Yesler Bridge Rehabilitation Project
PREFONTAINE PL S
PREFONTAINE PL S
Yesler Way Bridge Vicinity
5
JEFFERSON ST
JEFFERSON ST
TERRACE ST
JAMES ST
YESLER WAY YESLER WAY
S WASHINGTON STS WASHINGTON ST
4TH AVE
5TH AVE
6TH AVE
3RD AVE
2ND AVE
4TH AVE
5TH AVE
5TH AVE
6TH AVE
4TH AVE
3RD
AVE
City Hall Park
Prefontaine Place
King County Courthouse
PrefontaineBuilding
King County Administration
Building
PIONEER SQUARETRANSIT STATION
Yesler Building
Seattle Passport Agency
City of Seattle Fire Station
King County
ChinookBuilding
DILLIN
G WAY
• Built in 1910 as one of the first steel roadway bridges in the City
• Being rehabilitated to improve safety and reliability while preserving its principal historical elements
• Vital in connecting residents, commuters, workers, and businesses in the surrounding area and neighborhoods
Project overview
Schedule
60% Design
90% Design
Final Design
Begin Construction
Project Complete
October 2014
April 2015
Spring 2016
September2015
Fall 2017
We arehere
Project area
www.seattle.gov/transportation/YeslerBridge.htm
Yesler Bridge Rehabilitation Project
Final bridge design
Pedestrian Railing
Single Span Superstructure
West Abutment WallEast Abutment Wall
Fascia Girder
Design• Remove interior steel columns to form a single
span superstructure• Rehabilitate east abutment wall and replace west abutment wall• Refurbish north and south fascia girders and pedestrian railings
Pedestrian improvements • Improve intersection design to reduce crosswalk distance,
accommodate ADA, and improve pedestrian visibility
PREFONTAINE PL S
PREFONTAINE PL S
JEFFERSON ST
4TH AVE
4TH AVE
City Hall Park
PrefontaineBuilding
TERRACE ST
YESLER WAY
Yesler Building
PREFONTAINE PL S
PREFONTAINE PL S
S WASHINGTON ST
4TH AVE City of Seattle
Fire Station
LEGENDSidewalk Crosswalk
4TH AVE
City Hall Park
PrefontaineBuilding
Yesler Building
YESLER WAY
TERRACE ST
LEGENDSidewalk Crosswalk
Before After
4TH AVE
City Hall Park
PrefontaineBuilding
Yesler Building
YESLER WAY
TERRACE ST
DILLING WAY
LEGENDSidewalk Crosswalk
4TH AVE
City Hall Park
PrefontaineBuilding Yesler Building
YESLER WAY
TERRACE ST
DILLING WAY
LEGENDSidewalk Crosswalk
Design rendering
www.seattle.gov/transportation/YeslerBridge.htm
Yesler Bridge Rehabilitation Project
Construction impactsStreet closures• Yesler Way will be closed in both directions between
3rd Ave and midway between 5th Ave and 6th Ave • Terrace St will be closed to through traffic, open to
local access• 4th Ave will have ongoing lane closures and occasional
full nighttime and weekend closures• Sidewalks on either side of 4th Ave will have
alternating closures
Street and sidewalk closures
PREFONTAINE PL S
PREFONTAINE PL S
5
Road Closure
Sidewalk Closure
JEFFERSON ST
JEFFERSON ST
TERRACE ST
JAMES ST
YESLER WAY YESLER WAY
S WASHINGTON STS WASHINGTON ST
4TH AVE
5TH AVE
6TH AVE
3RD AVE
2ND AVE
4TH AVE
5TH AVE
5TH AVE
6TH AVE
4TH AVE
3RD
AVE
Prefontaine Place
King County Courthouse
PrefontaineBuilding
King County Administration
Building
PIONEER SQUARETRANSIT STATION
Yesler Building
Seattle Passport Agency
City of Seattle Fire Station
King County
ChinookBuilding
CHERRY ST
City Hall Park
DILLIN
G WAY
www.seattle.gov/transportation/YeslerBridge.htm
Yesler Bridge Rehabilitation Project
Construction impacts
PREFONTAINE PL S
6TH AVE
Road Closure
TemporaryStop
Sidewalk Closure
Metro Route 27 Detours
Metro 5th Ave Detours
Community Transit
ActiveStop
ClosedStop
5
JEFFERSON ST
JEFFERSON ST
TERRACE ST
YESLER WAY YESLER WAY YESLER WAY
S WASHINGTON ST
4TH AVE
5TH AVE
6TH AVE
3RD AVE
2ND AVE
4TH AVE
5TH AVE 6TH AVE
4TH AVE
3RD
AVE
Prefontaine Place
King County Courthouse
PrefontaineBuilding
King County Administration
Building
PIONEER SQUARETRANSIT STATION
Yesler Building
Seattle Passport Agency
Seattle Housing
Assistance Group
City of Seattle Fire Station
King County
ChinookBuilding
Occidental Park
MunicipalCourthouse
CHERRY ST
COLUMBIA ST
MARION ST
2ND AVE
JEFFERSON ST
8TH
AVE
JAMES ST
9TH AVE
8TH AVE
TERRY AVE
Harborview Park
S MAIN ST
JAMES ST
PREFONTAINE PL S
YESLER WAY
S WASHINGTON ST
5TH AVE
6TH AVE
8TH
AVE
9TH AVE
PREFONTAINE PL S
JAMES ST
Kobe Terrace Park
City Hall Park
3RD
AVE
4TH AVE
4TH AVE
DILLIN
G WAY
4TH AVE
3RD AVE
6TH AVE
Transit impacts and detoursTransit impacts • Some transit routes
will be affected during construction, including:
° King County Metro routes: 27, 111, 114, 212, 214, 216, 217, 218, 219, 252, 257, 268, 304, 308, 311, 312, 355
° Sound Transit routes: 510, 511, 512, 513, 554, 590, 594, 595
° Community Transit routes: 402, 405, 410, 412, 413, 415, 416, 417, 421, 422, 424, 425, 435
• Some bus stops will be temporarily relocated
• Transit agencies will notify their riders as appropriate
PREFONTAINE PL S Road Closure
Sidewalk Closure
Weekday VehicleDetours
Weekend & Evening Vehicle Detours
5
JEFFERSON ST
JEFFERSON ST
TERRACE ST
YESLER WAY YESLER WAY YESLER WAY
S WASHINGTON ST
4TH AVE
5TH AVE
6TH AVE
3RD AVE 4TH AVE
5TH AVE 6TH AVE
4TH AVE
3RD
AVE
City Hall Park
Prefontaine Place
King County Courthouse
PrefontaineBuilding
King County Administration
Building
Harborview Medical
PIONEER SQUARETRANSIT STATION
Yesler Building
Seattle Passport Agency
Seattle Housing
Assistance Group
City of Seattle Fire Station
King County
ChinookBuilding
Occidental Park
MunicipalCourthouse
CHERRY ST
COLUMBIA ST
MARION ST
2ND AVE
JEFFERSON ST
ALDER ST
8TH
AVE
JAMES ST
9TH AVE
8TH AVE
TERRY AVE
Harborview Park
Kobe Terrace Park
JAMES ST
PREFONTAINE PL S
YESLER WAY
S WASHINGTON ST
5TH AVE
6TH AVE
8TH
AVE
9TH AVE
PREFONTAINE PL S
JAMES ST
4TH AVE
JAMES ST
4TH AVE
4TH AVE
S MAIN ST
2ND AVE
DILLIN
G WAY
2ND AVE
Vehicle impacts and detours
www.seattle.gov/transportation/YeslerBridge.htm
Yesler Bridge Rehabilitation Project
Parking restrictions during construction
Parking restrictions after construction (permanent)
PREFONTAINE PL S
PREFONTAINE PL S
DILLIN
G WAY
DILLIN
G WAY
S MAIN ST
5
No Parking
JEFFERSON ST
JEFFERSON ST
TERRACE ST
JAMES ST
YESLER WAY YESLER WAY
S WASHINGTON STS WASHINGTON ST
4TH AVE
5TH AVE
6TH AVE
3RD AVE
2ND AVE
4TH AVE
5TH AVE
5TH AVE
6TH AVE
4TH AVE
3RD
AVE
City Hall Park
Prefontaine Place
King County Courthouse
PrefontaineBuilding
King County Administration
Building
PIONEER SQUARETRANSIT STATION
Yesler Building
Seattle Passport Agency
City of Seattle Fire Station
King County
ChinookBuilding
CHERRY ST
DILLIN
G WAY
PREFONTAINE PL S
PREFONTAINE PL S
5
No Parking
JEFFERSON ST
JEFFERSON ST
TERRACE ST
JAMES ST
YESLER WAY YESLER WAY
S WASHINGTON STS WASHINGTON ST
S MAIN ST
4TH AVE
5TH AVE
6TH AVE
3RD AVE
2ND AVE
4TH AVE
5TH AVE
5TH AVE
6TH AVE
4TH AVE
3RD
AVE
City Hall Park
Prefontaine Place
King County Courthouse
PrefontaineBuilding
King County Administration
Building
PIONEER SQUARETRANSIT STATION
Yesler Building
Seattle Passport Agency
City of Seattle Fire Station
King County
ChinookBuilding
CHERRY ST
DILLIN
G WAY
There will be no parking: ° In the construction area
along Yesler Way between 3rd Ave and midway between 5th Ave and 6th Ave
° Along Terrace St from the alley to Yesler Way
° Beneath the bridge on 4th Ave
° In the east curb lane of 5th Ave between Washington and Terrace St
° On the west side of 6th Ave immediately south of Yesler Way
° On the north side of Main St immediately west of 6th Ave
After construction: ° Parking will no longer be
allowed on the bridge ° A few parking spaces will be
removed on both Yesler Way and Terrace St immediately adjacent to the bridge
° Parking will no longer be allowed on the east side of 4th Ave between S Washington and Jefferson Streets
° Parking will no longer be allowed in the east curb lane of 5th Ave between S Washington and Terrace St
Parking impacts
www.seattle.gov/transportation/YeslerBridge.htm
Yesler Bridge Rehabilitation Project
Visit our website at: www.seattle.gov/transportation/YeslerBridge.htm
Call us at: 206-684-8684
Email us at: [email protected]
Email us to receive project updates
Stay informed
To request translation services or accommodation for persons with disabilities, please call 206-684-8684/TTY Relay: 711.
Si necesita traducir esta información al español, llame al 206-684-8684.
如果您需要此信息翻譯成中文 請致電 206-684-8684.
Nếu quý vị cần thông tin này chuyển ngữ sang tiếng Việt xin gọi 206-684-8684.