FY13 Waste Water Treatment Plant, PN75165, JBLM, WAW912DW-13-R-0001

Industry Day27 Nov 2012

2

Introduction

• This conference is for informational purposes only.

• Comments/clarifications made today will not necessarily change the upcoming solicitation.

W912DW-13-R-0001

3

Solicitation General Information

• This RFP will be advertised as a Two Phase Design Build, Best Value Procurement. Only the Firms Shortlisted in the Phase 1 Process will be sent to the Phase 2 Solicitation and invited to attend the Preproposal Conference and Site Visit.

W912DW-13-R-0001

4

Questions During the Upcoming Proposal Stage

• Questions during the solicitation phase 1 and 2 are handled through www. projnet.org

• Technical Questions:– www.projnet.org

• For Any Other Administrative Questions, please contact Erik Lundstrom:– Email: Erik.A.Lundstrom@usace.army.mil– Phone: (206) 764-6698

Federal Acquisition Regulation: http://farsite.hill.af.mil/

W912DW-13-R-0001

5

• Competition for this Solicitation is Unrestricted and open for all Business Firms.

• NAICS Code: 237110

• Small Business Size Standard: A firm having an average annual gross revenue of $33.5 Million or less for the last three fiscal years.

• For any small business related questions, please contact Seattle District’s Small Business Specialist, Ms. Veronica Kammler, at: Phone 206-431-7100 – Email: veronica.a.kammler@usace.army.mil

Solicitation General Information

W912DW-13-R-0001

6

Solicitation General Information

• This project is a Design-Build Request for Proposal (RFP), see FAR part 36.3.– There is no public bid opening. Information, other than technical

changes or administrative clarifications, will not be provided during the evaluation process.

• This is a Best Value procurement (refer to FAR part 15 and sections 00 22 10 and 00 22 20 of the upcoming solicitation).

W912DW-13-R-0001

7

Solicitation General Information

• Design-Build Two-Phase Schedule– Phase 1 on fbo.gov = 30 days– Phase 1 Evaluation = approx. 45-60 days

– Phase 2 sent to Prime Contractors = 45 days– Phase 2 Evaluation = approx 60-90 days

W912DW-13-R-0001

8

Conclusion

Questions?

W912DW-13-R-0001