of the voltage measure referred to the neutral for phase R TIFSxxx xxx = value of the voltage measure referred to the neutral for phase S TIFTxxx xxx = value of the voltage measure referred to the neutral for
BATTERY CHARGER Test Procedure
6 of 16 JUD411352 First Issue 28/01/09
phase T
Send the command MEEE000 to memorize the performed settings. Verify the readings on the PC.
12) Press the button ON/OFF of the front panel and check that the rectifier is on OFF mode. If not carry out the instructions to put in OFF mode.
ATTENTION (*): the parameter KC_V must be fixed to 200 if the revision index of the rectifier’s
control logic card (N_FS3006) is A.
5. START-UP IN MANUAL MODE
1) Open RICB and re close the contact 19-20 of M18 on the Back-Panel. Connect the burden resistor between + and the bar – of the rectifier and the eventual blocking diode of the rectifier and battery branch. Connect in parallel with the burden resistor a multimeter and an isolated oscilloscope.
2) Close RICB. Verify that the front panel transmits the start-up errors. Digit the
command ADEG120 and switch-on the modulation of the rectifier by means of the ON/OFF press button on the front panel.
3) Digit the command ADEG080, measure the output voltage and send the
following command:
VRECxxx xxx = value halve the measure of the rectifier output voltage on the load.
Don’t send the command MEEE000
BATTERY CHARGER Test Procedure
First Issue 28/01/09 JUD411352 7 of 16
4) With the isolated oscilloscope, check that in a period of the primary supplying voltage 6 pulses or 12 pulses can be distinguished. In dwg 2, the example of a 6 pulse rectifier where 6 impulses can be distinguished in a period of 20ms of the supply voltage.
Dwg. 2 – 6 pulse rectifier output without DC filter (ADEG080)
5) Digit the command ADEG001 and verify the value of the output value that will have to be equal to 1.35 times the secondary line voltage of the input transformer.
BATTERY CHARGER Test Procedure
8 of 16 JUD411352 First Issue 28/01/09
6) With the isolated oscilloscope, check that in a period of the primary supplying voltage 6 pulses or 12 pulses can be distinguished. In dwg 3, the example of a 6 pulse rectifier where 6 impulses can be distinguished in a period of 20ms of the supply voltage.
Dwg. 3 – 6 pulse rectifier output without DC filter (ADEG080)
7) Digit the command ADEG080, measure the output voltage and send the following command:
VRECxxx xxx = real value of the rectifier output dc voltage on
the load Send the command MEEE000
8) By means of the press button ON/OFF on the front panel , switch-off the rectifier
modulation. 9) Send the command ADEG080 and the command MEEE000. Wait that the
continous voltage goes to 0 V. Open RICB, remount the DC filter, the voltage feed-back and the filter capacitors terminal assembled before the circuit breakers RICB and BCB. Remove the burden capacitor.
BATTERY CHARGER Test Procedure
First Issue 28/01/09 JUD411352 9 of 16
6. START-UP IN AUTOMATIC MODE
1) Close RICB and wait for the alarms visualisation on the front panel. By means of the press button ON/OFF of the front panel switch on the rectifier bridge. At the end of the softstart, verify that the final voltage coincides with the set one. Verify the reading of the real output voltage with the one shown on the front panel. Reset in case it does not coincide with the command VRECxxx (xxx = value the rectifier dc output voltage).
2) Set the reading of the battery voltage by means of the command
VBATxxx xxx = value of the measure of the rectifier dc output
voltage on the battery.
Send the command MEEE000 to memorize the performed setting. Verify the reading on the PC.
3) Open RICB and wait that the dc voltage goes below 0 V.
BATTERY CHARGER Test Procedure
10 of 16 JUD411352 First Issue 28/01/09
7. LOAD TESTS
ATTENTION Care must be given to connect and disconnect the various load steps due to the
reduction of the cutting power of the dc switches. Particularly , in order to remove the load, it is necessary to switch-off the rectifier modulation, operate the switches and
restart with softstart.. 1) Connect on both on the battery side than on the load side a resistive load. 2) Close RICB and start-up the rectifier. 3) Close the output breaker ROCB and connect a first load step : set the reading
of the total current by means of the command:
CTOTxxx xxx = value of the measure of the rectifier total output current on the load side.
Send the command MEEE000 to memorize the performed setting. Verify the
reading on the PC.
Only for 12 pulse configuration, check the current sharing of the two bridges: they have to supply the 50% +/- 10% of the total load. In case the difference is higher than the specified limits, it's possible to adjust the current sharing with the following commands:
BPORXXX (value 0 to 400) to increase the current supplied from bridge 1 BNERXXX (value 0 to 400) to increase the current supplied from bridge 2 Verify the reading on the PC, on the label Balance Compensation of Dr16-
Test software. Verify, applying various step of load at the output, that the current sharing is
in tolerance with the value specified above. Send the command MEEE000 to memorize the performed setting. Verify the
reading on the PC.
Vary the load and verify the linearity of the reading of the front panel at full load.
4) Verify the total current limitation connecting a higher load than the one set at maximum output current. Verify that the output voltage remains stable during the limitation. (V out nominal +/- 2%). 5) Connect a load equal to 50 % of the nominal and set the reading of the input
current by means of the following commands.
BATTERY CHARGER Test Procedure
First Issue 28/01/09 JUD411352 11 of 16
TCIRxxx xxx = value of the measure of the absorbed current on the phase R.
TCISxxx xxx = value of the measure of absorbed current on
the phase S. TCITxxx xxx = value of the measure of the absorbed current
on the phase T.
Send the command MEEE000 to memorize the performed setting. Verify the reading on the PC. Vary the output load and verify the linearity of the reading of the front panel.
6) Remove the load.
7) Close the battery breaker BCB and connect a first load step: set the battery
current reading by means of following command:
CBATxxx xxx = value of the measure of the rectifier output current on the battery side.
Send the command MEEE000 to memorize the performed setting. Verify the reading on the PC. Vary the load and verify the linearity of the reading of the front panel.
8) Verify the battery current limitation connection a higher load than the one set at maximum recharge current.
9) Shut-down the system and wait that the voltage goes to zero. Remove the
resistite load on the battery side and connect the batteries.
10) Start-up the system following the start-up procedure. Connect a load on the output and induce a battery discharge switching off the rectifier modulation by means of the press button ON/OFF on the panel.
11) Switch on again the rectifier modulation by means of the ON/OFF button on the
panel and watch the behaviour of the system during the battery current limitation. Verify that the recharging current is equal to the set one ± 2%.
12) Remove the load and open the battery breaker.
13) In compliance with the technical book and the project characteristics, verify the
auxiliary signalling, the operating of the eventual shunt trips for the battery minimum voltage and whatever else may be present.
BATTERY CHARGER Test Procedure
12 of 16 JUD411352 First Issue 28/01/09
8. SETTING OF THE MANUAL CHARGE
1) To enable the manual charge function, operate on the Dip n.3 of the board DR16-COMP referring to fig. 1
2) Close RICB and put the rectifier on OFF status. Rotate the potentiometer on
the front of the equipment to the maximum and send the command:
POTA150 for systems with output nominal voltage 220 Vdc POTA075 for systems with output nominal voltage 110 Vdc
Send command MEEE000 to memorize performed setting.
3) Rotate the potentiometer to the minimum and select on the front panel the MANUAL CHARGE mode by means of the key NOR/MAN.
4) Verify that the rectifier goes to the set starting voltage. Rotate the potetiomenter
and verify that the output voltage varies. Verify on the PC that the system is in EQUAL status.
9. SETTING OF THE BOOST CHARGE
1) To enable the boost charge function, operate on the Dip n.2 of the board DR16-COMP referring to fig. 1
2) Switch on the rectifier and check on the Parameters Panel of the test software
on the PC the presence of the data relevant to the Boost Charge mode and their accuracy.
3) Connect the output load and close BCB; switch-off the rectifier modulation
inducing a long battery discharge.
4) Restart the rectifier modulation and watch the phase of battery recharging. Verify that if the absorbed battery current is higher that the set one from Float to Boost (current boost mode) or if the battery voltage is lower that the 1rs Level threshold (voltage boost mode) , the rectifier enters the boost phase showing it on the front panel. Verify on PC that the Set-Point Vdc corresponds to the boost voltage.
BATTERY CHARGER Test Procedure
First Issue 28/01/09 JUD411352 13 of 16
10. SETTING OF THE THERMAL PROBE (RECHARGING VOLTAGE COMPENSATION)
1) Shut-down the system. 1a) Connect the thermal probe on the back panel (N_FS3004) as per operating
instruction JRE409515. 1b) Start-up the system. 2) Measure the ambient temperature and send the command:
TEMPxxx where xxx is the temperature
(es.: TEMP020 for 20°C)
Memorize the command MEEE000.
3) Check the temperature reading on the display on the menu MEASURES. 4) Wait at least 5 minutes from the moment of the temperature setting and verify,
heating the probe with a hairdryer, that the floating output voltage varies with following progress :
T ↑ ⇒ VOUT ↓
11. FINAL TEST
1) With switched on rectifier, check on the front panel the correctness of the set data.
2) Verify the correct regulation of the eventual analog measuring instruments on
the front of the equipment
3) Reset hour and date by means of the appropriate key on the front keyboard.
4) Reset the alarms event
5) Shutdown the equipment, fix the bolts on the boards on the racks.
6) Fill the measurement report
BATTERY CHARGER Test Procedure
14 of 16 JUD411352 First Issue 28/01/09
12. TEST OF THE RTB.e SYSTEM IN PARALLEL REDUNDANT CONFIGURATION
This procedure is based on a configuration of two RTB.e connected in parallel on one DC BUS BAR and to one or two batteries these also connected in parallel to the DC BUS BAR.
ATTENTION
Both rectifiers have to be tested and the measures of the battery voltage, battery current, output current and voltage have to coincide. Verify both RTB.e that with the same load and battery current have the same readings on the PC.
Verify that both RTB.e generalt settings (Floating-Boost voltage, recharging parameters, thermal compensation coefficients) are the same.
1. In both the RTB.e, connect the board N_FS3011 on the board N_FS3006 (See operating instruction JRE409517).
2. On board N_FS3006, set the DIPSW 4 in position ON.
3. Verify that on the board N_FS3006 the setting have been carried out as per
operating instruction JRE409518.
4. Connect the connecting cable between the two RTB.e. The cable has to be connected to the female DB9 connectors, that are on the front of the rack of the control boards.
5. If no joining breaker is present between RTB.e 1 and RTB.e 2, connect a
jumper on the pins 17-18, of M18 of the Back-Panel N_FS3004 board.
6. For both the RTB.e, close RICB and put the rectifier on OFF mode.
7. Send to RTB.e 1 the command POSI001 and memorize with command MEEE000.
8. Send to RTB.e 2 the command POSI002 and memorize with command
MEEE000. 9. On RTB.e 1, verify the following led on the front of the rack on the control
boards:
TRX1 fix on TRX2 blinking
10. On RTB.e 2, verify the following led on the front of the rack on the control
boards:
TRX1 blinking TRX2 fix on
BATTERY CHARGER Test Procedure
First Issue 28/01/09 JUD411352 15 of 16
11. On both RTB.e send following commands KCSH100
KISH020
Send MEEE000 to memorize . On the test software, click on the PID Panel and verify the proportional and integrative parameters that have to be set as follows:
KC_SH = 100 Can be changed with KCSHxxx KI_SH = 20 Can be changed with KISHxxx 12. With two batteries in parallel procede as follows:
12a) Open RICB on both RTB.e and close the eventual interconnection device between the two RTB.e .
12b) Connect the restive load on the battery side (battery 2) of RTB.e 2. 12c) Close RICB on RTB.e 1 and start-up the rectifier. 12d) Close battery breaker BCB on RTB.e 2 and connect a first load step.
Connect the PC to RTB.e 1 and set the battery current by means of the command
SBATxxx xxx = value of the rectifier output current measured on the battery side.
Send command MEEE000 to memorize the performed setting. Verify the reading on the PC/on the front panel. Vary the resistive charge and verify the linearity of the reading.
12e) Open RICB, ROCB of RTB.e 1 and BCB of RTB.e 2. 12f) Disconnect the resistive load of the battery on RTB.e 2 and connect it to
the battery of RTB.e 1. 12g) Close RICB on RTB.e 2 and start-up rectifier. 12h) Close the battery breaker BCB on RTB.e 1 and connect a first load step.
Connect the PC to RTB.e 2 and set the reading of the battery current by means of the command:
SBATxxx xxx = value of the rectifier output current on the battery.
Send command MEEE000 to memorize the performed setting. Verify the reading on the PC/on the front panel. Vary the resistive load and verify the linearity of the readings.
12i) Open RICB, ROCB of RTB.e 2 and BCB of RTB.e 1 Disconnect the
resistive load.
13. Close RICB on RTB.e 1 and start-up the rectifier. When start-up is completed close ROCB.
14. Close RICB of RTB.e 2 and start-up the rectifier. When start-up is completed
close ROCB.
15. Apply a load on the Dc Bus Bar. If the interconnection device is closed, the Active Current Sharing system will be active and the two RTB.e will share the
BATTERY CHARGER Test Procedure
16 of 16 JUD411352 First Issue 28/01/09
load at 50%. If the interconnection is open the RTB.e will operate in Single Configuration.
16. Verify the stability of output current and the various steps of the load.
17. With the load connected open RICB of RTB.e 1 and verify the intake of the load
by RTB.e 2.
18. Close RICB of RTB.e 1 and verify connection of RTB.e 1 on the Dc Bus Bar and the activation of the current sharing.
19. Repeat points 17 and 18 for RTB.e 2.
20. Close battery breaker BCB (if there are two batteries, close the breaker
conntected to battery of RTB.e 1).
21. Verify the battery limitation current. In this case, if the interconnection device is closed RTB.e1 will supply the load and battery current while RTB.e2 will not supply current following the bus bar voltage)
22. In case of two batteries close also the battery breaker connected to RTB.e2 .
23. Making a mains fault test discharging the batteries. Verify when the mains
returns that RTB.e1 intakes all the load limiting the current in the two batteries.
BATTERY CHARGER Configuration
Rev. Descrizione Description
Data Date
Emesso Issued
Controllato Checked
Approvato Approved
Lingua Language
Pagina Page
di Pag. of Pag.
/ First Issue 24.01.09 P. Conti E. Simoni E. Simoni E 1 9 Codice / Code
JUD411353
BATTERY CHARGER CONFIGURATION
Index
1. INTRODUCTION.................................................................................. 2
2. CONFIGURATION VIA DIP SWITCHES............................................. 2
3. TEST AND MONITORING SOFTWARE ............................................. 3
3.1 CONNECTION CABLE.....................................................................................3
3.2 SOFTWARE INSTALLATION...........................................................................3
3.3 SOFTWARE DESCRIPTION ............................................................................4
3.4 SERIAL MESSAGES FOR RTB.e SETTING ...................................................5
3.5 SERIAL MESSAGES FOR RTB.e SETTING ...................................................6
3.6 SERIAL MESSAGES TO SEND COMMANDS TO RTB.e ...............................8
3.7 SERIAL MESSAGES FOR LOOP CONTROL .................................................9
Index of pictures
Fig. 1 – Dip Switches on card DR16-COMP ................................................................................................ 2 Fig. 2 – Connection cable............................................................................................................................. 3 Fig. 3 – Typical screen ................................................................................................................................. 4
BATTERY CHARGER Configuration
2 of 9 JUD411353 First Issue 28/01/09
1. INTRODUCTION
A test and monitoring software RCN-Monitor is available for the RCN unit that allows to check all the measurements and the operating statuses of the unit via an RS232 connection, as well as to carry out settings and configuration changes on the RCN unit.
2. CONFIGURATION VIA DIP SWITCHES
Some operating parameters are configured via Dip Switches on card DR16-COMP. The setting of the Dip Switches depends on the RTB.e size.
Dip no. Status Description
Off Battery test disabled 1 On Battery test enabled Off Boost charge disabled 2 On Boost charge enabled Off Manual charge disabled 3 On Manual charge enabled Off Parallel disabled 4 On Parallel enabled Off 5 On Off 6 On Off 7 On Off 8 On
Fig. 1 – Dip Switches on card DR16-COMP
BATTERY CHARGER Configuration
First Issue 28/01/09 JUD411353 3 of 9
3. TEST AND MONITORING SOFTWARE
RCN-Monitor software is connected from the serial port RS-232 of the PC, properly configured, to the serial port RS-232 of the RTB.e unit. For the connection a dedicated cable must be used, with the connections as indicated in the figure below. 3.1 CONNECTION CABLE
Fig. 2 – Connection cable
3.2 SOFTWARE INSTALLATION The software installation is performed like any other WINDOWS application. The software can be supplied on several floppy disks. In this case the software will
be installed starting from DISK1, or via a CD-ROM. Start the Setup program from the START menu, then follow the instructions as they
are requested by the installation software.
BATTERY CHARGER Configuration
4 of 9 JUD411353 First Issue 28/01/09
3.3 SOFTWARE DESCRIPTION The software allows to check values variables and system parameters, as well as to
perform settings. Therefore it is a necessary testing tool, whereas parameters can also be changed using the front panel.
As a rule, the software allows to display the status of the system updated in real time. Communication is therefore unidirectional from RTB.e to the PC.
When the communication is properly performed, the window named N. Bytes contains a number ranging from 1 to 250.
Fig. 3 – Typical screen
The user can send one of the messages listed below entering the text in the appropriate window.
BATTERY CHARGER Configuration
First Issue 28/01/09 JUD411353 5 of 9
NOTE Before sending any message, make sure the computer is writing in capital letters
(CAPS). All the controls consist of 4 letters and 3 numbers LLLLXXX. After sending a message, wait for the acoustic confirmation signal (double BEEP)
before sending a new string. If the signal is not received, it means the operation has failed and the last message must be sent once again.
IMPORTANT
Ratings and settings are not stored by RTB.e until the MEEE000 command is entered.
3.4 SERIAL MESSAGES FOR RTB.e SETTING The following messages allow to set the measurements made by RTB.e.
MAINS INPUT TIFRXXX (XXX=161/279) phase R voltage (Phase - Neutral) TIFSXXX (XXX=161/279) phase S voltage (Phase - Neutral) TIFTXXX (XXX=161/279) phase T voltage (Phase - Neutral) TCIRXXX (XXX=001/998) phase R current TCISXXX (XXX=001/998) phase S current TCITXXX (XXX=001/998) phase T current
DC VOLTAGE
VRECXXX (XXX=000/999) RTB.e output voltage (Feedback) VBATXXX (XXX=000/999) battery voltage (Measurement) ZCTO000 Zero total output current CTOTXXX (XXX=005/999) Setting of total output current ZCBT000 Zero battery current CBATXXX (XXX=005/999) battery current setting ZCBL000 Zero 12p balancing current CBALXXX (XXX=005/999) Setting of 12p balancing current
SPECIAL POTAXXX (XXX=010/300) Adjustment range of manual charge pot. (Vdc)
TEMPXXX (XXX=000/100) Temperature in degrees (from thermal probe) SBATXXX (XXX=000/999) charging current setting of second battery
(parallel config.)
BATTERY CHARGER Configuration
6 of 9 JUD411353 First Issue 28/01/09
3.5 SERIAL MESSAGES FOR RTB.e SETTING The following messages allow to set the operating parameters of RTB.e by working
on the internal variables that are also altered via the PARAMETERS menu on the front panel.
BOOST CHARGE PARAMETERS
Setting Range Variable Description MTMFXXX (XXX=000/999) TIMER_AFTER_MAINS_FAULT Mains failure delay (sec) SFTYXXX (XXX=000/999) SAFETY_TIME_B Safety timer (min) BOOSXXX (XXX=000/999) SETP_VDC_BOOST Boost charge voltage (V) FLBOXXX (XXX=000/999) CORR_FLOAT_BOOST Float → Boost switching current (A) BOFLXXX (XXX=000/999) CORR_ BOOST_FLOAT Boost → Float switching current (A) VFLBXXX (XXX=000/999) VOLT_FLOAT_BOOST Float → Boost switching voltage (V) VBFLXXX (XXX=000/999) VOLT_BOOST_FLOAT Boost → Float switching voltage (V) TIBOXXX (XXX=000/999) MAXTEMPO_BOOST_FLOAT Return-to-float timer (min) STTB001 / / Timed Boost cycle start SETBXXX (XXX=000/999) MaxTimeForced Timed Boost cycle timer (min) MANUAL CHARGE PARAMETERS
Setting Range Variable Description EQUAXXX (XXX=000/999) SETP_VDC_EQUAL Starting voltage (V) CLEQXXX (XXX=000/999) CORR_LIM_EQUAL Maximum battery current (A) MTEQXXX (XXX=000/999) MAXTIME_EQUAL Safety timer (min) BATTERY CHARGING AND DISCHARGING PARAMETERS
Setting Range Variable Description SPDCXXX (XXX=000/999) SETP_VDC_FLOAT Floating voltage (V) CLBAXXX (XXX=000/999) CORR_LIM_AUTO Maximum battery current (A) WRLOXXX (XXX=000/999) MIN_VBAT Minimum floating voltage (V) WRHIXXX (XXX=000/999) MAX_VBAT Maximum floating voltage (V) MTWHXXX (XXX=000/198) TEMPO_MAX_BAT Delay due to max. float. volt. (sec) COSTXXX (XXX=000/060) CONST_CMP_TEMP Battery thermal comp. (mV/°C)*Cell LEVAXXX (XXX=000/999) LIVELLO1 1st discharge level (V) LEVBXXX (XXX=000/999) LIVELLO2 2nd discharge level (V) LEVCXXX (XXX=000/999) LIVELLO3 3rd discharge level (V) INPUT PARAMETERS
Setting Range Variable Description FSUPXXX (XXX=000/005) FREQ_RETE_SUP Upper frequency limit (%) FRNOXXX (XXX=050/060) FREQ_RETE_NOMI Nominal frequency (Hz) FINFXXX (XXX=000/005) FREQ_RETE_INF Lower frequency limit (%) VIMAXXX (XXX=000/015) MAX_VIN Upper voltage limit (%) VINNXXX (XXX=000/999) VIN_NOM Nominal input voltage (V) VIMIXXX (XXX=000/015) MIN_VIN Lower voltage limit (%)
BATTERY CHARGER Configuration
First Issue 28/01/09 JUD411353 7 of 9
OUTPUT PARAMETERS
Setting Range Variable Description VOUNXXX (XXX=000/999) NOM_OUT_V Nominal output voltage (V) IOUNXXX * (XXX=000/999) NOM_OUT_I Nominal output current (A)
CLTOXXX ** (XXX=001/998) TOT_LIM_CURR Maximum output current (A) DRPOXXX (XXX=001/050) CONST_CMP_DROOP Positive compensation of cable drop (%) DRNEXXX (XXX=001/050) CONST_CMP_DROOP Negative compensation of cable drop (%) MAXRXXX (XXX=000/999) MAX_RECT_V Maximum output voltage (V) MTMRXXX (XXX=000/198) RECT_MAX_TIME Delay due to max. output volt. (sec) MINRXXX (XXX=000/999) MIN_RECT_V Minimum output voltage (V) LEVDXXX (XXX=000/999) LEVEL4 Emergency output level (V)
* : Example: IOUN020 ⇒ Nominal output current = 200A **: Example: CLTO020 ⇒ Maximum output current = 200A
BATTERY PARAMETERS (Battery Info)
Setting Range Variable Description
TYBAXXX (XXX=000/999) BATTERY_SIZE Battery capacity (Ah) / / BATTERY_DATE Battery installation date
FULL000 / Batt_Energy Forces the capacity stored in the battery to 0%
FULL100 / Batt_Energy Forces the capacity stored in the battery to 100%
BATTERY CHARGER Configuration
8 of 9 JUD411353 First Issue 28/01/09
3.6 SERIAL MESSAGES TO SEND COMMANDS TO RTB.e The following messages allow to send commands to RTB.e. Such commands cause
actions. LIST OF COMMANDS EQUIVALENT TO BUTTONS
Command Action on RTB.e RBOO000 Retrieves the boost charge level for 30 seconds MANU000 If the unit is in automatic charge, it forces the manual charge and vice versa EEDF000 Retrieves default parameters RESE000 Resets the unit HIZE000 Sets the alarm log to zero
ONOF000 Shuts the RTB.e down when started, and vice versa TEBA001 Starts the Deep Battery Test TEBA002 Starts the Quick Battery Test TEBA000 Interrupts the Battery Test
ALARM LOG READING The alarm log can be transferred to the computer by entering the following command:
READXXX XXX = 000 the latest 100 events XXX = 001 the 100 previous events ………….. …………………… XXX = 004 The first 100 events FORCING OF CONDUCTION ANGLE AND 12P BRIDGE BALANCING The conduction angle of the SCR’s can be forced (eliminating the regulation loops)
via the following command (to be only used during test):
ADEGXXX XXX = 001/179 forces the angle ADEG000 restores the loops BPORXXX XXX = 000/400 Setting of the pos. phase difference of 12p bridges BNERXXX XXX = 000/400 Setting of the neg. phase difference of 12p bridges
BATTERY CHARGER Configuration
First Issue 28/01/09 JUD411353 9 of 9
3.7 SERIAL MESSAGES FOR LOOP CONTROL The following messages allow to set the control parameters of RTB.e regulation
loops by working on the internal variables that cannot be altered via the PARAMETERS menu on the front panel.
PID VOLTAGE REGULATOR
Setting Range Variable Description KCFRXXX (XXX=000/999) KC_COS Proportional constant KIFRXXX (XXX=000/999) KBI_COS Integrating constant KDFRXXX (XXX=000/999) KBD_COS Derivative constant PID TOTAL CURRENT REGULATOR
Setting Range Variable Description KCTOXXX (XXX=000/999) TOT_KC_COS Proportional constant KITOXXX (XXX=000/999) TOT_KBI_COS Integrating constant KDTOXXX (XXX=000/999) TOT_KBD_COS Derivative constant PID BATTERY CURRENT REGULATOR
Setting Range Variable Description KCBAXXX (XXX=000/999) BATT_KC_COS Proportional constant KIBAXXX (XXX=000/999) BATT_KBI_COS Integrating constant KDBAXXX (XXX=000/999) BATT_KBD_COS Derivative constant PID PARALLEL REGULATOR
Setting Range Variable Description KCSHXXX (XXX=000/999) SH_KC_COS Proportional constant KISHXXX (XXX=000/999) SH_KBI_COS Integrating constant KDSHXXX (XXX=000/999) SH_KBD_COS Derivative constant RCN POSITION IN A PARALLEL SYSTEM In a parallel redundant system, each RTB.e unit is given a position by entering the following
command: POSIXXX XXX = 001 Position 1
XXX = 002 Position 2 STORAGE MEEE000 Stores the ratings and the settings made. (They become permanent).
BATTERY CHARGER Block Diagrams
Rev. Descrizione Description
Data Date
Emesso Issued
Controllato Checked
Approvato Approved
Lingua Language
Pagina Page
di Pag. of Pag.
/ First Issue 28.01.09 P. Conti E. Simoni E. Simoni E 1 12 Codice / Code
JUD411354
BATTERY CHARGER BLOCK DIAGRAMS
Index
1. GENERAL DESCRIPTION OF THE UNIT .......................................... 3
1.1 TYPOLOGY ......................................................................................................3
1.1.1 Basic structure .........................................................................................3
1.1.2 6-pulse Rectifier (Standard) ....................................................................4
1.1.3 12-pulse Rectifier (Optional) ...................................................................4
2. PCB BLOCK DIAGRAMS .................................................................. 5
2.1 BACK PANEL: BP-DR16 – N_FS3004 ............................................................5
2.2 POWER SUPPLY: PS-DR16 – N_FS3005 .......................................................7
2.3 CONTROL: DR16-COMP – N_FS3006 ............................................................8
2.3.1 Direct analog readings on AD.................................................................8
2.3.2 Direct analog readings on AD.................................................................9
2.3.3 Digital inputs ..........................................................................................10
2.3.4 Communication via RS232 ....................................................................11
2.3.5 SCR firing................................................................................................12
BATTERY CHARGER Block Diagrams
2 of 12 JUD411354 First Issue 28/01/09
Index of pictures
Figure 1 – RCN block diagram ..................................................................................................................... 4 Figure 2 – BP-DR16 – N_FS3004 ................................................................................................................ 5 Figure 3 – PS-DR16 – N_FS3005 ................................................................................................................ 7 Figure 4 – DR16-COMP – N_FS3006: Input circuit of Type 1 ..................................................................... 8 Figure 5 – DR16-COMP – N_FS3006: Input circuit of Type 2 ..................................................................... 9 Figure 6 – DR1-COMP6 – N_FS3006: Input circuit of Type 3 ..................................................................... 9 Figure 7 – DR16-COMP – N_FS3006: Input circuit of Type 4 ................................................................... 10 Figure 8 – DR16-COMP – N_FS3006: Input circuit of Type 5 ................................................................... 10 Figure 9 – DR16-COMP – N_FS3006: Digital input circuit......................................................................... 11 Figure 10 – DR16-COMP – N_FS3006: Interface RS232.......................................................................... 11 Figure 11 – DR16-COMP – N_FS3006: SCR firing ................................................................................... 12
BATTERY CHARGER Block Diagrams
First Issue 28/01/09 JUD411354 3 of 12
1. GENERAL DESCRIPTION OF THE UNIT
1.1 TYPOLOGY Rectifier RTB.e converts the alternate input voltage having a variable amplitude and
frequency into a constant-voltage and current-controlled direct output power source. Its function is to control the output values via a three-phase fully controlled SCR rectifier bridge (6-pulse version) or via two of these paralleled bridges (12-pulse version).
Galvanic insulation from the input mains (when provided for by the technical specification is achieved via a transformer.
1.1.1 Basic structure The basic structure of RTB.e is the following: • The input mains crosses the EMI filter for high frequency emissions and gets
into the primary winding of input transformer T1, via isolator RICB. The synchronism signals are taken from the primary winding for the control of the
SCR firing angle, the input currents for the measurement and the supply voltage for the control logic (battery redounded)
• The secondary winding is connected to the SCR bridge via protection fuses.
• In the 12-pulse version, the input transformer has got 2 secondary windings and 2 SCR bridges.
• The control logic, housed in the rack named DR16, consists of the following
cards: BP-DR16 Id. no. N_FS3004 Interconnection panel PS-DR16 Id. no. N_FS3005 System power supply DR16-COMP Id. no. N_FS3006 Control card (CPU) CAN-LINK Id. no. N_FS3011 Connection card CAN_BUS (optional
for parallel redundant configuration)
• The firing of the SCR’s is controlled by card DR16-COMP, and is performed via card: RTF Id. no. N_FS3002 SCR firing card
• The rectified and controlled voltage is filtered by an L (series inductance) and C
(paralleled capacitors) unit, calculated in accordance with the maximum ripple voltage provided for by the Technical Specification.
• On the output of said unit, a feedback voltage is taken for the voltage control
and measurements are made regarding the total output current (for the total limitation), as well as the charging and discharging current and voltage of the battery, if this function is provided.
BATTERY CHARGER Block Diagrams
4 of 12 JUD411354 First Issue 28/01/09
• The RCN output is connected to the loads via isolator ROCB.
Figure 1 – RCN block diagram
1.1.2 6-pulse Rectifier (Standard) The type of standard bridge configuration used by RTB.e is three-phase, fully
controlled, with SCR’s and 6 pulses. It is so sized as to supply direct current loads and to recharge the battery to the maximum charging current provided for by the Technical Specification. The nominal standard value of the current harmonic distortion (THD) reintroduced into the mains by a 6-pulse rectifier is < 27%.
1.1.3 12-pulse Rectifier (Optional) The 12-pulse configuration is used to reduce the current harmonic distortion (THD)
reintroduced into the mains, to a value < 12%. This prevents affecting the supply line while respecting the other loads, and avoids
the overheating of cables due to the circulation of harmonics. It consists of two rectifier bridges which, thanks to a phase-shift transformer, operate
with 30° difference, eliminating the harmonics typical of 6-pulse bridges, namely the 5th and the 7th harmonic. As a consequence, the harmonics left are the highest ones, namely the 11th, the 13th and multiple ones.
BATTERY CHARGER Block Diagrams
First Issue 28/01/09 JUD411354 5 of 12
2. PCB BLOCK DIAGRAMS
2.1 BACK PANEL: BP-DR16 – N_FS3004 This card includes all the connections coming from the power side and from the
signals to the control electronics and the power supply.
Figure 2 – BP-DR16 – N_FS3004
BATTERY CHARGER Block Diagrams
6 of 12 JUD411354 First Issue 28/01/09
Terminal board Pin Name Description
M1 1-3-5 R-S-T Supplies on transf. secondary side M2 1-2 +24V - Massa 24Vdc auxiliary supply M5 1-2-3 Pos-Misura-Neg Hall effect of total current M6 1-2-3 Pos-Misura-Neg Hall Effect of 12p balancing current M7 1-2-3 Pos-Misura-Neg Hall Effect of battery current
1-2 C_INR-Massa Input current phase R M8 3-4 C_INS-Massa Input current phase S M9 1-2-3 Pos-Misura-Massa Manual charge potentiometer POT1
M10 1-2 Ingresso digitale: Ing0 Imposition of LEVEL4 (Emergency) M11 1-2 Ingresso digitale: Ing1 Spare personalization input M12 1-2 Ingresso digitale: Ing2 Spare personalization input M13 1-2-3 Pos-Misura-Massa Spare for 0-20 mA measurement M14 1-2-3 Pos-Misura-Massa Temperature meas. from BTP probe M15 1-4 Neg-Pos RCN output feedback M16 1-4 Neg-Pos Battery voltage measurement
1-2 Caux_RICB-Massa Auxiliary contact RICB 3-4 Caux_BCB-Massa Auxiliary contact BCB 5-6 Caux_ROCB-Massa Auxiliary contact ROCB 7-8 THSW_BR2-Massa Thermal sensor of Bridge 2 heat sink
9-10 FUSE_BR2-Massa Auxiliary contact of Bridge 2 fuses 11-12 THSW_BR1-Massa Thermal sensor of Bridge 1 heat sink 13-14 FUSE_BR1-Massa Auxiliary contact of Bridge 1 fuses 15-16 Sign_FANS-Massa Fan fault signal from FMC 17-18 Caux_CONG.-Massa Auxiliary contact of parallel bus tie 19-20 COMM-ON/OFF-Massa ON/ OFF changeover switch 21-22 Sign_EARTH_F-Massa Pole-to-earth signal from ground relay
M18
23-24 PULS-ON/OFF-Massa RTB.e RESET button M19 To be used for compatibility with standard UPS control logic
M20 1-3-5 U_IN-V_IN-W_IN Synchronism and measurement on transf. primary side
Connector Pin No. Connected to Description
CN3 20 CN1-SCP Mimic panel control CN4 10 CN1-RTF Ponte 2 Bridge 2 control CN5 10 CN1-RTF Ponte 1 Bridge 1 control CN6 10 CN1-LED-DR16 Front Led Panel Control CN7 10 CN1-ARC #1 ARC #1 Card Control CN8 10 CN1-ARC #2 ARC #2 Card Control CN9 10 CN1-ARC #3 ARC #3 Card Control CN10 10 To be used for compatibility with standard UPS control logic CN11 10 CN1-SER_CAN Communication via RS232 and RS485
CAN DB 9 Another RTB.e Communication on CAN for parallel connection
BATTERY CHARGER Block Diagrams
First Issue 28/01/09 JUD411354 7 of 12
2.2 POWER SUPPLY: PS-DR16 – N_FS3005 This card creates all the power supplies required by RTB.e by taking energy from the
secondary voltage of the transformer and from the battery respectively. It also contains the three transformers for the synchronism and the measurement of the input voltage of RTB.e.
V_MA_W
S
V_MA_V
POS-BATT
NEG-BATT
U_IN
T
V_IN
U_IN
W_IN
V_IN
W_IN
R
T
R
POS-BATT
NEG-BATT
POS-BATT
NEG-BATTNEG-BATT
POS-BATT
GND_SPI
GND_MICRO
GND_SPI
+12SER
+24FIR+5FIR
GND_MICRO
GND_SER
+5FIR+24FIR
+5SER
+15V-15V
GND_FIR
GND_SER
AC1
+15V
-12SPI+5SPI
+5SER
AC2
+12SPI
+5SPI
+8V
+12SER
GND_SER
-15V
GND_FIRGND_FIR
GND_MICRO
+8V
-12SPI
GND_FIR
+12SPI
S
V_MA_U
J2-C
123456789
1011121314151617181920212223242526272829303132
J2-A
1234567891011121314151617181920212223242526272829303132
J1-A1234567891011121314151617181920212223242526272829303132
J1-C
123456789
1011121314151617181920212223242526272829303132
GraetzBridge
InsulatedForwardConverter
MultipleOutputs
3 Syncr. andMeasureTransformers
Figure 3 – PS-DR16 – N_FS3005
The multiple output voltages are generated by a switching power supply of forward type, with 2500 Vac insulation, which takes its supply from the transformer’s secondary voltage (R,S,T) and by the redundant battery (POS_BATT, NEG_BATT).
The three synchronism and measurement voltages (V_MA_U, V_MA_V, V_MA_W) are generated starting from the three input voltages of RTB.e (U_IN, V_IN, W_IN).
BATTERY CHARGER Block Diagrams
8 of 12 JUD411354 First Issue 28/01/09
2.3 CONTROL: DR16-COMP – N_FS3006 This card controls the whole operation of RTB.e. It is based on a 16-bit
microprocessor (Motorola HC16) where all the digital control algorithms are implemented.
Its main functions can be subdivided as follows:
2.3.1 Direct analog readings on AD The following readings are performed directly on the channels of the AD converter
located within HC16:
Value Input circuit AD channel no. Variable Zero Input Voltage Phase U Type 1 AD0 VOLT_ING_R No Input Voltage Phase V Type 1 AD1 VOLT_ING_S No Input Voltage Phase W Type 1 AD2 VOLT_ING_S No
Battery Current Type 2 AD3 VOLT_VAL_CBAT Yes Input Current Phase U Type 2 AD4 CORR_ING_R No (Total) Output Current Type 2 AD5 VOLT_VAL_CTOT Yes Input Current Phase V Type 2 AD6 CORR_ING_S No 12p Balancing Current Type 2 AD7 VOLT_VAL_CBAL Yes Input Current Phase W Type 2 -(AD4+AD6) CORR_ING_T No
V_MA_V
VMains_V
-15V
+15V
-15V
+15V
J1-C-4
R13
3K92
C29
100N
C26100N
R15
3K32 +
-
U6OP-07/SO
3
26
7 14 8
CB 470N
BAT41D6
D5BAT41
Figure 4 – DR16-COMP – N_FS3006: Input circuit of Type 1
BATTERY CHARGER Block Diagrams
First Issue 28/01/09 JUD411354 9 of 12
C_BATT
CBAT
+15V
-15V
J1-C-7
C424N7
JP1JUMPER-2
12
C444N7
R32332R
R28
154K
JP2JUMPER-2
12
C434N7
C414N7
R31332R
C38100N
R29
154K
+
- U10
OP-07/SO3
26
7 14 8
R33332R
C40
100N
C34 1uF
R34332R
Figure 5 – DR16-COMP – N_FS3006: Input circuit of Type 2
2.3.2 Direct analog readings on AD The following readings are performed on the channels of the external (serial) AD
converter U24-TLC1542:
Value Input circuit AD input no. Variable Zero Battery Temperature Type 3 IN0 TEMPERATURA No Manual Charge Pot. Type 4 IN1 POT1 No
Used as (digital) Input 0 Type 4 IN2 ING0 No Used as (digital) Input 1 Type 4 IN3 ING1 No Used as (digital) Input 2 Type 4 IN4 ING2 No 0-20 mA analog input Type 3 IN5 SPI_SPARE No
RCN Feedback Voltage Type 5 IN6 VRECT No Battery Voltage Type 5 IN7 VBATT No
GND_SPI
TEMPERATURESPI_TEMP
+12SPI
+12SPI
-12SPI
J2-A-2
R123
10K
D68
BAT41
C1151uF
R128
10K
R124
47K5
+
- U36
OP-07/SO3
26
7 14 8 C111
100N
D70
BAT41
R130
33R
R271
562R
R127
100KC114
100N
Figure 6 – DR1-COMP6 – N_FS3006: Input circuit of Type 3
BATTERY CHARGER Block Diagrams
10 of 12 JUD411354 First Issue 28/01/09
POT-1SPI_POT1
-12SPI+12SPI
+12SPI
J2-A-3
R137
100K
R133
10K
R140
24K9
D72
BAT41R138
10KC120
100N
+
- U37
OP-07/SO3
26
7 14 8 C117
100N
C1211uF
R134
10K
D74
BAT41
R272
562R
Figure 7 – DR16-COMP – N_FS3006: Input circuit of Type 4
V-RECT-RET
V-RECT
SPI_VRECT
-12SPI
+12SPI
-12SPI
+12SPI
J2-C-6
J2-C-7
R277
562R
R147
10K
R141
10K
C128
100N
C130
100N
C123
1uF
C125100N
C122
470N
C124100N
+
- U43
OP-07/SO3
26
7 14 8
C1294N7
R152
100KC1331uF
R1482K74
R154100K
R143
100K
D76
BAT41
R144
100K
+
- U42
OP-07/SO3
26
7 14 8
D75
BAT41
R142
10K
R1482K74
C1294N7
Figure 8 – DR16-COMP – N_FS3006: Input circuit of Type 5
2.3.3 Digital inputs The following digital inputs are sensed by an opto-coupler and selected via the chip
select CS2 that goes to latches U15 and U16 - 74HC244; the Dip Switches of SW1 are sensed in the same way:
Connector Pin OPTO Origin
A-14 ISO1 Auxiliary contact RICB A-9 ISO1 Auxiliary contact BCB
C-14 ISO2 Auxiliary contact ROCB A-12 ISO2 ON/ OFF changeover switch C-9 ISO3 Fan fault signal from FMC
C-10 ISO3 Auxiliary contact of parallel bus tie C-11 ISO4 Auxiliary contact of Bridge 2 fuses C-12 ISO4 Auxiliary contact of Bridge 1 fuses A-10 ISO5 Thermal probe of Bridge 2 heat sink A-11 ISO5 Thermal probe of Bridge 1 heat sink A-13 ISO6 Pole-to-earth signal from ground relay
J2
C-13 ISO6 RTB.e RESET button
BATTERY CHARGER Block Diagrams
First Issue 28/01/09 JUD411354 11 of 12
DIP4
D4
I_ROCB
I_FANS
I_BCB
I_THSW_BR1
I_FUSE_BR2
I_FUSE_BR2I_RICHIAMO_CARICA_RAPIDA
I_RESET_MAX_VOUTD10
D2
CS2
D8
I_THSW_BR2FUSE_BR1_aux D7
D9
D12
I_FUSE_BR1
D0
I_NORMALE/MANUALE
D6
D15
I_RICB
CS2
I_RADD_ON/OFF
D14FUSE_BR2_aux
D11
D3
D1
DIP1
D13DIP2DIP3
I_FUSE_BR1D5
+5V
+12SPI
+5V
+5V
+12SPI
J2-C-12
J2-C-11
ISO47
68
5
1
2
3
4
R881K54
U16
74HC244
246811131517
119
18161412
9753
20
10
1A11A21A31A42A12A22A32A4
1G2G
1Y11Y21Y31Y42Y12Y22Y32Y4
VCC
GND
C83100N
D29
1N4148
R904K7
D27
1N4148
C80100N
C79
100NU15
74HC244
246811131517
119
18161412
9753
20
10
1A11A21A31A42A12A22A32A4
1G2G
1Y11Y21Y31Y42Y12Y22Y32Y4
VCC
GND
D33
1N4148
R941K54
D31
1N4148
C82
100N
R914K7
Figure 9 – DR16-COMP – N_FS3006: Digital input circuit
2.3.4 Communication via RS232 The following section is used to interface the microprocessor with card SER_DR16
for the serial connection, in compliance with standard RS232. +5SER
0
0
0
+5V
TXD_SER
RXD_SER
RXD
TXD
C195
100N
R226365R
R225 365R
C196
100N
OP9
HP26018
6
7
5
3
2
OP8
HP26018
6
7
5
3
2
U53B
74HC14A
34
R211
365R
U53A
74HC14A
1 2
R227365R
J2-A-31
CN1-16
J2-C-31
CN1-17
Figure 10 – DR16-COMP – N_FS3006: Interface RS232
BATTERY CHARGER Block Diagrams
12 of 12 JUD411354 First Issue 28/01/09
2.3.5 SCR firing The following section allows to transfer the firings digitally generated by the
microprocessor, to the SCR’s of Bridge 1 and Bridge 2 (12p configuration).
+5V
+5V
+5FIR
+5FIR
D7
D4
D2
D6
D3
D1D0
D5
CS5
BR2_ENABLE (Selects BR2)
BR1_ENABLE (Selects BR1)
FIR_BR2_SCR1FIR_BR2_SCR2FIR_BR2_SCR3FIR_BR2_SCR4FIR_BR2_SCR5FIR_BR2_SCR6
FIR_BR1_SCR1FIR_BR1_SCR2FIR_BR1_SCR3FIR_BR1_SCR4FIR_BR1_SCR5FIR_BR1_SCR6
C225
100N
U6274HC273
1
10
11
20
256912151619
3478
13141718
CLR
GN
D
CLK
VCC 1Q
2Q3Q4Q5Q6Q7Q8Q
1D2D3D4D5D6D7D8D
R270
10K
C156
100N
U3274HC273
1
10
11
20
256912151619
3478
13141718
CLR
GN
D
CLK
VCC 1Q
2Q3Q4Q5Q6Q7Q8Q
1D2D3D4D5D6D7D8D
C156
100N
U3374HC273
1
10
11
20
256912151619
3478
13141718
CLR
GN
D
CLK
VCC 1Q
2Q3Q4Q5Q6Q7Q8Q
1D2D3D4D5D6D7D8D
J1-A-24J1-C-24J1-A-23J1-C-23J1-A-22J1-C-22
J1-A-21J1-C-21J1-A-20J1-C-20J1-A-19J1-C-19
Opt
ocou
pler
s
Driv
erD
river
Figure 11 – DR16-COMP – N_FS3006: SCR firing
Integrated circuits U62, U32, U33 are the firing latches that allow to switch the firing pulses to the two bridges.
BATTERY CHARGER MAINTENANCE MANUAL
BATTERY CHARGER maintenance
Rev. Descrizione Description
Data Date
Emesso Issued
Controllato Checked
Approvato Approved
Lingua Language
Pagina Page
di Pag. of Pag.
/ Emissione 09.03.09 P. Conti E. Simoni E. Simoni I 1 5 Codice / Code
JUD411546
BATTERY CHARGER MAINTENANCE MANUAL
Index
1 MAINTENANCE OPERATIONS............................................................ 2
1.1 VISUAL INSPECTION OF ELECTRICAL CONNECTIONS .....................................2
1.2 CHECK OF ALARMS ON FRONT PANEL DISLPAY..............................................2
1.3 AIR FILTER CHECK AND CLEANING ....................................................................3
1.4 FANS CONTROL AND CLEANING .........................................................................3
1.5 CHECK OF INPUT VOLTAGE .................................................................................3
1.6 CONTROLS ON DC VOLTAGE & BATTERY CHARGE FACILITIES.....................3
1.7 CURRENT ABSORBED BY DC FILTER .................................................................4
1.8 BATTERY TEST.......................................................................................................4
1.9 MEASURE OF OUTPUT VOLTAGE RIPPLE ..........................................................4
1.10 CLEANING OF MAGNETIC PARTS ........................................................................4
1.11 CLEANING OF ELECTRONIC BOARDS.................................................................4
2 MAINTENANCE PROGRAM ................................................................ 5
Index of pictures
Picture 1 – Front panel …………………………………………………………………………………………….2
BATTERY CHARGER maintenance
First Issue 09/03/09 JUD411546 2 of 5
1 MAINTENANCE OPERATIONS
1.1 VISUAL INSPECTION OF ELECTRICAL CONNECTIONS Make sure all cables and / or bars are firmly tightened the clamps connection and that no connection has loosened. A link not perfectly executed can increase the resistance of contact with all its consequences such as heating connection and increased voltage drop of the line.
1.2 CHECK OF ALARMS ON FRONT PANEL DISLPAY In order to verify the proper functioning of the system is advisable to check the history of alarms. This can be done through the front panel (see Operatingl Manual). If necessary, it is possible even simulate a condition of alarm (or an indication) to test the effective functioning of signalization.
Picture 1 – Front panel
BATTERY CHARGER maintenance
First Issue 09/03/09 JUD411546 3 of 5
LED 1 ⇒ Green light on = Rectifier Mains presence
Red light on = Otherwise
LED 2 ⇒ Green light on = RTB.e operating. Red light on = RTB.e failure or blocked Switched off for mains failure. LED 3 ⇒ Green light on = Rectifier in floating charge. Orange light on = Rectifier in rapid charge.
LED 4 ⇒ Green light on = Battery in recharge and ok.
Orange light on = Battery in discharge or battery test. Red light on = Battery KO.
LED 5 ⇒ Green light on = Output OK and ROCB closed.
Red light on = Otherwise
The meanings of Leds from 6 to 15 are depending from applications and are written beside the leds on the front panel.
1.3 AIR FILTER CHECK AND CLEANING Check whether the air input / output is blocked by dirt. If so clean them with compressed air blowing from the inside of the cabinet
1.4 FANS CONTROL AND CLEANING Monitoring the correct operation of fans (if presents) can be done with the rectifier on, making sure that does not appear on the display the alarm "A8 FAN Failure." In any case it is advisable to remove dust possibly deposited on the fans through a brush and blow with compressed air.
This operation should be done with the rectifier turned off.
1.5 CHECK OF INPUT VOLTAGE
Check with a multimeter C.A. that the input voltage is within the parameters defined in the data sheet.
1.6 CONTROLS ON DC VOLTAGE & BATTERY CHARGE FACILITIES
• Check of Floating Voltage
BATTERY CHARGER maintenance
First Issue 09/03/09 JUD411546 4 of 5
Measure with a D.C. multimeter the voltage at the rectifier output terminals and verify that the value is correct.
• Check of boost charge Start quick charge by pressing the button "BOOST" on the front panel and check that the LED 3 takes the color orange.
1.7 CURRENT ABSORBED BY DC FILTER Measure with D.C.current clamp the current absorbed by the DC capacitors; the value to ensure a longer life to capacitors must not exceed 25 amperes / capacitor.
1.8 BATTERY TEST In order to test the battery the battery test should be activated [see Operating Manual, chapter JUD407770 (“Front Panel”) par. 3.2.9 ]. If the rectifier is equipped with discharge facility the battery shall be discharged following a customized discharge profile (setted manually by service engineer)
1.9 MEASURE OF OUTPUT VOLTAGE RIPPLE Place the oscilloscope probe on the rectifier output terminals; measure the value peak to peak alternating component (AC) superimposed on the DC voltage and make sure that does not exceed 5 Volt (with battery connected).
1.10 CLEANING OF MAGNETIC PARTS
This operation should be done with rectifiers off Open the doors of rectifier cabinets. Remove protection by removing the screws. Remove dust deposited on the magnetic parts through a brush and blow with compressed air inside the gorges of the windings to remove any deposits.
1.11 CLEANING OF ELECTRONIC BOARDS
This operation should be done with rectifiers off. Open the front doors of rectifier cabinets. Remove the protections by removing the screws. Using a brush and / or blowing compressed air, eliminate dust deposited on the cards
BATTERY CHARGER maintenance
First Issue 09/03/09 JUD411546 5 of 5
2 MAINTENANCE PROGRAM
Equipment Operation Frequency Visual inspection of electrical connections 1 Year Check of alarms 6 Months Air filter check and cleaning 1 Year (*) Fans control and cleaning 1 Year (*) Check of input voltage 1 Year Control on DC voltage & Battery charger facilities
1 Year
Check of current absorbed by DC Filter 1 Year Battery Test 1 Year Measure of output voltage ripple 1 Year Cleaning of magnetic parts 2 Year (*) Cleaning of electronic boards 2 Year (*)
RTB_e
(*) In case of equipment operating in places particularly dusty increase the frequency of operation
WARNING If the values found or the result of tests made following the procedures described on Chapter 2( Maintenance ) are different from those expected please contact the customer service. The manufacturer declines any responsibility for damage to people or things, deriving from the non-fulfilment of the instructions or from wrong manoeuvres made by not qualified personnel.
BATTERY CHARGER Troubleshooting procedures
Rev. Descrizione Description
Data Date
Emesso Issued
Controllato Checked
Approvato Approved
Lingua Language
Pagina Page
di Pag. of Pag.
/ Emissione 24.01.09 P. Conti E. Simoni E. Simoni E 1 10 Codice / Code
JUD411295
BATTERY CHARGER TROUBLESHOOTING PROCEDURES
Index
1 INTRODUCTION.................................................................................. 3
2 TROUBLESHOOTING PROCEDURES .............................................. 3
2.1 A1 – MAINS FAULT .........................................................................................3
2.1.1 Troubleshooting procedure ....................................................................3
2.2 A2 – BLOWN FUSES .......................................................................................4
2.2.1 Troubleshooting procedure ....................................................................4
2.3 A3 – HIGH TEMPERATURE ............................................................................4
2.3.1 Troubleshooting procedure ....................................................................4
2.4 A4 – OVERLOAD / THERMAL IMAGE ............................................................4
2.4.1 Troubleshooting procedure ....................................................................5
2.5 A5 – MAX OUTPUT VOLTAGE........................................................................5
2.5.1 Troubleshooting procedure ....................................................................5
2.6 A6 – MIN OUTPUT VOLTAGE .........................................................................5
2.6.1 Troubleshooting procedure ....................................................................5
2.7 A7 – CHARGING FAULT .................................................................................6
2.7.1 Troubleshooting procedure (Wrong Floating Low)...............................6
2.7.2 Troubleshooting procedure (Wrong Floating High)..............................6
2.7.3 Troubleshooting procedure (Safety timer).............................................6
2.8 A8 – FANS FAILURE .......................................................................................7
2.8.1 Troubleshooting procedure ....................................................................7
2.9 A9 – OPEN CIRCUIT BREAKERS...................................................................7
2.9.1 Troubleshooting procedure ....................................................................7
2.10 A10 – EARTH FAULT ...................................................................................7
2.10.1 Troubleshooting procedure.................................................................7
2.11 A15 – EEPROM ERROR...............................................................................8
2.11.1 Troubleshooting procedure.................................................................8
BATTERY CHARGER troubleshooting procedures
2 of 10 JUD411295 First Issue 24/01/09
2.12 A16 – EMERGENCY LEVEL........................................................................ 8
2.13 PROGRAMMABLE ALARMS ...................................................................... 8
3 PCB’S AND COMPONENTS SUBSTITUTION....................................9
3.1 PCB’S SUBSTITUTION ................................................................................... 9
3.1.1 PS-DR16 (N_FS3005)............................................................................... 9
3.1.2 DR16-COMP (N_FS3006)......................................................................... 9
3.2 COMPONENTS SUBSTITUTION .................................................................. 10
3.2.1 RECTIFIER BRIDGE THYRISTORS ...................................................... 10
Index of pictures
Picture 1 – Rectifier input current waveform............................................................................................... 10
BATTERY CHARGER troubleshooting procedures
First Issue 24/01/09 JUD411295 3 of 10
1 INTRODUCTION This troubleshooting includes a first-level fault description based on the rectifier alarms and
suggests how to check the unit to solve the problems. This description assumes that all the connections inside the unit are correct: check them (connectors, power cables, signals and so on) before to start with the procedures. The first-level troubleshooting eventually leads to the substitution of the components of the Rectifier without attempting to repair them.
The procedures listed below takes into account the operator is provided with all the testing tools and perfectly confident with the test software.
2 TROUBLESHOOTING PROCEDURES
2.1 A1 – MAINS FAULT This alarm normally indicates that there is no power at the input of the Rectifier. The mains
voltage is acquired on the connector M1 of the back panel card BP-DR16 (N_FS3004) through the auxiliary transformer T10.
2.1.1 Troubleshooting procedure 1. Is the input voltage present and within the tolerance?
YES: go to step #2 NO: check the rectifier supply line
2. Measure the rectifier input voltage and compare the measure with the reading on the
DR16-Test screen (or front panel). Are the values shown equal to those measured? YES: go to step #6 NO: go to step #3
3. Check the fuses F11. Is there any fuse blown? YES: replace the broken fuse(s) NO: go to step #4
4. Check the auxiliary transformer T10 by measuring the secondary voltages directly on the transformer terminals. Do the voltage values match the transformer rating plate? YES: replace the card PS-DR16. Go to step #5 NO: replace the transformer T10
5. Is the problem solver after replacing the card PS-DR16? YES: END NO: replace the card DR-16
6. Is the variable RMSOK active on the DR16-Test software? YES: go to step #7 NO: check the phase sequence
7. Is the variable FROK active on the DR16-Test software? YES: replace the card DR-16 NO: go to step #8
8. Measure the rectifier input frequency. Is it within the tolerance limits? YES: replace the card DR-16 NO: check and/or adjust the input frequency window
BATTERY CHARGER troubleshooting procedures
4 of 10 JUD411295 First Issue 24/01/09
2.2 A2 – BLOWN FUSES This alarm normally indicates that there is a rectifier input fuse blown. The normally closed contact of the fuses is connected to the connector M18 (13-14) of the
back panel card BP-DR16 (N_FS3004). For the 12-pulse configuration the contact of the protection fuses of the slave bridge is connected to the connector M18 (9-10).
2.2.1 Troubleshooting procedure 1. Check the rectifier input fuses. Are they OK?
YES: go to step #2 NO: replace the broken fuse(s)
2. Check the connection between the auxiliary contact of the fuses and the connector
M18 of the card BP-DR16. Is it OK? YES: replace the card DR-16 NO: re-connect or replace the interconnection cable
2.3 A3 – HIGH TEMPERATURE This alarm indicates that the thermal switch on the bridge heatsink has stopped the rectifier.
The thermal switch(es) B1 (B1÷B3) mounted on the rectifier bridge heatsink(s) is normally closed, as the temperature exceeds 90°C the thermal switch opens. The signal comes directly from the switch to the connector M18 (11-12) of the back panel card BP-DR16. For the 12-pulse configuration the contact of the thermal switch of the slave bridge is connected to the connector M18 (7-8).
2.3.1 Troubleshooting procedure 1. Is the temperature of the heatsink lower than 80°C?
YES: go to step #2 NO: go to step #4
2. Check the thermal switch contact. Is it OK? YES: go to step #3 NO: replace the faulty thermal switch
3. Check the connection between the thermal switch(es) and the connector M18 of the card BP-DR16. Is it OK? YES: replace the DR-16 NO: re-connect or replace the interconnection cable
4. Are the cooling fans correctly working? YES: check the load. Repeated overloads (alarm A4) have caused the rectifier
overheating NO: replace the faulty fan(s)
2.4 A4 – OVERLOAD / THERMAL IMAGE This alarm gets two different meanings, according to the operating conditions; normally it
indicates that the rectifier is overloaded, and after a certain time (basing on the overload rate) the rectifier is stopped by the thermal image protection and the alarms become “Thermal Image”. The output current transformer measures a current exceeding the nominal output current. The alarm is activated and the microprocessor starts to calculate the energy pulse I2t.
BATTERY CHARGER troubleshooting procedures
First Issue 24/01/09 JUD411295 5 of 10
2.4.1 Troubleshooting procedure 1. Measure the output current with a current clamp. Does it exceed the rectifier nominal
current? YES: END. A overload is present. Check and/or reduce the load. NO: go to step #2
2. Compare the measure with the reading on the DR16-Test screen (or front panel). Is the value shown equal to the measured one? YES: replace the card DR-16 NO: replace the output current transformer TA1 and re-adjust the output current
reading with the DR16-Test software. Go to step #3 3. Repeat the step #2. Is the value shown equal to the measured one?
YES: END. Check that the load doesn’t exceed the nominal load. NO: replace the card DR-16
2.5 A5 – MAX OUTPUT VOLTAGE This alarm normally indicates that the rectifier output voltage is higher than the set limit. The
value can be checked through the front panel under PARAMETERS. The alarm provides to switch the rectifier off and remains stored. It can be reset manually from the front panel.
2.5.1 Troubleshooting procedure 1. Reset the alarm and measure the rectifier output voltage after the start-up. Is it higher
than the limit? YES: replace the CARD DR-16 NO: go to step #2
2. Compare the measure with the reading on the DR16-Test screen (or front panel). Is the
value shown equal to the measured one? YES: replace the CARD DR-16 NO: re-adjust the measure with the command VRECxxx. Go to step #3
3. Re-start the rectifier. Does the alarm occur again?
YES: replace the CARD DR-16 NO: END
2.6 A6 – MIN OUTPUT VOLTAGE This alarm normally indicates that the rectifier output voltage is lower than the set limit. The
value can be checked through the front panel under PARAMETERS.
2.6.1 Troubleshooting procedure 1. Open the battery breaker and measure the rectifier output voltage. Does the alarm
disappear? YES: the rectifier was in current limitation mode. Check the battery NO: go to step #2
2. Check the measure on the DR16-Test screen (or front panel). Is the value shown equal
to zero? YES: go to step #3 NO: go to step #4
BATTERY CHARGER troubleshooting procedures
6 of 10 JUD411295 First Issue 24/01/09
3. Check the fuses F13. Is there any fuse blown? YES: replace the broken fuse(s) NO: replace the CARD DR-16
4. Compare the measure with the reading on the DR16-Test screen (or front panel). Is the value shown equal to the measured one? YES: replace the CARD DR-16 NO: re-adjust the measure with the command VRECxxx. Go to step #5
5. Re-start the rectifier. Does the alarm occur again?
YES: replace the CARD DR-16 NO: END
2.7 A7 – CHARGING FAULT This alarm normally indicates that there’s something wrong with the batteries and the rectifier
is not capable of providing a suitable charge. It depends on three different alarm conditions, all of them shown in the front panel under the alarm row.
2.7.1 Troubleshooting procedure (Wrong Floating Low) 1. Check the battery voltage measure on the DR16-Test screen (or front panel). Is the
value shown equal to zero? YES: go to step #3 NO: go to step #4
2. Check the fuses F14. Is there any fuse blown? YES: replace the broken fuse(s) NO: replace the CARD DR-16
3. Measure the battery voltage and compare the value with the reading on the DR16-Test screen (or front panel). Is the value shown equal to the measured one? YES: replace the CARD DR-16 NO: re-adjust the measure with the command VBATxxx. Go to step #5
4. Re-start the rectifier. Does the alarm occur again?
YES: replace the CARD DR-16 NO: END
2.7.2 Troubleshooting procedure (Wrong Floating High) 1. Measure the battery voltage and compare the measure with the reading on the DR16-
Test screen (or front panel). Is the value shown equal to the measured one? YES: replace the CARD DR-16 NO: re-adjust the measure with the command VBATxxx. Go to step #5
2. Re-start the rectifier. Does the alarm occur again? YES: replace the CARD DR-16 NO: END
2.7.3 Troubleshooting procedure (Safety timer) When the alarm A7 depends on the operation of the safety timer the batteries are probably
old or worn out and need to be checked carefully. If the batteries are in order the problem is probably in the rectifier control loop, so we suggest to replace the card DR-16.
BATTERY CHARGER troubleshooting procedures
First Issue 24/01/09 JUD411295 7 of 10
2.8 A8 – FANS FAILURE This alarm normally indicates that there is at least one defective cooling fan. The normally closed contact coming from the fans monitoring card FMC is connected to the
connector M18 (15-16) of the back panel card BP-DR16 (N_FS3004).
2.8.1 Troubleshooting procedure 1. Check the fans monitoring card FMC. Is there any red LED lit?
YES: replace the fan connected to the channel indicated by the RED led. Go to step #2 NO: go to step #3
2. Re-start the rectifier. Does the alarm occur again? YES: replace the card FMC NO: END
3. Is the green LED DL5 lit? YES: go to step #4 NO: replace the card FMC
4. Check the connection between the card FMC and the connector M18 of the card BP-DR16. Is it OK? YES: replace the card DR-16 NO: re-connect or replace the interconnection cable
2.9 A9 – OPEN CIRCUIT BREAKERS This alarm indicates that one of the rectifier circuit breakers is open. The alarm is split into
three different sub-alarms; A91 (input breaker), A92 (battery breaker), A93 (output breaker). The auxiliary contacts of the circuit breaker are connected to the connector M18 of the back
panel card BP-DR16, to the pins 1-2 (input), 3-4 (battery) and 5-6 (output). The troubleshooting procedure that follows is not referred to a specific sub-alarms, as it is the
same for all of them.
2.9.1 Troubleshooting procedure 1. Is the breaker open?
YES: END NO: go to step #2
2. Check the connection between the auxiliary contact of the breaker and the connector M18 of the card BP-DR16. Is it OK? YES: replace the card DR-16 NO: re-connect or replace the interconnection cable
2.10 A10 – EARTH FAULT This optional alarm depends on the status of the external earth fault detector that may be
installed on request. The normally closed contact of the external detector is connected to the connector M18 (21-22) of the back panel card BP-DR16 (N_FS3004).
2.10.1 Troubleshooting procedure 1. Check the external earth fault detector; is the internal alarm activated?
YES: END. There’s a earth fault, check the loads and their connections to the rectifier. NO: go to step #2
BATTERY CHARGER troubleshooting procedures
8 of 10 JUD411295 First Issue 24/01/09
2. Check the connection between the detector and the connector M18 of the card BP-DR16. Is it OK? YES: replace the card DR-16 NO: re-connect or replace the interconnection cable
2.11 A15 – EEPROM ERROR This alarm depends on a wrong alignment of the data inside the EEPROM when the memory
is checked by the microprocessor. It is normally a fake alarm, but leads to a blocking condition of the rectifier.
2.11.1 Troubleshooting procedure 1. Connect the DR16-Test software and send the command MEE000, wait for 10 seconds
and re-start the rectifier after having turned it off. Does the alarm occur again? YES: replace the card DR-16 NO: END
2.12 A16 – EMERGENCY LEVEL This alarm indicates that the rectifier has been forced to lower the output voltage to the
programmed level as “emergency”. This operating mode is used when the rectifier is connected to critical loads which supply voltage range is lower than the floating voltage. The emergency level is commanded by an external contact connected to the connector M10 (1-2) of the back panel card BP-DR16. When the contact is closed the microprocessor forces the modification of the voltage set-point to the programmed “emergency level” (the value can be checked through the front panel under PARAMETERS).
2.13 PROGRAMMABLE ALARMS The alarms from A11 to A14 can be programmed during the engineering phase, in case the
technical specification requires additional signalisations. They can either be generated by mixing the standard rectifier alarms or depend on the free digital inputs available (connector M11 and M12 of the back panel card BP-DR16).
Considering the wide number of possible combinations a troubleshooting procedure cannot be given.
BATTERY CHARGER troubleshooting procedures
First Issue 24/01/09 JUD411295 9 of 10
3 PCB’S AND COMPONENTS SUBSTITUTION This chapter describes in detail all the checks that have to be done after the substitution of
electronic boards or power components installed in the digital rectifier, giving all the instructions to check the operating parameters or to change the rectifier settings.
3.1 PCB’S SUBSTITUTION 3.1.1 PS-DR16 (N_FS3005)
1. Re-connect carefully the card to the back panel. 2. Re-start the rectifier and check that all the green LED on the front of the card are steady
lit.
3.1.2 DR16-COMP (N_FS3006) 1. Check the setting of SW1 according to the following table. Check that the dip-switches
are in the same position as the old board.
Dip n. Status Description Off Battery test disabled 1 On Battery test enabled Off Rapid Charge disabled 2 On Rapid charge enabled Off Manual Charge disabled 3 On Manual Charge enabled Off Parallel configuration disabled 4 On Parallel configuration enabled
The dip switches 5-6-7-8 are not used and must be set to OFF.
2. Check the software version installed and, if necessary, replace the FLASH memory in the microprocessor card MC16 (installed on the solder side of the card DR-16).
3. Check the setting of the jumpers JP1-JP2-JP3-JP8-JP9 according to the following table. Check that they are in the same position as the old board.
Iout nominal JP1 JP2 JP8 JP9 JP3
50 A Yes No Yes No Yes 100 A Yes No Yes No Yes 150 A No Yes No Yes Yes 200 A No Yes No Yes Yes 250 A Yes Yes Yes Yes Yes 300 A No Yes No Yes Yes 500 A No Yes No Yes Yes 750 A Yes Yes Yes Yes Yes
>950 A Please refer to Operating Instructions PB132008
4. Set the jumpers JP10-JP11-JP12-JP13 according to the following table.
Nominal Voltage JP10 JP11 JP12 JP13
24-48-110 Vdc No No No No 220-380 Vdc Yes Yes Yes Yes
5. Close the input breaker and start-up completely the rectifier.
BATTERY CHARGER troubleshooting procedures
10 of 10 JUD411295 First Issue 24/01/09
6. Check that all the measure on the DR16-Test screen, or on the front panel, are equal to the values measured; on the contrary modify the value read on the screen with the following commands:
TIFRxxx (input voltage setting phase R; xxx is the value measured) TIFSxxx (input voltage setting phase S; xxx is the value measured TIFTxxx (input voltage setting phase T; xxx is the value measured) TCIRxxx (input current setting phase R; xxx is the value measured) TCISxxx (input current setting phase S; xxx is the value measured TCITxxx (input current setting phase T; xxx is the value measured) VRECxxx (output voltage setting; xxx is the value measured). VBATxxx (output current setting; xxx is the value measured). CRECxxx (battery voltage setting; xxx is the value measured). CBATxxx (battery current setting; xxx is the value measured). Store all the settings by sending the command MEEE000.
7. Check in the front panel that all the operating parameters (charging voltages and current, voltage and current thresholds, and so on) match the requirements of the technical specification.
8. Check the setting of the date and time on the front panel 9. Reset the history log.
3.2 COMPONENTS SUBSTITUTION 3.2.1 RECTIFIER BRIDGE THYRISTORS
1. Re-connect carefully the component to the firing board. 2. Check that the input current waveform, relevant to the phase controlled by the thyristors
that has been substituted, is symmetric (see picture, given for a 6-pulse system).
Picture 1 – Rectifier input current waveform
First Issue 03/03/09 JUD411479 1 of 1
BATTERY CHARGER APPENDIX SERVICE MANUAL
Index of sections Code
1 – Operating instr. for termal probe mounting on RTB.e JUD409515 2 – Operating instr. for N_FS3011 board mounting JUD409517 3 – Operating instr. for battery recharge LEM use JUD409518
Rev. Descrizione Description
Data Date
Emesso Issued
Controllato Checked
Approvato Approved
Lingua Language
Pagina Page
di Pag. of Pag.
/ First Issue 27.06.07 P. Conti E. Simoni E. Simoni I/E 1 1 Codice / Code
JRE409515
ISTRUZIONE OPERATIVA DI MONTAGGIO
Sonda termica su RTB_e con compensazione termica
MOUNTING OPERATING INSTRUCTION
Thermal probe on RTB_e with thermal compensation
Nei sistemi RTB_e con compensazione termica della tensione di tampone, collegare la FS1523, come riportato in figura 1, a M14 della scheda N_FS3004 con molex a 3 poli.
On RTB_e systems with thermal compensation of floating voltage, connect FS1523 (Picture 1) to M14 of N_FS3004 board with 3 poles molex.
Figura 1 – Picture 1
Rev. Descrizione Description
Data Date
Emesso Issued
Controllato Checked
Approvato Approved
Lingua Language
Pagina Page
di Pag. of Pag.
/ First Issue 27.06.07 P. Conti E. Simoni E. Simoni I/E 1 2 Codice / Code
JRE409517
ISTRUZIONE OPERATIVA
Montaggio scheda N_FS3011 CAN-LINK
OPERATING INSTRUCTION
Mounting board N_FS3011 CAN-LINK
1) Montare la scheda N_FS3011 sulla
scheda FS1420 come mostrato nella foto seguente.
1) Mount the N_FS3011 board on the
FS1420 as showed on the following picture.
2) Collegare il Pin 1 di M1 della
N_FS3011 al Pin2 del connettore DB9 femmina posto sul frontale del rack delle schede di controllo.
3) Collegare il Pin 2 di M1 della
N_FS3011 al Pin7 del connettore DB9 femmina posto sul frontale del rack delle schede di controllo.
2) Connect Pin 1 of M1 of N_FS3011 to Pin 2 of DB9 female connector placed on the front side of the control boards rack.
3) Connect Pin 2 of M1 of N_FS3011 to
Pin 7 of DB9 female connector placed on the front side of the control boards rack.
JRE409517 ISSUE 2
Cavo di collegamento CAN_BUS RTB_e in parallelo ridondante
Connection cable CAN_BUS parallel redundant RTB_e
Materiale: 2 connettori DB9 maschio, cavo bipolare
Material: 2 DB9 male connectors, bipolar cable
1) Collegare il Pin 2 di un connettore al
Pin 2 dell’altro connettore. 2) Collegare il Pin 7 di un connettore al
Pin 7 dell’altro connettore.
1) Connect Pin 2 of DB9 connector to Pin 2 of other DB9 connector.
2) Connect Pin 7 of DB9 connector to
Pin 7 of other DB9 connector.
Rev. Descrizione Description
Data Date
Emesso Issued
Controllato Checked
Approvato Approved
Lingua Language
Pagina Page
di Pag. of Pag.
/ Emissione 27/06/07 P. Conti E. Simoni E. Simoni I/E 1 4 Codice / Code
JRE409518
ISTRUZIONE OPERATIVA DI MODIFICA
Per utilizzo LEM ricarica batteria su raddrizzatori digitali in configurazione parallelo ridondante
Questa istruzione si riferisce ad una configurazione generica composta da due RTB_e e
una o due batterie. Si possono distinguere le seguenti configurazioni: 1. Due RTB_e con diodo di blocco, connessi in parallelo su un’unica barra e una
batteria collegata anch’essa in parallelo alla barra.
I due sensori di corrente di batteria devono essere collegati al connettore M7 della
N_FS3004 di ciascun RTB_e. Sul connettore M18 della N_FS3004 di ciascun RTB_e, si devono cortocircuitare con un
jumper i pin 17-18.
JRE409518 ISSUE 2
2. Due RTB_e con diodo di blocco, connessi in parallelo su un’unica barra e due batterie collegate anch’esse in parallelo alla barra e congiuntore fra i due sistemi.
Ogni batteria deve avere un sensore di corrente (Hall effect ammeter) per ciascun RTB_e. La tabella sotto riportata evidenzia la logica di collegamento dei sensori di corrente sulla N_FS3004.
BATTERIA 1 BATTERIA 2RTB_e1 M7 M13 RTB_e2 M13 M7
Sulla scheda FS1420 dovranno essere implementate le seguenti modifiche in base alla
corrente di ricarica di batteria degli RTB_e.
R122 = 10 k ¼ w R129 = in accordo alla seguente tabella
Rapporto di
trasformazione del sensore ad effetto
Hall di batteria
Massima corrente di ricarica della
batteria
R 129 [kOhm]
1W
151A 33 230A 22 2000/1 305A 33 // 33
4000/1 300A 33 5000/1 760A 33 // 33
Il contatto ausiliario del congiuntore dovrà essere portato ad entrambi gli RTB_e. Nel caso in cui il congiuntore non fosse previsto, si dovrà provvedere a cortocircuitare
con un jumper, in ogni RTB_e, i pin 17-18 del connettore M18 della N_FS3004.
JRE409518 ISSUE 3
MODIFICATION OPERATING INSTRUCTION
To use battery recharge LEM on parallel redundant digital rectifiers
This instruction is related to a generic configuration of two RTB_e and one or two batteries.
We can have the following configurations: 1. Two RTB_e with blocking diode, connected in parallel in one sinlge bar and one
battery aswell connected in parallel to the bar.
The two battery current sensors have to be connected to M7 connector of N_FS3004 of
each RTB_e. On M18 connector of N_FS3004 of each RTB_e, the pin 17-18 have to be short circuit
with a jumper.
JRE409518 ISSUE 4
2. Two RTB_e with blocking diode, connected in parallel on one single bar and two batteries aswell connect in parallel to the bar and coupling switch between the two system.
Each battery must have a current sensor (Hall effect ammeter) for each RTB_e The following table show the connection logic of current sensories on N_FS3004.
BATTERY 1 BATTERY 2 RTB_e1 M7 M13 RTB_e2 M13 M7
On the FS1420 board will have to be implemented following modifications according to
the battery recharge current of RTB_e.
R122 = 10 k ¼ w R129 = as according of following table
Battery Hall effect ammeter ratio
Maximum Battery recharge current
R 129 [kOhm]
1W 151A 33 230A 22 2000/1 305A 33 // 33
4000/1 300A 33 5000/1 760A 33 // 33
The auxiliary contact of coupling switch will have to be carried on each RTB_e. If there is not coupling switch, we will have to short circuit pin 17-18 of M18 connector of