Ed Dort – Regional Sales Manager, Eastern USA & Canada

August, 2016

IKE 3WSDOT Franchise Renewal Case Study

Data Collecting & Reporting

WSDOT ROW Franchise Renewal• Challenging Process to Collect Required Data

• 4-8 Measurements from Highway Center Line to Pole

• Safety is Paramount

• Accuracy and Efficiency is Critical

• Mandatory Data Reporting for Each Franchise Application

WSDOT Franchise Renewal

Required Measurements

Sample CSV File for From Collected Data

Ce

nte

rlin

e

Fo

g L

ine

Sh

ou

lde

r

Toe

BB

EC

Po

le 0

25

84

1

RO

W

Highway

Final

CAD Drawing

From Collected

Data For

WSDOT

Per Pole Timeline - Current vs New

Current: - One Person (potentially hazardous)

Laser Range Finder & Form – Manually Transcribe to Excel – AutoCAD Drawing

New: - Two Person (enhanced safety)

MapSight Data Capture – Export to Excel – Create Required Report & Drawing

10 – 15 minutes 3 – 5 minutes 15 minutes

<7 minutes …for everything!

What ikeGPS Accomplished at BBEC• Demonstrated a safer, more accurate way to collect data

• Eliminates error prone, tedious, and often dangerous process

• Faster – Instead of 30 mins per pole (or longer), <7 mins all in!

� Collect field data, export to Excel, run Excel macro

� Generate required reports and drawings