WELCOME!

Board Basics: Capital

Improvement Plans

RCAC Online Training SeriesMay 4, 2016

Storage and Distribution Word Search

N F O Q V E U R L N E B K W S

M Z I B D T L L B O L O C D S

F E E R H B E A C I E L O E W

B B E R E W F I Z T V T L T O

A U U V R F T C R A A E B E H

L S R A L S L X G R T D X V U

T Q E I A A Y O H O E P S I L

W L N L E U V M W P D L E R F

C G P L J D K P J R C A S T S

S T A N D P I P E O N P K S T

E D W Q M A I W P C V V K N O

H Y D R A N T R R C N A U U P

A Q F Y H V Z W O I E N E T J

Y T I R U C E S A N Q V B U S

L E E T S E U M S S X S D S Y

BAFFLING BLOCK BOLTED BURIED CAST CLEARWELL

CORPORATION ELEVATED FIREFLOW HYDRANT IRON MAIN

PLASTIC PVC RIVETED SECURITY STANDPIPE STEEL STOP

THRUST VALVE

Can you spot the difference? Total of 10

WELCOME!

This training is presented by RCAC with funding provided by the California State Water

Resources Control Board Division of Drinking Water (DDW)

Your Moderator Today…

Neil Worthen

Las Cruces, NM

[email protected]

The Rural Community Assistance Partnership

RCAC

RCAC Programs

• Affordable housing

• Community facilities

• Water and wastewater infrastructure

financing (Loan Fund)

• Classroom and online training

• On-site technical assistance

• Median Household Income (MHI) surveys

Performance Assessment

Rating Tool (PART)

• 4 to 6 weeks from today

• Email w/ today’s workshop in subject line

• 3 questions – 3 minutes maximum

• How did you use the information that was

presented today?

• Funders are looking for positive changes

• Help us continue these free workshops!

Control Tabs

Audio Controls

Attendee List

Today’s Materials

Marking Tool

Hide/Restore Control Panel

Questions?

Text your questions and comments anytime during the session

Text Chat…

• In the chat box, type one of your learning

objectives for today

Today’s Presenter

Richard Culp

RCAC/ENVIRONMENTAL PROGRAMS

Rural Development Specialist-Civil Engineer

Shelter Cove, CA

[email protected]

Today’s Session

Capital Improvement Plan (CIP)

•What and why

•Development process

•Examples and resources

What is it?

� A Capital Improvement Plan (CIP) is the multi-year scheduling of public improvements and infrastructure replacement.

What a Capital Improvement Plan

Should Not Be:

� A wish list that is never completed.

� Treatment facilities never built

� Vehicles not purchased

� Leaking mains not replaced.

Reasons Why Communities Resist CIPs

� Might lock a jurisdiction into projects

� Isn’t flexible

� Commits them to a future debt

� Causing higher rates to support future replacements.

Why Communities Need a CIP

� CIP saves money, by identifying upcoming needs

� It allows a community to spend money wisely, rather than paying top dollar in crisis mode.

� By looking at long term costs, it promotes financial and rate stability.

� Reduces the monies that otherwise would be paid as interest.

� Informs leaders, so they can educate the public.

Why Communities Need a CIP

Seven Steps in Developing a CIP

� Strategic Planning

� Step 1: What are you going to do.

� Step 2: How to do it.

� Identifying Projects

� Step 3: Inventory assets

� Step 4: Prioritize projects

� Budgeting

� Step 5: Analyze financial capacity

� Financial Planning

� Step 6: Funding options

� The Comprehensive Plan

� Step 7: Draft CIP package

Seven Steps in Developing a CIP

Strategic Planning Step 1: What are we going to do?

� Appoint a coordinating committee or person.

� Distinguish between a CIP or an operating expense.

� Decide how long to plan for and timetable for the process.

� Important to include public opinion early and often.

Strategic Planning Step 2: How to do it?

Develop Policy Framework:

� Prioritize capital improvement projects.

� When to use loans or outside money.

� Set these policies early.

Develop Policy Framework:

� Should answer two questions.

� Are we doing what we planned to do?

� Are we getting the results we intended?

Strategic Planning Step 2: How to do it?

CIP Strategic Plan

� Measured by:

� Comparing budgeted CIP to actual work completed.

� Completing projects on schedule

Step 3: Inventory Assets

� List all existing capital equipment and facilities

� Estimate the replacement cost for each item

� Determine the expected life span

� Review system growth rates

� Monitor Federal and State regulatory mandates

� Evaluate infrastructure conditions

� Use staff input in the CIP process

� Identify customer service needs

� Prepare a list of long range capital items

Step 3: Inventory Assets

� Record original cost and purchase date

� Maintain records of fixed assets and equipment

� Review accounting depreciation schedule

Step 3: Inventory Assets

Project information needed:

� Assign project ID #

� Project description and location

� Estimated start and finish dates

Step 3: Inventory Assets

Project information needed:

� Estimated project or equipment cost

� Financing method to be used

� Group and categorize similar projects

Step 3: Inventory Assets

CIP Information SpreadsheetANYTOWN

WATER DISTRICT

CAPITAL IMPROVEMENT PROJECTS

RESERVE FUND Adopted Projected Projected Projected Projected

CIP This year Year 2 Year 3 Year 4 Year 5

CAPITAL IMPROVEMENTSDESCRIPTION

Source of Supply

New Well $17,500

Clearwell storage tank $21,000

Hydrophnematic tank 15,000$

Elecrical panel upgrade 7,500$

loan for main well $2,200 2,200$ 2,200$ 2,200$ 2,200$

Distribution System0.05 MG storage tank 50,000$

8" mainline extension 15,000$

New hydrants 5,000$ 5,000$ 5,000$ 5,000$

VehiclesUtility truck $35,000 $7,278 7,278$ 7,278$ 7,278$ 7,278$

meter reader pickup $12,000

Total Capital Expenditures $59,978 $29,478 $14,478 $71,978 $29,478

Reserve Fund Calculator

� What can it do?

� Calculate monthly cost necessary for cash replacement of equipment

� Why use cash to replace equipment?

� Lessens the impact to rates

� You may not be able to borrow

� You may not want to borrow

v2.4

750$1.56

$14,085 $1,181,647

$50,058

ItemReplacement

Cost

Years to

ReplaceInflation Future Value

Account

Interest Rate

1 Pipes $302,000 51.0 2.0% $829,117 3.0%

2 Storage - replace 1 tank (2000 tank) $20,000 38.0 2.0% $42,446 3.0%

3 Valves - replacement $22,500 31.0 2.0% $41,571 3.0%

4 Hydrants - replacements $60,000 31.0 2.0% $110,855 3.0%

5 Storage - replace 2 tanks (1993 tanks) $40,000 31.0 2.0% $73,904 3.0%

6 Well pumps - 2 well pumps at $5000 ea. $10,000 10.0 2.0% $12,190 3.0%

7 Storage - rehabilitate 3 tanks $50,000 5.0 2.0% $55,204 3.0%

8 Chlorinator replacement $2,000 2.0 2.0% $2,081 3.0%

9 Chlorinator redundant unit $2,000 1.0 2.0% $2,040 3.0%

10 Pumphouse - replace controller $2,000 1.0 2.0% $2,040 3.0%

11 Well pumps - replace well 1 pump $5,000 1.0 2.0% $5,100 3.0%

12 Well pumps - replace well 2 pump $5,000 1.0 2.0% $5,100 3.0%

13

14

15

16

17

18

1920

Connections / ERUs:Monthly Payment:

Date:

INSTRUCTIONS: List items in descending order of "Years to Replace " (Longest replacement time first). Enter inflation,

capital costs to be reserved and interest rate of reserve account. (SORT password is "ok")

Annual Transfer to Budget:

Revenue Over Target:

Reserve Fund Calculator

Total Cash Outlay:

Consider rate decrease at end of year

Step 4: Prioritize Projects

� Immediate needs in the next year

� System improvements within 2-5 years

� Long range capital improvements within the next 5-10 years

Step 4: Prioritize Projects

� Solve water quality problems

� Regulatory requirements

� Eliminate maintenance problems

� Meet future growth needs

� Provide fire-flow requirements

� Improve operating efficiencies

Step 4: Prioritize ProjectsWATER DISTRICT

CIP SUMMARY

REVENUE FUNDED Adopted Projected Projected

CIP PROJECTIONS FY 02-03 FY 03-04 FY 04-05 COMMENTS

VEHICLES $18,000 $20,500 $22,000 GE-CORP loan

BUILDING IMPROVEMENTS $1,750 $2,750 $750 treatment plant

EQUIPMENT - FIELD $1,500 $11,100 $1,750 trench pumps

EQUIPMENT - ADMIN $7,400 $9,350 $6,000 electrical upgrades

TREATMENT PLANT $8,900 $14,000 $4,000 filter upgrades

DISTRIBUTION SYSTEM $1,200 $6,500 $5,000 valve repairs

MAIN UPGRADES AND HYD $5,000 $8,500 $8,500 hydrants

SOURCE OF SUPPLY $2,000 $3,000 $3,500 intake screens

ENGINEERING AND STUDIES $14,700 $10,000 $3,500 hazardous waste study

MISC. UNBUDGETED $1,000 $1,000 $1,000 misc.

TOTALS $61,450 $86,700 $56,000

Step 5: Analyze Financial Capacity

� Examine past and present finances

� Compare budgets with actual expenditures

� Check key financial ratios

� Debt service >25-30% of user rate

� User rate not to exceed 1.5-2.0% of MHI per year

Step 5: Analyze Financial Capacity

� Determine current financial condition

� Identify capital financing alternatives

� Estimate annual CIP and operating expenses over the planning period

� Calculate revenue required to cover expenses

� Assess impact on customer rates

Step 5: Analyze Financial Capacity

� Set up an interest bearing reserve account to fund future improvements

� An emergency reserve account

� Large facility capital improvements usually require some additional financing

Step 6: Funding Options

� How will the needed improvements be paid for?

� Few 100% grants

� Loans

� Assessment districts

� Reserve funds

� May need to raise rates

Federal and State Programs to Finance Improvements

� Community Development Block Grants

� USDA-RUS loans

� State Drinking Water Revolving Loan Fund.

� RCAC and other Sources of funds

� Website: California Financing Coordinating Committee (www.cfcc.ca.gov)

Step 7: The Comprehensive Plan

� Draft a CIP plan for public review

� Prioritized projects and link to funding sources

� Create a timeline

� Use as a guide for budgeting

CIP Checklist

What are we doing?

Prioritize projects

Inventory system assets

Establish policies, how to do it

CIP Checklist

Analyze financial capacity

Explore funding options

Prepare long range CIP plan

Start the first project

Developing a CIP: Conclusion

� A working CIP is a living document

� Revisited each year for:

� Changing circumstances

� Growth

� New technologies

Systems that invest in theirdistribution system perform better.

For Better…

…Or Worse!

Applicability1 of TMF Criteria #12:Budget Projection/Capital Improvement Plan

New Community Water System Applications Mandatory2.

Change of Ownership Applications Mandatory2.

SRF Community Water System Applications Mandatory2.

Existing Public Water Systems Should Address4.

1. Applicability may be changed depending on size and complexity of the water system

2. Mandatory: Compliance with this element is required at the time of permit issuance

3. Necessary: Compliance with this element will be required within a specific timeframe

4. Should Address: Every water system needs accurate information about its financial situation.

Questions / Discussion

BREAK TIME

CIP TOOLS & RESOURCES

• Step Guides

• Spreadsheets

• Mapping

http://www.epa.gov/safewater/smallsys/pdfs/guide_smallsystems_stratplan.pdf

Asset Management Step Guide

http://www.epa.gov/ogwdw/smallsystems/pdfs/guide_smallsystems_asset_mgmnt.pdf

RCAC TOOLBOX FREE DOWNLOADS

http://www.rcac.org/tools/

• Simplified Capital Improvement Plan

• Asset Inventory Worksheet (Version 13)

• Financial Toolbox (Version 10.3)

RCAC’s Asset Spreadsheet

Your Utility Name 8/28/2015Number of Units

(Connections, ERUs etc.):Total

Equity:

Connection Fee:

Monthly Cost Per Unit to Reserves:

$0.00

Annual $$ to Reserves: $0

Reserve Cash Applied: Payments over 0 years:

Current Year: 2015 Calculated Replacement Life Calculated Equity Replacement Cost

Asset and Description RCAC V13

Install Date

Est. Effective Life

Condition Rating

Critical Number

Calc Remain Life

Original Cost

Book Value Original $$

Replacment Cost

Infl. Rate

Accum Loss of Value (Dep)

Debt and Grants

EquityCash Replace

?

Saving Acc't Interest

Future Cost

Year Years1 to 10 1 to 5

Years Cost $ Value $ Cost $ % Loss $$ Value $ Value $ X % Value $Tab A Tab A

RCAC’s Asset Spreadsheet

A-1 Condition Assessment

Condition Rating Description Maintenance Level Condition Multiplier

1 Good/Expected ConditionNormal Preventive Maintenance (PM)

1

2 0.95

3 Minor Defects Only

Normal PM, Minor Contract Maintenance (CM)

0.8

4 0.7

5 Moderate DeteriorationNormal PM, Major CM

0.5

6 0.35

7 Significant DeteriorationMajor repair, rehabilitate

0.2

8 0.1

9 Virtually Unserviceable Rehab unlikely 0.05

10 Unserviceable Replace 0

A-2 Critical Number

Critical Number Description

1The water system would essentially shut down if this component fails. This asset has no backup and is so important that an emergency plan must be in place as well as funding to replace it. Example: Single well pump failure; single reservoir failure; anything that could cause a violation of the Safe Drinking Water Act.

2This asset would have a serious impact on the water system if it failed, however, procedures could fix the problem within a reasonable time. Example: Two wells and primary wellpump fails; Electrical compents in panels fail: backflow assembly did not pass testing; key pipe failure that could be repaired; single chlorinator failure; pressure reducing valve failure.

3The condition of this asset causes continued unnecessary operational costs to your utility. Examples: deteriorating buildings, equipment and rolling stock; leaks in piping; old and worn-out electrical equipment.

4This asset's condition or failure may cause inconvenience to customers via reduced service, outages, or minor taste or odor complaints. Examples: excessive leaks, valves frozen partway closed, hydrants not working so flushing cannot be done; poor billing program.

5These assets have been in service for a long time and their condition may not be well known. Evaluation should take place and a determination made as to what may be needed.

If you don’t own Excel:

• Use Excel online for free with a MicroSoftaccount (make one at login.live.com)

• Use Google Sheets online for free with a Google account (make one at accounts.google.com/SignUp)

• Download OpenOffice for free at www.openoffice.org/download/ (this one doesn’t require constant internet connection to use it)

LINKS FOR FREE RESOURCES

• http://www.efc.sog.unc.edu/reslib/item/water-sewer-rates-analysis-model

The Environmental Finance Center at the University of North CarolinaWater and Wastewater Rates Analysis Model

Subject: Budget, Costs, Financial Data, Rates, Reserves, Revenues

Program: Drinking Water and Wastewater Tool type: Calculator

Date: 08/04/2015 Version: 2.8.2

• http://www.rcac.org/news-publications/guidebooks/

• http://www.waterboards.ca.gov/drinking_water/certlic/drinkingwater/TMF.shtml#TMF_Assessment

Sample 5-Year Budget Projection/Capital Improvement Plan (CIP)

Sample 5-Year Budget Projection/Capital Improvement Plan (CIP) - Expense Only

Sample 5-Year Budget Projection/Capital Improvement Plan (CIP) - Large Community

Water System Mapping

With Google Earth

Google Earth

www.google.com/earth/

https://www.google.com/earth/

CIP/Mapping Examples/Demo

Questions / Discussion

65

Technical Resources

• Rural Community Assistance Corporation www.rcac.org

• California Rural Water Association www.calruralwater.org

• California State University Sacramento, Office of Water Programs www.owp.csus.edu

66

Thank You For Joining Us!

Richard [email protected]