The objective of a Site Environmental Management Plan (SEMP) is to protect river frontage and demonstrate that public safety, aesthetics, cultural values and water resource values have been addressed as part of a proposal to construct water diversion infrastructure. Where possible, efforts should be made to enhance the environment in the vicinity of the proposed infrastructure.TRANSCRIPT
Victorian Mallee Irrigation Region
Standards for Site Environmental
Management Plans
Mallee Catchment
Management Authority
www.malleecma.vic.gov.au
PO Box 5017 Mildura 3502
Telephone 03 5051 4377
Facsimile 03 5051 4379
Copyright
© Mallee Catchment Management
Authority 2011
Disclaimer
Publications produced by the Mallee
Catchment Management Authority may
be of assistance to you but the Mallee
Catchment Management Authority and
its employees do not guarantee that the
publication is without flaw of any kind or
is wholly appropriate for your particular
purpose and therefore disclaims all
liability for any error, loss or other
consequence which may arise from you
relying on any information in any Mallee
Catchment Management Authority
publication.
Publication details
Standards for Site Environmental
Management Plans in the Victorian Mallee:
Supporting Public Land Managers Consent
Report Number:
Project Number: 1474-2-104
Contract Number: 10/898A
CHMP Number: [Remove if not applicable.]
ISBN: [Remove if not applicable.]
April 2011
Sponsor: Regional Sustainability Unit
Author: Sunraysia Environmental Pty Ltd
Acknowledgements
Project Team: Peter Shadwick (Department
of Sustainability Environment), Angela
Gaynor (Parks Victoria), Owen Russell
(Lower Murray Water), Scott McLean
(Department of Primary Industries), Glenn
Sutherland and Deidre Jaensch (Mallee
CMA).
Cover images
Left: Site Environmental Management
Plans are required to protect, preserve and
if possible enhance the Murray River.
Photo: Mallee CMA
Middle: Example Site Plan for pump station
illustrating zones. Photo: Sunraysia
Environmental Pty Ltd
Right: Pump station on river frontage.
Photo: Mallee CMA
Version Prepared Author Reviewed
Final Draft 1 April 2011 S. Erlandsen – Sunraysia Environmental P/L
RS TAC, Project Team Members
Final 29 April 2011 S. Erlandsen – Sunraysia Environmental P/L D Jaensch
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
Acknowledgements
The Mallee Catchment Management Authority (CMA) wishes to acknowledge the
contribution of agencies involved in the development of this document, including:
• Parks Victoria
• Department of Sustainability and Environment (DSE)
• Department of Primary Industries (DPI)
• Lower Murray Water (LMW)
The Authority also acknowledges:
• the work of Sunraysia Environmental in providing technical content; and
• developers who willingly made previous Site Environmental Management
Plans (SEMPs) available for reference in the development of this document.
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
1.0 Introduction to SEMP and the Standards
1.1 Purpose of Site Environmental Management Plans (SEMP)The objective of a Site Environmental Management Plan (SEMP) is to protect river
frontage and demonstrate that public safety, aesthetics, cultural values and water
resource values have been addressed as part of a proposal to construct water diversion
infrastructure. Where possible, efforts should be made to enhance the environment in
the vicinity of the proposed infrastructure.
The purpose of a SEMP is to ensure that the natural features of the proposed site, such
as land stability, existing vegetation, native animals, water courses and social values of
the site, are identified early in the planning phase. These matters must be duly considered
when selecting the location, design and construction methods of the proposed water
diversion infrastructure works.
As all Murray River frontage in the Victorian Mallee is Crown (public) land, a SEMP must
be completed to obtain the consent of public land managers prior to:
• construction of new water diversion infrastructure;
• adding capacity to existing water diversion infrastructure;
• decommissioning major structures.
Public Land Manager’s Consent must be obtained before a Planning Permit can be issued
by local government (e.g. Mildura Rural City Council) and before Lower Murray Water
(LMW) will issue a Works Licence to construct, alter, remove or decommission pumps
and pipelines. The proponent should also investigate the need for other approvals (refer
to Appendix 1).
Once a SEMP is compelted by the developer, it will be assessed by the Department of
Sustainability and Environment (DSE) to determine if the site is suitable for occupation
and what actions must be taken to minimise the potential environmental impacts at the
nominated site.
A SEMP must cover the following areas:
• applicant details;
• proposed works;
• natural features of the location (assets) and condition ;
• potential impacts (threats) posed by the proposed infrastructure placement
and construction activities;
1
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
• mitigation measures that will be undertaken to avoid or minimise impacts,
along with information outling how any damage or disturbance will be
compensated for through preservation, restoration or rehabilitation activities;
• site management and supervision;
• monitoring and reporting.
1.2 Purpose of this documentThe objective of this Standards for SEMPs document (“standards document”) is to
provide a practical guide for those seeking Public Land Manager’s (PLM) consent to
construct water diversion infrastructure on public land in the Victorian Mallee. This
document is a guide to the structure and content of the reports that may be required to
be submitted by proponents to inform the consent process.
The standards outlined in this document describe the minimum requirements (Key
Performance Indicators; refer Appendix 2) that DSE will use to determine if the natural
features on the public land will be protected and preserved during construction works
and into the future.
Figure 1: Murray River frontage. This is an example of natural assets that SEMPs aim to protect and preserve.
2
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
Who will use this document and how?
This document is intended to be used by irrigation developers and/or their consultants/
agents to compile the supporting documentation for an application for PLM consent
required to construct water diversion infrastructure.
Proponents should discuss their intentions with the Department of Primary Industries
(DPI) Mallee Irrigation Development Coordinator prior to using this document and seek
advice on the relevant sections in this document that will need to be addressed.
This document will also assist DSE staff in the assessment of SEMPs by providing a
benchmark for the scope and content of the documentation required to support an
application for PLM consent.
What does this document include?
Section 2 of this document mirrors the headings included in a SEMP, with details
provided under each heading outlining what information should be considered.
Section 3 guides proponents through the range of techinical information that must
be considered when planning the proposed works and preparing a SEMP, in order
to characterise the environmental values of the site and potential risks posed by the
proposed development. This information may be gathered through a variety of methods
including desktop studies, site assessments, and relevant techinical investigations.
The information gathered in Section 3 is used to develop design and construction
methods that will protect and preserve the natural assets identified. These methods
underpin the management plans detailed in Section 2.
1.3 Context within the New Irrigation Development FrameworkUnder the Victorian Water Act 1989 , the Draft Victorian Mallee New Irrigation Development
Guidelines (the Guidelines) have been developed to outline the regulatory framework
(Agencies, Acts, Regulations Policies and Processes) relating to new irrigation
development.
PLM consent is one of the required processes within this framework. This standards
document complements the Guidelines in that it provides the higher level of detail
required to prepare a SEMP for PLM consent.
Within the PLM consent process, Siting and Design Guidelines (NRE 2001) exist to
3
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
guide design and construction of water diversion infrastructure. The Siting and Design
Guidelines must be met by all water diversion infrastructure developments. This
standards document doesn’t replace the Siting and Design Guidelines, but outlines
the requirements that must be met by proponents of complex and more sophisticated
construction works. This standards document captures the learnings from the last
decade, of rapid expansion in the Victorian Mallee irrigated horticultural industry.
Much of the information in a SEMP may also be relevant to applying for a Works Licence;
however, there are some additional specific details required by LMW that are not
included in a SEMP. Consultation is required with LMW in relation to the following areas
not addressed within this document:
• infrastructure design specifications including cross sections, technical
features and surveys of waterways;
• metering requirements;
• private storage dam requirements;
• operation and maintenance plan for the pump site.
Figure 2: Old pumps often do not comply with current siting and design guidelines. Every effort should be made to improve existing pumps. Photo: Sunraysia Environmental Pty Ltd.
4
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
2.0 SEMP Report Outline
This section provides the headings that should be included in a SEMP, with details
provided under each heading outlining what information should be considered.
This information is gathered from detailed site assessments and investigations (refer to
Section 3).
In developing a SEMP, proponents should note that the characteristics at each proposed
work site will vary and therefore the level of information required will also vary. While this
section (Section 2) contains a comprehensive list of matters that should be considered in
the development of a SEMP, not all matters will be applicable for all developments.
Proponents should seek early advice on their plans by speaking to the Mallee New
Irrigation Development Co-ordinator at the Department of Primary Industries (DPI).
Figure 3: A potential pump site which is acceptable against most criteria may be too close to the river bend, with a high likelihood of undercutting of the riverbank in the long term. Navigation hazards may also be a factor. Photo: Sunraysia Environmental Pty Ltd.
5
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
2.1 Proponent detailsA SEMP must include the name, address and contact details of the legal entity that will
own and operate the infrastructure and the details of the person/entity who will hold the
relevant licence. If the approvals application process is to be undertaken by an agent
on behalf of the legal owner, then the agent’s name and contact details must also be
provided as the primary contact person.
2.2 Proposed infrastructure and site selectionIn preparing a SEMP, information is required on the type of infrastructure proposed
and why the nominated site was chosen for both the pumps and rising mains route.
Alternative options that have been considered, but subsequently ruled out, should also
be described to demonstrate that the nominated route is the best option to minimise
impact on the environment and social values. An example of a location map illustrating
the proposed pipeline route in relation to the property is outlined in Appendix 4.
2.2.1 Description of proposed infrastructure
In order to minimise the visual impact of a pump station and ensure it does not detract
from the aesthetics of the river frontage, it is expected that:
• pump size and associated infrastructure does not exceed property
requirements;
• pump houses and other buildings (e.g. electrical cabinets) are as small as
practical, while complying with the requirements of the relevant engineering
regulations and standards;
• pump sites and access tracks are consolidated where possible;
• existing works, access tracks and power lines are utilised;
• all power supply on the river frontage, manifolds and rising mains will
be installed underground, while complying with the requirements of the
relevant engineering and electrical regulations and standards;
• the infrastructure be coloured to be compatible with the surrounding
environment;
• native vegetation be utilised to screen the infrastructure from the river and
river bank;
• the height and profile of structures be minimised where possible by
considering a number of smaller capacity pumps;
• only essential components of water diversion infrastructure are located on
the river frontage.
A site plan (refer to example in Appendix 5) of the proposed infrastructure should be
6
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
prepared that clearly identifies:
• the number of pumps and pipelines required to service the property,
including location of air valves, bypass pipes, electrical cabinets and cabling,
fencing, etc;
• the location of trees (alive and dead) or large shrubs in the construction zone
(centre point of trunk and outline of foliage);
• the power supply from grid to pump site;
• land features (e.g. floodways, existing infrastructure);
• road reserves, neighbouring property boundaries, the river bank.
A side view and plan of the proposed infrastructure should be prepared as outline
drawings to clearly identify:
• the height of infrastructure relative to river bank, surrounds and flood levels
(300mm above the 100 year ARI flood level);
• the cross-section of pipeline trenches/pipes and backfill materials.
Figure 4: Large pumping station after completion showing environmentally sympathetic colour scheme and stable soil surface. Photo: DPI.
7
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
2.2.2 Site suitability
In selecting the most suitable site for a pump and pipeline, the developmer must aim to
avoid or minimise impacts on the environment. Sites with less disturbance are preferred.
Proponents should submit a description of how the site and infrastructure placement has
been chosen to minimise the overall enviornmental disturbance, including:
• justification of the proposed pump site (e.g. least disturbance of native
vegetation, clustering with existing infrastructure, low visual impact, site
integrity, etc);
• justification of proposed pipeline route;
• discussion on other site options considered during the process of
determining the preferred site.
Aside from environmental impacts, there are other factors that may influence the choice
of a pump site/pipeline route and footprint. While such factors may affect a SEMP, they
are not part of the Public Land Manager’s Consent process. A brief description of how
each factor was considered in the process of determining the preferred site needs to be
included in the SEMP. Factors commonly considered include:
• proximity of site to the proposed irrigated area;
• limitations posed by crossing a Category 1 road reserve (VicRoads road);
• capacity of other road reserves;
• barriers posed by adjoining irrigated land or intensively settled areas;
• potential impacts on waterway navigation;
• pipeline routes through neighbouring private land using easements rather
than through public land (apart from the river frontage, which in the case of
diversion from the river is unavoidable);
• presence of European or Aboriginal cultural heritage.
Further
information
on site
suitability:
www.vicroads.vic.
gov.au and search
for “Working within
the Road Reserve”.
8
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
2.3 Detailed site descriptionA detailed description of the site should include existing environmental characteristics
(and their condition), in relation to the location of the proposed pump site and pipeline
route.
The site description should include all areas that may be affected before, during or after
the construction phase.
Consider the following information when describing the site.
2.3.1 Location details
• Local Government Area (e.g. Swan Hill Rural City Council);
• Parish, Crown Allotment number (if available);
• proximity to neighbouring water diversion infrastructure;
• location of the associated irrigation development in relation to the pump site,
including distance from pump site. The area and crop type being irrigated
may also justify the pump size and number of pipes required.
Figure 5: Preferred route for a new rising main, in this location is to follow centreline of an existing access track to avoid trees removal and minimise root damage. Note large old habitat tree on left. Photo: Sunraysia Environmental Pty Ltd.
Further
information
on location
details:
http://services.land.
vic.gov.au/maps/
interactive.jsp
or
http://www.dse.vic.
gov.au/vicmap
9
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
2.3.2 Status of Public Land
Identify the classification of any parcels of public land in which the proposed water
diversion infrastructure is to be located. Most pump sites will be on the Murray River
Public Purposes Reserve, in which water diversion is a ‘permissible use’ with the
appropriate approvals. Higher classifications of public land, such as Nature Reserve may
need to have a higher level of justification provided. Water diversion may be prohibited in
a National Park.
Efforts to avoid pipelines crossing ‘reserved’ public land, apart from the river frontage,
should be described in a SEMP. Pipeline routes through private land are preferred where
possible to minimise the occurrence of private infrastructure on public land.
2.3.3 Zones and Overlays
The Zones and Overlays under the Municipal Planning Scheme that relate to the
proposed development should be identified and the implications summarised in a SEMP.
For example, a proposed development could be planned for an area where a historic
structure is listed on the Heritage Overlay relating to the river frontage. This listing be will
provide the structure with protection and possibly apply a buffer zone or other conditions
to any works in the vicinity.
The Municipal Planning Scheme needs to be reviewed in respect to the development,
early in the process, as planning provisions may prevent a proposed development or
impose stringent conditions at some locations.
The need for a planning permit should be discussed with the relevant municipal body and
should be clarified in a SEMP, with reference to the relevant provisions in the planning
scheme.
2.3.4 Local sites of environmental significance
The proximity (in metres or kilometres) of the proposed construction site to sites of
national or international significance and any wetlands and conservation reserves must
be identified in a SEMP.
Further
information on
the status of
Public Land:
http://services.
land.vic.gov.
au and search
for “VEAC River
Red Gum Forests
Investigation”
Further
information
on Municipal
Planning
Schemes:
http://www.
dse.vic.gov.au/
planningschemes/
melbourne/home.
html
Further
information
on sites of
envirornmental
significance:
http://www.
environment.gov.au/
epbc/pmst/index.
html
10
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
2.3.5 Geology, landforms, topography, soils
The geology, hydrogeology, hydrology, landforms and topography should be described
with comment on riverbank slope and stability, depth of topsoil and mechanical strength
of the soil, in order to determine the erosion potential and suitability for rehabilitation.
Presence of floodways and areas of inundation during a 1 in 100 year flood must also be
described in order to determine if there will be potential obstruction to natural flows. This
may require detailed technical assessments to be undertaken by a suitably qualified civil
engineer, hydrologist, or geologist (refer Section 3.3).
Figure 6: An old heritage flume on far right was sufficient to exclude this pump site as an option prior to a detailed assessment. The historic value was identified in the Heritage Overlay of the municipal planning scheme. Photo: Sunraysia Environmental Pty Ltd.
Further
information
on geology,
landforms,
topography,
soils:
http://www.dpi.
vic.gov.au/dpi/vro/
malregn.nsf/pages/
mallee_homepage
For river flood
heights, contact the
Mallee CMA on
(03) 5051 4377
11
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
2.3.6 Current Land Use
How often the site is visited and how it is accessed by the general public will determine
the sites exposure and the potential public safety issues that may need to be considered
during construction works. The current use of the river frontage and pipeline route
should be described and may include the following:
• tourism, recreation, access routes, public utilities (e.g. power lines), other
water diversion infrastructure, fences;
• proximity of site to residential dwellings and places used by people;
• description of the landuse on neighbouring private land.
2.3.7 Biodiversity
A brief description of the key native vegetation and fauna that visit the sites must be
described in order to determine the environmental value of the natural features. This
is likely to require specialist advice in native flora and fauna to undertake technical
assessments (refer to Sections 3.1 and 3.2).
Figure 7: In some circumstances track closure at a construction site will be necessary for the safety of the public. The bunting and signage defines the work zone. Photo: Sunraysia Environmental Pty Ltd.
12
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
2.4 Defining the construction zone and the extent of disturbanceThe extent of the area disturbed by construction operations will need to be identified,
including access tracks leading to the pump site. The minimum width required for
the pipe trenching and maximum width for the pipe laying operation should be clearly
illustrated. The airspace above the ground and site access must also be considered in the
construction zone (e.g. overhanging tree branches on access tracks may constrain the
use of cranes to install pumps).
Areas subject to differing levels of disturbance are best defined in a map (Appendix 4)
showing: construction zone, work zone, traffic zone, conservation zone and rehabilitation
zone. The map should show the location of defined zones in relation to the proposed
infrastructure and key environmental features. An explanation of the key features to be
illustrated in each zone is provided in Appendix 3.
Figure 8: Construction zone coinciding with the work zone in this example showing the route of rising mains replace a former channel. Traffic movement is constrained within the disturbed area. Photo: DSE.
13
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
2.5 Construction managementThe construction activities should be clearly described, including how they have been
developed to avoid and minimise impacts on the environment and the social values at the
preferred site.
Construction methods will need to be suited to working in confined areas. Machinery
will need to be able to manoeuvre safely around stockpile and storage areas within the
construction zone.
2.5.1 Site establishment plan
A site establishment plan should be developed to avoid and minimise impacts on the
environment. An establishment plan may include:
• How the zones will be marked on the ground and maintained. Zone
protection measures could involve: fencing, bunting, flagging tape, bollards
and signage. In areas of high vegetation value, a more permanent fence
may be required to prevent machinery and stockpiles breaching the zone.
Areas that have rigid fencing may enable greater flexibility for construction
by providing a physical barrier to prevent native animals and the general
public from entering the construction zone;
Figure 9: Use of a skip for rubbish containment during construction is essential on a large project. Note: construction materials are stored in the construction zone. Photo: Sunraysia Environmental Pty Ltd.
14
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
• How native vegetation will be marked for removal (X) or trimming (T) on-
ground (e.g. using white paint or flagging tape on-ground); as well as the
construction zone map;
• Specific Hold Points where the authorities will inspect the site and approve
the continuation of the works (e.g. marking of zones, marking of pipeline
route, practical completion etc). This creates an opportunity to correct or re-
align works that do not reflect the original plan;
• Plans for rubbish and waste management, storage, removal. Rubbish must
be contained on site at all times and not allowed to migrate out of the
construction zone. An industrial skip may be allowed for larger sites but
must be located at least 100m from the river bank or at an off-site location;
• Procedures for the management of hazardous materials to ensure there will
be no spillage and therefore no contamination of the soil, water or air;
• Provision of staff amenities. One portable toilet and one office may be
allowed to be located at least 100m from the river bank or at an off-site
location. Information provided should also include a description of the type
of toilet and how it will be maintained;
• Arrangements for the decommissioning and removal of old/redundant
infrastructure (e.g. pump station, levy banks or channels). Requirements for
decommissioning may be determined through a heritage assessment or soil
contamination investigation. Decommissioned and disused infrastructure
that does not have any aesthetic or historic value must be removed from the
site within 30 days of the infrastructure becoming redundant;
• Plans for investigations of contaminated sites and amelioration or removal
of contaminated soil that exists at the site, which must be undertaken in
accordance with relevant legislation prior to commencing works;
• Details on how public safety will be managed, including signs, fencing and
provision of alternative access tracks around the site;
• How the site establishment plan will be communicated to all contractors and
subcontractors on site.
15
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
Figure 10: A spill kit is an essential part of waste management on a construction site. Photo: Sunraysia Environmental Pty Ltd.
Figure 11: Base of old pump being decommissioned will need a contaminated site investigation then removal or amelioration of contaminated soil. Photo: Sunraysia Environmental Pty Ltd.
16
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
2.5.2 Traffic management
A traffic management plan should be developed to ensure safe and responsible
movement of vehicles and machinery within restricted areas (e.g. construction zones)
and in areas shared with the general public.
A traffic management plan may include:
• Information on the type of vehicles, cranes and heavy machinery that will be
used.
• Traffic safety procedures, speed zones, passing bays, two-way or one-way
direction, use of two-way radio for traffic control;
• The location of the access tracks to be used including site access/egress
routes. This should be limited to one point of entry and one point of exit if
possible. At all times pre-existing tracks should be used;
• The extent of crane pads and the material proposed to construct the pad
to prevent future degradation of the site during upgrades and maintenance
works;
• Vehicle parking arrangements;
• Vehicle exclusion zones, taking into consideration factors such factors as
cultural heritage, environmental values and overhead power lines;
• The hours of operation at the site;
• Arrangements for pedestrians;
• Track closures, which track and when, how changed track arrangements will
be communicated to the public;
• Signage type, size, height and position and location signage should include
entry and exit points, construction signs as per OHS regulations. Vic Roads
signage may need to be considered if works adjoin public roads;
• Weed management and hygiene procedures need to be developed to
ensure that there is no increase in the current variety and extent of weeds
within public land;
• Vehicle and equipment hygiene practices to avoid cross contamination of
weeds and soil borne pathogens prior to entering the site or if coming from
a weed infested area during works along a pipeline onto public land.
• Vehicle and equipment maintenance and refuelling procedures to prevent
contamination, including the location and frequency of these activities.
• Tracks must be maintained during all weather conditions. Consider how
tracks will be maintained during construction, after wet weather and on
completion of project.
Further
information
on traffic
management
plans:
Copy and paste
this link to access
a copy of the
VicRoads Traffic
Management Plan
Assessment Report/
Checklist.
http://webapps.
vicroads.vic.gov.au/
VRNE/tenconin.nsf/
webFreeForms/4F2F
DB39FBDD3CF3CA2
574BF0010AFD6?Op
enDocument
17
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
• Access tracks may need to be temporarily closed during wet weather to
avoid damage. The duration of which must be discussed with the relevant
land manager. During track closure a barrier may need to be placed across
the track.
• Wet weather may impact on the ability to undertake construction works
safely.
• Flooding may prevent access to the site, where by temporary alternative
access tracks may need to be arranged with the land manager.
• Dust suppression procedures.
• How this plan will be communicated to all contractors and sub-contractors
on site.
Figure 12: Machinery must be free of soil when entering public land, unlike the excavator in this view, which has arrived on site from another job with the potential to spread weeds. Photo: Sunraysia Environmental Pty Ltd.
18
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
2.5.3 Soil Management
A soil management plan should be developed as part of a SEMP to preserve the integrity
of the soil structure. This should include both the physical characteristics of the soil, as
well as the microbial activity it supports through preservation of leaf litter and woody
debris. By preserving the soil integrity there is less likelihood of erosion occurring and
soil sediments contaminating the river.
A soil management plan may include:
• An earthworks construction profile (i.e. a diagram showing a cross section of
the position of windrows of leaf litter, topsoil and spoil, trenching machinery,
pipe crane, open trench and pipeline assembly area) within a specified width
of construction zone.
• Plans for the preservation of topsoil and leaf litter during construction works,
as well as reinstatement following completion. Stockpiles or windrows of
leaf litter should be illustrated on the construction zone map and should be
placed close to where they originated and away from traffic zones;
• Strategies to implement and maintain riverbank stability and sediment
control measures during construction to prevent erosion and sedimentation
of water ways, river banks or waterway crossings;
• A description of how excess soil will be suitably disposed offsite;
• Identification of additional soil or fill material requirements and a suitable
source site, preferably using like material. If the fill material is imported from
offsite it must be sourced from a certified weed seed free location;
• Information on soil contamination, preparedness and response. Chemical
and hydrocarbon storage areas and washing, refuelling and maintenance
areas are required to be located >100m from waterways;
• How this plan will be communicated to all contractors and subcontractors on
site.
2.5.4 Native Vegetation Management
A native vegetation management plan (refer to Section 3.1) should be completed as
part of a SEMP in order to ensure that live trees, shrubs and sub-shrubs, native grasses,
standing dead trees and logs are protected during works. Where removal or temporary
loss of native vegetation is unavoidable, controls should be in place to minimise the
impacts and must be in accordance with the Native Vegetation Management Framework
(refer to Section 3.1).
Further
information on
soil management
plans:
http://new.dpi.vic.
gov.au/vro
or
http://www.dse.vic.
gov.au
Further
information on
native vegetation
management
plans:
http://www.dse.
vic.gov.au and
search for “Native
Vegetation Victoria”
19
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
2.5.5 Fauna Management
Fauna management (refer to Section 3.2) should be considered as part of a SEMP
to ensure native fauna and associated habitat is protected during works and incident
response plans are in place.
A fauna management plan should include:
• A wildlife protection action plan, along with the scheduling of works to avoid
breeding seasons of native fauna.
• Protocols governing wildlife detection, rescue and relocation.
• An emergency contact list.
• How this plan will be communicated to all on site.
Further
information
on fauna
management:
http://www.dse.vic.
gov.au/plants-and-
animals
Figure 13: This tree has a raptor nest in the upper canopy; it is an example of habitat that must be avoided during development. Photo: Sunraysia Environmental Pty Ltd.
20
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
2.5.6 Rehabilitation plan
A SEMP should inculde a rehabilitation plan to ensure the soil profile and native
vegetation is restored to its prior state or better and to ensure there is no long-term visual
scarring of the landscape.
A rehabilitation plan may include:
• Provisions for the compaction of backfill material to prevent slumping and
channelling of surface water along pipeline routes.
• Restoration of natural shape and levels at the pump site to prevent surface
water pooling or obstruction to surface flows.
• Arrangements for the reinstatement of topsoil, leaf litter, and woody debris
across the construction zone as soon as practical after the completion of
works to encourage the re-establishment of micro biological activity. This
may require manual levelling if windrows occur in sensitive areas or around
tree bases. Larger logs may be placed to exclude public vehicle access
along pipeline routes or unnecessary tracks. One main ‘all-weather’ access
track is preferred.
Figure 14: An unstable riverbank may pose problems for potential pump sites. Photo: DSE
Further
information on
rehabilitation
plans:
http://www.dse.vic.
gov.au
or
http://www.vicveg.
net.au
and search for “tools
and techniques”
21
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
• Provision for compacted soil within the traffic zone or tracks earmarked for
rationalisation to be ripped or cultivated. This helps to create pockets for leaf
litter to collect and seeds to regenerate.
• Erosion control measures and sediment containment for high disturbance
areas that are at risk of erosion (e.g. cut batters, waterway crossings, long
barren slopes, riverbank beneath suction pipes).
• Lists of plant species to be planted in revegetation areas, which must
correlate with the appropriate number of seedlings as identified in the flora
assessment (refer Section 3.1).
• A site map that clearly identifies planting locations, along with the
techniques to be used for ground preparation, the watering schedule,
protection of seedlings from pest animals and the plans for ongoing
maintenance;
• Plans to construct bollards, signage or other temporary measures for public
exclusion around rehabilitation areas. These measures should be described
in a SEMP, including material type, placement and frequency;
• Measures to avoid the creation of pest animal harbour during and after
construction;
• The timeframe for implementation of rehabilitation activities;
• How this plan will be communicated to all on site.
2.5.7 Control of noise/air quality/odour/vibration
The control of noise/air quality/odour/vibration is not part of the SEMP process, but these
issues should be considered through the appropriate approval process (refer to Appendix
1).
Considerations may include:
• The hours of operation.
• The impact the development may have on people.
• Options to control the noise of machinery.
• Vibration.
• Dust prevention and suppression.
• Potential causes of odour, odour suppression.
• How information and/or precautionary measures regarding these issues will
be communicated to all on site.
Further
information
on controlling
noise/air quality/
odour/vibration:
http://www.epa.
vic.gov.au and
search for “noise”;
“air issues”; and/
or “environmental
guidelines for major
construction sites”.
22
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
2.6 Site management
A SEMP should also include a specific site management plan to ensure that a
management structure is in place to supervise contractors during works; to report
on SEMP non-compliances; and to ensure that corrective actions are implemented
immediately.
A site management plan should include:
• The relevant project management structure;
• The name of the nominated site supervisor and contact details;
• Details of contract and sub-contract staff inductions and works briefings.
• SEMP incident (accidental damage) report and notification procedures.
• An incident and emergency response plan (e.g. flood/fire).
• Notification protocols for when hold points are reached and works are
completed.
• The schedule of works.
2.7 Monitoring requirements and reporting scheduleA monitoring plan is required to be developed before works commence, along with the
establishment of permanent photographic monitoring reference points (i.e. a permanent
marker from which photo point monitoring can be conducted before, during and after
construction). These will be used to illustrate compliance to the SEMP report.
The monitoring plan must detail monitoring activities to be undertaken during the
construction phase, rehabilitation phase and post-construction. Monitoring provides
the evidence to demonstrate to the public land manager that the proponent has carried
out works in line with the original SEMP and that ongoing maintenance of the site is
being undertaken. Key Performance Indicators are used by DSE to determine if the
environmental assets at a site are being protected and preserved (refer Appendix 2). The
proponent should identify in the monitoring plan which KPIs are relevant to their proposal.
The monitoring plan should include a reporting schedule. The frequency of monitoring
and reporting during construction should reflect the scale, degree of risk and duration
of the works. For example, the monitoring of a large development may need to be
done quarterly during construction or may align with the completion of major stages in
construction (e.g. pipeline trenching). Monitoring post construction may only be required
annually for up to three years.
Each reporting event nominated should include a brief report to DSE addressing the KPIs.
23
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
A monitoring report may include:
• A description of the condition of the site against Key Performance Indicators
(KPI) (Appendix 2).
• Photographs at permanent monitoring points.
• Photographs of any significant observations or milestones.
Figure 15: Careful saving and reinstatement of topsoil has enabled good groundcover to return to this pipeline in the season after completion of works. Photo: Sunraysia Environmental Pty Ltd.
24
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
Figure 17: Accidental damage to a tree by heavy machinery during pipeline construction must be reported, note the boundary of construction zone marked by rope. Photo: Sunraysia Environmental Pty Ltd.
Figure 16: Electrical control room and transformer located with setback from the pumps on the river. This feature has minimised the visual impact and allowed the river track to remain in original location. Photo: Mallee CMA.
25
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
3.0 Detailed assessments required to inform a SEMP
Various investigations and assessments must be undertaken at a site to characterise
the environmental values of the site and the potential risks to those values posed by
the planned new infrastructure and associated construction works. Such investigations
should also address practical ways to minimise risks to the environmental values of a
site during design and construction works. The information from these investigations
and assessments may help complete the management plans outlined in Section 2 of this
standards document.
When submitting a SEMP, the detailed reports of assessments and investigations carried
out should be attached as appendices in order for the assessors to understand the
reasoning behind the approach described in the SEMP.
These assessments will require specific technical expertise and suitably qualified
assessors to ensure the information is accurate and the logic is sound. Early discussions
with the Mallee New Irrigation Development Co-ordinator will assist in determining which
assessments are relevant for the nominated site.
For all assessments, the area that needs to be investigated should include the
construction zone, plus approximately 50m either side.
3.1 Native vegetation assessment and management planNative vegetation assessment and management plans must be consistent with Victoria’s
Native Vegetation Management - A Framework for Action (NRE 2002).
A native vegetation assessment will identify the type of vegetation located at the
proposed site, or in the near vicinity and the environmental value of this vegetation.
A vegetation assessment may include the following:
• Identification of bioregions and Ecological Vegetation Classes (EVCs) from
modelled EVC mapping, including a comment on the connectivity of existing
vegetation stands.
• A list of flora species that may occur in this area from a database search;
Victorian Rare or Threatened Species (VROTS) should be highlighted.
• Verification of the flora species found to be growing in the local area and the
EVC through a field inspection.
26
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
• Description of the age, quality, life-forms and species diversity of the native
vegetation. Consider also habitat value of larger trees (refer section 3.2).
• Comment on the ability of the vegetation to provide a screen for
infrastructure from any road, river tracks, houses or the river.
• GPS co-ordinates for the position of large trees, with a diameter at breast
height (DBH being 1.3m above ground level) of greater than 40 cm as these
are likely to have a higher habitat value. Trees with cultural heritage value
must be avoided.
• Identification of weeds or exotic plants present, their location across the
site and describe how disturbance through intended works may affect their
population;
• Discuss the potential impact on the vegetation (species, diversity, condition)
that may be caused by the proposed works during and post construction;
• Identification of any vegetation (alive or dead) that may potentially obstruct
machinery access to the site, prevent safe operations of construction works
or may cause harm or damage to infrastructure in the future. These trees
should be avoided, trimmed, or removed.
• Habitat hectare assessments undertaken according to the guidelines to
determine losses, gains and offsets (compensation for losses).
A native vegetation management plan should be developed to describe ways to reduce
the damage to native vegetation and how the site will be managed to prevent the spread
of weeds.
A vegetation management plan may include the following:
• Nominated vegetation protection areas and revegetation zones. These
zones must be clearly delineated from the traffic and construction zones on
site using a physical barrier of either a fence or flagging tape (minimum).
Construction works and vehicle movement should be excluded from
vegetated areas to avoid damage.
• Describe methods for removal or trimming of trees (alive or dead) or limbs
that are unable to be avoided. Methods for trimming should include the
three cut method (VicRoads 2006). Trees with a DBH of less than 40cm may
be considered for removal as these are less likely to have habitat value.
• Information on how the proponent will ensure that only trees and limbs
approved for removal by DSE will be marked and communicated to all
contractors and sub contractors on site.
Further
information on
native vegetation
assessment and
management
plans:
http://www.
malleecma.vic.
gov.au/resources/
corporate-
documents/
final-mallee-nvp-
update-0208.pdf
http://www.dse.vic.
gov.au and search
for “accessing native
vegetation data”
http://www.
environment.gov.au/
epbc/pmst/index.
html
http://www.viridans.
com/pageone.html
http://www.vicroads.
vic.
gov.au
and search for
“biodiversity”
27
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
• Minimisation of excavation activities to ensure root damage is limited.
Roots greater than 100mm in diameter must be retained if they are found
to intersect a trench during pipeline installation. The pipeline must be eased
along the trench beneath the intact root;
• Identification of the area where removed trees or trimmed branches and
woody debris will be temporarily stored to be spread across the site post
construction;
• Plans for the removal of woody and noxious weeds in the construction zone;
• How this plan will be communicated to all contractors and sub contractors
on site.
Figure 18: Use of the recommended three-cut method by an arborist has avoided tearing when undertaking approved lopping of a branch from this tree near a large pump site. Photo: Sunraysia Environmental Pty Ltd.
28
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
3.2 Fauna assessment and management planThe fauna assessment and management plan should take into consideration the native
animals known to occupy the area, as well as the native animals that may potentially be
attracted to the area based on the native vegetation type, condition and habitat value.
A fauna assessment may include the following:
• Identification of bioregions.
• Lists of fauna from a search of the Victorian Wildlife Atlas database, noting
rare and threatened species;
• Lists of fauna recorded in the local area during field inspections;
• Descriptions of fauna habitat existing on site;
• Discussion of the impact on the fauna, particularly threatened fauna, and
associated habitat, potentially caused by the proposed construction works.
A fauna management plan is developed to reduce the impact on the habitat features. For
example, preservation of pre-existing logs and woody debris, reuse of trees and branches
from lopping and clearing, preservation of standing dead trees (if safe to do so).
Figure 19: Damage to roots when an excavation occurs near trees. The impact is minimised by locating trenches beyond the “dripline” of trees. Photo: DSE.
Further
information
on fauna
assessment and
management
plans:
http://www.
malleecma.vic.
gov.au/resources/
corporate-
documents/
final-mallee-nvp-
update-0208.pdf
http://www.dse.vic.
gov.au and search
for “native plants
and animals”
http://www.
environment.gov.au/
epbc/pmst/index.
html
http://www.viridans.
com/pageone.html
29
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
A fauna management plan may include the following:
• Measures to protect fauna during construction (e.g. inspection of trenches
each morning for fauna, inspection of open pipes for fauna prior to use,
closing off installed pipe ends overnight, wildlife rescue and relocation
procedures);
• Erection of semi-permanent fencing around work areas to prevent animals
falling into open trenches.
• Consideration of the timing of works to avoid mating or breeding seasons.
• Identification of pest animals at the site and how they may impact on the
development and rehabilitation activities. Impacts on wildlife must be
avoided during pest animal control.
3.3 Hydrology and geotechnical assessmentA hydrology report relates to assessment of the impact of proposed structures on water
flows, particularly during floods. A geotechnical assessment will identify the potential for
soil erosion, soil and by default, riverbank stability issues. These assessments will inform
suitable placement of pumps, pipelines and associated infrastructure (refer Section
2.3.5).
A hydrology assessment may be required for developments where the proposed pump
station infrastructure is large and may cause obstruction to water flows in high river
events.
A geotechnical assessment may be required wherever there is potential for soil instability
or soil erosion, particularly during floods and large rain events. It may also include design
considerations for infrastructure foundations, supports and anchor points.
30
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
A hydrology assessment may include:
• Descriptions of the geomorphology of the localised floodplain and river (e.g.
nearby river bends or floodrunners, river bank height and slope);
• Descriptions of the hydrology at the site (i.e. where the surface water and
floodwater is likely to flow in relation to the proposed infrastructure);
• Comparisons of the 1:100 year flood level with the topography of the site
and the level of the proposed infrastructure;
• Discussion of any impacts the proposed development mau have on flooding
in the local area and any potential impact of flooding on the proposed
development;
• Discussion of the impact of the proposed development on the hydrology
of the river, including any potential obstruction to river flows in high river
events.
A geotechnical assessment may include:
• Testing and description of the structural stability (including physical and
chemical properties) of the soils of the proposed pump site and trench;
• Identification of any signs of existing erosion at the proposed site;
• Information on design and structural considerations for the various
structures;
• Discussion of the impact of the proposed development on the potential for
riverbank instability and erosion;
• Erosion mitigation strategies.
Further
information on
hydrology and
geotechnical
assessments:
http://www.dpi.
vic.gov.au/dpi/vro/
malregn.nsf/pages/
mallee_homepage
http://www.mallee
cma.vic.gov.au and
search for “Mallee
River Health
Strategy”
31
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
3.4 Cultural Heritage Management PlanA cultural heritage assessment (Appendix 1) is crucial in the early stages of site selection,
as sites of Aboriginal cultural heritage significance may veto the proposed development
site or create limitations. A Cultural Heritage Management Plan is outside the jurisdiction
of the Public Land Manager’s Consent; however, a Cultural Heritage Management Plan
is likely to be required for any development near the river. More information should be
sought from Aboriginal Affairs Victoria.
3.5 Social Impact AssessmentA social impact assessment (Appendix 1) will identify the impacts and benefits of the
development before, during and after construction. Some points that may need to be
covered in a social impact assessment are:
• The extent/frequency of visitation to the local area;
• Uses of the local area;
• Public access use existing tracks;
• Potential impacts /loss of amenity values;
• Noise, dust, odour, traffic during construction;
• European cultural heritage (search of Heritage Overlay in planning scheme
and Victorian Heritage Database).
Further
information on
Cultural Heritage
Management
Plans:
http://www.dpcd.vic.
gov.au/indigenous/
aboriginal-cultural-
heritage
http://www.dpcd.
vic.gov.au/heritage
Figure 20: Typical scene along Murray River frontage showing hard rubbish that will need removal prior to construction of a rising main. Photo: Sunraysia Environmental Pty Ltd.
32
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
4.0 References
DSE 2004 Vegetation Quality Assessment Manual – Guidelines for applying habitat
hectare scoring method. Department of Sustainability and Environment, Melbourne.
DSE 2010 Policies for Managing Works Licences. Department of Sustainability and
Environment, Melbourne.
DSE (undated). Sample EMP – minimal content. Department of Sustainability and
Environment.
Mallee CMA 2010 Victorian Mallee Irrigation Development Guidelines (final draft Oct
2010). Mallee Catchment Management Authority, Mildura.
NRE 2001 Siting and Design Guidelines for Water Diversion Works on or across Crown
land. Department of Natural Resources and Environment, Mildura.
NRE 2002 Victoria’s Native Vegetation Management, A Framework for Action.
Department of Natural Resources and Environment, Melbourne.
VicRoads 2006 A Roadside Handbook: An Environmental Guide for Road Construction
and Maintenance VicRoads Melbourne.
Figure 21: Common Emubush (Eremophila maculata) is an example of a rare species of shrub that must be avoided during construction. Photo: Sunraysia Environmental Pty Ltd.
33
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
5.0 Glossary of Terms and Acronyms
AHD: Australian Height Datum, used for describing the absolute height at a point of land.
Biodiversity: the variety of all life forms- the different plants, animals and micro-
organisms, the genes they contain and the ecosystems of which they are a part.
Bioregions: biogeographic areas that capture the patterns of ecological characteristics
in the landscape, providing a natural framework for recognising and responding to
biodiversity values.
Crown Licence: for most categories of public land DSE may issue a Crown licence (with
conditions) to allow occupation of that land by infrastructure or other uses. A licence is
issued for a specified period and is periodically reviewed. However a Crown licence for
water diversion infrastructure on the Murray River frontage is no longer issued.
Dangerous tree: a tree that poses an immediate threat to life and property.
Database search: provides a list of flora and fauna that have been recorded in a
geographical area and their conservation status. When requesting a search, a buffer zone
is usually added to a study area to expand the search area to obtain meaningful data.
DBH: diameter at breast height, a standard method of defining tree size/age.
Department of Primary Industry: case manager for irrigation development proposals,
responsible authority for pest plants and animals.
Department of Sustainability and Environment: (DSE) administers the occupation of
public land and issues Public Land Manager’s Consent to apply for a planning permit.
DSE is a referral agency for planning applications and is the responsible authority for flora
and fauna and removal of native vegetation.
Ecological Vegetation Class (EVC): a type of native vegetation classification that is
described through a combination of its floristic, life form and ecological characteristics.
EPBC: matters of national environmental significance or other matters protected by the
Environment Protection and Biodiversity Conservation Act 1999.
34
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
Habitat hectare: a site-based measure of quality and quantity of native vegetation
assessed in the context of a specific Ecological Vegetation Class (EVC). A site
assessment is done by comparing vegetation quality to a defined benchmark for each
EVC.
Habitat tree: usually a large old tree that contains habitat for fauna e.g. decorticating
bark, hollows and forks or tall branches suitable for nesting.
Land tenure: is the person or entity who owns and/or manages a parcel of land; the
generic descriptors of public land and private land is one way of describing land tenure,
the next level is who is the owner/manager/occupier.
Local Government: A Council is the responsible authority for administering its planning
scheme and considering applications for planning permits.
Lower Murray Water: the responsible authority for much of the Water Act 1989. May
issue a Works Licence for proposed water diversion infrastructure on the Murray River
frontage.
Murray River Public Purposes Reserve: the strip of Public land comprising the river
frontage on the Victorian side of the Murray River. The reserve is generally 60m in
width but is much wider in some locations and may be occupied for various uses under
a licence or lease. Water diversion infrastructure is commonly located on the reserve,
which is in the process of being re-classified as the Murray River Park which will not
impact on its availability for approved water diversions.
Mitigation measures: actions that are taken that will minimise or avoid impacts of the
development on the environment.
Net gain: a measured increase in the extent and/ or quality of native vegetation.
NSW Victoria State border: the boundary between the States as surveyed in 1870
generally then along the high bank on the Victorian side of the Murray River.
Offset: the gain in native vegetation quality and/or extent required under a habitat hectare
assessment to compensate for losses incurred due to destruction, removal or lopping of
native vegetation.
35
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
Overlays: (relates to a planning scheme), ensure that important aspects of the land
are recognised (such as areas of significant vegetation or special heritage significance).
Overlays indicate the type of development and/or protection which may be appropriate in
that area, e.g. heritage overlay, environmental significance overlay.
Parks Victoria: manages reserved Public land on behalf of DSE, including the Murray
River Park.
Planning permit: a legal document that allows a certain use or development to proceed
on a specified parcel of land. A permit is not always required to use or develop land.
Planning scheme: a legal instrument, that sets out the provisions for land use,
development, and protection, it’s function is to facilitate fair, orderly, economic and
sustainable use of land - by providing for the individual needs of an area. A planning
scheme is administered by the relevant Council. One way they do this is by requiring
that certain types of use or development can only be carried out if a planning permit
is granted. Planning schemes allow some changes in land use without the need for a
permit, provided conditions are met. Some uses or development may be prohibited.
Public Land Manager’s Consent: consent must be obtained from DSE to build and
operate structures on public land. In addition, consent must be obtained from the Public
Land Manager prior to submitting a planning application for certain developments on
public land.
Proponent: the legal entity that is proposing to build and own the water diversion
infrastructure, that is the entity seeking Public Land Manager’s Consent.
Threatened species: The Flora and Fauna Guarantee Act 1988 (Vic) provides for the
listing of genera, species, subspecies, varieties and communities of flora and fauna
which are threatened (the Threatened List), and potentially threatening processes
(the Processes List). There are also species that are listed under the Commonwealth
Environment Protection and Biodiversity Conservation Act 1999. Threatened species are
protected under the legislation and some may have an action plan.
Three step approach: relates to the way environmental impacts are addressed in
planning and implementation of works that involve disturbance:
• Avoid adverse impacts, particularly native vegetation clearance
36
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
• If impacts cannot be avoided, minimise impacts through appropriate
consideration in planning processes and expert input into project design or
management
• Identify appropriate offset options.
VROTS: Victorian Rare or Threatened Species, an advisory list of flora and fauna that are
categorised according to the parameters - extinct, endangered, vulnerable, threatened,
rare or poorly known in Victoria.
Zones: areas assigned on a construction site based on environmental values and needs
of construction:
• Work zone - total area impacted including construction zone, access tracks,
materials storage, stockpile sites, vehicle and equipment parking, amenities,
skip, maintenance and refuelling;
• Traffic zones - access tracks or roads through or near the work zone where
there will be public use;
• Construction zone - areas or area directly impacted by works, includes pump
footprint, transformer kiosk, control room and, power supply and pipeline
corridor. No works to be performed outside this zone;
• Work exclusion zone - area within a work zone that maybe excluded due to
vegetation or other reasons, not to be disturbed. Could be a single tree,
archaeological site, etc;
• Conservation zone - area outside the work zone, construction zone and
traffic zone, not to be disturbed;
• Rehabilitation zone - area involved in restoration of the site including
provision of offset revegetation;
• Storage area - designated area storing for overburden during construction,
pipe, and other materials prior to installation, will be within the work zone.
Zones: relating to a planning scheme, reflect the primary character of land and indicate
the type of use and development which may be appropriate in that zone, e.g. residential
zone, public conservation and resource use zone, road zone or farming zone.
37
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
Appendix 1
Other approvals that may be required
Approvals under legislation, regulations, policies and standards that are not under the
authority of DSE in gaining Public Land Manager’s Consent will not be described in
detail in this document. However these are important components of building pump
infrastructures on river frontages and may affect the infrastructure placement, design and
construction methodology contained within the SEMP. These will need to be addressed
by the proponent.
Victoria:
• Planning permit (Council) including Social impact
• Social impacts
• Aboriginal cultural heritage management plan (Aboriginal Affairs Victoria)
• European cultural heritage (Heritage Victoria)
• Consent to do works on a category 1 road reserve and licence for
permanent infrastructure on road reserve (VicRoads)
• Electrical installations (Powercor)
• Development on a floodplain (Mallee CMA)
• Permit to do construction works on a waterway in Victoria (Mallee CMA)
• Works Licence (Lower Murray Water)
New South Wales:
• Inspection of proposed pump site with NSW Waterways officer regarding
potential for navigation hazard
• Submit SEMP and obtain consent from the Land and Property Management
Authority
• Submit SEMP to Council (Wentworth, Balranald or Wakool Shire Councils)
• Development consent issued by Council with conditions
• Crown licence issued by Land and Property Management Authority with
conditions
38
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
Appendix 2
Key Performance Indicators used by DSE to assess a SEMP and for ongoing monitoring and reporting
Key Performance Indicators (KPIs) are used by DSE to determine if the environmental
assets at a site are being protected and preserved during construction and after the
rehabilitation activites. The details following each KPI listed below may assist proponents
to determine if KPIs are being met.
Key Perfomance Indicators
Surface water pollution
• Regular maintenance and monitoring of sediment controls by the contractor;
• No visible or inferred surface water contamination.
Erosion and sediment control
• The ongoing implementation of effective erosion control measures;
• Any storm water runoff from disturbed areas entering streams must have a
turbidity level of less than 30NTU;
• The physical integrity of all environments must be maintained;
• No visible erosion of disturbed land and stockpiles;
• No visible sedimentation in waterways downstream of the construction site.
Waterway crossings
• No erosion of creek bed/flood runners and banks at crossing locations;
• No visible or inferred release of sediments into waterways downstream of
the crossing;
• Adequate provisions for flow events during construction;
• Waterway reinstatement completed in accordance with the specific
requirements of the crossing;
• No evidence of any increase in the range and extent of weeds at the
waterway crossing.
Terrestrial ecology
• The observation of all restrictions indicated by environmental fencing or
flagging tap;
39
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
• No loss of vegetation, other than that designated as being able to be
removed;
• No known damage to trees designated for protection;
• No known or inferred impact on, or loss of, threatened species, other than
due to the salvage of threatened flora species;
• Contractor adherence to weed management and hygiene procedures;
• No evidence of weeds in the packing/bedding material brought onto the site;
• No evidence of an occurrence of new noxious weeds or spread of existing
noxious weeds within the construction zone, works zone or surrounds;
• No evidence of an occurrence of new introduced species or spread of
existing introduced species within the construction zone or works zone
within Crown land.
Aquatic ecology
• No visible or inferred loss of aquatic organisms downstream of disturbed
areas due to project impacts;
• All chemical and hydrocarbon storage areas and washing, refuelling
and maintenance areas located >100m from waterways (or maximum
practicable distance where this is not possible).
Land Management and Reinstatement
• Management of weeds present on topsoil or other stockpiles;
• Topsoil stripping undertaken to the depth required;
• No mixing of subsoil and topsoil in stockpiles or reinstated areas;
• The return of subsoil and topsoil to excavated areas (in reverse order to its
removal);
• No evidence of equipment tracks, tyre ruts or compressed soils at
completion of land reinstatement
Visual impacts
• No complaints regarding visual amenity;
• No evidence to suggest that long term visual scarring of the landscape may
occur.
Dust, odour and air quality
• No visible dust plumes reaching roads, residences or sensitive receivers;
• No dust or odour complaints.
40
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
Noise and vibration
• Compliance with EPA guidelines;
• No complaints regarding noise.
Traffic
• Access roads kept in a condition consistent with conditions prior to
construction;
• Restrictions on the movement and parking of construction vehicles,
equipment and plant to designated access roads, construction zone and
works zone;
• No complaints relating to construction traffic.
Waste management
• Adherence to waste minimisation and management objectives;
• Litter free site (and surrounds);
• No visible or inferred contamination incidents as a result of waste handling
and disposal.
Hazardous materials
• No visible or inferred evidence of incidents or spillages of hazardous
materials;
• Transportation, storage, handling and disposal of hazardous substances in
accordance with the Australian Standard and regulations.
Fire management
• Details of any project related fire events.
Cultural heritage
• Adherence to procedures outlined in the Cultural Heritage Management
Plan.
Environmental emergencies
• Demonstrated monitoring and evaluation of any conditions that could lead to
an environmental emergency.
41
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
Appendix 3
Key elements required to be illustrated in each zone
• Work Zone and Construction Zone (intense disturbance):
• material storage, e.g. pipes;
• waste disposal areas;
• topsoil/leaf litter stockpile areas;
• overburden storage area;
• erosion control measures;
• site amenities;
• native vegetation to be removed or lopped;
• monitoring reference points.
• Traffic Zones (moderate disturbance):
• site access/egress routes;
• parking areas;
• turning circles for large vehicles;
• signage;
• direction of traffic;
• crane pads;
• allowance for public access past the construction site;
• native vegetation to be removed or lopped.
• Conservation Zone and Rehabilitation Zone (nil or minor disturbance):
• vegetated areas;
• culturally significant sites and locations;
• proposed areas for revegetation after construction;
• tracks requiring rationalisation.
42
App
endi
x 4
Lo
cati
on
Map
43
App
endi
x 5
S
ite
Pla
n
44
Standards for Site Environmental Management PlansVictorian Mallee Irrigation Region
Appendix 6
Appendices that may accompany a SEMP
1. Location map, including pipeline route to farm gate, may show other site
options considered if applicable, must be geo-referenced, scale could
between 1:5,000 and 1:50,000 ( refer Section 2.2; Appendix 3).
2. Site plan for pump station showing work zones, construction zone and
rehabilitation zone and outline of pump station and pipeline, must be geo-
referenced, scale could be between 1:500 and 1:2,500 (refer Section 2.2.1;
Appendix 4).
3. Concept design for pump station and electrical installations – including line
drawings of site plan and cross section also showing position of trees, levels
of ground, river, surface of slab for pumps, power kiosk floor etc, scale
approx 1:100 to 1:400 for plan and1:100 for cross section (refer Section
2.2.1).
4. Rising main cross section design (line drawings), scale approx 1:10 (refer
Section 2.2.1).
5. Schedule of work (refer Section 2.6).
6. Monitoring requirements and reporting schedule Key Performance Indicators
– Minimum DSE requirements (DSE 2010) (refer Section 2.7).
7. Native vegetation assessment and management plan (refer Section 3.1).
8. Fauna assessment and management plan (refer Section 3.2).
9. Hydrology and geotechnical assessment (refer Section 3.3).
45