SMART CITY VARANASIPresentation based on Smart City Challenge

Overview of Progress & Way ahead

Facts

• Smart City Challenge : 98 Cities.

• Challenge mode, scoring pattern, bottom up approach with citizen’s feedback, consultations

• Citizen’s Consultation over.

• Two Components under Guidelines

• PAN City Initiatives

• Area Based Development

• Retrofitting √

• Redevelopment x

• Greenfield Development x

Citizen’s Engagement Strategy

Make stakeholders aware of the guidelines

Understand ..how they will communicate effectively… decisive manner

Taking views…

Analysis of Feedback

Proposal preparation.. Again taking feedback

Online/ Offline

Approach.. #SmartcityChallenge…

• No pre –defined components, its not project based scheme..its area driven scheme

• Bottom Up Approach

• Citizens participation at each stage envisaged, citizens are expected to indicate their choice..

• Convergence with other schemes ..admissible

Citizen Engagements in #Smart City Challenge…

Engagement StatisticsSr No Method/ Means Offline/ Online Statistics

1 Focus Group Discussions with various groups –officers- Slums,

Street Vendors, economically deprived classes. Schools,

Colleges etc

Direct Contact 156

2 Feedback forms on choice Offline 1,50,000

3 Online Mygov- discussions Online 21000

4 Logo Competition Both 60- Online 32-BHU, 35- Kashi

127

5 Essay Competition Both 1100

6 Dedicated E- Mail/ Website based suggestions

Online 600

7 Facebook followers Online 2100

8 Twitter Follower Online 70

9 Chief Secretary, City MLAs,Minister, Mayor, MLC, Councilors

Direct Done

10 Parasatal Agencies– State Direct Done

PAN City Project.. • Intelligent Traffic Management

• Choice of Majority of Population

• Unplanned old city…4000 Yrs old

• Majority Population lives in VNN – 89%

• Density in Core City Area -1000-1500 per /ha

• As per Master Plan-2031 (p-6)

As per City Mobility Plan- E & Y Study :---50 % of the Carriageway capacity

..occupied by Parking

Proposal for PAN CityPAN City Traffic Decongestion- only ICT Based Solutions

• Paperless working of SPV • ICT solutions at junctions , critical location of cities in core city area

including fixing of cameras, sensors, controller etc• Putting of Variable information sign boards, at different entry and

decision points• Development of Master Control Center, Hardware, Software etc• Development of smart Parking Facilities in Existing Infrastrcture,

with deployment of camera,parking censors, barrier, software etc• GIS Mapping of entire City City Utilities and development of mobile

app for problem sharing for citizens Mounting of GPS on all Police traffic vehicle, solid waste, ambulance, public buses etc Capacity Building of Police Department

Area Based Development

• Core Area of City Bhelupur- Sigra- Gadoiya-Lahurabeer Adjoining Area

• Expected Beneficiaries : 400000 People

• Heart of City- Central Business Area

• Old Age Stressed Infrastructure

Central Core Area –under Area Base Development

Dhamekh Stupa

Sarnath Prohbited Area

Proposed Activities under Proposed Retrofitting Area (PRA)

GPR Based Area scanning for planning and Execution- very old settlementWater Supply- Provision of SCADA , Real time water quality, smart meter, NRW related work in PRA Rehabilitation of existing sewer lines in CoreAreaProvision of Underground cabling in the Area. (110 Km)- Rest under IPDSSolar Power Provision for 9 MW PowerSolid Waste Collection RFID Censor based bins, transfer vehicle onlyImprovement of Storm Water Drainage System in the Area, Improvement in Water Logging conditions.Rainwater Harvesting at Public BuildingsImprovement of Junctions at Critical Locations, space creationDevelopment of Cycle Track near Sigra Area, Sigra StatdiumModernization of schools in Retrofit AreaAir Quality Monitoring StationDevelopment of Footpath, Footoverbridges in congested roads in steel pillars above groundsLandscaping in PRA

Provision of E-Ricksaws for moving on limited roadsCCTV Camera, Fire Alarm, information sign board all Crossing, important locationsProvision for WIFI in the Key Public AreasDevelopment of Town Hall Building at Zonal officeDevelopment of Ponds-5 NosFacelifting of the Godlaiya Crossing to Dashashmegh GhatSmart Card Based Multi level parking, Trauma Center with machines, provision of telemedicine, machines, commercial space creation at Dashasmegh Zonal office land Convention Center, Heritage Museum at Nagar Nigam Premises at Sigra central officeDevelopment of Smart Card Based Smart Multi Level Parking and Commercial Space at Bhelupur- Jal-Kal Land with parking censors and DisplaysConstruction of multi Level Smart Parking , commercial and office Space at old VeternaryHospital Land- Smart Card- Smart Censor BaedConstruction of multi Level Smart Parking and Commercial Space at Juta Ghar Area- Smart Card- Smart Censor BasedSmart Multi level Parking Facility Development at Shastri Garden Sigra with landscaping again on ground floor – Smart Card- Smart Censor BasedConstruction of Multi Level Smart Parking, Commercial space at Malviya Market, Chowk, Maidagin- Smart Card- Smart Censor- Display Board BasedConstruction of Multi Level parking, Commercial Space near Nagar Nigam Building within nagar nigam premises

City Level Mobile app for parking availability