Saving energy and reducing Waste

The equipment suppliers view

Cemco-FSLHampshire

England

THE INSTITUTE OF CIRCUIT TECHNOLOGYSOUTHERN SYMPOSIUM

Wet Process equipment past and present

FSL 22 Etcher

Developer

Etch Strip

Wet Process equipment past and present

Criteria for future equipment design

•USE OF LOW VOLUME ENCLOSED SUMPS

•IMPROVE CHEMICAL & RINSE WATER FLOW DYNAMICS

•IMPROVE PROCESS LIQUID CONTAINMENT

•IMPROVE DRYING TEQNIQUES

•INTEGRATION OF CONTROLLED WATER USAGE & CHEMICAL/WASTE MANAGEMENT

•REDUCE PROCESS FOOTPRINT

Low volume enclosed sumps

BENEFITS

•LESS HEAT LOSS

•LESS CHEMICALS

•LESS WATER

•LESS POWER

•LESS WASTE

Sump sizes typically 80Ltr water & 120 Ltr Chemical or

less

BENEFITS

•SMALLER CHAMBER

•LESS HEAT LOSS

•MORE UNIFORM PROCESS

•SHORTER FOOTPRINT Chemical Process Typically 165 lpm Flow

rate

Improve chemical & rinse water flow dynamics

Improve chemical & rinse water flow dynamics

Process chamber volume: aprox.  150 litres.                         

Process chamber volume turnover rate: 1.5 per min. 

Fluid Dynamics: Chaotic.

Process chamber volume:  aprox. 5 litres combined. 

Process chamber volumeturnover rate 65 per min.  

Fluid dynamics: Streamline.

Conventional FSL Immersion chamber

Sreamline Immersion chamber

Improve chemical & rinse water flow dynamics

Improve chemical & rinse water flow dynamics

Patent No 2351458 DE

Conventional FSL 65 litre/min Spray Rinse thin material

system.

Streamline 65 litre/min Fluid Knife Rinse thin material

system

Improve process liquid containment

BENEFITS

•LESS CHEMICAL & WATER CARRY OUT

•LESS WASTE

•LESS EXTRACTED CONTAMINANTS

Improve drying techniques

•NO WATER ABSORBING ROLLERS •NO SUPLIMENTARY AIR HEATING•NO HEATED OVEN SECTION

BENEFITS

•NO POST CLEAN CONTAMINATION

•LESS POWER

•NO WATER RESIDUE MARKS

•SHORTER FOOTPRINT

Integration of controlled water usage & chemical / waste management

•ON-LINE COPPER RECOVERY•MONITORING OF RINSE WATER CONDUCTIVITY

BENEFITS

•IMPROVED PROCESS CONTROL

•CLOSED LOOP WASTE MANAGEMENT

•REDUCED CHEMICAL & WATER CONSUMPTION

Cupric etch Copper recovery

System

Rinse water copper recovery System

‘Streamline’

•USE OF LOW VOLUME ENCLOSED SUMPS

•IMPROVE CHEMICAL & RINSE WATER

FLOW DYNAMICS

•IMPROVE LIQUID CONTAINMENT/SEGREGATION

•IMPROVE DRYING TEQNIQUES

•INTEGRATION OF CONTROLLED WATER

USAGE & CHEMICAL/WASTE MANAGEMENT

Reduce process footprint

24-CW324-25-IM24-13-IM

1905

24-CW3

M

1127

964

12 1 2 3 4 5

1598

406

991

24-DS24-CW324-53 IM24-13-IM

6 7 8 9 10

M

310 BOARD = 510 610 BOARD = 680

1:1

J .P

***

*** Q0064 1 1B

CONVENSIONAL VS STREAMLINE COMPARISONHALF METER MPM SILVERLINE

A 07/11/79 ***** N/A

B 27/06/08 PW16502

Typical 0.5mpm AlphaStar Silver line

Conventional FSL design

Aprox 9mtr

StreamlineAprox 4.5mtr

Reduce process footprint

24-CW324-25-IM24-13-IM

1905

24-CW3

M

1127

964

12 1 2 3 4 5

1598

406

991

24-DS24-CW324-53 IM24-13-IM

6 7 8 9 10

M

310 BOARD = 510 610 BOARD = 680

1:1

J .P

***

*** Q0064 1 1B

CONVENSIONAL VS STREAMLINE COMPARISONHALF METER MPM SILVERLINE

A 07/11/79 ***** N/A

B 27/06/08 PW16502

Typical 0.5mpm AlphaStar Silver line

Conventional FSL design

Aprox 9mtr