Proceedings of the International Conference on Industrial Engineering and Operations Management Dubai, UAE, March 10-12, 2020 © IEOM Society International The Effects of Energy Expenditure on the Mental Fatigue of Construction Workers Ma. Janice J. Gumasing, Claire Marie A. Llamas and Czarina Anne A. Martin School of Industrial Engineering and Engineering Management Mapua University Intramuros, Manila [email protected], [email protected], [email protected] Abstract This study aims to determine the significant factors that affect the mental fatigue of construction workers in the Philippines. Studies revealed that workers in the construction site routinely exceed generally accepted physiological thresholds for manual work leading to fatigue. They typically carry out highly demanding physical tasks with various types of stresses resulted from awkward posture, excessive force demands, repetitive actions and excessive energy expenditure. Due to this labor-intensive nature of construction work, many construction workers face excessive demands beyond their physical capabilities. Thus, they are prone to be exposed to significantly high level of mental fatigue as well as other safety risks. This study aims to focus on the physiological measures of energy expenditure of workers leading to fatigue. Factors that were considered in the study are activity metabolic rate, heart rate, age, and body mass index. To objectively measure the mental fatigue experienced by the construction workers during the whole 8-hour shift, the Deary Liewald reaction time software was used. Statistical analysis is also employed to determine the significant differences in the factors identified among the 5 construction trades such as labor, mason, carpentry, steal work and plumbing using ANOVA. Correlation analysis is also used to identify relationship of factors to the fatigue level of construction workers. Results of the study revealed that all factors considered in the study have significant relationship to the fatigue experienced by workers among the 5 construction trades. And in order to develop measures to minimize mental fatigue level of workers, a suitable work-rest schedule is designed through the application of Monte Carlo simulation model having 9,125 runs, which generated a year worth of data for the 25 construction workers. Keywords Mental fatigue, energy expenditure, construction 1. Introduction Due to the rise of construction industry, the number of employees in the workforce also accelerates. Over the forecast period for years 2016 to 2020, the pace of global construction industry will accelerate to an annual average of 3.4%, with the industry reaching a value of US$10.0 trillion in 2020. In the United States alone, approximately 10.3 million people are part of the construction workforce in 2016 (Ahmed & Rahman, 2015; Statistics Portal, 2018). The construction industries in the Middle East and Africa region are predicted to be the fastest growing in 2016-2020, overtaking the Asia-Pacific region, which held the top spot in 2011-2015. However, Asia-Pacific's share of the global construction industry will continue to rise, reaching close to 49% in 2020, up from 40% in 2010 (Market Reports Store, 2015). As one of the largest industries in the world, the construction workers are exposed to harsh and dangerous situations, which lead to poor judgment, poor quality of work, and reduction in productivity, and increased risk of accidents (Ahmed & Rahman, 2015; Cheng et al., 2012). Construction workers either work only on short contracts or at a construction site for a limited period, which leads to unfamiliarity with the workplace thus enhancing the risk of injury (Chang, F.L., 2007). They typically carry out highly demanding physical tasks with various types of stresses 1210

Upload: others

Post on 13-May-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Effects of Energy Expenditure on the Mental Fatigue of

Proceedings of the International Conference on Industrial Engineering and Operations Management Dubai,

UAE, March 10-12, 2020

© IEOM Society International

The Effects of Energy Expenditure on the Mental Fatigue of

Construction Workers

Ma. Janice J. Gumasing, Claire Marie A. Llamas and Czarina Anne A. Martin

School of Industrial Engineering and Engineering Management

Mapua University

Intramuros, Manila

[email protected], [email protected],

[email protected]

Abstract

This study aims to determine the significant factors that affect the mental fatigue of construction workers in the Philippines. Studies revealed that workers in the construction site routinely exceed generally accepted physiological thresholds for manual work leading to fatigue. They typically carry out highly demanding physical tasks with various types of stresses resulted from awkward posture, excessive force demands, repetitive actions and excessive energy expenditure. Due to this labor-intensive nature of construction work, many construction workers face excessive demands beyond their physical capabilities. Thus, they are prone to be exposed to significantly high level of mental fatigue as well as other safety risks. This study aims to focus on the physiological measures of energy expenditure of workers leading to fatigue. Factors that were considered in the study are activity metabolic rate, heart rate, age, and body mass index. To objectively measure the mental fatigue experienced by the construction workers during the whole 8-hour shift, the Deary Liewald reaction time software was used. Statistical analysis is also employed to determine the

significant differences in the factors identified among the 5 construction trades such as labor, mason, carpentry, steal work and plumbing using ANOVA. Correlation analysis is also used to identify relationship of factors to the fatigue level of construction workers. Results of the study revealed that all factors considered in the study have significant relationship to the fatigue experienced by workers among the 5 construction trades. And in order to develop measures to minimize mental fatigue level of workers, a suitable work-rest schedule is designed through the application of Monte Carlo simulation model having 9,125 runs, which generated a year worth of data for the 25 construction workers.

Keywords Mental fatigue, energy expenditure, construction

1. Introduction

Due to the rise of construction industry, the number of employees in the workforce also accelerates. Over the forecast

period for years 2016 to 2020, the pace of global construction industry will accelerate to an annual average of 3.4%,

with the industry reaching a value of US$10.0 trillion in 2020. In the United States alone, approximately 10.3 million

people are part of the construction workforce in 2016 (Ahmed & Rahman, 2015; Statistics Portal, 2018). The

construction industries in the Middle East and Africa region are predicted to be the fastest growing in 2016-2020,

overtaking the Asia-Pacific region, which held the top spot in 2011-2015. However, Asia-Pacific's share of the global

construction industry will continue to rise, reaching close to 49% in 2020, up from 40% in 2010 (Market Reports

Store, 2015). As one of the largest industries in the world, the construction workers are exposed to harsh and dangerous

situations, which lead to poor judgment, poor quality of work, and reduction in productivity, and increased risk of

accidents (Ahmed & Rahman, 2015; Cheng et al., 2012). Construction workers either work only on short contracts or

at a construction site for a limited period, which leads to unfamiliarity with the workplace thus enhancing the risk of

injury (Chang, F.L., 2007). They typically carry out highly demanding physical tasks with various types of stresses

1210

Page 2: The Effects of Energy Expenditure on the Mental Fatigue of

Proceedings of the International Conference on Industrial Engineering and Operations Management Dubai,

UAE, March 10-12, 2020

© IEOM Society International

resulted from awkward posture, excessive force demands, repetitive actions and excessive energy expenditure (Maiti,

R., 2008). Given these factors, they are prone to be exposed to significantly high level of fatigue as well as other safety

risks (Gumasing & Pacheco, 2018; Gumasing & Sasot, 2019). From a study by Everette et al. (2002), it was revealed

that 20% to 40% of different craft workers on a construction site routinely exceed generally accepted physiological

thresholds for manual work leading to fatigue. The impact of fatigue is likely to be more serious under the construction

environment, which is usually regarded as dynamic and risky (Pinto, A., 2011).

Fatigue is a state of physical and mental exhaustion. In many industries, fatigue leads to overall decrease in

productivity. However, in construction, the decrease in alertness and energy levels caused by fatigue can be very

dangerous. Fatigue can be classified into two: mental fatigue and physical fatigue. Physical fatigue is the transient

inability of muscles to maintain optimal physical performance, and is made more severe by intense physical exercise

while mental fatigue is a transient decrease in maximal cognitive performance resulting from prolonged periods of

cognitive activity. In view of the mental nature of fatigue, it is possible that fatigue may impair cognitive functions

and influence health and safety adversely. Although existing studies have suggested an association between fatigue

and cognitive function in different populations (Boksem, M., 2005; Moore, R., 2012) few studies have examined this

relationship in the construction industry (Zhang, M., 2015).

To further understand the importance of safety and health of construction workers, several studies have been done.

According to Strasser (2003), the assessment of workers' physiological conditions is a crucial prerequisite in every

ergonomics study and devices capable of assessing worker's physiological conditions and, eventually, work

physiological demands can play a crucial role in enhancing construction workforce productivity, safety, and wellbeing

(Gatti, U., 2014). Currently, numerous techniques are available to assess work physiological demands of construction

such as questionnaires, oxygen consumption and heart rate monitoring (Abdelhamid, T., 2002; Rwamamara, R., 2010).

However, there is no published study—most especially in the Philippine setting— that tackles the relationship of

occupational risks in terms of mental fatigue to the physiological demands of work depending on various construction

trades. They usually involve only a certain task or job type; for instance, rebar workers (Yi, W., 2013), specific lifting

tasks (Antwi-Afaria, M., 2017), and the likes.

Given these conditions, the paper intends to determine the significant factors that affect mental fatigue experienced by

the workers using physiological measures of energy expenditure. This is needed in order for the researcher to design

a work-rest schedule to adjust the physical workload of workers to prevent overstrain, fatigue, and injuries.

2. Methodology

2.1. Data Gathering

The researchers have standardized the sample set by considering two factors: project size and different job trades. The

chosen project observed by the researchers had 31 construction workers on site. However, only 25 workers were

included in the study. They were classified into 5 construction trades: plumber, laborer, mason, carpenter, and steel

man. The researchers selected 5 workers from each trade to be able to evaluate each trades without bias. Other trades

such as foreman and time-keeper were removed from the study since they are assigned with simpler tasks and only

one person is assigned per site. This study is also limited to small-medium scale project since the focused project by

the researchers only involved construction work of 9 townhouses.

To process and select the factors that will be considered in the study, the following sequence of steps was performed.

First, the researchers conducted a thorough investigation and analysis from previous researches and studies. Then,

survey forms and questionnaires were administered to the construction workers, managers, healthcare practitioners

and similar stakeholders in order to determine the factors that will be considered in the study. Next, an onsite

observation was done in the study to investigate the exposure of the construction workers to the fatigue-related risks.

All the data were gathered using the apparatuses, devices and instrumentation. A fitness tracker was used to obtain

real time data for heart rate and activity metabolic rate. For the heart rate, the real-time monitoring helped the

researchers in gathering a much accurate data since the fitness tracker determines the highest heart rate and the lowest

1211

Page 3: The Effects of Energy Expenditure on the Mental Fatigue of

Proceedings of the International Conference on Industrial Engineering and Operations Management Dubai,

UAE, March 10-12, 2020

© IEOM Society International

which shall give the average beats per minute in every task. Other factors such as age and BMI of the respondents

were also gathered in the study.

Moreover, in order to measure the mental fatigue level of the respondents, Deary Liewald reaction time software was

used. This test was developed to measure the average length of time for an individual to respond to visual or auditory

stimulus. The test represents the alertness and motor speed of an individual and will be used to represent the level of

mental fatigue of the respondents since according to previous studies, the mental fatigue is one of the main reasons

for the decline in response inhibition. And reaction time is one of the best measures for response inhibition of a person

(Guo, Z., 2018). Welford (1968, 1980) also found that reaction time gets slower when the subject experiences fatigue.

For this study, two types of reaction time were considered: Simple Reaction Time (SRT) and Choice Reaction Time

(CRT). SRT is measured to determine the response time of an individual when performing cognitive tasks without

decision making involved while CRT a more complex test which measures the capability of an individual to respond

when a choice is presented.

2.2. Statistical Analysis

To determine which among the contributing factors (i.e. age, body mass index, heart rate, activity metabolic rate) have

a significant difference among the different construction trades, the researchers had use one-way ANOVA, at level of

significance of 0.05%. Next, correlation analysis was also employed to determine the strength of relationship between

the factors considered in the study to the mental fatigue of the respondents. And to further illustrate the relationship

between the factors to the mental fatigue of workers, multiple regression analysis was applied in the study. This tool

helped the researchers to come up with a predictive model to determine the severity of mental fatigue of the workers

based on the contributing factors such as age, body mass index, heart rate, and activity metabolic rate.

3. Results and Discussion

3.1. Summary of Factors

The table below shows the statistical descriptions of the factors gathered from the 25 respondents of the study grouped

on 5 different construction trades. Using the Deary Lieward RT software, data for SRT and CRT were obtained from

the respondents. Activity metabolic rate and heart rate were also obtained using fitness tracker device, and

demographic data such as age and BMI were gathered using survey questionnaires. These data will be further analyzed

using for statistical tools such as analysis of variance, correlation and regression analysis.

Table 1. Descriptive statistics of factors considered in the study

Descriptive Statistics Reaction

Time (secs) Activity Metabolic

Rate (kcal) Heart rate

(bpm) Age BMI

CARPENTER

Mean 56.73 4.17 93.40 38.80 24.19 Median 62.00 4.14 95.00 41.00 25.71 Standard Deviation 15.90 0.13 5.22 15.25 3.43 Sample Variance 252.76 0.02 27.30 232.70 11.78 Kurtosis 3.42 1.82 1.40 -2.02 -2.20 Skewness -1.72 0.85 -1.31 0.06 -0.21 Range 41.38 0.36 13.00 36.00 8.11

LABORER

Mean 45.93 3.87 89.40 30.80 23.21 Median 53.50 4.07 90.00 35.00 23.69 Standard Deviation 18.08 0.45 6.50 10.73 4.24 Sample Variance 326.86 0.21 42.30 115.20 17.94 Kurtosis -0.59 2.86 -1.72 -1.32 -1.86 Skewness -0.66 -1.65 0.24 -0.22 -0.41 Range 46.00 1.15 15.00 27.00 9.72

1212

Page 4: The Effects of Energy Expenditure on the Mental Fatigue of

Proceedings of the International Conference on Industrial Engineering and Operations Management Dubai,

UAE, March 10-12, 2020

© IEOM Society International

MASON

Mean 47.05 3.97 89.40 33.00 23.08 Median 47.75 3.91 90.00 31.00 23.09 Standard Deviation 16.65 0.31 4.88 14.23 3.10 Sample Variance 277.33 0.10 23.80 202.50 9.59 Kurtosis -1.02 1.47 -2.03 0.89 -1.87 Skewness 0.02 0.87 -0.38 0.95 0.18 Range 42.50 0.84 11.00 37.00 7.43

PLUMBER

Mean 41.73 4.17 88.40 30.00 22.28 Median 41.38 4.12 89.00 29.00 22.15 Standard Deviation 2.45 0.50 2.88 4.18 1.00 Sample Variance 6.00 0.25 8.30 17.50 1.00 Kurtosis -2.03 -0.58 -1.80 2.91 -1.67 Skewness 0.18 0.19 -0.04 1.54 0.30 Range 5.88 1.29 7.00 11.00 2.44

STEEL MAN

Mean 45.90 4.08 89.00 31.40 22.39 Median 50.63 4.16 90.00 32.00 23.37 Standard Deviation 17.32 0.30 5.10 11.13 2.34 Sample Variance 300.07 0.09 26.00 123.80 5.47 Kurtosis -2.90 -2.08 -0.86 -1.81 -2.72 Skewness -0.31 -0.12 -0.40 0.24 -0.29 Range 37.50 0.72 13.00 26.00 5.12

3.2. Result of ANOVA

ANOVA was performed in order to determine if there is significant difference between the factors (AMR, heart rate,

age, BMI) among the 5 construction trades identified in the study using significance level of 0.05. The results are

shown in the figures below.

Figure 1. ANOVA for AMR Factor

Figure 2. ANOVA for Heart Rate Factor

Figure 3. ANOVA for Age Factor Figure 4. ANOVA for BMI Factor

The results of ANOVA indicate that there is no significant difference in the AMR, heart rate, age and BMI among the

5 construction trades such as carpenter, laborer, mason, plumber and steel man. So, it can be assumed that the results

and conclusions that will be derived from this study would be applicable to all types of construction trades.

3.3. Result of Correlation Analysis

To determine the strength of relationship of the factors (AMR, heart rate, age, BMI) to the mental fatigue experienced

by the workers, correlation analysis was used. There were two correlation analyses conducted as two measurements

1213

Page 5: The Effects of Energy Expenditure on the Mental Fatigue of

Proceedings of the International Conference on Industrial Engineering and Operations Management Dubai,

UAE, March 10-12, 2020

© IEOM Society International

for mental fatigue were considered: the simple reaction time and choice reaction time. CRT is more complicated than

the SRT and can be more related with the decision making of the construction workers. The summary of the results is

shown in the table below.

Table 2. Result of Correlation Analysis

Correlation Analysis SRT CRT

AMR Pearson correlation 0.649 0.677 p-value 0.000 0.000

Heart Rate Pearson correlation 0.832 0.805 p-value 0.000 0.000

Age Pearson correlation 0.736 0.797

p-value 0.000 0.000

BMI Pearson correlation 0.885 0.874

p-value 0.000 0.000

The results of the correlation analysis for simple reaction time and choice reaction time indicate that all factors (AMR,

heart rate, age, BMI) have strong positive correlation to the reaction time of the respondents that represents the severity

of the mental fatigue experienced by the construction workers. All factors have Pearson correlation value of greater

than 0.6 and p-value of less than 0.05. This explains that as each factor increases, the reaction time or mental fatigue

of the worker also increases, as the factor and mental fatigue are directly proportional with each other.

As previously mentioned in a study by Aryal, A. (2017), the variations in the heart rate reflect the physical activity

performed by the participants. It was observed that an increase in the heart rate happens when the participant performs

physical work, and a drop in heart rate when the participant pauses, as the heart rate is correlated with the intensity of

the physical activity. And as the intensity of physical activity increases, the risk of physical fatigue increases. Thus,

the correlation analysis of this study by the researchers further proves this claim. Meanwhile, the AMR of an individual

results to higher level of fatigue experienced by the workers as the physical activity requires exertion of more energy.

As intensity of work increases, as proven by the statistical analysis, the AMR of the construction worker also increases.

As BMI and age are related with the AMR of an individual, as the BMI increases and as the individual becomes older,

the construction worker also experiences the higher level of fatigue.

3.3. Result of Multiple Regression Analysis

To further illustrate the relationship of the factors to the mental fatigue of workers, the researchers performed the

multiple regression analysis. There are two regression models that were developed in the study. For the first model,

response variables considered is the simple reaction time (SRT) and for the second model, response variable is the

choice reaction time (CRT) that were obtained using Deary Lieward RT Software. The predictors considered for the

both models are the physiological measures for energy expenditure such as AMR, heart rate, age and BMI. The results

are shown in the equations 1 and 2 below.

(1)

Simple Reaction Time = -608 + 23.2 Activity Metabolic Rate + 5.24 Heart Rate + 1.666 Age + 9.47

Body Mass Index

(2)

Choice Reaction Time = -721 + 35.9 Activity Metabolic Rate + 6.06 Heart Rate + 3.087 Age + 10.10

Body Mass Index

1214

Page 6: The Effects of Energy Expenditure on the Mental Fatigue of

Proceedings of the International Conference on Industrial Engineering and Operations Management Dubai,

UAE, March 10-12, 2020

© IEOM Society International

Figure 5. Result of Regression Analysis for SRT

Figure 6. Result of Regression Analysis for CRT

The results of the regression models prove that all factors (AMR, HR, age and BMI) significantly affect the SRT and

CRT of the respondents (having p-values of less than 0.05 and model accuracy of adjusted R2 values 88.48% and

90.48% respectively. Since it was proven in the models that reaction times of the respondents significantly decrease

with respect to the factors considered in the study, thus, we can conclude that mental fatigue of the respondent increases

as the AMR, HR, age and BMI of the respondent also increases.

3.4. Development of Work-Rest Schedule

In order to lessen the mental fatigue experienced by the workers, the researchers designed a suitable work-rest schedule

for the specific scope of work that was covered in the study. Previous study has presented a theoretical model that

could be the basis for work-rest schedule that considers physiological factors in determining the work capacity of the

workers (Hsie, M., 2009). However, it only focuses on the specific activities done by the workers, which could be

very diverse for construction workers. Given that, data gathering would be time consuming and the results could vary

from workplace to workplace. Another study conducted in Hong Kong presented a work-rest schedule for rebar

workers (Garg, A., 2009). The study focused on heat tolerance and environmental exposure of the workers as well as

a specific construction trade, which makes the study limited to its scope. The researchers chose to incorporate these

1215

Page 7: The Effects of Energy Expenditure on the Mental Fatigue of

Proceedings of the International Conference on Industrial Engineering and Operations Management Dubai,

UAE, March 10-12, 2020

© IEOM Society International

two studies to come up with a simulation model that would allow diverse construction projects—or even other

practices—in coming up with their own work-rest schedule.

3.4.1. Calculation of Maximum Allowable Work Duration

In calculating the maximum allowable work duration, an equation derived from a study of Wu, H.C. (2001) was

considered to determine the maximum allowable work duration to be imposed on workers doing high-intensity works

similar to the tasks of construction workers.

Where VO2work (l/min) is the oxygen consumption during work, VO2rest is the oxygen uptake during rest—which is

typically at 0.341 l/min and 0.31 l/min for men and women, respectively—and VO2max is the estimated work capacity

of an individual. VO2max equation is presented below:

Where SRE is Self-Reported Exercise, BMI (kg/m2) is Body Mass Index, Gender is indicated as 0 and 1 for female

and male respectively, and W (kg) is weight. Self-reported exercise is a widely used metrics to determine the level of

physical effort exerted by an individual beyond the daily-required tasks. It has been used in various studies to be able

to determine the oxygen uptake capacity of certain individuals (Hsie, M., 2009; Jackson, A., 1996).

3.4.2. Monte Carlo Simulation Model

Monte Carlo Simulation method is a technique that produces different randomized situations that will help in

determining solutions for a given problem. Thus, for this study, the researchers chose to simulate more situations to

acquire more data and attain more accurate results. The model used was derived from a study conducted by Yi, W. &

Chan, A. (2013), which has a similar objective with this study—to be able to create an optimal work-rest schedule for

workers in the construction industry.

To develop the simulation model, three factors were randomly selected for 9,125 runs to generate approximately a

year worth of data for all 25 workers. Factors for the simulation model includes SRE, BMI, Age, Gender, and weight.

The estimated work capacity for the worker will be then computed and assigned as VO2max. The next randomly

generated number would determine the assigned activity metabolic rate. The activity metabolic rate values were based

on the obtained AMR values from the observation. The researchers created a probability distribution table to list down

the possible assigned values and its corresponding frequency percentage. The AMR is then converted to oxygen

consumption (l/min) by dividing the AMR (kcal) by 4.83—which is said to be the conversion factor as mentioned in

a previous study (Chang, F. et al., 2008). After having all the oxygen consumption values needed, the RVO2 can be

obtained then the maximum allowable work duration (MAWD). The simulation will then subtract the MAWD to 240

minutes to determine if time left is greater than 240 minutes. The last randomly generated number will let the model

know which rest period should be chosen. The rest period will also determine the percent replenishment of MAWD,

which was derived from a previous study as well (Garg, A., 2009). The simulation will then proceed to run

continuously until there is no time left within 240 minutes. The result of the simulation model is shown in the table

below.

1216

Page 8: The Effects of Energy Expenditure on the Mental Fatigue of

Proceedings of the International Conference on Industrial Engineering and Operations Management Dubai,

UAE, March 10-12, 2020

© IEOM Society International

Table 3. Sample Results for Monte Carlo Simulation

3.4.3. Optimal Work-Rest Schedule

In order to determine the optimal work-rest schedule, the researchers first determined the average maximum allowable

work duration (MAWD). The average is obtained by adding all the MAWD per run then dividing it by the total number

of runs, which are 9,125. Results show that the average MAWD for the workers is 159.92 minutes. The researchers

rounded it off to 160 minutes or 1 hour and 40 minutes. Thus, the optimal duration for construction workers before a

rest period is as mentioned. After that, the optimal rest duration was considered. Two factors were used in determining

which rest duration is the most suitable for the model, the average productive time and the average number of rest

periods. The summary is shown in the table below.

Table 4. Summary of Results in Determining the Number of Rest Period

Number of rest

periods Average Number of rest

periods needed

5 2 10 1 15 1 20 1 25 1 30 1 35 1 40 1

The best choice for average productive time is 5 minutes given that it has an average of 232.00 productive minutes

based from the simulation runs. However, the MAWD forecast can only cater up to one (1) rest period in between of

morning shift and afternoon shift respectively.

The researchers chose the optimal rest period not only in terms of productive time, but also considering the best in

different age brackets. The researchers observed that the optimal rest period and MAWD was affected by the difference

in age groups. Therefore, the averaging method was less accurate given that there are still a lot of older working

generations. Therefore, the researchers opted to obtain the MAWD and optimal rest period per age bracket to determine

the lowest MAWD and highest rest period to cater to all of the workers’ needs.

Table 5. Age Bracket Range for MAWD and Optimal Rest Period

Age bracket 20s 30s 40s 50s MAWD 179.69 159.02 143.12 123.25

1217

Page 9: The Effects of Energy Expenditure on the Mental Fatigue of

Proceedings of the International Conference on Industrial Engineering and Operations Management Dubai,

UAE, March 10-12, 2020

© IEOM Society International

Optimal rest period 5 mins. 10 mins. 10 mins. 20 mins.

Therefore, in order to consider all age groups in the industry—especially that there are still a lot of construction

workers whom are in the eldest age group—the researchers chose 20 minutes for the rest period for both morning and

afternoon and the MAWD used will be 120 minutes.

Work Rest

Lunch

Duration

120 min 110 min 120 120 min 110 min

Figure 7. Optimal Work-Rest Schedule

The figure above illustrates the Work-Rest duration in between the lunch break. The work duration runs for 120

minutes. The worker is then given the chance to replenish for 20 minutes and regain his optimal MAWD by 84%. The

worker then proceeds to finish the first shift of his task then rest for 60 minutes during lunch break. The worker repeats

the same work-rest schedule for the afternoon.

4. Conclusion

The findings of the study have revealed that workers in the construction site routinely exceed generally accepted

physiological thresholds for manual work leading to fatigue. This was evident on the factors gathered from the

respondents such as their activity metabolic rate, heart rate, age and body mass index. Results of statistical analyses

such as correlation and regression model proved that the factors considered in the study have significant effect to the

mental fatigue of the workers as measured in the reaction time of the respondents using the SRT and CRT tests.

Considering results of this study, the researchers were able to design an optimal work-rest schedule for the construction

workers using Monte Carlo simulation. Through this method, the researchers were able to determine the maximum

allowable work duration for the workers and compute the optimal rest period to lessen the mental fatigue experienced

by workers in different construction trades.

References

Abbe, O., Harvey, C., Ikuma, L., Aghazadeh, F. Modeling the relationship between occupational stressors,

psychosocial/physical symptoms and injuries in the construction industry., Available: http://dx.doi.org/

10.1016/j.ergon.2010.12.002, 2010

Abdelhamid, T., Everett, J. Physiological demands during construction work. Journal of Construction Engineering

and Management. pp. 427-437, Available: http://dx.doi.org/10.1061/(ASCE)0733-9364(2002)128:5(427),

September 2002.

Ainsworth, B. et. al., Compendium of Physical Activities: an update of activity codes and MET intensities. 2010

Antwi-Afaria, M., Lib. H., Edwards, D., Biomechanical analysis of risk factors for work-related musculoskeletal

disorders during repetitive lifting task in construction workers. Automation in Construction. 41-47,

http://dx.doi.org/10.1016/j.autcon.2017.07.007, 2017

Aryal, A., Ghahramani, A., Becerik-Gerber, B., Monitoring fatigue in construction workers using physiological

measurements. Automation in Construction. 154-165, Availabe: https://doi.org/10.1016/j.autcon.2017.03.003.,

2017

Astrand, P. and Rodahl, K., Textbook of work physiology: Physiological bases of exercise., 1986

Yi, W. and Chan, A. Optimizing work-rest schedule for construction rebar workers in hot and humid environment.,

2013

Boksem MAS, Meijman TF, Lorist MM. Effects of mental fatigue on attention: an ERP study. Brain Research, pp.

107-116, September 25, 2005. Available: https://doi.org/10.1016/j.cogbrainres.2005.04.011

1218

Page 10: The Effects of Energy Expenditure on the Mental Fatigue of

Proceedings of the International Conference on Industrial Engineering and Operations Management Dubai,

UAE, March 10-12, 2020

© IEOM Society International

Bowen, J., Hinze, A., Griffiths, C., Investigating real-time monitoring of fatigue indicators of New Zealand forestry

workers. Accident and Analysis Prevention. https://doi.org/10.1016/j.aap.2017.12.010., 2017

Cheng, T., Migliaccio, G., Teizer, U., Gatti, C. Data fusion of real-time location sensing and physiological status

monitoring for ergonomics analysis of construction worker. s320–335, Available:

http://dx.doi.org/10.1061/(ASCE)CP.1943-5487.0000222, 2012.

Department of Labor and Employment. Occupational Safety and Health Standards. Available:

http://www.oshc.dole.gov.ph/images/Files/OSH%20Standards%202017.pdf., 1989

Domingo, J., De Pano, M., Ecat, D., Sanchez, N., Custodio, B., (2015). Risk assessment on Filipino construction

workers. Procedia Manufacturing, 1854 – 1860, Available: doi: 10.1016/j.promfg.2015.07.226., 2015

Eaves, S., et al., Building healthy construction workers: Their views on health, wellbeing., 2016

Gallagher, S., Heberger, J.R., Examining the interaction of force and repetition on musculoskeletal disorder risk a

systematic literature review. Factors Ergonomics. 55 (1), 108-124., 2013

Garg, A., Kapellusch, J.M., Applications of biomechanics for prevention ofwork-related musculoskeletal disorders.

Ergonomics. 52 (1), 36-59. 2009

Gatti, U., Schneider, S., Migliaccio, G., Physiological condition monitoring of construction workers. Automation in

Construction. 227–233, http://dx.doi.org/10.1016/j.autcon.2014.04.013., 2014.

Gumasing, J., Robielos, R., Ergonomic Intervention Addressing Musculoskeletal Disorders Among Poultry Layer

Workers, ICIEA Conference Proceedings, 2018

Gumasing, M.J.J., & Pacheco, E.G. P., (2018). Predictive Model on the Severity of Musculoskeletal Disorder and

Accidents of Truck Drivers in the Philippines. 2018 2nd European Conference on Industrial Engineering and

Operations Management (IEOM), Paris, France, July 26-28, 2018

Gumasing, M. J. J., & Sasot, Z. B. (2019). An Occupational Risk Analysis of Garbage Collection Tasks in the

Philippines. 2019 IEEE 6th International Conference on Industrial Engineering and Applications (ICIEA). doi:

10.1109/iea.2019.8715109

Haggarty, P., Valencia, M., Mcneill, G., Gonzales, N., Moya, S., Pinelli, A., Quihu, L., Saucedo, M., Esparza, J.,

Ashton, J., Milne, E., James, P., Energy expenditure during heavy work and its interaction with body weight.

British Journal of Nutrition, 77, 359-373, 1996

Hsie, M. et. al., A model used in creating a work-rest schedule for laborers. Automation in Construction, pp. 762–769,

2009

Hsu, D., Sun, Y., Chuang, K., Juang, Y., Chang, F., E ect of elevation change on work fatigue and physiological

symptoms for high-rise building construction workers. Safety Science Journal. 833 - 843, Available: doi:

10.1016/j.ssci.2007.01.011., 2005

Hwanga, S., Leeb, S., Wristband-type wearable health devices to measure construction workers' physical demands.

Wristband-type wearable health devices to measure construction workers' physical demands. Automation in

Construction. http://dx.doi.org/10.1016/j.autcon.2017.06.003., 2017

International Labor Organization (ILO). Facts of Safety at Work,

http://www.ilo.org/wcmsp5/groups/public/dgreports/dcomm/documents/publication/wcms_067574.pdf , 2005

Jackson, A., Ross, R., Methods and limitations of assessing functional work capacity objectively, Journal of Back and

Musculoskeletal Rehabilitation, pp. 265–276., 1996

Leung, M., Chan, I., Cooper, C., Stress Management in the Construction Industry. ISBN: 978-1-118-45641-5, 2014

Ng, S., Tang, Z., Labour-intensive construction sub-contractors: their critical success factors, Int., 732–740,

http://dx.doi.org/10. 1016/j.ijproman.2009.11.005, 2010

Maiti, R., Workload assessment in building construction related activities in India, Applied Ergonomics. pp. 754–

765., 2008.

Market Reports Store. News. Available: https://www.prnewswire.com/news-releases/global-construction-

marketworth-103-trillion-in-2020-50-largest-most, 2015

Moore RD, Romine MW, O’Connor PJ, Tomporowski PD. The influence of exercise-induced fatigue on cognitive

function. Journal of Sports Science, vol. 30, pp. 841–850, 2001.

Mucenski, V., Pesko, I., Drazic, J., Cirovic, G., Trivunic, M., Bibic, D., Construction Workers Injury Risk Assessment

in Relation to their Experience and Age. Procedia Engineering. 523 - 525, http://dx.doi:

10.1016/j.proeng.2015.08.205., 2015

Pinto, A., Nunes, I.L., Ribeiro, R.A., 2011. Occupational risk assessment in construction industry – overview and

reflection. Journal of Safety Science. 49 (5), 616–624., 2011.

1219

Page 11: The Effects of Energy Expenditure on the Mental Fatigue of

Proceedings of the International Conference on Industrial Engineering and Operations Management Dubai,

UAE, March 10-12, 2020

© IEOM Society International

Philippines Star. Philippine construction works seen growing over 50% by 2020. Available:

https://www.philstar.com/business/2016/05/26/1586914/philippine-construction-works-seen-growing-over-

502020., 2016

Philippine Statistics Authority. Safety and Health in the Workplace: Cases of Occupational Injuries. Available:

htps://psa.gov.ph/content/safety-and-health-workplace-cases-occupational-injuries-first-series-2., 2017

Philippine Statistics Authority. Statistical tables on Labor Force Survey (LFS): Available:

https://psa.gov.ph/content/statistical-tables-labor-force-survey-lfs-january-2018., January 2018.

Rahman, A., Assessing major Environmental hazards of Construction projects in Dhaka city. Available:

http://dx.doi.org/10.15242/IIE.E0815050, 2015.

Ricci, J., Chee, E., Lorandeau, A., Berger, J., Fatigue in the US workforce: prevalence and implications for lost

productive work time, Journal of Occupational Environmental Medicine, 49 (1) 1–10,

http://dx.doi.org/10.1097/01.jom.0000249782.60321.2a., 2007

Robielos, R., Sambua, K. Ergonomic Intervention for Healthcare Workers and Patients: A Development of Patient

Handling Devices., 2014

Rwamamara, R., Lagerqvist, O., Olofsson, T., Johansson, B., Kaminskas, K., Evidence based prevention of work

related musculoskeletal injuries in construction industry, Journal of Civil Engineering Management. 16, 499–

509., 2010

Sabitoni. Number of Worker Deaths in Construction Continues to Rise. Laborer's Health and Safety Fund of North

America. Vol 14, Num 9. Available: https://www.lhsfna.org/index.cfm/lifelines/february-2018/number-

ofworker-deaths-in-construction-continues-to-rise/., 2018

Statista. Statistics Portal. Available: https://www.statista.com/statistics/187412/number-of-employees-in-

usconstruction/influential-markets-292235961.html, 2015

Strasser, H., Work physiology and ergonomics in Germany: from the past to future challenges, Occupational

Ergonomics Journal. 319–44., 2003

Wu, H., Wang, M., Determining the maximum acceptable work duration for high-intensity work, European Journal

of Applied Physiology, 85 (3–4) (2001)339–344., 2001

Yi, W., Chan, A., Wang, X., Wang, J., Development of an early-warning system for site work in hot and humid

environments: a case study, Automation Construction. 62, 101–113,

http://dx.doi.org/10.1016/j.autcon.2015.11.003., 2015

Zhang, M., Murphy, L.A., Fang, D., Caban-Martinez, A.J., Influence of fatigue on construction workers’ physical and

cognitive function. Occupational Medicine, vol. 65, no. 3, pp. 245–250, April 2015. Available:

https://doi.org/10.1093/occmed/kqu215

Biographies

Ma. Janice J. Gumasing is a Professor of School of Industrial Engineering and Engineering Management at Mapua

University, Philippines. She has earned her B.S. degree in Industrial Engineering and Masters of Engineering degree

from Mapua University. She is a Professional Industrial Engineer (PIE) with over 15 years of experience. She is also

a professional consultant of Kaizen Management Systems, Inc. She has taught courses in Ergonomics and Human

Factors, Cognitive Engineering, Methods Engineering, Occupational Safety and Health and Lean Manufacturing. She

has numerous international research publications in Human Factors and Ergonomics.

Claire Marie A. Llamas graduated from Mapua University with B.S. degree in Industrial Engineering. She is a

member of Philippine Institute of Industrial Engineers (PIIE) Mapua Chapter and also an active member in Operation

Research Society of the Philippines (ORSP) Mapua Chapter. Her research interest includes Risk Management,

Ergonomics and Human Factors.

Czarina Anne A. Martin graduated from Mapua University with B.S. degree in Industrial Engineering. She is a

member of Philippine Institute of Industrial Engineers (PIIE) Mapua Chapter and also an active member in Operation

Research Society of the Philippines (ORSP) Mapua Chapter. Her research interest includes Risk Management,

Ergonomics and Human Factors.