suryashakti kisan yojna (sky) - kanoda

16
Kanoda [email protected] | Kanoda Suryashakti Kisan Yojna (SKY): A distributed ultra-mega solar initiative By : Dr. Omkar Jani, Director (Research & Culture) Kanoda Energy Systems Pvt. Ltd. At : CII Solar Conclave 2018, Ahmedabad 20 July 2018

Upload: others

Post on 23-May-2022

14 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Suryashakti Kisan Yojna (SKY) - Kanoda

Kanoda

[email protected] |

Kanoda

Suryashakti Kisan Yojna (SKY):A distributed ultra-mega solar initiative

By : Dr. Omkar Jani, Director (Research & Culture)

Kanoda Energy Systems Pvt. Ltd.

At : CII Solar Conclave 2018, Ahmedabad

20 July 2018

Page 2: Suryashakti Kisan Yojna (SKY) - Kanoda

Kanoda

[email protected] |

Outline

1. Introduction

2. Implementation Framework

3. Benefits

4. Cost and Returns

5. Pilot @ GUVNL

"SKY", CII Solar Conclave 2018, Ahmedabad, 20 July 2018. 2

Page 3: Suryashakti Kisan Yojna (SKY) - Kanoda

Kanoda

[email protected] |

Agriculture Consumption vs. Revenue

"SKY", CII Solar Conclave 2018, Ahmedabad, 20 July 2018. 3

AG. CONSUMPTION

Total Ag. Connections : 14.82 Lakh

Avg. Contract Load : 11.4 HP

Agriculture17,521 MU

(27%)

Other48,153 MU

(73%)

AG. REVENUE

From Farmer : Rs. 1,103 Cr.

Govt. Subsidy : Rs. 5,088 Cr.

Cross Subsidy : Rs. 4,358 Cr.

TOTAL : Rs. 10,891 Cr.

Agriculture3% Govt. Subsidy

13.5%

Cross Subsidy11.5%

Other72%

(Data: GUVNL, 2016-17)

Page 4: Suryashakti Kisan Yojna (SKY) - Kanoda

Kanoda

[email protected] |

Implementation Framework

(1) General

GENERAL

Scheme is for farmers already connected to the grid.

Desirable to include as many farmers as possible on a given AG feeder.

COMMITTEE

Farmer’s on a feeder should form a committee for ease of communication & implementation.

"SKY", CII Solar Conclave 2018, Ahmedabad, 20 July 2018. 4

Page 5: Suryashakti Kisan Yojna (SKY) - Kanoda

Kanoda

[email protected] |

Implementation Framework

(2) Technical

PV SYSTEM

Farmer will be provided with a grid-connected solar PV system.

1.25 kW PV system to be provided per hp. E.g. 10 hp 12.5 kW PV system

Installation through empanelled installers at competitively discovered rates.

AG FEEDER

“SKY” feeder to be kept ON during daytime for 12 hours.

"SKY", CII Solar Conclave 2018, Ahmedabad, 20 July 2018. 5

Page 6: Suryashakti Kisan Yojna (SKY) - Kanoda

Kanoda

[email protected] |

Implementation Framework

(3) Funding

COST SHARE

5% Minimum upfront investment from farmer

35% Loan on behalf of farmer

30% Subsidy from Govt. of Gujarat (through loan)

30% Subsidy from Govt. of India

LOAN FACILITATION

State Govt. will take loan of 65% of capital expenditure from NABARD at <6% interest for 7 years.

"SKY", CII Solar Conclave 2018, Ahmedabad, 20 July 2018. 6

35%

30%

Page 7: Suryashakti Kisan Yojna (SKY) - Kanoda

Kanoda

[email protected] |

Implementation Framework

(4) Returns

NET METERING

Farmers would utilize the solar electricity, and inject the surplus generated electricity into the grid.

Farmer’s would earn a revenue based on net evacuated energy at the end of the billing cycle.

REVENUE DURING FIRST 7 YEARS

Rs. 3.50 per kWh, feed-in tariff by DisCom, plus

Rs. 3.50 per kWh, evacuation-based incentive (subsidy) by Govt. of Gujarat

Up to a maximum of 1,000 kWh per hp per year of contract load.

REVENUE DURING NEXT 18 YEARS

Rs. 3.50 per kWh, feed-in tariff by DisCom

NET REVENUE

Farmer will be regularly credited revenue after deduction of loan EMI.

"SKY", CII Solar Conclave 2018, Ahmedabad, 20 July 2018. 7

Page 8: Suryashakti Kisan Yojna (SKY) - Kanoda

Kanoda

[email protected] |

Farmer-level Interconnection Scheme

"SKY", CII Solar Conclave 2018, Ahmedabad, 20 July 2018. 8

Scope of Scheme

PumpConsumption

Meter

Scope of Scheme

Pump

PV Panel Inverter Solar MeterConsumption

MeterNet-

Meter

11 kV

11 kV / 433 V

433 V

11 kV 433 V

Bef

ore

Aft

er

11 kV / 433 V

Page 9: Suryashakti Kisan Yojna (SKY) - Kanoda

Kanoda

[email protected] |

Feeder-level Interconnection Scheme

"SKY", CII Solar Conclave 2018, Ahmedabad, 20 July 2018. 9

Farmer 5

66 kV

11 kV

11 kV

11 kV/ 433 VDistributionTransformer

433 V

Meter

Pump (5 hp)

GenerationMeter Inverter

PV Array(6.25 kW)

11 kV/ 433 VDistributionTransformer

433 V

Meter

Pump (5 hp)

11 kV/ 433 VDistributionTransformer

433 V

Meter

Pump (50 hp)

GenerationMeter Inverter

PV Array(62.5 kW)

433 V

11 kV/ 433 VDistributionTransformer

GenerationMeter

Inverter PV Array(9.38 kW)

Pump (7.5 hp)

Meter

GenerationMeter

Inverter PV Array(12.5 kW)

Pump (10 hp)

Meter

GenerationMeter

Inverter PV Array(12.5 kW)

Pump (10 hp)

Meter

GETCO66/11 kV S/S

To Other Locations

433 V 433 V

Farmer 1 Farmer 2 Farmer 3

Farmer 4 Farmer 6

Net Net

Net

Net Net

Consump-tion

Meter

Consump-tion

Meter

Consump-tion

Meter

FeederNet Meter

Farmer 5“Watchdog”DistributionTransformer(For load controland monitoring)

Note: “Farmer 5” is a non-participating farmer. A watchdog device is installed at this distribution transformer.

Page 10: Suryashakti Kisan Yojna (SKY) - Kanoda

Kanoda

[email protected] |

Benefits to Farmer

1. Relief from electricity bill.

2. Additional income from sale of surplus electricity.

3. 12 hours of daytime grid-quality power.

4. Return on investment within 8 to 18 months.

5. Ownership of PV system after loan repayment.

6. 7 years performance guarantee on PV system.

7. Insurance on PV system by State Govt.

8. Land under PV modules can be used for cropping.

9. Option of increasing height of PV modules.

10. Development of rural economy.

"SKY", CII Solar Conclave 2018, Ahmedabad, 20 July 2018. 10

Page 11: Suryashakti Kisan Yojna (SKY) - Kanoda

Kanoda

[email protected] |

Other Benefits

ENVIRONMENT

Clean energy generation

Avoid requirement of large parcels of land

Incentive for efficient water utilization

TECHNICAL

Improved transmission & distribution efficiency

Maximum utilization of existing grid infrastructure

Avoid establishment of dedicated transmission facility

PUBLIC

Reduction in cross-subsidy surcharge

Reduction in government subsidy burden

"SKY", CII Solar Conclave 2018, Ahmedabad, 20 July 2018. 11

Page 12: Suryashakti Kisan Yojna (SKY) - Kanoda

Kanoda

[email protected] |

Cost of PV Systems

SCOPE

Engineering, procurement, construction of PV system

Approvals and commissioning

Comprehensive maintenance for 7 years

Generation guarantee for 7 years

EXTRA COST

Pump & controller

Height extension from 0.9 m to 2.6 m

"SKY", CII Solar Conclave 2018, Ahmedabad, 20 July 2018. 12

PV Capacity[kW (AC)]

Rate[Rs./ kW (AC)]

5 52,091

>5 - 9 51,975

>9 - 20 50,295

>20 - 50 45,149

>50 - 100 41,999

>100 - 150 kW 41,474

(Rate includes GST)

Page 13: Suryashakti Kisan Yojna (SKY) - Kanoda

Kanoda

[email protected] |

Farmer Economics: 10 hp 12.5 kW

"SKY", CII Solar Conclave 2018, Ahmedabad, 20 July 2018. 13

E q

u i

v a

l e n

tGovt. of India’s 30%

capital subsidy30% (Rs. 1,88,606)

Govt. of Gujarat Loanfor its 30% subsidy30% (Rs. 1,88,606)

Govt. of Gujarat Loan on behalf of Farmer35% (Rs. 2,20,041)

5% (Rs. 31,434)

CAPITAL COST

Rs. 6,28,688

Rs. 71,924 /yr(for 7 years)

TOTAL LOAN REPAYMENT

Evacuation-basedIncentive (Subsidy)

from Govt. of Gujarat@Rs. 3.50 /kWh(Rs. 43,750 /yr)

Sale of Power to DisCom

@ Rs. 3.50/kWh(Rs. 49,000 /yr)

Bill Save (Rs. 4,800 /yr)

GROSS BENEFIT (FIRST 7 YRS)

Rs. 97,550 /yr

NET BENEFIT(FIRST 7 YEARS)Rs. 25,626 /yr NET BENEFIT

(NEXT 18 YEARS)Rs. 53,800 /yr

Page 14: Suryashakti Kisan Yojna (SKY) - Kanoda

Kanoda

[email protected] |

Pilot of 137 Feeders

"SKY", CII Solar Conclave 2018, Ahmedabad, 20 July 2018. 14

Sr. DisComNo. of

FeedersAvg. Farmersper Feeder

Avg. Loadper Consumer

(hp)

Avg. Solarper Consumer

(kW)

1. DGVCL 21 118 6.31 7.89

2. MGVCL 33 85 11.01 13.76

3. UGVCL 23 49 22.11 27.64

4. PGVCL 60 99 11.86 14.86

TOTAL 137 91 11.49 14.36

Total:(In 33 districts)

12,400 Farmers

1,42,000hp

175 MW

Estimate Cost of Pilot Project: Rs. 870 Crore

Page 15: Suryashakti Kisan Yojna (SKY) - Kanoda

Kanoda

[email protected] |

Comparison: Pilot vs. Whole State

"SKY", CII Solar Conclave 2018, Ahmedabad, 20 July 2018. 15

Pilot 1-Lakh Farmers Whole State

Total (AG) Consumers : 12,400 1 Lakh 15 Lakh

Total No. of (AG) Feeders : 137 471 7,060

Total Districts Covered : 33 33 33

Total Contract Load :1.42 Lakh hp

(Avg: 11.49 hp/ farmer)

11.5 Lakh hp(Avg: 11.47 hp/ farmer)

172 Lakh hp(Avg: 11.43 hp/ farmer)

Solar PV Potential : 175 MW 1,400 MW 21,000 MW

Total Project Cost Rs. 870 Crore Rs. 7,000 Crore Rs. 1,05,000 Crore

Govt. of India Subsidy 30% 261 2,107 31,605

Govt. of Gujarat Subsidy 30% 261 2,107 31,605

Farmer’s Loan 35% 305 2,458 36,873

Farmer’s Upfront Pmt. 5% 44 351 5,268

Page 16: Suryashakti Kisan Yojna (SKY) - Kanoda

Kanoda

[email protected] | "SKY", CII Solar Conclave 2018, Ahmedabad, 20 July 2018. 16

THANK YOU.