track - indian railway2).pdfbhel haridwar has been processed for maximum test speed ... annual...

11
www.rdso.indianrailways.gov.in www.rdso.indianrailways.gov.in Annual Report 2011-2012 RESEARCH, DESIGNS & STANDARDISATION Revision of Specifications for Track Based Lubricators Following condonation cases have been sent to CCRS for sanction of Railway Board during the month April 2011 to March 2012 n n n n n n Condonation of Infringements for EMD GT50AC (WDG5) Locomotive Trial of Corrosion Resistant NCC (Ni-Cr-Cu) n Rails n n n Trial of Corrosion Resistant Cu-Mo Rails n developed corrosion resistant Cu-Mo rails which were laid in Waltair Division of East Coast Railway for initial field trial. On finding the performance of Cu-Mo rails encouraging, Railway Board ordered rolling of 1,000 MT Para 427 of IRPWM deals with measures for reducing of rails for extensive field trial. wear on outer rails on curves, by lubricating the gauge Trial scheme for trial of corrosion resistant (Cu-Mo) rails face of outer rails. This lubrication is presently done by has been prepared and sent to Southern, South Eastern applying the graphite grease manually. To save the and Western Railways for conducting trial. These rails manpower and consistency of lubrication of track, are also under field trial over these railways for RDSO has done a trial by procuring 12 Nos. of track performance evaluation. Mounted Imported & mechanised lubricators. Infringement of Schedule of Dimensions by Ballast Regulating Machine, manufactured by M/s Gemac Engineering Machinary Company Ltd., China, design condonation thereof. Infringement of Schedule of Dimensions by Work Site Tamper without flat car Model VPR 02M, manufactured by M/s Metex-Jsc, design condonation thereof. Condonation of infringements to IRSOD (BG)- Revised 2004 of 4-Wheeler Self-Propelled Mast Erection Machine Vehicle (MEMV) manufactured by M/s Phooltas Tamper Pvt. Ltd, Patna. After gathering experience from field trial of these Condonation of infringements for new design lubricators, existing specifications have been revised. A auto car wagon-BCACBM. final draft specification has been sent to Railway Board Condonation of infringements to maximum for approval after considering the comments/ dimensions of second class Non AC EOG LHB suggestions received from stakeholders. This variant coach to IRSOD 2004. specification covers the requirement of lubricating system, properties of lubricant, performance of Condonation of infringements to maximum applicators, control on dispensation of lubricant and dimensions of 3-Tier sleeper Non AC EOG LHB performance and travel of grease to minimum 2.0 km variant coach to IRSOD 2004. distance in all climatic & traffic conditions and reduction of coefficient of friction to 0.25 μ. Condonation of infringements to maximum dimensions of EOG AC Hot Buffet LHB A new metallurgy has been developed as a result of variant Coach to IR-SOD 2004. project on corrosion prevention of rails under Condonation of infringements to maximum Technology Mission on Railway Safety. This metallurgy dimensions of EOG AC First Class LHB variant has been developed jointly by RDSO, IIT Kanpur and Coach to IR-S0OD 2004. SAIL. Condonation of infringements to maximum Railway Board had placed trial order of 10,000MT of dimensions of EOG AC Two Tier LHB variant NCC rails for laying in corrosion prone areas. Trial Coach to IR-SOD 2004. scheme and locations for laying of these rails have been Condonation of infringements to maximum advised to SER, SCR, SR, SWR and WR with dimensions of EOG AC Data Acquisition and monitoring proforma. These rails are under trial over Analysis Car (EOG AC Oscillograph Car) LHB these railways for performance evaluation. variant Coach to IR-SOD 2004. Condonation of infringements to maximum In order to prevent rail corrosion, RDCIS/Ranchi had dimensions of EOG AC Track Recording Car LHB TRACK 74

Upload: lehanh

Post on 24-Mar-2018

225 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: TRACK - Indian Railway2).pdfBHEL Haridwar has been processed for maximum test speed ... Annual Report 2011-2012 TRACK ... North Central Railway and Northern MW Turbo Generator stator

www.rdso.indianrailways.gov.inwww.rdso.indianrailways.gov.in

Annual Report 2011-2012

RESEARCH, DESIGNS & STANDARDISATION

Revision of Specifications for Track BasedLubricators

Following condonation cases have been sent to CCRS for sanction of Railway Board during the month April 2011 to March 2012

n

n

n

n

n

n

Condonation of Infringements for EMD GT50AC (WDG5) Locomotive

Trial of Corrosion Resistant NCC (Ni-Cr-Cu) nRails

n

n

n

Trial of Corrosion Resistant Cu-Mo Railsn

developed corrosion resistant Cu-Mo rails which were laid in Waltair Division of East Coast Railway for initial field trial. On finding the performance of Cu-Mo rails encouraging, Railway Board ordered rolling of 1,000 MT

Para 427 of IRPWM deals with measures for reducing of rails for extensive field trial. wear on outer rails on curves, by lubricating the gauge

Trial scheme for trial of corrosion resistant (Cu-Mo) rails face of outer rails. This lubrication is presently done by

has been prepared and sent to Southern, South Eastern applying the graphite grease manually. To save the

and Western Railways for conducting trial. These rails manpower and consistency of lubrication of track,

are also under field trial over these railways for RDSO has done a trial by procuring 12 Nos. of track

performance evaluation. Mounted Imported & mechanised lubricators.

Infringement of Schedule of Dimensions by Ballast Regulating Machine, manufactured by M/s Gemac Engineering Machinary Company Ltd., China, design condonation thereof.

Infringement of Schedule of Dimensions by Work Site Tamper without flat car Model VPR 02M, manufactured by M/s Metex-Jsc, design condonation thereof.

Condonation of infringements to IRSOD (BG)-Revised 2004 of 4-Wheeler Self-Propelled Mast Erection Machine Vehicle (MEMV) manufactured by M/s Phooltas Tamper Pvt. Ltd, Patna.

After gathering experience from field trial of these Condonation of infringements for new design lubricators, existing specifications have been revised. A auto car wagon-BCACBM.final draft specification has been sent to Railway Board Condonation of infringements to maximum for approval after considering the comments/ dimensions of second class Non AC EOG LHB suggestions received from stakeholders. This variant coach to IRSOD 2004. specification covers the requirement of lubricating

system, properties of lubricant, performance of Condonation of infringements to maximum applicators, control on dispensation of lubricant and dimensions of 3-Tier sleeper Non AC EOG LHB performance and travel of grease to minimum 2.0 km variant coach to IRSOD 2004.distance in all climatic & traffic conditions and reduction of coefficient of friction to 0.25 µ.

Condonation of infringements to maximum dimensions of EOG AC Hot Buffet LHB

A new metallurgy has been developed as a result of variant Coach to IR-SOD 2004. project on corrosion prevention of rails under

Condonation of infringements to maximum Technology Mission on Railway Safety. This metallurgy

dimensions of EOG AC First Class LHB variant has been developed jointly by RDSO, IIT Kanpur and

Coach to IR-S0OD 2004.SAIL.

Condonation of infringements to maximum Railway Board had placed trial order of 10,000MT of

dimensions of EOG AC Two Tier LHB variant NCC rails for laying in corrosion prone areas. Trial

Coach to IR-SOD 2004.scheme and locations for laying of these rails have been

Condonation of infringements to maximum advised to SER, SCR, SR, SWR and WR with dimensions of EOG AC Data Acquisition and monitoring proforma. These rails are under trial over Analysis Car (EOG AC Oscillograph Car) LHB these railways for performance evaluation.variant Coach to IR-SOD 2004.

Condonation of infringements to maximum In order to prevent rail corrosion, RDCIS/Ranchi had dimensions of EOG AC Track Recording Car LHB

TRACK

74

Page 2: TRACK - Indian Railway2).pdfBHEL Haridwar has been processed for maximum test speed ... Annual Report 2011-2012 TRACK ... North Central Railway and Northern MW Turbo Generator stator

www.rdso.indianrailways.gov.inwww.rdso.indianrailways.gov.in

Annual Report 2011-2012 TRACK

variant Coach to IR-SOD 2004. suspension arrangement for 9 Car rake on CCG - V Rsection of Western Railway. Condonation of infringements to maximum

dimensions of EOG AC Track Recording Staff Oscillation trials on MRVC AC/DC EMU coaches Car LHB variant Coach to IR-SOD 2004. fitted with ICF make shell and "Siemens" bogie

fitted with air spring at the secondary stage upto a Condonation of 28-axle special wagon for M/s. maximum test speed of 145 km/h in empty and BHEL Haridwar has been processed for loaded condition with air spring in inflated and sanction of Railway Board through Chief deflated mode over Dahanu Road -Virar UP Line Commissioner of Railway Safety.section of Western Railway.

Condonation of infringements to maximum Confirmatory Oscillograph Car Run (COCR) of dimensions of EOG Air Conditioned double Rajdhani Express train with a rake comprising of decker coaches (width3050mm)oscillograph car and 18 LHB AC (EOG) coaches

Condonation of infringements to maximum hauled by WAP5 Locomotive upto a maximum dimensions of EOG Air Conditioned double speed of 140 Kmph on AGC-BINA section of North decker (MK-II).coaches Central Railway.Condonation of infringement to IRSOD by Work Oscillation trial of WDP4B class of locomotive up Site tamper without flat car model VPR02M, to maximum test speed of 120 kmph on manufactured by M/s Metex-JSc, Moscow Belanagar-Dankuni section of Eastern Railway.

Detailed Oscillation trial of WDP4D locomotive over 20 curve by a test train consisting of one WDP4D locomotive and one oscillograph car with all coil ICF bogies or with IR 20 bogies at maximum

Confirmatory Oscillograph Car Run (COCR) of permissible speed of 120 kmph over Belanagar-Metro coaches manufactured by M/s CAF , Dankuni section in Howrah Division of Eastern Spain over New Delhi to Dwarka sector 21 Railway. station up to a maximum speed of 120kmh on

Oscillation trials of WDM3F locomotive on Delhi Airport Metro Express line.20 curve with wear adopted and worn wheel profile

Controllability trials including EBD trials on 25 air over Belanagar-Dankuni section of Eastern braked loaded coaches (including 1inspection Railway at maximum test speed of 120 kmph. car) headed by WAP7,WAP4,WAG5,WAG7, Oscillation trials of WDM3F locomotive on WAP5, WDM3A,WDG3A(earlier named as 20 curve with wear adopted and worn wheel profile WDG2) and WDM3D locomotive in descending over Belanagar-Dankuni section of Eastern direction of MJY-DHQ and CCD-TEO ghat Railway at maximum test speed of 120 kmph.section in NGP division of Central Railway.

Draft report of oscillation trial of Bangalore Metro Controllability trial including EBD trial of 42 Rail Corporation Ltd (BMRCL) coaches BCNAM1 wagon (loaded CC+8+2t) headed by manufactured by M/s Hyundai -Rotem/Korea 3WAG7 locomotive upto the maximum test upto a maximum test speed of 90 kmph over speed of 30 kmph over LNL-KJT down the ghat Mahatma Gandhi Road to Baiyappanahali section of Mumbai division of Central Railway. sections of SG network in both empty and loaded Coupler force trial on loaded 50 BTPN wagon condition with Air Spring in fully inflated , deflated headed by 3WAG5A(MU) and 3WAG7(MU) and partly deflated mode. locomotives as banker upto the maximum test Draft report of Emergency Braking Distance trial of speed of 55 kmph over KJT - LNL (down & Bangalore Metro Rail Corporation Ltd (BMRCL) Middle line) Mumbai division of Central Railway. coaches manufactured by M/s Hyundai -Oscillation trials of KOLKATA Metro A.C. Rotem/Korea upto a maximum test speed of Coaches up to a maximum test speed of 90 75 kmph over Mahatma Gandhi Road to kmph over Shovabazar - Central station Baiyappanahali sections of SG network in both sections (B.G.). empty and loaded condition with Air Spring

arrangement.Oscillation trials on MRVC AC/DC EMU coaches fitted with ICF make shell and "Siemens" bogie Controllability trials including EBD trials on 25 air to assess the ride quality of the stock upto the braked loaded coaches (including 1 inspection speed potential of 120 km/h on CCG-VR section car) headed by WAP7,WAP4,WAG5,WAG7, of Western Railway. WAP5, WDM3A,WDG3A(earlier named as

WDG2) and WDM3D locomotive in descending. Emergency Braking Distance (EBD) trials on MRVC AC/DC EMU stock fitted with ICF make Confirmatory Oscillogrph Car Run (COCR) EBD shell and "Siemens" bogie fitted with air and Jerk Trials of Mail/Express trains consisting of

nn

n

nn

n

n n

Following Oscillation Trial Reports Have nBeen Scrutinized During April 2011 to March 2012

n

n

n

nn

n

n

n

n

n

n

n

1111111175

Page 3: TRACK - Indian Railway2).pdfBHEL Haridwar has been processed for maximum test speed ... Annual Report 2011-2012 TRACK ... North Central Railway and Northern MW Turbo Generator stator

www.rdso.indianrailways.gov.inwww.rdso.indianrailways.gov.in

Annual Report 2011-2012 TRACK

22AC/Non AC EOG LHB coaches up to a Amendment no.2 to speed certificate for maximum speed of 130kmph on RJPB- conducting detailed Oscillation trials of WAP4 NDLS(UP&DN line) sections of East Central class of locomotive up to a maximum speed of Railway, North Central Railway and Northern 155kmph on Track maintained to C&M-1 Vol-1 Railway. standard.

EBD Trials of Mail/Express trains consisting of Provisional speed certificate for one time 22AC/Non AC EOG LHB coaches up to a movement of 24 axle ( Threaded beam) BG maximum speed of 130kmph on RJPB- special wagon Kailash (with KWU-C loading beam) NDLS(UP&DN line) sections of East Central of M/s BHEL Haridwar, for transport of 3 nos. 500 Railway, North Central Railway and Northern MW Turbo Generator stator weighing 258t Ex. Railway Haridwar, Northern Railway to Shakti Nagar for

Rihand TPS siding, East Central Railway.

Speed certificate for movement of 90 tones bogie type B.G. 800hp, diesel hydraulic locomotives manufactured by M/s SAN Engineering &

BMRC has submitted Schedule of Dimensions (SOD). Locomotive Co.Ltd.Accordingly, Schedule of Dimensions (SOD) was Provisional speed certificate for one time scrutinized in RDSO and after getting final draft SOD movement of 24 axle ( Threaded beam) BG from BMRCL, comments on the same were sent to special wagon Kailash (with KWU-C loading beam Railway Board. Railway Board has provisionally ) of M/s BHEL Haridwar, for transport of 3 nos. approved SOD vide their let ter no. 500 MW Turbo Generator stator weighing 258t 2010/Proj/Bangalore/30/4. Ex. Haridwar, Northern Railway to Shakti Nagar

Vindhyachal TPS siding, East Central Railway.

Provisional speed certificate for one time Final draft SOD of DFC (Eastern and Western movement of 24 axle ( Threaded beam) BG corridors) was submitted to Railway Board vide letter special wagon Kailash (with KWU-C loading beam no.CT/DG/DFC dated 15.11.2011. ) of M/s BHEL Haridwar, for transport of 3 nos. 500 MW Turbo Generator stator weighing 258t Ex. Haridwar, Northern Railway to Bokaro TPS siding, Eastern Railway.

Amendment no.1 to provisional speed certificate Sh.S.P.Mishra,JDST-II along with five other officers for Rail Grinding Machines model EGI 72,supplied and staff from Wagon and Bridge Dte. of RDSO visited by M/s Loram,USA.China for feasibility study of Special Wagon required

for transportation of 660 MW Generator to be imported Speed certificate for operation of passenger train by M/s Reliance Infra Ltd. on IR network. comprising of 25 air braked Hybrid (LHB shell +

ICF bogie) coaches with single WAP7 locomotive over Dharakhoh -Maramjhiri and Teegaon-Chichonda ascending the Ghat Section of Nagpur Division of Central Railway.

Amendment no.01 to Revised Final Speed certificate for operation of BG EOG Double Following speed certificates has been vetted From Decker Chair Car coaches fitted with pneumatic April 2011 to March 2012Suspension at the Secondary stage on Fiat

Speed certificate for conducting detailed bogies up to a maximum speed of 160kmph on oscillation and EBD trials on standard gauge track maintained to C&M-I Vol-I standard.(SG) system for Bangalore metro coaches

Speed certificate for one time movement of 50nos. manufactured by M/s Hundai -Rotem /Korea Food grain hopper wagon type BCBFG for M/s with air suspension arrangement. Adani Agri Logistics Ltd. From the siding of M/s

Draft speed certificate for conducting detailed Texmaco Ltd. Kolkata to Dagru Adani siding near oscillation trial of Broad Gauge Bogie Brake Van Moga on Ludhiana - Ferozpur section of Wagon type BVCM at 110kmph. Northern Amendment no.2 to speed certificate for Speed certificate for conducting Coupler force conducting detailed Oscillation trials of trials of goods trains consists of 43BCNM1/ WDP4D class of locomotive up to a maximum BCNAM1/BCNAHSM1 loaded wagon with speed of 155kmph on Track maintained to C&M- 1WCAG1/1WAG7/2WAG5(A/B/C)/ 2WDG3A/ 1 Vol-1 standard. 1WDG4 as leading and 3WAG5(A/B/C)

n

n n

Submission of Final Draft of Schedule of nDimensions (SOD) for Bangalore Metro

Railway Corporation Ltd.

n

DFC SODn

Feasibility Study of Special Wagon for movement of ODC of M/s Reliance Infra Ltd.

n

n

METRO SOD

Letter has been sent to Railway Board after First round scrutiny of RMGL,

nKMRCL, and MMOPL SOD

n

n

n

n n

1111111176

Page 4: TRACK - Indian Railway2).pdfBHEL Haridwar has been processed for maximum test speed ... Annual Report 2011-2012 TRACK ... North Central Railway and Northern MW Turbo Generator stator

www.rdso.indianrailways.gov.inwww.rdso.indianrailways.gov.in

Annual Report 2011-2012 TRACK

/3WAG7(MU) as banker locos over lonavala - track maintained to C&M-I, Vol-I standard up to a Karjat ascending the Ghat section of BB division maximum speed of 155kmph.of Central Railway. Amendment no.1 to speed certificate no. Speed certificate for conducting Coupler force MW/CS/BHEL/HD/Pt. dated 19-05-2011for one trials of goods trains consists of 50 BTPN loaded time movement of 24 axle ( Threaded beam) BG wagon with 1WCAG1/1WAG7/2WAG5(A/B/C)/ special wagon Kailash (with KWU-C loading 2WDG3A/1WDG4 as leading and 3WAG5 beam) of M/s BHEL Haridwar, for transport of 3 (A/B/C)/3WAG7(MU) as banker locos over nos. 500 MW Turbo Generator stator weighing lonavala -Karjat ascending the Ghat section of 258t Ex. Haridwar, Northern Railway to Bokaro, BB division of Central Railway TPS siding, East Central Railway.

Amendment no.1 to final speed certificate of Speed certificate for conducting confirmatory WDM3B class of locomotive up 105kmph on oscillograph car run of Rajdhani Expresss train track maintained to Other than C&M-I vol.I upto a maximum speed 140kmph on Agra cant- standard track. Palwal section with a rake comprising of 24 LHB

AC (EOG) variant coaches with WAP5 Amendment no.1 to final speed certificate of locomotive. WDM3D class of locomotive up 105kmph on

track maintained to Other than C&M-I vol.I Final maximum Speed Certificate for Utility Track standard track. Vehicle supplied by M/s. Phooltas Tamper Pvt.

Ltd. Patna. Amendment no.1 to final speed certificate of WDM3F class of locomotive up 105kmph on Speed certificate for conducting detailed track maintained to Other than C&M-I vol.I oscillation trials of Rail cum Road Vehicle standard track. manufactured by DMW, Patiala up to a maximum

speed of 95kmph on track maintained to other Amendment no.2 to final speed certificate of than C&M-I Vol-I. 3WDM3D class of locomotive up 105kmph on

track maintained to Other than C&M-I vol.I Amendment no. 1 to speed certificate for one time standard track. movement of 106nos. BG Bogie Alumina Tank

Wagon(BTAP) for M/s NALCO from the Agarpara Amendment to speed certificate for conducting work siding of M/s Taxmaco Ltd. Kolkata to siding detailed oscillation trials and Emergency of M/s NALCO Damanjodi Distt-Korapt , Orissa of Braking Distance (EBD) trials on MRVC AC-DC East Coast Railway.EMU coaches with ICF Shell and Siemens Bogie

up to maximum test speed of 120km/h over Amendment no.1 of speed certificate for one time Churchgate-Virar section of Western Railway on movement of 53nos. BG Bogie Alumina Tank track maintained to other than C&M Vol-I Wagon for M/s Utkal Alumina International Limited standard. from the Agarpara works siding of M/s Taxmaco

Ltd. Kolkata to Tikiri station yard, Waltaier division Speed Certificate for conducting controllability of East Coast Railway.trials including EBD trials of passenger trains

comprising of 25 air braked ICF (loaded) Provisional Speed Certificate for operation of coaches with single WCAM3 locomotive over standard gauge Bangalore Metro coaches IGP-KSR descending the ghat section of manufactured by M/s Hyundai-Rotem/Korea with Mumbai division of central Railway. air suspension arrangement at secondary stage at

a maximum speed of 75Kmph over Bangalore Speed certificate for conducting detailed Metro Standard Gauge (SG) system.oscillation trials 22.0t axle load BG Double

Stack Container of 2896mm (9 ½' high each) on Amendment no.1 to final speed certificate of existing low platform bogie container flat wagon WDM3B class of locomotive on track maintained type BLCAM/BLCBM on a specified route. to Other than C&M-I vol.I standard track.

Speed certificate for movement of 22nos.C'-C' Amendment no.1 to final speed certificate of BG Diesel Hydraulic locomotives manufactured WDM3F class of locomotive on track maintained by M/s SAN Engineering & Locomotive Co. Ltd. to Other than C&M-I vol.I standard track.

Speed certificate for movement of B.G. 1400hp, Amendment no.1 to final speed certificate of Single power pack Diesel Electric shunting WDM3A class of locomotive on track maintained locomotives manufactured by M/s BHEL,Jhansi to Other than C&M-I vol.I standard track.from SgTPP (via monogram Railway station ) to Amendment no.1 to final speed certificate of BkTPP (via Chinpai Railway Station) . WDM3D class of locomotive on track maintained Speed certificate for conducting detailed to Other than C&M-I vol.I standard track.oscillation trials of WAP7 class of locomotive on Amendment no.1 to final speed certificate of

nn

n n

n

n

nn

n

n

n

n

n

n

n

n

n n

n n

n

n

n

1111111177

Page 5: TRACK - Indian Railway2).pdfBHEL Haridwar has been processed for maximum test speed ... Annual Report 2011-2012 TRACK ... North Central Railway and Northern MW Turbo Generator stator

www.rdso.indianrailways.gov.inwww.rdso.indianrailways.gov.in

Annual Report 2011-2012 TRACK

WDM2 class of locomotive on track maintained speed SPART wi th two power packs to other than C&M-I vol.I standard track. manufactured by ICF, Chennai up to a maximum

test speed of 135kmph on track maintained to Amendment no.2 to final speed certificate of C&M-I Vol.-I standard.3WDM3D class of locomotive on track

maintained to other than C&M-I vol.I standard Speed certificate for operation of MLR type air track. braked NG coaches with NDM6, NDM1 and

NDM1A locomotives over Neral-Matheran Speed certificate for conducting Confirmatory section of Mumbai division.Oscillograph Car run of BOXN/BOY wagon

(loaded upto CC+8+2t) with WAG5 A/B/C/D/E Final Speed certificate for operation of second class of locomotives (with/without thrust pad) class Non AC EOG LHB variant coaches fitted upto speed of 75kmph on Waltier -Kirandul with Fiat bogies upto maximum speed of section of East Cost Railway. 120kmph on track maintained to C&M-I Vol-I

standard.Speed Certificate for conducting detailed oscillation trial of 22.9t axle load Broad Gauge Final Speed certificate for operation of second bogie open Wagon type BOXNHL. class Non AC EOG LHB variant coaches fitted

with Fiat bogies upto maximum speed of Speed certificate for conducting Oscillation 105kmph on track maintained to other than C&M-I trials and controballity trials of ZDM3(Twin Cab) Vol-I standard.class of Diesel Hydraulic locomotive on Kalka -

Shimla (NG) section of Northern Railway upto a Final Speed certificate for operation of 3-Tier maximum speed of 35kmph. sleeper Non AC EOG LHB variant coaches fitted

with Fiat bogies upto maximum speed of Speed certificate for conducting detailed 120kmph on track maintained to C&M-I Vol-I oscillation trials and EBD trials of 3-Coach high standard.speed SPART with two power packs

manufactured by ICF, Chennai up to a maximum Final Speed certificate for operation of 3-Tier test speed of 115kmph on track maintained to sleeper Non AC EOG LHB variant coaches fitted Other than C&M-I Vol.-I standard. with Fiat bogies upto maximum speed of

105kmph on track maintained to other than C&M-I Speed certificate for one time movement of SG Vol-I standard.ACCW coach fitted with pneumatic suspension

at the secondary stage on ICF bogies from New Speed certificate for operation of Shatabdi Delhi sickline, Northern Railway to Test site over express and other similar trains comprising of Nagda- Ujjain -Bairagarh section of Western maximum 18numbers of LHB AC EOG coaches Railway and thereafter to ICF ,Chennai, on NDLS-LDH-NDLS section of Northern Railway Southern Railway. at a maximum speed of 130kmph on track

maintained to C&M-I Vol-I standard.Provisional speed certificate for one time movement of 24 axle ( Threaded beam) BG Speed certificate for conducting field trials of long special wagon Kailash (with KWU-C loading haul trains(3goods train amalgamated in one beam ) of M/s BHEL Haridwar, for transport of 3 formation) with WDG3A/WDG4/WAG7/WAG9 nos. 500 MW Turbo Generator stator weighing class of locomotive over Bhilai-Korba section of 258t Ex. Haridwar, Northern Railway to Naila, SECR on both UP/DN Direction.South East Central Railway for Marwa T.P.S. Speed Certificate for conducting detailed siding. oscillation trial of 25 axle load Broad Gauge bogie Amendment no.1 to Provisional Speed open Wagon type BOXN25M. Certificate for operation of standard gauge Speed Certificate for conducting coupler force Bangalore Metro coaches manufactured by M/s trials of 24 air braked ICF type coaches Hyundai-Rotem/Korea with air suspension Passenger train with WDG3A(MU)/WDG4(MU) arrangement at secondary stage at a maximum locomotives over SKLR-SBHR up the ghat speed of 75Kmph over Bangalore Metro sections of South Western Railway.Standard Gauge (SG) system Mahatma Gandhi

Speed Certificate for conducting controllability Road to Baiyappanahali sections.trials including EBD trials for goods trains

Provisional speed certificate of 16 stone Rail consisting of WDG3A(earlier named as WDG2) Grinding Machine model LRG-18 for DMRC and 41 BOXN wagon loaded up to CC+8t+2t Standard Gauge (SG) rail nework, supplied by down the ghat of SKLR-SBHR Road of Hasan - M/s Loram USAAUG. Mangalore sections of South Western Railway.Speed certificate for conducting detailed Amendment to final Speed certificate for operation oscillation trials and EBD trials of 3-Coach high

n

n

n

n

nn

n

n

n

n

n

n

nn

n

n

n

n

n

n n

1111111178

Page 6: TRACK - Indian Railway2).pdfBHEL Haridwar has been processed for maximum test speed ... Annual Report 2011-2012 TRACK ... North Central Railway and Northern MW Turbo Generator stator

www.rdso.indianrailways.gov.inwww.rdso.indianrailways.gov.in

Annual Report 2011-2012 TRACK

of LHB main line coaches fitted with pneumatic operation of second class Non AC EOG LHB suspension at the secondary stage on Fiat variant coaches fitted with Fiat bogies upto bogies on track maintained to other than C&M-I maximum speed of 120kmph on track maintained Vol-I standards. to C&M-I Vol-I standard.

Amendment to final Speed certificate for Speed certificate for movement of rake of 20nos. operation of Self generating AC variants of high capacity ACEOG Double Decker Chair Car 16.25t axle load coaches with LHB shell and coaches (width 3050mm) fitted with pneumatic ICF bogie fitted with pneumatic suspension at suspension at the secondary stage on Fiat bogies the secondary stage on track maintained to from Rail Coach Factory, Hussainpur Halt, NR to other than C&M-I Vol-I standards. Mumbai WR.

Amendment to final Speed certificate for Speed certificate for movement of rake of 20nos. operation of Self generating AC variants of high capacity ACEOG Double Decker Chair Car 16.25t axle load coaches with LHB shell and coaches (width 3050mm) fitted with pneumatic ICF bogie fitted with pneumatic suspension at suspension at the secondary stage on Fiat bogies the secondary stage on track maintained to from Rail Coach Factory, Hussainpur Halt, NR to other than C&M-I Vol-I standards. Jaipur NWR.

Amendment to final Speed certificate for Final Speed certificate for operation of BG AC operation of Self generating variants of 13t axle EOG Double Decker Chair Car coaches (width load coaches with LHB shell and ICF bogie 3050 mm) fitted with pneumatic Suspension at the fitted with pneumatic suspension at the Secondary stage on Fiat bogies upto a maximum secondary stage on track maintained to other speed of 160kmph on track maintained to C&M-I than C&M-I Vol-I standards. Vol.I standard.

Speed certificate for movement of one prototype Final Speed certificate for operation of BG AC EOG second class LHB variant coach fitted EOG Double Decker Chair Car coaches (width with Fiat bogies from Rail Coach Factory, 3050 mm) fitted with pneumatic Suspension at the Hussainpur Halt to Lucknow junction NR via Secondary stage on Fiat bogies upto a maximum NR, and NCR . speed of 105kmph on track maintained to

otherthan C&M-I Vol.I standard.Speed certificate for movement of rake of 10nos. high capacity ACEOG Double Decker Speed certificate for conducting detailed Chair Car coaches (width 3135mm) fitted with oscillation trials for assessing the speed potential pneumatic suspension at the secondary stage of ICF make coaches for Rajastah Tourism on Fiat bogies from Rail Coach Factory, Development Corporation (RTDC) coaches for Hussainpur Hal t to Howrah ER v ia Rajasthan Royal on wheel(RROW) and Palace NR,NCR,NER and ECR . wheel (POW) fitted with modified suspension

spring as per RDSO sketch -K1038 and K1039 for Provisional Speed certificate for BOBY 22.9t. axle box and bolster arrangenment spring

Provisional Speed certificate for BRN 22.9t. respectively at primary and secondary stage in Amendment no. 1 to final speed certificate for existing 16.25t axle load ICF all coil spring bogies BG-8 wheeler Self-propelled Diesel Electic Jet upto a test speed of 115kmph on track maintained Deflector Crane Car (JDCC) for operation on to otherthan C&M-I Vol.I standard.Indian Railways at maximum permissible speed Speed certificate for conducting controllability and of 95 Kmph. EBD trials of 8-wheelers OHE inspection car Speed certificate for conducting confirmatory (DETC/US along with up to two trailing wagon oscillograh car run and EBD trials of AC/non AC (gross load 60t) manufactured by M/s ICF EOG LHB coaches express train upto a Chennai, fitted with all coil ICF Bogies) up to a maximum speed of 130kmph on RJPB-NDLS maximum speed of 75kmph over Jolarpettai -section of East Central Railway , North Central Bangalore section of South Western Railway.Railway and Northern Railway with a rake Speed certificate for conducting field trials on comprising of 22 AC/non AC EOG LHB coaches goods train with WAG9H locomotive with remote on track maintained to C&M-I Vol-I standard . control on Board.Final Speed certificate for operation of 3-Tier Speed certificate for conducting controllability and sleeper Non AC EOG LHB variant coaches EBD trials of 8-wheelers OHE inspection car fitted with Fiat bogies upto maximum speed of (DETC/US along with up to two trailing wagon 130kmph on track maintained to C&M-I Vol-I (gross load 60t) manufactured by M/s ICF standard. Chennai, fitted with all coil ICF Bogies) up to a Amendment no.1 to Final Speed certificate for maximum speed of 75kmph over Jolarpettai -

n n

n n

n n

n n

nn

n

n

n

n

n

n

n n

n

79

Page 7: TRACK - Indian Railway2).pdfBHEL Haridwar has been processed for maximum test speed ... Annual Report 2011-2012 TRACK ... North Central Railway and Northern MW Turbo Generator stator

www.rdso.indianrailways.gov.inwww.rdso.indianrailways.gov.in

Annual Report 2011-2012 TRACK

Bangalore section of South Western Railway. coaches (width3050mm) fitted with Pneumatic Suspension at the secondary stage on Fiat Speed Certificate for conducting detailed Bogies and 2 nos. of BG LHB Generator Van on oscillation trial of 25t axle load Broad Gauge New Delhi-Jaipur section of NR and NWR upto a bogie open Wagon type BOXN25M upto a speed maximum speed of 110kmph.of 110kmph on track maintained to other than

C&M-I Vol.I. Speed Certificate for operational trials of long haul train-two freight trains amalgamated into Speed certificate for conducting detailed one train (python) with WDG3A class of oscillation trials of WAP4 class of locomotive on locomotives fitted with distributed power control track maintained to C&M-I, Vol-I standard up to system over South Central Railway. a maximum speed of 155kmph.Speed certificate for one time movement of Speed certificate for coupler force & braking 2300hp B.G. diesel Electric locomotives distance trials of 59 BOXN wagon loaded up to manufactured by DLW Varanasi for export to CC+8+2t goods train with 2WDM2 locomotive Srilanka.with end of train telemetry (EOTT) system over

TKD-JNPT section. Amendment no.1 to final speed certificate for operation of EOG Non AC chair car LHB variant Final Speed Certificate for BG-8 wheeler Self coaches fitted with FIAT bogie upto maximum propelled over head equipment (OHE) speed of 105kmph on track maintained to other inspection car 1676mm gauge of diesel hydraulic than C&M 1 Vol 1 standard.under slung type manufactured by M/s BEML

Bangalore up to a maximum speed of 105kmph. Amendment no.1 to final speed certificate for operation of second class EOG Non AC LHB Amendment no.1 to Speed certificate for variant coaches fitted with FIAT bogie upto movement of one prototype EOG second class maximum speed of 105kmph on track maintained LHB variant coach fitted with Fiat bogies from to other than C&M 1 Vol 1 standard.Rail Coach Factory, Hussainpur Halt to

Lucknow junction NR. Amendment no.1 to final speed certificate for operation of 3- Tier sleeper EOG Non AC chair Speed certificate for conducting confirmatory car LHB variant coaches fitted with FIAT bogie oscillograph car run cum clearance studies of a upto maximum speed of 105kmph on track rake consisting of 18 nos. of BG high capacity AC maintained to other than C&M 1 Vol 1 standard.EOG Double Decker Chair Car coaches (width

3050 mm) fitted with pneumatic Suspension at Speed certificate for one time movement of the Secondary stage on Fiat bogies and 2 nos. of 106 nos. BG Bogie Alumina Tank Wagon for M/s BG LHB Generator Van on New Delhi- Jaipur Hindalco Industries Limited from the Agarpara section of NR and NWR upto a maximum speed works siding of M/s Kolkata to Aluminum private of 130kmph on track maintained to C&M-I Vol.I siding Bargawan, Singrauli, East central Railway.standard. Draft speed certificate for movement and Speed certificate for conducting confirmatory conducting oscillation trials of 25t axle load broad oscillograph car run cum clearance studies of a gauge BLC 25M wagon at 110kmph on track rake consisting of 18 nos. of BG high capacity AC maintained to other than C&M-I Vol.I standard.EOG Double Decker Chair Car coaches Speed certificate for operation of Shatabdi (width3050mm) f i t ted wi th pneumat ic express and other similar trains comprising of Suspension at the Secondary stage on Fiat maximum 18 no. of LHB AC EOG coaches bogies and 2 nos. of BG LHB Generator Van on hauled by single WAP5 locomotive on AGC -Bina Mumbai- Ahmedabad section of WR upto a section of North Central Railway at a maximum maximum speed of 130kmph on track speed of 140kmph on track maintained to C&M-I maintained to C&M-I Vol.I standard. Vol-I standard.Speed certificate for operation of Shatabdi Speed certificate for one time movement of express and other similar trains comprising of 106nos. BG bogie Alumina Tank Wagon for M/s maximum 18 numbers of LHB AC EOG coaches BALCO from Agarpara work siding of M/s hauled by single WAP5 locomotive on AGC -Bina texmaco Ltd., Kolkata to M/s BALCIO Railway. section of North Central Railway at a maximum Siding, KORBA,Chattisgarh, South East Central speed of 140kmph on track maintained to C&M-I Railway.Vol-I standard.

Speed certificate for one time movement of Speed certificate for conducting route clearance 55nos.bottom discharge coal hopper wagon from studies of a rake consisting of 13 nos. of BG high M/s. Texmaco ltd., Kolkata to M/s NTPC Ltd. capacity AC EOG Double Decker Chair Car Talchar ,STPS, East Coast Railway against their

n

n

n

nn

n

n

n

n

n

n

n

nn

n

n n

nn

1111111180

Page 8: TRACK - Indian Railway2).pdfBHEL Haridwar has been processed for maximum test speed ... Annual Report 2011-2012 TRACK ... North Central Railway and Northern MW Turbo Generator stator

www.rdso.indianrailways.gov.inwww.rdso.indianrailways.gov.in

Annual Report 2011-2012 TRACK

purchase order no. 4200033986-M-1026.

Speed certificate for one time movement of 26nos.bottom discharge coal hopper wagon from Design and drawings for 1:12 Scissor Cross over with M/s. Texmaco ltd., Kolkata to M/s NTPC Ltd. 60 Kg (UIC) rail with PSC sleeper layout with 4.725 m c/c Talchar ,STPS, East Coast Railway against their spacing of track has been developed. The following new purchase order no. 4200061164-M-1026 dated concepts have been used in above design:16.03.2011.

The 1:12 LH/RH Acute CMS Crossings have Speed certificate for conducting detailed curved RH/LH wing rail up to tangent point. oscillation trial on MRVC AC-DC-EMU coaches

Crossings have been designed to facilitate use of with ICF Shell and Siemens bogie upto a 1 m long fish plate at toe and heel end.maximum speed of 145kmph over Virar-Dahanu Fishing fit CI distance blocks at the toe and heel road section of Western Railways on track end of CMS Crossing have been designed as maintained to C&M I Vol.I standard. hollow block to reduce the weight to facilitate its Speed certificate for operation of passenger handling and placement. trains comprising of 25 air brake coaches

WAP7/WAP4/WAG5(A/B/C)/WAG7/WAP5/ WDM3A/WAG3A AND WDM3D locomotives over

Railway Board advised asked RDSO to prepare a the Maramijhri-Dharkhoh and Chichonda-detailed technical report compiling updated data to Teegaon deciding the ghat section of Nagpur establish the need for going in for thick web switches. Division of Cenytal Railway.RDSO studied the technical features of TWS in detail

Speed certificate for movement and conducting and field performance of trial of TWS has also been detailed oscillation trail of 25t axle load Broad collected. Based on the comparative performance of Gauge bogie open Wagon type BOXN25M up to thick web switches vis-à-vis representative over-riding a speed of 110 kmph on track maintain to other switches in respect of service life, wear, maintenance than C&M-I Vol.I requirement and safety etc, a technical report was

submitted to Railway Board recommending that it is Speed certificate for movement of 90 tones bogie necessary to use TWS on high density routes to improve type BG 800hp. Diesel Hydraulic locomotives safety, reliability, riding comfort and to reduce manufactured by M/s SAN Engineering and maintenance efforts.Locomotives Co. Ltd.

Speed certificate for conducting detailed oscillation trials of WDG5 class of locomotive up to a maximum test speed of 115kmph on track maintained to Other than C&M-I Vol.I standard.

Provisional speed certificate of EMD GT50AC (WDG5) class of Locomotive upto a maximum speed of 80kmph on track maintained to Other than C&M-I Vol.I standard.

Provisional speed certificate for operation of broad gauge Bogie Covered Autocar carrier wagon type BCACBM.

Speed certificate for one time movement of MRVC AC-DC EMU coaches with ICF shell and Siemens Bogie fitted with pneumatic suspension

Many fractures of tongue rail in Allahabad Division of at the secondary stage from BCT, Western

N.C. Railway were reported. All the above tongue rails Railway to KTT, West Central Railway at a speed

were on 1:12 fan shaped PSC layout and the fractures of 60kmph.

occurred near junction of rail heads (JOH) and during Final Speed Certificate for maximum permissible investigation it has been revealed that crack has been speed of WDP4D twin cab class of locomotive initiated from machined edge of the under cutting upto 135 kmph on track maintained to C&M.I Vol.I portion of tongue rail. One of the main reasons for standard. above fractures has been found to be the rubbing of

under cutting portion of tongue rail with stock rail due to Provisional speed certificate for Ballast lateral thrust / movement of tongue rail. Such rubbing Regulating Machine manufactured by M/s can be avoided by ensuring full butting of tongue rail with Gemac Engineering Machinay Company stock rail up to JOH by providing SSD / Double pull Ltd.,China.arrangement. Detailed report about the cause of

Design of 1:12 Scissor Cross Over with 60 n Kg UIC Rail with PSC Sleepers

nn

n

n

n

Report on Thick Web Switch

n

n

n

n

n

n

Study of Fracture of Tongue Rails

n

n

60g 1:12 Thick Web Switch of RDSO Design

1111111181

Page 9: TRACK - Indian Railway2).pdfBHEL Haridwar has been processed for maximum test speed ... Annual Report 2011-2012 TRACK ... North Central Railway and Northern MW Turbo Generator stator

www.rdso.indianrailways.gov.inwww.rdso.indianrailways.gov.in

Annual Report 2011-2012 TRACK

fracture and remedial measures has been sent to Pvt. Ltd, Hyderabad. After installation and Railway Board. commissioning of above machine, the X-ray

images of Composite sleepers with pre-drilled holes were observed and a methodology for void

West Central Railway reported incidences of cracks in testing was prepared by RDSO. After the CMS crossings laid in track and sought guidance on the approval of above methodology by Railway action to be taken in such cases. Details were sought in Board, inspection of 100 nos Tietek sleepers has June 2011 from all zonal railways regarding been carried out recently by RDSO and NR performance of CMS crossings in respect of officials jointly. These sleepers now will be laid for development and propagation of crack laid in track in trial purpose.last three years to create a database for study of cracks in CMS crossings. The details received from Zonal Railways show 710 nos. of cracked CMS crossings out of 13187 CMS crossings. This item was also At present, reconditioning of cupped AT welding joint deliberated in 82nd TSC meeting at Bhopal in Dec 2011. and wheel burn/scab is done by using Micro Flow Metal TSC recommended the following which has been Spray Powder which gives a minimum service life of 25 approved by Railway Board: GMT and there is only one firm in the approved list.

Provisionally, crack upto 40 mm height from RDSO tried to explore other technologies which bottom of the CMS crossing may be allowed are proven over world railways for repairing of which should be kept under observation. CMS above defects. After technical evaluation of crossings with crack more than 40 mm height technology offered by M/s ABC Rail Road from the bottom shall be replaced. Product Pvt. Ltd., Lucknow by RDSO for repair of

rail top defect by Translamatic Robotic Welder, Railway Board has approved field trial of above

As an alternative to wooden and steel channel/H beam technology in NCR & NR under supervision of sleeper, Composite Sleeper for use at girder bridges are RDSO. under development. Lab testing of four design of composite sleepers completed and field trials are ordered. Status of field trial is as under: On the recommendation of 76th TSC, Zonal Railways

were advised to carry out limited field trials of Improved The Composite FFU (Fibre reinforced foamed SEJ on curve up to 20 developed by M/s Rahee urethane) sleepers of M/s Sekisui Chemical Co. Industries Ltd., Kolkata (M/s RTT) and M/s Bina Metal Ltd., Japan have been laid in track at Bridge No. Way, Jamshedpur (M/s BMW) . Based upon field 280(UP) near Sultanpur at NR in Jan 2012 after performance of improved SEJs, Railway Board inspection of above sleepers by RDSO. Recently approved the adoption of the same on IR. Modalities for sleepers have been supplied in Southern Railway transfer of IPR to IR for improved design of SEJ up to 20 also and laying is in progress. are under process at Railway Board's level.

The issue of provision of SEJ on 20 to 40 curves was discussed in 81st TSC and accordingly it was decided that SEJ for the same will be developed by RDSO. On the basis of recommendation of RDSO, Railway Board has approved limited field trial of improved SEJ for 60 Kg on 20 to 40 curves of both the designs (M/s BMW's & M/s RTT's) in ECoR, NFR & SR.

RDSO has taken up a project on 'Optimisation of PSC Sleeper' with CHARMEC Sweden which has expertise in the area of PSC sleeper design and production. Various technical issues of the project were discussed with experts from CHARMEC and ABETONG and a report on 'Improvements in Manufacturing process of

The sleepers of Tietek design for extended trial PSC sleeper' has been prepared by RDSO and sent to could not be supplied mainly due to non- the Railway Board on 29.02.2012. A presentation on availability of X-ray machine for void testing in the status and outcome of the project has been made in the plant of the supplier M/s Patil Rail Infrastructure Railway Board on 24.02.2012. Analysis and Design part

Study on Cracks in CMS Crossing

Reconditioning of Cupped AT Welding Joint and Wheel Burn/Scab

n n

Development of Composite Sleepers

Improved SEJ on Curves up to 4 Degree

n

n

UIC Asia Project on Opimisation of PSC Sleeper

n

Composite FFU Sleeper at Bridge No. 280 (UP)Near Sultanpur at Northern Railway

1111111182

Page 10: TRACK - Indian Railway2).pdfBHEL Haridwar has been processed for maximum test speed ... Annual Report 2011-2012 TRACK ... North Central Railway and Northern MW Turbo Generator stator

www.rdso.indianrailways.gov.inwww.rdso.indianrailways.gov.in

Annual Report 2011-2012 TRACK

of report is under study which is likely to be completed by crossing, SEJ, Deck Bridge, Bridge approach, turnout etc. Sep 2012. are to be developed for 1676 mm gauge. Accordingly,

design of PSC line sleeper and sleepers for SEJ, level This project will help in optimizing the sleeper design by crossings, Deck Bridge, bridge approach has been reviewing of various design factors involved including completed. These drawings have been issued to DFCC.the study on effect of rail irregularity, wheel flat, ballast

pressure distribution pattern on sleeper design. Data generated / Study carried out through this project will

Railway Board have approved for adoption of ERC Mk-help in designing track structure as a whole including V on Indian Railways for regular use and desired to components of track.develop vendors for ERC Mk-V from the existing approved vendors of ERC Mk-III. The Item Specific Guidelines & STR for ERC Mk-V has been finalized. The Under the guidance of Railway Board, revision of exercise of registration of vendors has been taken up specification of PSC sleeper (T-39) has been taken up to which is in progress. So far four vendors have been fine tune it in line with latest practice / production approved in Part-II category.techniques and experienced gained by IR.These

revised specifications have been discussed with the manufacturers and finally approved by Railway Board.

The elastic rail clip for fish plated joints/glued joints Now revised specifications have been implemented.location with higher toe load has been developed. By development of this clip, full Railway Board approved the trial of under sleeper pads toe load is achieved at the for ballast protection and reduction of noise and location of glued joint, fish vibration in SCR & NR. Production of all the sleepers plated joint and joggled fish with USP has been completed in NR & SCR. These plate. As lab testing report of sleepers have been laid in NR for trial and field G-J clip and field perfor-measurements are in progress for track settlements, mance report was satisfac-ballast sieving and track parameters as per trial scheme to ry, same has been circulated by RDSO.approved by Railway Board for adoption on Indian Railways.

Railway Board asked RDSO to design 25T axle load PSC line sleeper and sleepers for special locations viz. level

To improve the life and performance of existing 6mm GRSP, RDSO has developed Composite GRSP. After successful lab tests and satisfactory field performance, composite GRSP has been approved by Railway Board for regular adoption. This pad is expected to have minimum service life of 8 years / 300 GMT. Specifications, STR & item specific guidelines have been prepared by RDSO. As per Railway Board's instructions, vendor development work was taken up and so far 10 vendors have been approved in Part-II category. RDSO has also finalised in service performance criteria of the same.

Development of ERC Mk-V

Revision of Specification of PSC Sleeper

Development of GJ Clip

Development of Under Sleeper Pad

Design of 25T PSC Sleepers for DFCCI

Composite Grooved Rubber Sole Plate

1111111183

Page 11: TRACK - Indian Railway2).pdfBHEL Haridwar has been processed for maximum test speed ... Annual Report 2011-2012 TRACK ... North Central Railway and Northern MW Turbo Generator stator

www.rdso.indianrailways.gov.inwww.rdso.indianrailways.gov.in

Annual Report 2011-2012 TRACK

Design & Development of Fastening System Through EOI for Ballasted Track

Technical Standards for Track Fastening System for Ballastless Track for Indian Railways

Technical Standards for Track Structure for Metro Railways/MRTS Systems

extensively scrutinised the track structure of Metro Railways available world over through literature survey and meetings/discussions. After several discussions

There is a need to develop fastening system as a whole with the members of the committee and based on for ballasted track so that tolerances can be kept within experience of Indian railways, the specifications were limit and life of all the components matches. Railway formulated and sent to Railway Board by ED/Track-Board vide letter no. 2010/Tk-II/22/6/2 dated12.08.2011 II/RDSO (Convener). These technical standards have have desired to invite EOI for fastening system with PSC been approved by Railway Board and same has been sleeper to Drg. No. RDSO/T-7008 along with change in circulated to all concerned by Railway Board vide letter design of rail seat keeping sleeper dimensions same. no. 2010/Proj./Genl./3/3 dated 23.12.2011.Documents of EOI for exploring the possibility of world proving fastening system on Indian Railways were prepared and sent to Board on 15.09.2011 for approval. Approval of Railway Board has been received vide their letter No. 2010/Track-II/22/6/32 dated 07.10.2011.

The draft performance specification has been prepared Accordingly, notice for inviting EOI has been published

based on the literature survey and knowledge & on 11.11.2011. A total number of 05 offers have been

experience in Indian Railways system. The same has received. Scrutiny of these offers is in progress.

been finalized by the committee (ED/Track-II/RDSO, Convener) and sent to Railway Board vide letter no. CT/BLT/FS dated 18.01.2012.

To formulate the specification, the committee

1111111184