WSDOT/AGC/ACEC Design- Build Subcommittee Annual Report Scott Ireland / Paul Mayo WSDOT / AGC Co-Chairs WSDOT / ACEC Annual Meeting Bellevue, WA June 11, 2015

Upload: adam-sims

Post on 04-Jan-2016

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WSDOT/AGC/ACEC Design- Build Subcommittee Annual Report Scott Ireland / Paul Mayo WSDOT / AGC Co-Chairs WSDOT / ACEC Annual Meeting Bellevue, WA June 11,

WSDOT/AGC/ACEC Design-Build Subcommittee Annual Report

Scott Ireland / Paul MayoWSDOT / AGC Co-Chairs

WSDOT / ACEC Annual MeetingBellevue, WA

June 11, 2015

Page 2: WSDOT/AGC/ACEC Design- Build Subcommittee Annual Report Scott Ireland / Paul Mayo WSDOT / AGC Co-Chairs WSDOT / ACEC Annual Meeting Bellevue, WA June 11,

2015 Annual Report

Who we are

2014-2015 Accomplishments

Team’s Purpose and Function

2

2014-2015 Focus Areas

Page 3: WSDOT/AGC/ACEC Design- Build Subcommittee Annual Report Scott Ireland / Paul Mayo WSDOT / AGC Co-Chairs WSDOT / ACEC Annual Meeting Bellevue, WA June 11,

WSDOT / AGC / ACEC-WA sub-committee team consisting of approximately 25 members (+\-)

•WSDOT is represented by State Construction Office, State Design Office, State Materials Lab, NWR, OR, SR 520 Program, I-405 Program, AWV Program and FHWA

•AGC is currently represented by Max J. Kuney Co., Kiewit, Atkinson, Granite, PCL, Flatiron, and Graham.

•ACEC is currently represented by Buckland & Taylor, Parsons, AECOM, Rohila Consulting Services, and GeoEngineers.

Who we are

3

Page 4: WSDOT/AGC/ACEC Design- Build Subcommittee Annual Report Scott Ireland / Paul Mayo WSDOT / AGC Co-Chairs WSDOT / ACEC Annual Meeting Bellevue, WA June 11,

• Vision - A nationally recognized Design-Build Program that consistently delivers quality projects through positive coordination with Design-Builders, executed through competitive contracts that appropriately allocate risk, promote innovation and collaboration that ultimately benefits the citizens of Washington. 

• Mission - Founded on strong WSDOT and Design-Builder relationships, further develop and maintain WSDOT’s Design-Build Program based on the values of collaboration, innovation and continuous improvement that result in industry best practices.

• Purpose - To serve as a resource for establishing Design-Build policy, procedures and process improvement.

Team’s Purpose and Function

4

Page 5: WSDOT/AGC/ACEC Design- Build Subcommittee Annual Report Scott Ireland / Paul Mayo WSDOT / AGC Co-Chairs WSDOT / ACEC Annual Meeting Bellevue, WA June 11,

Team’s Purpose and Function (continued)

5

• Meet approximately every six weeks

• Provide specific expertise to support Design-Build project delivery

• Review, comment and collectively discuss high priority RFP sections focused on establishing consistency and appropriate risk allocation.

• Discus specific Design-Build related topics as they relate to project delivery.

Page 6: WSDOT/AGC/ACEC Design- Build Subcommittee Annual Report Scott Ireland / Paul Mayo WSDOT / AGC Co-Chairs WSDOT / ACEC Annual Meeting Bellevue, WA June 11,

2014-15 Accomplishments • Established the Team’s Charter and 2015 Goals

• Focus on standardizing RFP documents including the ITP, Chapter 1 and Chapter 2 RFP documents

• Established Document Review procedures and have reviewed 4 of 12 RFP Sections

• Supported the development of WSDOT’s report on Small Design-Build Pilot Projects

• Represented Washington at the 2015 DBIA Conference

6

Page 7: WSDOT/AGC/ACEC Design- Build Subcommittee Annual Report Scott Ireland / Paul Mayo WSDOT / AGC Co-Chairs WSDOT / ACEC Annual Meeting Bellevue, WA June 11,

2014-2015 Focus Areas

• Complete RFP template contract documents

• Further refinement of DBE requirements as they apply to DB delivery

• Formalize WSDOT DB administration processes and policy for consistent statewide application

• Develop formal Project Delivery Method Selection Guidance

• Continue to engage and participate in national forums through FHWA and the DBIA

• Status upcoming DB projects and other opportunities as identified by the subcommittee

7

Page 8: WSDOT/AGC/ACEC Design- Build Subcommittee Annual Report Scott Ireland / Paul Mayo WSDOT / AGC Co-Chairs WSDOT / ACEC Annual Meeting Bellevue, WA June 11,

Thank you

8

WSDOTScott Ireland, PE

State Construction OfficeAssistant State Construction Engineer

(360) 705-7468

FlatironPaul MayoFlatiron Corp.

Northwest Area Manager(425) 508-7713

ACEC - WARichard Patterson, PE SE

Buckland & Taylor / COWIWashington Practice Lead

(206) 321-6655