Indonesia National Petroleum Corporation

Genset specification: Prime rating 1250KVA, 4160V (High volt), 60HZ, 1800RPM

Engine:KTA38-G4(CCEC CUMMINS)Alternator:JFG5002-4/4160(LIUZHOU JIALI)Control panel:DSE5220

QTY:4 units

Application: 4 units running at 24hrs x 7 days.Output power to electricity grid

Page 3: Typical cases by saonon
Page 4: Typical cases by saonon

Saudi Arabia COMMUNICATION CO., LTD

Genset specification: Prime rating 1400KVA, 480V,60HZ, 1800RPM

Engine:KTA50-G3(CCEC CUMMINS)Alternator:PI734D(STAMFORD)Control panel:PCCP3100

QTY:28 units

Application: 4 units running at 24hrs x 7 days.Output power to government electricity grid55℃Deg, desert area, big temperature difference between day and night

Page 5: Typical cases by saonon
Page 6: Typical cases by saonon

Nigeria stannum mine project

Genset specification: Prime rating 625KVA,380V,50HZ, 1500RPM

Engine:KTAA19-G5 (CCEC CUMMINS)Alternator:HCI544E (Stamford)Control panel:DSE7510

QTY:7 units

Application: 3 units running in 8 hours,each 8 hours use the parallel system, power no stop divert to other 3 units.Diggings high reqeust for the levels of protection

Page 7: Typical cases by saonon
Page 8: Typical cases by saonon

Typical Project Introduce_ 5x2MW Caterpillar Containerized Power Plant

Project Name: Shandong Asia Pacific Ssymb Pulp and Paper Co.,Ltd.- 5 units of 2000kw standby ratings Caterpillar gensets

Genset specification: Prime rating 10MW,380V,50HZ, 1500RPM

Project Background:When the factory fails of electricity power supply, the generator set will start automatically, it will supply the power electricity and start the auxiliary system to start the Steam turbine generating sets of the power plant. After the successful start of steam turbine generating sets, it will reduce the load of diesel generating sets automatically. When the steam turbine generating sets run normally, the DCS (Distributed Control System) of the power plant will stop the diesel generating sets.

Project Introduce:

In 2011, our company (SAONON) successfully won this black-start project, providing Five sets of 2000kw Containerized Diesel Generating Sets and Two sets of Containerized HV&LV Distribution System and according fuel pipeline system, and meet the requirement of that starting the diesel generating sets which with automatic-start capability, to start the steam turbine generating set which without automatic-start, and gradually expand the system restore electricity range. This project consist of Five sets of 2000kw Containerized gensets, and the Scope of Supply including 5 sets of imported Genuine Caterpillar Gensetsmodel# 3516(2000kw standby ratings/10.5KV/50hz/1500rpm), Caterpillar Sync cabinet, Medium-Voltage switchgear, Neutral Grounding Resistance and Control System, PT Cabinet, DC110V Panel with Batteries, LV MCC Switchgear, PLC Monitoring System, Siemens Transformer, and including electricity installation system, fuel pipeline engineering system and our company in charge of the on-site installation and commissioning, is a typical turnkey projects in China.

Page 9: Typical cases by saonon
Page 10: Typical cases by saonon
Page 11: Typical cases by saonon

When the gensets in factory

Page 12: Typical cases by saonon

First, we will provide you the professional suggestion in the parallel system. And show you the design.

How SAONON to do

Page 13: Typical cases by saonon

The suggestion and the supply include this – Technical support

Page 14: Typical cases by saonon

If you talking about the machinery support – We will do it like that.