whatever good things we build, - tqc.qatqc.qa/upload/tqc-catalog-2019.pdf · 15 oregon barriers (...
TRANSCRIPT
Construction Company W.L.L .
Whatever good things we build,end up building us.
Jim Rohn
“”
2
From President
As we build the world of tomorrow and look into the future, we also take pride in our past, never forgetting where we began. We should not expect excellence in the future unless we measure the success of our past, listen to our clients and take the necessary and appropriate actions to meet their needs.
At Turquoise Construction, we carry the justified pride of exceeding well over quarter ofa century. We are striding confidently towards the future with our wide andacknowledged experiences in national and international arenas; our dynamic, yetmature corporate structure that is open to changes; our virtuous approach comprisingstrong work ethics; and our expanding technical knowledge.
We know that our success is defined by the quality of service that we provide and thelevel of satisfaction that we deliver.
As our success begins and ends with our staff, I must admit that I am thankful andproud to be part of a team that is fully committed to working diligently and followinguniversal safety guidelines.
With our experience, technical excellence, and innovative solutions, we realize projectsthat convince our customers and are beneficial to society. We believe that we can only achieve a sustainable growth if we can create a value forour business partners, shareholders and the community.
Efe Şükrü Birgili
33
Construction Company W.L.L .
The human foot is a masterpiece ofengineering and a work of art.
Leonardo da Vinci
“”
4
Engineering and construction are the main sectors in which the business activities of Turquoise Construction WLL are carried out.Turquoise is committed to deliver the best in engineering and construction, using the best resources like people and application tools in the market to provide his clients with projectsof outstanding quality by adapting values like integrity, teamwork and customer satisfaction. Turquoise acts in accordance with the highest ethical standards to maintain his position of trust with his clients.
Turquoise Construction specializes in construction of institutional and industrial buildings, residential apartments, commercial compounds, treatment plants and infrastructural buildings.
Turquoise’s mission is to provide qualitative engineering and construction in order to achieve his clients’ requirements and deliver satisfaction.
Our vision is to serve with success to be trustworthy for all districts with the highest efficiency and quality for all kinds of construction projects.
ABOUT US.
5
ORGANIZATION CHART10
12
14
30
42
46
48
FIELD OF ACTIVITIES
ONGOING PROJECTS
COMPLETED PROJECTS
COMPANY REFERANCES
HSE MANAGEMENT
QUALITY MANAGEMENT
6
AHMET BÜLENT ÖZKANGeneral Manager
Mr.Ahmet Bülent Özkan graduated from the Middle East Technical Univerity of Civil Engineering and completed his Masters’ Degree in 1984. After 30 successful years working for
Tekfen Construction as a senior project manager and taking part in housing, infrasturcture, industrail plants, sports buildings and stadium projects, Mr. Ahmet Bülent Özkan has joined the
family of Turquoise Construction WLL as the General Manager.
EFE ŞÜKRÜ BİRGİLİPresident
Graduated from the University Of Central Florida - Faculty of Civil Engineering in 2003, Mr.Efe Şükrü Birgili established his own construction company
Hasbutcular Construction Co. and took part in several construction projects in Turkey. As a part of his business expansion plan, he founded Turquoise Construction WLL in
Qatar in 2014 and has been actively running the company as the president since then.
MEHMET METİN AYRANCITechnical Manager
As a graduate of Istanbul Technical University-Civil Engineering Faculty with a MSc degree in structural engineering, Mr. Mehmet Metin Ayrancı had successfully worked in major
international projects from beverage factories, water/sewage treatment plants, shopping centers, aquariums, refineries to commercial and residential buildings. After working in
Turkey, Azerbaijan, Pakistan, Kazakhstan, Turkmenistan and Iraq, Mr. Ayrancı joined the family of Turquoise Construction WLL in Qatar in 2017.
7
Al Khor Expressway Project, Qatar - 2018
8
9
ORGANIZATION CHART
10
Headquarter Organization
Projects Organization
PRESIDENT
GENERAL MANAGER
COMMERCIAL DEPUTY GM TECHNICAL DEPUTY GM
PROCUREMENT ADMINISTRATIVE HUMAN RESOURCES PROJECT COORDINATOR
PROJECT MANAGER
HSE QA-QC ADMINISTRATIVE PROCUREMENT&
LOGISTIC
PROJECT CONTROL &
PLANNING
CONSTRUCTION
SURVEY ENGINEER
SURVEY ENGINEER
SITE ENGINEER
SITE ENGINEER
SITE ENGINEER
FOREMAN FOREMAN FOREMAN FOREMAN FOREMAN FOREMAN
ICT
11
FIELD OF ACTIVITIES
12
STEEL STRUCTURES
CONCRETE STRUCTURES
COMMERCIAL & RESIDENTAL BUILDINGS
MOTORWAYS
PASSIVE FIRE PROOFING
INDUSTRIAL PLANTS
TURNKEY CONTRACTS13
ONGOING PROJECTS
1
14
Design & BuildAl Khor Expressway
Project
Location:
Doha / QATAR
Client:
ASHGHAL - Public Works Authority
Main Contractor:
Tekfen Construction and Installation Co. Inc.
Consultant:
KEO International Consultants
Duration:
24 Months
15
16
Production & Installation ofPrecast Bridge Parapets:
5.300 m.
Concrete:
3.150 m3
Surface Preparetion & Painting:
23.000 m2
GRC Works:
3.425 m.
Monorail Guardrails:
1.000 m.
Design & BuildAl Khor Expressway
Project
17
MSE Wall
18
MSE Wall Production & Installation: 11.082 m2
Panels: 3.700 Pieces
Selected Fill: 6.500 m3
Precast F Type Barriers: 1.900 m.
Paint: 17.650 m2
Guardrail: 900 m.
Design & BuildAl Khor Expressway
Project
19
In-situ & Precast Traffic Sign Foundations
Standart Traffic Signal Foundations:
2.100 Pieces
Ground Mounted Signboard Foundations:
300 Pieces
Concrete:
1.500 m3
20
In-situ & Precast NewJersey Barrier:
120.000 m.
Formwork:
295.000 m2
Reinforcement:
6.000 Ton
Concrete:
47.500 m3
Paint:
250.000 m2
Design & BuildAl Khor Expressway
Project
21
ONGOING PROJECTS
2
22
East Industrial Road Between Al Muntazah Street &
West Corridor
Location: Doha / QATAR
Client: ASHGHAL - Public Works Authority
Main Contractor: Tekfen Construction and Installation Co. Inc.
Consultant: Parsons
Duration: 24 Months
23
24
MSE Wall Production & Installation:
4.050 m2
Panels:
1.300 Pieces
Rock Fill:
45.000 m3
Selected Fill:
24.000 m3
Precast F Type Barriers:
740 m.
In-situ New Jersey Barriers:
3.244 m.
East Industrial Road Between Al Muntazah Street &
West Corridor
25
ONGOING PROJECTS
3
26
Hangar for Qatar Emiri Maintenance Corp. of
Qatar Armed ForcesLocation:
Doha / QATAR
Client:
Qatar Armed Forces
Main Contractor:
MDS Savunma Teknolojileri ve İnşaat A.Ş.
Consultant:
CICO Consulting Engineers
Duration:
6 Months
27
28
Hangar for Qatar Emiri Maintenance Corp. of
Qatar Armed ForcesCivil Works of Hangars
Concrete:
9.000 m2
Reinforcement:
1.400 Ton
Surface Concrete
34.000 m2
Formwork:
5.500 m2
29
COMPLETED PROJECTS
1
30
COMPLETED PROJECTS Service Road Enhancement To
North Road Corridor
Location:
Doha / QATAR
Client:
ASHGHAL - Public Works Authority
Main Contractor: Tekfen Construction and Installation Co. Inc.
Consultant:
KEO International Consultants
Duration:
48 Months
31
Precast Bridge Parapets:
3.732 m.
TSE Pipeline Valve Chambers:
1.943 Pieces
ITS Manholes:
500 Pieces
Protection Slab Over Existing Utilities:
17.500 m.
Traffic Sign Foundations:
4.500 Pieces
In-situ New Jersey Barriers:
12.500 m.
Scada Drawpit Manholes:
300 Pieces
32
Service Road Enhancement To North Road Corridor
33
COMPLETED PROJECTS
2
34
Marmaray TunnelPassive Fire Protection
Location: Istanbul / TURKEY
Client: Sencora France
Consultant: Marmaray Engineering & Consulting
Duration: 14 Months
Status: Completed
Scope: 156.000 m2 Vermiculite & Cement Base
Passive Fireproofing.35
COMPLETED PROJECTS
3
36
Tupras Refinery RUPLocation:
Kocaeli / TURKEY
Client: Tekfen Construction and Installation Co. Inc.
Consultant:
Tecnicas Reunidas
Duration:
5 Months
Status:
Completed
Scope:
478 Tons of Steel Fabrication and Erection For Substation Buildings
37
COMPLETED PROJECTS
4
38
Location:
Kocaeli / TURKEY
Client: Tekfen Construction and Installation Co. Inc.
Consultant:
Tecnicas Reunidas
Duration:
5 Months
Status:
Completed
Scope:
8.500 m2 Passive Fireproofing With Vermiculite Based Mortar
Tupras Refinery RUP
39
COMPLETED PROJECTS
5
40
Tekfen Real Estate Office Park
Location:
Istanbul / TURKEY
Client:
Tekfen Construction and Installation Co. Inc.
Consultant:
Tekfen Real Estate
Duration:
3 Months
Status:
Completed
Scope:
135 Tons of Steel Fabrication and Erection For The Roof Offices
41
COMPANY REFERENCES
No Project Place Client Consultant Duration Status Scope Category1 Tse Pipeline Valve Chambers (North Road Service Road Enhancement P059) Doha/Qatar Tekfen Construction and Installation Keo 48 Months Completed Precast & In-Situ Production and Installation Of Valve Chambers (Manholes) In-Situ & Precast2 New Jersey Bridge Barrier Production (North Road Service Road Enhancement P059) Doha/Qatar Tekfen Construction and Installation Keo 18 Months Completed Precast Production Of Jersey Barriers Precast3 New Jersey Bridge Barrier Installation (North Road Service Road Enhancement P059) Doha/Qatar Tekfen Construction and Installation Keo 18 Months Completed Installation Of Jersey Barriers Precast4 Protection Slab (North Road Service Road Enhancement P059) Doha/Qatar Tekfen Construction and Installation Keo 12 Months Completed In-Situ Casting In-Situ5 ITS Manholes (North Road Service Road Enhancement P059) Doha/Qatar Tekfen Construction and Installation Keo 6 Months Completed Precast & In-Situ Production and Installation Of Valve Chambers (Manholes) In-Situ & Precast6 Footpad (North Road Service Road Enhancement P059) Doha/Qatar Tekfen Construction and Installation Keo 3 Months Completed In-Situ Casting In-Situ7 F-Type New Jersey Barriers (North Road Service Road Enhancement P059) Doha/Qatar Tekfen Construction and Installation Keo 18 Months Completed Precast Production Precast8 Draw pit Manholes For Scada (North Road Service Road Enhancement P059) Doha/Qatar Tekfen Construction and Installation Keo 12 Months Completed Precast & In-Situ Production and Installation Of Valve Chambers (Manholes) In-Situ & Precast9 Standard Road Sign Foundations (North Road Service Road Enhancement P059) Doha/Qatar Tekfen Construction and Installation Keo 12 Months Completed Precast Production and Installation Precast10 GMS, Cantilever And Overhead Foundations (North Road Service Road Enhancement P059) Doha/Qatar Tekfen Construction and Installation Keo 8 Months Completed In-Situ Casting In-Situ11 Oregon Barriers (North Road Service Road Enhancement P059) Doha/Qatar Tekfen Construction and Installation Keo 4 Months Completed Precast Production Precast12 Standard Road Sign Foundations ( Bu-Thella Roaway Project ) Doha/Qatar Tekfen Construction and Installation Keo 4 Months Completed Precast & In-Situ Production and Installation Of Valve Chambers (Manholes) In-Situ & Precast13 Gms,Cantilever And Overhead Foundations ( Al-Khor Expressway Project ) Doha/Qatar Tekfen Construction and Installation Keo 18 Months Completed Precast Production and Installation Precast14 Existing Potable Water Pipe Protection Slab ( Al-Khor Expressway Project ) Doha/Qatar Tekfen Construction and Installation Keo 4 Months Completed Precast Production Precast15 Oregon Barriers ( Al-Khor Expressway Project ) Doha/Qatar Tekfen Construction and Installation Keo 4 Months Completed Precast Production Precast16 Mse Wall Section 3 (Al-Khor Expressway Project ) Doha/Qatar Tekfen Construction and Installation Keo 24 Months Ongoing Mse Wall Structures Turnkey (11.500 M2) Mse Wall System17 PC Planks Over Q Girders (Al-Khor Expressway Project ) Doha/Qatar Tekfen Construction and Installation Keo 12 Months Ongoing Pc Plank Production and Installation (9500 Pcs) Precast & Installation18 Jersey Barriers Production and Installation (Al-Khor Expressway Project ) Doha/Qatar Tekfen Construction and Installation Keo 24 Months Ongoing Jersey Bariers Production and Installation (105 Km) In-Situ & Precast19 Precast Bridge Barriers, Transitions And GRC Elements (Al-Khor Expressway Project ) Doha/Qatar Tekfen Construction and Installation Keo 18 Months Ongoing Precast Bridge Barriers and GRC Elements (7500 M) In-Situ & Precast20 Underpass Barrier (Al-Khor Expressway Project ) Doha/Qatar Tekfen Construction and Installation Keo 4 Months Ongoing Underpass Barriers Production In-Situ21 Precast & In-Situ Traffic Signs (Al-Khor Expressway Project ) Doha/Qatar Tekfen Construction and Installation Keo 15 Months Ongoing Precast Traffic Signs (2090 Pcs) In-Situ & Precast22 Mse Wall and F Type Barrier Work (Construction of East Industrial Road Between Al
Muntazah Street and West Corridor P017)Doha/Qatar Tekfen Construction and Installation Parsons 12 Months Ongoing Mse Wall Structures Turnkey (3.500 M2) Mse Wall System
23 New Jersey Barrier Production & Installation (Construction Of East Industrial Road Be-tween Al Muntazah Street And West Corridor P017)
Doha/Qatar Tekfen Construction and Installation Parsons 12 Months Ongoing Jersey Bariers Production and Installation (7,5 Km) In-Situ
QATAR REFERENCES
42
No Project Place Client Consultant Duration Status Scope Category1 Tse Pipeline Valve Chambers (North Road Service Road Enhancement P059) Doha/Qatar Tekfen Construction and Installation Keo 48 Months Completed Precast & In-Situ Production and Installation Of Valve Chambers (Manholes) In-Situ & Precast2 New Jersey Bridge Barrier Production (North Road Service Road Enhancement P059) Doha/Qatar Tekfen Construction and Installation Keo 18 Months Completed Precast Production Of Jersey Barriers Precast3 New Jersey Bridge Barrier Installation (North Road Service Road Enhancement P059) Doha/Qatar Tekfen Construction and Installation Keo 18 Months Completed Installation Of Jersey Barriers Precast4 Protection Slab (North Road Service Road Enhancement P059) Doha/Qatar Tekfen Construction and Installation Keo 12 Months Completed In-Situ Casting In-Situ5 ITS Manholes (North Road Service Road Enhancement P059) Doha/Qatar Tekfen Construction and Installation Keo 6 Months Completed Precast & In-Situ Production and Installation Of Valve Chambers (Manholes) In-Situ & Precast6 Footpad (North Road Service Road Enhancement P059) Doha/Qatar Tekfen Construction and Installation Keo 3 Months Completed In-Situ Casting In-Situ7 F-Type New Jersey Barriers (North Road Service Road Enhancement P059) Doha/Qatar Tekfen Construction and Installation Keo 18 Months Completed Precast Production Precast8 Draw pit Manholes For Scada (North Road Service Road Enhancement P059) Doha/Qatar Tekfen Construction and Installation Keo 12 Months Completed Precast & In-Situ Production and Installation Of Valve Chambers (Manholes) In-Situ & Precast9 Standard Road Sign Foundations (North Road Service Road Enhancement P059) Doha/Qatar Tekfen Construction and Installation Keo 12 Months Completed Precast Production and Installation Precast10 GMS, Cantilever And Overhead Foundations (North Road Service Road Enhancement P059) Doha/Qatar Tekfen Construction and Installation Keo 8 Months Completed In-Situ Casting In-Situ11 Oregon Barriers (North Road Service Road Enhancement P059) Doha/Qatar Tekfen Construction and Installation Keo 4 Months Completed Precast Production Precast12 Standard Road Sign Foundations ( Bu-Thella Roaway Project ) Doha/Qatar Tekfen Construction and Installation Keo 4 Months Completed Precast & In-Situ Production and Installation Of Valve Chambers (Manholes) In-Situ & Precast13 Gms,Cantilever And Overhead Foundations ( Al-Khor Expressway Project ) Doha/Qatar Tekfen Construction and Installation Keo 18 Months Completed Precast Production and Installation Precast14 Existing Potable Water Pipe Protection Slab ( Al-Khor Expressway Project ) Doha/Qatar Tekfen Construction and Installation Keo 4 Months Completed Precast Production Precast15 Oregon Barriers ( Al-Khor Expressway Project ) Doha/Qatar Tekfen Construction and Installation Keo 4 Months Completed Precast Production Precast16 Mse Wall Section 3 (Al-Khor Expressway Project ) Doha/Qatar Tekfen Construction and Installation Keo 24 Months Ongoing Mse Wall Structures Turnkey (11.500 M2) Mse Wall System17 PC Planks Over Q Girders (Al-Khor Expressway Project ) Doha/Qatar Tekfen Construction and Installation Keo 12 Months Ongoing Pc Plank Production and Installation (9500 Pcs) Precast & Installation18 Jersey Barriers Production and Installation (Al-Khor Expressway Project ) Doha/Qatar Tekfen Construction and Installation Keo 24 Months Ongoing Jersey Bariers Production and Installation (105 Km) In-Situ & Precast19 Precast Bridge Barriers, Transitions And GRC Elements (Al-Khor Expressway Project ) Doha/Qatar Tekfen Construction and Installation Keo 18 Months Ongoing Precast Bridge Barriers and GRC Elements (7500 M) In-Situ & Precast20 Underpass Barrier (Al-Khor Expressway Project ) Doha/Qatar Tekfen Construction and Installation Keo 4 Months Ongoing Underpass Barriers Production In-Situ21 Precast & In-Situ Traffic Signs (Al-Khor Expressway Project ) Doha/Qatar Tekfen Construction and Installation Keo 15 Months Ongoing Precast Traffic Signs (2090 Pcs) In-Situ & Precast22 Mse Wall and F Type Barrier Work (Construction of East Industrial Road Between Al
Muntazah Street and West Corridor P017)Doha/Qatar Tekfen Construction and Installation Parsons 12 Months Ongoing Mse Wall Structures Turnkey (3.500 M2) Mse Wall System
23 New Jersey Barrier Production & Installation (Construction Of East Industrial Road Be-tween Al Muntazah Street And West Corridor P017)
Doha/Qatar Tekfen Construction and Installation Parsons 12 Months Ongoing Jersey Bariers Production and Installation (7,5 Km) In-Situ
43
HSE Management
24 Saritas Paslanmaz Turn-Key Office Building Kocaeli/Turkey Saritas Celik San.Ve Tic A.S Dali Mimarlik 6 Months Completed 1500 M2 Turnkey Office Building With Fit out Works Turnkey
25 Soyak Siesta Oxygen Residential Building Izmir/Turkey Tekyol Insaat Soyak 8 Months Completed 35.000 M2 Arc Structural Workmanship Turnkey26 Tupras Refinery Rup Project Kocaeli/Turkey Tekfen Insaat Ve Tesisat A.S Tecnicas Reunidas 5 Months Completed 8500 M2 Passive Fire Proofing With Vermiculite Based Mortar Fireproofing
27 Marmaray Submersible Tunnels Istanbul/Turkey Sencora France Marmaray 14 Months Completed 156.000 M2 Passive Fireproofing For Tunnels Fireproofing28 Tupras Refinery Rup Project Kocaeli/Turkey Tekfen Insaat Ve Tesisat A.S Tecnicas Reunidas 5 Months Completed 278 Ton Steel Construction and Installation For Substation Buildings Steel Construction29 Tekfen Emlak Hep Istanbul Project Istanbul/ Turkey Tekfen Emlak Gelistirme Tekfen 4 Months Completed 165 Ton Steel Construction and Installation Of Showroom Steel Construction30 Tekfen Emlak Ofispark Istanbul/ Turkey Tekfen Emlak Gelistirme Tekfen 1 Month Completed 35 Ton Steel Construction and Installation Of Roof Office Steel Construction31 Turquazoo Aquarium Istanbul/ Turkey Marinescape Nz Marinescape 12 Months Completed 8000 M2 Turnkey Aquarium Facility Turnkey32 Club Flipper Hotel Renovation Bodrum/Turkey Club Flipper None 12 Months Completed 17.000 M2 Hotel, Residence Renovation Finishing and Fit out Works Turnkey33 Nef Primary School Istanbul/Turkey Nef Gayrimenkul Entegre Pro. Man 9 Months Completed 5500 M2 Primary School For Government Donation Of Nef Company Turnkey
34 Coca-Cola Elazig Greenfield Plant Elazig/Turkey Coca-Cola Icecek A.S. Modern Müh 12 Months Completed 35.000 m2 Beverage Plant Management35 Coca-Cola Bursa Brownfield Plant Bursa/Turkey Coca-Cola Icecek A.S. Tem Müh. 9 Months Completed 65.000 m2 Beverage Plant Management36 Coca-Cola Baku Plant Baku/Azerbaijan A.C.C.B Modern Müh. 12 Months Completed 32.000 m2 Beverage Plant Management37 Coca-Cola Karachi Greenfield Plant Karachi/Pakistan A.C.C.B Modern Müh. 15 Months Completed 32.000 m2 Beverage Plant Management38 Coca-Cola Erbil Brownfield Plant Erbil/Iraq A.C.C.B Tem Müh. 15 Months Completed 24.000 m2 Beverage Plant Management39 Coca-Cola Astana Greenfield Plant Erbil/Iraq A.C.C.B Modern Müh. 15 Months Completed 55.000 m2 Beverage Plant Management40 Coca-Cola Ashgabat Brownfield Plant Asghabat/Turkmenistan A.C.C.B Modern Müh. 9 Months Completed 35.000 m2 Beverage Plant Management41 Aujan Coca-Cola Egypt Six of October Plant Giza/Egytpt AUJAN Coca-Cola Modern Müh. 9 Months Completed 68.000 m2 Beverage Plant Design Coordinator42 Hepsiburada Logistic Warehouse Kocaeli/Turkey Dogan -Abraaj Cem Mimarlik 18 months Completed 48.000 m2 2 storey logictics warehouse with multirack smart building automation Design Coordinator43 Mary 24.000 m3/day Water treatment Plant Mary/Turkmenistan Turkmenistan Goverment Modern Müh. 24 months Completed Drinking water treatment RO, UF, classic systems Design Coordinator
OTHER REFERENCES
MANAGEMENT REFERENCES
COMPANY REFERENCES
44
24 Saritas Paslanmaz Turn-Key Office Building Kocaeli/Turkey Saritas Celik San.Ve Tic A.S Dali Mimarlik 6 Months Completed 1500 M2 Turnkey Office Building With Fit out Works Turnkey
25 Soyak Siesta Oxygen Residential Building Izmir/Turkey Tekyol Insaat Soyak 8 Months Completed 35.000 M2 Arc Structural Workmanship Turnkey26 Tupras Refinery Rup Project Kocaeli/Turkey Tekfen Insaat Ve Tesisat A.S Tecnicas Reunidas 5 Months Completed 8500 M2 Passive Fire Proofing With Vermiculite Based Mortar Fireproofing
27 Marmaray Submersible Tunnels Istanbul/Turkey Sencora France Marmaray 14 Months Completed 156.000 M2 Passive Fireproofing For Tunnels Fireproofing28 Tupras Refinery Rup Project Kocaeli/Turkey Tekfen Insaat Ve Tesisat A.S Tecnicas Reunidas 5 Months Completed 278 Ton Steel Construction and Installation For Substation Buildings Steel Construction29 Tekfen Emlak Hep Istanbul Project Istanbul/ Turkey Tekfen Emlak Gelistirme Tekfen 4 Months Completed 165 Ton Steel Construction and Installation Of Showroom Steel Construction30 Tekfen Emlak Ofispark Istanbul/ Turkey Tekfen Emlak Gelistirme Tekfen 1 Month Completed 35 Ton Steel Construction and Installation Of Roof Office Steel Construction31 Turquazoo Aquarium Istanbul/ Turkey Marinescape Nz Marinescape 12 Months Completed 8000 M2 Turnkey Aquarium Facility Turnkey32 Club Flipper Hotel Renovation Bodrum/Turkey Club Flipper None 12 Months Completed 17.000 M2 Hotel, Residence Renovation Finishing and Fit out Works Turnkey33 Nef Primary School Istanbul/Turkey Nef Gayrimenkul Entegre Pro. Man 9 Months Completed 5500 M2 Primary School For Government Donation Of Nef Company Turnkey
34 Coca-Cola Elazig Greenfield Plant Elazig/Turkey Coca-Cola Icecek A.S. Modern Müh 12 Months Completed 35.000 m2 Beverage Plant Management35 Coca-Cola Bursa Brownfield Plant Bursa/Turkey Coca-Cola Icecek A.S. Tem Müh. 9 Months Completed 65.000 m2 Beverage Plant Management36 Coca-Cola Baku Plant Baku/Azerbaijan A.C.C.B Modern Müh. 12 Months Completed 32.000 m2 Beverage Plant Management37 Coca-Cola Karachi Greenfield Plant Karachi/Pakistan A.C.C.B Modern Müh. 15 Months Completed 32.000 m2 Beverage Plant Management38 Coca-Cola Erbil Brownfield Plant Erbil/Iraq A.C.C.B Tem Müh. 15 Months Completed 24.000 m2 Beverage Plant Management39 Coca-Cola Astana Greenfield Plant Erbil/Iraq A.C.C.B Modern Müh. 15 Months Completed 55.000 m2 Beverage Plant Management40 Coca-Cola Ashgabat Brownfield Plant Asghabat/Turkmenistan A.C.C.B Modern Müh. 9 Months Completed 35.000 m2 Beverage Plant Management41 Aujan Coca-Cola Egypt Six of October Plant Giza/Egytpt AUJAN Coca-Cola Modern Müh. 9 Months Completed 68.000 m2 Beverage Plant Design Coordinator42 Hepsiburada Logistic Warehouse Kocaeli/Turkey Dogan -Abraaj Cem Mimarlik 18 months Completed 48.000 m2 2 storey logictics warehouse with multirack smart building automation Design Coordinator43 Mary 24.000 m3/day Water treatment Plant Mary/Turkmenistan Turkmenistan Goverment Modern Müh. 24 months Completed Drinking water treatment RO, UF, classic systems Design Coordinator
45
HSE MANAGEMENT
46
Turquoise Construction Company commits to provide a safe and healthy workplace, conduct its business activities in a manner that protects environment, achieve and maintain customer satisfaction through the continuous improvement. Turquoise Construction Company commits to act in accordance with the below-mentioned principles;
• Be responsible for health, Safety, Environment and Quality at all levels of the organization and comply with the related legislation, regulation, standards and customer requirements, • Strive to increase its employee’s contribution, competence, involvement and motivation in order tom provide safe working environment and deliver the projects to customer with the highest standard of quality and durability in a framework of sustainable solutions, • Encourage the employment of process-based approach and risk-based thinking, through its leaders, • Ensure the risks and opportunities that can affect people, assets, environment, conformity of products and services and the ability to enhance customer satisfaction and duly addressed and determined, • Take all necessary actions to prevent incidents, injuries and occupation illnesses, • Ensure that every persons at all levels has obligation to stop unsafe work, • Identify the potential emergency cases and take actions to be prepared for the same, • Protect the environment through the prevention of pollution along with reducing the carbon footprint and conservation of energy and natural resources in order to encourage sustainability, • Ensure that goods are procured, used and disposed in compliance with lifecycle perspective, through its own organization as well as its selected suppliers, to minimize the environmental impact, • Minimize the production of waste through measures that emphasize reduction, reuse, recycling, • Follow the principles of integrity, honesty, transparency and fairness, • Respect to human rights, cultural values, • Implement grievance mechanism to ensure that the expectations of interested parties are considered, • Minimize the customer complaints, re-works, repair works and reduce losses, • Increase the efficiency of the Management System, continuously monitor and improve their implementation.
PresidentEfe Şükrü Birgili
47
QUALITY MANAGEMENT
48
Turquoise Construction Company recognizes Quality as an integral component that contributes to the company’s success within the local and international construction industry.
Turquoise Construction Company aims to deliver excellent services and projects that are fully compliant to the highest standards and strictly adherent to all relevant local and international regulations.
• The management is responsible to:• Provide exceptional quality of work to address the clients’ needs
and expectations.• Deliver compliant projects and services timely and within the budget.• Ensure a healthy and safe working environment within the job site
and other areas.• Continuously improve systems and procedures based on effective
Quality Management System.• Conduct training programs for employees to develop and upgrade
their skills in order to meet the company’s objectives.
Turquoise Construction Company establishes its policy by implementing and strictly controlling all technical, administrative and human factors that can influence the conduct of work and servicen delivery.
The management is committed to the execution of the Quality Management System. Regular audits will be conducted to verify, validate and establish systems and procedures.
PresidentEfe Şükrü Birgili
49
Turquoise Construction Co. WLL.Palm Tower B, 6th Floor, No. 605, West Bay, Doha - Qatar
T. +974-4006-4537 | www.tqc.qa | [email protected]