  • 8/7/2019 Taehwa 6 Tool Motor Audit ENGLISH

    1/15

    C&M Go

    2010. 7.28

    CONTENTS

    3

    2

    Process audit overall1

    Q-System audit result

    5

    Process audit list : 6 Tool

    Process audit list :Condition control

    Process audit list : T5S

    Auditor : Gu, Jin-Mok

    4Process Audit List :

    Outgoing assurance /CTQ Control

    6 NC point of Process Audit

  • 8/7/2019 Taehwa 6 Tool Motor Audit ENGLISH

    2/15

    1 / 7

    Vendor) Q-System audit result approvalIn charge approval

    C&M Biz. Team

    Gu, Jin-Mok

    27 th J u ly 10

    Vendor Motor line, Taehwa Ent. India Pvt.

    Ltd.

    Audit dt. 27 th July 10 Obtained

    mark

    Grade

    Auditor Gu, Jin-Mok Attended byfrom Taehwa

    QA manager /Koreansupport team

    55 A, B, C, D

    category Item Allottedmark

    Obtainedmark

    6-tools

    Qualitymeeting

    9 2.4

    OS&D control 8 3.8

    Seq uentialinspection

    8 1.9

    Key processcontrol

    8 1.6

    T/Check 9 5.4

    Q-a ud it 8 1.6

    Total 50 16.7

    4 M control

    Man 5 1.8

    Machine /tools 5 1.3Materials 5 3.0

    Metho d 10 6.2

    Information of 4 M changes

    5 1.3

    Total 30 13.6

    Outgoing qualityassurance /CTQ control

    20 4.7

    T5S 50 20

    Opinion aboutoverall audit

    result

    [Good points]-M/C 5S ( du e to no work time increases)

    [Major problems]-Pro du ction is carrie d ou t witho u t basic 6 tool con d ition control

    in Q-system.- No q u ality training to workers an d QA personal does not have

    concept abo u t qu ality.- No q u ality ass u rance du ring pro du ct o u tgoing.

    (No OQC control.)

    Audit historyAudit dt. Mark Grade Audit dt. Mark Grade

    27 th July10

    55 D

    Grade (Grade A : 150~131 points, Grade B : 130~111 marks,Grade C : 110~91 mark, Grade D : lower than 90)F/up of result (Higher than Grade B : Pass, to publish NCR report,Lower than Grade C : re-audit and to link to biz wrap up???)

  • 8/7/2019 Taehwa 6 Tool Motor Audit ENGLISH

    3/15

    A udit check list 6 tools

    2 / 7Profitable Market Share Growth

    ItemDetaile d a ud it item

    Excellent -- Ba d calc u lation

    Obtaine d mark Opinion from a ud itor

    5 4 3 2 1

    1) Q u alitymeeting

    (9 points)

    1) Is d aily q u ality meeting being hel d? z

    2.4

    1) Q u ality meeting not being calle d .2) Weekly an d monthly q u alitymeeting not being hel d .

    Qu ality meeting itself is notbeing hel d .

    2) Is d aily q u ality meeting recor d being maintaine d properly ?

    z

    3) Is Q u ality in d ex being recor d e d in the q u alitystat u s boar d?

    - Part RTN d efect rate (monthly) , process d efect rate ( d aily , monthly)

    z

    4) Is weekly q u ality improvement meeting being hel d? z

    5) Is monthly review meeting being d one ? z

    6) Is F/Up for the d eci d e d item being d one z

    2) OS&Dcontrol(8 points)

    - Ret u rn setcontrol

    1) Is RTN , IQC reject , an d claim receive d set beingrecovere d imme d iately ?

    z

    3.84

    1) RTN sample not being ret u rne d imme d iately. : 1 no. of d ispatche d Q member to L G .2) Q u ality training to operator nil.3) N G set d isplaye d d ie notavailable.4) Except NC report an d co u ntermeas u re against L G qu ality meeting , no d oc u mentavailable.

    2) Is N G set being d isplaye d for a specifie d perio d? z

    3) Is d efect phenomena being ta u ght to operator ? (Isoperator aware abo u t NG? )

    z

    4) Is co u ntermeas u re for the NC item being replie d in time ? z

    5) Is the d etail regar d ing 2 nd ven d or being F/B an d isits co u ntermeas u re being followe d?

    z

    3)Seq u entialinspection

    1) Is self/seq u ential inspection item being set an d followe d? z

    1.9

    1) Overall , seq u ential inspectionactivity is lacking.2) No training recor d abo u tseq u ential inspection for operator.

    2) Is N G set being recognize d by p u tting tag or marking with marker ?

    z

    3) Is N G set being kept in d efect box ? z

    4) Is operator wise recor d being maintaine d? z

    5) Is co u ntermeas u re for the d efect been set ? z

    6) Is prize being awar d e d as per the achievement of eachoperator ?

    z

    |x in

    1.8

    |x in

    1. 6

    |x in

    1.9

  • 8/7/2019 Taehwa 6 Tool Motor Audit ENGLISH

    4/15

    A udit C/List 6 Tools

    3 / 7Profitable Market Share Growth

    Item Detaile d a ud it item

    Excellent -- Ba d calc u latio

    n

    Obtaine d

    mark Opinion from a ud itor 5 4 3 2 1

    4) Keyprocesscontrol(8 points)

    1) Has key process sign boar d been attache d on theproblem process ?

    z

    1.6

    1) There is no signboar d operationr u le.

    2) Is check sheet being ma d e an d is s u pervisor checkingthe performance ?

    z

    3) Is key process control like d with history control an d improvement activity ?

    z

    5) T/Check

    1) Is T/Check being carrie d ou t time wise (initial , mid, final) ? z

    5.4

    2) T/Check of resistance checkitem only being d one2) Has s u rface plate , meas u ring eq u ipment , jig, an d check

    sheet etc. been d isplaye d?z

    3) Is act u al set being kept as first set , mid pro du ction set , an d final set wise ?

    z

    4) Is line lea d er , pro du ction hea d checking whether T/Checkis being d one ?

    z

    5) Is N G imme d iately correcte d an d its improvement activitybeing carrie d ou t?

    z

    3)Sequentialinspection

    1) Is Q-a ud it system been assigne d? z

    1.6

    3) No a ud it assessment is beingma d e.

    2) Is A-a ud it being carrie d ou t on a monthly basis ? z

    3) Is checking being carrie d ou t as per Check stan d ar d? z

    4) Is Q-A ud it eval u ation sheet being ma d e ? z

    5) Is improvement activity being carrie d ou t for the NC item ? z

    6) Is a ud it res u lt (mark , NC point) being d isplaye d an d share d?

    z

    |x i

    n2 .3

    |x i

    n 1.8

    |x in

    1. 6

  • 8/7/2019 Taehwa 6 Tool Motor Audit ENGLISH

    5/15

  • 8/7/2019 Taehwa 6 Tool Motor Audit ENGLISH

    6/15

    5 / 7

    A udit C/List - 4 M control

    Profitable Market Share Growth

    Item Detaile d a ud it itemExcellent -- Ba d

    Calc u lationObtain

    e d mark

    Opinion from a ud itor 5 4 3 2 1

    4) Method(10 marks)

    1) Is QC , 4M control chart been ma d e ? z

    6.2

    1) Operator d o not u nd erstan d thecontent of work stan d ar d

    2) There is no working metho d revisionhistory.

    3) There is no a ud it report for the 2 nd

    ven d or.4) History for the Calibration of

    meas u ring instr u ment omitte d .

    2) Is working stan d ar d been d isplaye d in the process ? (more than 80%)

    z

    3) Is working st d . an d work matching an d is workingcon d ition being complie d (to check key process)

    z

    4) Is change d contents of working metho d an d inspectionmetho d been revise d an d controlle d (process chart , stan d ar d ) in chase working metho d an d inspectionmetho d are change d?

    z

    5) Is d rawing from c u stomer been entere d in d rawing log

    book an d is its history being controlle d an d is its latestversion being marke d?

    z

    6)Is specification log book being recor d e d an d is its contentsbeing arrange d in d rawing an d is it being fee d /back torelate d d ept ?

    z

    7) Is process a ud it an d ven d or a ud it report for 2 nd ven d or been prepare d an d is perio d ical a ud it being carrie d ou t?

    z

    8) Is incoming q u ality inspection an d history control for the2nd ven d or being carrie d ou t?

    z

    9) Is necessary meas u ring instr u ment available an d

    calibration being carrie d ou t perio d ically ? (Meas u ringeq u ipment history car d )

    z

    3)Materials(5 marks)

    1) Is raw materials report (st d .) available ? z

    1.3

    1) Lacking in d oc u ment.

    2) Is incoming low wise materials report (mill sheet) beenobtaine d an d controlle d?

    z

    3) Is materials incoming an d ou tgoing log book beingcontrolle d?

    z

    4) Is tracing system available in case there is problem in rawmaterials ?

    z

    |x i

    n2 .0

    |x i

    n 1

  • 8/7/2019 Taehwa 6 Tool Motor Audit ENGLISH

    7/15

    A udit C/List Outgoing quality assurance/CTQ control

    6 / 7Profitable Market Share Growth

    Item Detaile d a ud it itemExcellent -- Ba d

    Calc u lationObtain

    e d mark

    Opinion from a ud itor 5 4 3 2 1

    Outgoingqualityassurance(20 marks)

    1) Is separate OQC inspector been assigne d in QCorganization chart an d is it being operate d?

    z

    4.7

    1) No OQC system is available.

    2) Is item wise OQC inspection item been assigne d an d isinspection history car d available ?

    z

    3) Is OQC inspection history being controlle d per every lot ? (Control with inspection report & system)

    z

    4) Is OQC inspector controlling the q u ality problem an d spec.changes history ?

    z

    5) Is Lot tracing possible by classifying o u tgoing lot wisepro du ction d ate ?

    z

    6) Is i d entification car d attaching for the inspection rea d y/inspection completion/ N G item been classifie d?

    z

    7) Is meas u rement an d item wise possible meas u ringinstr u ment been eq u ippe d as per o u tgoing inspectionitem ?

    z

    8) Is perio d ical gage R&R being carrie d ou t with c u stomer for the o u tgoing item ?

    z

    9) Is important q u ality been selecte d as CTQ item an d isCTQ item a d ju stment history been controlle d on amonthly basis ?

    z

    10) Is CTP control item been selecte d for the satisfaction of cu stomer ?

    z

    11) Is improvement activity being carrie d ou t du ring processcapa. analysis an d when target val u e (Z) is notachieve d?

    z

    |x in

    4

  • 8/7/2019 Taehwa 6 Tool Motor Audit ENGLISH

    8/15

    C/List T5S

    7 / 7Profitable Market Share Growth

    Aud it item G ra de E G ra de D G ra de C G ra de B G ra de A Obtaine d mark

    Opinion from A ud itor

    5S Arrangementan d organization

    10

    Unnecessary item , NG item , left over from pro du ction areleft at site witho u tmarking

    2

    Unnecessary itembeing han d led witho u tany plan

    Part mixe d stacke d .4

    Temporaryd isposal placeassigne d, perio d icallyd ispose d

    Depot area control6

    Whenever unnecessary item isfound, it is d ispose d asper r u le

    Stan d ar d inventory/stock q uantity is beingcomplie d

    8

    Basic system toprevent defectrec u rrence isavailable

    Linke d todecreases ininventory/ stock

    10

    4 points

    OK pro du ct , NG pro du ctidentification not proper.Model of inventory can notbe i dentifie d .

    Cleaning an d cleanness

    10

    Floor , wall notcleane d an d d irty.

    2

    Cleaning toolscontrol , d rinking water control , d ressing placecontrol OK

    Floor , wall , an d ceiling is clean

    4

    Cleaning area , incharge freq uencyclear.

    Corner , d rinkingwater , d ressing area

    6

    Eq u ipment cleaningis being doneperio d ically

    Eq u ipment in chargeposte d an d operate d

    8

    Habit uate d cleaningan d maintainingcleanness

    Basic improvementactivity is being doneto prevent

    contamination

    4 points

    No in charge assigne d No separate cleaning toolbox

    3R Right location , right q uantity , Right container

    10

    Inventory stacke d on gangway , floor.

    Part , tools left onthe floor

    2

    Having concept of gangway an d havingsimple concept of rightlocation level.

    4

    Controlling thesystem by whichlocation , item , an d amo unt can befigu re d ou t.

    6

    Right container , rightquantity is beingcomplie d an d kept atright location

    8

    The system bywhich 3 R is beingcomplie d . Bin /pallet/container

    10

    4 points

    Unnecessary item is mixe d in lineNo stan dar d container

    Visiblemanagement

    Find ing o u tabnormality , han d ling theabnormality

    10

    The system bywhich normal an d abnormal can not befigu re d ou t.

    2

    The system by whichoperator can not reportby self when anyproblem is occ u rre d .

    The con d ition inwhich only relate d personal han d les.

    4

    The system bywhich operator canreport by self whenany problem isocc u rre d .

    Controlling done bylinking to relate d dept.

    6

    The system in whichanyone can fin d ou tproblem an d solve

    Abnormal con d itionis controlle d cumu lativeway an d linke d toimprovement

    8

    Problem con d itionis being controlle d inthe form of data , systemization

    10 2 points

    The system by whichproblem from line can notbe fig u re d ou t

    Stat us boar d control

    10

    The system bywhich pro du ctionstat us , loss can notbe fig u re d ou t.

    2

    Pro du ction stat us , loss stat us not beingcontrolle d

    Stat us boar d controllacking

    1

    Pro du ction target vs.res u lt control

    Cleanness of Stat us boar d so so

    6

    Time wise target an d res u lt, line loss stat us isbeing marke d .

    Stat us boar d isbeing maintaine d itemwise an d element wise.

    10

    Pro du ction stat usan d d istrib u tion stat usof loss can be seenimme d iately

    Maintainingcleanness of datasheet in stat us boar d

    10

    6 points

    Pro du ct loss can be seenpartially.No pro du ction stat usboar d in ME line.

    Total 20marks

  • 8/7/2019 Taehwa 6 Tool Motor Audit ENGLISH

    9/15

    Non conformity item in process audit (Before and after improvement)

    Profitable Market Share Growth

    No. Process NC item Phenomena Improvementcountermeasure

    After improvement Incharge

    Schedule

    completion

    Remark

    1 Slot

    insertion

    Core preparation

    work station notproperly kept.Core left

    anywhere

    Training to operators an d now

    maintaining properly.

    Producti

    onleader

    Done

    2 Winding J u mp wire beingpu lled (Wire c u t)

    Improve d tools u sing at allwind ers

    P.E. Done

    3 Winding No inner pin inTransfer tool

    All tool change d now on everyWin d er.

    Production

    leader

    Done

    4 1 st

    formingLea d wire d ent atG ripper

    Ou t G ripper 90 t u rn Mr.Lee

  • 8/7/2019 Taehwa 6 Tool Motor Audit ENGLISH

    10/15

    NC item during process Audit (Before and after improvement)

    Profitable Market Share Growth

    No. Process NC item P henomena Improvementcountermeasure

    After improvement Incharge

    Schedule

    completion

    Remark

    5Winding

    Excessive amo u ntof Coil d ispose d asscrap du ringwind ing an d left inline.

    Now after toolImprovement scrap

    re du ce d

    Production

    leader

    6 Crimping

    Wire c u t NG du e tocoil being p u lled du ring coilstripping.

    7 Manualprocess

    Wiring N G set leftwitho u tid entification

    Now u sing bins to keepNg sets (Apart from

    Ru nning mo d els)

    8 Manualprocess

    Jigs an d tools lyingon floor

    All jigs & fixtu res keepingin rack only.

    Production

    leader

  • 8/7/2019 Taehwa 6 Tool Motor Audit ENGLISH

    11/15

    NC item during process audit (before and after improvement)

    Profitable Market Share Growth

    No. Process NC item Phenomena Improvementcountermeasure

    After improvement Incharge

    Schedule

    completion

    Remark

    9 Manual

    work

    Coil is being p u lled after ins u lationplastic insertion =>

    wire c u t

    After tool improvement.

    10 Manualwork

    NG set mixe d witho u t marking

    Now u sing stickers towrite any d efect.

    Production

    leader &

    Quality

    Done

    11Repair

    Fan r u nning whilelying on floor

    5S maintaine d an d nowthis kin d of activities are

    notd oing

    Production

    leader

    Done

    12Manualwork

    Congeste d linemakes workinefficient

    No congeste d line (reworkat the same time)

    Production

    leader

    Target date-22.10.10

  • 8/7/2019 Taehwa 6 Tool Motor Audit ENGLISH

    12/15

  • 8/7/2019 Taehwa 6 Tool Motor Audit ENGLISH

    13/15

    NC item during process audit (before and after improvement)

    Profitable Market Share Growth

    No. Process NC item Phenomena Improvementcountermeasure

    After improvement Incharge

    Schedule

    completion

    Remark

    17 Line

    Jigs an d toolsBu ffing notproperly d one

    Before shift starting , bu ffing of tools on d aily

    basis.

    Production

    leader

    Done

    18 Rework

    Core lying on floor Rework witho u t st d .

  • 8/7/2019 Taehwa 6 Tool Motor Audit ENGLISH

    14/15

    Audit ( , )

    Profitable Market Share Growth

    No. Process NC item Phenomena Improvementcountermeasure

    After improvement Incharge

    Schedule

    completion

    Remark

    20Line

    No pro du ctionstat u s boar d thu s , loss can not befigu re d ou t exceptMA line

    TAR G ET DATE-25-10-10

    21 Line

    G age not eq u ippe d .(may have large

    no. of N G set)

    TAR G ET DATE-27-10-10

  • 8/7/2019 Taehwa 6 Tool Motor Audit ENGLISH

    15/15

    NC item during process audit (Before and after improvement)

    Profitable Market Share Growth

    No. Process NC item Improvement countermeasure Incharge

    Schedule

    completion

    Remark

    2Return defect Ret u rn N G set not being collecte d

    imme d iately : It takes 2~3 d ays (1 no. of CSd ept.)

    2LQCinspection

    N G st d . set1) Kept in line with r u st witho u t Mod el marking2) Master sample for meas u ring instr u ment notbeen kept.3) Inspector not checking appearance N G

    inspecting only f u nction.

    3*Qualitymeeting*Signboard inkeyprocessing

    Not being hel d No signboar d operation

    4* Sequentialinspection

    Nee d to start from stan d ar d setting1) To train its concept an d self training2) To set seq u ential inspection item per each

    process

    5* Line Audit * No a ud it plan

    64M changereporting

    4M changes reporting not being complie d 1) No 4M changes reporting history.

    7Quality boardin the shopfloor

    Stat u s boar d abo u t Improvement contents1) All are being ma d e man u ally2) Not reasonable for operator to u nd erstan d

    8

    Dismantletest

    Stator Asm d ismantle test1) Not being carrie d ou t.