workshop green sand casting

Upload: aiman-izmin

Post on 07-Aug-2018

234 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/20/2019 Workshop Green Sand Casting

    1/13

    APPARATUS

    Material Function

    AluminiumMaterial that use to create the

    product.

    Green sand As core material to create themold.`

    Parting agent used to make sure the mold

    does not attach with the

    pattern and easy to remove

    the mold from the pattern.

  • 8/20/2019 Workshop Green Sand Casting

    2/13

    Equipment Function

    Flask used to produced drag and

    cope which putted the greensand inside of it.

    Pattern used to pattern theshape of the product.

    Furnace used to make the moltenmetal of aluminium.

  • 8/20/2019 Workshop Green Sand Casting

    3/13

    Crucible used to transfer the moltenmetal of aluminium after it

    was produced from thefurnace and then poured into

    the mold.

    ands separator used to separate a bulk of sand to the finer particle

    and Muller also known as sands mi!er that was used to produce

    green sand which containedsilica sand" bentonite" coal

    dust and water

    and rammer machine used to compress and

    compacted the green sand

    into the mold. #n the

    machine" it has air compressor to clean the

    e!cesses green sand on the

    machine and vibrator to

    make green sand filled up the

    space in the flask.

  • 8/20/2019 Workshop Green Sand Casting

    4/13

    Hand Tools Function

    pure pin used to make a hole to flow

    the molten metal of aluminium into the mold.

    $eart trowel used to dig the green sand to

    make hole and pulled out the

    spure pin from the mold.

    %rowel used to transfer the greensand into the lifter.

  • 8/20/2019 Workshop Green Sand Casting

    5/13

    &ifter used for removing the sand

    particles from the mould

    repaired the mold.

    criber used to make air vent at the

    upper of the cope.

    Aluminium plate used to hold the flask and themold in order to make sure

    the mold does not break

  • 8/20/2019 Workshop Green Sand Casting

    6/13

    INDUSTRIAL APPARATUS

    Figure '.()* +ouble arm resin sand mi!er

    Figure '.() showed that the machine mi!ed in the short time and the rotation of the double

    arms was fle!ible. %he operation and maintenance were easy and simply besides improved

    the ,uality of molding sand to get good economic efficiency. -t used plc control" running

    stable and reliable.

    Figure '.( * Automatic pouring machine F/01

    Figure '.( showed that it transfer from hot molten metals and bringing the melt securely to

    the mold.

    Figure !"#$ $igh precision rubber compression molding machine

    Figure '.(2 used for various re,uirements like rubber" 3akelite" melamine dishes and urea

    product forming use.

    E%PERIMENTAL PR&'EDURE

  • 8/20/2019 Workshop Green Sand Casting

    7/13

    (. -n order to ensure that green sand mold easy to split from pattern" parting agent was

    put around the pattern in the drag part as shown in figure 4.(.

    Figure 4.(* Parting agent stew process

    5. %hen green sand was filled in the drag part. Green sand was filled until it fulfills the

    drag part as shown in figure 4.5.

    Figure 4.5* Green sand was filled in drag part

    6. %hen" the green sand being compacted by using sand rammer. -t is being rammed for

    five seconds in order to ensure green sand was compressed.'. 3eside" to ensure that green sand was compacted it also was compressed by a

    compressor as shown in figure 4.6.

  • 8/20/2019 Workshop Green Sand Casting

    8/13

    Figure 4.6* Mold was compress by compressor

    4. After it was compressed" the green sand mold will going through vibrating process toensure that the pattern and flask were easier to remove from green sand mold.

    7. After the drag part were finished" the cope take place. prue was build by using sprue

    pin in cope part as shown in figure 4.'.

    Figure 4.'* prue pin was marked

    ). After that" green sand was fulfilled the cope part and it was compress by compressor

    to ensure that green sand was really compacted.. %hen" green sand mold in cope part will going through vibrating process to ensure that

    sprue and flask were easier to remove from green sand mold.2. 0e!t" air vent was build in the cope part to make sure there is air ventilation in the

    mold to minimi8e the defect in casting. Air vent was build by using scriber as shown

    in figure 4.4. 3esides" pouring cup99p was build by using trowel to make pouring

    process more easier.

  • 8/20/2019 Workshop Green Sand Casting

    9/13

    Figure 4.4* Air vent was build by using scriber

    (:. After that" flasks were removed from mold" cope and drag part were ;oining together as shown in figure 4.7.

    Figure 4.7* Cope and drag part were ;oined together

    ((. 0e!t" the mold was compacted parting line with a green sand as shown in figure 4.) to

    ensure that there is no leaking between cope and drag. 3esides" it also to make sure

    that there is no molten metal flow out from the mold.

  • 8/20/2019 Workshop Green Sand Casting

    10/13

    Figure 4.)* Green sand was put at parting line

    (5. %hen" aluminum metal was heated until it reaches melting temperature. After that"molten metal were pour into crucible as shown in figure 4. to easier the process of

    pouring molten metal into the mold.

    Figure 4. * Molten aluminum was poured into crucible

    (6. %he mold was left around 5' hours in a room temperature for ensure that the

    aluminum is fully solidified.

    ('. After that" the mold was broke and the product was cleaned.

    (4. Finally" the product of casting process can be observed as shown in figure 4.2. All the

    defects were known by observing the product.

  • 8/20/2019 Workshop Green Sand Casting

    11/13

  • 8/20/2019 Workshop Green Sand Casting

    12/13

  • 8/20/2019 Workshop Green Sand Casting

    13/13