Working of Septic tank Septic tank is sludge digestion cum

sedimentation tank with large detention time.

It is suitable for population up to 300.

The septic tank is a buried, water-tight container

usually made of concrete, brick masonry,

fiberglass or polyethylene.

Its job is to hold the wastewater long enough to

allow solids to settle down to the bottom (forming

sludge), while the oil and grease floats to the top

(as scum).

Page 4: Septictank 150312104320-conversion-gate01

LAYOUT OF

SEPTIC

TANK

TREATMENT

Page 5: Septictank 150312104320-conversion-gate01

Following reaction occurs:

Organic materials +Nutrients = CH4 +

CO2 +NH3 + H2S + Biomass

Sulfates, under the anaerobic conditions of septic

tanks, are reduced to hydrogen sulfide (H2S), a

pungent and toxic gas.

Nitrates and organic nitrogen compounds are reduced

to ammonia (NH3).

Because of the anaerobic conditions, fermentation

processes take place, which ultimately generate

carbon dioxide and methane.

Methane, a potent greenhouse gas. Waste water also

contain phosphate and phosphate.

Page 6: Septictank 150312104320-conversion-gate01
Page 7: Septictank 150312104320-conversion-gate01
Page 8: Septictank 150312104320-conversion-gate01
Page 9: Septictank 150312104320-conversion-gate01
Page 10: Septictank 150312104320-conversion-gate01

DESIGN OF SEPTIC TANK

A. DETENTION PERIOD METHOD

B. RATIONAL METHOD

Page 11: Septictank 150312104320-conversion-gate01

A. Detention period method

1. Detention period (t) is assumed in between

12 to 36 hrs (common value = 24 hrs)

2. Assuming rate of sewage flow (lpcd) [90 to

150 lpcd] and knowing population to be

served; total discharge (Q) is determined.

3. Volume is calculated by

V=Q. t

4. Depth is assumed 1 to 2 m.

Page 12: Septictank 150312104320-conversion-gate01

5. Surface area is calculated by

As = V / depth

6. Assuming L/B ratio in between 2 to 4

length and breadth can be fixed.

Page 13: Septictank 150312104320-conversion-gate01

B. Rational Method

1. Settling zone is kept min 30 cm deep.

2. Digestion zone is provided as 0.032

m3/capita.

3. Sludge storage zone of 7.30 m3/100 persons

for cleaning interval of 1 year is provided.

4. Surface area of 0.92 m2/10 lpm of flow is

provided.

5. Free board of 0.3 m is provided.

( depth 1 to 2 m, L/B ratio 2 to 4)

Page 14: Septictank 150312104320-conversion-gate01

Estimated peak discharge

No. of users Peak discharge

(lpm)

100 240

150 360

200 480

300 720

Page 15: Septictank 150312104320-conversion-gate01
Page 16: Septictank 150312104320-conversion-gate01
Page 17: Septictank 150312104320-conversion-gate01

Advantages

1. Ease in construction.

2. No maintenance problem(except periodical

cleaning).

3. Cost of construction is less.

4. Effluent can be discharged without any

trouble.

5. It is suitable for isolated community.

6. Very little attention and skilled attendance is

needed.

Page 18: Septictank 150312104320-conversion-gate01

Disadvantages 1. If ST is not properly functioning, effluent will

be very foul & dark.

2. Leakage of gases from top cover of ST may

cause bed smells & environmental pollution.

3. Periodical cleaning, removal and disposal of

sludge remains a tedious problem.

4. Unpredictable functioning.

5. Size required is large for larger communities.

6. Effluent contains high BOD.

7. Problem of mosquito nuisance.

8. Problem of ground water contamination

Page 19: Septictank 150312104320-conversion-gate01

Disposal Of Effluent

Ways Of Disposal Of Effluent Are:-

1. Soak Pit.

2. Dispersion trenches

3. Sub-Surface Irrigation

4. Leaching Cess-Pools.

5. Treated In Trickling Filters

6. Recycling.

Page 20: Septictank 150312104320-conversion-gate01

Soak Pit Soak Pit does not provide adequate treatment

for raw wastewater and the pit will clog quickly.

A Soak Pit should be used for discharging pre

settled black water or grey water .

Soak pits are appropriate for rural and

suburban settlements.

They depend on soil with a sufficient absorptive

capacity.

Soak pits are used for soils where percolation

rate is below 25 min/cm.

Page 21: Septictank 150312104320-conversion-gate01

They are not appropriate for areas that are

prone to flooding or have high groundwater

tables.

The total subsurface soil area required for

soak pits and dispersion trenches is given by

q = 130/(√t)

Where,

q = Max rate of effluent application in Lit/d/m2

of leaching surface.

T= Standard percolation rate for the soil in

min/cm

Page 22: Septictank 150312104320-conversion-gate01

Total trench/soak pit area required can be

calculated by

A = (Q/q)

Where,

Q = total flow = Population x Sewage flow

rate.

Page 23: Septictank 150312104320-conversion-gate01
Page 24: Septictank 150312104320-conversion-gate01
Page 25: Septictank 150312104320-conversion-gate01
Page 26: Septictank 150312104320-conversion-gate01
Page 27: Septictank 150312104320-conversion-gate01
Page 28: Septictank 150312104320-conversion-gate01

Advantages

1. Can be built and repaired with locally

available materials.

2. Small land area required.

3. Power conservative.

4. Can be built and maintained with locally

available materials.

5. Simple technique for all users.

Page 29: Septictank 150312104320-conversion-gate01

Disadvantages

1. Pre-treatment is required to prevent

clogging, although eventual clogging is

inevitable.

2. Negatively affects soil and groundwater

properties.

Page 30: Septictank 150312104320-conversion-gate01

Dispersion trenches

Page 31: Septictank 150312104320-conversion-gate01
Page 32: Septictank 150312104320-conversion-gate01
Page 33: Septictank 150312104320-conversion-gate01

Trenches are 0.5 to 1 m deep and 1 m wide.

Maximum length of trench is 30 m.

Spacing between trenches is 2m.

One distribution box is provided for every 3 to 4

trenches

Page 34: Septictank 150312104320-conversion-gate01
Page 35: Septictank 150312104320-conversion-gate01

Cleaning of septic tank

Page 36: Septictank 150312104320-conversion-gate01
Page 37: Septictank 150312104320-conversion-gate01

Objective questions

1. Septic tank is ________ cum _______

tank.

2. Detention period adopted in septic

tanks is __ to __ hrs.

3. Septic tank can be used for population

up to __ users.

Page 38: Septictank 150312104320-conversion-gate01

Theory questions

Q1] Explain working of septic tank with

neat sketch.

Q2] write short note on

1. Design of septic tank

2. Septic tank Effluent disposal