    PresenterNguyenVanThach

    MinistryofTransport

    GMSHaNoi LangSonExpresswayproject

    130km/46lanesexpressway

    20112013

    $1.300M

    Tobeco financedbyADB(900M),EDCF(140M)andtheGovernmentof

    VietNam

    (260

    M);

    TheF/SofHaNoiLangSonExpresswayProjectisbeingpreparedbyConsultants.FinalreportwillbecompletedinDecember2010.Bidfordetaileddesignisunderpreparation..

    Ha Noi

    Hoa Binh Hai Ph

    Thai Nguyen

    Lao Cai

    Ninh Binh

    Thanh Hoa

    Ha

    The views expressed in this paper/presentation are the views of the author and do not necessarily reflect the views or

    policies of the Asian Development Bank (ADB), or its Board of Governors, or the governments they represent. ADB does not

    guarantee the accuracy of the data included in this paper and accepts no responsibility for any consequence of their use.

    Terminology used may not necessarily be consistent with ADB official terms.

  • 8/8/2019 STF-14 Appendix 5F Viet Nam

    2/5

    2

    GMS:Ha

    Long

    Mong

    Cai

    Expressway

    144km/4lanesexpressway

    $1.100.0M

    ADBconsultantsrecommendedtodelaytheinvestmentafter2015whenHanoi Haiphong

    Expressway

    completed.

    SecondGMSNorthernTransportNetworkImprovementPhaseI:

    Luangprabang Thanh Hoa.

    20102016 $97,4M Tobefinancedby

    ADB$75M,andVietnamese

    government$22.4

    M. LoanAgreementis

    expectedtobesignedby1stQuarter 2011;civil

    workswillbecommencedby4thQuarterof2011.

  • 8/8/2019 STF-14 Appendix 5F Viet Nam

    3/5

    3

    Benluc

    Long

    Thanh

    Expressway 58km/46lanes

    expressway 20102014 $1,608.0M Cofinancingby

    ADB,JICAandtheGovernmentofVietNam.AmounttobefinancedbyADBof$636M,JICA635MandtheGovernmentofVietNam337M.

    Projectinvestment

    hasbeenapprovedinOctober2010.

    DetailDesignContractwassignedinNovember2010;

    HoChiMinh LongThanh Dau

    Giay Expressway 55km/46lanes

    expressway.

    2009 2013

    932.4M

    Cofinancingby

    JICA

    $

    516.5M,

    ADB

    $410.2MandcounterpartfundingfromtheGovernmentofVietNam$5.7M

    Theconstructionwork commencedinOctober2009and

    willbecompletedbytheendof2013.

  • 8/8/2019 STF-14 Appendix 5F Viet Nam

    4/5

    4

    GMSSouthernCoastalCorridorProject(Rehabilitation

    HW80&63)

    20102014

    $400M FinancedbyADB(loan

    $75M);EDCF(Korea)$220M;Australia($25M);andthe GovernmentofVietNam($80M).

    ForADB&Australiafundedcomponents,civilworks commenced byJanuary 2011;

    For2EDCF

    funded

    components(Korea)civilworkswillcommenceby2st Quarter2011;

    CentralMekongDeltaTransportConnectivityPhaseI

    20112015

    $751M:$130MfinancedbytheAustralianGov;$220MtobefinancedbyADB; $200MtobefinancedbytheKoreanGov;Therest$201MwillbefinancedbyVietnameseGoV.

    AsplanneddetaileddesigncontractwillbesignedbyJune2011

    Constructionworkwillbestartedby2nd

    Quarterof2012andwillbecompletedby2015.

  • 8/8/2019 STF-14 Appendix 5F Viet Nam

    5/5

    5

    Bien Hoa Vung Tau expressway

    - Bien Hoa Vung Tauexpressway and wideningNH51: length 69km, 6 lanes;commenced at the end of 2009and will be completed in 2013

    Total investment: $ 679.0 M

    The project is under BOTscheme

    1st phase of the Projects has

    been carrying by a domesticcorporations including Idico +BIDV+Song Da.

    Tp HCM

    Can Tho

    Bien Hoa

    Vung TKienGiang

    Da Nang Quang Ngai Expressway

    130Km46laneexpressway

    2011 2014

    $1.472M

    CofinancingfromWB632M,JICA678MandtheGovernmentofVietNam162M.

    F/ShasbeenapprovedinSep.2010;

    DetaileddesignwillbestartedbyJanuary2011.