UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT SECTOR

PROJECT , CAMBODIA (ADB LOAN 3289 ‐CAM) : PROJECT MANAGEMENT AND

IMPLEMENTATION CONSULTANT

9THQUARTERLYPROGRESSREPORT

April2018

Page 2: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of
Page 3: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT SECTOR PROJECT (UIWRMSP), CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANTS

9th QUARTERLY PROGRESS REPORT April 2018

IN ASSOCIATION WITH

PACIFIC RIM INNOVATION AND

MANAGEMENT EXPONENTS, INC., PHILIPPINES

Page 4: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

REVISION HISTORY

Revision No. Date Comments Authorization

Originated by Checked by Approved by

UIWRMSP-01 11/04/2018 Editing/ formatting

Ung Kotaro

UIWRMSP-02 11/04/2018 Reformatting Jo Ann Ativo Leo Pura

UIWRMSP-02 14/04/2018 Final review Abdul Hakeem Khan Elvira Ablaza Elvira Ablaza

Page 5: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

TABLE OF CONTENTS Page i

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

TABLE OF CONTENTS

Page

List of Appendices ................................................................................................................... i List of Abbreviations ............................................................................................................... ii 

I.  EXECUTIVE SUMMARY OF IMPLEMENTATION PROGRESS ............................... 1 

II.  PROJECT PURPOSE ................................................................................................ 2 

III.  UTILIZATION OF FUNDS ......................................................................................... 3 

IV.  IMPLEMENTATION PROGRESS ............................................................................. 8 

A.  Output 1: Enhanced Efficiency and Climate Resilience of Irrigation Systems ........................................................................................... 8 B.  Output 2: Improved Water Resource Management ...................................... 10 C.  Project Management .................................................................................... 10 

V.  ISSUES AND ACTIONS TAKEN ............................................................................. 11 

A.  Actions Taken on Issues Reported in QPR8, 2017 ...................................... 11 B.  Current Issues and Actions Taken ............................................................... 12 

VI.  ACTIVITIES IN THE NEXT QUARTER ................................................................... 12 

LIST OF APPENDICES

Number Title

1 Project Location Map 2 Design and Monitoring Framework (DMF) 3 List of Awarded Contracts 4 Summary of Disbursements 5 Summary of Expenditures 6 Project Implementation Progress 7 Monitoring/Reporting Form for the Status of Compliance with Loan Covenants 8 Monitoring/Reporting Form for Progress in GAP Implementation 9 Contract Administration Monitor, Taing Krasaing Scheme (CW04) 10 Contract Administration Monitor, Prek Chik Distribution System (CW07 and

CW08) 11 Progress of FWUC Formation and Development 12 Quarterly Environmental Progress Report 13 Summary of Consultants’ Mobilization

Page 6: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

TABLE OF CONTENTS Page ii

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

LIST OF ABBREVIATIONS

ADB Asian Development Bank ADCP Acoustic Doppler Current Profiler AH affected household AHS automatic hydromet station AWS automatic weather station BER bid evaluation report CADTIS Cambodians’ Action for Development Consultant Co. Ltd. ch. Chainage DD detailed design DFWUC Department of Farmer Water User Communities EA executing agency EIC environmental impact categorization EMP Environmental Management Plan EMR environmental monitoring report EOI expression of interest F&P framework and procedure FS feasibility study FWUC farmer water user community GAP gender action plan ha hectare IEE initial environmental examination IPC Interim Payment Certificate IR involuntary resettlement JOROP joint reservoir operation JV joint venture km kilometer m meter MAFF Ministry of Agriculture, Forestry, and Fisheries mc main canal MOWRAM Ministry of Water Resources and Meteorology NGO nongovernmental organization O&M operation and maintenance OCG Oriental Consultants Global Co., Ltd. OKN O Kra Nhak PAM Project Administration Manual PC Prek Chik PDWRAM Provincial Department of Water Resources and Meteorology PMIC project management and implementation consultant PMU project management unit PPMS project performance management system PRC Procurement Review Committee PRIMEX Pacific Rim Innovation and Management Exponents, Inc. QPR7 Seventh Quarterly Progress Report QPR8 Eighth Quarterly Progress Report RGC Royal Government of Cambodia SC secondary canal SDR Special Drawing Rights TC tertiary canal TK Taing Krasaing TNA training needs assessment TOT training of trainers UIWRMSP Uplands Irrigation and Water Resources Management Sector Project VO variation order

Page 7: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

MAIN TEXT

Page 8: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

NINTH QUARTERLY PROGRESS REPORT Page 1

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

I. EXECUTIVE SUMMARY OF IMPLEMENTATION PROGRESS

1. The Royal Government of Cambodia (RGC), through the Ministry of Water Resources and Meteorology (MOWRAM) as the executing agency (EA), has received a loan from the Asian Development Bank (ADB) for the implementation of the Uplands Irrigation and Water Resources Management Sector Project (UIWRMSP) (ADB Loan 3289-CAM). The project will enhance agriculture and rural economic productivity through increased efficiency and climate resiliency of irrigation systems and improved management of water resources in the upland areas of Kampong Thom and Battambang provinces. The total project cost is about US$ 66.12 million financed through an ADB loan of US$60 million1 equivalent from Special Drawing Rights (SDR) 43,121,0002 and government counterpart of about US$6.12 million. The location of the project area and targeted irrigation systems is in Appendix 1.

2. To provide the required project management and implementation consultants (PMICs) services to MOWRAM, project management unit (PMU), and the Provincial Department of Water Resources and Meteorology (PDWRAMs) of Kampong Thom and Battambang, MOWRAM engaged the services of Pacific Rim Innovation and Management Exponents, Inc. (PRIMEX), Philippines in Joint Venture (JV) with Oriental Consultants Global Co., Ltd (OCG), Japan and in association with Cambodians’ Action for Development Consultant Co. Ltd. (CADTIS), Cambodia through a contract signed on 29 January 2016. The team of consultants was mobilized on 15 February 2016.

3. As of 31 March 2018, the contracts awarded amounted to US$46.167 million (or 76.94% of the loan amount), while a cumulative expenditure of US$30.356 million (about 98.12% of total disbursement) was incurred. (The advance payment to the contractor is not considered as expenditure.) Six out of seven contracts have been awarded (CW02 was officially dropped), and the physical progress of works stands at about 69.58%, while the time elapsed from the effective date is 38.91%. Most of the project works are ahead of their scheduled targets.

4. The contract for Taing Krasaing (TK) (CW01) and Chroab (CW03) are fully completed and the Korkoah distribution system (CW04) is 87.70% done, including VO1, without time extension. Prek Chik (PC) main canal (CW-06) was completed in August 2017, and the defects liability period will last until August 2018. PC Package 1 (CW07) is 60.24% complete, and PC Package 2 (CW08) is about 75% complete. The results of the evaluation of bids for the Okra Nhak scheme (CW05) are being reviewed by the Procurement Review Committee (PRC). A new non-core subproject (NCSP) in PC Package 3, viz., Improvement of O Tra Cheak Chit Reservoir (MOWRAM/ICB-CW09) in Battambang (BTB) Province, was officially approved through an updated and revised Procurement Plan.3 The topographic survey proposal for the detailed design (DD) of the new subproject has been submitted to ADB for review and approval. The Model Interim Report of the Study on the Joint Reservoir Operation (JOROP) of TK and Stung Chinit (SC) has been prepared and submitted to PMU, to be followed by field testing and training in the following quarter.

5. The work plan for farmer water user community (FWUC) formation has been revised, with target completion in May 2018. The Project Management Implementation Consultant (PMIC) and the MOWRAM Farmer Water User Community (FWUC) Department teams have met farmers and local authorities, who benefit from irrigation systems, to discuss the following: (i) election of the Sub-Group of FWUCs (FWUSGs) and Group of FWUCs (FWUGs); (ii) FWUC

1 ADB. 2015. Project Administration Manual (PAM). Kingdom of Cambodia: Upland Irrigation and Water

Resources Management Sector Project. September 2015. 2 Loan Agreement between ADB and the Royal Government of Cambodia, Upland Irrigation and Water Resources

Management Sector Project, 10 November 2015. 3 The NOL from ADB was issued on 21 November 2017.

Page 9: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

NINTH QUARTERLY PROGRESS REPORT Page 2

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

statute; and (iii) training of FWUCs on their responsibilities and how to develop a five-year work plan and record the land areas of target farmers. The Draft Tripartite Agreement for the TK irrigation system has been submitted to PMU and ADB for review and approval.

6. New goods contracts packages have been approved via the approved Updated Procurement Plan. These are: (i) Goods Contract No. PMU-ESM-01 (Equipment for Stream Flow Measurement for the Development of Rating Curve); and (ii) Goods Contract No. PMU-SOF-01 (Procurement of Licensed Accounting Software – Peachtree Accounting System Sage 50). The technical specifications for PMU-ESM-01 have been prepared for tendering. Contract No. PMU-SOF-01 has been procured, and the entire works have been fully completed.

7. An ADB Review Mission visited the project from 29 January to 5 February 2018 to review its progress and implementation. The Mission held meetings with MOWRAM, the Ministry of Economy and Finance (MEF), Ministry of Agriculture, Forestry, and Fisheries (MAFF), PMIC, contractors, and FWUCs in Phnom Penh, TK, and PC. They also visited the ongoing works in BTB and Kampong Thom (KT) provinces. The Mission was satisfied with the overall progress and quality of works as well as the implementation of social and environmental safeguards and gender action plan (GAP). A few comments were made by the Mission for the EA to address.

8. This ninth quarterly progress report (QPR9) covers the period, January 2018 to March 2018. It provides a summary of accomplishments during the reporting period, identifies issues and concerns and recommends the actions required, and lists the activities to be carried out in the next quarter.

II.PROJECT PURPOSE

9. The project supports the government’s strategy to enhance economic growth in the project area through the rehabilitation, modernization, and climate proofing of selected existing irrigation systems in the provinces of BTB and KT. The outcome of the project is enhanced water and agriculture productivity in the project provinces. The project outputs are: (i) enhanced efficiency and climate resilience of irrigation systems; and (ii) improved management of water resources.

10. Output 1: Enhanced efficiency and climate resilience of irrigation systems consists of the rehabilitation, modernization, and climate proofing of at least three irrigation systems in the KT and BTB. The cultivated area of the systems is expected to increase to 29,500 hectares (ha) from a baseline of 13,500 ha. This output will include the rehabilitation and modernization of the TK and O Kra Nhak (OKN) irrigation systems in KT and the PC irrigation system in BTB. Physical improvement covers distribution channels, installation of structures and gauges for water measurement, control and distribution, and construction of drainage facilities

11. Output 2: Improved water resource management includes the following key activities:

Formation and development of FWUCs; Installation of hydro-meteorological (hydromet) stations in the watersheds and flow

measurement networks in the irrigation systems; Provision of training to staff of MOWRAM, PDWRAMs, MAFF, and FWUCs; Modernization of canal operations;

Page 10: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

NINTH QUARTERLY PROGRESS REPORT Page 3

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

Design and implementation of JOROP for linked systems in KT and BTB; and Provision of training to FWUCs on the operation and maintenance (O&M) of canals,

management of FWUCs, orientation on climate variability and change, and water management.

12. Appendix 2 presents the profile of the project results.

III. UTILIZATION OF FUNDS4

13. As of 31 March 2018, the contracts awarded by PMU amounted to $46.167 million (Appendix 3), or 76.94% of the loan amount, as a result of the advance procurement carried out by the EA immediately upon approval of the loan. Payments under these contracts totalled $30.217 million, corresponding to 65.45% of the amount of contracts awarded so far.

14. The workbook for the summary of disbursements against the respective allocations from the loan and the RGC counterpart is presented in Appendix 4. As of 31 March 2018, $41,640 (0.68%) has been disbursed from the RGC counterpart fund for incremental operating cost. A total of $30.937 million (51.56%) has been disbursed from the ADB loan for the following expenditures:

i) Civil works ($26.41 million)  

Advance Payment Contract No.: MOWRAM/ICB-CW01 $ 1,052,127

1st Payment Contract No.: MOWRAM/ICB-CW01 $ 2,061,040

2nd Payment Contract No.: MOWRAM/ICB-CW01 $ 1,353,089

3rd Payment Contract No.: MOWRAM/ICB-CW01 $ 299,982

4th Payment Contract No.: MOWRAM/ICB-CW01 $ 317,627

5th Payment Contract No.: MOWRAM/ICB-CW01 $ 376,762

6th Payment Contract No.: MOWRAM/ICB-CW01 $ 2,528,488

7th Payment Contract No.: MOWRAM/ICB-CW01 $ 658,806

8th Payment Contract No.: MOWRAM/ICB-CW01 $ 534,639

9th Payment Contract No.: MOWRAM/ICB-CW01 $ 826,775

10th Payment Contract No.: MOWRAM/ICB-CW01 $ 418,722

10th Payment Contract No.: MOWRAM/ICB-CW01 $ 953,189

1st Payment Contract No.: MOWRAM/ICB-CW03 $ 264,264

2nd Payment Contract No.: MOWRAM/ICB-CW03 $ 221,886

3rd Payment Contract No.: MOWRAM/ICB-CW03 $ 329,158

4th Payment Contract No.: MOWRAM/ICB-CW03 $ 160,530

5th Payment Contract No.: MOWRAM/ICB-CW03 $ 121,331

6th Payment Contract No.: MOWRAM/ICB-CW03 $ 516,340

7th Payment Contract No.: MOWRAM/ICB-CW03 $ 219,653

1st Payment Contract No.: MOWRAM/ICB-CW04 $ 1,338,356

2nd Payment Contract No.: MOWRAM/ICB-CW04 $ 906,065

3rd Payment Contract No.: MOWRAM/ICB-CW04 $ 846,191

4th Payment Contract No.: MOWRAM/ICB-CW04 $ 701,466

5th Payment Contract No.: MOWRAM/ICB-CW04 $ 277,723

6th Payment Contract No.: MOWRAM/ICB-CW04 $ 299,203

4 In this report, “$” refers to US Dollars.

Page 11: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

NINTH QUARTERLY PROGRESS REPORT Page 4

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

7th Payment Contract No.: MOWRAM/ICB-CW04 $ 888,169

1st Payment Contract No.: MOWRAM/ICB-CW06 $ 522,923

2nd Payment Contract No.: MOWRAM/ICB-CW06 $ 1,047,285

3rd Payment Contract No.: MOWRAM/ICB-CW06 $ 364,140

4th Payment Contract No.: MOWRAM/ICB-CW06 $ 1,223,078

5th Payment Contract No.: MOWRAM/ICB-CW06 $ 809,728

6th Payment Contract No.: MOWRAM/ICB-CW06 $ 609,637

Advance Payment Contract No.: MOWRAM/ICB-CW07 $ 522,428

1st Payment Contract No.: MOWRAM/ICB-CW07 $ 480,242

1st Payment Contract No.: MOWRAM/-CW08 $ 919,124

2nd Payment Contract No.: MOWRAM/-CW08 $ 552,009

3rd Payment Contract No.: MOWRAM/-CW08 $ 888,532

$ 26,410,706

(ii) Hydrometeorology Equipment ($1.411 million)  

Payment for 10% of total contract and 80% of goods from abroad $ 718,339

Payment 70% of construction and related services within the country $ 482,563

Payment for VAT of this contract $ 69,472

Final payment, 10% of total contract $ 141,093

$ 1,411,467

(iii) Office Equipment, Furniture, and Vehicles ($1.154 million)  

Initial Advance to Imprest Account $ 289,640

Full payment for PMU-VEH-01 $ 457,100

Payment for office repair $ 88,496

Payment for office equipment $ 5,360

Payment for office furniture $ 52,600

Payment for office repair (50% retention) $ 4,916

Payment for office equipment $ 133,342

Full payment for two vehicles $ 79,800

Full payment for 11 motor cycle $ 18,612

Full payment for IT office equipment $ 19,876

Payment for safe box $ 280

Payment for final retention for contract PMU-OW-01 $ 4,916

$ 1,154,939

(iv) Consulting services ($1.847 million)  

Initial Advance to Imprest Account $ 200,000

1st payment contract CS-01-PMIC for Feb-Apr 2016 $ 160,260

2nd payment contract CS-01-PMIC for May 2016 $ 87,941

3rd payment contract CS-01-PMIC for Jun 2016 $ 96,408

4th payment contract CS-01-PMIC for Jul 2016 $ 89,580

5th payment contract CS-01-PMIC for Aug-Oct 2016 $ 259,588

6th payment contract CS-01-PMIC for Nov 2016 $ 94,077

7th payment for withholding tax, Feb-Oct 2016 $ 95,575

8th payment for withholding tax, Nov-Dec 2016 $ 23,560

Page 12: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

NINTH QUARTERLY PROGRESS REPORT Page 5

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

9th payment for withholding tax, Jan 2017 $ 12,009

11th payment request for Dec 2016 $ 95,477

14th payment request for Jan 2017 $ 119,801

15th payment request for Feb 2017 $ 110,721

10th payment for withholding tax, Feb 2017 $ 9,008

12th payment request for Mar 2017 $ 50,025

13th payment request for Apr 2017 $ 70,782

16th payment request for May 2017 $ 65,024

20th payment for withholding tax for Mar-Jul 2017 $ 38,609

22th payment for withholding tax for Aug 2017 $ 8,122

17th payment request for Jun 2017 $ 87,976

21th payment request for Jul 2017 $ 73,102

$ 1,847,647

(v) Incremental operating cost ($0.112 million)  

Initial Advance to Imprest Account $ 40,360

Payment for operating cost, Apr-May 2016 $ 2,034

Payment for operating cost, Jun-Dec 2016 $ 10,656

Payment for operating cost, Jan- Mar 2017 $ 11,043

Payment for operating cost, Apr-Jun 2017 $ 10,186

Payment for operating cost, Jul-Sep 2017 $ 12,979

Payment for operating cost, Oct-Dec 2017 $ 25,401

$ 112,659

15. As shown in Appendix 5, a cumulative actual expenditure of $30.356 million (about 98.12% of total disbursement) has been incurred as of 31 March 2018, for the following:

(i) Civil works ($26.015 million)  

1st Payment Contract No.: MOWRAM/ICB-CW01 $ 2,510,242

2nd Payment Contract No.: MOWRAM/ICB-CW01 $ 1,647,993

3rd Payment Contract No.: MOWRAM/ICB-CW01 $ 365,363

4th Payment Contract No.: MOWRAM/ICB-CW01 $ 386,853

5th Payment Contract No.: MOWRAM/ICB-CW01 $ 458,876

6th Payment Contract No.: MOWRAM/ICB-CW01 $ 2,619,788

7th Payment Contract No.: MOWRAM/ICB-CW01 $ 658,806

8th Payment Contract No.: MOWRAM/ICB-CW01 $ 534,639

9th Payment Contract No.: MOWRAM/ICB-CW01 $ 826,775

10th Payment Contract No.: MOWRAM/ICB-CW01 $ 418,722

11th Payment Contract No.: MOWRAM/ICB-CW01 $ 953,189

1st Payment Contract No.: MOWRAM/ICB-CW03 $ 264,264

2nd Payment Contract No.: MOWRAM/ICB-CW03 $ 221,886

3rd Payment Contract No.: MOWRAM/ICB-CW03 $ 329,158

4th Payment Contract No.: MOWRAM/ICB-CW03 $ 160,530

5th Payment Contract No.: MOWRAM/ICB-CW03 $ 121,331

Page 13: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

NINTH QUARTERLY PROGRESS REPORT Page 6

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

6th Payment Contract No.: MOWRAM/ICB-CW03 $ 516,340

7th Payment Contract No.: MOWRAM/ICB-CW03 $ 219,653

1st Payment Contract No.: MOWRAM/ICB-CW04 $ 1,338,356

2nd Payment Contract No.: MOWRAM/ICB-CW04 $ 906,065

3rd Payment Contract No.: MOWRAM/ICB-CW04 $ 846,191

4th Payment Contract No.: MOWRAM/ICB-CW04 $ 701,466

5th Payment Contract No.: MOWRAM/ICB-CW04 $ 277,723

6th Payment Contract No.: MOWRAM/ICB-CW04 $ 299,203

7th Payment Contract No.: MOWRAM/ICB-CW04 $ 888,169

1st Payment Contract No.: MOWRAM/ICB-CW06 $ 522,923

2nd Payment Contract No.: MOWRAM/ICB-CW06 $ 1,047,285

3rd Payment Contract No.: MOWRAM/ICB-CW06 $ 364,140

4th Payment Contract No.: MOWRAM/ICB-CW06 $ 1,223,078

5th Payment Contract No.: MOWRAM/ICB-CW06 $ 809,728

6th Payment Contract No.: MOWRAM/ICB-CW06 $ 609,637

Completion pmt. contr. MOWRAM-CW06 $ 15,005

1st Payment Contract No.: MOWRAM/ICB-CW07 $ 592,079

1st Payment Contract No.: MOWRAM/ICB-CW08 $ 919,124

2nd Payment Contract No.: MOWRAM/ICB-CW08 $ 552,009

3rd Payment Contract No.: MOWRAM/ICB-CW08 $ 888,532

$26,015,121

(ii) Hydrometeorology Equipment ($1.411 million)  

Payment for 10% of total contract and 80% of goods from abroad $ 718,339

Payment 70% of construction and related services within the country $ 482,563

Payment for VAT of this contract $ 69,472

Final payment 10% of total contract $ 141,093

$ 1,411,467

 (iii)          Office equipment, furniture and vehicles ($0.871 million)   

Full payment for PMU-VEH-01 $ 457,100

Payment for office repair $ 88,496

Payment for office equipment $ 5,360

Payment for office furniture $ 52,600

Full payment for 11 motorcycles $ 18,612

Payment for office repair (50% retention) $ 4,916

Payment for office equipment $ 133,342

Full payment for IT office equipment $ 19,876

Full payment for two vehicles $ 79,800

Payment for safe box $ 280

Payment for office repair (final 50% retention) $ 4,916

Payment 90% for completed supply of licensed Accounting Software $ 5,238

Final payment 10% for completed supply of licensed Accounting software $ 582

$ 871,119

(iv) Consulting services ($1.919 million)  

Page 14: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

NINTH QUARTERLY PROGRESS REPORT Page 7

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

1st payment contract CS-01-PMIC for Feb-Apr 2016 $ 160,260

2nd payment contract CS-01-PMIC for May 2016 $ 87,941

3rd payment contract CS-01-PMIC for Jun 2016 $ 96,408

4th payment contract CS-01-PMIC for July 2016 $ 89,580

5th payment contract CS-01-PMIC for Aug-Oct 2016 $ 259,588

6th payment contract CS-01-PMIC for Nov 2016 $ 94,077

7th payment for withholding tax Feb-Oct 2016 $ 95,575

8th payment for withholding tax Nov-Dec 2016 $ 23,560

9th payment for withholding tax Jan 2017 $ 12,009

10th payment for withholding tax Feb 2017 $ 9,008

11th payment request for Dec 2016 $ 95,477

12th payment request for Mar 2017 $ 50,025

13th payment request for Apr 2017 $ 70,782

14th payment request for Jan 2017 $ 119,801

15th payment request for Feb 2017 $ 110,721

16th payment request for May 2017 $ 65,024

17th payment request for Jun 2017 $ 87,976

20th payment, withholding tax for Mar-Jul 2017 $ 38,609

21th payment request for Jul 2017 $ 73,102

22th payment, withholding tax for Aug 2017 $ 8,122

23th payment request for Aug 2017 $ 63,270

24th payment, withholding tax for Sep 2017 $ 3,471

25th payment request for Sep 2017 $ 27,648

26th payment, withholding tax for Oct 2017 $ 5,938

27th payment request, Oct 2017 $ 46,579

28th payment, withholding tax for Nov 2017 $ 3,518

29th payment, withholding tax for Dec. 2017 $ 5,633

30th payment, withholding tax for Jan 2018 $ 4,865

31st payment, withholding tax for Feb 2017 $ 4,424

32nd payment, withholding tax for Nov 2017 $ 25,699

33rd payment, withholding tax for Dec 2017 $ 43,515

34th payment request for Jan 2018 $ 37,633

$ 1,919,841

(v) Incremental operating cost ($0.138 million)  

Payment for operating cost, Apr-May 2016 $ 2,034

Payment for operating cost, Jun-Sep 2016 $ 13,677

Payment for operating cost, Oct-Dec 2016 $ 18,433

Payment for operating cost, Jan-Mar 2017 $ 3,331

Payment for operating cost, Apr-Jun 2017 $ 5,380

Payment for operating cost, Jul-Sep 2017 $ 21,711

Payment for operating cost, Oct-Dec 2017 $ 17,201

Payment for operating cost, Jan-Mar 2018 $ 56,863

$ 138,629

Page 15: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

NINTH QUARTERLY PROGRESS REPORT Page 8

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

16. The advance payment to the CW07 contractor ($0.522 million), which was paid directly by ADB, is not considered an expense as it has been recouped from the progress invoices/ billings of the contractor in the amount of $0.111 million. The disbursed fund balance of $0.155 million (0.51%) remains in the project’s imprest account. These amounts are excluded: advance payment to the contractor (0.410 million), advance payment for FWUC activity ($14,400), and expenditure of completion payment for CW-06 ($15,005) which has not been replenished yet.

IV. IMPLEMENTATION PROGRESS

17. The physical completion of the project is indicated as a percentage derived from the estimate of the weight contributed by each activity as a percentage of the total project, consistent with the S-curve concept. Appendix 6 shows the project activities and the assigned corresponding weights contributed by each activity towards the project as a whole. As of 31 March 2018, physical completion was estimated at 69.58%, while the time elapsed from effectiveness date was 38.91%.

18. Appendix 7 gives the status of compliance with the loan covenants. Among 28 items in the list, four had been complied with, 21 are being complied with, and the remaining three are yet to be complied with, as of 31 March 2018. Appendix 8 presents the monitoring and reporting format for the GAP, which was prepared by the Gender Specialist. Activities for mainstreaming of gender development have been conducted in subprojects since the new Gender Specialist was recruited and mobilized.

A. Output 1: Enhanced Efficiency and Climate Resilience of Irrigation Systems

19. Appendix 9 presents the accomplishments during the reporting period against the plan of CW04.

1. TK Subproject

20. TK main canal (MC) (MOWRAM-CW01). This package was fully completed in December 2017, and the one-year defects liability period will end in December 2018. With the approval of the final inspection report, the Taking Over Certificate was issued to the contractor on 7 March 2018.

21. Chroab distribution system (MOWRAM-CW03). This package was fully completed in February 2018 after the completion date was rescheduled from 22 December 2017 to 28 February 2018 due to a variation order (VO), and the one-year defects liability period will end in February 2019.

22. Korkoah distribution system (MOWRAM-CW04). The distribution system was designed to serve 2,120 ha and is composed of two secondary canals (SCs) with a total length of 5.54 km, 16 tertiary canals (TCs) with lengths ranging from 200–500 meters (m) for a total TC length of 6.55 km, and 233 structures. The civil works contract for the upgrading, modernization, and extension of the Korkoah SCs and TCs of the TK irrigation system was signed with Seak Chheav Leng Enterprise Co., Ltd. on 27 December 2016 for a total amount of $5.88 million. Based on requests from farmers and local authorities, as well as the need for improved scheme function, some of the works had been deducted and added through VO1. The amount increased by $2.107 million, for a new contract price of $7.98 million, for an increase of 35.84% compared to the original contract amount of $5.88 million. The completion date remains the same, i.e., 20 June 2018.

Page 16: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

NINTH QUARTERLY PROGRESS REPORT Page 9

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

23. As of 31 March 2018, the reported accomplishment was 87.70% against the plan of 92.18%. The total unskilled labor complement for the Korkoah distribution system comprised 57 persons, of whom 18 (about 32%) are female unskilled workers. To date, the contractor has submitted 1,675 test results for materials, as follows: (i) embankment/canal, 1,224 tests: 1,176 passed, 48 failed; (ii) laterite wearing course, 66 tests, 62 passed, four failed; (iii) concrete coarse aggregates, three tests, all passed; (iv) concrete fine aggregates, two tests, both passed; (v) water for concrete, three tests, all passed; (vi) cement, two tests, both passed; (vii) fresh and hardened concrete, 375 tests, 370 passed, 5 failed; and (viii) concrete reinforcing steel bars, 12 tests, all passed.

2. PC Subproject

24. Appendix 10 presents the accomplishments during the reporting period against the plans for CW-07 and CW-08

25. PC MC and headworks (MOWRAM-CW06). This package was fully completed in August 2017, and the one-year defects liability period will end in August 2018. With the approval of the final inspection report, the Taking Over Certificate was issued to the contractor on 11 September 2017.

26. PC Package 1 (MOWRAM-CW07). Distribution system, Package 1, was designed to serve 7,798 ha. It is composed of three SCs with a total length of 21.7 km and 23 TCs with lengths ranging from 300–1,000 m, for a total length of 11.7 km, and 394 structures. The civil works contract for the upgrading, modernization, and extension of SCs and TCs of the PC irrigation system (Package1-CW07) was signed with Anhui Shui’an Construction (Cambodia) Co., Ltd. and MTA Construction Co., Ltd. JV on 5 May 2017for a total amount of $5.54 million.

27. As of 31 March 2018, the reported accomplishment was 60.24% against the plan of 71.16%. The total unskilled labor complement of the distribution system comprised 68 persons, 16 (about 24%) of whom are female unskilled workers. To date, the contractor has submitted 1,452 test results for materials, as follows: (i) embankment/canal, 1,388 tests, all passed; (ii) laterite wearing course, one test, passed; (iii) concrete coarse aggregates, one test, passed; (iv) concrete fine aggregates, one test, passed; (iv) fresh and hardened concrete, 59 tests, all passed; and (v) concrete reinforcing steel bars, 2 tests, all passed.

28. PC Package 2 (MOWRAM-CW08). Distribution system, Package 2, was designed to serve 3,560 ha. It is composed of an 8.50-km SC, 16 TCs with lengths ranging from 300–1,000 m for a total length of 15.90 km, and 453 structures. The civil works contract for the upgrading, modernization, and extension of SCs and TCs of the PC irrigation system (Package1-CW08) was signed with Soeun Soknan Construction Co., Ltd. on 20 July 2017 for a total amount of $4.36 million. Based on the request of farmers and authorities and the need for scheme function, some additional works were proposed through VO1, which was approved on 12 March 2018.

29. As of 31 March 2018, the reported accomplishment of this package was about 75% against the plan of 71.28%. The total unskilled laborers engaged for the distribution system comprised 75 persons, of whom 15 (20%) are female unskilled workers. To date, the contractor has submitted 1,465 test results for materials, as follows: (i) embankment/canal, 1,288 tests: 1,286 passed, 2 failed; (ii) concrete coarse aggregates, one test, passed; (iii) concrete fine aggregates, one test, passed; (iv) cement, two tests, both passed; (v) fresh and hardened concrete, 158 tests, all passed; and (vi) concrete reinforcing steel bars, 2 tests, both passed.

3. OKN Subproject (CW05)

30. The Bid Evaluation Report (BER) was reviewed by the PRC and submitted to ADB CARM for review and approval.

Page 17: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

NINTH QUARTERLY PROGRESS REPORT Page 10

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

B. Output 2: Improved Water Resource Management

31. FWUC formation and development. Due to the lack of interest of national consulting firms or nongovernment organizations (NGOs) to provide the required services, as indicated by the submission of only two expressions of interest (EOIs) after three advertisements, it was suggested by PMU that the formation and development of FWUCs be handled instead by the MOWRAM-DFWUC with support from PMU and PMIC. This proposal was approved by ADB, and the work plan has been revised, with FWUC formation expected to be completed by May, instead of June, 2018. Of the eight steps involved in the FWUC formation process, the accomplishments during the reporting period were: (i) completion of activities until Step 8.1: “Meeting to sign the finalization of FWUC” in KT Province; and (ii) completion until Step 4.2: “Election of FWUC” in BTB Province.

32. Meetings and discussions were held with the farmers, community elders, and DFWUC on their roles and responsibilities in the O&M of the TK system prior to development of the Tripartite Agreement. The Draft Tripartite Agreement for the TK irrigation system was subsequently prepared and submitted to PMU for further comments.

33. Training needs assessments (TNAs) were conducted among MOWRAM and PDWRAM staff in KT and BTB provinces. Training of Trainers (TOT) on Module 1 (UIWRMSP Project Orientation) was conducted from 24-27 January 2017, and TOT on Module 2 (FWUC Organizational Building and Management) was held from 7-10 February 2017 in KT Province, with participants from MOWRAM and the PDWRAMs of KT and BTB. The TOT aimed to enable MOWRAM and PDWRAM trainers to train the FWUCs to undertake their work in an efficient and effective manner and handle FWUC development themselves.

34. As of 31 March 2018, the DFWUC teams have organized meetings with target farmers and local authorities to discuss the election of FWUSGs and FWUGs as well as the FWUC statute. They also trained FWUCs on their responsibilities and how to develop a five- year work plan, record the land areas of target farmers, and disseminate the process of FWUC formation (see Appendix 11).

35. Design and implementation of JOROP of linked systems in KT and BTB. Hydrographic surveys of the TK and Stung Chinit reservoirs in KT Province and of the Bassac and Dauntri reservoirs in BTB were completed, and the necessary data collected and analyzed. The conceptual design, Interim Report, and Operational Model User Manual for the JOROP of TK and Stung Chinit reservoirs were also prepared and submitted to PMU.

36. O&M study. This study is based on the analysis of data collected by MOWRAM under the Cambodian Irrigation Schemes Information System (CISIS). The draft report has been submitted to PMU for review and comments. The analysis focused on the physical condition and performance of the concerned irrigation systems in 25 provinces of the country and estimated the financial requirements of the O&M of all the systems.

C. Project Management

37. Involuntary resettlement (IR). An assessment of resettlement issues was conducted for CW01, CW02, CW03, CW04, CW05, CW06, CW07, and CW08. The results of the assessment indicated that there was no significant land acquisition in CW01, CW04, CW05, CW06, CW07, and CW08. Therefore, those were categorized as Category C. However, CW02 was categorized as Category A as most of AHs did not agree to donate their land to the project after several consultations with farmers and local authorities. As a result, CWO2 was officially dropped. CW03 was re-categorized from the initial Category B to Category C after 95% of the affected households (AHs) (except six out of 124 AHs) agreed to donate their land to the project after the design was revised to minimize IR impacts.

Page 18: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

NINTH QUARTERLY PROGRESS REPORT Page 11

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

38. Environmental safeguards. The Environmental Management Plan (EMP) for CW03, CW04, CW07, and CW08, as well as the checklists for monitoring EMP implementation in the PC and TK schemes, were prepared by the national Environment Specialist, and the Environmental Impact Categorization (EIC) reports were approved by PMU and ADB. The EIC report for CW05 was prepared and incorporated in the revised FS report and bidding documents, which has been approved by ADB. The initial environmental examination (IEE) report for PC and TK distribution systems has been updated and approved by PMU and ADB. The first and second six-monthly environmental monitoring reports (EMRs) had been submitted to PMU and ADB for review and approval. Field visits have been conducted regularly to train staff, monitor EMP implementation, and make recommendations to solve environmental issues. The quarterly EMR will be prepared in mid- April 2018.

39. Project performance management system (PPMS). As of 31 March 2018, the following reports have been submitted to PMU and ADB: (i) PPMS Framework and Procedures (PPMS F&P) Report; (ii) QPRs 1-8; (iii) 4 PPMS reports; and (iv) annual reports for 2016 and 2017. This report is QPR9.

40. Financial management. The financial management system has been established and is functioning well, with corresponding forms developed for various PMU transactions. The ADB and RGC imprest accounts had been set up and are available for use.

41. As of 31 March 2018, the TK-CW04 contractor has submitted seven interim payment certificates (IPCs), all paid. The contractor for PC Package 1-CW07 received 10% advance payment and has submitted two IPCs, one has been paid and the other one is being processed. The PC Package 2-CW08 contractor has submitted three IPCs, all of which have been paid. Seven replenishments of the ADB imprest account have been requested, all paid. For the RGC imprest account, six replenishments have been requested, four paid, and the two remaining ones are being processed. Disbursements and payments are proceeding well, as described in Section III above.

42. Procurement. PMIC has been assisting PMU in the preparation of bid documents and bid invitations, organization of pre-bid meetings and bid opening, preparation of BERs, including technical and price bid evaluation; contract agreement and signing; and other related activities.

43. As of 31 March 2018, six out of eight civil works contracts (CW02 was officially dropped) have been awarded (CW01, CW06, CW03, CW04, CW07, and CW08), while CW05 is being processed – the bidding documents are being reviewed by PRC.

44. Project website. Data have been updated and uploaded on the project website (www.uplands-irrigation-mowram.gov.kh). The web designer, who resigned, has been replaced.

45. Deployment of consultants. From January–March 2018, 13 consultants were mobilized (2 international and 11 national) for a total of 25.6 person-months (p-m). The cumulative consultant input to date is 356.6 p-m or 44.8% of the total contracted person-months (Appendix 12).

V. ISSUES AND ACTIONS TAKEN

A. Actions Taken on Issues Reported in QPR8, 2017

46. The suggestion for FWUC formation and capacity building to be handled by the DFWUC of MOWRAM was approved by the PRC and ADB. Since then, DFWUC has formed teams responsible for FWUC formation and development. The teams have organized

Page 19: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

NINTH QUARTERLY PROGRESS REPORT Page 12

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

meetings with target farmers and local authorities to discuss the election of FWUSGs and FWUGs, as well as the FWUC statute, and trained FWUCs on their responsibilities and on how to develop their five-year work plan.

B. Current Issues and Actions Taken

47. In PC Package-1, CW-07, there were some issues, such as lack of personnel, machinery, and equipment, which have affected the quality of construction works and the completion date of this package. The overall situation is being observed and appropriate actions have been taken to address the issues.

48. CW-05, OKN irrigation distribution system, was delayed due to the revision of the FS report and the review of the BER by PRC. The communities along CW-04 have requested improved scheme function of the TK Korkoh subproject (see para. 21). Package 2–CW08, also requested for additional civil works, and the proposal for VO1 was been approved on 12 March 2018.

VI. ACTIVITIES IN THE NEXT QUARTER

49. In Output 1, the following activities are planned for implementation in the next quarter:

Taing Krasaing Scheme

o Chroab (CW03): Continue to conduct final inspection and subsequently issue the Taking

Over Certificate to the contractor. o Korkoah (CW04): Supervise the construction of upgrading, modernization, and extension of

Korkoah distribution system.

Prek Chik Scheme

o Package 1 (CW07): Supervise the construction of upgrading, modernization, and extension of

the distribution system. o Package 2 (CW08): Supervise the construction of upgrading, modernization, and extension of

the distribution system.

O Kra Nhak Subproject (CW05)

o Prepare contract agreement and other related documents; and o Supervise the contractor’s mobilization and construction works after the

contract is signed.

Improvement of O Tracheak Chit Reservoir (CW09)

o Conduct topographical survey for detailed design; o Prepare detailed design once the topographical data are available; and o Prepare tender documents.

50. In Output 2, the following activities are planned for the next quarter:

Social safeguards

o Monitor EMP implementation in all subprojects; and o Monitor GAP implementation in all subprojects.

FWUC formation and development

Page 20: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

NINTH QUARTERLY PROGRESS REPORT Page 13

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

o Assist the DFWUC of MOWRAM in FWUC formation in the TK, PC, and OKN areas and in preparing FWUC formation reports.

Joint Reservoir Operation for TK and PC

o Finalize the JOROP Study for Stung Chinit and TK reservoirs; o Test and justify the JOROP Operation Model User Manual for Stung Chinit and

TK reservoirs.

O&M Study and Tripartite Agreement

Prepare O&M plan for TK; and Facilitate and finalize tripartite agreement based on ADB’s comment.

Installation of hydromet stations in the watersheds and flow measurement

networks in the irrigation systems

o Continue to check the operation of, and fix any problem encountered in, the automatic hyrdromet station (AHS), automatic weather station (AWS), and Acoustic Doppler Current Profiler (ADCP) devices.

River flow measurement for developing the rating curve

o Prepare tender documents; and o Select service provider to supply equipment and tools for flow measurement.

Page 21: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDICES

Page 22: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 1:

PROJECT LOCATION MAP

Page 23: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 1: PROJECT LOCATION MAP Page 1

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

PROJECT LOCATION MAP

Page 24: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 2:

DESIGN AND MONITORING FRAMEWORK (DMF)

Page 25: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 2: DESIGN AND MONITORING FRAMEWORK (DMF) Page 1

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

DESIGN AND MONITORING FRAMEWORK (DMF)

Design Summary Performance Targets and Indicators with Baselines

Progress Assessment to 31 March 2018 Remarks/

Recommendation Impact

Inclusive economic growth through agriculture and irrigation

The project is aligned with the Government’s "Rectangular Strategy for Growth, Employment, Equity, and Efficiency, Phase III”

Outcome Enhanced water and agriculture productivity in the project areas

By 2022: Average annual crop production increased to 4.25 tons per ha (2015 baseline: 1.65 tons/ha)

Assessment will be undertaken after completion of construction work and during the operation of the irrigation systems.

Outputs 1. Efficiency and

climate resilience of irrigation systems in the project areas enhanced

By 2021: 1a. Irrigation infrastructures

improved, modernized, and made climate-resilient. Dry- and wet- season cultivated area increased to 29,500 (2015 baseline: 13,500 ha)

TK main canal (CW01),

(CW03) and PC main canal (CW06) has been fully completed.

Civil works for upgrading, modernizing and extending of Korkoah (CW04), PC Package 1 (CW07), and Package 2 (CW08) distribution systems are ongoing.

Physical accomplishments: CW04,

87.70%; CW07, 60.24%; and CW08, about 75%.

CWO2 was officially dropped as most of AHs did not agree to donate their land to the project.

1b. Irrigation efficiency of three irrigation systems increased by 100% (2015 baseline: 20%)

Assessment will be undertaken after completion of construction work and during the operation of the irrigation systems.

1c. Drainage facilities for 1,800 ha improved

Improvement of drainage facilities of PC and TK schemes is ongoing.

Assessment will be undertaken after completion of construction

Page 26: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 2: DESIGN AND MONITORING FRAMEWORK (DMF) Page 2

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

Design Summary Performance Targets and Indicators with Baselines

Progress Assessment to 31 March 2018 Remarks/

Recommendation (2015 baseline: 0 ha) work and during the

operation of the drainage facilities.

1d. 2,000 ha of land leveled by laser leveling in coordination with MAFF (2015 baseline: 0 ha)

This activity is kept on hold.

1e. 21,000 ha land improved through irrigation, drainage, and/or flood protection.

Assessment will be undertaken after completion of construction work and during the operation of the irrigation, drainage, and flood protection facilities.

1f. 25% of unskilled laborers in civil works are women.

TK distribution system: Korkoah CW04, 32%; CW07, 24%; and CW08, 20%.

2. Water resource management improved

By 2021: 2a. Three FWUCs formed and

trained (2015 baseline: 0)

Due to the lack of interest from service providers, PMU suggested that the MOWRAM FWUC Department be tasked to handle FWUC formation and capacity building.

The DFWUC Team organized

meetings with target farmers and local authorities to discuss the election of FWUSGs and FWUGs, FWUC statute, and trained FWUCs on their responsibilities and on how to develop the five-year work plan.

2b. 30% of FWUC members are women (2015 baseline: 0)

Being complied with.

2c. 30% of FWUC management committee members are women (2015 baseline: 0)

To be complied with during FWUC formation.

2d. Annual O&M plan prepared during design of each irrigation system.

The proposal for the activities and cost estimates for the development of the tripartite agreement (including O&M

Page 27: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 2: DESIGN AND MONITORING FRAMEWORK (DMF) Page 3

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

Design Summary Performance Targets and Indicators with Baselines

Progress Assessment to 31 March 2018 Remarks/

Recommendation plan) for TK irrigation system has been approved.

2e. O&M funds allocated by the government for main canals and reservoirs.

To be complied with after the completion of civil works and O&M plan.

2f. Eight hydro-meteorological stations installed in the watersheds (2015 baseline: 0)

15 AWSs and 15 AHSs have been installed, and field inspection has been conducted to fix the devices that were not working properly.

Page 28: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 3:

LIST OF AWARDED CONTRACTS

Page 29: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 3: LIST OF AWARDED CONTRACTS Page 1

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

LIST OF AWARDED CONTRACT

Paid

up to 31 Mar 18Civil Works

MOWRAM‐CW01 ‐ Taing Krasaing Main Canal and Headworks Ongoing 27‐Jan‐16        10,521,268.05 

Add: Variation order no.1 09‐Jun‐16            1,485,948.73 

Deduct: Variation order no.2 14‐Sep‐16        (1,200,721.69)

Add: Variation order no.3 26‐Jul‐17            1,101,747.04 

Add: Variation order no.4  13‐Nov‐17               185,776.92 

Final Contract Amount CW01        12,094,019.05       11,381,246.10           712,772.95 

MOWRAM‐CW06 ‐ Prek Chik Main Canal and Headworks Completed 26‐Feb‐16           3,499,407.63 

Add: Variation order no.1 09‐Jun‐16           1,922,345.34 

Deduct: Variation order no.2 14‐Sep‐16             (542,175.30)

Variation order no.3 09‐Aug‐17                                ‐   

Final Contract Amount CW06           4,879,577.67          4,591,795.94           287,781.73 

MOWRAM‐CW03 ‐ TK_Chorab Ongoing 27‐Dec‐16           1,938,956.89 

Add: Variation order no.1 24‐Nov‐17              246,763.26 

Final Contract Amount CW03           2,185,720.15          1,833,162.58           352,557.57 

MOWRAM‐CW04 ‐ TK_Korkoah Ongoing 27‐Dec‐16           5,879,592.80 

Add: Variation order no.1 24‐Nov‐17           2,107,539.57 

Final Contract Amount CW04           7,987,132.37         5,257,172.19        2,729,960.18 

MOWRAM‐CW07 ‐ PC_Package 1 Ongoing 05‐May‐17           5,542,927.18             592,078.94        4,950,848.24 

MOWRAM‐CW08 ‐ PC_Package 2 Ongoing 20‐Jul‐17           4,365,728.38 

Add: Variation order no.1           2,758,991.77 

Final Contract Amount CW08           7,124,720.15         2,359,664.90        4,765,055.25 

TOTAL CIVIL WORKS        39,814,096.57        26,015,120.65     13,798,975.92 

Balance

Contract Awarded/Committed

‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ In US $  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐

Category Name / Detailed DescriptionStatus / 

RemarksDate of Contract  

AwardedAmount

Page 30: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 3: LIST OF AWARDED CONTRACTS Page 2

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

Hydrometeorology Equipment

PMU - HME - 01 - Hydrometeorological Equipment Completed 31‐May‐16           1,410,933.00          1,411,467.01                 (534.01)

TOTAL Hydrometeorology Equipment           1,410,933.00          1,411,467.01                  (534.01)

Office equipment, furniture and vehicles

PMU ‐ OF ‐ 01 ‐ Office Furniture Completed 28‐Jan‐16                 52,600.00               52,600.00                             ‐  

PMU ‐ OE ‐ 01 ‐ Office Equipment(Lot1) Completed 03‐Feb‐16             133,342.00             133,342.00                             ‐  

PMU ‐ OE ‐ 01 ‐ Office Equipment(Lot2) Completed 05‐Feb‐16                  5,360.00                 5,360.00                             ‐  

PMU - VEH - 01 - Vehicles 29‐Jan‐16              457,100.00              457,100.00                             ‐  

Add: Variation order no.1 23‐Aug‐16                 79,800.00                79,800.00                             ‐  

Final Contract Amount             536,900.00             536,900.00                             ‐  

PMU ‐  VEH ‐ 01 ‐ Motorcycles Completed 05‐Aug‐16                 18,612.00               18,612.00                             ‐  

PMU ‐ OE ‐ 02 ‐ Office Equipment Completed 05‐Aug‐16                 19,876.00               19,876.00                             ‐  

PMU‐OW‐01‐ Office Repairs Completed 25‐Jan‐16                 98,329.00               98,329.00                             ‐  

Other‐Office Furniture Completed N/A                       280.00                     280.00                             ‐  

PMU ‐ SOF ‐ 01 ‐ Accounting software Completed 07‐Feb‐18                  5,820.00                 5,820.00                             ‐  

TOTAL OFFICE FURNITURE, EQUIPMENT AND VEHICLE              871,119.00              871,119.00                             ‐  

Consulting servicesCS - 01 - PMIC - Project Management and Implementation Consultants Ongoing 29‐Jan‐16           4,251,571.00 

Deduct: Amendment no.4 10‐Apr‐17            (179,802.00)

04.1)-Topographic Maps (Provisionals Sum),US$143,200 Completed 03‐May‐16

04.2)-PMU-HRS-01 (Provisionals Sum), US$ 96,250 Completed 08‐Jun‐16

04.3)-National Economist (Provisionals Sum), US$ 5,100 Completed 05‐Jul‐17

TOTAL PMIC CONTRACT           4,071,769.00          1,919,840.60        2,151,928.40 

GRAND TOTAL        46,167,917.57        30,217,547.26     15,950,370.31 

Completed

Page 31: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 4:

SUMMARY OF DISBURSEMENTS

Page 32: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 5:

SUMMARY OF EXPENDITURES

Page 33: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 6:

PROJECT IMPLEMENTATION PROGRESS

Page 34: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 6: PROJECT IMPLEMENTATION PROGRESS Page 1

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

% of % of % of % ofQ1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Activity Total Activity Total

A. Output 1 - Enhanced efficiency & climate resilience of Irrigation Systems 60 75.84 45.5 228.02 45.31 Taing Krasaing Subproject 24 81.34 19.52 87.70 19.61

1. Construction supervision of MC and HW 6 100 6.00 100 6.002. Detailed design of secondary/tertiary canals 6 100 6.00 100 6.003. Procurement of civil works of SC/TC 4 100 4.00 100 4.004. Construction supervision of SC/TC 4 88.06 3.52 90.34 3.615. Commissioning & O&M of MC, SC/TC 2 0 0.00 0 0.006. Defect liability correction 2 0 0.00 0 0.00

2 Prek Chik Subproject 24 74.94 17.98 73.65 17.681. Construction supervision of MC and HW 6 100 6.00 100 6.002. Detailed design of secondary/tertiary canals 6 100 6.00 90 5.403. Procurement of civil works of SC/TC 4 100 4.00 90 3.604. Construction supervision of SC/TC 4 49.61 1.98 66.89 2.685. Commissioning & O&M of MC, SC/TC 2 0 0.00 0 0.006. Defect liability correction 2 0 0.00 0 0.00

3 O Kra Nhak Subproject 12 66.67 8.0 66.67 8.01. Feasibility study 3 100 3.00 100 3.002. Detailed engineering design 3 100 3.00 100 3.003. Procurement of civil works 2 100 2.00 100 2.004. Construction supervision 2 0 0.00 0 0.005. Commissioning & O&M of subproject 1 0 0.00 0 0.006. Defect liability correction 1 0 0.00 0 0.00

B. Output 2 - Improved water resources management 25 41.12 10.3 54.00 13.51. Formation and development of FWUC 4 35 1.40 80 3.202. JOROP Study/Adoption, Taing Krasaing 4 95 3.80 100 4.003. JOROP Study/Adoption, Prek Chik 4 50 2.00 60 2.404. Installation of hydromet and AW stations 2 100 2.00 100 2.005. Installation of flow-measurement network 3 0 0.00 10 0.306. Irrigation efficiency & water productivity study 2 0 0.00 0 0.007. Improvement plans of O&M of Irrigation Systems 2 0 0.00 0 0.008. Assistance in the conduct of laser land leveling 2 4 0.08 20 0.409. Training of PDWRAM and FWUC on O&M 2 50 1.00 60 1.20

C. Project Management 15 68.85 10.3 71.95 10.81. Establish financial management system 2 100 2.00 100 2.002. Procurement of goods, services and works 2 84 1.68 85 1.703. Preparation of guidelines, TOR, and procedures 1 100 1.00 100 1.004. Project performance management system, PPMS 3 75 2.25 80 2.405. Compliance to safeguards and loan covenants 1 85 0.85 90 0.906. Capacity building and transfer of technology 2 40 0.80 50 1.007. Field works of consultants 4 44 1.75 44.8 1.79

Total Estimated Physical Progre 100 66.1 69.58

Time elapsed from effectiveness date= 34.5 % 38.91 %

Component / ActivityYear / Quarter

% Weight

as of 31-Dec-17 as of 31-Mar-182016 2017

PROJECT IMPLEMENTATION PROGRESS

Page 35: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 7:

MONITORING/REPORTING FORM FOR THE STATUS OF COMPLIANCE WITH LOAN COVENANTS

Page 36: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 7: MONITORING/REPORTING FORM FOR THE STATUS OF COMPLIANCE WITH LOAN COVENANTS Page 1

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

MONITORING/REPORTING FORM FOR THE STATUS OF COMPLIANCE WITH LOAN COVENANTS

No. Covenant Reference in Loan

Agreement Status of

Compliance Remarks

Execution of Project; Environmental, Social and Financial Matters 1. In the carrying out of the Project and operation of the Project facilities, the Borrower shall

perform or cause to be performed, all obligations set forth in Schedule 5 to this Loan Agreement.

Section 4.01, Article IV Being complied with

Implementation Arrangements 2. The Borrower shall ensure that the Project is implemented in accordance with the detailed

arrangements set forth in the PAM and RF, as applicable. Any subsequent change to the PAM shall become effective only after approval of such change by the Borrower and ADB. In the event of any discrepancy between the PAM and this Loan Agreement, the provisions of this Loan Agreement shall prevail.

Paragraph 1, Schedule 5 Complied with

Environment 3. The Borrower shall ensure or cause MOWRAM to ensure that the preparation, design,

construction, implementation, operation and decommissioning of the Project and all Project facilities comply with (a) all applicable laws and regulations of the Borrower relating to environment, health and safety; (b) the applicable principles and requirements sets forth in the SPS; and (c) all measures and requirements set forth in the EARF, IEE, the EMP, and any corrective or preventative actions set forth in a Safeguards Monitoring Report.

Paragraph 2, Schedule 5 Being complied with

4. The Borrower shall ensure or cause MOWRAM to ensure that no Subproject with Category A environmental as defined in the SPS is financed under the Project.

Paragraph 3, Schedule 5 Being complied with

Land Acquisition and Involuntary Resettlement 5. The Borrower shall ensure or cause MOWRAM to ensure that all land and all rights- of-way

required for the Project are made available to the Works contractor in accordance with the schedule agreed under the related Works contract and all land acquisition and resettlement activities are implemented in compliance with the RF and/or RPs based on (a) all applicable laws and regulations of the Borrower relating to land acquisition and involuntary resettlement; (b) the applicable principles and requirements set forth in the SPS; and (c) any necessary

Paragraph 4, Schedule 5 Being complied with

M&E Form no. 7

Version: September 2016

Reporting Date: _________________________________________ (quarterly)

Prepared by: ________________________________________________ PMU supported by PMIC

Page 37: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 7: MONITORING/REPORTING FORM FOR THE STATUS OF COMPLIANCE WITH LOAN COVENANTS Page 2

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

No. Covenant Reference in Loan

Agreement Status of

Compliance Remarks

corrective or preventative actions set forth in a Safeguards Monitoring Report as agreed by the Inter-Ministerial Resettlement Committee (IRC).

6. Without limiting the application of the SPS or the RP(s), the Borrower shall ensure or cause MOWRAM to ensure that no physical or economic displacement takes place in connection with the Project until:

(a) compensation and other entitlements have been provided to affected people in accordance with the RP(s); and

(b) a comprehensive income and livelihood restoration program is in place in accordance with the RP(s).

Paragraph 5, Schedule 5 Being complied with

7. The Borrower shall ensure or shall cause MOWRAM to ensure that no Subproject with Category A involuntary resettlement is financed under the Project.

Paragraph 6, Schedule 5 Being complied with

Indigenous Peoples 8. The Borrower shall ensure or cause MOWRAM to ensure that the Project does not have any

indigenous people’s impact, all within the meaning of the SPS. In the event that the Project does have any such impact, the Borrower shall take all steps required to ensure that the Project complies with the applicable laws and regulations of the Borrower and with the SPS.

Paragraph 7, Schedule 5 Complied with

Human and Financial Resources to Implement Safeguards Requirements

9. The Borrower shall make available or cause MOWRAM to make available necessary budgetary and human resources to fully implement the EARF, EMP, RF, and RP(s).

Paragraph 8, Schedule 5 Being complied with

Safeguards – Related Provisions in Bidding Documents and Works Contracts 10. The Borrower shall ensure or cause MOWRAM to ensure that all bidding documents and

Works contracts contain provisions that require contractors to: (a) comply with the measures relevant to the contractor set forth in the EMP and RP(s)

(to the extent they concern impacts on affected people during construction), and any corrective or preventative actions set forth in a safeguards monitoring report in compliance with EARF and RF;

(b) make available a budget for all such environmental and social measures; (c) provide MOWRAM with a written notice of any unanticipated environmental,

resettlement or indigenous peoples risks or impacts that arise during construction, implementation or operation of the Project that were not considered in the EMP and RP(s);

(d) adequately record the condition of roads, agricultural land, and other infrastructure prior to starting to transport materials and construction; and

(e) reinstate pathways, other local infrastructure, and agricultural land to at least their

Paragraph 9, Schedule 5 Being complied with

Page 38: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 7: MONITORING/REPORTING FORM FOR THE STATUS OF COMPLIANCE WITH LOAN COVENANTS Page 3

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

No. Covenant Reference in Loan

Agreement Status of

Compliance Remarks

pre-project condition upon the completion of construction.

Safeguard Monitoring and Reporting 11. The Borrower shall do the following or cause MOWRAM to do the following:

(a) submit semi-annual Safeguards Monitoring Reports to ADB and disclose relevant information from such reports to affected persons promptly upon submission;

(b) if any unanticipated environmental and/or social risks and impacts arise during construction, implementation or operation of the Project that were not considered in the EMP and RP(s), promptly inform ADB of the occurrence of such risks or impacts, with detailed description of the event and proposed corrective action plan; and

(c) report any actual or potential breach of compliance with the measures and requirements set forth in EMP or RP(s) promptly after becoming aware of the breach.

Paragraph 10, Schedule 5 Being complied with

12. The Borrower shall ensure that within six months of the Effective Date an external monitoring agency acceptable to ADB is recruited from the counterpart funds for social safeguards monitoring.

Paragraph 11, Schedule 5 Being complied with

Prohibited List of Investments 13. The Borrower shall ensure that no proceeds of the loans are used to finance any activity

included in the list of prohibited investment activities provided in Appendix 5 of the SPS. Paragraph 12, Schedule 5 Being complied with

Labor Standards, Health, and Safety

14. The Borrower shall ensure or cause MOWRAM to ensure that the core labor standards and the Borrower’s applicable laws and regulations are complied with during Project implementation. MOWRAM shall include specific provisions in the bidding documents and Works contracts requiring that the contractors, among other things: (a) comply with the Borrower’s applicable labor law and regulations and incorporate applicable workplace occupational safety norms; (b) do not use child labor; (c) do not discriminate workers in respect of employment and occupation; (d) do not use forced labor; (e) allow freedom of association and effectively recognize the right to collective bargaining; and (f) disseminate, or engage appropriate service providers to disseminate, information on the risks of sexually transmitted diseases, including HIV/AIDS, to the employees of contractors engaged under the Project and to members of the local communities surrounding the Project area, particularly women.

Paragraph 13, Schedule 5 Being complied with

15. The Borrower shall strictly monitor compliance with the requirements set forth in paragraph 12 above and provide ADB with regular reports.

Paragraph 14, Schedule 5 To be complied with

Gender and Development

16. The Borrower shall ensure or cause MOWRAM to ensure that (a) the GAP is implemented in accordance with its terms; (b) the bidding documents and Works contracts include relevant

Paragraph 15, Schedule 5 Being complied with

Page 39: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 7: MONITORING/REPORTING FORM FOR THE STATUS OF COMPLIANCE WITH LOAN COVENANTS Page 4

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

No. Covenant Reference in Loan

Agreement Status of

Compliance Remarks

provisions for contractors to comply with the measures set forth in the GAP, including a provision that requires contractors to recruit at least 25% women as unskilled labor; (c) adequate resources are allocated for implementation of the GAP; (d) progress on implementation of the GAP, including progress toward achieving key gender outcome and output targets, are regularly monitored and reported to ADB; and (e) key gender outcome and output targets include, but not limited to: (i) at least 30% of women participation during the presentation on project design and discussion and planning of water distribution and cropping plans; (ii) at least 30% women membership in FWUCs; (iii) at least 30% women representation in FWUC management committee; (iv) at least 25% of unskilled labor employed in Works construction at equal wages shall be women; (v) at least 50% of project training to FWUC be participated by women; and (vi) capacity building of women in management of FWUC affairs, operation and maintenance and water management.

Counterpart Support 17. The Borrower shall ensure that a counterpart fund necessary for the Project is provided on a

timely basis. Paragraph 16, Schedule 5 Being complied with

Operation and Maintenance 18. At the time of the design and cost estimate of each Subproject, the Borrower shall ensure that

operation and maintenance costs shall be estimated and maintenance plans shall be prepared by PDWRAM with support of the project management implementation consultants and involvement of the FWUCs, which shall form the basis of calculating the average annual irrigation service fees for the operation and maintenance of the distribution canals.

Paragraph 17, Schedule 5 Being complied with

19. After completion of each Subproject, the Borrower shall ensure that FWUCs collect adequate irrigation service fees to sustain the operation and maintenance of distribution canals in sound and functional order and provide additional counterpart funds to cover any shortfalls.

Paragraph 18, Schedule 5 To be complied with

20. Before and after the completion of the irrigation systems, the Borrower shall ensure that adequate counterpart funds are allocated each year and provided on a timely basis for the operation and maintenance of the main canals.

Paragraph 19, Schedule 5 To be complied with

21. Prior to award of the related Works contracts, PDWRAM shall sign MOUs with the respective FWUCs in accordance with the recently approved law on FWUCs. Each MOU shall outline (a) role and responsibilities of the FWUC; and (b) amount of irrigation service fee per hectare, which shall be determined during the design and cost estimation of each Subproject.

Paragraph 20, Schedule 5 Being complied with

22. Prior to the completion of the Taing Krasang main canal works, the Borrower shall ensure that a tripartite water allocation agreement has been signed between PDWRAM- Kampong Thom,

Paragraph 21, Schedule 5 Being complied with

Page 40: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 7: MONITORING/REPORTING FORM FOR THE STATUS OF COMPLIANCE WITH LOAN COVENANTS Page 5

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

No. Covenant Reference in Loan

Agreement Status of

Compliance Remarks

FWUCs and private land owners, which agreement clearly specifies the quantity, timing and duration of water to be supplied to the private land owners and the water charges to be paid by them.

Subproject Eligibility and Selection Criteria 23. The Borrower shall ensure and shall cause MOWRAM to ensure that all Subprojects are

selected in accordance with the procedures as described in the PAM, and shall meet the screening and eligibility criteria agreed between the Borrower and ADB and documented in the PAM. Specifically, the Borrower shall ensure or cause MOWRAM to ensure that each Subproject meets the following criteria:

Paragraph 22, Schedule 5 Complied with

(a) with category B or less in terms of environmental impact; (b) with category B or less in terms of involuntary resettlement impact; (c) with category C in terms of indigenous peoples impact; (d) irrigation system having low irrigation efficiency and water productivity, and scope for

substantial enhancement of both irrigation efficiency and water productivity; (e) involving only rehabilitation of existing systems or related schemes and should not

involve construction of new systems; (f) being located outside the Tonle Sap basin; (g) involving rehabilitation of both primary and secondary canals to ensure that water

reached the farm; (h) not being covered by other ongoing or proposed projects financed by ADB or any

other development partners; (i) beneficiaries including sharecroppers, poor farmers, and women farmers; and (j) being economically viable; and technically, socially and environmentally feasible with

the EIRR of each subproject being greater than 12%.

Being complied with

Grievance Redress Mechanism

24. Within six months of Effective Date, the Borrower shall ensure or cause MOWRAM to ensure that separate safeguards grievance redress mechanisms for environmental and social safeguards, acceptable to ADB, are established in accordance with the provisions of the EARF, IEE, EMP, RF and RP(s), within the timeframes specified in the relevant EARF, IEE, EMP, RF and RP(s), to consider safeguards complaints.

Paragraph 23, Schedule 5 Complied with

Governance and Anti-Corruption 25. The Borrower, MOWRAM and Project Provinces shall (a) comply with ADB’s Anti- corruption

Policy (1998, as amended to date) and acknowledge that ADB reserves the right to investigate directly, or through its agents, any alleged corrupt, fraudulent, collusive or coercive practice

Paragraph 24, Schedule 5 Being complied with

Page 41: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 7: MONITORING/REPORTING FORM FOR THE STATUS OF COMPLIANCE WITH LOAN COVENANTS Page 6

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

No. Covenant Reference in Loan

Agreement Status of

Compliance Remarks

relating to the Project; and (b) cooperate with any such investigation and extend all necessary assistance for satisfactory completion of such investigation.

26. The Borrower, MOWRAM and Project Provinces shall ensure that the anti-corruption provisions acceptable to ADB are included in all bidding documents and contracts, including provisions specifying the right of ADB to audit and examine the records and accounts of the executing and implementing agencies and all contractors, suppliers, consultants, and other service providers as they relate to the Project.

Paragraph 25, Schedule 5 Being complied with

Accounts, Records, and Financial Statements

27. (a) The Borrower shall (i) maintain separate accounts and records for the Project; (ii) prepare annual financial statements for the Project in accordance with accounting principles acceptable to ADB; (iii) have such financial statements audited annually by independent auditors whose qualifications, experience and terms of reference are acceptable to ADB, in accordance with international standards for auditing or the national equivalent acceptable to ADB; (iv) as part of each such audit, have the auditors prepare a report (which includes the auditors’ opinion on the financial statements, use of the Loan proceeds and compliance with the financial covenants of this Loan Agreement as well as on the use of the procedures for imprest fund and statement of expenditures) and a management letter (which sets out the deficiencies in the internal control of the Project that were identified in the course of the audit, if any); and (v) furnish to ADB, no later than 6 months after the end of each related fiscal year, copies of such audited financial statements, audit report and management letter, all in the English language, and such other information concerning these documents and the audit thereof as ADB shall from time to time reasonably request.

(b) ADB shall disclose the annual audited financial statements for the Project and the opinion of the auditors on the financial statements within 30 days of the date of their receipt by posting them on ADB’s website.

(c) The Borrower shall enable ADB, upon ADB's request, to discuss the financial statements for the Project and the Borrower's financial affairs where they relate to the Project with the auditors appointed pursuant to subsection (a)(iii) hereinabove, and shall authorize and require any representative of such auditors to participate in any such discussions requested by ADB. This is provided that such discussions shall be conducted only in the presence of an authorized officer of the Borrower unless the Borrower shall otherwise agree.

Section 4.02, Article IV Being complied with

Inspection

Page 42: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 7: MONITORING/REPORTING FORM FOR THE STATUS OF COMPLIANCE WITH LOAN COVENANTS Page 7

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

No. Covenant Reference in Loan

Agreement Status of

Compliance Remarks

28. The Borrower shall enable ADB's representatives to inspect the Project, the Goods and Works, and any relevant records and documents.

Section 4.03, Article IV Being complied with

Page 43: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 8:

MONITORING/REPORTING FORM FOR PROGRESS IN GAP IMPLEMENTATION

Page 44: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 8: MONITORING/REPORTING FORM FOR PROGRESS IN GAP IMPLEMENTATION Page 1

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

MONITORING/REPORTING FORM FOR PROGRESS IN GAP IMPLEMENTATION

M&E Form no. 6

Version: September 2016

Reporting Date: _________________ (quarterly)

Prepared by: _____________________________________ PMU Gender Officer supported by PMIC Gender Specialist

Activities, Indicators, and Targets. Achievement to Date

(This should include information on period of actual implementation, sex-disaggregated qualitative and quantitative updates (e.g. number of participating

women, women beneficiaries of services, etc.)

Issues and Challenges (Please include reasons why

an activity was not fully implemented, or if targets fall short, or reasons for delay,

etc.)

Output 1: Enhanced efficiency and climate resilience of irrigation systems in the project area

1.1 Orientation and training on construction work, such as on canal measurements and work specifications, should be provided to women to ensure the quality of construction work.

Undertaken in TK and PC by the contractors.

1.2 Women who can read and write are encouraged to be hired as record keepers.

All office support staff of PC contractor are women.

1.3 Orientation on gender equality should be provided to constructors.

Undertaken in TK and PC by PMIC Gender Specialist.

1.4 Gender equity and labor arrangements should be included in the contract of construction companies, i.e. at least 25% of unskilled labor will be given to local women during construction and there should be equal pay for equal work.

Included in contracts of contractors in TK and PC. Status of unskilled women laborers in both core subprojects:

GAP Time-frame

TK Subproject PC Subproject Contra

ct name

Total F (%) Contract name Total F (%)

Unskilled labors

QPR9

CW04

57

32

CW07 68 24

CW08 75 20

Average 71 22

1.5 At least 30% of women should participate during the presentation of project design and in the discussion and planning of the water distribution and cropping plans.

Being complied with.

Page 45: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 8: MONITORING/REPORTING FORM FOR PROGRESS IN GAP IMPLEMENTATION Page 2

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

Activities, Indicators, and Targets.

Achievement to Date (This should include information on period of actual implementation, sex-

disaggregated qualitative and quantitative updates (e.g. number of participating women, women beneficiaries of services, etc.)

Issues and Challenges (Please include reasons why

an activity was not fully implemented, or if targets fall short, or reasons for delay,

etc.)

1.6 Conduct meeting with women farmers separately (especially in early stage of the project) to ensure that their ideas will be collected in developing gender project plans.

Undertaken in TK and PC by PMIC Gender Specialist.

Output 2: Improved water resource management

2.1 Encourage both husband and wife to register as member in the FWUC to ensure that at least 30% of the members are women.

Being complied with in the process of FWUC formation.

2.2 Women, as FWUC members, are given equal opportunity with men to participate in project training.

Will be complied with as soon as FWUCs have been organized and training is conducted.

2.3 Develop the knowledge, communication and leadership skills of women members through awareness-raising and training to enable them to be leaders of FWUC.

Will be complied with when FWUC training is conducted.

2.4 At least 30% of FWUC management committee members, including design and construction committee, are women.

Will be complied with during FWUC organization.

2.5 Ensure that women will take part in the operations and maintenance activities with potential for payment or support for livelihood activity.

Will be complied with when FWUCs have been organized and O&M of irrigation system commences.

2.6 Provide coaching on gender awareness and leadership for the gender focal person to ensure that they are able to conduct training within MOWRAM and PDWRAM officials and to women FWUCs.

Will be complied with when training commences.

Page 46: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 9:

CONTRACT ADMINISTRATION MONITOR, TAING KRASAING SCHEME (CW04)

Page 47: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 9: CONTRACT ADMINISTRATION MONITOR, TAING KRASAING SCHEME (CW04) Page 1

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

As of Jan 17 As of Mar 17 As of Jun 17As of Apr 17 As of May 17As of Feb 17 As of Jul 17 As of Aug 17 As of Sep 17 As of Oct 17 As of Nov 17 As of Jan 18 As of Mar 18 As of Apr 18As of Feb 18As of Dec 17

6.889% 

20.547% 

30.055% 

40.893% 

46.401% 49.419% 

52.977% 54.465%  56.373% 

59.731% 

68.989% 

77.347% 

85.485% 

92.183% 

0.000% 

4.384% 

18.470% 

29.746% 

33.883% 

42.965% 

49.331% 52.765% 

55.980%  56.591% 58.240% 

60.650% 

66.58% 

73.21% 

80.50% 

87.70% 

CONTRACT ADMINISTRATION MONITOR, Contract No. CW04

Subproject S-Curve Planned vs. Actual (As of 31 March 2018)

Planned Actual

Page 48: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 10:

CONTRACT ADMINISTRATION MONITOR, PREK CHIK DISTRIBUTION SYSTEM (CW07 and CW08)

Page 49: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 10: CONTRACT ADMINISTRATION MONITOR, PREK CHIK DISTRIBUTION SYSTEM (CW07 AND CW08) Page 1

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

CONTRACT ADMINISTRATION MONITOR, PC PACKAGE 1 (CW07)

Subproject S-Curve Planned vs. Actual (As of 31 March 2018)

Planned Actual

As of 5 May 2017 As of 5 June 2017 As of 5 July 2017 As of 5 Augt 2017 As of 5 Nov 2017 As of 5 Dec 2017 As of 5 Jan 2018As of 5 Oct 2017 As of 5 Mar 2018As of 5 Sep 2017 As of 5 Feb 2018

0% 

0.27%  0.54% 

0.63% 0.72% 

0.80%  0.89% 12.80% 

27.00% 

42% 

56.10% 

71.16

0.00%  0.00% 0.31%  6.69% 

12.33%  13.22%  15.16% 18.06% 

30.75% 50.66% 

60.24

Page 50: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 10: CONTRACT ADMINISTRATION MONITOR, PREK CHIK DISTRIBUTION SYSTEM (CW07 AND CW08) Page 2

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

CONTRACT ADMINISTRATION MON ITOR, PC PACKAGE 2 (CW08)

Subproject S-Curve Planned vs. Actual (As of 31 March 2018)

Planned Actual

As of 4 Sep 2017 As of 4 Oct 2017 As of 4 Nov 2017As of 4 Aug 2017 As of 4 Dec 2017 As of 4 Jan 2018 As of 4 Feb 2018 As of 4 Mar 2018 As of 4 Apr 2018 As of 4

0.00%  2.66%  5.95%  10.18% 

20.67% 

33.64% 

46.60% 

58.31% 

71.28% 

83.82% 

0.00% 

12.04% 

21.71%  25.00% 

34.01% 

42.92% 

54.59% 

64.25% 

74.99% 

Page 51: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 11:

PROGRESS OF FWUC FORMATION AND DEVELOPMENT

Page 52: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 11: PROGRESS OF FWUC FORMATION AND DEVELOPMENT Page 1

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

Royal Government of Cambodia Nation Religion King

Ministry of Water Resources and Meteorology Department of Farmer Water Users Community

KAMPONG THOM PROVINCE

To : Project Director, Deputy Director General of Technical Affairs From : Teng Bora, Im Chenda, Sok Boren, and Nhoem Sorphea Subject : Back-to-Office Report, Mission Report to the province of Kampong Thom Taing

Krasaing Irrigation Scheme from 11-15 December 2017

Dear Sir:

As mentioned in subject above, we are pleased to inform the Deputy Director General of Technical Affairs and Project Director that, on 11 to 15 December 2017, the Task Force for Developing and Strengthening the Capacity of the FWUCs led the meeting on “Selection of SC Candidate Members” for Taing Krasaing Irrigation System located at Korkoah Commune, Chroab Commune and Taing Krasaing Commune.

A. Introduction

1. Project Summary

Uplands Irrigation and Water Resource Management Sector Project is a project that has received loans from the Asian Development Bank (ADB Loan 3289-CAM) through the Ministry of Water Resources and Meteorology and the Royal Government of Cambodia. The project objective is to support the Rectangular Strategy of the Royal Government of Cambodia Phase III to promote national economic growth through the rehabilitation, modernization and climate proofing of the irrigation system in Kampong Thom province (Taing Krasaing and O Kra Nhak Subprojects) and Battambang province (Prek Chik Subproject). The project's long-term strategic goal is to make the FWUC efficient and reduce the vulnerability of Cambodian people to natural disasters.

2. Taing Krasaing Subproject

Taing Krasaing subproject irrigation system was built during 1975-1978 and was restored in 2000 and part of the irrigation system was refined and modernized in 2005 and 2012. Taing Krasaing subproject (TK) is located approximately 25 km southeast of Kompong Thom province, near National Road 6, and about 168 km from Phnom Penh.

3. Project Scope

Taing Krasaing irrigation scheme covers a total area of 4179 hectares in three communes: Korkaoh, Chroab and Taing Krasaing communes in Kampong Thom province. Each commune has beneficial villages such as:

Korkaoh commune has 5 villages: Sala Santuk Village, Chi Meak village, Santuk Krao village, Santuk KnongVillage and Svay Kal village.

Chroab commune has 4 villages: O Kaohkoki village, Sdok Sdom village, Chey Mongkul village and Toul Vihear village.

Page 53: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 11: PROGRESS OF FWUC FORMATION AND DEVELOPMENT Page 2

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

Taing Krasaing commune has 4 villages: Vang Churng village, Thormneat village, Sangkum Thmei village and and Sang Klang village.

4. Mission Team

Mr. Teng Bora Facilitator Team Mrs. Im Chenda Facilitator Team Mrs. Sok Boren Facilitator Team Mrs. Nhoem Sorphea Facilitator Team

B. Output

The selected meeting was started from 12 to 14 December 2017 on "Selection of Draft Statute Candidate members". The meeting is organized in three places.

On 12 December 2017 held in Chak Prachiev Pagoda, Sala Santuk Village, Korkaoh Commune;

On 13 December 2017 held in Reasmey Cheymongkul Pagoda, Chey Mongkul Village, Chhraob Commune; and

On 14 December 2017 held in Thorm Neath Pagoda, Thorm Neath Village, Taing Krasaing Commune.

Each meeting was attended by commune councils, village leaders, and people from relevant villages.

The dissemination meeting agenda focused on the:

Presentation on the Uplands Irrigation and Water Resources Management Sector Project;

Gender mainstreaming in the Candidate Selection; Determine the criteria of candidates from each village; At each village, select 10 applicants in each village who qualify according to the

criteria set out above; The nomination process in 10 villagers shall determine the candidates of 5 or 6

candidates (equal votes) by voting; and Prepared next action plan

The meeting achieved the results as follows:

Presented on the Uplands Irrigation and Water Resources Management Sector Project o Project layout o Output of UIWRMSP o Outcome of UIWRMSP o FWUC formation

Gender Mainstreaming in Draft Statute Committee and FWUC structure of Taing Krasaing.

The composition of each village candidate has:

No. Village Name Communes Candidates Remarks 1 Sala Santuk Korkoah 5 2 Chi Meak Korkoah 6 3 Santuk Krao Korkoah 6

Page 54: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 11: PROGRESS OF FWUC FORMATION AND DEVELOPMENT Page 3

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

No. Village Name Communes Candidates Remarks 4 Santuk Knong Korkoah 3

Election together 5 Svay Kal Korkoah 2 6 Sdok Sdom Chroab 4 7 O Koahkoki Chroab 2 8 Toul Vihear Chroab 6 9 Chey Mungkul Chroab 5 10 Vaing KhangChurng Taing Krasaing 6 11 Thorm Neath Taing Krasaing 5 12 Sang Kumthmey Taing Krasaing 4

Election together 13 Sang Klang Taing Krasaing 5

C. Next Action Plan

Continuation Plan in Step 3 activity 3.2 on lection of members of the draft Statute Committee and activity 3.3 to train roles and responsibilities to the members of the draft Committee of Elected Representatives.

Table of Participants List from Villages and Communes Involved in UIWRMSP

No. Date

Places UIWRMSP Local

authorities #

Beneficiaries

Total % F Villages Communes

DF

WU

C

PD

WR

AM

/ D

WR

AM

PM

IC

DG

CC

VL

To

tal

F

% F

1 12-Dec-2017 Salasantuk Korkaoh 4 2 0 0 1 4 39 18 46% 50 40%

2 13-Dec-2017 Chey Mungkul

Chhroab 4 2 0 0 1 4 27 7 26% 38 24%

3 14-Dec-2017 Thorm Neath

Taing Krasaing 4 2 0 1 1 3 21 3 14% 32 16%

សរុប 12 6 0 1 3 11 87 28 32% 120 28%

D. Conclusion

By collaborating with technical officers of Provincial Department of Water Resources and Meteorology, District Water Resources Agency, local authorities and people benefiting from subproject Taing Krasaing have a great interest in the project of Uplands Irrigation and Water Resources Management. On the other hand, the participants were actively involved in dissemination meeting and bring this new knowledge to the people in their village.

We should, therefore, be grateful if Deputy Director General of Technical Affairs and Project Director, PMU, ADB, MOWRAM would check and recognize this report at your earliest convenience.

From the capacity building and formation team of FWUC, high respectfully,

Phnom Penh, 16 December 2017

Reported by: Teng Bora

Page 55: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 11: PROGRESS OF FWUC FORMATION AND DEVELOPMENT Page 4

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

Royal Government of Cambodia Nation Religion King

Ministry of Water Resources and Meteorology Department of Farmer Water Users Community

BATTAMBANG PROVINCE

From : The Farmer Water User Community Establishment and Strengthened Working

Group To : Project Director, Deputy Director General of Technical Affair Subject : Meeting Report on processing FWUC Formation of Step 4, Activities 4.1 & 4.2 in

Prek Chik Irrigation System in Rukahkiri and Mong Russey district, Battambang Province

Dear Director:

As mentioned in subject above, we are very pleased to inform the Deputy Director General for Technical Affairs and Project Director that from 22 February until 15 March 2018, FWUC working group keep on fulfilling the mission at Prek Chik Irrigation System located at Rukahkiri and Mong Russey district, Battambang Province in order to have a meeting with the involved authorities and farmers in the target of villages/communes about:

Election the Sub-Group of Framer Water Users Committees (FWUSGs) Election the Group of Framer Water Users Committees (FWUGs) Recording the land area from farmers who are gotten the irrigation system’s

benefits.

1. Project Summary

Uplands Irrigation and Water Resource Management Sector Project is a project that has received loans from the Asian Development Bank (ADB Loan 3289-CAM) through the Ministry of Water Resources and Meteorology and the Royal Government of Cambodia. The project objective is to support the Rectangular Strategy of the Royal Government of Cambodia Phase III to promote national economic growth through the rehabilitation, modernization and climate proofing of the irrigation system in Battambang province (Prek Chik Subproject) and Kampong Thom province (Thaing Krasaing and O Kra Nhak Subprojects). The project's long-term strategic goal is to make the FWUC efficient and reduce the vulnerability of Cambodian people to natural disasters.

2. Scope of Prek Chik Irrigation System

Prek Chik irrigation scheme covers a total area of 12,047 hectares located in two districts and four communes: Prek Chik, Prey Tralach communes in Rukahkiri and Kear and Prey Svay commune in Mong Russey district of Battambang province. Each communes have beneficial villages such as:

Prek Chik commune has 6 villages including: Prek Chik, Preaek Taven, Chhker Kham Pres, Khnach Ampor, Thnom, Siem village.

Prey Tralach commune has 2 villages including: Chong Por and Prey Khlot village. Kear commune has 4 villages including: Roka Chhmol, Run, Koh Thkov and Ta Nak

village. Prey Svay commune has 1 village including Cham Ro A village.

Page 56: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 11: PROGRESS OF FWUC FORMATION AND DEVELOPMENT Page 5

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

3. Objective of Meeting

To be having the certain one leader on irrigation system’s responsibilities. To be having the efficiency of management and division of general tasks in FWUC. To be having the join of take care, protection, and irrigation system’s responsibilities.

4. Mission Team Members of the DFWUC

Mr. Tan Naren The DFWUC Facilitator Team Leader Mrs. Laing Sokim The DFWUC Facilitator Team Mr. Cheanov Bundara The DFWUC Facilitator Team Mrs. Phan Reasey The DFWUC Facilitator Team

5. Output

5.1 Meeting on Election Process

The meeting on the election (FWUSGs) and (FWUGs)’s committees in the target villages/communes above (Step 4, Activities 4.1 & 4.2) was conducted on 22 February to 15 March 2018, which included the main subjects below:

Presenting the strategic goal of Cambodia Government Presenting the map and scope of Prek Chik Irrigation System Presenting the structure of FWUC Presenting the criteria and composition of candidates standing in Election Presenting the procedures in election committees (FWUSGs and FWUGs) Processing the election committees (FWUSGs and FWUGs)

5.2 Table of Names of Elected Candidates

The elected candidates as FWUSGs and FWUGs committees in the target villages/ communes in Prek Chik Irrigation System are as shown below:

No. Name Sex Age Village Name Commune Name District Name Roles

1. Prek Chik Commune, Rukahkiri District, Battambang Province

1.1 FWUSGs Prek Taven Village

1 Mrs. Souy Pher F 51 Preaek Taven Prek Chik Rukahkiri Leader

2 Mr. Choum Sokong

M 58 Preaek Taven Prek Chik Rukahkiri Assistant

1.2 FWUSGs Prek Chik Village

1 Mr. Choung Roun M 52 Prek Chik Prek Chik Rukahkiri Leader

2 Mr. Chhen Doeurn M 48 Prek Chik Prek Chik Rukahkiri Assistant

1.3 FWUSGs Chhker Kham Pres Village

1 Mr. Put Leng M 59 ChhkerKham

Pres Prek Chik Rukahkiri Leader

2 Mr.Sin Bunthoeun M 58 ChhkerKham

Pres Prek Chik Rukahkiri Assistant

1.4 FWUSGs Khnach Ampor Village

1 Mr. Joy Sros M 39 Khnach Ampor Prek Chik Rukahkiri Leader

2 Mr. Kong Keo M 58 Khnach Ampor Prek Chik Rukahkiri Assistant

1.5 FWUSGs Thnom Village

1 Mr. Ouch Houy M 61 Thnom Prek Chik Rukahkiri Leader

2 Mr. Buth Yan M 41 Thnom Prek Chik Rukahkiri Assistant

1.6 FWUSGs Siem Village

1 Mr. Khen Khon M 63 Siem Prek Chik Rukahkiri Leader

Page 57: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 11: PROGRESS OF FWUC FORMATION AND DEVELOPMENT Page 6

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

No. Name Sex Age Village Name Commune Name District Name Roles

2 Mr. Eal Orn M 40 Siem Prek Chik Rukahkiri Assistant

1.7 FWUGs Prek Chik Commune

1 Mr. Puth Chim M 63 Preaek Taven Prek Chik Rukahkiri Leader

2 Mr.Youm Your M 51 Prek Chik Prek Chik Rukahkiri Sub-Leader

1

3 Mr. Bin Bros M 56 Khnach Ampor Prek Chik Rukahkiri Sub-Leader

2

4 Mr. Phim Phon M 48 Siem Prek Chik Rukahkiri Finance

2. Prey Tralach Commune, Rukahkiri District, Battambang Province

2.1 FWUSGs Chong Por Village

1 Mr. Ngeth Rong M 44 Chong Por Prey Tralach Rukahkiri Leader

2 Mr. Yim Ath M 47 Chong Por Prey Tralach Rukahkiri Assistant

2.2 FWUSGs Prey Khlot Village

1 Mr. Mut Sao M 53 Prey Khlot Prey Tralach Rukahkiri Leader

2 Mr. Heng Bon M 45 Prey Khlot Prey Tralach Rukahkiri Assistant

2.3 FWUGs Prey Tralach Commune, Rukahkiri District, Battambang Province

1 Mr. Mong Seout M 63 Prey Khlot Prey Tralach Rukahkiri Leader

2 Mr. Yim Ean M 66 Chong Por Prey Tralach Rukahkiri Sub-Leader

3 Mr. Chay Broch M 57 Prey Khlot Prey Tralach Rukahkiri Assistant

3. Prey Svay Commune, Mong Russey District, Battambang Province (Have one Village)

3.1. FWUSGs Cham Ro A Village

1 Mr. Kheav Khon M 59 Cham Ro A Prey Svay Mong Russey Leader

2 Mr. Nheam Vid M 46 Cham Ro A Prey Svay Mong Russey Assistant

3.2 FWUGs Prey Svay Commune, Mong Russey district, Battambang Province

1 Mr. Touch Goeun M 45 Cham Ro A Prey Svay Mong Russey Leader

2 Mr. Heng Vannak M 38 Cham Ro A Prey Svay Mong Russey Sub-Leader

3 Mr. Ouch Koch M 47 Cham Ro A Prey Svay Mong Russey Assistant

4. Kea Commune, Mong Russey District, Battambang Province (Have four Villages)

4.1 FWUSGs Koh Thkov Village

1 Mr. Chea Mao M 60 Koh Thkov Kea Mong Russey Leader

2 Mr. Yun Cheth M 45 Koh Thkov Kea Mong Russey Assistant

4.2 FWUSGs Roka Chhmol Koh Thkov Village

1 Mr. Pat Pheoun M 57 Roka Chhmol Kea Mong Russey Leader

2 Mrs. Mao Saory M 25 Roka Chhmol Kea Mong Russey Assistant

4.3 FWUSGs Run Village

1 Mr. Ban Sambath M 55 Run Kea Mong Russey Leader

2 Mrs. Ran Chamreoun

F 32 Run Kea Mong Russey Assistant

4.4 FWUSGs Ta Nak Village

1 Mr. Keo Pheoun M 45 Ta Nak Kea Mong Russey Leader

2 Mr. Nai Neang M 54 Ta Nak Kea Mong Russey Assistant

4.5 FWUGs Kea Commune, Mong Russey District, Battambang Province

1 Mr. Chheng Cheth

M 47 Run Kea Mong Russey Leader

2 Mr. Lach Long M 48 Roka Chhmol Kea Mong Russey Sub-Leader

3 Mr. Ei Sok M 59 Ta Nak Kea Mong Russey Assistant

5.3 Participation

The above meeting discussion engaged by technical officials from PDWRAM Battambang, the involved PDWRAM Agency, the involved local authorities (villages, communes, and district)

Page 58: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 11: PROGRESS OF FWUC FORMATION AND DEVELOPMENT Page 7

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

and also framers in the target villages/communes above of irrigation systems from Prek Chik Subproject.

Place, Date, and Participants Involved in the Election for the FWUSGs and FWUGs Committees

Date Place

DF

WU

C

AD

B&

PM

IC

PD

WR

AM

Local authorities FWUC’s # Farmers

Gra

nd

T

ota

l

F DG CC VL Total F Total F

1. Prek Chik Commune, Rukahkiri District, Battambang Province

23/02/18 Prek Taven Village 5 0 2 0 1 1 0 0 49 21 58 23

24/02/18 Prek Chik Village 4 0 2 0 1 1 0 0 56 20 64 22

26/02/18 ChhkerKham Pres Village

4 0 2 0 1 1 0 0

57 28 65 30

27/02/18 Khnach Ampor 4 0 2 0 1 1 0 0 51 31 59 33

28/02/18 Thnom Village 4 0 2 0 1 1 0 0 49 20 57 22

01/03/18 Siem Village 4 0 2 0 1 1 0 0 50 20 58 22

02/03/18 Prek Chik Commune 4 0 2 1 1 6 12 1 97 18 123 21

2. Prey Tralach Commune, Rukahkiri District, Battambang Province

03/03/18 Chong Por Village 4 0 2 1 1 1 0 0 51 33 60 35

05/03/18 Prey Khlot Village 4 0 2 0 1 1 0 0 50 26 58 28

06/03/18 Prey Tralach Commune

4 0 2 1 1 2 4 0

35 13 49 15

3. Prey Svay Commune, Mong Russey District, Battambang Province

07/03/18 Cham Ro A Village 4 0 2 1 1 1 0 0 56 30 65 32

08/03/18 Prey Svay Commune

4 0 2 0 1 1 2 1

21 1 31 4

4. Kea Commune, Mong Russey District, Battambang Province

09/03/18 Koh Thkov Village 4 0 2 0 1 1 0 0 49 23 57 25

10/03/18 Roka Chhmol Village 4 0 2 0 1 1 0 0 52 30 60 32

12/03/18 Run Village 4 0 2 0 1 1 0 0 50 27 58 29

13/03/18 Ta Nak village 4 0 2 0 1 1 0 0 61 34 69 36

14/03/18 Kea Commune 4 0 2 0 1 1 8 1 62 11 82 14

Grand Total 69 0 34 5 17 26 26 3 896 386 1073 423

Please see attendance lists of participants in attachment.

6. The Next Action Plan

The Action Plan for keep on fulfilling consists as the following below:

Step 5 Activities 5.1 & 5.2 will have meeting about : o Recheck the drafting FWUC’s statue o Promote the drafting FWUC’s statue in the target villages/communes in Prek

Chik Irrigation System.

7. Conclusion

According to meeting of election the (FWUSGs) and (FWUGs)’s committees above, we observed that the involves local authorities and citizens have shown their highly appreciations that they could join the election and selected their own representatives for leading, managing, dividing the certain job on management and maintenance the irrigation with sustainable and

Page 59: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 11: PROGRESS OF FWUC FORMATION AND DEVELOPMENT Page 8

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

development, which are the crucial parts to be having the join of take care, protection, responsibility, and self on irrigation system in order to reduce the government’s expenditures on operations and its maintenance under method of irrigation system which have joined by the beneficiaries and PIMD. As described above, I would like to submit you, the Deputy Managing Director for Technical Affair and Project Director of PMU-ADB MOWRAM, for your report. From FWUC working Group, High Respectfully, Phnom Penh 19 March 2018 Reported by Tan Naren

Page 60: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 11: PROGRESS OF FWUC FORMATION AND DEVELOPMENT Page 9

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

PHOTOS OF FWUC FORMATION PROCESS

Page 61: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 11: PROGRESS OF FWUC FORMATION AND DEVELOPMENT Page 10

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

Royal Government of Cambodia Nation Religion King

Ministry of Water Resources and Meteorology Department of Farmer Water Users Community

KAMPONG THOM PROVINCE

To : Project Director, Deputy Director General of Technical Affairs From : Teng Bora, Im Chenda, Em Sophorn, and Nhoem Sorphea Subject : Back-to-Office Report, Mission Report to the province of Kampong Thom Taing Krasaing Irrigation Scheme from 25 February to 2 March 2018 As stated above, I would like to inform the Deputy Director General for Technical Affairs and in charged Project Director that on 25 February to 02 March 2018, the Task Force for Developing and Strengthening the Capacity of the FWUC led a meeting in Step 6 activity 6.1 on " Meeting to select candidate of Farmer Water User Community Committee” and activity 6.2 on “Meeting to elect FWUC Committee members” and Step 6.3 “ Train FWUC committee on Role Duty Responsibility and develop 5 year work plan for FWUC” in Taing Krasaing Irrigation System.

1. Introduction

1.1. Project Summary

Uplands Irrigation and Water Resource Management Sector Project is a project that has received loans from the Asian Development Bank (ADB Loan 3289-CAM) through the Ministry of Water Resources and Meteorology and the Royal Government of Cambodia. The project objective is to support the Rectangular Strategy of the Royal Government of Cambodia Phase III to promote national economic growth through the rehabilitation, modernization and climate proofing of the irrigation system in Kampong Thom province. (Taing Krasaing and O’kra Nhak Subprojects) and Battambang (Prek Chik Subproject). The project's long-term strategic goal is to make the FWUC efficient and reduce the vulnerability of Cambodian people to natural disasters.

1.2. Taing Krasaing Subprojects

Taing Krasaing Subproject irrigation system was built during 1975-1978 and was restored in 2000 and part of the irrigation system was refined and modernized in 2005 and 2012. Taing Krasaing Subproject (TK) is located approximately 25 km southeast of Kompong Thom province, near National Road 6, and about 168 km from Phnom Penh.

1.3. Project Scope

Taing Krasaing irrigation scheme covers a total area of 4179 hectares in three communes: Korkoah, Chhroab and Taing Krasaing communes in Kampong Thom province. Each commune has beneficial villages such as:

Korkoah commune has 5 villages: Sala Santuk Village, Chi Meak village, Santuk Krao village, Santuk KnongVillage and Svay Kal village.

Chhroab commune has 4 villages: O Kaohkoki village, Sdok Sdom village, Chey Mongkul village and Toul Vihear village.

Page 62: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 11: PROGRESS OF FWUC FORMATION AND DEVELOPMENT Page 11

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

Taing Krasaing commune has 4 villages: Vang Churng village, Thormneat village, Sangkum Thmei village and Sang Klang village.

1.4. Mission Team

Mr. Teng Bora Facilitator Team Mrs. Im Chenda Facilitator Team Mr. Em Sophorn Facilitator Team Mrs. Nhoem Sorphea Facilitator Team

2. Output

2.1. Meeting to select candidate of FWUC Committee

The meeting started on 26 February 2018, organized in one location by participated from Deputy District Governor, Commune Councils and Village Leaders in Taing Krasaing Irrigation System with the following agenda:

Introduce the purpose of the meeting Introduce the structure of FWUC Committee Introduce the names of sub-committees, FWUCs and Drafting Committee of the

FWUC List of candidates in the sub-committee of FWUCs and draft committees that

meet criteria set out to be discussed. Discuss the criteria of the candidates Gender mainstream in global and in-project development Prepare action plan

2.2. Meeting to elect FWUC committee members

The election started on 27th February 2018 organized in Chey Mongkul pagoda, Chey mongkul village, Chhroab Commune by participating from Deputy District Governor, Commune Councils from the commune of Korkoah, Chhroab and Taing Krasaing with the following agenda:

Introduce the purpose of the meeting Introduce the structure of FWUC Committee Announce and present the names of the candidates for the election Describe the candidate's criteria to the voters Gender mainstream in global and in-project development Present the procedure of election Elected and declared the results of the electorate Prepare action plan

2.3. Training on role duty responsibility of FWUC Committee and develop 5 year work plan

The training course started in 2 days from 28th February to 01st March 2018 by participating from Deputy District Governor, Commune Councils from the commune of Korkoah, Chhroab and Taing Krasaing, relevant village leaders, FWUC Committee members.

The training led 2 days will be able all levels of local authorities and FWUC Committee members to understand:

Roles, duty and responsibilities for managing and leading FWUC

Page 63: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 11: PROGRESS OF FWUC FORMATION AND DEVELOPMENT Page 12

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

Management of FWUC General administration of FWUC Decentralization and Deconcentration planning for the FWUC

The training course aim on topics:

The characteristics of the CEC Committee Roles, duties and responsibilities of

o The CGSI Committee o Chairman of the CEC Committee o The 1st Vice President of the FWUC o The 1st Vice President of the CAP o Treasury bills o Team Leader and Sub-Team Leader o Relevant institutions in CAPWA management

FWUC management General management of administration Leadership Decentralization and Deconcentration Planning for FWUC

3. Next Action Plan

Next Plan in Step 7 as follows:

Activity 7.1: Finalization of FWUCs draft statute and 5 year work plan.

Page 64: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 11: PROGRESS OF FWUC FORMATION AND DEVELOPMENT Page 13

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

Participant List from Villages and Communes Involved in UIWRMSP

No. Date

Location UIWRMSP Local authorities # Beneficiaries FWUC Com.

Total % F

Villages Commune DFWUC PDWRAM/ DWRAM

PMIC DG CC VL Total F % F Total F % F

1 26-Feb-2018 Chey Mongkul

Chhroab 4 2 ០ 1 3 11 0 0 0% 0 0 0% 21 5%

2 27-Feb-2018 Chey Mongkul

Chhroab 4 2 ០ 1 3 11 0 0 0% 32 11 34% 53 25%

3 28-Feb-2018 Chey Mongkul

Chhroab 4 2 ០ 0 3 11 0 0 0% 33 12 36% 53 26%

4 1-Mar-2018 Chey Mongkul

Chhroab 4 2 ០ 1 3 11 0 0 0% 33 12 36% 54 26%

សរុប 8 6 0 3 12 44 0 0 0% 98 35 36% 181 24%

Note: DFWUC 4P (2F)

Page 65: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 11: PROGRESS OF FWUC FORMATION AND DEVELOPMENT Page 14

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

4. Conclusion

By collaborating with technical officers of Provincial Department of Water Resources and Meteorology, District Water Resources Agency, local authorities and people benefiting from subproject Taing Krasaing have a great interest in the project of Uplands Irrigation and Water Resources Management. On the other hand, the participants were actively in identifying the criteria of FWUC committee candidate and understood on role duty and responsibility of FWUC committee.

All the mentioned above, I would like to submit you, the Deputy Director General for Technical Affair and Project Director of PMU-ADB MOWRAM for your report.

From the Capacity Building and Formation Team of FWUC, High Respectfully,

Phnom Penh, 5 March 2018 Reported by Teng Bora

Page 66: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 11: PROGRESS OF FWUC FORMATION AND DEVELOPMENT Page 15

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

Royal Government of Cambodia Nation Religion King

Ministry of Water Resources and Meteorology Department of Farmer Water Users Community

To : Project Director, Deputy Director General of Technical Affair From : Teng Bora, Im Chenda, Em Sophorn and Nhoem Sorphea Subject : Back-to-Office Report, Mission Report to the province of Kampong Thom Taing Krasaing Irrigation Scheme from 5 to 8 March 2018 As stated above, I would like to inform the Deputy Director General for Technical Affairs and in charged Project Director that on 5 to 8 March 2018, the Task Force for Developing and Strengthening the Capacity of the FWUC led a meeting in Step 7 activity 7.1 on "Finalization of FWUC draft statute and 5 year work plan” in Taing Krasaing Irrigation System.

1. Introduction

1.1. Project Summary

Uplands Irrigation and Water Resource Management Sector Project is a project that has received loans from the Asian Development Bank (ADB Loan 3289-CAM) through the Ministry of Water Resources and Meteorology and the Royal Government of Cambodia. The project objective is to support the Rectangular Strategy of the Royal Government of Cambodia Phase III to promote national economic growth through the rehabilitation, modernization and climate proofing of the irrigation system in Kampong Thom province. (Taing Krasaing and O’kra Nhak Subprojects) and Battambang (Prek Chik Subproject). The project's long-term strategic goal is to make the FWUC efficient and reduce the vulnerability of Cambodian people to natural disasters.

1.2. Taing Krasaing Subprojects

Taing Krasaing Subproject irrigation system was built during 1975-1978 and was restored in 2000 and part of the irrigation system was refined and modernized in 2005 and 2012. Taing Krasaing Subproject (TK) is located approximately 25 km southeast of Kompong Thom province, near National Road 6, and about 168 km from Phnom Penh.

1.3. Project Scope

Taing Krasaing irrigation scheme covers a total area of 4179 hectares in three communes: Korkoah, Chhroab and Taing Krasaing communes in Kampong Thom province. Each commune has beneficial villages such as:

Korkoah commune has 5 villages: Sala Santuk Village, Chi Meak village, Santuk Krao village, Santuk KnongVillage and Svay Kal village.

Chhroab commune has 4 villages: O Kaohkoki village, Sdok Sdom village, Chey Mongkul village and Toul Vihear village.

Taing Krasaing commune has 4 villages: Vang Churng village, Thormneat village, Sangkum Thmei village and and Sang Klang village.

1.4. Mission Team

Page 67: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 11: PROGRESS OF FWUC FORMATION AND DEVELOPMENT Page 16

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

Mr. Teng Bora Facilitator Team Mrs. Im Chenda Facilitator Team Mr. Em Sophorn Facilitator Team Mrs. Nhoem Sorphea Facilitator Team

2. Output

2.1. Meeting to finalize the draft statute of FWUC

The meeting started on 06th March 2018, organized in Chey Mongkul pagoda, Chey mongkul village, Chhroab Commune by participating from Deputy District Governor, Commune Councils and Village Leaders in Taing Krasaing Irrigation System with the following agenda:

Introduce the purpose of the meeting Introduce the structure of FWUC Committee Introduce the names of FWUC committees, Drafting statute Committee will be

dissolved after finalization of FWUC statute Discuss each points of FWUC statute from article 1 to article 40 Determine Irrigation Service Fee for operation and Maintenance

2.2. Meeting to finalize 5 year work plan

The meeting started on 7 March 2018 organized in Chey Mongkul pagoda, Chey mongkul village, Chhroab Commune by participating from 1st Commune vice Chief, Commune Councils from the commune of Korkoah, Chhroab and Taing Krasaing with the following agenda:

Introduce the purpose of the planning Verify plan in step 6 activity 6.3 Develop 5 year work plan Group discussion on planning in sub-group Present the result from group discussion and combine 1 year into 5 year work plan Prepare action plan for next step

3. Next Action Plan

Next Plan in Step 8 as follows:

Activity 8.1: Meeting to sign the final statute Activity 8.2: Dissemination approval of FWUC Statute at village level Activity 8.3: Official announce to carry out the FWUC statute

Page 68: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 11: PROGRESS OF FWUC FORMATION AND DEVELOPMENT Page 17

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

Participant List from Villages and Communes Involved in UIWRMSP

No. Date Location UIWRMSP

Local authorities

# Beneficiaries FWUC Com. Total % F

Villages Commune DFWU

C PDWRAM/DWRAM

PMIC

DG CC VL Total F % F Tota

l F % F

1 06-Mar-2018

Chey Mongkul Chhroab

4 2 ០ 1 3 9 0 0

0% 49 18

37% 68 29%

2 07-Mar-2018

Chey Mongkul Chhroab

4 2 ០ 0 3 9 0 0 0% 49 18 37% 67 30%

សរុប 8 4 0 1 6 18 0 0 0% 98 35 37% 135 30%

Note: DFWUC 4P (2F)

Page 69: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 11: PROGRESS OF FWUC FORMATION AND DEVELOPMENT Page 18

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

4. Conclusion

By collaborating with technical officers of Provincial Department of Water Resources and Meteorology, District Water Resources Agency, local authorities and people benefiting from subproject Taing Krasaing have a great interest in the project of Uplands Irrigation and Water Resources Management. On the other hand, the participants were strongly involved in interpreting each item in the statute, including collecting irrigation services fee for operation and maintenance. The FWUC understands the yearly planning for its FWUC implementation.

All the mentioned above, I would like to submit you, the Deputy Director General for Technical Affair and Project Director of PMU-ADB MOWRAM, for your report.

From the Capacity Building and Formation Team of FWUC, High Respectfully,

Phnom Penh, 9 March 2018 Reported by Teng Bora

Page 70: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 11: PROGRESS OF FWUC FORMATION AND DEVELOPMENT Page 19

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

Royal Government of Cambodia Nation Religion King

Ministry of Water Resources and Meteorology Department of Farmer Water Users Community

To : Project Director, Deputy Director General of Technical Affairs From : Teng Bora, Im Chenda, Em Sophorn, and Nhoem Sorphea Subject : Back-to-Office Report, Mission Report to the province of Kampong Thom Taing Krasaing Irrigation Scheme from 11 to 15 March 2018 As stated above, I would like to inform the Deputy Director General for Technical Affairs and in charged Project Director that on 11 to 15 March 2018, the Task Force for Developing and Strengthening the Capacity of the FWUC led a meeting in Step 8 activity 8.1 on "Meeting to sign the finalization of FWUC statute” in Taing Krasaing Irrigation System.

1. Introduction

1.1. Project Summary

Uplands Irrigation and Water Resource Management Sector Project is a project that has received loans from the Asian Development Bank (ADB Loan 3289-CAM) through the Ministry of Water Resources and Meteorology and the Royal Government of Cambodia. The project objective is to support the Rectangular Strategy of the Royal Government of Cambodia Phase III to promote national economic growth through the rehabilitation, modernization and climate proofing of the irrigation system in Kampong Thom province. (Taing Krasaing and O’kra Nhak Subprojects) and Battambang (Prek Chik Subproject). The project's long-term strategic goal is to make the FWUC efficient and reduce the vulnerability of Cambodian people to natural disasters.

1.2. Taing Krasaing Subprojects

Taing Krasaing Subproject irrigation system was built during 1975-1978 and was restored in 2000 and part of the irrigation system was refined and modernized in 2005 and 2012. Taing Krasaing Subproject (TK) is located approximately 25 km southeast of Kompong Thom province, near National Road 6, and about 168 km from Phnom Penh.

1.3. Project Scope

Taing Krasaing irrigation scheme covers a total area of 4179 hectares in three communes: Korkoah, Chhroab and Taing Krasaing communes in Kampong Thom province. Each commune has beneficial villages such as:

Korkoah commune has 5 villages: Sala Santuk Village, Chi Meak village, Santuk Krao village, Santuk KnongVillage and Svay Kal village.

Chhroab commune has 4 villages: O Kaohkoki village, Sdok Sdom village, Chey Mongkul village and Toul Vihear village.

Taing Krasaing commune has 4 villages: Vang Churng village, Thormneat village, Sangkum Thmei village and and Sang Klang village.

Page 71: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 11: PROGRESS OF FWUC FORMATION AND DEVELOPMENT Page 20

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

1.4. Mission Team

Mr. Teng Bora Facilitator Team Mrs. Im Chenda Facilitator Team Mr. Em Sophorn Facilitator Team Mrs. Nhoem Sorphea Facilitator Team

2. Output

2.1. Meeting to sign the finalization of FWUC statute

The meeting started on 12th March 2018, organized in Chhroab Commune hall, Chey mongkul village by participating from Deputy District Governor, Commune Councils and Village Leaders in Taing Krasaing Irrigation System with the following agenda:

Review the presentation of Uplands Irrigation Water Resources Management Sector Project.

Briefing on the Process of FWUC formation of Taing Krasaing Irrigation System. Introduce the structure of FWUC Taing Krasaing. Announcement name of FWUC committee. Signing ceremony on Final statute of FWUC between FWUC leader and local

authorities at all levels.

2.2. Action to continue signing the statute of FWUC

Task Force Team of Capacity building and strengthening of FWUC cooperated with Provincial Department of Water Resource and Meteorology technical staff continues to sign on the FWUC statute with concerned communes following:

On 12th March 2018 signed FWUC statute at the commune of Korkaoh and Taing Krasaing.

On 13th March 2018 signed the FWUC statute at Santuk District Hall. On 14th March 2018 signed the FWUC statute at PDoWRAM and sent to

administrative staff of Kampong Thom Province for Provincial Governor final signature.

3. Next Action Plan

Next Plan in Step 8 as follows

Activity 8.2: Dissemination approval of FWUC Statute at village level Activity 8.3: Official announce to carry out the FWUC statute

Page 72: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 11: PROGRESS OF FWUC FORMATION AND DEVELOPMENT Page 21

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

Participant List from Villages and Communes Involved in UIWRMSP

No. Date

Location UIWRMSP Local

authorities # Beneficiaries FWUC Com.

Total % F

Villages Commune DFWU

C PDWRAM/DWRAM

PMIC

DG CC VL Total F % F Tota

l F % F

1 12-Mar-2018

Chey Mongkul Chhroab

4 2 ០ 1 3 10 0 0

0% 31 10

32% 51 24%

2 13-Mar-2018 Santuk District hall

4 2 ០ 0 0 0 0 0 0% 0 0 0% 6 33%

3 14-Mar-2018 Steung Seng municipality

4 1 0 0 0 0 0 0 0% 0 0 0% 5 40%

សរុប 12 5 0 1 3 10 0 0 0% 31 10 32% 62 19%

Note: DFWUC 4P (2F)

Page 73: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 11: PROGRESS OF FWUC FORMATION AND DEVELOPMENT Page 22

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

4. Conclusion

By collaborating with technical officers of Provincial Department of Water Resources and Meteorology, District Water Resources Agency, local authorities and people benefiting from subproject Taing Krasaing have a great interest in the project of Uplands Irrigation and Water Resources Management convening the formation of the FWUC committee and its statute, which recognizes the authorities at all levels for formal implementation of the Taing Krasaing irrigation system. All the mentioned above, I would like to submit you, the Deputy Director General for Technical Affair and Project Director of PMU-ADB MOWRAM, for your report. From the Capacity Building and Formation Team of FWUC, High Respectfully, Phnom Penh, 16 March 2018 Reported by Teng Bora

Page 74: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 11: PROGRESS OF FWUC FORMATION AND DEVELOPMENT Page 23

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

PHOTOS OF FWUC FROMATION PROCESS

Page 75: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 12:

QUARTERLY ENVIRONMENTAL PROGRESS REPORT

gan

Page 76: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 12: SUMMARY OF CONSULTANTS’ MOBILIZATION Page 1

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

QUARTERLY ENVIRONMENTAL MONITORING REPORT No. 4 – QEMR No.4

For the Period of January – March 2018

CAMBODIA: Uplands Irrigation and Water Resources Management Sector Project

ADB Loan 3289 – CAM

April 2018

Page 77: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 12: SUMMARY OF CONSULTANTS’ MOBILIZATION Page 2

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM):

PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

VII. TABLE OF CONTENTTable of Content ................................................................................................................. 2 List of Tables ...................................................................................................................... 2 List of Appendix ................................................................................................................. 2 I. Introduction ................................................................................................................. 3

A. Purpose of Report ..................................................................................................... 3 B. Project Progress ........................................................................................................ 3

II. Implementation of EMP and Monitoring ................................................................. 3A. Roles and Responsibilities for EMP and Monitoring Implementation ........................ 3 C. EMP Implementation Progress .................................................................................. 4

1. Water Pollution ................................................................................................. 42. Air quality from construction equipment ........................................................... 43. Dust 44. Noise impact on sensitive receivers ................................................................. 55. Demolition waste .............................................................................................. 56. Impacts on Local Cultural Sites ........................................................................ 57. Occupational Health and safety........................................................................ 6

D. Environmental Institutional Capacity Building and Training ..................................... 6 E. Public Consultation, Disclosure and Grievance Redress Mechanism ..................... 6

III. Compliance with EMP Requirement ........................................................................ 7A. Corrective Measures of Last Reporting ..................................................................... 7 B. Necessary Corrective Measures of this Reporting Period ......................................... 8

VIII. LIST OF TABLESTable 1: Physical Project Progress (As 31 March 2018) ...................................................... 3 Table 2: Schedule of Environmental Monitoring by PMIC .................................................... 4 Table 3: Environmental Institutional Capacity Building and Training implementation status 6 Table 4: Follow-up actions on the environmental problems identified in the last reporting period

...................................................................................................................................... 7 Table 5: Environmental Problems Identified in this Reporting Period and Proposed

Improvement ................................................................................................................. 8

IX. LIST OF APPENDIXAppendix 1: List of Participants in EMP Review Meeting ................................................... 10 Appendix 2: List of Participants during Environmental Monitoring ...................................... 11 Appendix 3: Pictorial Record of Safeguard Activities in TK and PC .................................. 13

Page 78: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 12: SUMMARY OF CONSULTANTS’ MOBILIZATION Page 3

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM):

PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

Ministry of Water Resources and Meteorology Uplands Irrigation and Water Resources Management Sector

Project ADB Loan 3289 – CAM [SF]

Quarterly Environmental Monitoring Report No.4 – QEMR No.4 For Period of January – March 2018

I. INTRODUCTION A. PURPOSE OF REPORT 1. This report relates to the EMP implementation of 4 packages namely; Chroab (CW03),

Koh Koah (CW-04), Prek Chik Package I (CW-07) and Prek Chik Package II (CW-08)and covers the period January to March 2018. It also discusses the issues and concernsencountered and suggested solutions. Environmental monitoring during construction ismonitored to ensure that the proposed mitigation measure of EMP in IEE report havebeen implemented by relevant stakeholder, particularly the contractor. This monitoringwill be evaluated on compliance of contractor’s environmental performance onapplicable EMP.

B. PROJECT PROGRESS 2. Table 1 shows the summary of the periodic and cumulative progress of work by the

contractors from January to March 2018 for all contract packages CW01, CW03, CW04,CW05, CW06, CW07 and CW08.

Table 1: Physical Project Progress (As 31 March 2018)

No. Contract No. Subproject Name Contract Award% of Accomplishment

(As 31 March 2018) 1 CW01 TK Main Canal 12,007,216.78 100% (Completion) 2 CW03 Chroab* 1,938,956.89 100% (Completion) 3 CW04 Korkoah 5,879,592.80 87.67% 4 CW05 O Kra Nhak** NA NA 5 CW06 Prek Chik Main Canal 5,421,752.97 100% (Completion) 6 CW07 Prek Chik Package 1 5,542,927.18 60.24% 7 CW08 Prek Chik Package 2 4,365,728.38 75.00%

Note: *Chroab is completed by 28 February 2018. **O Kra Nhak is in tender process.

Source: PMIC, March 2018.

II. IMPLEMENTATION OF EMP AND MONITORINGA. Roles and Responsibilities for EMP and Monitoring Implementation

3. Environmental monitoring is being done by the Project Management and ImplementationConsultant (PMIC) and by the contractors themselves. PMIC field staff monitor theactivities regularly and submit monthly progress reports. Each contractor fills in theenvironmental checklist, which is integrated into the monthly project progress report andthen forwarded to PMIC. In addition, site inspections are conducted every 3-month usingthe same environmental checklist.

4. For this report period (Jan – Mar 2018), Environment Specialist of PMIC conducted afield visit to all sites in April 2018 as given in Table 2.

Page 79: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 12: SUMMARY OF CONSULTANTS’ MOBILIZATION Page 4

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

Table 2: Schedule of Environmental Monitoring by PMIC

No. Subproject As of April 2018

1 Taing Krasaing (CW01) Completion 2 Chroab (CW03) Completion 3 Kor Koah (CW04) 24 April 2018 4 PC Main Canal (CW06) Completion 5 Prek Chik Package I (CW07) 26 April 2018 6 Prek Chik Package II (CW08) 27 April 2018

5. The main environmental monitoring tasks during site inspection were: i. Review of available reports, e.g., monthly progress reports; ii. Site verification, observation, informal interviews (if necessary), and photo

documentation of activities; iii. Consulting with local people; iv. Use of monitoring checklist contained in the EMP; and v. Modification of the checklist, if necessary.

C. EMP Implementation Progress

6. Environmental impacts and mitigation measures refer to construction impacts, which are common to these subprojects (CW03, CW04, CW07 and CW08), which require earth works, soil stabilization, dust and noise control, as well as management of the impacts from machinery operation, transport and handling of materials, and domestic needs of the workforce.

1. Water Pollution

7. Wastewater is produced from the maintenance and cleaning of mechanical equipment and vehicles, maintenance water for mixing and curing concrete, and lost water and soil during the construction period, which are discharged as pollutants. The effluent, comprised mainly of inorganic wastewater, commonly contains no poisonous and harmful substances, except suspended solids, but if discharged in an improper manner, still have the potential to affect existing water bodies. Some oil-containing wastewater can arise from machinery repair.

8. During site inspection, wastewater produced from construction activity had not been discharged to water source. Since the contractor using small mixing machine at any concrete site, sedimentation tanks were equipped to keep wastewater from cleaning equipment. Furthermore, the construction camps from worker were equipped with septic tanks to treat wastewater and 2-chamber sediment tanks to treat wastewater and process water respectively before discharge.

2. Air quality from construction equipment

9. Construction machinery on sites consume petrol and diesel, releasing gaseous sulphur dioxide (SO2), carbon monoxide (CO), and nitrous oxide (NOx).

10. As site observation during site inspection, contractor maintained regularly the construction machinery and lubricants changed on schedule to reduce air quality pollution.

3. Dust

11. Construction sites and access roads will potentially produce fugitive dust from material storage areas, dump sites, concrete mixing, excavation and general site usage, especially under windy conditions. Material stockpiles and concrete mixing equipment will be equipped with dust shrouds. The operators will regularly maintain the shrouds to

Page 80: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 12: SUMMARY OF CONSULTANTS’ MOBILIZATION Page 5

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

ensure their effective operation. For all the construction sites and construction roads, water spraying to suppress dust and maintenance of driving surfaces will be standard site management practices. Vehicles carrying soil, sand, or other fine materials to and from the construction sites will be covered.

12. During site visit, it was observed that the contractor had at least one water truck for spraying water to suppress dust in unpaved areas and haul roads at least three times per day and more frequent during dry weather and windy days. Transporting construction material was handle by supplied while; soil transporting was carried within the project site.

4. Noise impact on sensitive receivers

13. Activities with intensive noise levels will not only have an impact on the residents but may also cause injury to construction workers operating the equipment. Although the noise impacts will be transient and temporary, the following mitigation measures are essential for construction activities to meet construction site noise limits and to protect sensitive receptors. Construction at night within 300 meters (m) of residences shall be strictly prohibited. During daytime construction, the contractor will ensure that:

i. Equipment with high noise and high vibration are not used in village or township areas and only low-noise machinery or equipment with sound insulation is employed;

ii. Sites for concrete-mixing plants and similar activities will be located at least 1 km away from sensitive areas, such as residences and schools; and

iii. Temporary anti-noise barriers will be installed to shield any schools, residences, and medical centers within 100 m of the work sites.

14. As interviewed with workers and contractor representatives, there is no construction work at night. The excavated spoil and backfill materials transported during daytime on existing roads and avoiding densely populated areas. No noisy construction works such as piling or blasting was carried out at night. Night-time construction noise was strictly controlled.

5. Demolition waste

15. Any waste from the demolition of un-repairable sluice and gate structures will be either sold to building materials recyclers or collected and transported to official landfill sites. Metal parts, including pumps and pipes, will be broken up and sold to scrap metal merchants. Any excess spoil will be made available to nearby communities for use as building pads and bunds.

16. As site observation, none of demolition waste remains at construction site. As informed by the contractor and CME, waste from the demolition of un-repairable sluice and gate structures re-used by local community. Metal parts, including pumps and pipes, had been broken up and sold to scrap metal merchants.

6. Impacts on Local Cultural Sites

17. During construction, contractors will ensure that any local cultural sites (including shrines and graves) will be kept clear of construction material and protected from dust and other disturbances. Access to these sites will not be impeded, and after construction is finished, any disturbed surroundings will be restored to pre-construction standards.

18. As site observation and conform from local people, no construction activity disturbed to the local cultural site or shrines and graves.

Page 81: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 12: SUMMARY OF CONSULTANTS’ MOBILIZATION Page 6

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

7. Occupational Health and safety

19. During site inspection, both workers and staff were engaged in a safe environment due to contractor arrange camps site where are located to the construction site. The toilets were also provided in main campsite and the toilet at workplace is identified and install if necessary. Personal protection equipment (PPE) also provided while site environmental health and safety plan was prepared (CW07, CW08, CW03 and CW04).

D. Environmental Institutional Capacity Building and Training 20. Table 3 presents on-the-job training conducted for PMU, PMIC and contractors. The list

of participants is attached in Appendix 1. Table 3: Environmental Institutional Capacity Building and Training implementation status

Topic Trainer(s) Attendees Date

PMU No. PMIC

No. Contractors No.

EMP Claim template and quarterly report preparation

Environment Specialist/PMIC

PMU in Phnom Penh

2 PMIC 5 CW-01 CW-03&CW-04 CW-07 CW-08

2 2 4 2

21 March 2018

Sub-Total 2 5 10 Grand total 17

21. A half-day training (1 training) was conducted on 21 March 2018 at PMU office in Phnom

Penh. The training purpose is to review the progress of EMP implementation and document preparation. All material for EMP implementation has been re-introduced to all participants; EMP Implementation Template, monitor the environment and improve the mitigation measure if needed and quarterly report preparation.

Photo taken on November 2017. Introducing on EMP Implementation Template to PMU, PMIC and All contractors 

E. Public Consultation, Disclosure and Grievance Redress Mechanism 22. Investigation carried out among surrounding residents of the packages during the

reporting period. As a result, no complaint had been received during the reporting period since the project benefits the public and is widely supported and contractor implemented the environmental mitigation measures.

Page 82: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 12: SUMMARY OF CONSULTANTS’ MOBILIZATION Page 7

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

Photo taken: 24 April 2018. Consultations with local people

regarding project benefit of CW-04

Photo taken: 26 April 2018. Consultations with local people regarding disturbance of CW-07

construction activity

Photo taken: 26 April 2018. Consultations with local people regarding disturbance of CW-08

construction activity

III. COMPLIANCE WITH EMP REQUIREMENT 23. Site inspections during the reporting period conducted from 24 – 27 April 2018.

Corrective measures of the last reporting and the identified environmental problems were shows in Table 4 and Table 5 respectively.

A. Corrective Measures of Last Reporting 24. Environmental problems identified, in the last reporting period and the correctives

measures implemented in this reporting period are shown in below Table.

Table 4: Follow-up actions on the environmental problems identified in the last reporting period

Packages Environmental Problems Identified in the

last reporting period and necessary corrective measures

Follow-up inspections in the reporting period

Implemented Description/Photos

CW07-PC1

There is over flow of septic tank

Yes Clean up the over flow from toilet

CW07-PC1

Waste Scater at Camp Site Yes Cleaning Activity

Page 83: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 12: SUMMARY OF CONSULTANTS’ MOBILIZATION Page 8

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

Packages Environmental Problems Identified in the

last reporting period and necessary corrective measures

Follow-up inspections in the reporting period

Implemented Description/Photos

CW07-PC1

Oil Spill at sub-camp site

Yes Oil Spilling had been cleaned up

B. Necessary Corrective Measures of this Reporting Period 25. Site inspections during the reporting period have showed that most of the

requirements in the EMP have been implemented while few environmental problems were identified during site visit. These are:

i. Oil spilling at storage area for visited packages (CW07 and CW08), ii. Insufficient personal protection equipment providing (CW04), iii. Waste scatter at construction site and campsite for all visited packages (CW-

04, CW-07 and CW-08). 26. Appropriate corrective measures had been discussed with contractor; the follow-up work

will be continued in the next reporting period. Table 5: Environmental Problems Identified in this Reporting Period and Proposed Improvement

Page 84: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 12: SUMMARY OF CONSULTANTS’ MOBILIZATION Page 9

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

Packages Identified Problems Corrective Measures

CW-08 PC2

Storage area of empty oil closed to water source Find the storage oil area where is far from water source.

CW-08 PC2

Oil spilling from vehicle maintenance at Camp Site of CW08

Clean up as soon as possible

CW-08 PC2

Secondary Oil Contamination is broken. Repair the secondary oil

contamination as soon.

CW04-Kor Koh

No PPE Using during work Contractor shall encourage

workers using PPE properly.

Page 85: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 12: SUMMARY OF CONSULTANTS’ MOBILIZATION Page 10

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

27. All corrective measures will be followed up in next report period. Appendix 1: List of Participants in EMP Review Meeting

Page 86: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 12: SUMMARY OF CONSULTANTS’ MOBILIZATION Page 11

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

Appendix 2: List of Participants during Environmental Monitoring

Page 87: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 12: SUMMARY OF CONSULTANTS’ MOBILIZATION Page 12

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

Page 88: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 12: SUMMARY OF CONSULTANTS’ MOBILIZATION Page 13

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

Appendix 3: Pictorial Record of Safeguard Activities in TK and PC

Mental Fence Installation after civil work to prevent falling down into the canal (CW04)

Construction Activity at CW04

Induction on environment, Health and Safety to

workers (CW-08) Interview with female worker at CW08

Environment Specialist/PMIC have meeting with

Contractor (CW07) during field visit Workers with PPE during working (CW07)

Page 89: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 12: SUMMARY OF CONSULTANTS’ MOBILIZATION Page 14

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

Oil Storage Area at sub-camp site (CW07) Mental Waste Collection for other purpose usage

(CW07)

Drinking Water Providing to Workers at Sub-construction stie (CW07)

Toilet provided at Sub-cam Site (CW07)

Sub-camp site Location (CW07) Garbage bins at CW08

Page 90: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 12: SUMMARY OF CONSULTANTS’ MOBILIZATION Page 15

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

Warning Sign (CW-08) Water Spraying at CW-07

Warning Sign at Construction Site (CW-07)

Page 91: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 12: SUMMARY OF CONSULTANTS’ MOBILIZATION Page 16

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

APPENDIX 13:

SUMMARY OF CONSULTANTS’ MOBILIZATION

Page 92: UPLANDS IRRIGATION AND RESOURCES MANAGEMENT …uplands-irrigation-mowram.gov.kh/giant_uploads/... · PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT Design and implementation of

APPENDIX 12: SUMMARY OF CONSULTANTS’ MOBILIZATION Page 17

UPLANDS IRRIGATION AND WATER RESOURCES MANAGEMENT

SECTOR PROJECT, CAMBODIA (ADB LOAN 3289-CAM): PROJECT MANAGEMENT AND IMPLEMENTATION CONSULTANT

 

SUMMARY OF CONSULTANTS’ MOBILIZATION

01 January 2018 to 31 March 2018

Previous This Qtr To Date

INTERNATIONAL CONSULTANTS

1 Jose A. Galvez, Ph D***** Team Leader/Water Res. Specialist PRIMEX 9.1 9.1 - 9.1 -

2 Mr. Abdul Hakeem Khan Team Leader/Water Res. Specialist PRIMEX 14.9 5.5 0.6 6.1 8.8

3 Ms. Benilda Tayag Institutional/Training Specialist PRIMEX 4.0 3.3 - 3.3 0.7

4 Mr. Rolando Maloles Hydrologist OCG 12.0 6.4 1.0 7.4 4.6

5 Mr. Bienvenido Gilles Monitoring & Evaluation Specialist OCG 6.0 3.8 - 3.8 2.2

6 Mr. Syed Umar Ali Syah Procurement & Contracts Specialist (Home) PRIMEX 12.0 5.8 - 5.8 6.2

7 Mr. Syed Umar Ali Syah Procurement & Contracts Specialist(Field) PRIMEX 12.0 1.8 - 1.8 10.2

Subtotal for International Consultants 70.0 35.7 1.6 37.3 32.7

NATIONAL CONSULTANTS

1 Mr. Lim Dalika* DTL/ Irrigation Management Specialist CADTIS 0.5 0.5 - 0.5 -

2 Mr. An Saradeth*** DTL/ Irrigation Management Specialist CADTIS 2.4 2.4 - 2.4 -

3 Mr. Ung Kotaro DTL/ Irrigation Management Specialist CADTIS 51.2 12.8 2.9 15.7 35.5

4 Mr. Roeun Sophanna Procurement & Contracts Specialist CADTIS 24.0 22.5 1.3 23.8 0.2

5 Mr. Kuch Pouk** Financial Mngment/Accountant Specialist CADTIS 3.0 3.0 - 3.0 -

6 Ms. Lim Kimvourch Financial Mngment/Accountant Specialist CADTIS 51.0 18.8 3.0 21.8 29.2

7 Mr. Han Pon Institutional/Training Specialist CADTIS 12.0 6.2 - 6.2 5.8

8 Mr. Ouk Daren Monitoring & Evaluation Specialist CADTIS 24.0 18.0 - 18.0 6.0

9 Mr. Cheng Saroeun Hydraulic Structures Engineer CADTIS 24.0 13.2 - 13.2 10.8

10 Mr. Kimhor Chhit Hydrologist CADTIS 24.0 16.9 - 16.9 7.1

11 Mr. Sok Chea Agriculture Specialist/ Agronomist CADTIS 10.0 2.6 - 2.6 7.4

12 Mr. Sok Piseth Materials/Quality Control Engineer CADTIS 12.0 9.0 - 9.0 3.0

13 Mr. Doeur Davuth Materials/Quality Control Engineer CADTIS 12.0 11.6 - 11.6 0.4

14 Mr. Chap Samoeun Social Safeguards/Resettlement Specialist CADTIS 24.0 8.6 - 8.6 15.4

15 Mr. Prak Sokha**** Gender Specialist CADTIS 18.0 3.2 - 3.2 14.8

16 Mr. Pen Thay Gender Specialist CADTIS 14.8 - 0.5 0.5 14.3

17 Ms. Sao Sambathmorakat Environment Specialist CADTIS 18.0 10.2 0.4 10.6 7.4

18 Mr. Vong Dara Construction Management Engineer CADTIS 54.0 22.5 3.0 25.5 28.5

19 Mr. Vuth Sivorng Construction Management Engineer CADTIS 54.0 22.5 3.0 25.5 28.5

20 Mr. Thai Pipheak Assistant Engineer, KPT CADTIS 48.0 18.3 3.0 21.3 26.7

21 Ms. Heng Thavy Assistant Engineer, Batt CADTIS 48.0 21.6 3.0 24.6 23.4

22 Mr. Sar Samath Assistant Engineer, KPT CADTIS 48.0 13.8 - 13.8 34.2

23 Mr. Tao Kimmeng Assistant Engineer, Batt CADTIS 48.0 18.9 3.0 21.9 26.1

24 Mr. Heang Rethdaro******* Website Designer CADTIS 30.0 6.6 - 6.6 23.4

25 Mr. El Chhuon Website Designer CADTIS 23.4 - 1.0 1.0 22.4

26 Mr. Lim Sary Assistant Engineer, KPT CADTIS 24.0 7.8 - 7.8 16.2

27 Mr. Lim Sambath****** Assistant Engineer, KPT CADTIS 24.0 3.8 - 3.8 20.2

Subtotal for National Consultants 726.3 295.3 24.0 319.3 407.0

TOTAL FOR ALL CONSULTANTS 796.3 331.0 25.6 356.6 439.7

1/ Original contract Percent rendered 44.8 %

***** Resigned on 09 January 2017.

****** Resigned on 03 May 2017.

******* Resigned on 30 May 2017.

Note: This Quarter is Jan-Mar 2018

Name Position Firm

Summary of Consultant's Mobilization

Contract 1/ Cumulative Input

Balance