Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared by Neil Sullivan Principal Design Engineer Email: [email protected] Kier Services Exchange Station Tithebarn Street Liverpool L2 2QP T 0151 600 5500 Client – Kier Services Stevenage

Upload: others

Post on 25-Sep-2019

19 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

Westwood Primary School Maple Grove

Cambridge PE15 8JT

Mechanical Services Stage 3 Part L2A Summary

Date 15 May 2017

Prepared by Neil Sullivan Principal Design Engineer Email: [email protected]

Kier Services Exchange Station Tithebarn Street Liverpool L2 2QP T 0151 600 5500

Client – Kier Services Stevenage

Page 2: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

DOCUMENT CONTROL SHEET.

Project Title Westwood primary School Part L2A Summary

Doc Title Part L2A Summary

Doc Ref KWS-00-XX-SP-M-0001

Revision v.01

Status Stage 3

15-05-2017

Record of Issue

Issue Status Author Date Check Date Authorised Date

v.01 Stage 3 N. Sullivan 15.05.17 D. Thomas R. Evans

Distribution

Organisation Contact Copies

Kier Stevenage office Ioannis Papanikolaou 1e

Page 3: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

This summary report is presented by Kier Services in respect of a preliminary Stage 3 Part L2A assessment for Westwood Primary School, Cambridge and may not be used or relied on by any other person or by client in relation to any other matters not covered specifically by the scope of this report. Notwithstanding anything to the contrary contained in the document, Kier Services is obliged to exercise reasonable skill, care and diligence in our performance. Kier Services shall not be liable except to the extent that it has failed to exercise reasonable skill, care and diligence, and this report shall be read and construed accordingly. The document has been prepared by Kier Services. No individual is personally liable in connection with the preparation of this document. By receiving this document and acting on it, the client or any other person accepts that no individual is personally liable whether in contract, tort for breach of statutory duty or otherwise.

Page 4: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

4

Index

Stage 3 Design – Part L2A Summary 5

Criterion 1 - Achieving the Target Emission Rating 5

Criterion 2 - Assessment – Limits on design flexibility 6 Criterion 3 – Solar Gain Check 8 Appendices 9

1. As Designed BRUKL Document 9 2. As Designed – Criterion 3 Solar Gain Check 16 3. As Designed – Stage 3 EPC 17 4. Input Summary 19 5. System and Plant Summary 23 6. Zone and System assignment 27 7. Annual CO² Emissions 28 8. Construction Specification details 29

Page 5: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

5

Westwood Primary School Stage 3 Design - Part L2A Summary Criterion 1 – Achieving the Target Emission Rating A preliminary energy assessment has been conducted for the new extension building at Westwood Primary School, Cambridge. The assessment has been calculated in line with the National Calculation Methodology (NCM). In order to meet the requirements of Criterion 1 of the approved document, the Carbon Dioxide (CO2) emissions rate from the proposed development, the Building Emissions Rate (BER), should be less than the Target Emissions Rate (TER).

Energy Consumption by End Use (kWh/m²)

System

kWh/m²

Actual Notional

Heating 7.16 7.75

Cooling 0 0 Auxiliary 0.84 0.82

Lighting 12.10 12.85

DHW 10.43 9.38

Equipment 14.38 14.38

Total kWh/m²

30.53

30.80

Part L2A 2010 CO² Emission

Results

TER 12.9

BER 12.4

Pass Rate 4.0 %

Status

PASS

The results of the annual CO2 emissions analysis indicates that the proposed design is performing better than the minimum requirements of the Building Regulations and achieves an improvement of 4.0 % over the Part L2A 2013 Target Emission Rate:

Page 6: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

6

.

Criterion 2 Assessment – Limits on design flexibility The following design parameters have been used in the energy assessment and comply with Criterion two of the approved document:

Building Fabric Performance Details

Element

Value

Ground Floor Weighted U Value (W/m²K)

0.22

External Wall Weighted U Value (W/m²K)

0.26

Roof average Weighted U Value (W/m²K)

0.18

Window average Weighted U Value (W/m²K)

1.66

Glazing Total solar transmission (G-VALUE)

0.4

Design air permeability @ 50 Pascal’s (m³hr/m²)

5.0

HVAC and Lighting Performance Details

Detail

Value

Air to water heat pump (Seasonal COP 3.5 operating at design temperatures 50-30 ºC) %

90

LTHW distribution delivery efficiency (%)

90

DHW distribution delivery efficiency (%)

90

DHW storage tank insulation thickness (mm)

50

Occupied rooms have incorporated natural ventilation through opening windows

Page 7: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

7

HVCA and Lighting performance (continued)

Toilet Extract Fan Specific Fan Power (SFP) (W/l/s)

0.3

General Lighting efficacy (lumen/circuit watt)

65

Display, Lighting efficacy (lumen/circuit watt)

22

Whole Site electrical power factor

>0.95

BMS system with the ability to draw attention to ‘out of range’ values on HVAC systems

BMS system with the ability to draw attention to ‘out of range’ values on for lighting

All fans and pumps to be fitted with variable speed equipment.

Manual On/Auto off presence detectors (PIR) in all teaching spaces, stores, and offices. Auto on/ Auto off presence detectors (PIR) in all circulation areas and toilets.

Photocell control to all occupied rooms. Daylight sensors in teaching and office spaces with independent control. Photocell sensors are on a time clock.

Parasitic Power of PIR and daylight sensors of 0.25 W/m²

Page 8: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

8

Criterion 3 – Solar Gain Check Part L 2A 2013 Criterion 3 for limiting solar gain in buildings. It states that any space that is occupied and / or air conditioned must be considered against the requirement. The limiting value for any façade is set by calculating the total solar gain between April to September through an eastern facade which has a 900mm glazed section with a g value of 0.68. A preliminary calculation has been undertaken for Westwood Primary School using the TAS Thermal Dynamic modelling software. We would note other software is available and they may produce different results. If required a further assessment will need to be undertaken as part of Stage 4 detailed design. The glazing area has been modelled as detailed in the proposed design assuming a total solar transmission (G-value) for the glazing of 0.4. The analysis does not consider the impact of surrounding buildings. The daylight factor analysis has no internal blinds installed in rooms. The thermal model has included for external canopies on the outside walls to the following areas;

• South facing façade above class room Ref Nos 018, 021, & 024

• East facing façade above the main lobby entrance The results from the assessment indicate that the spaces are complying with criterion 3. Refer to the attached result sheet in the appendix.

Full details and the results for Criterion 3 compliance can be found on the ‘As Designed’ BRUKL Output documents dated 14.05.2017.

Please note this assessment is based on the following Architectural Plans. WESTWOOD-KWS-XX-XX-DR-M-SK04 Dated - Feb 17 WESTWOOD-KWS-XX-XX-DR-M-SK06 Dated - Feb 17 WESTWOOD-KWS-XX-XX-DR-M-SK07 Dated - Feb 17 WESTWOOD-KWS-XX-XX-DR-M-SK22 Dated - Feb 17

Page 9: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

9

Appendix Part L2A - As Designed Compliance documents

1. As Designed - BRUKL Certificate

Page 10: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

10

Page 11: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

11

Page 12: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

12

Page 13: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

13

Page 14: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

14

Page 15: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

15

Page 16: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

16

2. As Designed – Criterion 3 Solar Gain Check

Zone NameLighting

Type

Facade

Length

(m)

Floor Area

(m²)

Actual Solar

Gain (kWh)

Solar Gain

Limit (kWh)

Solar

Gain (%)

Internal

Blinds

Solar

Gain

Check

Daylight

Factor

(%)

D2_General Office Side Lit 26.73 68.98 881.28 7187.78 -87.74 FALSE TRUE 1.35

D2_Interview Side Lit 3.06 7.73 177.25 822.05 -78.44 FALSE TRUE 1.54

D2_Lobby Side Lit 10.29 27.69 1286.34 2767.04 -53.51 FALSE TRUE 4.66

D2_Reception Side Lit 29.04 58.23 0 7809.46 -100.00 FALSE TRUE 0

D2_Circulation 1 -

009

Side Lit 28.64 38.49 5311.38 7699.59 -31.02 FALSE FALSE 9.69

D2_Circulation 2 -

Break out Area

Side Lit 14.62 15.43 0 3929.98 -100.00 FALSE FALSE 0

D2_Circulation 3 -

027

Side Lit 2.88 20.78 239.71 773.57 -69.01 FALSE FALSE 1.19

D2_Class 014 Side Lit 20.11 67.30 2068.53 5406.50 -61.74 FALSE TRUE 2.48

D2_Class 018 Side Lit 15.22 67.26 1396.98 4091.01 -65.85 FALSE TRUE 2.55

D2_Class 021 Side Lit 8.55 66.90 1392.03 2298.92 -39.45 FALSE TRUE 2.59

D2_Class 024 Side Lit 8.67 67.87 1395.89 2331.19 -40.12 FALSE TRUE 2.56

D2_Small Group

room

Side Lit 7.84 15.65 822.45 2109.36 -61.01 FALSE TRUE 2.47

D2_Break out group

area

Side Lit 21.37 116.27 1345.6 5746.61 -76.58 FALSE TRUE 0.82

D2_Boys WC Side Lit 5.81 8.63 41.98 1561.44 -97.31 FALSE FALSE 0.18

D2_Girls WC Side Lit 3.24 8.77 41.98 871.76 -95.18 FALSE FALSE 0.21

D2_Unisex WC Side Lit 3.74 3.34 0 1004.32 -100.00 FALSE FALSE 0

D2_Store 015 Neither 0.00 3.12 0 124.08 -100.00 FALSE FALSE 0

D2_Store 019 Neither 1.36 3.00 0 365.68 -100.00 FALSE FALSE 0

D2_Store 022 Neither 0.00 3.19 0 126.58 -100.00 FALSE FALSE 0

D2_Store 025 Neither 0.00 3.22 0 127.61 -100.00 FALSE FALSE 0

westwood primary school.tplp2013

Part L - Criterion 3 - Solar Gain Check

Weather File: NOR

Page 17: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

17

3. As designed – Stage 3 Energy Performance Certificate

Page 18: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

18

Page 19: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

19

4. Input Summary

Page 20: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

20

Page 21: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

21

Page 22: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

22

Page 23: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

23

5. System and Plant Summary

Page 24: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

24

Page 25: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

25

Page 26: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

26

Page 27: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

27

6. Zone and System assignment

Page 28: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

28

7. Annual CO2 Emissions Comparison

Page 29: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

29

8. Construction Specification Details

a) External Wall

b) Roof

Page 30: Westwood Primary School Maple Grove Cambridge PE15 8JT · Westwood Primary School Maple Grove Cambridge PE15 8JT Mechanical Services Stage 3 Part L2A Summary Date 15 May 2017 Prepared

30

c) Ground Floor

d) Glazing