unclassified 1 multinational planning augmentation team (mpat) 06 november 2006 what is mpat?

15
1 UNCLASSIFIED Multinational Planning Multinational Planning Augmentation Team Augmentation Team (MPAT) (MPAT) 06 November 2006 What is MPAT? What is MPAT?

Upload: tracy-long

Post on 18-Jan-2016

217 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: UNCLASSIFIED 1 Multinational Planning Augmentation Team (MPAT) 06 November 2006 What is MPAT?

1UNCLASSIFIED

Multinational PlanningMultinational PlanningAugmentation TeamAugmentation Team

(MPAT)(MPAT)

06 November 2006

What is MPAT?What is MPAT?

Page 2: UNCLASSIFIED 1 Multinational Planning Augmentation Team (MPAT) 06 November 2006 What is MPAT?

2UNCLASSIFIED

A cadre of military planners from nations with Asia-Pacific interests capable of rapidly augmenting a multinational force (MNF) headquarters (HQ) established to plan and execute coalition operations in response to military operations other than war (MOOTW) / small scale contingencies (SSC).

MPATMPAT

Page 3: UNCLASSIFIED 1 Multinational Planning Augmentation Team (MPAT) 06 November 2006 What is MPAT?

3UNCLASSIFIED

MPAT – A Multinational MPAT – A Multinational ProgramProgram

•Multinational venue to share MNF CTF HQ procedures

•Maintains a cadre of MNF planners:– skilled in common crisis action planning procedures

– available to rapidly augment a CTF HQ during a crisis

•Develops habitual relationships among MPAT cadre

•Meets periodically to:– share information & develop CTF HQ procedures (MNF SOP)

– practice CTF HQ activation, formation, & planning processes

•Includes interested nations, International Organizations (IOs), Non-governmental Organizations (NGOs), & United Nations (UN) agencies

MPAT PROGRAM BELONGS TO

ALL INTERESTED NATIONS

Page 4: UNCLASSIFIED 1 Multinational Planning Augmentation Team (MPAT) 06 November 2006 What is MPAT?

4UNCLASSIFIED

MPAT Objectives & MethodsMPAT Objectives & Methods

•Improve Speed of Multinational Crisis Response

•Improve Multinational Force Interoperability

•Increase CTF Mission Effectiveness

•Unity of Effort

•Strengthen & Practice Common Crisis Action Planning Procedures

•Develop and become familiar with common Standing Operating Procedures (SOP) for MNF CTF HQ

Page 5: UNCLASSIFIED 1 Multinational Planning Augmentation Team (MPAT) 06 November 2006 What is MPAT?

5UNCLASSIFIED

AustraliaAustralia Bangladesh Bangladesh BruneiBruneiCanadaCanada East TimorEast Timor FranceFranceFijiFiji GermanyGermany IndiaIndiaIndonesiaIndonesia ItalyItaly JapanJapanKoreaKorea Madagascar Madagascar MalaysiaMalaysiaMaldivesMaldives MauritiusMauritius MongoliaMongoliaNepalNepal New ZealandNew Zealand Papua New GuineaPapua New GuineaRussiaRussia PhilippinesPhilippines SingaporeSingaporeSolomon IslandsSolomon Islands Sri LankaSri Lanka ThailandThailandTongaTonga TuvaluTuvalu UKUKUSUS VanuatuVanuatu VietnamVietnam

(33 countries)(33 countries)

MPAT Participants

Page 6: UNCLASSIFIED 1 Multinational Planning Augmentation Team (MPAT) 06 November 2006 What is MPAT?

6UNCLASSIFIED

•Increase multinational force (MNF):–Speed of Initial Response–Interoperability–Overall Mission Effectiveness–Unity of Effort

MNF SOP PurposeMNF SOP Purpose

Page 7: UNCLASSIFIED 1 Multinational Planning Augmentation Team (MPAT) 06 November 2006 What is MPAT?

8UNCLASSIFIED

JTF HQ OrganizationJTF HQ Organization

Single Nation Concept

JTFJTF

Joint TaskJoint Task

Force HQForce HQ

Core Planning Staff

MNF CTF HQ AugmentationMNF CTF HQ Augmentation

Lead Nation Concept

CTF HQCTF HQ

MultinationalMultinational

Force HQForce HQ

Core Planning Staff - Lead

Nation

Nation 4Nation 4

Nation 5Nation 5

Nation 6Nation 6Nation 3Nation 3

Nation 2Nation 2

Nation 1Nation 1MPAT CADRE

MPAT CADRE

MPAT CADRE

MPAT CADRE

MPAT CADRE

MPAT CADRE

Page 8: UNCLASSIFIED 1 Multinational Planning Augmentation Team (MPAT) 06 November 2006 What is MPAT?

11UNCLASSIFIED

Event Links

SOP-9 (Nov06)

TE-11 (Mar07)

Future TEs

Develop Procedures

Test Procedures

Validate Procedures

SOP Development:•SOP Rewrite•CM•CBRN-TIM Staff•Medical•International Standards

MULTINATIONAL FORCE STANDING OPERATING

PROCEDURES(MNF SOP)

Version: 2.0 (Working Draft)Last Update: 7 July 2006

Page 9: UNCLASSIFIED 1 Multinational Planning Augmentation Team (MPAT) 06 November 2006 What is MPAT?

12UNCLASSIFIEDHow Do We Coordinate, Cooperate, Synchronize Efforts?How Do We Coordinate, Cooperate, Synchronize Efforts?

Civil – Military Interoperability Efforts

Humanitarian Community

MilitaryCivil

Governmental

• Workshops & Seminars Information-Sharing• Education & Training Learning• Exercises Knowing

UnifiedActionUnifiedAction

Page 10: UNCLASSIFIED 1 Multinational Planning Augmentation Team (MPAT) 06 November 2006 What is MPAT?

15UNCLASSIFIED

Schedule

06 November (Monday) / Uniform Class “B” or equivalent• 0800-0900 Final Registration (2nd Floor)• 0900-0905 Administrative Remarks – to be announced• 0905-0920 Opening / Welcoming Remarks – MG Heryadi• 0920-1000 Brief #1: Disaster Relief Operations in Indonesia Brief – MG

Heryadi• 1000-1020 Tea Break• 1020-1030 Group Photo (Location: Main Ball Room Plenary Space)• 1030-1100 What is MPAT Brief – MPAT Secretariat Representative• 1100-1130 Plenary review of MNF SOP – Mr John Bratton• 1130-1150 Brief #2: Indonesian Armed Forces Video – COL Paruntungan• 1150-1230 Brief #3: ICRC Brief – Mr Nick Nobbs Brief• 1230-1400 Lunch (Portoveneri Room – Ground Floor)• 1400-1430 Brief #4: Consequence Management Brief – Mr Stephen Carey / Ms

Kate Elliott• 1430-1445 Workgroups Convene and Conduct Initial Organization

(Facilitators)• 1445-1500 Tea Break• 1500-1600 Workgroup Initial Review Actions and Discussions• 1600-1615 Facilitators Meeting

Page 11: UNCLASSIFIED 1 Multinational Planning Augmentation Team (MPAT) 06 November 2006 What is MPAT?

16UNCLASSIFIED

Schedule Continued

•07 November (Tuesday) / Uniform Class “B” or equivalent

• 0800-0830 Working Group Stand Up (all Workgroups assemble in designated room)

• 0830-1230 Working Group review of SOP• 1230-1400 Lunch (Second Floor Foyer)• 1400-1530 Working Group review of SOP• 1530-1600 Facilitators meeting

•08 November (Wednesday) / Special Dress – See Note Below

• 0800-0830 Working Group Stand Up (all Workgroups assemble in designated room)

• 0830-0930 Travel to Cultural Event• 0930-1230 Cultural Event (Taman Mini Indonesia Indah)• 1230-1330 Return to Hotel• 1330-1430 Lunch (Second Floor Foyer)• 1400-1530 Working Group review of SOP• 1530-1600 Facilitators meeting

Page 12: UNCLASSIFIED 1 Multinational Planning Augmentation Team (MPAT) 06 November 2006 What is MPAT?

17UNCLASSIFIED

Schedule Continued

• 09 November (Thursday) / Uniform Class “B” or equivalent – Special for Dinner

• 0800-0830 Working Group Stand Up (Workgroups assemble in designated room)

• 0830-1230 Working Group review of SOP• 1230-1400 Lunch (Second Floor Foyer)• 1400-1530 Working Group review of SOP• 1530-1600 Facilitators meeting• 1830 Busses Depart for Dinner• 1930-2200 Hosted Dinner / Crest Exchange (TNI-USPACOM) – (Men – Long

sleeve shirt and dark trousers; Woman – Conservative)

• 10 November (Friday) / Uniform Class “B” or equivalent• 0800-0915 Final Working Group Reviews of SOP (Plenary Room)• 0915-1100 Final Back Briefs Executive Summaries – moderator to be

announced• (Tea Break 1000-1015)• 1100-1145 Review of issues and MPAT way ahead – MPAT Secretariat Rep• 1145-1215 Closing Remarks / Certificates / Coins• 1230-1400 Lunch (Portoveneri Room – Ground Floor)

Page 13: UNCLASSIFIED 1 Multinational Planning Augmentation Team (MPAT) 06 November 2006 What is MPAT?

18UNCLASSIFIED

Detailed Friday Schedule

• 10 November (Friday) / Uniform Class “B” or equivalent• 0800-0930 Final Working Group Reviews of SOP (Plenary Room)• 0930-1115 Final Back Briefs Executive Summaries – 15 minutes

(max)/group– 0930-0945 Group 1– 0945-1000 Group 2

• Tea Break 1000-1015– 1015-1030 Group 3– 1030-1045 Group 4– 1045-1100 Group 5– 1100-1115 Group 6

• 1115-1145 Review of issues and MPAT way ahead – MPAT Secretariat Rep

• 1145-1215 Closing Remarks / Certificates / Coins• 1230-1400 Lunch (Portoveneri Room – Ground Floor)

Page 14: UNCLASSIFIED 1 Multinational Planning Augmentation Team (MPAT) 06 November 2006 What is MPAT?

19UNCLASSIFIED

Cultural Event

• Wednesday, 08 Nov 06–Travel to Event (0830-0930)–Event (0930-1230)–Return to Hotel (1230-1330)–Lunch at Hotel (1330-1430)

• Taman Mini Indonesia Indah Trip• Casual Dress, short sleeve shirt and trousers (men), conservative dress (women), sandals, sneakers

• Bring cameras, hats, money for souvenirs

Page 15: UNCLASSIFIED 1 Multinational Planning Augmentation Team (MPAT) 06 November 2006 What is MPAT?

20UNCLASSIFIED

MPAT:

www.mnfsop.com

Or send email to:

[email protected]