weekly waste projects – w/e 3rd august

7
Weekly Waste Projects Update – week ending 3 rd August 2015 Weekly Waste Projects Update: week ending 3 rd August 2015 Source: AcuComm Waste Business 01 Incineration (with energy recovery) 16.9% Gasification 12.4% Integrated/mixed facilities 10.1% Anaerobic Digestion 7.5% Landfill 6.5% Others 46.6% Est. Value of New Projects by Facility Type (w/e 03 Aug 2015) New/Updated WBF Projects Reported (w/e 03 Aug 2015) Number Estimated Value (all projects) Estimated Value (new projects only) US$ millions US$ millions Anaerobic Digestion 4 97 97 Biofuel - - - Biogas - - - Gasification 2 331 160 Incineration (with energy recovery) 10 937 219 Incineration (without energy recovery) - - - Integrated/mixed facilities 4 385 131 Landfill 3 84 84 MBT - - - Other 2 3,526 526 Recycling 2 31 11 Waste processing 4 189 65 Total 31 5,580 1,293 In the week ended 03 Aug 2015, AcuComm added 31 new or updated waste projects to our Waste Business Finder database, worth an estimated US$5,580 million and reported waste capacity of 2.3 million tonnes. This takes the cumulative total to 3,340 active projects since 2013, with a total estimated investment value of US$324 billion. To find out more information about the projects and investments covered in this update, click here

Upload: eric-wigart

Post on 17-Aug-2015

22 views

Category:

Environment


0 download

TRANSCRIPT

Weekly Waste Projects Update – week ending 3rd

August 2015

Weekly Waste Projects Update: week ending 3rd

August 2015 Source: AcuComm Waste Business

Finder

01

Incineration (with

energy recovery)

16.9%

Gasification

12.4%

Integrated/mixed

facilities

10.1%

Anaerobic Digestion

7.5%

Landfill

6.5%

Others

46.6%

Est. Value of New Projects by Facility Type (w/e 03 Aug 2015)

New/Updated WBF Projects Reported (w/e 03 Aug 2015)

Number

Estimated Value (all projects)

Estimated Value (new projects only)

US$ millions US$ millions

Anaerobic Digestion 4 97 97

Biofuel - - -

Biogas - - -

Gasification 2 331 160

Incineration (with energy recovery) 10 937 219

Incineration (without energy recovery) - - -

Integrated/mixed facilities 4 385 131

Landfill 3 84 84

MBT - - -

Other 2 3,526 526

Recycling 2 31 11

Waste processing 4 189 65

Total 31 5,580 1,293

In the week ended 03 Aug 2015, AcuComm added 31 new or updated waste projects to our

Waste Business Finder database, worth an estimated US$5,580 million and reported waste

capacity of 2.3 million tonnes.

This takes the cumulative total to 3,340 active projects since 2013,

with a total estimated investment value of US$324 billion.

To find out more information about the projects and investments

covered in this update, click here

Weekly Waste Projects Update – week ending 3rd

August 2015

Weekly Waste Projects Update: week ending 3rd

August 2015 Source: AcuComm Waste Business

Finder

02

New/Updated WBF Projects Reported (w/e 03 Aug 2015)

Number Capacity (tonnes) MW

Anaerobic Digestion 4 43,800 -

Biofuel - - -

Biogas - - -

Gasification 2 1,095 20

Incineration (with energy recovery) 10 1,364,854 69

Incineration (without energy recovery) - - -

Integrated/mixed facilities 4 394,500 9

Landfill 3 401,500 -

MBT - - -

Other 2 - -

Recycling 2 - -

Waste processing 4 100,219 5

Total 31 2,305,968 103

The total reported waste capacity of projects reported on in

the past week is just over 2.3 million tonnes. WtE

incineration was the largest category, accounting for just

under 1.4 million tonnes.

The total reported power generation from these projects

was 103 MW. Again, WtE incineration was the largest

category, accounting for 69 MW.

Incineration (with

energy recovery)

59.2%

Landfill

17.4%

Integrated/mixed

facilities

17.1%

Others

6.3%

Reported Capacity of Projects by Facility Type (w/e

03 Aug 2015)

To find out more information about the projects and investments

covered in this update, click here

Weekly Waste Projects Update – week ending 3rd

August 2015

Weekly Waste Projects Update: week ending 3rd

August 2015 Source: AcuComm Waste Business

Finder

03

New WBF Projects Reported by Waste Types (w/e 03 Aug 2015)

Number Capacity (tonnes) MW

Animal 2 - -

Clinical - - -

Construction/Demolition - - -

e-Waste - - -

Food 2 44,019 -

Gas 2 - -

Glass - - -

Hazardous 1 30,000 -

Heat - - -

Industrial - - -

Metals - - -

MSW 13 2,026,279 88

Oil - - -

Organic (general/unspecified) 3 105,000 5

Other 1 - -

Paper - - -

Plant biomass (non-waste) - - -

Plant biomass (waste) - - -

Plastics 1 - -

Radioactive 1 - -

Rubber - - -

Sewage/wastewater 2 100,000 5

Wood 3 670 5

Total 31 2,305,968 103

Municipal Solid Waste (MSW), accounted for

the largest share of projects by feedstock type

in the past week, with an annualised figure of

just over 2.0 million tonnes.

MSW

87.9%

Organic

(general/unspecified)

4.6%

Sewage/wastewater

4.3%

Others

3.2%

Reported Capacity of Projects by Waste Type (w/e

03 Aug 2015)

To find out more information about the projects and investments

covered in this update, click here

Weekly Waste Projects Update – week ending 3rd

August 2015

Weekly Waste Projects Update: week ending 3rd

August 2015 Source: AcuComm Waste Business

Finder

04

New WBF Projects, Country Coverage, (w/e 03 Aug 2015)

Projects

USA 5

UK 5

China 4

Germany 3

India 3

Australia 2

Hungary 1

France 1

Jordan 1

Oman 1

Total (includes others) 31

The leading countries in the past week were the USA

and UK, with five projects each. These were followed by

China with four projects.

5 5

4

3 3

2

1 1 1 1

5

0

1

2

3

4

5

6

Reported Projects by Country (w/e 03 Aug 2015)

To find out more information about the projects and investments

covered in this update, click here

Weekly Waste Projects Update – week ending 3rd

August 2015

Weekly Waste Projects Update: week ending 3rd

August 2015 Source: AcuComm Waste Business

Finder

05

Average Project Values by Facility Type

US$ millions

Anaerobic Digestion 22

Biofuel 121

Biogas 45

Gasification 172

Incineration (with energy recovery) 109

Incineration (without energy recovery) 85

Integrated/mixed facilities 127

Landfill 28

MBT 98

Other 526

Recycling 31

Waste processing 61

All Projects 102

Average Project Values by Feedstock Type

US$ millions

Animal 30

Clinical 28

Construction/Demolition 6

e-Waste 27

Food 21

Gas 376

Glass 13

Hazardous 102

Heat 26

Industrial 131

Metals 47

MSW 97

Oil 46

Organic (general/unspecified) 95

Other 77

Paper 72

Plant biomass (non-waste) 99

Plant biomass (waste) 93

Plastics 16

Radioactive 864

Rubber 33

Sewage/wastewater 40

Wood 87

All Projects 102

The average waste project is worth US$102 million. There are naturally

wide variations in average project value, due to the size, duration and

complexity of different types of project. The figures on this page

represent our latest estimates, based on data from 2013 to the most

recent week. To find out more information about the projects and investments

covered in this update, click here

Weekly Waste Projects Update – week ending 3rd

August 2015

Weekly Waste Projects Update: week ending 3rd

August 2015 Source: AcuComm Waste Business

Finder

06

Top Five Projects in Latest Week by Reported US$m Value

1 USA 3,000 Construction of a plant to convert natural gas into fertiliser. http://www.acucomm.net/business-finder/483

2 UK 283 Development of a 40 MW WtE facility. http://www.acucomm.net/business-finder/2731

3 Germany 160 Construction of a combined cycle power plant. http://www.acucomm.net/business-finder/2623

4 UK 160 Proposed construction of a 20 MW gasification facility. http://www.acucomm.net/business-finder/3456

5 Switzerland 62 Construction of the most advanced sewage sludge thermal treatment plant in Switzerland. http://www.acucomm.net/business-finder/299

Top Five Projects in Latest Week by Reported Waste Capacity

1 Jordan 496,684 Development of a waste-to-energy facility. http://www.acucomm.net/business-finder/3096

2 Oman 401,500 Engineered civic waste landfill opened. http://www.acucomm.net/business-finder/3448

3 UK 300,000 Development of a 40 MW WtE facility. http://www.acucomm.net/business-finder/2731

4 Canada 280,000 Upgrading of environmental control systems at waste-to-energy facility. http://www.acucomm.net/business-finder/1685

5 UK 195,000 Proposed development of a waste treatment facility. http://www.acucomm.net/business-finder/418

Top Five Projects in Latest Week by Reported MW Power Generation

1 UK 40 Development of a 40 MW WtE facility. http://www.acucomm.net/business-finder/2731

2 UK 20 Proposed construction of a 20 MW gasification facility. http://www.acucomm.net/business-finder/3456

3 Germany 19 Upgrading of a waste incineration plant. http://www.acucomm.net/business-finder/2205

4 UK 6 Proposed development of a waste treatment facility. http://www.acucomm.net/business-finder/418

5 Switzerland 5 Construction of the most advanced sewage sludge thermal treatment plant in Switzerland. http://www.acucomm.net/business-finder/299

Click here to take a look at the waste, renewables and energy projects in the

AcuComm database.

Register for free project updates hereTel: +44 (0)1243 788686 [email protected] acucomm.net