"timber: the future of construction and building rehabilitation" call for projects...

9
"Timber: the future of construction and building rehabilitation" Call for projects Appendix 7 - Call for projects "Timber: the future of construction and building rehabilitation" Project summary presentation template Please do not exceed 14 slides Project acronym: Full name: Total budget = Aid requested =

Upload: brian-perez

Post on 28-Mar-2015

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: "Timber: the future of construction and building rehabilitation" Call for projects Appendix 7 - Call for projects "Timber: the future of construction and

"Timber: the future of construction and building rehabilitation" Call for projects

Appendix 7 - Call for projects"Timber: the future of construction and building

rehabilitation"

Project summary presentation template

Please do not exceed 14 slidesProject acronym:

Full name:

Total budget = Aid requested =

Page 2: "Timber: the future of construction and building rehabilitation" Call for projects Appendix 7 - Call for projects "Timber: the future of construction and

Appel à projets « Le bois : avenir de la construction et de la réhabilitation des bâtiments »

Adherence to the 3 project eligibility criteria

• Which "group(s) of works" does your project fall into? (see specification – appendix 2)

• Depending on the selected "group(s) of works", which "qualitative/quantitative eligibility criteria" (see appendix 6) do you think are the most apparent in your project, and how?

• What "work category" does your project fall into? (see specifications – appendix 2)

Page 3: "Timber: the future of construction and building rehabilitation" Call for projects Appendix 7 - Call for projects "Timber: the future of construction and

Appel à projets « Le bois : avenir de la construction et de la réhabilitation des bâtiments »

Presentation of the project owner

• Overview of the company, date of incorporation, share capital, turnover, etc.

Page 4: "Timber: the future of construction and building rehabilitation" Call for projects Appendix 7 - Call for projects "Timber: the future of construction and

Appel à projets « Le bois : avenir de la construction et de la réhabilitation des bâtiments »

Presentation of partners and service providers

• Where applicable

Page 5: "Timber: the future of construction and building rehabilitation" Call for projects Appendix 7 - Call for projects "Timber: the future of construction and

Appel à projets « Le bois : avenir de la construction et de la réhabilitation des bâtiments »

Aim of the project

• Explain your project in such a way that someone unfamiliar with the industry would understand.

• What are its main objectives?

• How does it meet the call for project specifications?

Feel free to include any images that make the project easier to explain

(charts, photos, diagrams, etc.)

Page 6: "Timber: the future of construction and building rehabilitation" Call for projects Appendix 7 - Call for projects "Timber: the future of construction and

Appel à projets « Le bois : avenir de la construction et de la réhabilitation des bâtiments »

State of the art, context and issues

• State of the art, technical context, issues, etc.

Page 7: "Timber: the future of construction and building rehabilitation" Call for projects Appendix 7 - Call for projects "Timber: the future of construction and

Appel à projets « Le bois : avenir de la construction et de la réhabilitation des bâtiments »

Innovations and hurdles

• Innovative solutions, patents

• Main technical hurdles encountered and possible ways around them

• What is the added value of your component, product, piece of equipment or system on the timber construction and rehabilitation markets?

• How will your deliverable be presented? : plans, digital or physical mock-ups, prototypes

Page 8: "Timber: the future of construction and building rehabilitation" Call for projects Appendix 7 - Call for projects "Timber: the future of construction and

Appel à projets « Le bois : avenir de la construction et de la réhabilitation des bâtiments »

Market and economic model

• Target market and its size, potential customers, use, economic model, etc.

Page 9: "Timber: the future of construction and building rehabilitation" Call for projects Appendix 7 - Call for projects "Timber: the future of construction and

Appel à projets « Le bois : avenir de la construction et de la réhabilitation des bâtiments »

Budget breakdownNames

Partners

Costs

Small companies < 50 peopleMedium-sized companies

50 to 250 peoplePublic institutions

Large companies

> 250 peopleOrganisations

TOTAL