weekly projects update - w/e 25th november
TRANSCRIPT
Weekly Waste Projects Update – week ending 25th
November 2016
Weekly Waste Projects Update: week ending 25th
November 2016 Source: AcuComm Business Database
01
2nd September 2016
New/Updated Projects Reported (w/e 25th Nov 2016)
Number
Estimated Value (all projects)
Estimated Value (new projects only)
US$ millions US$ millions
Anaerobic Digestion 8 276 63
Biofuel 6 631 236
Biogas 5 106 9
Gasification 3 331 233
Incineration (with energy recovery) 12 1,683 917
Incineration (without energy recovery) - - -
Integrated/mixed facilities - - -
Landfill - - -
MBT - - -
Other 1 58 58
Recycling 5 112 88
Waste processing 3 63 56
Total 43 3,259 1,660
In the week ended 25th November 2016, AcuComm added 43 new or updated waste projects
to our Business Database, worth an estimated US$3,259 million and waste capacity of just
over 7.0 million tonnes.
This takes the cumulative total to 4,550 active projects since 2013,
with a total estimated investment value of US$346.1 billion.
To find out more information about the projects and investments
covered in this update, click here
Incineration (with
energy recovery)
55.2%
Biofuel
14.2%
Gasification
14.0%
Recycling
5.3%
Anaerobic Digestion
3.8%
Other
3.5%
Others
3.9%
Est. Value of New Projects by Facility Type (w/e 25th Nov
2016)
Weekly Waste Projects Update – week ending 25th
November 2016
Weekly Waste Projects Update: week ending 25th
November 2016 Source: AcuComm Business Database
02
New/Updated Projects Reported (w/e 25th Nov 2016)
Number Capacity (tonnes) MW
Anaerobic Digestion 8 886,634 21
Biofuel 6 1,196,485 68
Biogas 5 249,245 15
Gasification 3 343,491 32
Incineration (with energy recovery) 12 3,536,314 273
Incineration (without energy recovery) - - -
Integrated/mixed facilities - - -
Landfill - - -
MBT - - -
Other 1 156,865 -
Recycling 5 394,320 -
Waste processing 3 262,909 -
Total 43 7,026,263 410
The total estimated waste capacity of projects reported on
in the past week is just over 7.0 million tonnes. WtE
incineration was the largest category, accounting for just
over 3.5 million tonnes.
The total estimated power generation from these projects
was 410 MW. WtE incineration was the largest category,
accounting for 273 MW.
Incineration (with
energy recovery)
50.3%
Biofuel
17.0%
Anaerobic Digestion
12.6%
Others
20.0%
Reported Capacity of Projects by Facility Type (w/e
25th Nov 2016)
To find out more information about the projects and investments
covered in this update, click here
Weekly Waste Projects Update – week ending 25th
November 2016
Weekly Waste Projects Update: week ending 25th
November 2016 Source: AcuComm Business Database
03
New Projects Reported by Waste Types (w/e 25th Nov 2016)
Number Capacity (tonnes) MW
Animal 2 466,071 5
Clinical - - -
Construction/Demolition - - -
e-Waste 1 50,513 -
Food 3 109,875 7
Gas - - -
Glass - - -
Hazardous 1 68,700 -
Heat - - -
Industrial - - -
Metals - - -
MSW 14 3,007,961 229
Oil 1 4,000 16
Organic (general/unspecified) 4 786,324 29
Other 1 172,354 -
Paper - - -
Plant biomass (non-waste) 1 748,324 34
Plant biomass (waste) 4 535,396 25
Plastics 1 30,942 -
Radioactive - - -
Rubber - - -
Sewage/wastewater 5 324,045 14
Wood 5 721,759 52
Total 43 7,026,263 410
MSW was the leading feedstock type reported on in the
past week, accounting for an estimated 3.0 million tonnes,
or 42.8% of the total. This was followed by unspecified
organic matter with just under 0.8 million tonnes.
MSW
42.8%
Organic
(general/unspecified)
11.2%
Plant biomass (non-
waste)
10.7%
Others
35.3%
Reported Capacity of Projects by Waste Type (w/e
25th Nov 2016)
To find out more information about the projects and investments
covered in this update, click here
Weekly Waste Projects Update – week ending 25th
November 2016
Weekly Waste Projects Update: week ending 25th
November 2016 Source: AcuComm Business Database
04
New/Updated Projects, Country Coverage, (w/e 25th Nov 2016)
Projects
UK 11
USA 10
Canada 3
United Arab Emirates 2
Germany 2
Others 15
Total 43
The leading country in the past week was the
UK with 15 projects. This was followed by the
USA with ten and Canada with three.
1110
32 2 0 0 0 0 0 0
15
0
2
4
6
8
10
12
14
16
UK
US
A
Can
ad
a
Un
ited
Ara
b E
mira
tes
Germ
an
y
Oth
ers
Reported Projects by Country (w/e 25th Nov 2016)
To find out more information about the projects and investments
covered in this update, click here
Weekly Waste Projects Update – week ending 25th
November 2016
Weekly Waste Projects Update: week ending 25th
November 2016 Source: AcuComm Business Database
05
Average Project Values by Facility Type
US$ millions
Anaerobic Digestion 24
Biofuel 118
Biogas 26
Gasification 144
Incineration (with energy recovery) 110
Incineration (without energy recovery) 58
Integrated/mixed facilities 195
Landfill 21
MBT 68
Other 124
Recycling 30
Waste processing 62
All Projects 76
Average Project Values by Feedstock Type
US$ millions
Animal 17
Clinical 30
Construction/Demolition 7
e-Waste 23
Food 20
Gas 57
Glass 14
Hazardous 70
Heat 41
Industrial 121
Metals 48
MSW 90
Oil 46
Organic (general/unspecified) 86
Other 57
Paper 74
Plant biomass (non-waste) 115
Plant biomass (waste) 80
Plastics 21
Radioactive 564
Rubber 34
Sewage/wastewater 47
Wood 87
All Projects 76
The average active waste project is worth US$76 million. There are naturally
wide variations in average project value, due to the size, duration and
complexity of different types of project. The figures on this page represent
our latest estimates, based on data from 2013 to the current week.
To find out more information about the projects and investments
covered in this update, click here
Weekly Waste Projects Update – week ending 25th
November 2016
Weekly Waste Projects Update: week ending 25th
November 2016 Source: AcuComm Business Database
06
Top Five Projects, week ending 25th November 2016, by Estimated Value (US$ millions) Click the flag for more information on each project
1 UK 402 Construction of a 33 MW energy recovery facility.
2 UK 283 Development of a 40 MW WtE facility.
3 USA 229 Construction of a 600,000 tpa wood pellet facility.
4 Canada 212 Upgrading of a biodiesel refinery.
5 Ireland 200 Development of a resource recovery centre/WtE facility.
Top Five Projects, week ending 25th November 2016, by Reported Waste Capacity (tonnes)
1 China 730,000 Upgrading of 2,000 tpd WtE facility.
2 UK 350,000 Construction of a WtE facility.
3 UK 320,000 Construction of a 33 MW energy recovery facility.
4 UK 300,000 Development of a 40 MW WtE facility.
5 Ireland 240,000 Development of a resource recovery centre/WtE facility.
Top Five Projects, week ending 25th November 2016, by Reported Power Generation (MW)
1 UK 40 Development of a 40 MW WtE facility.
2 UK 34 Construction of a WtE facility.
3 UK 33 Construction of a 33 MW energy recovery facility.
4 Japan 22 Construction of a 22.1 MW biomass plant.
5 UK 20 Construction of a 20 MW gasification facility.
Weekly Waste Projects Update – week ending 25th
November 2016
Weekly Waste Projects Update: week ending 25th
November 2016 Source: AcuComm Business Database
07