    Presentation the project Morocco NIS FRAME BIDDING 2014 :

    This frame bidding only includes the NIS professional service activities of

    BTS integration implementation (wireless product) and access product

    integration implementation, according to Huawei latest outsourcing

    strategy for NIS service, such kind of low level activities can be done by

    subcontractors . This frame bidding result can be used by Huawei wireless

    projects and access projects for Morocco Telecom, INWI and Meditel. The

    duration of this frame bidding is 14 months from Nov. 2014- Dec. 2015 .

  • 8/10/2019 Technical Proposal for Wireless Project

    4/22

    4 567 589:9 ;< =67 >?;@7A= 3B?7C799

    M?BIAB>8C M?;A7NO?7

    1.

    Make BTS Data configuration files and BSC/RNC script, send BTSfile to Huawei

    2.

    Load script in BSC/RNC under the permission of Huawei

    3. Antenna and Feeder cutover

    4.

    Alarm cleanup and service check

    5. Basic troubleshooting

    6. Publish Swap report and acceptance report

  • 8/10/2019 Technical Proposal for Wireless Project

    5/22

  • 8/10/2019 Technical Proposal for Wireless Project

    6/22

    4 567 589:9 ;< =67 >?;@7A= 3B?7C799

    Q+L !++ *7=K;?: !5+ 8IN "RB9 )I=7?O 4&3$'

  • 8/10/2019 Technical Proposal for Wireless Project

    7/22

    4 567 589:9 ;< =67 >?;@7A= 3B?7C799

    GSM BSS Network Abis Interface Integration-SWAP-/BTS

    Preparation of scripts/files to configure Huawei 2G BTS based onthe configuration tool supplied by Huawei.

    Load the scripts/files to Huawei equipment without impacting the

    commercial service of Huawei's customer.Integration of the Huawei equipments into customer RAN

    network.If necessary, upgrade/update of the Huawei equipment remotely.

    Troubleshooting during and after integration with Huawei

    cooperation or support to ensure the interface and BTS

    equipment running normal.Distribute licenses if necessaryAlarm cleanup after integration and before service cutover.

  • 8/10/2019 Technical Proposal for Wireless Project

    8/22

    4 567 589:9 ;< =67 >?;@7A= 3B?7C799

    GSM BSS Network BTS and Abis Interface Integration-Expansion-/BTS

    Preparation of scripts/files to configure Huawei 2G BTS based on the

    configuration tool supplied by Huawei.

    Load the scripts/files to Huawei equipment without impacting thecommercial service of Huawei's customer.

    Distribute licenses if necessary.Troubleshooting during and after the expansion with Huawei

    cooperation or support to ensure normal service.

    Alarm cleanup during and after expansion.

    Fulfill expansion checklist to certify service quality.Expansion report

  • 8/10/2019 Technical Proposal for Wireless Project

    9/22

    4 567 589:9 ;< =67 >?;@7A= 3B?7C799

    GSM BSS Network Abis Interface IP ReconstructionImplementation(Except Hardware Replacement and

    Installation)-Reconstruction-/BTS

    Preparation of scripts/files to configure Huawei 2G BTS based on

    the configuration tool supplied by Huawei.Load the scripts/files to Huawei equipment under the permission

    of Huawei.Cordinate Huawei's customer and Huawei hardware

    subcontractor to finish the transmission cutover.

    Distribute licenses if necessary.

    Troubleshooting during and after the reconstruction with Huaweicooperation or support to ensure normal service.Alarm cleanup during and after reconstruction.

    Fulfill reconstruction checklist to certify service quality.

    Operation report

  • 8/10/2019 Technical Proposal for Wireless Project

    10/22

    4 567 589:9 ;< =67 >?;@7A= 3B?7C799

    GSM BSS Network BTS Cutover Implementation(ExceptHardware Cutover)-SWAP-/BTS

    Cordinate Huawei's customer and Huawei hardware

    subcontractor to finish the hardware cutover.

    Integrate antenna & feeder system to Huawei GSM BTS.Configuration and test of external alarms if necessary.

    Alarm cleanup after swap.Troubleshooting during and after swap with Huawei cooperation

    or support to ensure normal service.

    Fulfill swap checklists to certify swap quality

    Swap report

  • 8/10/2019 Technical Proposal for Wireless Project

    11/22

    4 567 589:9 ;< =67 >?;@7A= 3B?7C799

    UMTS RAN Network NodeB and Iub Interface Integration-New-/NodeB

    Preparation of scripts/files to configure Huawei 3G NodeB based on

    the configuration tool supplied by Huawei.Load the scripts/files to Huawei equipment without impacting the

    commercial service of Huawei's customer.

    Integration of the Huawei equipments into customer RAN network.Integration of the antenna & feeder system including RCU.

    Distribute licenses if necessary.

    Configuration and test of external alarms if necessary.

    If necessary, upgrade/update of the Huawei equipment.Troubleshooting during and after the integration with Huaweicooperation or support to ensure normal service.

    Alarm cleanup during and after integration.

    Fulfill integration checklists to certify service quality.integration report

  • 8/10/2019 Technical Proposal for Wireless Project

    12/22

    4 567 589:9 ;< =67 >?;@7A= 3B?7C799

    UMTS RAN Network NodeB and Iub Interface Integration-SWAP-/NodeB

    Preparation of scripts/files to configure Huawei 3G NodeB based

    on the configuration tool supplied by Huawei.

    Load the scripts/files to Huawei equipment without impacting thecommercial service of Huawei's customer.

    Integration of the Huawei equipments into customer RANnetwork.

    If necessary, upgrade/update of the Huawei equipment remotely.

    Troubleshooting during and after integration with Huawei

    cooperation or support to ensure the interface and NodeBequipment running normal.Distribute licenses if necessary

    Alarm cleanup after integration and before service cutover.

  • 8/10/2019 Technical Proposal for Wireless Project

    13/22

    4 567 589:9 ;< =67 >?;@7A= 3B?7C799

    UMTS RAN Network NodeB and Iub Interface Integration-Expansion-/NodeB

    Preparation of scripts/files to configure Huawei 3G NodeB based

    on the configuration tool supplied by Huawei.

    Load the scripts/files to Huawei equipment without impacting thecommercial service of Huawei's customer.

    Distribute licenses if necessary.Troubleshooting during and after the expansion with Huawei

    cooperation or support to ensure normal service.

    Alarm cleanup during and after expansion.

    Fulfill expansion checklist to certify service quality.Expansion report

  • 8/10/2019 Technical Proposal for Wireless Project

    14/22

    4 567 589:9 ;< =67 >?;@7A= 3B?7C799

    UMTS RAN Network Iub Interface IP ReconstructionImplementation-Reconstruction-/NodeB

    Preparation of scripts/files to configure Huawei 3G NodeB based

    on the configuration tool supplied by Huawei.

    Load the scripts/files to Huawei equipment without impacting thecommercial service of Huawei's customer.

    Cordinate Huawei's customer and Huawei hardwaresubcontractor to finish the transmission cutover.

    Distribute licenses if necessary.

    Troubleshooting during and after the reconstruction with Huawei

    cooperation or support to ensure normal service.Alarm cleanup during and after reconstruction.Fulfill reconstruction checklist to certify service quality.

    Operation report

  • 8/10/2019 Technical Proposal for Wireless Project

    15/22

    4 567 589:9 ;< =67 >?;@7A= 3B?7C799

    UMTS RAN Network NodeB Cutover Implementation(ExceptHardware Cutover)-SWAP-/NodeB

    Cordinate Huawei's customer and Huawei hardware

    subcontractor to finish the hardware cutover.

    Integrate antenna & feeder system to Huawei 3G NodeB.Configuration and test of external alarms if necessary.

    Alarm cleanup after swap.Troubleshooting during and after swap with Huawei cooperation

    or support to ensure normal service.

    Fulfill swap checklists to certify swap quality

    Swap report

  • 8/10/2019 Technical Proposal for Wireless Project

    16/22

  • 8/10/2019 Technical Proposal for Wireless Project

    17/22

    4 567 589:9 ;< =67 >?;@7A= 3B?7C799

    LTE FDD Network Integration for eNodeB(Security Networking)-New-/eNodeB

    Preparation of scripts/files to configure Huawei LTE eNodeB based on the

    configuration tool supplied by Huawei.Load the scripts/files to Huawei equipment without impacting the commercial

    service of Huawei's customer.Integration of the Huawei equipments into customer RAN network.Integration of the antenna & feeder system including RCU.

    Distribute licenses if necessary.

    Configuration and test of external alarms if necessary.If necessary, upgrade/update of the Huawei equipment.

    Troubleshooting during and after the integration with Huawei cooperation orsupport to ensure normal service.

    Alarm cleanup during and after integration.

    Fulfill integration checklists to certify service quality.integration report

  • 8/10/2019 Technical Proposal for Wireless Project

    18/22

  • 8/10/2019 Technical Proposal for Wireless Project

    19/22

    4 567 589:9 ;< =67 >?;@7A= 3B?7C799

    Conversion from a GU/UL/GL dual-mode BTS to a Co-MPTdual-mode BTS (Except Hardware Cutover)-Reconstruction-/

    BTS

    Preparation of scripts/files to configure Huawei MBTS based on

    the configuration tool supplied by Huawei.Load the scripts/files to Huawei equipment under the permission

    of Huawei.Cordinate Huawei's customer and Huawei hardware

    subcontractor to finish the transmission cutover.

    Distribute licenses if necessary.

    Troubleshooting during and after the reconstruction with Huaweicooperation or support to ensure normal service.Alarm cleanup during and after reconstruction.

    Fulfill reconstruction checklist to certify service quality.

    Operation report

  • 8/10/2019 Technical Proposal for Wireless Project

    20/22

  • 8/10/2019 Technical Proposal for Wireless Project

    21/22

    4 567 589:9 ;< =67 >?;@7A= 3B?7C799

    #"* *7=K;?: *2 L;IB=;?BIJHBIBS8C 899O?8IA7 NO?BIJ 9=8RBCB=F >7?B;NTU5BW7

    #%$+)$B RS!T '2'$B B)*./)$.*3 .* U!VVV -2.%*/

    K)*/'-/ )*W-'22 54'6%. /$)4;2%,=))(*3 %*3.*%%$ /) ='* $%&)$/?

    "I=7II8 +K8> KB=6 #25 H 5L" BI=7J?8S;I 8IN A;IXJO?8S;I

    #%$+)$B $%B)/% Y:ZF /%,/ ;%+)$% '*< 'P%$ '*/%**' ., -='*3%