Page 1: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access

© 2015 HDR, all rights reserved.

Waverly Road Progressive Design Build Project Owner: City of Edgerton, KS

2016 TEAM Conference

March 10, 2016

Page 2: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access

Project Location

Page 3: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access

Project Location

BNSF LPKC

BNSF Transcon

Tracks

BNSF Intermodal

Lead Trucks

Gardner, KS

Waverly Road

Edgerton, KS

Page 4: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access

Project Team

Page 5: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access

Clarkson Construction Company Tom Kellerman, P.E. – Chief Engineer – Project Sponsor Pat Weaver, P.E. – Project Manager Randy Smith, P.E. – Structures Manager

Design Build Team

HDR Cory Imhoff, P.E. – Design Manager Simon Sun, P.E. – Roadway Design Lead Chad Hall, P.E. – Structures Design Lead Shannon McCauley, P.E. – Railroad Liaison Subconsultants Renaissance Infrastructure Consultants Braun Intertec Terra Technologies

Design Team

Owners Beth Linn, City Administrator Kenny Cook, Community Development Director David Hamby, City Engineer (BG Consultants, Inc.)

Page 6: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access

Progressive Design Build Process

Page 7: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access

Delivery Phases

1. Qualifications Phase

• Statement of Qualifications

• Shortlist • Interview • Selection

2. Guaranteed Maximum Price (GMP) Development Phase

• Collaborative Design and Estimating

• Setting Scope and Schedule of Project

• Advance Permitting, Utility Relocation and Right of Way Acquisition

• Setting Guaranteed Maximum Price for Project Scope (30% plans)

3. Final Design & Construction

• Project segmentation • Developing 100% plans

for owner review and approval

• Finalize Right of Way Acquisition

• Finalize Utility Relocation

• Finalize Permitting • Release for

Construction Documents

• Construction

Page 8: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access

November 2014 RFQ December 2014 Shortlist/Interview January 2015 Pre-GMP Design

to March 2015 & Estimating

Project Schedule April to July 2015 Final Design April 2015 to May 2016 Construction

Page 9: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access

1. Qualifications Phase

Page 10: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access

RFP/RID Alignment Over Existing & Future BNSF IMF Tracks Impacts KCP&L Wetlands Parcel Position Relative to BNSF Lead Track Monitoring Equipment Complicates Intersection at 183rd Street Required Steel Plate Girders

Page 11: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access

Wetland & Conservation Corridor Impacts DWR, COE, KDWP, KDHE, USFWS FAA 7460 for Lights on Bridge & Cranes Schedule Risk

Permitting

Page 12: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access

Utilities

KCP&L, Gardner Water, Gardner Electric, Water District 7, Century Link, Kansas Gas, BNSF Minimize Impacts City & Utility Staff Integral Part of Process Schedule Risk

Page 13: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access

Quick Decisions City Leadership o Beth Linn

Cooperation with North Point and BNSF KCP&L Wetland City of Gardner Boundary Mixed Results with Private

Properties o Biggest challenge to

project delivery Schedule Risk

Right of Way

Private Property

Private Property

Page 14: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access

Bridge Over Existing & Future BNSF IMF Tracks Avoid Impacts to KCP&L Wetlands Parcel to Maintain Schedule Stay on or Near Existing Alignment Use Precast Girders to Maintain Schedule Straddle Bent Required Over Future Lead Track (Square or Skewed?) Evaluate Longer Bridge to Avoid Culvert Replacement(s) & Additional Impacts

KCP&L Overhead

Gardner Water

Page 15: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access

Waverly Road Profile Over BNSF RFP/RID 183rd Street Intersection Was A Concern Relocating 183rd Street Intersection Allows Tie In and Access to BNSF Water Storage Tank

Entrance And Improved Intersection Geometry Profile Controlled by Straddle Bent & Future IMF Tracks High Fills Over Culverts vs. Increasing Bridge Length & Avoiding Culvert & Stream Impacts Fill Heights & Potential MSE Wall Strap Length Conflicts for Parallel Walls

Page 16: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access

Inverted Tee Straddle Bent Staged Post-Tensioning Inverted Tee Cap TxDOT Detailing Approach Good Alternative to a Framed Cap Simple Construction Can be Constructed Without Girders

Page 17: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access

Maintaining Access During Construction Waverly Road Closed to Through Traffic Temporary Surfacing to Maintain Access for BNSF, Developers, Contractors,

Private Residents & Emergency Responders Segmentation and Use of Local Roads to Maintain Access for Everyone

WD No. 7

Kubota Private

BNSF

North Point

Page 18: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access

2. GMP Development Phase

Page 19: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access

Weekly Task Force Meetings o Owner o Major Stakeholders o Designer o Contractor

Communication is Key Decisions Made and Maintained Allows Priorities and Expectations for

Project to be Aligned Develop 30% Plans o Contract Basis for Construction and Design

Pricing Third Party / Independent Review of Pricing

Setting Project Scope, Schedule and Price

Page 20: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access

During GMP development phase o Advance Permitting o Advance Utility Relocation o Advance Right of Way Acquisition

Owner involvement and decision making Working with single consultant and

contractor Owner retention of GMP plans whether

GMP contract is signed or not The owner, the contractor, and the designer

are on the same page going into final design and construction

GMP Development Phase is “The Advantage” of Progressive Design Build

Page 21: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access

3. Final Design And Construction

Page 22: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access

Bridge Packages

S01A – Girders & Bearings Waverly Road Bridge

S01B – Pier 1 Straddle Waverly Road Bridge

S01C – Abutment 1 & 2 Waverly Road Bridge

S01D – Pier 2, 3, 4 & 5 Waverly Road Bridge

S01E – Deck, Barrier, Joints, Lights Waverly Road Bridge

Page 23: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access
Page 24: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access

Roadway Packages

R01 – G, D & P 187th Street

R02A – G & D South – Sta. 65 + 50 to Sta. 126 + 75

R02B – G, D & P South – Sta. 65 + 50 to Sta. 110 + 00

R02C – G, D & P South – Sta. 110 + 00 to Sta. 131 + 50

R04 – G, D & P North – 185th Street to 183rd Street

R05A – G & D North – Sta. 126 + 75 to 202 + 02.13

R05B – G & D & P North – Sta. 126 + 75 to 202 + 02.13

R02 A, B

R02 C R04

R05 A, B

R01

Page 25: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access
Page 26: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access

Project Photos

Page 27: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access
Page 28: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access
Page 29: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access
Page 30: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access
Page 31: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access
Page 32: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access
Page 33: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access
Page 34: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access
Page 35: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access
Page 36: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access
Page 37: 2016 TEAM ConferenceMar 10, 2016  · Cory Imhoff, P.E. – Design Manager . Simon Sun, P.E. – Roadway Design Lead . ... Relocating 183rd Street Intersection Allows Tie In and Access

Questions