Springflow Benefits for Pumping Forbearance East and West of Cibolo Creek Edwards Aquifer Habitat Conservation Plan Prepared for: Stakeholder Committees: ASR and VISPO Work Groups Prepared by: Larry Land, P.E. and Maureen Reilly, P.E. (CA) Sam Vaugh, P.E. and Phyllis Stanin, P.G.(CA) July 31, 2014

Upload: vail

Post on 17-Mar-2016

46 views

Category:

Documents


1 download

DESCRIPTION

Springflow Benefits for Pumping Forbearance East and West of Cibolo Creek Edwards Aquifer Habitat Conservation Plan Prepared for: Stakeholder Committees: ASR and VISPO Work Groups. Prepared by: Larry Land, P.E . and Maureen Reilly, P.E. (CA) - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Prepared by: Larry Land, P.E .  and Maureen Reilly,  P.E. (CA)

Springflow Benefits for Pumping Forbearance East and West of Cibolo Creek

Edwards Aquifer Habitat Conservation Plan

Prepared for:Stakeholder Committees:

ASR and VISPO Work Groups

Prepared by:Larry Land, P.E. and Maureen Reilly, P.E. (CA) Sam Vaugh, P.E. and Phyllis Stanin, P.G.(CA)

July 31, 2014

Page 2: Prepared by: Larry Land, P.E .  and Maureen Reilly,  P.E. (CA)

2

Topics of Discussion

Purpose and Scope Technical Approach and Assumptions Modeling Analyses Summary Conclusions

Page 3: Prepared by: Larry Land, P.E .  and Maureen Reilly,  P.E. (CA)

Purpose and Scope

PURPOSE: Establish the Springflow Benefits of ASR Leases

and VISPO Forbearance Agreements East and West of Cibolo

Creek

SCOPE: Test and Evaluate One Conceptual Scenario

3

Page 4: Prepared by: Larry Land, P.E .  and Maureen Reilly,  P.E. (CA)

Technical Approach and Assumptions

Tasks

1. Estimate Availability of Potential Forbearance Agreements

for ASR Leases or VISPO East and West of Cibolo Creek

a) Selected 10,000 acft/yr of IRP for Test and Evaluation

East of Cibolo: 69% from Comal County and 31% from

Hays County

West of Cibolo: 60% from Medina County and 40%

from Uvalde County

NOTE: 10,000 acft/yr is 13.8 cfs

4

Page 5: Prepared by: Larry Land, P.E .  and Maureen Reilly,  P.E. (CA)

Technical Approach and Assumptions(Continued)

Tasks (Continued)

2. Applications of Edwards Aquifer Model

a) Baseline Scenario

• Prepare a Baseline Pumping Dataset for 200,000

acft/yr. Distribution within County is a Prorated

Reduction of IRP. Monthly Distribution is Based on

Use Type

• Turn OFF Critical Period Management Controls

• Run the Model

5

Page 6: Prepared by: Larry Land, P.E .  and Maureen Reilly,  P.E. (CA)

Technical Approach and Assumptions(Continued)

Tasks (Continued)

2. Applications of Edwards Aquifer Model (Continued)

b) East of Cibolo Creek Scenario

• Prepare a Pumping Data Set with a Forbearance of up

to 10,000 acft/yr

• Run the Model

c) West of Cibolo Creek Scenario

• Prepare a Pumping Data Set with a Forbearance of up

to 10,000 acft/yr

• Run the Model6

Page 7: Prepared by: Larry Land, P.E .  and Maureen Reilly,  P.E. (CA)

Technical Approach and Assumptions(Continued)

Tasks (Continued)

2. Applications of Edwards Aquifer Model (Continued)

d) Calculate Springflow Benefits to Comal and San Marcos

Springs

3. Deliverables, Meeting and Schedule

a) Powerpoint

b) Presentation to Work Groups

7

Page 8: Prepared by: Larry Land, P.E .  and Maureen Reilly,  P.E. (CA)

Flowpaths and Forbearance (acft/yr)

8

Source: EAA

4,000 6,000

6,900

3,100

West of Cibolo

East of Cibolo

Page 9: Prepared by: Larry Land, P.E .  and Maureen Reilly,  P.E. (CA)

Springs in MODFLOW

9

Discharge from Springs

Notes: • Hueco Springs is not in model.• Barton Springs is lumped in with

Colorado River and simulated as a “River”.

• Las Moras Springs is considered to be insignificant for purposes of this study.

Page 10: Prepared by: Larry Land, P.E .  and Maureen Reilly,  P.E. (CA)

Groundwater Modeling Results

10

Hydrographs at Springs and Index Wells Difference between Baseline Scenario and

East and West of Cibolo Scenarios Distribution of Springflow Benefits from

Forbearance Efficiency of Forbearance to Springs

Page 11: Prepared by: Larry Land, P.E .  and Maureen Reilly,  P.E. (CA)

J-17 and J-27

11

Page 12: Prepared by: Larry Land, P.E .  and Maureen Reilly,  P.E. (CA)

Comal and San Marcos

Springs

12

Page 13: Prepared by: Larry Land, P.E .  and Maureen Reilly,  P.E. (CA)

Forbearance Benefit

Comal and San Marcos

13

5.6

3.9

0.4

8.8

Page 14: Prepared by: Larry Land, P.E .  and Maureen Reilly,  P.E. (CA)

Forbearance BenefitComal and San Marcos Combined

14

12.7

6.0

Page 15: Prepared by: Larry Land, P.E .  and Maureen Reilly,  P.E. (CA)

Distribution of Forbearance Springflow BenefitScenario 1 (East of Cibolo)

15

Leona San Antonio and San Pedro

Comal

San Marcos

Page 16: Prepared by: Larry Land, P.E .  and Maureen Reilly,  P.E. (CA)

Distribution of Forbearance Springflow BenefitScenario 2 (West of Cibolo)

16

San Antonio and San Pedro

San Marcos

Comal

Leona

Page 17: Prepared by: Larry Land, P.E .  and Maureen Reilly,  P.E. (CA)

Summary of Forbearance Benefit to Springs

17

Page 18: Prepared by: Larry Land, P.E .  and Maureen Reilly,  P.E. (CA)

18

Summary

Benefit to Minimum Springflow Comal Springs

• Eastern Forbearance (Scenario 1): +5 cfs• Western Forbearance (Scenario 2): +10 cfs

San Marcos Springs• Eastern Forbearance (Scenario 1): +10 cfs• Western Forbearance (Scenario 2): +0 cfs

Page 19: Prepared by: Larry Land, P.E .  and Maureen Reilly,  P.E. (CA)

19

Summary

• Benefit to Long-Term Average Springflow• Comal Springs

• Eastern Forbearance (Scenario 1): +3.9 cfs• Western Forbearance (Scenario 2): +5.6 cfs

• San Marcos Springs• Eastern Forbearance (Scenario 1): +8.8 cfs• Western Forbearance (Scenario 2): +0.4 cfs

Page 20: Prepared by: Larry Land, P.E .  and Maureen Reilly,  P.E. (CA)

20

Conclusions

• Forbearance in Comal and Hays Counties (Scenario 1)• About 28% of the Flow Benefit goes to Comal Springs, 64%

to San Marcos Springs, and 3% to Other Springs• About 5% goes to Storage (higher water levels), Los Moras

Springs and boundaries• Forbearance in Medina and Uvalde Counties : (Scenario 2)

• About 41% of the Flow Benefit goes to Comal Springs, 3% to San Marcos Springs, and 44% to Other Springs

• About 12% goes to Storage (higher water levels), Los Moras Springs and boundaries

• Results are Consistent with the Flowpath Map in Slide 15

Page 21: Prepared by: Larry Land, P.E .  and Maureen Reilly,  P.E. (CA)

Discussion

21

Questions &Answers